Cape Fox Corporation et al v. Jackson et al

Filing 40

ORDER Regarding Motion to Dismiss at Docket 34. (Jan, Chambers Staff)

Download PDF
Cape Fox Corporation et al v. Jackson et al Doc. 40 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF ALASKA CAPE FOX CORPORATION, an Alaska Corporation; APM, LLC, an Alaska Limited Liability Company; and 1CI, a Delaware Corporation, Plaintiffs, vs. CRAIG JACKSON; ADVANCE BUSINESS MANAGEMENT SERVICES INC., a Nevada Corporation; SANDERS ENGINEERING CO., INC., a California Corporation; and BUTLER MARKETING & CONSULTING GROUP, INC., a Virginia Corporation; Defendants. Case No. 3:10-cv-0080-RRB ORDER REGARDING MOTION TO DISMISS AT DOCKET 34 I. INTRODUCTION Before the Court are Defendants Craig Jackson ("Jackson"), Sanders Engineering, Co., Inc. ("SEC"), and Advanced Business Management Services, Inc. ("ABMS") (collectively "Defendants") with a Motion to Dismiss at Docket 34. Defendants move to dismiss ORDER RE MOTION TO DISMISS AT DOCKET 34 - 1 3:10-CV-0080-RRB Dockets.Justia.com Counts I, II, III, V, VI, VIII, XII, and XIII of the First Amended Complaint under Federal Rules of Civil Procedure Rule 12(b)(6), arguing that the Counts fail to state a claim upon which relief can be granted.1 Plaintiffs Cape Fox Corp. ("CFC"), APM, L.L.C. ("APM"), and 1CI Corp. ("1CI") (collectively "Plaintiffs") oppose at Docket 36 and contend that there are valid factual allegations that support each of the eight counts sought to be dismissed and all eight counts should be heard by the trier of fact.2 Because Plaintiffs' fraudulent misrepresentation claim was not pled with particularity; because Plaintiffs' economic damages must be pursued in accordance with the economic loss doctrine; and because business destruction is not a separate claim, but a factor in calculating consequential damages; the Court concludes that a partial dismissal is appropriate. Defendants' Motion to Dismiss, therefore, at Docket 34 is hereby GRANTED IN PART as to Counts III, VI, VIII, and XII of the First Amended Complaint and DENIED IN PART as to Counts I, II, V, and XIII. Additionally, Defendants' Motion to Dismiss at Docket 24 is rendered moot by Plaintiffs' First Amended Complaint and is, therefore, DENIED.3 1 Docket 34 at 1-2. Docket 36 at 2. 2 Pacific Bell Telephone Co. v. Linkline Communications, Inc., 129 S.Ct. 1109, 1123 (2009) (an amended complaint supercedes the original complaint). 3 ORDER RE MOTION TO DISMISS AT DOCKET 34 - 2 3:10-CV-0080-RRB II. FACTS This action arises out of a contractual business dispute. CFC is an Alaska Native Corporation ("ANC") based in Ketchikan, Alaska.4 As an ANC, CFC is entitled to participate in Federal Government contracting programs both directly and through its subsidiaries.5 APM's government and 1CI's business awarded each under consisted the primarily of contracts Small Business Administration ("SBA") 8(a) program.6 CFC had acquired a majority interest in APM and was interested in using APM to expand into 8(a) contracting.7 The representatives of CFC and APM met Jackson, who Jackson acquired an interest in was active in 8(a) contracting.8 APM and 1CI and took over management of both companies.9 Through his management position at APM and 1CI, from 2004 through 2006, Jackson caused both companies to enter into agreements with ABMS (which Jackson owned), SEC (Jackson's wife being the president), Butler Marketing & Consulting Group, Inc. 4 Docket 27 at 3. Id. Id. Id. at 4. Id. Id. at 4-5. 5 6 7 8 9 ORDER RE MOTION TO DISMISS AT DOCKET 34 - 3 3:10-CV-0080-RRB ("Butler") (Jackson's sister being the president), and Chung & Associates.10 In addition, in December 2004, Townsend Jackson, Jackson's brother, executed, on behalf of APM, a promissory note in favor of ABMS for a loan of $1.9 million to APM.11 In late 2008, the United States Government began an investigation into the actions of Jackson, ABMS, APM, and 1CI under the SBA 8(a) program, which led to the suspension of APM from contracting under the program.12 In March 2010, Plaintiffs filed a complaint in the Superior Court for the State of Alaska alleging, inter alia, breach of contract, breach of fiduciary duties, and professional negligence on the part of Defendants.13 Court on April 22, 2010.14 The matter was then removed to this The current dispute stems from the actions taken by Jackson as manager of APM and 1CI and the consequences of such actions to Plaintiffs. III. RULE OF DECISION Rule 12(b)(6) allows a party to assert by motion that all or part of the opposing party's claims, as stated in the complaint, 10 Id. at 6. Id. at 9. Id. at 6. Docket 34 at 2. Id. 11 12 13 14 ORDER RE MOTION TO DISMISS AT DOCKET 34 - 4 3:10-CV-0080-RRB fail to state a claim upon which relief can be granted. Dismissal can be based on a lack of a cognizable legal theory or the absence of facts to support a valid legal theory.15 A complaint, however, should not be dismissed "unless it appears beyond doubt that the plaintiff can prove no set of facts in support of his claim which would entitle him to relief[,]" with the court treating as true all facts alleged in the complaint.16 Furthermore, all reasonable The inferences must be drawn in favor of the non-moving party.17 Court should not look to "whether a plaintiff will ultimately prevail but whether the claimant is entitled to offer evidence to support the claims."18 IV. DISCUSSION A. Counts I, III, and V Are Not Time-barred Because Plaintiffs Allege Plausible Facts That Jackson and ABMS Actively Concealed Their Fraudulent Scheme From Plaintiffs. Defendants argue that Counts I, III, and V, (Breach of Fiduciary 15 Duty against Jackson, Fraudulent Misrepresentation Balistreri v. Pacifica Police Dept., 901 F.2d 696, 699 (9th Cir. 1990) (quoting Conley v. Gibson, 355 U.S. 41, 45-46 (1957)). 16 Id. Holden v. Hagopian, 978 F.2d 1115, 1118 (9th Cir. 1992) (citing Usher v. City of Los Angeles, 828 F.2d 556, 561 (9th Cir. 1987)). 17 Gilligan v. Jamco Development Corp., 108 F.3d 246, 249 (9th Cir. 1997). 18 ORDER RE MOTION TO DISMISS AT DOCKET 34 - 5 3:10-CV-0080-RRB against Jackson, and Breach of Fiduciary Duty against ABMS), should be dismissed because the claims are raised after either the twoyear tort or three-year contract Alaska statute of limitations limit has passed.19 Defendants contend that Plaintiffs had inquiry The notice of the possibility of these claims as early as 2004.20 facts in the complaint, however, allege otherwise. The Court applies the statutes of limitations of the state in which it sits.21 Alaska employs the discovery rule, which states that "a cause of action accrues `when a reasonable person has enough information to alert that person that he or she has a potential cause of action or should begin an inquiry to protect his or her rights.'"22 A party that conceals the existence of fraudulent activity from the plaintiff, however, is estopped from pleading "the statute of limitation if the plaintiff's delay in bringing suit was occasioned by reliance on the false or fraudulent representation."23 A party should be charged with the knowledge of Docket AS 09.10.053. 19 20 34 at 3; see generally AS 09.10.070 and Docket 34 at 4. Guaranty Trust Co. of N.Y. v. York, 326 U.S. 99, 110 Egner v. Talbot's, Inc., 214 P.3d 272, 278 (Alaska 2009). 21 (1945). 22 Palmer v. Borg-Warner Corp., 838 P.2d 1243, 1247 (Alaska 1992) (quoting Sharrow v. Archer, 658 P.2d 1331, 1333 (Alaska 1983)). 23 ORDER RE MOTION TO DISMISS AT DOCKET 34 - 6 3:10-CV-0080-RRB the "concealment only when it would be utterly unreasonable for the party not to be aware of the deception."24 In the present case, it was reasonable for Plaintiffs not to be aware of Jackson's and ABMS's alleged fraudulent activities because Jackson and ABMS were, allegedly, taking measures to actively conceal such activities from Plaintiffs.25 According to the complaint, the true impact of the transactions between Jackson, ABMs, and other companies was not revealed to Plaintiffs until the investigations by the United States Government in late 2008.26 Furthermore, Plaintiffs trusted and relied on both ABMS and Jackson, who allegedly held himself out as a competent manager in the realm of SBA 8(a) program contracts,27 to efficiently and effectively facilitate APM's and 1CI's 8(a) contracts.28 Plaintiffs had no reason to suspect that Jackson and ABMS harbored ulterior motives.29 Thus, on its face, the complaint puts forward believable facts that show that Plaintiffs did not have enough information to alert them to a possible cause of action against Defendants nor to 24 Id. at 1251. Docket 27 at 6. Id. Id. at 4. Id. Id. at 6. 25 26 27 28 29 ORDER RE MOTION TO DISMISS AT DOCKET 34 - 7 3:10-CV-0080-RRB warrant reasonable inquiry into the matter. Therefore, since the complaint was filed in March of 2010, Counts I, III, and V are well within either of Alaska's statute of limitations limits. Dismissal, therefore, is not warranted. B. Count II Avoids Dismissal Because Jackson Holds an Interest in Both APM and 1CI and the Complaint Pleads Enough Evidence to Support Holding Jackson Liable for Agreements Entered into by APM and 1CI. Defendants argue that Count II (Breach of Contract against Jackson) should be dismissed because the complaint fails to allege the existence of a contractual relationship between Jackson and the other parties to the agreements that APM and 1CI entered into while Jackson was managing both companies, and that such privity of contract is needed in order to successfully bring a breach of contract claim.30 Although Jackson was not a signatory to the contracts between APM, 1CI, and the other involved companies, Jackson was a stake holder in both APM and 1CI, and the complaint alleges enough facts to support piercing the corporate veil of the two companies and holding Jackson liable. "Piercing the corporate veil is a means of assessing liability for the acts of a corporation against the equity holder in the corporation."31 30 However, a court should only pierce the veil in Docket 34 at 5. Pyramid Printing Co. v. Alaska State Com'n for Human Rights, 153 P.3d 994, 1000 (Alaska 2007). 31 ORDER RE MOTION TO DISMISS AT DOCKET 34 - 8 3:10-CV-0080-RRB "exceptional circumstances."32 In the case at hand, the complaint sufficiently alleges such exceptional circumstances. The complaint alleges that Jackson manipulated and controlled the actions of SEC, ABMS, Butler, and other entities and in doing so, ignored the concept that all of the entities were separate.33 Furthermore, Plaintiffs allege that Jackson used SEC to funnel funds to himself to the detriment of CFC, APM, 1CI, and other companies. 3 4 If true, along with evidence of the 2008 government investigation into Defendants' 8(a) actions, these facts point to exceptional circumstances that could warrant piercing the corporate veil and finding Jackson liable. dismissed. C. Count III Is Dismissed Because the First Amended Complaint Fails to Provide Enough Information for Defendants to Prepare an Adequate Answer to the Allegations. Count II, therefore, will not be Plaintiffs argue that the First Amended Complaint contains specificity regarding by the time, and place, that and nature of the pled misrepresentation Jackson, Plaintiffs have specific enough facts to place Defendants on notice.35 Plaintiffs 32 L.D.G., Inc. v. Brown, 211 P.3d 1110, 1125 (Alaska 2009). Docket 27 at 4. Id. Docket 36 at 10. 33 34 35 ORDER RE MOTION TO DISMISS AT DOCKET 34 - 9 3:10-CV-0080-RRB misinterpret the Federal Rules of Civil Procedure Rule 9(b) pleading standard. While putting the defendant on notice is the crux of the basic pleading standard as described in Rule 8, Rule 9(b) requires the heightened standard of is pleading adjudicated with by particularity. Moreover, particularity determining whether the pleading "identifies the circumstances constituting fraud so that a defendant can prepare an adequate answer from the allegations."36 Broad allegations lacking in particularized detail do not satisfy the particularity requirement of 9(b).37 Plaintiffs' only attempt at pleading with particularity occurs in relation to the nature of the alleged misrepresentations and is comprised of nothing more than broad, general allegations that are devoid of any supporting detail. time of the Furthermore, Plaintiffs do not pinpoint the fraud; they simply state that the alleged misrepresentations were made and ongoing between 2004 and 2009.38 Thus, the Court finds that Count III is not supported by sufficient facts and must be dismissed. Moore v. Kayport Package Exp., Inc., 885 F.2d 531, 540 (9th Cir. 1989) (emphasis added). 36 37 2001). 38 Bly-Magee v. California, 236 F.3d 1014, 1018 (9th Cir. Docket 27 at 20. ORDER RE MOTION TO DISMISS AT DOCKET 34 - 10 3:10-CV-0080-RRB D. Counts VI and VIII Are Dismissed Because Economic Damages Based on Professional Services Contracts must Be Sought under a Contract Theory of Liability. Plaintiffs argue that because ABMS held itself out as possessing a degree of knowledge and skill ordinarily possessed by a construction manager qualified to run an SBA 8(a) certified construction management firm . . . [,] ABMS had an independent duty imposed by law, apart from its contractual duty to APM, to adhere to a professional standard of care[,] and, therefore, ABMS can be sued for professional negligence.39 Additionally, Plaintiffs contend that SEC can be sued for professional negligence because SEC "owed a duty to APM and CFC to provide accounting services for the APM contracts utilizing the care and skill a reasonably competent accountant would utilize."40 Plaintiffs rely primarily on Dep. Of Natural Res. v. Transamerica Premier Ins. Co., 856 P.2d 766 (Alaska 1993), to show that a party can recover economic losses arising from a professional's malpractice despite the existence of a contractual relationship between the parties because the duty of professional care is one imposed by law, not contract.41 However, the Court in Pedersen v. Flannery, 863 P.2d 856 (Alaska 1993), announced the contrary 39 Docket 36 at 12. Docket 27 at 24. Id. at 11 40 41 ORDER RE MOTION TO DISMISS AT DOCKET 34 - 11 3:10-CV-0080-RRB principal that professional malpractice claims seeking solely economic damages sound in contract, not tort.42 Pedersen distinguished between economic and non-economic damages sought under malpractice claims and noted that when the parties are in privity of contract economic damages sought for negligent professional services must be pursued under a theory of contractual liability and not tort.43 between Transamerica and Pedersen, With the apparent dissonance the Court relies, in the interest of continuity, on St. Denis v. Department of Housing and Urban Development, 900 F. Supp. 1194 (D. Alaska 1995). In St. Denis, the court found that "Alaska cases foreshadow a general rule precluding negligence actions by those in privity where only economic losses are alleged."44 Because Plaintiffs' negligence claims against ABMS and SEC allege only economic damages, and because Plaintiffs were in privity with both ABMS and SEC, the negligence claims are not appropriate. Additionally, ABMS's and 42 See 863 P.2d at 957-58 Id.; Lee Houston & Associates, Ltd. v. Racine, 806 P.2d 848, 854 (Alaska 1991). ABMS's actions qualify as professional services. American Motorists Ins. Co. v. Republic Ins. Co., 830 P.2d 785, 787 (Alaska 1992) (professional services includes acts: arising out of a vocation, calling, occupation, or employment involving specialized knowledge, labor, or skill and in determining whether a particular act is a "professional service" the court must look not to the title or character of the party performing the act, but to the act itself). 43 44 900 F. Supp. at 1204. ORDER RE MOTION TO DISMISS AT DOCKET 34 - 12 3:10-CV-0080-RRB SEC's actions raised by the negligence claims practically mirror those used by Plaintiffs to support their breach of contract claims against both companies.45 Promises expressed or implied in a contract must be enforced by an action on the contract, not in tort.46 Therefore, Plaintiffs' grievances under these particular claims must be remedied under a contractual legal theory and not under a theory of professional negligence. and VIII are dismissed. E. Count XII Is Dismissed Because it Alaska Law Recognizes a Separate Destruction" and Such a Claim Is Factor in Determining Consequential Is Unclear Whether Tort of "Business Better Suited as a Damages. Accordingly, Counts VI Plaintiffs argue that Alaska courts recognize the tort of business destruction, and that they can make such a claim because Defendants' alleged fraudulent activity has proximately caused Plaintiffs' companies to be suspended from government contracting, thereby, destroying such businesses.47 In support of their contention, Plaintiffs cite Industrial Commercial Elec., Inc. v. Mclees, 101 P.3d 593 (Alaska 2004). In Industrial, defendants counterclaimed on a theory of tortious business destruction, and the court, while dismissing all of the plaintiffs' claims, took no 45 Docket 27 at 7, 8, 22-24. Alaska Pacific Assur. Co. v. Collins, 794 P.2d 936, 946 (Alaska 1990). 46 47 Docket 36 at 13-14. ORDER RE MOTION TO DISMISS AT DOCKET 34 - 13 3:10-CV-0080-RRB action with regard to the business destruction claim.48 However, there was no motion to dismiss nor any other motions that would have allowed the Industrial court to consider the validity of the business destruction claim. Showing that a party in a single case raised the claim of business destruction does not establish that Alaska courts recognize such a tort. Moreover, the consideration of whether a business has been destroyed or not is more appropriate in the damages phase of trial. Business destruction is akin to loss of profits and other consequential damages that stem from a breach of contract. In addition, the facts alleged under the business destruction claim are practically the same as the facts alleged under the breach of contract claims against Jackson, SEC, Butler, and ABMS. Thus, Plaintiffs may pursue the alleged destruction of their businesses as a consideration for consequential damages, but not as a separate claim. F. Count XIII Avoids Dismissal Because There Is an Immediate Need to Determine Whether or Not the Promissory Note Is Currently Enforceable Against APM. argue that a declaratory judgment as to the Defendants validity of the promissory note given by APM to ABMS for a loan of $1.9 million to APM is not ripe "because the promissory note would only be involved in a hypothetical future `accounting' . . . " due 48 101 P.3d at 596. ORDER RE MOTION TO DISMISS AT DOCKET 34 - 14 3:10-CV-0080-RRB to Plaintiffs' failure to make a claim on the promissory note.49 It is not, however, necessary to make a claim on the promissory note for the Court to issue a declaratory judgment concerning such note.50 A declaratory judgment action is justiciable if: (1) it is brought by an interested party; (2) involves an actual controversy that has not reached a stage at which either party may seek a coercive remedy; and (3) a party that could sue for coercive relief has not yet done so.51 The controversy must be "of sufficient immediacy and reality to warrant the issuance of a declaratory judgment."52 In the present case, Plaintiffs bring an action for declaratory judgment because the promissory note, allegedly, was received for an improper purpose and was not supported by consideration, and the complaint states that there is no evidence that funds were even issued to APM in exchange for such note.53 The promissory note places an ever-present and immediate burden on APM to pay the amount of the loan to ABMS. It is of no consequence 49 Docket 38 at 8. Seattle Audubon Soc. v. Mazel, 80 F.3d 1401, 1405 (9th Cir. 1996). 50 51 Id. Id. Docket 27 at 27. 52 53 ORDER RE MOTION TO DISMISS AT DOCKET 34 - 15 3:10-CV-0080-RRB that ABMS has not actually taken action to collect on the note; the note's mere existence makes APM responsible for the note. Thus, the Court determines that Count XIII is justiciable and, therefore, not subject to dismissal. V. CONCLUSION For the foregoing reasons, a partial dismissal of the Counts in Plaintiffs First Amended Complaint is proper. Accordingly, Defendants' Motion to Dismiss at Docket 34 is hereby GRANTED IN PART as to Counts III, VI, VIII, and XII and DENIED IN PART as to Counts I, II, V, and XIII. Additionally, Defendants' Motion to Dismiss at Docket 24 is rendered moot by Plaintiffs' First Amended Complaint and is, therefore, DENIED. IT IS SO ORDERED. ENTERED this 7th day of October, 2010. S/RALPH R. BEISTLINE UNITED STATES DISTRICT JUDGE ORDER RE MOTION TO DISMISS AT DOCKET 34 - 16 3:10-CV-0080-RRB

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?