Black Earth Meat Market, LLC, et al v. Village of Black Earth, et al

Filing

Filed opinion of the court by Judge Wood. AFFIRMED. Diane P. Wood, Chief Judge; William J. Bauer, Circuit Judge and Joel M. Flaum, Circuit Judge. [6777764-1] [6777764] [15-3818]

Download PDF
Case: 15-3818 Document: 38 Filed: 08/24/2016 Pages: 17     In the United States Court of Appeals For the Seventh Circuit ____________________  No. 15‐3818  BLACK EARTH MEAT MARKET, LLC, et al.,  Plaintiffs‐Appellants,  v.  VILLAGE OF BLACK EARTH, et al.,  Defendants‐Appellees.  ____________________  Appeal from the United States District Court for the  Western District of Wisconsin.  No. 3:14‐cv‐00674‐bbc — Barbara B. Crabb, Judge.  ____________________  ARGUED JUNE 1, 2016 — DECIDED AUGUST 24, 2016  ____________________  Before WOOD, Chief Judge, and BAUER and FLAUM, Circuit  Judges.  WOOD, Chief Judge. Roughly 90 miles west of Milwaukee  lies  the  small  town  of  Black  Earth,  Wisconsin.  For  years,  a  butcher shop operated on the plot located at 1345 Mills Street.  While the property is not zoned for slaughtering livestock, the  activity  had  long  been  permitted  as  a  legal  nonconforming  use.  In  2001,  Black  Earth  Meats  (BEM)  purchased  the  prop‐ erty.  Sometime  after  2009,  the  volume  and  frequency  of  Case: 15-3818 Document: 38 Filed: 08/24/2016 2  Pages: 17 No. 15‐3818  slaughter  increased.  By  2011,  neighbors  were  complaining  about increased traffic, delivery trucks blocking the road, live‐ stock noise, foul odors, improper storage of animal parts, and  the presence of offal, blood, and animal waste in the streets.  Steers escaped from the facility on three occasions; each time,  a posse had to hunt the fugitive bovine through the streets of  Black Earth and, ultimately, shoot it dead.   In  2013,  the  Village  trustees  decided  to  do  something  about the renegade slaughterhouse. It increased enforcement  of Village regulations, ordered BEM to propose an acceptable  plan for relocating its slaughter activities, held several public  meetings, and in July 2014, threatened litigation. As a result  of the Village’s threat of litigation, the U.S. Department of Ag‐ riculture (USDA) refused to guarantee a loan to BEM from the  Bank of New Glarus. Shortly afterwards, BEM lost its financ‐ ing, closed, and then sued the Village and the members of its  Board. The district court granted summary judgment to the  defendants. BEM appeals, and we affirm.  I  In 2001, Black Earth Meats purchased the property located  at 1345 Mills Street, in the Village of Black Earth, Wisconsin.  For the previous 60 years, the plot had been used as a slaugh‐ terhouse and retail butcher shop. While the land was zoned  as “B‐1 General Commercial”—a designation that did not al‐ low  the  operation  of  a  slaughterhouse—BEM’s  slaughtering  operation  constituted  a  legal  nonconforming  use  and  thus  was  permitted  under  the  zoning  law  in  effect  at  the  time.  BEM’s current owner, Kemper Durand, Jr., acquired the com‐ pany and property in 2008.  Case: 15-3818 No. 15‐3818  Document: 38 Filed: 08/24/2016 Pages: 17 3  About  a  year  after  Durand  acquired  the  property,  the  slaughter operations increased in both volume and frequency.  This led to a crescendo in complaints from the neighbors. In  response to these complaints, the Village hired Vierbicher As‐ sociates, an engineering and land‐use consulting firm, to in‐ vestigate  and  report  on  the  effects  of  the  BEM  facility.  Vierbicher  delivered  its  report  to  the  Village  on  January  27,  2011.  The  report  found  that  BEM’s  slaughter  operation  was  responsible  for  “[i]ncreased  truck  traffic  on  local  residential  streets”; “[i]ncreased noise due to trucks and slaughter oper‐ ations on the premises”; “[o]ffal runoff  from  the  property   that    goes    into    storm    sewers  and  adjacent  properties”;  “[f]lies  and  other  vermin  due  to  offal  runoff  and  outdoor   storage  of  animal  waste  that  is  not  promptly  removed   from the property”; and “[a]nimals escaping from the prop‐ erty.” The report concluded that BEM could “continue opera‐ tion  in  its  current  location,  but  must  do  so  within  the  con‐ straints of Village ordinances. If further complaints are made  to  the  Village  and  found  to  be  of  merit,  abatement  actions  and/or fines may be in order.”  Neighbors continued in 2012 to lodge  the  same  kinds of  complaints about the effects of BEM’s slaughterhouse opera‐ tions. And their complaints were heard: the Village President,  Patrick Troge, wrote a letter to BEM warning that if the prob‐ lems continued, the Village would take action, potentially in‐ cluding a nuisance abatement action or fines.   On  May  2,  2012,  a  Red  Angus  steer  escaped  from  BEM  and was pursued by 12 BEM employees, one of them armed  with a rifle, through the village. Three Dane County deputies  eventually  arrived  on  scene  and  cornered  the  animal.  The  showdown  ended  in  a  hail  of  gunfire;  after  the  deputies  Case: 15-3818 4  Document: 38 Filed: 08/24/2016 Pages: 17 No. 15‐3818  pumped six shotgun slugs, seven rounds from an M16, and  three .22 rifle rounds into the steer, it fell dead in the streets of  Black Earth. This was not the first renegade beast cut down in  the Village: steers had escaped from BEM on two previous oc‐ casions since 2009. Each fugitive had occasioned a similar re‐ sponse, and met a similar end.  In the meantime, Durand was looking for new financing  for BEM’s operations. In 2013, after a search lasting more than  a  year,  Durand  approached  the  Bank  of  New  Glarus.  New  Glarus  agreed  to  loan  BEM  approximately  $1.3  million.  But  the  loan  came  with  strings:  BEM  was  required  to  raise  $525,000 on its own, and to obtain a loan guarantee from the  USDA’s  Office  of  Rural  Development.  The  USDA  guarantee  would cover 80 percent of the loan amount. While he initially  opposed the loan guarantee condition, Durand eventually ac‐ quiesced; he finalized the loan agreement in August 2013. The  USDA  provided  New  Glarus  with  a  “conditional  commit‐ ment,” which would convert into the required loan guarantee  upon the meeting of certain prerequisites. One of those pre‐ requisites was a certification that there were “[n]o ... suits ...  pending or threatened that would adversely affect the collat‐ eral when the security instruments are filed.” Similarly, BEM  was required to certify that “there are no actions, suits or pro‐ ceedings  pending  or,  to  the  knowledge  of  the  [B]or‐ rower/guarantors,  threatened  against  the  Borrower/guaran‐ tors  that  may  result  in  any  material  adverse  change  in  the  business operations ... of the Borrower/guarantors.”  The complaints about BEM continued unabated through‐ out 2013. (Over the course of the year, BEM was the cause of  40  requests  for  police  service.)  On  July  10,  2013,  the  Village  Case: 15-3818 No. 15‐3818  Document: 38 Filed: 08/24/2016 Pages: 17 5  trustees met with the Village’s attorney to discuss BEM’s ordi‐ nance violations and potential zoning issues. At first, the trus‐ tees considered drafting or amending ordinances specifically  addressed at BEM. They ultimately rejected this course of ac‐ tion  out  of  concern  about  the  propriety  of  addressing  ordi‐ nances  toward  one  specific  business.  Instead,  they  decided  that the Village should do more to enforce the already‐exist‐ ing ordinances they believed BEM was violating. At the Vil‐ lage police committee meeting the following week, the trus‐ tees  delivered  their  message  to  local  law  enforcement  offi‐ cials.  As  a  result  of  the  increased  enforcement,  BEM  received  nine citations between October 1, 2013, and January 3, 2014.  The citations had no effect on BEM’s behavior, however, and  the complaints continued. On December 10, 2013, the Village  Board held a public meeting “regarding nuisance and zoning  violations associated with Black Earth Meats.” The agenda in‐ cluded  time  for  remarks  by  law  enforcement,  the  Village’s  building inspector, a BEM representative, and the public. The  agenda also advised that the trustees would discuss and vote  on a “strategy to be adopted by the [Village] with respect to  litigation in which it is or likely to become involved regarding  [BEM].” Notice of the meeting was published. Durand spoke  on behalf of BEM. At the conclusion of the meeting, the trus‐ tees passed a motion giving BEM 120 days to present an ac‐ ceptable  plan  for  relocating  its  slaughter  operation.  If  BEM  failed to meet that deadline, it said, the Village would “take  legal action to remove the slaughter operation.”   Troge sent the promised notice to BEM the following day.  His  letter  noted  that  BEM’s  slaughter  operation  had  “in‐ creased to such a degree that it is now a much more intensive  Case: 15-3818 6  Document: 38 Filed: 08/24/2016 Pages: 17 No. 15‐3818  commercial slaughtering operation” and had become a “nui‐ sance.” It directed BEM to relocate within a reasonable period  and advised that if BEM failed to present an acceptable plan  for doing so within 120 days, the Village “intend[ed] to com‐ mence legal action to abate the nuisance and secure a court  order enjoining slaughter operations.”  On  December  23,  2013,  BEM  responded  to  Troge’s  letter  with a notice of claim. The notice alleged that “as a direct re‐ sult  of  the  Village’s  Complaints,  Citations,  Resolutions  and  Statements,” the USDA had refused to guarantee a loan from  the  Bank  of  New  Glarus  to  BEM.  It  noted  that  without  the  guarantee, it might not be able to obtain the loan from New  Glarus, which would in turn affect its financing. The Village  denied the claim on January 7, 2014.  The Village then extended BEM’s deadline for presenting  its relocation plan. The plan was supposed to be presented at  a Board meeting held on June 26, 2014, at the conclusion of  the extended time period. Instead of the requested plan, how‐ ever, BEM presented a consultant’s report detailing four op‐ tions  for  mitigating  the  problems  its  slaughtering  created.  Only one of those options involved relocating the operation  to a new facility. The trustees took no action at the meeting.  The Board held another meeting one week later. Appear‐ ing as BEM’s representative, Durand informed the trustees of  the financing problems BEM had experienced because of the  Board’s  December  10,  2013  motion.  He  explained  that  BEM  needed the New Glarus loan to continue operating, and that  if the Board did not pass another motion authorizing slaugh‐ ter  at  the  location,  the  loan  would  not  be  forthcoming.  He  asked the Board to pass a motion he had prepared. The pro‐ posed motion declared that slaughter was “permitted at the  Case: 15-3818 No. 15‐3818  Document: 38 Filed: 08/24/2016 Pages: 17 7  [BEM] facility as a legal, nonconforming use”; that it “shall be  permitted to continue”; and that BEM’s “normal operation ...  is  not  a  public  nuisance.”  Troge  advised  Durand  that  the  Board could not vote on Durand’s motion until the Village’s  lawyer reviewed it. The plaintiffs, Durand and BEM, filed this  lawsuit that day.  A week later, the Village held another meeting to discuss  its “strategy ... with respect to litigation” regarding BEM. Du‐ rand was present and was offered the chance to speak, but he  declined. After the public portion of the meeting, the Board  went into a closed session. When they returned, the trustees  passed a motion “to authorize and direct the Village attorney  to take necessary legal action to eliminate any public nuisance  and complaints” regarding BEM. On July 21, 2014, the Bank  of New Glarus told Durand that it would no longer offer him  the  previously  discussed  loan.  Although  the  Bank  did  pro‐ vide  BEM  short‐term  financing,  BEM  was  forced  to  end  its  slaughter operations. By August 4, 2015, BEM had closed and  listed its facility for sale.  BEM’s lawsuit continued. At the end of discovery, the par‐ ties  filed  cross‐motions  for  summary  judgment.  The  district  court granted summary judgment to the defendants on BEM’s  procedural  due  process  and  equal  protection  claims,  dis‐ missed BEM’s takings claims as unripe, and remanded BEM’s  state‐law claims  to  the  Circuit Court for Dane County, Wis‐ consin. BEM timely appealed the district court’s dismissal of  its  procedural  due  process  and  equal  protection  claims,  to  which we now turn.   Case: 15-3818 Document: 38 Filed: 08/24/2016 8  Pages: 17 No. 15‐3818  II  We  review the district  court’s  rulings on  summary  judg‐ ment de novo. Advance Cable Co., LLC v. Cincinnati Ins. Co., 788  F.3d  743,  746  (7th  Cir.  2015).  Because  the  parties  submitted  cross‐motions  for  summary  judgment,  we  take  the  motions  one at a time, construing all facts and drawing all reasonable  inferences  in  favor  of  the  non‐moving  party.  Id.  Summary  judgment is appropriate when there is no dispute of material  fact, and the moving party is entitled to judgment as a matter  of law. FED. R. CIV. P. 56(a).  A  Although our appellate jurisdiction is secure, we have no‐ ticed a question about the district court’s jurisdiction that we  must address. Wisconsin Central, Ltd. v. Shannon, 539 F.3d 751,  759 (7th Cir. 2008) (internal citations omitted). It relates to the  risk that BEM’s procedural due process claims are not yet ripe,  and if not, fall outside the permissible scope of the court’s Ar‐ ticle III power.  1  Under Williamson County Regional Planning Commission v.  Hamilton  Bank  of  Johnson  City,  473  U.S.  172  (1985),  if  a  state  provides adequate procedures for seeking just compensation,  a property owner cannot state a takings claim in federal court  until she has used these procedures and been denied just com‐ pensation. Wisconsin provides an inverse condemnation pro‐ cedure by which a property owner may seek just compensa‐ tion  by  initiating  condemnation  proceedings.  See  WIS.  STAT.  ANN. § 32.10. BEM has not availed itself of this procedure. If  its procedural due process claims are takings claims, they are  unripe.  Case: 15-3818 No. 15‐3818  Document: 38 Filed: 08/24/2016 Pages: 17 9  We  have construed  Williamson broadly,  holding  that  “[a]  property owner may not avoid Williamson by applying the la‐ bel ‘[procedural] due process’ to the claim.” Forseth v. Vill. of  Sussex,  199  F.3d  363,  368  (7th  Cir.  2000)  (internal  quotation  mark  omitted).  There  do  exist  bona  fide  non‐takings  claims  “arising  from  land‐use  decisions”  that  “can  be  made  inde‐ pendently from a takings claim and without being subject to  Williamson ripeness.” Id. at 370 (referring to equal protection  claims). But labels are irrelevant: “[a] person contending that  state or local regulation of the use of land has gone overboard  must repair to state court.” Id. at 368 (internal quotation mark  omitted). The question is thus whether BEM’s procedural due  process  claims  are  really  takings  claims  in  disguise—in  this  case, regulatory takings. If so, they are not ripe.  The parties do not dispute the existence of four interests  protected by procedural due process: (1) a liberty interest in  the occupation of slaughter; (2) a property interest in the non‐ conforming use; (3) the right to use the property for a slaugh‐ terhouse purpose; and (4) the plaintiff’s interest in its financ‐ ing  agreement  with  New  Glarus.  Because  the  second  and  third give rise to archetypal takings claims, BEM’s due process  claims with regard to those interests are not ripe.  There is some question whether BEM’s remaining claims  are properly understood as takings claims. BEM’s briefs can  be read to suggest as much. With regard to the New Glarus  financing and its liberty interest in the occupation of slaugh‐ ter, BEM’s claim is essentially that the Board achieved ends it  could have obtained through zoning with the threat of litiga‐ tion. Instead of rezoning the property and actually executing  a taking, the Village threatened to sue. This was an action that,  because of BEM’s financing needs, indirectly deprived BEM  Case: 15-3818 Document: 38 Filed: 08/24/2016 10  Pages: 17 No. 15‐3818  of financing and forced it to shut down. If the Village could  have achieved the same result through an actual taking, the  most logical response might be to see if a state court would  construe it retroactively as a taking, provide or decline to pro‐ vide compensation, and thereby provide all the process that  was due. If BEM still had complaints when that process was  over, it could then sue under 42 U.S.C. § 1983 and its claims  would be ripe.  But BEM’s financing agreement with New Glarus and its  liberty interest in slaughter both represent interests independ‐ ent of the property itself. We think that they may be properly  construed  as  (non‐takings)  procedural  due  process  claims,  and therefore as ripe. We thus proceed to the merits.   2  In determining whether a deprivation of procedural due  process has taken place, we ask two questions: first, whether  the plaintiff has been deprived of a protected liberty or prop‐ erty interest; second, if so, whether the deprivation occurred  without  due  process.  Pro’s  Sports  Bar  &  Grill,  Inc.  v.  City  of  Country Club Hills, 589 F.3d 865, 870 (7th Cir. 2009). BEM has  asserted two interests whose alleged deprivation, if protected,  would support a claim: (1) a liberty interest in the occupation  of  slaughter,  and  (2)  its  interest  in  its  financing  agreement  with New Glarus. The defendants do not dispute that these  interests are cognizable under the due process clause of the  Fourteenth  Amendment.  Instead,  the  parties  disagree  whether any action by the Village actually deprived BEM of  those protected interests. BEM points to four events that it be‐ lieves qualify as a deprivation: (1) the December 10, 2013 mo‐ tion; (2) the December 11, 2013 letter; (3) the failure to adopt  Durand’s motion; and (4) the July 10, 2014 motion.  Case: 15-3818 No. 15‐3818  Document: 38 Filed: 08/24/2016 Pages: 17 11  BEM’s theory suffers from several fatal flaws. First, none  of these actions was more than a threat of litigation—that is,  notice  that  the  Village  intended  to  seek  enforcement  of  its  rights. Contrary to BEM’s contention, nothing the Village did  actually forbade slaughter, and in not passing Durand’s mo‐ tion, the Board merely declined to adopt his legal position. We  are hard‐pressed to imagine when notice itself can be consid‐ ered a deprivation of due process, and this is certainly not such  a case.  In Hussein v. City of Perrysburg, the Sixth Circuit held that  where “a state official states his view that a citizen’s actions  are in violation of the law and threatens litigation, this is not  a  deprivation  of  the  citizen’s  interest  without  notice  and  an  opportunity to be heard.” 617 F.3d 828, 832 (6th Cir. 2010). In‐ stead, the official’s statement is the “provision of notice.” Id.  The ensuing litigation is the opportunity to be heard. Id. Proce‐ dural due process does not “demand notice as a precondition  of notice.” Id. A contrary holding would “impose recursively  impossible demands upon state officials who seek to enforce  the law.” Id.  We find this logic sound. In general, a threat to sue cannot  qualify as a deprivation of procedural due process. If the ac‐ tual abatement of a nuisance is not a deprivation of due pro‐ cess, mere notice that a governmental actor will pursue a nui‐ sance action in an adversary proceeding cannot constitute a  due process violation. See Pierce v. Vill. of Divernon, Ill., 17 F.3d  1074,  1080  (7th  Cir.  1994)  (demolition  of  partially  destroyed  home pursuant to ex parte order not violation of due process  where  municipality  gave  owners  “ample  notice  and  oppor‐ tunity to abate the nuisance”).  Case: 15-3818 12  Document: 38 Filed: 08/24/2016 Pages: 17 No. 15‐3818  To state a claim against a municipality under section 1983,  “a  plaintiff  must  show  that  the  municipal  action  was  taken  with the requisite degree of culpability and must demonstrate  a direct causal link between the municipal action and the dep‐ rivation of federal rights.” Bd. of Cnty. Comm’rs of Bryan Cnty.,  Okl. v. Brown, 520 U.S. 397, 404 (1997). There is no such direct  causal link here. There were four steps between the Village’s  threat of litigation and all the deprivations except BEM’s in‐ terest in its financing agreement with New Glarus. The pur‐ ported deprivation of BEM’s right to engage in slaughter was  a  result  of  the  fact  that  BEM  had  to  shut  down.  BEM  shut  down because (1) it needed financing; (2) the only financing it  could  get  depended  upon  a  guarantee;  (3)  USDA  was  the  guarantor  (and  apparently  no  other  guarantor  was  on  the  horizon); and (4) the USDA guarantee depended on BEM’s not  being subject to impending litigation. Even the loss of the loan  from  New  Glarus  depended  on  three  intermediate  causal  steps: (1) the New Glarus agreement required a guarantee; (2)  the USDA was the guarantor; and (3) the USDA guarantee de‐ pended on BEM’s being free from impending litigation.  BEM argues that Reed v. Village of Shorewood, 704 F.2d 943,  949 (7th Cir. 1983), stands for the principle that “a municipal‐ ity is responsible for the indirect results that flow from its di‐ rect actions.” That overstates the case; indirect effects can rip‐ ple out quite a long way, and the law does not hold munici‐ palities responsible for all of them. Reed in particular does not  support  the  idea  that  a  municipality  is  responsible  for  the  kind of downstream effects alleged in this case. Reed held that  even though the municipal defendant did not directly revoke  the  plaintiffs’  liquor  license,  it  could  deprive  them  of  it  “through harassment of customers and employees and relent‐ less, baseless prosecutions,” thereby “destroy[ing] the value  Case: 15-3818 No. 15‐3818  Document: 38 Filed: 08/24/2016 Pages: 17 13  of [their] licensed  business and forc[ing] them ultimately  to  give  up  their  Class  A  license.”  Id.  Harassment  and  baseless  prosecutions  can  be  a  direct  cause  of  the  loss  of  a  liquor  li‐ cense; the threat of litigation and the loss of one loan may or  may not lead to the decision to shut down a business. Moreo‐ ver, Reed’s logic depended upon an analogy to regulatory tak‐ ings, see id., and that is not BEM’s theory.  BEM points us to Baer v. City of Wauwatosa, 716 F.2d 1117  (7th Cir. 1983), but it is similarly inapposite. The municipality  in Baer had a loophole that allowed gun shops to operate with‐ out a license. Id. at 1121–22. As a result, the municipality’s rev‐ ocation of the plaintiff’s gun license did not cause him to lose  his business. But the municipality then repealed the loophole  and refused to issue the plaintiff a new license. Together, the  municipality’s three actions—revoking the license, repealing  the  loophole,  and  then  refusing  to  issue  a  new  license—di‐ rectly  deprived  the  plaintiff  of  his  gun  business.  Id.  Signifi‐ cantly, we held there that both the revocation and the repeal  had to be wrongful for the plaintiff to state a procedural due  process claim. Id. at 1121. BEM’s citation to Martinez v. Califor‐ nia, 444 U.S. 277, 284 (1980), which held that a parole officer  who released a prisoner who killed someone five months later  did  not  “deprive”  the  victim  of  life  for  Fourteenth  Amend‐ ment purposes, is unhelpful to its cause; if anything, it sup‐ ports the Village.  Finally,  Backpage.com,  LLC  v.  Dart,  807  F.3d  229,  230  (7th  Cir. 2015) represents an intriguing but ultimately faulty anal‐ ogy. In Backpage.com, we held that Sheriff Dart’s “campaign of  starving  [Backpage]  by  pressuring  credit  card  companies  to  cut ties with its website” violated the First Amendment (not  the Due Process Clause). Id. “The First Amendment,” it noted,  Case: 15-3818 14  Document: 38 Filed: 08/24/2016 Pages: 17 No. 15‐3818  “forbids a public official to attempt to suppress the protected  speech of private persons by threatening that legal sanctions  will at his urging be imposed unless there is compliance with  his demands.” Id. at 231. It is less clear that the Due Process  Clause does so. The First Amendment is concerned with the  chilling effect government action may have on speech; proce‐ dural  due  process  is not.  Moreover,  in  this  case,  the  Village  threatened  only  to  litigate,  not  to  impose  sanctions  solely  within its power. And surely BEM does not contend that the  Due Process Clause forbade the Village from suing to abate a  nuisance; an actual lawsuit would have had the same effect  on BEM’s protected interests as the threat of one.  Even if the threat of litigation could in itself constitute a  violation of due process and were a sufficiently direct cause  of BEM’s alleged deprivations, there is no reason to think that  the process accorded to BEM was inadequate. Procedural due  process generally requires only “notice and an opportunity to  be heard.” Dusenbery v. United States, 534 U.S. 161, 167 (2002)  (internal quotation marks omitted). “Cities may elect to make  zoning decisions through the political process ... with no hear‐ ings of any kind.” River Park, Inc. v. City of Highland Park, 23  F.3d  164,  166  (7th  Cir.  1994).  Here,  the  Village  did  not  even  make a zoning decision. Even if it had, BEM received notice  and a hearing at every turn. It received notice for every rele‐ vant Board meeting. Durand spoke at the December 10, 2013  meeting. Durand spoke at length in support of his motion at  the July 2, 2014 meeting. Durand was given the opportunity  to speak at the July 10, 2014 meeting; he declined to do so. The  question arises what other process the Village could have pro‐ vided before stating its intention to pursue enforcement of le‐ gal rights.  Case: 15-3818 Document: 38 Filed: 08/24/2016 No. 15‐3818  Pages: 17 15  BEM’s attempt to answer that question is largely nonsen‐ sical.  The  only  additional  process  it  identifies  seems  to  be  more  specific  notice.  (It  treats  the  December  10  and  July  10  motions as notice; that concession disposes of any claims that  these motions constituted an official deprivation.) It contends  that the “language of the Motions do [sic] not inform” BEM  “that they have an opportunity to object nor does it include  any information relating to specifics of the plan that must be  presented in order to  avoid such ‘legal action.’” It also con‐ tends that there was “no clear indication of what ‘legal action’  [would] be taken.” But the record leaves no doubt that BEM  knew  it  had  the  opportunity  to  object:  it  did  so  at  several  meetings.  It  presented  alternate  motions.  And  the  Village  stated clearly what legal action it intended to take: an action  for nuisance abatement. Even if BEM had a protected right at  stake, the process the Village used met constitutional stand‐ ards.   B  BEM’s  last  hurrah  is  a  “class  of  one”  equal  protection  claim.  In  order  to  proceed,  it  must  show  that  it  was  “inten‐ tionally treated differently from others similarly situated and  that there is no rational basis for the difference in treatment.”  Vill.  of  Willowbrook  v.  Olech,  528  U.S.  562,  564  (2000)  (per  cu‐ riam). BEM argues that where official action is motivated only  by “sheer malice, vindictiveness, or malignant animosity,” the  victim states an equal protection claim and is not required to  provide evidence of a better‐treated comparator. Fenje v. Feld,  398  F.3d  620,  628  (7th  Cir.  2005)  (internal  quotation  marks  omitted);  Hilton  v.  City  of  Wheeling,  209  F.3d  1005,  1008  (7th  Cir. 2000) (so‐called “vindictive action” equal protection cases  Case: 15-3818 16  Document: 38 Filed: 08/24/2016 Pages: 17 No. 15‐3818  require  proof  of  “a  totally  illegitimate  animus  toward  the  plaintiff by the defendant”).   The law on that point is up in the air, see Del Marcelle v.  Brown Cnty. Corp., 680 F.3d 887 (7th Cir. 2012) (en banc), but we  can assume for present purposes that BEM’s position is cor‐ rect.  As  the  Supreme  Court  noted  in  Olech,  “the  purpose  of  the equal protection clause of the Fourteenth Amendment is  to secure every person within the State’s jurisdiction against  intentional and arbitrary discrimination.” 528 U.S. at 564 (in‐ ternal quotation marks omitted). If a plaintiff can show that it  was  a  victim  of  intentional  and  arbitrary  discrimination  through direct evidence, there is no reason it should be forced  to jump through additional evidentiary hoops. See Swanson v.  City of Chetek, 719 F.3d 780, 784 (7th Cir. 2013) (“If animus is  readily obvious, it seems redundant to require that the plain‐ tiff show disparate treatment in a near exact, one‐to‐one com‐ parison to another individual.”).  BEM’s problem is that there is no evidence of animus in  this  case.  While  the  Village  trustees  made  no  secret  of  their  intent  to  force  BEM  to  move  its  slaughterhouse  operations  (and were happy once it shut down), there is no evidence that  they  were  motivated  by  malice  or  animosity.  They  were  re‐ sponding to a drumbeat of complaints from BEM’s neighbors  about increased traffic, delivery trucks blocking the road, live‐ stock noise, foul odors, improper storage of animal parts, and  offal runoff, blood, and animal waste in the streets. They re‐ sponded more forcefully from 2011 onward to BEM than they  had  in  the  past  because  BEM’s  new  owner  significantly  in‐ creased slaughter activities. In directing deputies to “feel free  to  write  a  citation”  if  they  “s[aw]  a  violation,”  the  trustees  Case: 15-3818 Document: 38 Filed: 08/24/2016 No. 15‐3818  Pages: 17 17  were at most building a record in anticipation of a nuisance  abatement suit.   As  a  result,  although  the  Village  pursued  a  campaign  against  continued  slaughter  activities  by  BEM  at  its  current  location,  it had a rational basis for doing so. See Geinosky v.  City of Chicago, 675 F.3d 743, 747 (7th Cir. 2012) (class‐of‐one  equal protection claim requires that state actor has no rational  basis for singling out plaintiff). It was BEM’s burden “to elim‐ inate any reasonably conceivable state of facts that could pro‐ vide a rational basis for the classification.” D.B. ex rel. Kurtis  B. v. Kopp, 725 F.3d 681, 686 (7th Cir. 2013) (citations omitted).  It has failed to do so.   Lastly, BEM has not suggested a sufficiently similar com‐ parator. It needed to find someone (or something) that shared  with it all the principal, pertinent characteristics. Swanson, 719  F.3d at 784. BEM offers David W. Heiney’s, a restaurant and  bar, but Heiney’s does not fit the bill. The tavern was not re‐ sponsible for livestock noise, foul odors, improper storage of  animal parts, and offal runoff, blood, and animal waste in the  streets  (let  alone  half‐ton,  horned  desperadoes).  There  is  no  evidence that the Village received complaints from neighbors  of Heiney’s in any way similar to those it received about BEM.  That provides an independent reason to reject the equal pro‐ tection theory.  III  The district court correctly granted summary judgment to  the defendants on BEM’s procedural due process and its equal  protection claims. We therefore AFFIRM its judgment. 

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?