Marsteller et al v. Tilton et al
Filing
77
MEMORANDUM OPINION. Signed by Judge Abdul K Kallon on 3/31/2016. (DWC, )
FILED
2016 Mar-31 PM 05:23
U.S. DISTRICT COURT
N.D. OF ALABAMA
UNITED STATES DISTRICT COURT
FOR THE NORTHERN DISTRICT OF ALABAMA
NORTHEASTERN DIVISION
UNITED STATES OF AMERICA,
ex. rel. PHILIP MARSTELLER and
ROBERT SWISHER,
Plaintiffs/Relators,
v.
LYNN TILTON, et al.,
Defendants.
)
)
)
)
)
)
)
)
)
)
)
Civil Action Number
5:13-cv-830-AKK
MEMORANDUM OPINION
Relators Phillip Marsteller and Robert Swisher pursue this action pursuant to
the False Claims Act (“FCA”), 31 U.S.C. § 3729 et seq., alleging that their former
employer, MD Helicopters, Inc., and its Chief Executive Officer, Lynn Tilton,
submitted false claims and made materially false statements in the process of
obtaining government contracts for the manufacture of helicopters for the United
States Army’s Non-Standard Rotary Aircraft Project Office (“NSWRA”). In a
nutshell, Relators allege that Tilton offered gratuities and employment to Norbert
Vergez—the project manager in charge of NSWRA—in violation of federal laws
incorporated in the contracts. Vergez purportedly accepted these offers, including
an offer of employment at MD and Patriarch Partners, LLC (“Patriarch”), a debt
and equity investment and management company that Tilton founded and
Page 1 of 19
manages. According to Relators, in exchange for the gratuities and offer of
employment, Vergez facilitated MD Helicopters Inc.’s (“MD”) submission of
inflated pricing information in its bids with NSWRA, and later, MD purportedly
withheld information about its relationship with Vergez when it submitted claims
for payment. These actions purportedly constitute violations of 31 U.S.C. §
3729(a)(1)(A) and (B) on the part of MD, Tilton, and Patriarch (collectively
“Defendants”) (Counts I-V). Doc. 57. Finally, Relators assert that MD, Tilton,
Vergez, and Patriarch conspired to defraud the government in violation of 31
U.S.C. § 3729(a)(1)(C) (Count VI). Id. In the present motion, Defendants move to
dismiss the action on the grounds that Relators’ claims do not meet the pleading
requirements of Federal Rule of Civil Procedure 12(b)(6).1 Doc. 65 (*SEALED*).
For the reasons below, the motion is due to be granted.
I. STANDARD OF REVIEW
Federal Rule of Civil Procedure 8(a) requires that a pleading stating a claim
for relief provide “a short and plain statement of the claim showing that the pleader
is entitled to relief.” Where a complaint fails to make such a statement, Federal
Rule of Civil Procedure 12(b)(6) permits dismissal. To survive a motion to dismiss
under Rule 12(b)(6), “a complaint must contain sufficient factual matter, accepted
1
Vergez has joined the motion and moved to dismiss the claims against him. See doc. 63. The court agrees
with Vergez that “nowhere in the Complaint is it alleged that [he] submitted, facilitated or prepared any false claim
to the Government. . . [n]or does the Complaint allege that [he] made any false statement to the Government in
support of a false claim.” Doc. 63 at 2. Therefore, Vergez’s motion is due to be granted.
Page 2 of 19
as true, to state a claim to relief that is plausible on its face.” Ashcroft v. Iqbal, 556
U.S. 662, 677 (2009) (citations and internal quotation marks omitted). A complaint
states a facially plausible claim for relief “when the plaintiff pleads factual content
that allows the court to draw the reasonable inference that the defendant is liable
for the misconduct alleged.” Id. (citation omitted). The complaint must establish
“more than a sheer possibility that a defendant has acted unlawfully.” Id.; see also
Bell Atl. Corp. v. Twombly, 550 U.S. 544, 555 (2007) (“Factual allegations must be
enough to raise a right to relief above the speculative level . . . .” (citation
omitted)). The Eleventh Circuit instructs that Rule 12(b)(6) “‘does not impose a
probability requirement at the pleading stage,’ but instead ‘simply calls for enough
fact to raise a reasonable expectation that discovery will reveal evidence of’ the
necessary element[s].” Watts v. Fla. Int’l Univ., 495 F.3d 1289, 1295-96 (11th Cir.
2007) (quoting Twombly, 550 U.S. at 555). Ultimately, this inquiry is a “contextspecific task that requires the reviewing court to draw on its judicial experience
and common sense.” Iqbal, 556 U.S. at 678. While the court accepts all factual
allegations in the complaint as true, legal conclusions unsupported by factual
allegations are not entitled to that assumption of truth. Id.
Further, because it is “‘well settled’ and ‘self-evident’ that the FCA is ‘a
fraud statute,’” a claim under the FCA must meet the heightened pleading standard
of Federal Rule 9(b). U.S. ex rel. Clausen v. Lab. Corp. of Am., 290 F.3d 1301,
Page 3 of 19
1309 (11th Cir. 2002). Rule 9(b) provides that a claimant must plead fraud with
“particularity”:
In all averments of fraud or mistake, the circumstances constituting
fraud or mistake shall be stated with particularity. Malice, intent,
knowledge, and other condition of mind of a person may be averred
generally.
Fed. R. Civ. P. 9(b). Requiring particularity under Rule 9(b) “serves an important
purpose in fraud actions by alerting defendants to the precise misconduct with
which they are charged and protecting defendants against spurious charges of
immoral and fraudulent behavior.” Ziemba v. Cascade Int’l, Inc., 256 F.3d 1194,
1202 (11th Cir. 2001) (quoting Durham v. Bus. Management Assocs., 847 F.2d
1505, 1511 (11th Cir.1988)) (citation and internal quotation marks omitted).
Significantly, a FCA complaint satisfies Rule 9(b) if it sets forth “facts as to time,
place, and substance of the defendant’s alleged fraud, specifically the details of the
defendants’ allegedly fraudulent acts, when they occurred, and who engaged in
them.” Hopper v. Solvay Pharm., Inc., 588 F.3d 1318, 1324 (11th Cir. 2009)
(citations and internal quotation marks omitted).
II. FACTUAL BACKGROUND
NSWRA is headquartered at the Redstone Arsenal in Huntsville, Alabama as
part of the U.S. Army Aviation and Missile Command (“AMCOM”). Doc. 57 at
13. As a major defense acquisition program, NSWRA’s mission is to “consolidate
under a single service-level Project Management Office the procurement,
Page 4 of 19
sustainment, and technical support of non-standard rotorcraft for the Department of
Defense, allied countries under foreign military sales (FMS) contracts[,] or as
directed by the Office of the Secretary of Defense.” Id. Relators’ allegations are
related to five FMS contracts for the manufacture of helicopters for allied
countries: the Afghani Air Force in March and September 2011 (Counts I and II),
the El Salvadorian Air Force in December 2011 (Count III), the Saudi Arabian
National Guard in June 2012 (Count IV), and the Costa Rican government in
December 2012 (Count V). Id. When MD submitted proposals to NSWRA for
these contracts, Vergez served as NSWRA’s Project Manager. Id. at 13-14. In that
capacity, Vergez
purportedly was “personally and substantially involved in
managing the process of issuing, selecting, negotiating, pricing, and awarding all
of the FMS contracts obtained by MD that are at issue in this [action].” Id. at 14.
Allegedly, Tilton, MD’s CEO, offered employment and transportation on Tilton’s
private jet “to influence Vergez to act in MD’s favor as NSWRA’s program
manager.” Id.
From April 2011 onward, “it was commonly known among several MD
employees that Tilton intended to hire Vergez upon his Army retirement.” Id.
Consistent with Tilton’s plan, between April 2011 and the spring of 2012, Tilton
and Vergez at various times “discussed the subject of Vergez’[s] employment to
begin . . . following Vergez’s anticipated retirement.” Doc. 57 at 16. By spring
Page 5 of 19
2012, Vergez and Tilton purportedly “reached an . . . understanding . . . that
Vergez would be hired by either MD or Patriarch to work for . . . MD’s facility in
Mesa, Arizona” at “a beginning salary that was more than twice what Vergez was
receiving as his active duty base pay.” Id. By that summer, Vergez had purportedly
signed an employment agreement with Patriarch to direct MD’s Civil and Military
Programs. Id. at 27. In December 2012, Tilton purportedly announced to MD’s
employees at a plant-wide meeting at MD’s Mesa, Arizona facilities that “a very
special person who had been very influential in MD’s receipt of Army contracts
would be joining the MD team.” Id. at 29. Shortly thereafter, “MD issued a revised
Organizational Chart showing Vergez as the head of all MD Programs.” Id.
However, “to obscure Vergez’[s] employment arrangement at MD, Tilton created
the illusion on paper that Vergez was a Patriarch employee, with a Patriarch title,
based out of Patriarch’s offices in New York.” Id. at 30.
In addition to the job offer, Tilton purportedly “provided free private
transportation to Vergez aboard her jet” while negotiations for the El Salvador
contract were ongoing. Id. at 19. Relators allege that Tilton’s behavior constituted
bribery and that MD had an obligation to disclose these unethical acts, and that
such disclosures were a “material condition” of each of the contracts. See docs. 31,
34, 37, 40, 43. By failing to make these disclosures, Defendants allegedly
submitted false claims to the government (Counts I-V). See id. Also, in conjunction
Page 6 of 19
with the El Salvador, Saudi, and Costa Rican contracts, MD allegedly failed to
provide accurate pricing information in compliance with the Truth in Negotiations
Act (Counts III-V). Id. at 37, 40, 43. Finally, Defendants allegedly conspired to
defraud the Government (Count VI). Id. at 44.
III. ANALYSIS
Defendants contend that dismissal is warranted on all claims. The court
addresses each claim in turn.
A. False claims under Section 3729(a)(1)(A) and (B)— (Counts I-V)
Sections 3729(a)(1)(A) and (B) create a cause of action against “any person
who . . . (A) knowingly presents, or causes to be presented, a false or fraudulent
claim for payment or approval; [or] (B) knowingly makes, uses, or causes to be
made or used, a false record or statement material to a false or fraudulent claim.”
Relevant here, Relators contend that their complaint properly alleges that
Defendants submitted false claims to the government under an “implied
certification” theory. 2 Doc. 71 at 20.
2
In their brief opposing the motion to dismiss, Relators also argue a “fraud in the inducement” theory. Doc.
71 at 33. Allegedly, Defendants “fraudulently induced the Government to enter into sole-source contracts for
commercial items by concealing the fact [that] its prices . . . were [inflated] . . . and by falsely agreeing to comply
with the contracting ethics.” Id. Relators further contend that “[c]ommon sense counsels that the government would
never enter into a contract if the contractor truthfully announced that it had not, and did not intend to, comply with
the mandatory Contractor Code of Business Ethics set forth in FAR 52.203-13.” Id. at 34. This claim fails because
the Amended Complaint does not plead a fraud in the inducement theory. See generally doc. 57; St. George v.
Pinellas County, 285 F.3d 1334, 1337 (11th Cir. 2002) (In a motion to dismiss, “the scope of the review must be
limited to the four corners of the complaint.”). Moreover, the arguments advanced by Relators in support of this
theory are similar to those they make for their implied certification and TINA claims, and, as such, fail for the same
reasons stated below. See infra III.A. Finally, as outlined in their brief, see doc. 71 at 33–34, Relators’ fraud in the
inducement claim fails to meet the particularity standard of Fed. R. Civ. P. 9(b).
Page 7 of 19
1. Implied certification
Under this theory, “the FCA is violated where compliance with a law, rule,
or regulation is a prerequisite to payment but a claim is made when a participant
has engaged in a knowing violation.” U.S. ex rel. Keeler v. Eisai, Inc., 568 F.
App’x 783, 799 (11th Cir. 2014); see also McNutt v. Haleyville Medical Supplies,
Inc., 423 F.3d 1256, 1259-60 (11th Cir. 2005) (allegations of kickbacks can create
FCA liability where compliance with the Anti–Kickback Statute is a prerequisite
for payment under the Medicare Program) 3; U.S. ex rel. Compton v. Circle B
Enterprises, Inc., No. CIV.A 7:07-CV-32(HL), 2010 WL 942293, at *7 (M.D. Ga.
Mar. 11, 2010) (“If the payee submits an invoice for payment while knowingly
violating a contractual provision, statute, or regulation, then he may have
submitted a false claim.”). The relevant laws here for Relators’ implied
certifications of compliance theory are 48 C.F.R. §52.203-13 (Contractor Code of
Business Ethics and Conduct) and 10 U.S.C. §2306a (Truth in Negotiations Act).
a. Contractor Code of Business Ethics and Conduct, 48 C.F.R. §52.203-13
Relevant to Counts I-V, the parties agree that all of the FMS contracts at
issue incorporated 48 C.F.R. §52.203-13, which requires contractors to disclose
3
In McNutt, the Government identified with particularity alleged kickbacks that disqualified defendants’
claims from reimbursement under the Medicare Program—but, the defendants nevertheless submitted the
disqualified claims for reimbursement. 423 F.3d at 1257-1259. The court concluded that “[w]hen a violator of
government regulations is ineligible to participate in a government program and that violator persists in presenting
claims for payment that the violator knows the government does not owe, that violator is liable, under the [FCA], for
its submission of those false claims.” Id. at 1259.
Page 8 of 19
any “credible evidence that a principal, employee, [or] agent . . . had committed . .
. a violation of Federal criminal law involving fraud, conflict of interest, bribery, or
gratuity violations found in Title 18 of the United States Code.” 48 C.F.R. §
52.203-13(b)(3)(i)(A). Based on this provision, Relators allege that Defendants
violated 18 U.S.C. § 201 by bribing a public official in conjunction with each of
the FMS contracts, and by failing to disclose evidence of the purportedly unethical
conduct pursuant to § 52.203-13. Allegedly, § 52.203-13 was a “material
contractual requirement” and a condition to payment under the FMS contracts, and
Defendants purportedly violated §52.203-13 by submitting false claims under an
implied certification theory.
i. Whether compliance with § 52.203-13 is a express prerequisite to
payment under the contracts
Defendants counter that—even if they failed to disclose the so-called
unethical conduct—compliance with § 52.203-13 is not an express “prerequisite to
payment” under the FMS contracts because the contracts do not expressly
condition payment on compliance. To support their position, Defendants direct the
court to caselaw holding that noncompliance with the statute or regulation may
form the basis of an FCA claim under an implied certification theory only where
the government expressly conditioned payment on compliance with a statute or
regulation. See U.S. ex. rel. Ortolano v. Amin Radiology, No. 5:10–cv–583–Oc–
PRL, 2015 WL 403221 at *8 (M.D. Fla January 28, 2015) (citing United States ex
Page 9 of 19
rel. Steury v. Cardinal Health, Inc., 735 F.3d 202, 207 n. 3 (5th Cir. 2013); Mikes
v. Straus, 274 F.3d 687, 700 (2d Cir. 2001)). Under this approach, to establish that
compliance with a statute or regulation is “condition of payment,” Relators are
“required to plead that the government . . . would have necessarily terminated the
Contract [or withheld payment] based on [MD’s] violations of FAR [§ 52.20313].” Circle B, 2010 WL 942293, at *8. 4 The United States take issue with the
express condition approach and notes that recent cases have rejected the Mikes v.
Strauss line of cases and asks this court not to adopt this approach. See doc. 70 at
5–7. The court declines the Government’s invitation because it is contrary to case
law. Specifically, in U.S. ex rel. Keeler v. Eisai, Inc., 568 F. App’x 783, 799 (11th
Cir. 2014), the Relator alleged that Defendants submitted reimbursement claims to
the government that falsely certified compliance with federal law. Id. at 798. In
evaluating this claim, the Eleventh Circuit discussed implied certification and
articulated that: “an implied certification theory . . . recognizes that the FCA is
4
In Circle B, which is particularly instructive, the Middle District of Georgia addressed whether a
government contract that incorporated a Financial Acquisition Regulation conditioned payment on compliance with
that regulation. Id. at *8. After reviewing the contract and the regulation at issue, the court noted the lack of any
“express language in the [c]ontract” prohibiting government payment in the event of noncompliance. Id. at *9.
Similarly, the court found that the regulation “[did] not contain any express prohibition of government payment
based on noncompliance,” or any provision that “expressly requires a contractor to comply with [the regulation] in
order to be paid.” Id. at *10. As a result, the court concluded that compliance with regulation was not a condition of
payment. Id. In contrast, the court reached a different conclusion regarding the Anti-Kickback Statute (“AKA”),
which also applied to the contracts in that case, and which the court found “expressly” conditioned payment on
compliance:
The AKA expressly states that [it] is illegal for a person to include any kickback in a claim for
payment to the government. It is clear that the statute prohibits government payment for a
kickback . . . [and] allows the government to refuse to pay the kickback . . . . It follows then that
an invoice submitted for payment which includes the cost of a kickback constitutes a false claim
because the government is prohibited from paying the amount of the kickback.
Id.
Page 10 of 19
violated where compliance with a law, rule, or regulation is a prerequisite to
payment but a claim is made when a participant has engaged in a knowing
violation.” Id. at 799 (emphasis added).
Turning to the specific contentions in this case, the court notes that Relators
are generally correct that § 52.203-13 is mandatory in “subcontracts that have a
value in excess of $5.5 million and performance period of more than 120 days.” 48
C.F.R. § 52.203-13(d); doc. 71 at 27. However, as Defendants correctly point out,
Relators overlook that no provision in § 52.203-13 expressly conditions payment
upon compliance with the regulation; rather, § 52.203-13 merely sets forth
minimum standards for requiring contractors to “[e]xercise due diligence to
prevent and detect criminal conduct” and “[o]therwise promote an organizational
culture that encourages ethical conduct and a commitment to compliance with the
law.” 48 C.F.R. § 52.203-13. Moreover, having carefully reviewed the March 2011
Afghani contract, December 2011 El Salvador contract, the June 2012 Saudi
contract, and the December 2012 Costa Rica contract, the court notes that there is
no provision in any of them that prohibits payment in the event of noncompliance
with § 52.203-13. 5 See docs. 65-2, 65-4, 65-6, 65-8 (*SEALED*). With respect to
the September 2011 Afghani contract, while the court does not have the contract
5
The court may review these contracts in deciding the motion because Plaintiffs reference it in the
complaint and it is “central to the plaintiff’s claim.” Brooks v. Blue Cross and Blue Shield of Fla., Inc., 116 F.3d
1364, 1369 (11th Cir. 1997) (citing Venture Assocs. Corp. v. Zenith Data Sys. Corp., 987 F.2d 429, 431 (7th Cir.
1993)).
Page 11 of 19
before it, Relators’ complaint contains no allegation establishing that the contract
expressly made compliance with § 52.203-13 a condition to payment. Thus, under
the “express condition of payment” approach, Relators’ claim under § 3729(a)
would fail under an implied certification theory. See Circle B, 2010 WL 942293, at
*10.
ii. Whether compliance with § 52.203-13 is a material
contractual requirement
Even if the court does not adopt the “express condition of payment”
approach, the Relators’ implied certification claim still fails due to their failure to
show that compliance with § 52.203-13 was a “material contractual requirement.”
Doc. 57 at 31, 34, 37, 38, 41. While “[t]he existence of express contractual
language specifically linking compliance to eligibility for payment may well
constitute dispositive evidence” that compliance is a prerequisite to payment,
express language “is not . . . a necessary condition” to sustain an allegation of false
claims under an implied certification theory. United States v. Sci. Applications Int’l
Corp., 626 F.3d 1257, 1269 (D.C. Cir. 2010); see also United States v. Triple
Canopy, Inc., 775 F.3d 628, 636 (4th Cir. 2015). Instead, “to establish the
existence of a ‘false or fraudulent’ claim on the basis of implied certification of a
contractual condition, the FCA plaintiff . . . must show that the contractor withheld
information about its noncompliance with material contractual requirements.” Sci.
Applications Int’l Corp., 626 F.3d at 1269 (emphasis added). To meet this burden,
Page 12 of 19
an FCA plaintiff must allege the implied certification “had a natural tendency to
influence, or be capable of influencing, the Government’s decision to pay.” Triple
Canopy, Inc., 775 F.3d at 637. For example, “materiality may be established . . .
through testimony demonstrating that both parties to the contract understood that
payment was conditional on compliance with the requirement at issue.” Id.
(quoting SAIC, 626 F.3d at 1269) (internal quotation marks omitted).
Relators’ claims fail under the “material contractual requirement” because
aside from the conclusory allegations that Defendants violated “material
contractual requirements,” Relators have not pleaded any particularized facts
tending to show the existence of “objective requirements” in the contract that MD
“failed to provide,” or that MD “continued to bill the Government with the
knowledge that it was not providing the contract’s requirements.” 775 F.3d at 638.
An example from the District of Columbia Circuit of the types of claims that fall
under the “material contractual requirement” approach is instructive:
Consider a company that contracts with the government to
supply gasoline with an octane rating of ninety-one or higher.
The contract provides that the government will pay the
contractor on a monthly basis but nowhere states that supplying
gasoline of the specified octane is a precondition of payment.
Notwithstanding the contract’s ninety-one octane requirement,
the company knowingly supplies gasoline that has an octane
rating of only eighty-seven and fails to disclose this discrepancy
to the government. The company then submits pre-printed
monthly invoice forms supplied by the government-forms that
ask the contractor to specify the amount of gasoline supplied
during the month but nowhere require it to certify that the
Page 13 of 19
gasoline is at least ninety-one octane. So long as the
government can show that supplying gasoline at the specified
octane level was a material requirement of the contract, no one
would doubt that the monthly invoice qualifies as a false claim
under the FCA despite the fact that neither the contract nor the
invoice expressly stated that monthly payments were
conditioned on complying with the required octane level.
SAIC, 626 F.3d at 1270. Along the same lines, the Fourth Circuit in Triple Canopy
addressed a government contract for providing security on a military base in an
active combat zone where the contract required that security officers undergo
weapons training prior to serving as a security officer on a military base (“the
marksmanship requirement”). Triple Canopy, 775 F.3d at 632. The complaint
alleged that the contracts referred to the marksmanship requirement as a
“responsibility” that the defendant must fulfill under the contract. Id. at 637. The
complaint also contained “an abundance of allegations that [the contractor] did not
satisfy [the marksmanship] requirement, and, instead, undertook a fraudulent
scheme that included falsifying records to obscure its failure.” Id. The court
concluded that the complaint sufficiently alleged that compliance with this
contractual requirement was a prerequisite to payment because “common sense
strongly suggests that the Government’s decision to pay a contractor for providing
base security in an active combat zone would be influenced by knowledge that the
guards could not, for lack of a better term, shoot straight.” Id. at 637–38.
Page 14 of 19
In the case of the FMS contracts at issue here, Relators have not alleged
facts demonstrating that compliance with § 52.203-13 was material to the
agreements under circumstances similar to Triple Canopy or SAIC. Therefore, with
respect to the allegations surrounding § 52.203-13, the court concludes that
Relators do not adequately plead their § 3729(a)(1) claims under an implied
certification theory using either the “express condition of payment” or the
“material requirement” approaches. 6
b. Truth in Negotiations Act (“TINA”)
In Counts III, IV, and V, Relators allege that MD failed to provide accurate
pricing data pursuant to the TINA in conjunction with the El Salvador, Saudi, and
Costa Rica contracts. Doc. 57 at 35, 38, 41. The parties generally agree that the
FMS contracts are commercial, see doc. 71 at 30-31, meaning that under TINA,
“certified cost or pricing data are not required to be submitted.” 10 U.S.C. §
2306a(d)(1).
Nonetheless,
for
commercial
contracts,
the
Government’s
“contracting officer shall require submission of data other than certified cost or
pricing data to the extent necessary to determine the reasonableness of the price of
6
Relators also generally base their implied certification theory claims on Defendants’ alleged violations of
numerous other regulations and statutes, including 48 C.F.R. §§ 52.203-03 (Gratuities), 52.212-4 (Contract Terms
and Conditions—Commercial Items), and 41 U.S.C. §§ 2103 and 2104. The court has reviewed these provisions and
finds that none of them condition payment on compliance. Furthermore, none of the FMS contracts make
compliance with these provisions an express condition of payment. See Circle B, 2010 WL 942293 at *9. Moreover,
Relators’ complaint does not state a plausible claim under Triple Canopy or SAIC by demonstrating that the
provisions relate to a material requirement of the contract. As other courts have cautioned, the “material contractual
requirement” articulation of the implied certification theory “is prone to abuse” by parties seeking “to turn the
violation of minor contractual provisions into an FCA action.” SAIC, 626 F.3d at 1270; see also Triple Canopy, 775
F.3d at 637.
Page 15 of 19
the contract.” Id. With the goal of “plac[ing] government and private contractors in
roughly equal positions during contract negotiations[,] . . . TINA prevents
contractors
from
withholding
cost
or
pricing
information
from
the
government.” Aerojet Solid Propulsion Co. v. White, 291 F.3d 1328, 1330 (Fed.
Cir. 2002). Since 1986, TINA has included an express definition of “cost and
pricing data”: “all facts that . . .
a prudent buyer or seller would reasonably
expect to affect price negotiations significantly.” 10 U.S.C. § 2306a(h)(1).
In this case, Relators contend that they “have knowledge . . . that the
contracting officer for one or more of the contracts at issue required such noncertified cost and pricing data,” and that MD, in submitting its proposals, provided
the officer with inflated prices, “thereby misleading the officer.” Doc. 71 at 32. In
particular, with respect to the El Salvador contract, Relators indeed allege that
“AMCOM requested that MD provide a sales history (i.e., information on the
prices at which the same or similar items had previously been sold to other
commercial customers),” and that MD allegedly “only provided the Army [with]
information” regarding “October 11, 2011 sale of an MD 500E to the Columbus,
Ohio Police Department for the base price of $1,802,282, but did not disclose any
prior sales” of helicopters, including one for a lower base price of $1,550,000.
Doc. 57 at 18. Along the same lines, for the Costa Rica contract, MD’s Chief
Operating Officer allegedly “‘cherry-picked’ higher priced commercial purchase
Page 16 of 19
agreements between MD and its commercial customers to provide to the Army for
its price evaluation, specifically failing to disclose an original purchase agreement
for [a particular aircraft] and substituting it with a purchase agreement for the same
aircraft that showed a higher price.”7 Id. at 28. Finally, with respect to the Saudi
contract, Relators generally allege that “MD did not provide all the historical
commercial pricing data that was necessary for the Army to effectively evaluate
price reasonableness.” 8 Id. at 24. In light of MD’s failure to provide accurate
pricing information for these three contracts, Relators allege that the Army “was
deprived of its ability to effectively negotiate a reasonable and lower price[,] which
caused the agreed base price for each aircraft to be higher than it would have been
if MD had fully complied with the Army’s request for pricing data.” Id. at 18-19.
Accepting these allegations as true, the court concludes Relators have not
sufficiently alleged that compliance with TINA is a prerequisite to payment as
required to sustain their implied certification theory. Specifically, the alleged
7
For the Costa Rican contract, Relators generally state that MD failed to provide pricing information for
approximately eleven previous helicopter sales that were the “same or similar,” doc. 57 at 28, but the complaint does
not allege any particular information about any of these previous sales, when they occurred, or the base price for
each. Moreover, Relators’ allegation that MD failed “to disclose an original purchase agreement for a Helicentro
replacement aircraft SN RN083” and substituted the purchase agreement with one “for the same aircraft that showed
a higher price,” id., does not support their purported misrepresentations because even assuming that the Government
requested pricing information for previous sales of “same or similar” helicopters, as pleaded, Relators’ allegations
regarding a “Helicentro replacement aircraft SN RN083” do not tend to show a misrepresentation regarding the
different aircraft in the Costa Rican contract—two “MD 600N” helicopters. See id.
8
Because TINA states that the Government’s “contracting officer shall require submission of data . . . to
the extent necessary to determine the reasonableness of the price of the contract. . .,” 10 U.S.C. § 2306a(d)(1),
Relators’ failure to allege that the Government actually requested pricing data for this contract dooms their claim.
See doc. 57 at 25 (stating only that the Government “overlooked” obtaining the pricing information).
Page 17 of 19
TINA violations do not satisfy the express condition of payment approach and
Relators’ complaint does not demonstrate that the pricing requirements of TINA
were material to the contracts. See United States v. Triple Canopy, Inc., 775 F.3d
628, 636 (4th Cir. 2015); United States v. Sci. Applications Int’l Corp., 626 F.3d
1257, 1269 (D.C. Cir. 2010).
For all of these reasons, the court concludes that Relators’ allegations fail to
state a plausible claim under an implied certification theory.
B. Section 3729(a)(1)(C)—Conspiracy (Count VI)
In light of the decision to grant the motion to dismiss the other claims, the
motion to dismiss count VI is also due to be granted. See U.S. ex rel. Potra v.
Jacobson Companies, Inc., No. 1:12-CV-01600-WSD, 2014 WL 1275501, at *4
(N.D. Ga. Mar. 27, 2014) (where relators’ allegations of false claims fail, “their
claim that the Defendants conspired to violate the FCA necessarily fails”).
IV. CONCLUSION
For all these reasons, the court finds that the motion to dismiss is due to be
granted. 9 A separate order will be entered in accordance with this opinion.
9
At the end of their brief, Relators request leave to amend if the court “grants some or all of the
Defendants’ motions to dismiss. . .” Doc. 71 at 35. “[T]here is no rule that every request to amend must be granted,”
Panther Partners Inc. v. Ikanos Communications, Inc., 347 F. App’x 617, 620 (2d Cir. 2009), and “[i]t is within the
court’s discretion to deny leave to amend. . . when [as here] leave is requested informally in a brief filed in
opposition to a motion to dismiss,” Chechele v. Scheetz, 466 F. App’x 39, 41 (2d Cir. 2012). Although Relators’ first
amended complaint, in response to Defendants’ initial motion to dismiss, failed to cure the deficiencies and there is
Page 18 of 19
DONE the 31st day of March, 2016.
_________________________________
ABDUL K. KALLON
UNITED STATES DISTRICT JUDGE
no reason for the court to expect that a second amended complaint would cure these pleading defects, the court will
reserve making a decision until after a motion is filed and it has had an opportunity to review the proposed
amendment.
Page 19 of 19