NATIONAL MINING ASSOCIATION v. JACKSON et al
Filing: 167
MEMORANDUM AND OPINION. This Memorandum Opinion accompanies the Court's Order of this same date. Signed by Judge Reggie B. Walton on 7/31/2012. Associated Cases: 1:10-cv-01220-RBW, 1:11-cv-00295-RBW, 1:11-cv-00446-RBW, 1:11-cv-00447-RBW (lcrbw2)
UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF COLUMBIA
____________________________________
)
NATIONAL MINING ASSOCIATION,
)
et al.,
)
)
Plaintiffs,
)
)
v.
)
)
Civil Action No. 10-1220 (RBW)
LISA JACKSON, Administrator,
)
Civil Action No. 11-0295 (RBW)
U.S. ENVIRONMENTAL PROTECTION )
Civil Action No. 11-0446 (RBW)
AGENCY, et al.,
)
Civil Action No. 11-0447 (RBW)
)
Defendants,
)
)
and,
)
)
SIERRA CLUB, et al.,
)
)
Defendant-Intervenors.
)
____________________________________)
MEMORANDUM OPINION
This case is before the Court on the partiesâ cross-motions for partial summary judgment
regarding the Final Guidance memorandum issued by the Environmental Protection Agency
(âEPAâ) on July 21, 2011. 1 See Plaintiffsâ Motion for Partial Summary Judgment (âPls.â
1
On July 20, 2010, plaintiff National Mining Association (âthe Associationâ) filed a complaint seeking
declaratory and injunctive relief against multiple federal defendants. On September 17, 2010, the Association filed a
motion for a preliminary injunction, but consented to the defendantsâ request for an extended briefing schedule. On
January 14, 2011, the Court denied the Associationâs motion for a preliminary injunction and denied the federal
defendantsâ motion to dismiss the Associationâs complaint. See Natâl Mining Assân v. Jackson, 768 F. Supp. 2d 34,
56 (D.D.C. 2011) (âNatâl Mining Assân Iâ). After that ruling, four cases pending in United States District Courts in
West Virginia and Kentucky were transferred to this Court and consolidated with case number 10-cv-1220, the case
in which the Association had moved for a preliminary injunction in this Court. The plaintiffs proposed, and the
Court accepted, a bifurcated summary judgment briefing schedule with respect to the challenged EPA actions (i.e.,
the Enhanced Coordination Process and the Interim Detailed Guidance).
On October 6, 2011, the Court granted the plaintiffsâ first motion for partial summary judgment after it
concluded that the EPA exceeded its statutory authority under the Clean Water Act (âCWAâ), 33 U.S.C. 1251
(2006), in adopting its Multi-Criteria Integrated Resource Assessment (âMCIR Assessmentâ) and Enhanced
Coordination Process (âEC Processâ). See Natâl Mining Assân v. Jackson , 816 F. Supp. 2d 37, 49 (D.D.C. 2011)
(Continued . . . )
1
Mot.â); United Statesâ Motion for Partial Summary Judgment (âDefs.â Mot.â). The Court heard
oral argument on the motions on July 13, 2012. For the reasons that follow, the plaintiffsâ
motion will be granted and the defendantsâ motion will be denied. 2
I. STATUTORY AND REGULATORY BACKGROUND
A. The Surface Mining Control and Reclamation Act
âThe Surface Mining Control and Reclamation Act embodies Congressâ recognition that
âthe expansion of coal mining to meet the Nationâs energy needs makes even more urgent the
establishment of appropriate standards to minimize damage to the environment . . . .â In re
Permanent Surface Mining Regulation Litigation, 653 F.2d 514, 516 & 516, n.1 (D.C. Cir. 1981)
(âIn re PSMRLâ) (citing 30 U.S.C. § 1201). Accordingly, the SMCRA requires those engaging
in surface coal mining operations to comply with permitting requirements and environmental
protection standards. 30 U.S.C. §§ 1202, 1256-1266 (2006). The SMCRA is administered and
enforced by the Department of the Interiorâs Office of Surface Mining Reclamation and
( . . . continued)
(âNatâl Mining Assân IIâ). On July 21, 2011, the EPA issued its Final Guidance Memorandum, mooting the
plaintiffsâ challenges to the Interim Guidance. The plaintiffs and plaintiff-intervenors then amended their
complaints, alleging that the Final Guidance violates the Surface Mining Control and Reclamation Act (âSMCRAâ),
30 U.S.C. § 1202 (2006), CWA, and the Administrative Procedure Act (âAPAâ), 5 U.S.C. § 702 (2006). The parties
then rebriefed the challenges to the Final Guidance, and the pending cross-motions pertain only to the Final
Guidance.
2
In addition to the documents already referenced, the Court considered the following filings in resolving the
partiesâ cross-motions: (1) the Plaintiffsâ Joint Memorandum in Support of their Motion for Partial Summary
Judgment [ECF 122-1] (âPls.â Mem.â); (2) the United Statesâ Memorandum in Support of its Cross-Motion for
Partial Summary Judgment and in Opposition to Plaintiffsâ Joint Motion for Partial Summary Judgment (âDefs.â
Mem.â); (3) the Defendant-Intervenors Sierra Club et al. Memorandum in Opposition to Plaintiffsâ Motion for
Partial Summary Judgment and in Support of Defendantsâ Cross-Motion for Partial Summary Judgment (âDef.-Ints.â
Mem.â); (4) the Plaintiffsâ Opposition to Defendantsâ and Defendant-Intervenorsâ Cross-Motions for Partial
Summary Judgment and Reply Memorandum in Support of their Joint Motion for Partial Summary Judgment (âPls.â
Replyâ); (5) the United Statesâ Reply Memorandum in Support of its Cross-Motion for Partial Summary Judgment
(âDefs.â Replyâ); (6) the Defendant-Intervenors Sierra Club et al. Memorandum in Reply and in Support of
Defendantsâ Cross-Motion for Partial Summary Judgment (âDef.-Ints.â Replyâ); (7) the Plaintiffsâ Responses to the
Courtâs Request for Filings Addressing Jurisdictional Questions (âPls.â Resp.â); (8) the United Statesâ Pre-Hearing
Responses to Questions Posed by the Court (âDefs.â Resp.â); (9) the Administrative Record (âA.R.â); and (10) the
extra-record evidence the Court ruled it would consider in its April 20, 2012, July 2, 2012, and July 13, 2012 Orders.
2
Enforcement (âOffice of Surface Miningâ), 30 U.S.C. § 1211(c)(1), but a state may assume
primary jurisdiction over the regulation of surface mining within its borders by having its
proposed program approved by the Secretary of the Interior, 3 30 U.S.C. § 1253. Pursuant to the
SMCRA, before approving a state program the Secretary must solicit and then publicly disclose
the views of certain federal agencies regarding the state regulatory program and must obtain the
written concurrence of the EPA with respect to the aspects of the state program that relate to
water quality standards promulgated under the Clean Water Act, 33 U.S.C. § 1313 (2006). 30
U.S.C. § 1253(b). Once a state program is approved, the state has the primary responsibility for
all aspects of the regulatory program. See In re PSMRL, 653 F.2d at 516 (âThe Secretary may
only approve the state program if he finds it capable of carrying out the exacting provisions of
the [SMCRA] and consistent with his own regulations.â); id. at 518 (âUnder a state program, the
state makes decisions applying the national requirements of the [SMCRA] to the particular local
conditions of the state. The Secretary is initially to decide whether the proposed state program is
capable of carrying out the provisions of the [SMRCA], but is not directly involved in local
decisionmaking after the program has been approved.â).
The statute provides only a limited role for the EPA. First, the SMCRA requires the
Secretary of the Interior to obtain the EPAâs written concurrence on any SMCRA-implementing
regulations that relate to air or water quality standards. Second, as noted, the Office of Surface
Mining may not approve a proposed state program until it has solicited and publicly disclosed
the EPAâs views and obtained the EPAâs written concurrence as to any aspects of the state
program that relate to water quality standards promulgated under the CWA. In short, although
3
Of the six Appalachian states with active coal mining and subject to the Final Guidance, only Tennessee
does not have an approved state SMCRA permitting program. Defs.â Mem. at 12; Pls.â Mem. at 3, n.2.
3
the SMCRA explicitly conveys Congressâs admonition that the EPA cooperate with the Office of
Surface Mining to the greatest extent practicable, 30 U.S.C. § 1292, it is clear that oversight
authority of the state permitting authorities belongs to the Secretary of the Interior. See In re
PSMRL, 653 F.2d at 519 (âThe Secretaryâs ultimate power over lax state enforcement is set out
in section 521(b) of the [SMCRA]. When the Secretary determines that violations result from a
stateâs lack of intent or capability to enforce the state program, he is to enforce permit conditions
directly, and to take over the entire permit-issuing process himself.â); see also id. (âOnce the
State has assumed all these functions, the Secretaryâs role is primarily one of oversight.â); id. at
520 (âDirect intervention by the Secretary in the operation of state regulatory programs is clearly
intended as an extraordinary remedy.â) And of significant importance, the SMCRA does not
supersede the Clean Water Act. See 30 U.S.C. § 1292.
B. The Clean Water Act
The CWA establishes a permitting scheme for pollutants discharged into bodies of water,
and coal mining operations typically must obtain both CWA permits and SMCRA permits.
1. Section 404 Permits
Clean Water Act Section 404 permits are issued by the United States Army Corps of
Engineers (âCorpsâ) âfor the discharge of dredged and fill material into navigable waters at
specific disposal sites,â 33 U.S.C. § 1344(a), and govern material that fills or displaces receiving
waters. The Corps has sole authority to issue Section 404 permits, id., but in doing so must
apply guidelines that it develops in conjunction with the EPA, id. § 1344(b). As required by the
4
Clean Water Act, id., the EPA and the Corps promulgated 404(b)(1) guidelines to guide the
Corpsâ review of the environmental effects of proposed disposal sites. 4
2. Section 402 Permits
Known as National Pollutant Discharge Elimination System (âNPDESâ) permits, Section
402 permits are typically issued by states for the discharge of all other pollutants not covered by
Section 404 permits (i.e., non-dredged or fill material). See 33 U.S.C. § 1342(a). NPDES permits
govern pollutants that are assimilated by receiving waters by establishing limits placed on the
make-up of wastewater discharge. See 33 U.S.C. § 1342.
Section 402 permits are issued by the EPA, unless a state has an approved program. 5 See
id. § 1342(b). Once the EPA approves a state permitting program, the state has exclusive
authority to issue NPDES permits, although the EPA does have limited authority to review the
state action. Id. § 1342(d). For example, the state must submit draft permits to the EPA, and the
EPA may object to a proposed permit that is not consistent with the CWA or federal regulations.
Id. If the state does not respond to an EPA objection to a permit within specified timeframes, the
EPA assumes the authority to issue the permit. See id. § 1342(d)(4). If the EPA does not object
to the issuance of a permit within the specified timeframe, the state may proceed to issue the
permit. Id. § 1342(d)(2).
4
The 404(b)(1) guidelines, which are codified at 40 C.F.R. Part 230, played a considerable role in the
partiesâ arguments regarding the validity of the EC Process and the MCIR Assessment. The Courtâs October 6, 2011
ruling on the plaintiffsâ challenges to the EPAâs EC Process concluded that the âEPA ha[d] expanded its role in the
issuance of Section 404 permits and ha[d] thus exceeded the statutory authority afforded it by the Clean Water Act.â
Natâl Mining Assân II, 816 F. Supp. 2d at 45.
5
All of the Appalachian states subject to the Final GuidanceâKentucky, Ohio, Pennsylvania, Tennessee,
Virginia, and West Virginiaâhave approved programs and thus administer the Section 402 permitting programs
within their states.
5
a. The Relationship Between Section 301 Effluent Limits and Section 402 Permits
In accordance with Section 301 of the CWA, 33 U.S.C. § 1313, NPDES permits
âtypically contain numerical limits called âeffluent limitationsâ[6] that restrict the amounts of
specified pollutants that may be discharged.â Defs.â Mem. at 9. âWater quality based effluent
limitations are required for all pollutants that the permitting authority determines âare or may be
discharged at a level [that] will cause, have the reasonable potential to cause, or contribute to an
excursion above any [applicable] water quality standard, including state narrative criteria for
water quality.ââ Id. (quoting 40 C.F.R. § 122.44(d)(1)(i)). Accordingly, the procedure for
determining the need for effluent limits is called a reasonable potential analysis. If the discharge
does have the reasonable potential to cause an excursion 7 above a numeric or narrative water
quality standard set in accordance with Section 303 of the CWA, the state must develop permit
limitations to ensure compliance with that water quality standard. See Am. Paper Inst. v. EPA,
996 F.2d 346, 349 (D.C. Cir. 1993) (explaining that Section 301 of the CWA, 33 U.S.C. § 1311,
requires that âevery permit contain (1) effluent limitations that reflect the pollution reduction
achievable by using technologically practicable controls, and (2) any more stringent pollutant
release limitations necessary for the waterway receiving the pollutant to meet water quality
standardsâ) (citing 33 U.S.C. § 1311(b)(1)(A) & (C)). To achieve this compliance, the states
may establish either numeric or narrative permit limits. See id. (noting that criteria come in âtwo
varieties: specific numeric limitations on the concentration of a specific pollutant in the water . . .
or more general narrative statements applicable to a wide set of pollutantsâ).
6
An effluent is an outflowing of water, gas, or some other material. Thus, an effluent limitation, is a
limitation imposed on outflows, and a water-quality based effluent limitation is a limitation based on the
maintenance of water quality standards.
7
To say that a discharge may cause or has caused an excursion is simply to say that the standard has been
exceeded or violated.
6
3. Section 303 Water Quality Standards
Section 303 ârequires states to adopt water quality standards applicable to their intrastate
and interstate waters.â Defs.â Mem. at 8 (citing 33 U.S.C. § 1313(a)-(c); see also Am. Paper.
Inst., 996 F.2d at 349 (âUnder the CWA, the water quality standards referred to in section 301
[and which the Section 301 effluent limitations are intended to protect] are primarily the statesâ
handiwork.â); id. at 350 (âOf course, the [section 303] water quality standards by themselves
have no effect on pollution; the rubber hits the road when the state-created standards are used as
the basis for specific [section 301] effluent limitations in NPDES permits [i.e., Section 402
permits].â). A water quality standard designates uses for a particular body of water and
establishes criteria for protecting those uses. As already noted, Section 303 water quality
standards can be expressed as a specific numeric limitation on pollutants or as a general narrative
statement.
While states are responsible for developing the water quality standards, the EPA is
required to review the standards for approval. See 33 U.S.C. § 1313(c). The EPA may assume
the role of actually promulgating water quality standards only if (1) it determines that a stateâs
proposed new or revised standard does not measure up to the Clean Water Actâs requirements
and the state refuses to accept EPA-proposed revisions, or (2) a state does not act, and the EPA
determines that a new or revised standard is necessary. See Am. Paper Inst., 996 F.2d at 349
(citing 33 U.S.C. § 1313(c)(3)-(4)).
II. FACTUAL BACKGROUND AND THE PARTIESâ ARGUMENTS
In April 2010, the EPA released its âinterimâ guidance memorandum. In seeking a
preliminary injunction from this Court in September 2010, the plaintiffs asserted that the EPA
had made sweeping pronouncements regarding the need for water quality-based limits in CWA
7
Section 402 and 404 permits. The plaintiffs maintained that the interim guidance had (1)
effectively established a region-wide water quality standard based on conductivity 8 levels it
associated with adverse impacts to water quality, (2) was being used by the EPA to cause
indefinite delays in the permitting process, and (3) caused various permitting authorities to
include the conductivity level into pending permits. See Pls.â Mem. at 14-16. The defendants
responded by arguing that the interim guidance was not final agency action and was therefore
not ripe for review. In an opinion denying both the plaintiffsâ motion for a preliminary
injunction and the defendantsâ motion to dismiss, the Court observed that âbased on the record
[then] before the Court . . . , it appear[ed] that the EPA [wa]s treating the [interim] [g]uidance as
binding.â Natâl Mining Assân I, 768 F. Supp. 2d at 45.
On July 21, 2011, the EPA issued the Final Guidance, which, according to the EPA,
reflects public input on the interim guidance and accounts for and responds to key concerns
raised by the Appalachian states and the mining industry during the earlier stages of this
litigation. Defs.â Mem. at 1-2. The plaintiffs, however, allege that the EPAâs Final Guidance
exceeds the EPAâs authority under the SMCRA and the CWA, is arbitrary and capricious, and is
an abuse of discretion. See Pls.â Mem. at 1-2. The defendantsâ principal response is a bevy of
arguments targeting the Courtâs ability to review the Final Guidance. They assert that the Final
Guidance is not final agency action, Defs.â Mem. at 13; that the Final Guidance is not ripe for
review, id. at 24; and that the plaintiffs do not have standing to maintain their challenges to the
Final Guidance, id. at 26. Alternatively, the defendants maintain that if the Final Guidance does
8
As the defendants helpfully explain, â[a]n increase in conductivity means that the water is getting saltier.
Salinity is often expressed as specific conductance, or conductivity, which is a measure of the ability of water to
conduct an electrical current. It is highly dependent on the amount of dissolved solids . . . in the water.â Defs.â
Mem. at 2, n. 2. The defendants further state: âAs conductivity levels rise, fish, amphibians, mussels, and other
aquatic organisms can be adversely affected.â Id. at 2, n.3.
8
constitute final agency action, 33 U.S.C. §1369(b)(1) vests exclusive jurisdiction of its review in
the District of Columbia Circuit. Id. at 23. The defendants further assert that the Final Guidance
is consistent with existing statutory and regulatory authority. Id. at 30, 33. Lastly, the
defendants maintain that the Final Guidance satisfactorily explains its recommendations and thus
does not violate the APA. This Memorandum Opinion addresses these arguments in turn.
III. STANDARD OF REVIEW
The summary judgment standard set forth in Federal Rule of Civil Procedure 56(a) does
not apply in a case involving review of a final agency action under the APA due to the limited
role of a court in reviewing the administrative record. See Catholic Health Initiatives-Iowa,
Corp. v. Sebelius, 841 F. Supp. 2d 270, 276 (D.D.C. 2012). âUnder the APA, . . . âthe function
of the district court is to determine whether . . . as a matter of law the evidence in the
administrative record permitted the agency to make the decision it did.ââ Id. (quoting Occidental
Engâg Co. v. INS, 753 F.2d 766, 769-70 (9th Cir. 1985)); see also Fund for Animals v. Babbitt,
903 F. Supp. 96, 105 (D.D.C. 1995) (explaining that where a case involves a challenge to a final
administrative action, a courtâs review is limited to the administrative record) (citing Camp v.
Pitts, 411 U.S. 138, 142 (1973))). âSummary judgment thus serves as the mechanism for
deciding, as a matter of law, whether the agency action is supported by the administrative record
and otherwise consistent with the APA standard of review.â Catholic Health, 841 F. Supp. 23d
at 276 (citing Richards v. INS, 554 F.2d 1173, 1177 & n.28 (D.C. Cir. 1977)).
IV. LEGAL ANALYIS
A. Can the Court Review the Final Guidance?
âFiring nearly all the arrows in its jurisdictional quiver,â Natural Res. Def. Council v.
EPA, 643 F.3d 311, 313 (D.C. Cir. 2011), the EPA argues that the Final Guidance is not final
9
agency action, or, alternatively, if it is, that exclusive jurisdiction for its review rests with the
Circuit, that the Final Guidance is not ripe for review, and that the plaintiffs lack standing to
challenge the Final Guidance. As explained below, â[a]ll [four] arrows miss their target.â Id.
1. Final Agency Action
The APA limits judicial review to âfinal agency action for which there is no other
adequate remedy in court.â 5 U.S.C. § 704. In other words, finality is a âthreshold questionâ
that determines whether judicial review is available. Fund for Animals, Inc. v. U.S. Bureau of
Land Mgmt., 460 F.3d 13, 18 (D.C. Cir. 2006). The Supreme Court has explained that, â[a]s a
general matter, two conditions must be satisfied for agency action to be final: First, the action
must mark the consummation of the agencyâs decision making process,â and second, âthe action
must be one by which rights or obligations have been determined, or from which legal
consequences will flow.â Bennett v. Spear, 520 U.S. 154, 177-78 (1997) (quotation marks
omitted).
âFinality resulting from the practical effect of an ostensibly non-binding agency
proclamation is a concept [that the District of Columbia Circuit has] recognized in the past.â
Natâl Assân of Home Builders v. Norton, 415 F.3d 8, 15 (D.C. Cir. 2005) (citing Gen. Elec. Co.
v. EPA, 290 F.3d 377, 383 (D.C. Cir. 2002) (â[I]f the language of the document is such that
private parties can rely on it as a norm or safe harbor by which to shape their actions, it can be
binding as a practical matter[.]â); McLouth Steel Prods. Corp. v. Thomas, 838 F.2d 1317, 1321
(D.C. Cir. 1988) (agency action, though facially nonbinding, âcreated a norm with present day
binding effectâ)). For example,
[i]f an agency acts as if a document issued at headquarters is controlling in the
field, if it treats the document in the same manner as it treats a legislative rule, if it
bases enforcement actions on the policies or interpretations formulated in the
document, if it leads private parties or State permitting authorities to believe that
10
it will declare permits invalid unless they comply with the terms of the document,
then the agencyâs document is for all practical purposes binding.
Appalachian Power Co. v. EPA, 208 F.3d 1015, 1021 (D.C. Cir. 2000) (emphasis added).
However, âif the practical effect of the agency action is not a certain change in the legal
obligations of a party, the action is non-final for the purpose of judicial review.â Norton, 415
F.3d at 15.
Here, the Court finds that the EPAâs Final Guidance marks the âconsummation of the
agencyâs decision making process.â Bennett, 520 U.S. at 177-78. Indeed, the defendants
concede that the first prong of the Bennett test is met as the arguments in their opposition pertain
only to whether the Final Guidance is a binding legislative rule or whether it is merely a policy
statement. See Defs.â Mem. at 15-23. This concession was expressed again at the July 13, 2012
hearing when defense counsel explicitly stated that the EPA does not dispute that the Final
Guidance is the consummation of the decision making process.
Despite the defendantsâ concession, because final agency action is a âthreshold question,â
Fund for Animals, Inc., 460 F.3d at 18, the Court is compelled to briefly set forth its reasoning
why the first prong of the Bennett test is satisfied. The Final Guidance was issued after the EPA
received over 60,000 comments on the interim guidance. See Norton, 415 F.3d at 14
(concluding that the agency protocols at issue âclearly marked the consummation of the decision
making process,â and observing that the protocols were âpublished after [the agency] solicited
input from specialists and reviewedâ past data); Appalachian Power, 208 F.3d at 1022 (observing
that the EPA guidance in dispute followed the circulation of two earlier drafts). The Final
Guidance itself notes that it âreplaces [the] EPAâs interim final guidance issued on April 1, 2010,
and the Regions should begin consulting it immediately.â Final Guidance at 1 (A.R. FG005440).
Furthermore, and most important as to the first element of Bennett, the Final Guidance reflects
11
the EPAâs settled position on both its understanding of its authority under the respective statutes
and regulations, see id. at 2 (A.R. FG005441), and its understanding of the science upon which
the Final Guidance is based, see id. at 5 (A.R. FG005444). It is thus clear that the Final
Guidance represents the consummation of the EPAâs decision making process.
Next, the Court must assess whether the second element of Bennett is satisfiedâwhether
the Final Guidance is an action âby which rights or obligations have been determined, or from
which legal consequences will flow.â 520 U.S. at 178. Unsurprisingly, the plaintiffs argue yes
and the defendants argue no. The EPA contends that the Final Guidance âis a policy statement,
not a legislative rule.â 9 Defs.â Mem. at 15. Of the various claims the defendants advance in
support of this assertion, of greatest import here is their contention that âthe Guidance does not
establish new obligations, change the governing legal norm, or purport to provide [the] EPA with
any authority that [the] EPA does not already possess to review draft permits or permit
applications. Rather, the Guidance relies upon existing standards in the CWA and [the] EPAâs
regulations.â Id. at 17. At the July 13, 2012 hearing, the defendants similarly maintained that
the âcritical pointâ is that the Final Guidance does not provide new authority to the EPA. The
plaintiffs obviously disagree, asserting that â[p]rior to the issuance of the Final Guidance, neither
the SMCRA nor the CWA nor EPA regulations nor case law authorized EPA regional directors
to regulate mine design and planning upland from waters of the United States.â Pls.â Reply at 3.
As an initial matter, the Court is unconvinced by the defendantsâ arguments in regard to
the nonbinding language in the Final Guidance. See Defs.â Mem. at 16, 18-19. It is true that the
Final Guidance contains language avowing that the recommendations within the document are
9
âA policy statement is one that, first, does not have âa present-day binding effect,â that is, it does not
âimpose any rights and obligations,â and second, âgenuinely leaves the agency and its decision makers free to
exercise discretion.ââ McLouth Steel, 838 F.2d at 1320.
12
not binding pronouncements. See, e.g., Final Guidance at 1 (A.R. FG005440) (âThis
memorandum does not impose legally binding requirements and will not be implemented as
binding in practice. It does not impose any obligations on private parties.â); id. at 9 (A.R.
FG005448 (âThe use of language such as ârecommend,â âmay,â âshould,â and âcanâ is intended to
describe agency policies and recommendations, while the use of mandatory terminology such as
âmustâ and ârequiredâ refers to existing requirements under the CWA, its implementing
regulations, and relevant case law.â). This Circuit has, however, described similar disclaimers as
âboiler-plate.â Appalachian Power, 208 F.3d at 1023; see also id. (explaining that because the
policies in the disclaimer impose requirements, âârightsâ may not be created but âobligationsâ
certainly areâobligations on the part of the State regulators and those they regulateâ). With the
adage that actions speak louder than words thus ringing true, the Court will examine âthe
practical effect of [the] ostensibly non-binding [Final Guidance].â Norton, 415 F.3d at 15.
Review of the Final Guidance itself and of the post-implementation evidence before the
Court makes clear that the Final Guidance, whether intentionally or not, has caused EPA field
offices and the state permitting authorities to believe that permits should and will be denied if its
âsuggestionsâ and ârecommendationsâ are not satisfied. For example, after the bulk of the first
four paragraphs of the Final Guidance explain that it is nonbinding, the conclusion of the fourth
paragraph makes clear that â[w]e [EPA Headquarters in Washington, D.C.] expect EPA Regions
3, 4, and 5 to give appropriate consideration to this guidance when reviewing proposed permits
or permit applications associated with Appalachian surface coal mining activities.â Final
Guidance at 2 (A.R. FG005441) (emphasis added). Indeed, the document itself proclaims that it
is âintended to guide EPA staff in reviewing and commenting on permitting activities related to
Appalachian surface coal mining.â Id. (A.R. FG005441). Additionally, after discussing two
13
EPA reports and their review by the EPAâs Science Advisory Board, the Final Guidance explains
the review âreinforce[ed] the significant aquatic effects of Appalachian surface coal mining and
the appropriateness of [the] EPAâs conductivity benchmark for protecting aquatic life.â Id. at 5
(A.R. FG005444). This leaves no doubt that the EPAâs regional field offices and the state
permitting authorities are on notice that the âEPA will consider the recommendations in this
guidance, along with other relevant factors, when reviewing CWA permits.â Id. at 10 (A.R.
FG005449).
As plaintiffsâ counsel asked at the July 13, 2012 hearing, when EPA Headquarters
explains to its subordinate regional offices that they âshouldâ do something, can any region
actually feel free not to comply? Perhaps predictably, then, communication between the regional
offices and the state permitting authorities shows that the considerations set forth in the Final
Guidance have played a prominent role in the regional officesâ review of draft permits. Compare
Pls.â Reply, Exhibit (âEx.â) B (Declaration of Thomas Cook (âCook Decl.â) (describing a letter
received from the EPA that suggests using conductivity as a trigger indicator) with Final
Guidance at 27 (A.R. FG005466) (explaining that the EPA is âparticularly concernedâ with high
conductivity levels); compare Pls.â Reply, Ex. C (Declaration of R. Bruce Scott) (explaining that
âEPA Region 4 very clearly based their [September 28, 2011] objection to all 19 permits on the
fact that each provided for a post-permit [reasonable potential analysis]â) with Final Guidance at
13 (A.R. FG005452) (âIn order to submit a complete NPDES permit application for an
individual permit, the applicant must present data to properly characterize its discharge to enable
a reasonable potential analysis to be completed by the permit writer at the time of permit
issuance.â) (emphasis added), and 14 (A.R. FG005453) (âpermitting authorities should not defer
reasonable potential analyses until after permit issuanceâ). The post-implementation
14
communication also reveals at least one instance in which a state permitting agency has acceded
to the regional officeâs request, resulting in the abandonment of the EPA objection for that
particular permit. See United Statesâ Response to the Courtâs July 2, 2012 Order (âDefs.â Extrarecord Resp.â), Declaration of Mark Nuhfer (âNuhfer Decl.â) ¶ 18 (âKentucky submitted a
revised permit fully meeting [the] EPAâs objection and that permit has been issued.â).
Specifically, with regard to a draft Section 402 permit for Matt/Co, Inc., the EPAâs September
29, 2010 objection
was based on the [Kentucky Department of Waterâs (KDOW)] failure to conduct
an adequate reasonable potential analysis, in accordance with 40 C.F.R. §
122.44(d), to determine whether the proposed discharge will cause, have
reasonable potential to cause, or contribute to, a violation of state water quality
standards (WQS), and KDOWâs failure to include in the permit, effluent limits
necessary to ensure that the proposed discharge will not cause or contribute to a
violation of WQS.
Defs.â Extra-record Resp., Nuhfer Decl., Ex. 2 (April 2, 2012 Letter from James Giattina, EPA
Region 4, to Sandy Gruzesky, Director, Division of Water, Kentucky Department for
Environmental Protection (âApril 12, 2012 Giattina Letterâ)) at 1 (internal quotations marks
omitted). The September 29, 2010 objection made clear that to address the objection, âKDOW
[had to] submit a revised permit with effluent limitations that are as stringent as necessary to
meet applicable narrative and numeric WQS.â Id. (internal quotation marks omitted). And it
was only after the KDOW revised the draft permit and resubmitted it for the EPAâs
consideration, that the EPA withdrew its objection after determining that âthe revised permit
reflect[ed] a more robust reasonable potential analysis and . . . contain[ed] the necessary
conditions and effluent limits.â Id. The record before the Court thus confirms the plaintiffsâ
allegations that the Final Guidance is being implemented as binding and having a practical effect
on the permitting process for new Appalachian surface coal mining projects.
15
To complete its final agency action analysis, the Court must address the defendantsâ
argument that â[w]here [the] EPA merely comments on a draft permit, but does not object, the
State can issue the permit without further action from [the] EPA; thus, [the] EPAâs comments
cannot possibly be seen as mandating compliance with a binding standard.â Defs.â Reply at 20.
Under the rationale of Appalachian Power, 208 F.3d at 1021, the distinction between an EPA
comment letter and a formal EPA objection letter seems unimportant in light of the EPAâs
warnings to state regulators that âit expects [the state permitting authority] to take its comments
seriously and to address them.â Defs.â Extra-record Resp., Declaration of Linda Boornazian
(âBoornazian Decl.â) ¶ 8; see also Defs.â Extra-record Resp., Declaration of Evelyn S.
MacKnight (âMacKnight Decl.â) ¶ 10 (âWhen [the] EPA issues a comment letter, [the] EPA has
exercised its discretion not to utilize its authority udner CWA Section 402(d) to object to a
permit. Nevertheless, [it is] correct that [the] EPAâs comment letters often state an expectation
that [the state permitting authority] should address [the] EPAâs comments. That is because [the]
EPA has taken the time and expended the resources to review the permit, has identified . . .
concerns . . . , and accordingly anticipates that its comments and concerns will be reviewed and
addressed.â).
Indeed, the EPAâs own affidavits convey what the Court construes as a comply-
or-else attitude in regard to the review process. See, e.g., Defs.â Extra-record Resp., Boornazian
Decl. ¶ 8 (explaining that she had âpointed out that if [the] EPAâs comment letters were
consistently disregarded, that fact would be considered in determining whether to exercise [the]
EPAâs discretion to utilize the more formal objection process with respect to future permits that
raise similar issuesâ); Defs.â Extra-record Resp., MacKnight Decl ¶ 11 (âstating the rather
obvious point that, if [the] EPA were to repeatedly find its comment letters disregarded, that fact
would be considered in determining whether to exercise [its] discretion to issue an objection with
16
respect to future permitsâ). And in light of such statements made by EPA employees with
leadership roles in the regional offices, it is hard to see how state permitting authorities could be
expected to view an EPA comment letter any differently from a formal EPA objection letter.
Either form of critique would undoubtedly âlead[] private parties or State permitting authorities
to believe that [the agency] will declare permits invalid unless they comply.â Appalachian
Power, 208 F.3d at 1021.
The Final Guidance constitutes final agency action because it is both the consummation
of the EPAâs decision making process, and, even if facially nonbinding, it has been applied by
the regional field offices in their review of draft permits in a manner that has had the practical
effect of changing the obligations of the state permitting authorities. Therefore, the Final
Guidance is a de facto legislative rule. 10 Accordingly, the following language from Appalachian
Power aptly describes the Final Guidance in this case and provides an appropriate conclusion to
the Courtâs final agency action analysis:
[W]hatever [the] EPA may think of its Guidance generally, the elements of the
Guidance petitioners challenge consist of the agencyâs settled position, a position
it plans to follow in reviewing State-issued permits, a position it will insist State
10
In deciding the question of whether the Final Guidance amounts to final agency action, the Court also
necessarily decides the question of whether the EPAâs actions constitute a de facto legislative rule. This is so given
the similarity between the second aspect of the Bennett finality assessmentâwhether the action gives rise to legal
obligations or is one from which legal consequences flowâand the standard for determining whether a challenged
action amounts to a rule or a mere statement of policyââwhether the action has binding effects on private parties or
on the agency,â Molycorp, Inc. v. EPA, 197 F.3d 543, 545 (D.C. Cir. 1999), or, in other words, âwhether the agency
action binds private parties or the agency itself with the force of law,â General Electric v. EPA, 290 F.3d 377, 382
(D.C. Cir. 2002). Indeed, the District of Columbia Circuit has recognized the manner in which these standards
become intertwined:
In order to sustain their position, appellants must show that the [challenged guidelines] either (1) reflect
âfinal agency action,â . . . or, (2) constitute a de facto rule or binding norm that could not properly be
promulgated absent the notice-and-comment rulemaking required by [the APA]. These two inquiries are
alternative ways of viewing the question before the court. Although, if appellants could demonstrate the
latter proposition, they would implicitly prove the former, because the agencyâs adoption of a binding norm
obviously would reflect final agency action.
Center for Auto Safety v. Natâl Highway Traffic Safety Admin., 452 F.3d 798, 806 (D.C. Cir. 2006).
17
and local authorities comply with in setting the terms and conditions of permits
issued to petitioners, a position EPA officials in the field are bound to apply.
208 F.3d at 1022.
2. Circuit Jurisdiction
Section 509 of the CWA places exclusive jurisdiction in the federal Courts of Appeals to
review certain EPA actions taken under color of the CWA. See Am. Frozen Food Inst. v. Train,
539 F.2d 107, 124 (D.C. Cir. 1976) (âThe Act gives the Courts of Appeals of the United States
wide and exclusive jurisdiction to review the actions of the Administrator.â). Section 509,
codified at 33 U.S.C. § 1369, provides that:
Review of the Administratorâs action . . . (E) in approving or promulgating any
effluent limitation or other limitation under section 1311 [i.e., Section 301 of the
CWA], 1312, 1316, or 1345 of this title, [or] (F) in issuing or denying any permit
under section 1342 [i.e., Section 402 of the CWA] of this title . . . may be had by
any interested person in the Circuit Court of Appeals of the United States.
33 U.S.C. §1369(b)(1).
The defendants assert that, because the Court has agreed with the plaintiffs that the Final
Guidance is a binding rule, the â[p]laintiffsâ challenge to the portions of the [Final] Guidance
that address Section 402 permits must be dismissed for lack of jurisdiction,â as the Final
Guidance âplainly relate[s] to the issuance or denial of Section 402 permitsâ and the plaintiffsâ
challenge therefore âfalls within the exclusive jurisdiction of the Courts of Appeals.â Defs.â
Mem. at 23. The plaintiffs disagree, maintaining that âSection 509(b)(1) delineates six very
specific categories of agency action for which a challenge must be brought as an original
proceeding in a court of appeals,â and that their âchallenge to the Final Guidance is not among
them and need not be reviewed by a court of appeals.â Pls.â Reply at 11. The Court agrees with
the plaintiffs.
18
The Final Guidance is not subject to the Circuitâs original jurisdiction on the basis of 33
U.S.C. § 1369(b)(1)(E) because it is not an approved or promulgated Section 301 effluent
limitation. First, even under the most expansive reading, the Final Guidance cannot be
interpreted as establishing Section 301 effluent limitations. In other words, the Final Guidance
does not set specific limits and mandate their inclusion in all Section 402 permits. Rather, the
Final Guidance is concerned with (1) the interplay between Section 303 water quality standards
and conductivity, and (2) the need for pre-permit reasonable potential analyses to ensure that
Section 402 permits contain the most stringent effluent limitations necessary. Thus, while the
Final Guidance does touch on the need for Section 301 effluent limitations in its discussion of
pre-permit analyses and the requirements of 40 C.F.R. §122.44(d), it does not attempt to
prescribe certain effluent limitations. Second, even if the Final Guidance could be read as
establishing Section 301 effluent limitations, the Final Guidance was not âpromulgat[ed]â and
therefore lies outside Section 509âs reach. While the defendants urge the Court to employ a
âpractical rather than cramped constructionâ of Section 509, Defs.â Resp. at 1 (quoting Natural
Res. Def. Council Inc. v. EPA, 673 F.2d 400, 405 (D.C. Cir. 1982)), it is clear that in this Circuit
â[i]f the agency does not define the term by regulation and if the statute supports (or at least does
not foreclose) the interpretation, âpromulgationâ is accorded its âordinary meaningââi.e.,
publication in the Federal Register.â Horsehead Res. Dev. Co. v. EPA, 130 F.3d 1090, 1093
(D.C. Cir. 1997). The CWA does not define promulgate and Section 509 does not foreclose
according promulgation its ordinary meaning. And it is worth noting that â[i]n [the] EPAâs own
words, it âdid not publish the [Final] Guidance in the Federal Register, nor is it codified in the
C.F.R.ââ Pls.â Resp. at 2 (quoting Defs.â Mem. at 17). Although the Final Guidance was
certainly issued, it was not promulgated as that term is understood in this Circuit. Section
19
1369(b)(1)(E) therefore does not vest exclusive jurisdiction in the Circuit because the Final
Guidance did not approve or promulgate Section 301 effluent limitations.
Next, because the EPA has neither issued nor denied any Section 402 permits, §
1369(b)(1)(F) does not vest exclusive jurisdiction in the Circuit. While the EPAâs formal
objection to draft 402 permits may once have been construed as the âfunctional denialâ of a
permit, see Crown Simpson Pulp Co. v. Costle, 445 U.S. 193 (1980), it is clear that after the
1977 Amendments to the CWA, an EPA objection âis no longer âfunctionally similarâ to denying
a permit.â Am. Paper Inst. v. EPA, 890 F.2d 869, 874 (7th Cir. 1989); see also id. at 874, n.7
(explaining that the challenge in Crown Simpson preceded the 1977 Amendments). Here, then,
while the plaintiffs are correct that Final Guidance does ârelate toâ the issuance of 402 permits,
Defs.â Mem. at 23, it does not amount to an EPA issuance or denial of a 402 permit.
Accordingly, § 1369(b)(1)(F) does not vest exclusive jurisdiction in the Circuit.
As neither of the two §1369(b)(1) subsections cited by the defendants as mandating
exclusive Circuit jurisdiction apply to the Final Guidance, this Court possesses original
jurisdiction to review the Final Guidance.
3. Ripeness
â[R]epresent[ing] a prudential attempt to balance the interests of the court and the agency
in delaying review against the petitionerâs interest in prompt consideration of allegedly unlawful
agency action,â Fla. Power & Light Co. v. EPA, 145 F.3d 1414, 1420-21 (D.C. Cir. 1998), the
ripeness doctrine requires courts to consider the framework set forth by the Supreme Court in
Abbott Laboratories v. Gardner, 387 U.S. 136, 148-49 (1967). First, a court must âevaluate the
âfitness of the issues for judicial decision.ââ Fla. Power & Light, 145 F.3d at 1421 (quoting
Abbott Labs., 387 U.S. at 149). If a challenged decision is not âfitâ for review, âthe petitioner
20
must show âhardshipâ in order to overcome a claim of lack of ripeness.â Fla. Power & Light,
145 F.3d at 1421. In assessing the fitness prong, courts evaluate âwhether the agency action is
final; whether the issue presented for decision is one of law which requires no additional factual
development; and whether further administrative action is needed to clarify the agencyâs
position.â Action Alliance of Senior Citizens v. Heckler, 789 F.2d 931, 940 (D.C. Cir. 1986).
In light of the earlier conclusion that the Final Guidance constitutes final agency action,
the Court need not tarry long on the defendantsâ ripeness argument. Indeed, the primary
consideration for a court assessing the fitness of the issue for judicial decision is whether the
agency action is final. See id. Having examined that question at length above, the Court will
here only add that the other two components of the fitness evaluation are likewise met by the
Final Guidance. First, as the EPA asserts that the Final Guidance is not an expansion of its
authority under the SMCRA, the CWA, or their implementing regulations, it is clear that review
of the Final Guidance âis one of law which requires no additional factual development,â id.;
rather, the Courtâs review is limited to an analysis of the pertinent statutes and regulationsâthe
lawâto assess the accuracy of the EPAâs claim. Second, as explained above, the EPA has
conceded that the Final Guidance represents the consummation of their decision making process.
Therefore, no âfurther administrative action is needed to clarify the agencyâs position.â Id.
Accordingly, the Final Guidance is ripe for review.
4. Standing
The irreducible constitutional minimum of standing contains three elements: (1) injury in
fact, (2) causation, and (3) the possibility of redress by a favorable decision. Lujan v. Defenders
of Wildlife, 504 U.S. 555, 560-61 (1992). These requirements apply whether an organization
21
asserts standing on its own behalf, or on behalf of its members. Havens Realty Corp. v.
Coleman, 455 U.S. 363, 378 (1982).
The defendants assert that the plaintiffs have failed to demonstrate injury in fact and
causation because â[t]he [Final] Guidance does not impose any obligations on the regulated
industry and does not bind [the] EPA, the States, or the Corps in taking action on permit
applications.â Defs.â Mem. at 26. The defendantsâ standing argument thus strikes a similar
chord to their arguments on final agency action. And those arguments have already been
rejected by the Court. The Final Guidance is binding in regard to the obligations it imposes on
the state permitting authorities, and thus the members of the regulated industry seeking the
permits, and these obligations amount to injuries caused by the Final Guidance. And a decision
vacating the Final Guidance would redress the plaintiffsâ injuries. Accordingly, the plaintiffs
have standing to challenge the Final Guidance.
In sum, the Court is confident that it has authority to review the claims asserted in this
case and is unmoved by any of the defendantsâ jurisdictional arguments. The Final Guidance is
final agency action, subjecting it to this Courtâs review under the APA; the Final Guidance does
not trigger any of the subsections of § 1369(b)(1), which would divest this Court of jurisdiction
and confer exclusive jurisdiction on the Circuit; the Final Guidance is ripe for review; and the
plaintiffs have demonstrated that they have standing to challenge the Final Guidance.
Consequently, the Court now moves to the heart of the plaintiffsâ contentions: What did
Congress intend the SMCRA and the CWA to regulate, and what role does the EPA play in that
regulation?
22
B. The EPAâs Statutory and Regulatory Authority
Under the APA, courts must hold unlawful and set aside agency actions found to be in
excess of statutory jurisdiction, authority, or limitations. 5 U.S.C. § 706(2)(C). To determine
whether an agency exceeded its statutory authority under the APA, the Court must engage in the
two-step inquiry required by Chevron U.S.A., Inc. v. Natural Res. Def. Council, 467 U.S. 837
(1984). Under Chevron, if a statute reflects that Congress has directly addressed the question at
issue, then the court and the agency must give effect to the clearly expressed intent of Congress.
See id. at 842-43. If, however, the court determines that an agencyâs enabling statute is silent or
unclear with respect to the specific issue, the question for the court is whether the agencyâs
answer is based on a permissible construction of the statute. See id. at 843.
Whether statutory ambiguity exists is for the Court to decide, and the Court âowe[s] the
agency no deference on the existence of ambiguity.â Am. Bar Assân v. FTC, 430 F.3d 457, 468
(D.C. Cir. 2005). If the Court determines that the statute is either silent or ambiguous, the Court
must then proceed to the second component of Chevron and determine whether the agencyâs
position is based on a permissible construction of the statute. Colo. Wild Horse & Burro Coal.,
639 F. Supp. 2d at 91. Courts are hesitant to âpresume a delegation of power based solely on the
fact that there is not an express withholding of such power.â Am. Petroleum Inst. v. EPA, 52
F.3d 1113, 1120 (D.C. Cir. 1995) (citing Ethyl Corp. v. EPA, 51 F.3d 1053, 1060-61 (D.C. Cir.
1995)). Similarly, âthe duty to act under certain carefully defined circumstances simply does not
subsume the discretion to act under other, wholly different, circumstances, unless the statute
bears such a reading.â Ry. Labor. Execs. Assân v. Natâl Mediation Bd., 29 F.3d 655, 671 (D.C.
Cir. 1994) (emphasis omitted); see also id. at 670 (âcategorically reject[ing]â the Boardâs
23
suggestion that âit possesses plenary authority to act within a given area simply because
Congress has endowed it with some authority to act in that areaâ).
1. The EPAâs Authority Under the SMCRA
As noted above, âCongress chose a special kind of regulatory structure for the [SMCRA],
in which the federal government shares administrative responsibility with the states.â In re
PSMRL, 653 F.2d at 518. It is, however, the Secretary of the Interior, acting through the Office
of Surface Mining, who executes the duties that the SMCRA imposes on the federal side of the
state-federal relationship. The SMCRA grants to the EPA only the ability to comment on and
provide its written concurrence prior to the Secretaryâs approval of a state SMCRA permitting
program. In other words, once the EPA has given its assent to approve a state SMCRA
permitting program, the SMCRA affords it no further authority in the oversight or administration
of the SMCRA regime. The plaintiffs are therefore correct that â[n]othing in the SMCRA
expresslyâor even implicitlyâcontemplates that [the] EPA will âwork withâ SMCRA
permitting authorities to incorporate [Best Management Practices] or otherwise influence permit
terms.â Pls.â Mem. at 30. As the SMCRA unambiguously limits the EPAâs authority, there is no
need to advance to the second step of the Chevron analysis.
Attempting to cast the issue differently, the defendants argue that the Final Guidance
does not violate the SMCRA because âthere is substantial overlap between issues that are
appropriately considered by the SMCRA permitting authority during its permit process, and
issues that are properly considered by the Corps during its CWA Section 404 permit process or
by State permitting authorities during the 402 permitting process.â Defs.â Mem. at 30-31; see
Pls.â Mem. at 27 (â[The] EPA seeks to either duplicate or undo the work of SMCRA permitting
authorities under the guise of ensuring compliance with the 404(b)(1) Guidelines.â). Regardless
24
of any purported overlap between the SMCRA and the CWA, the defendantsâ argument fails.
Under the CWA, the EPA possesses neither the authority to apply the 404(b)(1) Guidelines to
Section 404 permits, nor, once it has approved state permitting programs, the authority to work
with the regulated industry on their Section 402 permits. For example, the defendants assert that
the â[Final] Guidance identifies best management practices that can facilitate compliance with
the CWA and the 404(b)(1) Guidelines,â but, as explained above, the EPA itself has a very
limited role in the issuance of CWA permits and has only the authority to develop the 404(b)(1)
guidelines with the Corps (while it is the Corps, as the permitting authority, that actually
determines compliance with the guidelines). It is thus beyond the EPAâs purview to declare that
â[p]rojects should fully evaluate and, where appropriate and practicable, incorporate the
following general aspects of effective impact minimizationâ or to attempt to specify to the Office
of Surface Mining or the State SMCRA agency what constitutes an âappropriateâ best
management practice. Final Guidance at 36 (A.R. FG005475).
Moreover, the defendants themselves seemingly recognize the limitations on their
permitting authority as they correctly identify the entities that do possess such authority: the
Corps and state permitting authorities. See Defs.â Mem. at 30. Thus, even assuming the
existence of overlap between the SMCRA and the CWA, it is not the EPA that is responsible for
working with the SMCRA permitting authorities on matters where overlap exists. Stated
differently, in circumstances where the EPA lacks the authority to issue the permits, whether
there is overlap between requirements for SMCRA permits and CWA permits is of no moment.
Accordingly, the EPA cannot justify its incursion into the SMCRA permitting scheme by relying
on its authority under the CWAâit has no such permitting authority. The EPA has therefore
25
impermissibly interjected itself into the SMCRA permitting process with the issuance of the
Final Guidance.
2. The EPAâs Authority Under the CWA
The plaintiffs assert that, with the issuance of the Final Guidance, the EPA has
overstepped the limitations on its CWA authority in two principal ways: (1) by setting âwhat is
tantamount to a region-wide water quality criterion for conductivity,â thus infringing on the
Stateâs role under Section 303, Pls.â Mem. at 32, and (2) by insisting that draft permits contain a
pre-issuance reasonable potential analysis, thus âusurping the Stateâs primary authority to
determine when and if a discharge has the âreasonable potentialâ to exceedâ water quality
standards, Defs.â Mem. at 37. The Court will examine each of these contentions in turn.
a. The EPAâs Section 303 Authority
As explained above, Section 303 of the CWA allocates primary authority for the
development of water quality standards to the states. All parties agree that the EPA does have
the authority to promulgate section 303 water quality standards in certain instances, but likewise
agree that they those procedures have not been undertaken here. See Defs.â Mem. at 33, n.23
(citing Pls.â Mem. at 9-10, 31); see also 33 U.S.C. § 1313(c)(3)-(4). Logically, then, having
recognized that the EPA has only limited authority under Section 303 to establish water quality
standards, and having conceded that it has not exercised that authority here, the question is not
what authority the EPA possess. The question necessarily becomes whether the EPA, through
the Final Guidance, has established a water quality standard. And this is where the parties
disagree. See Pls.â Mem. at 32 (arguing that the Final Guidance amounts to a region-wide water
quality criterion for conductivity); Defs.â Mem. at 33 (asserting that the Final Guidance does not
set a region-wide water quality criterion for conductivity).
26
Throughout their briefs, the defendants assert the nonbinding language of the Final
Guidance, but nowhere more than in regard to the conductivity âbenchmarksâ or âtriggers.â See
Defs.â Mem. at 33 (âThe conductivity benchmarks set forth in the [Final] Guidance are just
thatâbenchmarks.â); id. (âNeither the language of the [Final] Guidance itself, nor the
experience in the field, supports [the p]laintiffsâ contention that the conductivity benchmarks are
binding water quality standards or that they have been applied as such.â); id. at 34 (âThere is
simply nothing in the [Final] Guidance to support [the p]laintiffsâ assertion that the conductivity
benchmarks are binding water quality standards.â); id. at 36 (noting that the Final Guidance
merely ârecommendsâ that states give serious consideration to the science contained in the
EPAâs two studies, which indicated that substantial impacts on aquatic life occur as conductivity
increases beyond the lower range of the EPAâs benchmark). The defendants thus offer nothing
more than a repetition of the arguments made in regard to the finality of the Final Guidance,
arguments earlier ejected by the Court.
With the Court and the parties all in agreement as to the EPAâs statutory authority under
Section 303, the assessment of the plaintiffsâ claim that the EPA has impermissibly infringed on
the statesâ Section 303 authority is less a matter of statutory interpretation and more a matter of
assessing the Final Guidance itself. Accordingly, in light of its earlier determination that the
Final Guidanceâs conductivity benchmarks were being treated as binding by the EPAâs regional
offices, see supra at 14, 17, the Court must again conclude that the Final Guidance impermissibly
sets a conductivity criterion for water quality. The EPA has, therefore, overstepped the authority
afforded it by Section 303 of the CWA.
27
b. The EPAâs Section 402 Authority
As described earlier in this Memorandum Opinion, the Appalachian States subject to the
Final Guidance all have EPA-approved permitting programs and thus administer the Section 402
permitting scheme for permits sought within their state borders. As such, the states are the
primary permitting authority for Section 402 permits, but must submit draft permits to the EPA
for review. Should the EPA determine that the draft permit does not meet the requirements of
the CWA, the EPA possesses the statutory authority to object to that draft permit. If the state
does not respond to the EPAâs objection, the EPA may assume the responsibility to issue the
permit. It is this authorityâthe authority to review draft permits for compliance with the
CWAâthat the defendants cite as the authority underpinning the Final Guidance.
The plaintiffs assert that the EPA has usurped the Stateâs primary authority to determine
when and if a discharge has the reasonable potential to exceed state water quality standards.
Pls.â Mem. at 37. Specifically, the plaintiffs maintain that
it is the state permitting authority, not [the] EPA, that âdetermines,â in the first
instance, whether the discharge has the âreasonable potentialâ to exceed state
water quality standards and whether [the] next steps (e.g., adopting numeric
[Section 301] effluent limits for conductivity in order to meet state narrative water
quality standards for such pollutants) must be taken.
Id.; see also id. at 38 (â40 C.F.R. § 122.44(d)(1) is clear and unambiguous that states, not [the]
EPA, make the âreasonable potentialâ determination.â) The plaintiffs continue: âThere is no
permissible construction of the CWA or its regulatory scheme that would permit [the] EPA to
displace state permitting authorities from their role of determining whether a discharge violates
their own state narrative water quality standards and/or when specific numeric effluent limits
must be established.â Id. at 38; see also Pls.â Reply at 22 (âUnder the plain language of the
CWA, the states, not [the] EPA, determine how to best interpret their narrative standards and
28
when there is a reasonable potential to cause or contribute to an excursion from those standards.
[The] EPA cannot substitute its judgment for the statesâ in a guidance document.â). Lastly, the
plaintiffs maintain that since the issuance of the Final Guidance, â[s]tate permitting authorities
no longer have the discretion to conduct post-permit [reasonable potential analyses] and
determine through collection of site-specific data whether the discharge actually will cause or
has the potential to cause a violation of state standards.â Pls.â Mem. at 38.
The defendants respond that the âEPA promulgated regulations more than 20 years ago
that require state permitting authorities to incorporate water quality-based effluent limitations in
permits for all pollutants that have the reasonable potential to cause or contribute to an excursion
above any applicable water quality standard, including narrative water quality standards.â Defs.â
Mem. at 36. The defendants further maintain that â[w]hile the reasonable potential
determination rests with the State in the first instance, existing regulations require that States
consider relevant information when performing a reasonable potential analysis for narrative
standards.â 11 Id. at 38; see also Def.-Ints.â Mem. at 6 (âThe [Final] Guidance appropriately
recommends a pre-permit [reasonable potential analysis] because this analysis is already
mandated by Section 402 regulations.â). Finally, and most telling, the defendants argue that the
â[Final] Guidance merely sets forth [the] EPAâs presumption that the science supporting the
conductivity benchmarks will be relevant to the reasonable potential analysis, and [the] EPAâs
11
The defendants also advance their recurring argument that the Final Guidanceâs is not binding and merely
recommends a pre-issuance reasonable potential analysis. See, e.g., Defs.â Mem. at 38 (contending that the â[Final]
Guidance does no more than suggest approaches to ensure that the permit complies with existing regulationsâ); id. at
39 (claiming that the Final Guidance does not dictate when the reasonable potential analysis must be performed or
how necessary water quality-based effluent limitations must be incorporated in an NPDES permit). To the extent
that these arguments are separable from the assertion that the EPA possesses the underlying statutory or regulatory
authority asserted, the Court rejects the arguments that the Final Guidance is not binding for the same reasons set
forth at various points earlier in this Memorandum Opinion.
29
suggestion that relevant data can be secured through evaluation of similarly situated facilities in
adjacent watersheds.â Defs.â Mem. at 38.
It is thus clear that the partiesâ disagreement boils down to whether the CWA and its
implementing regulationsâspecifically, 40 C.F.R. § 122.44ârequire that the reasonable
potential analysis be conducted prior to the stateâs issuance of a Section 402 permit. In making
this assessment, the Court must ââgive substantial deference to an agencyâs interpretation of its
own regulations.ââ St. Markâs Housing Co., Inc. v. HUD, 610 F.3d 75, 82 (D.C. Cir. 2010)
(quoting Thomas Jefferson Univ. v. Shalala, 512 U.S. 504, 512 (1994)). To be sure, ââthe
agencyâs interpretation must be given controlling weight unless it is plainly erroneous or
inconsistent with the regulation.ââ St. Markâs Housing Co., 610 F.3d at 82 (quoting Thomas
Jefferson Univ., 512 U.S. at 512).
In pertinent part, 12 40 C.F.R. § 122.44(d)(1) reads as follows:
In addition to the conditions established under § 122.43(a), each NPDES permit
shall include conditions meeting the following requirements when applicable.
...
(d) Water quality standards and State requirements: any requirements in addition
to or more stringent than promulgated effluent limitations guidelines or standards
under sections 301, 304, 306, 307, 318, and 405 of CWA necessary to:
(1) Achieve water quality standards established under section 303 of the CWA,
including State narrative criteria for water quality.
(i) Limitations must control all pollutants or pollutant parameters (either
conventional, nonconventional, or toxic pollutants) which the Director[13]
12
As plaintiffsâ counsel explained at the July 13, 2012 hearing, § 122.44(d)(1)(vi) is not applicable as
Kentucky has established water quality criterion for specific chemical pollutants. And, for reasons unclear to the
Court, the pre-issuance reasonable potential analysis has apparently only manifested as a problem in Kentucky. See
Pls.â Mem. at 39, n.30 (âAlthough West Virginia has not shared Kentuckyâs experience regarding pre-permit
[reasonable potential analyses] and permit reopener clauses, it joins and fully supports Kentuckyâs challenge thereto.
Kentuckyâs experience mirrors that of West Virginia insofar as [the] EPA seeks to undo its prior permitting practices
and override the statesâ CWA Authority.â).
13
40 C.F.R § 122.2 makes clear that âDirector means the Regional Administrator or the State Director, as the
context requires, or an authorized representative. When there is no âapproved State program,â and there is an EPA
(Continued . . . )
30
determines are or may be discharged at a level which will cause, have the
reasonable potential to cause, or contribute to an excursion above any State water
quality standard, including State narrative criteria for water quality.
(ii) When determining whether a discharge causes, has the reasonable potential to
cause, or contributes to an in-stream excursion above a narrative or numeric
criteria within a State water quality standard, the permitting authority shall use
procedures which account for existing controls on point and nonpoint sources of
pollution, the variability of the pollutant or pollutant parameter in the effluent, the
sensitivity of the species to toxicity testing (when evaluating whole effluent
toxicity), and where appropriate, the dilution of the effluent in the receiving
water.
(iii) When the permitting authority determines, using the procedures in paragraph
(d)(1)(ii) of this section, that a discharge causes, has the reasonable potential to
cause, or contributes to an in-stream excursion above the allowable ambient
concentration of a State numeric criteria within a State water quality standard for
an individual pollutant, the permit must contain effluent limits for that pollutant.
(iv) When the permitting authority determines, using the procedures in paragraph
(d)(1)(ii) of this section, that a discharge causes, has the reasonable potential to
cause, or contributes to an in-stream excursion above the numeric criterion for
whole effluent toxicity, the permit must contain effluent limits for whole effluent
toxicity.
(v) Except as provided in this subparagraph, when the permitting authority
determines, using the procedures in paragraph (d)(1)(ii) of this section, toxicity
testing data, or other information, that a discharge causes, has the reasonable
potential to cause, or contributes to an in-stream excursion above a narrative
criterion within an applicable State water quality standard, the permit must
contain effluent limits for whole effluent toxicity. Limits on whole effluent
toxicity are not necessary where the permitting authority demonstrates in the fact
sheet or statement of basis of the NPDES permit, using the procedures in
paragraph (d)(1)(ii) of this section, that chemical-specific limits for the effluent
are sufficient to attain and maintain applicable numeric and narrative State water
quality standards.
40 C.F.R. § 122.44(d)(1)(i)-(v) (footnote and emphases added).
There is no quarrel here that the âpermitting authorityâ referenced in the regulation is the
state, as all Appalachian states have EPA approval to administer Section 402 permitting regimes
( . . . continued)
administrative program, âDirectorâ means the Regional Administrator. When there is an approved State program,
âDirectorâ normally means the State Director.â
31
for coal mining projects on lands within their state boundaries. And it is clear that the permitting
authority is afforded the authority to determine whether a discharge âcauses, has the reasonable
potential to cause, or contributes toâ and excursion of water quality standards. Id. §
122.44(d)(1)(ii). As written, the regulation does not mandate when the state permitting authority
must conduct its analysis of the dischargeâs impact on the water quality standard. For example,
40 C.F.R. § 122.44(d)(1)(i) provides that âlimitations must control all pollutants . . . which the
Director determines are or may be discharged,â suggesting that the pollutants could already have
been discharged at the time the Director makes the determination or may be discharged in the
future. Additionally, the regulation sets forth procedures for the state-permitting authorities to
use âwhen determining whether a discharge causes, has the reasonable potential to cause, or
contributes to an in-stream excursion above a narrative or numeric criteria within a State water
quality standard.â 40 C.F.R. § 122.44(d)(1)(ii) (emphasis added). The fact that two of these
determinations are written in the presentârather than futureâtense belies the defendantsâ
assertion that the CWA, and particularly § 122.44, require a pre-issuance reasonable potential
analysis. To be clear, the Court agrees that § 122.44(d)(1) sets forth requirements with which the
states must comply, but it does not impose or mandate the timing of that compliance (i.e.,
whether compliance must be achieved prior to the issuance of the permit).
Accordingly, the EPAâs âpresumptionâ that, based on the scientific studies regarding
conductivity, it is likely that all discharges will lead to an excursion or that the conductivity
studies will be instructive on the matter, Defs.â Mem. at 38, removes the reasonable potential
analysis from the realm of state regulators. In other words, by presuming anything with regard to
the reasonable potential analysis, the EPA has effectively removed that determination from the
state authority. And there can be no question that a plain reading of the regulation leaves that
32
determination, and the decision as to when it must be made, solely to state permitting authorities.
The EPAâs interpretation of the regulation, an interpretation on which it has premised the Final
Guidance, is therefore âinconsistent with the regulationâ itself. St. Markâs Housing Co., 610
F.3d at 82. Should the EPA wish to alter the manner by which an reasonable potential analysis is
conducted, it is of course free to amend the regulation in a manner consistent with the APA and
its own statutory authority. Until it does so, however, it cannot make the reasonable potential
determination for the states. The Final Guidanceâs ârecommendationââwhich the Court has
found is more than a mere suggestionâthat permitting authorities should not defer reasonable
potential analyses until after permit issuance, therefore finds no support in the CWA or 40 C.F.R.
§ 122.44(d)(1).
V. CONCLUSION
The Court is not unappreciative of the viable interests asserted by all parties to this
litigation. How to best strike a balance between, on the one hand, the need to preserve the
verdant landscapes and natural resources of Appalachia and, on the other hand, the economic
role that coal mining plays in the region is not, however, a question for the Court to decide. In
this litigation, the sole inquiry for the Court is the legality of the Final Guidance, and, for the
reasons set forth above, that inquiry yields the conclusion that the EPA has overstepped its
statutory authority under the CWA and the SMCRA, and infringed on the authority afforded
state regulators by those statutes. Accordingly, because the EPA has exceeded its statutory
authority, the plaintiffsâ motion for partial summary judgment is granted and the defendantsâ
motion for partial summary judgment is denied. 14
14
The Court will contemporaneously issue an Order consistent with this Memorandum Opinion.
33
REGGIE B. WALTON
United States District Judge