Design Trend International Interiors, Ltd. v. Cathay Enterprises, Inc.
Filing
92
ORDER, Appellant's Motion to Amend Judgment 31 and Design Trend's Motion for Award of Attorneys' Fees and Costs 46 are granted; the final decision of the bankruptcy court is reversed; the portion of this Court's 2/15/12 order 87 requiring supplemental briefing on attorneys' fees is vacated; the Clerk shall enter judgment nunc pro tunc effective 3/29/11, in favor of Design Trend and against Cathay, for: (1) the principal sum of $169,025.22, with prejudgment int erest at 10 percent per annum from 6/5/03 to 3/28/11, and post judgment interest at the federal judgment rate (as of 3/29/11) of 0.26 percent from 3/29/11 until paid; (2) attorneys fees in the amount of $382,966.44; and (3) taxable costs and the amount of $10,203.93; the Clerk shall terminate this case. Signed by Judge Neil V Wake on 3/6/12. (REW)
1
WO
2
3
4
5
6
IN THE UNITED STATES DISTRICT COURT
7
FOR THE DISTRICT OF ARIZONA
8
9
Design Trend International Interiors, Ltd.,
an Arizona corporation,
10
ORDER
Appellant,
11
vs.
12
Cathay Enterprises,
corporation,
No. CV 10-01079-PHX-NVW
13
Inc.,
an
Arizona
Appellee.
14
15
Before the Court are (1) the parties’ briefs in response to Cathay’s motion to
16
reconsider (Docs. 79, 84, 86; see also Docs. 32, 44, 57, 69, 74, 76); (2) “Appellant’s
17
Motion to Amend Judgment” (Doc. 31); and (3) Design Trend’s “Motion for Award of
18
Attorneys’ Fees and Costs” (Doc. 46). For the reasons stated below the Court will enter a
19
revised judgment nunc pro tunc, effective March 29, 2011, for the principal sum of
20
$169,025.22, and Design Trend’s motions for prejudgment interest and attorneys fees
21
will be granted.
22
I.
FINDINGS & CONCLUSIONS
23
Having withdrawn the reference to the bankruptcy court and having considered the
24
evidence and arguments submitted in connection with these proceedings, the Court finds
25
and concludes as follows:
26
27
28
1
A.
Contract and Performance
2
1.
On March 14, 2001, Design Trend International Interiors. Ltd. (Design
3
Trend) agreed with Cathay Enterprises, Inc. (Cathay) to remodel Cathay’s hotel for a
4
fixed price of $1,277,000, inclusive of sales tax. (Doc. 15-3 at 3, 9, 22.)
5
2.
In July 2001, Design Trend and Cathay agreed to narrow the scope of
6
Design Trend’s work and reduce the fixed price of their contract to $1,209,737.45. (Doc.
7
15-2 at 56, 83; Doc. 45 at 38, 40, 48, 74; Doc. 79-4 at 13.)
8
3.
9
$986,707.80.
10
As of late July 2001, Cathay’s payments to Design Trend totaled
(Undisputed.)
11
12
13
4.
Cathay has since made no further payments to Design Trend.
Under the contract as modified in July 2001, the parties expected Design
Trend to complete its work by August 31, 2001. (Doc. 15-6 at 2.)
5.
Through two Arizona Registrar of Contractors (“Registrar”) proceedings
14
filed by Cathay against Design Trend, it was established by decision dated June 5, 2003
15
that Design Trend had not completed its work for Cathay by August 31, 2001, but had
16
substantially completed its work by mid-February 2003. (Doc. 15-2 at 19–28, 30–36.)
17
18
19
6.
As of June 5, 2003, Cathay became obligated to pay all amounts yet owing
to Design Trend. (Doc. 15-2 at 30–36.)
7.
By complaining to the Registrar against Design Trend, insisting that Design
20
Trend complete its work, and accepting such additional work as the Registrar ordered,
21
Cathay waived any claim that Design Trend’s delay in performance excuses Cathay from
22
paying Design Trend for such performance. (Doc. 29 at 11–14.)
23
B.
Sundry Offsets
24
8.
The $1,209,737.45 reduced contract price was intended to include
25
$14,201.19 in furniture, fixtures, and equipment (namely: headboards, toasters, end
26
tables, vanity lights, and dressing mirrors) and Design Trend never provided those items.
27
(Doc. 79-2 at 19–68; Doc. 79-4 at 13–23.) Based on a review of the joint pretrial
28
statement, the Court finds that Cathay adequately preserved this claim for trial. (Doc. 79-2
1
1 at 86 ¶ 15.) Cathay is therefore entitled to a $14,201.19 offset for furniture, fixtures,
2
and equipment.
3
9.
Cathay claims that it was required to purchase $1,603.66 in roofing
4
materials to repair damage done by Design Trend. Design Trend concedes this assertion.
5
(See Doc. 84 at 4 n.2.) Cathay is therefore entitled to a $1,603.66 offset for roofing
6
materials.
7
10.
Cathay claims that it was forced to pay $36,199.58 to certain other
8
contractors to fix or complete some of Design Trend’s work. Design Trend concedes that
9
Cathay is entitled to some offset in this regard and has agreed not to contest the requested
10
amount. (See Doc. 29 at 15.) Cathay is therefore entitled to a $36,199.58 offset for
11
amounts it paid to other contractors for work that Design Trend should have done.
12
11.
Cathay also claims that is was forced to spend an unspecified amount to fix
13
certain “punch list” items that were Design Trend’s responsibility.
14
concedes that Cathay is entitled to a $2,000 offset in this regard. (See Doc. 29 at 15.)
15
Cathay is therefore entitled to a $2,000.00 offset for amounts it paid to fix punch list
16
items that Design Trend should have fixed.
17
12.
Design Trend
Cathay claims that it incurred $4,496.80 in extra costs for cleanup, repairs,
18
and phone calls that Design Trend should have paid for. Based on a review of the joint
19
pretrial statement, the Court finds that Cathay did not adequately preserve this claim for
20
trial. (Doc. 79-1 at 67–90.) Cathay therefore is not entitled to an offset for these
21
amounts.
22
13.
Cathay claims that it paid for and received from Design Trend certain
23
tables, worth about $500, but those tables went missing. Cathay claims an offset of $500
24
because the $1,209,737.45 reduced contract price included two $48.06 line items for
25
“protection of FF&E [furniture, fixtures, and equipment]” (Doc. 79-4 at 16, 17), which
26
Cathay interprets as some sort of security fee or insurance premium related to loss or
27
theft. Based on the value of these “protection of FF&E” line items and the nature of this
28
project, the Court concludes that “protection of FF&E” does not refer to security or
-3
1
insurance. It likely refers to protection from paint and dust, but the Court need not
2
conclude as much. It suffices to note that “protection of FF&E” does not refer to security
3
or insurance. Cathay therefore is not entitled to an offset for the lost tables.
4
C.
“Phase V” Electrical Work
5
14.
The $1,209,737.45 reduced contract price included a line item for electrical
6
work described as “[f]urnish[ing] and install[ing] new circuits at wet locations per plans”
7
in twenty-two Type “C” guestrooms, at a cost of $1,458 per room, for a total of $32,076.
8
(Doc. 79-4 at 17.)
9
15.
The $1,458 cost per Type “C” guestroom reflected a reduction in scope
10
from full electrical work to rough-in only (i.e., running wire and installing related
11
hardware, but not making it functional). (Doc. 79-4 at 39–41, 47–48.)
16.
12
The electrical work on Type “C” guestrooms, located on the south side of
13
Cathay’s hotel, comprised “Phase V” of the remodeling project. (Doc. 79-4 at 9, 25, 30–
14
32.)
15
17.
In both Registrar complaints filed by Cathay against Design Trend (see ¶ 5,
16
above) Cathay alleged that “Phase V was never touched.”
17
Cathay’s first Registrar of Contractors complaint attached two lists of allegedly
18
unfinished work (designated “List A” and “List B”), and stated at item 10 of List A:
19
“Electrical wire was not run in the South side building” (referring to Phase V electrical
20
work). (Doc. 15-2 at 57.)
21
18.
(Doc. 15-2 at 56, 83.)
A Registrar inspector performed an on-site inspection based on Lists A and
22
B and ordered Design Trend to address various items on those lists, but did not order
23
Design Trend to correct List A, item 10, regarding the Phase V electrical work. (Doc. 15-
24
2 at 20–21.)
25
26
19.
Following the Registrar inspector’s order, Design Trend completed at least
some of the work required by the inspector. (Doc. 15-2 at 21–22.)
27
28
-4
20.
1
At a Registrar hearing following Design Trend’s additional work, Cathay
2
testified regarding the items from List A that it believed were still uncompleted. Cathay
3
did not mention the Phase V electrical work. (Doc. 15-2 at 22–23.)
21.
4
5
Cathay’s second Registrar complaint against Design Trend also did not
mention Phase V electrical work. (Doc. 15-2 at 83–90.)
22.
6
Cathay fully and fairly litigated the electrical work issue through Registrar
7
proceedings and lost, and is now collaterally estopped from re-raising the issue here.
8
(See Doc. 29 at 8–9 (citing authority regarding collateral estoppel effect of Registrar
9
proceedings).) Moreover, viewing the matter de novo on the evidence of record, the
10
Court independently finds that Cathay has not proved and is not entitled Phase V offsets.
11
D.
Sales Tax
12
23.
The $1,209,737.45 reduced contract price, like the original contract price,
13
was inclusive of sales tax. (Doc. 79-4 at 13; Doc. 79-6 at 20.)
24.
14
Although Design Trend claims that the $1,209,737.45 reduced contract
15
price was conditioned on Cathay receiving a sales tax waiver, Design Trend’s argument
16
is based on its own purported summary of certain trial testimony which it does not attach.
17
(Doc. 84 at 8–9.) Accordingly, Design Trend’s argument fails for lack of evidence.
18
Cathay is not required to pay sales tax on the remaining amounts it owes.
19
E.
Damages Calculation
20
25.
Design Trend’s principal damages are as follows:
21
$
1,209,737.450
22
$
(986,707.80)
23
$
(14,201.19)
24
$
(1,603.66)
Roofing Materials (¶ 9)
25
$
(36,199.58)
Other Contractors (¶ 10)
26
$
(2,000.00)
Punch List Items (¶ 11)
$
169,025.220
Reduced Contract Amount (¶ 2)
Sums Previously Paid by Cathay (¶ 3)
Furniture, Fixtures, and Equipment (¶ 8)
27
TOTAL
28
-5
1
II.
DESIGN TREND’S MOTION TO AMEND JUDGMENT
2
Design Trend’s motion to amend the judgment requests prejudgment interest on
3
the principal award, excluding sales tax. Whether Design Trend merits prejudgment
4
interest turns on the questions discussed below.
5
A.
6
Cathay argues that 11 U.S.C. § 726(a)(5) — specifying that the fifth priority in
7
distributing property of the bankruptcy estate is “payment of interest at the legal rate from
8
the date of the filing of the petition” — means that (i) interest started to accrue when
9
Cathay filed for bankruptcy (September 7, 2004), and not before; and (ii) “the legal rate”
State vs. Federal Law
10
means the federal judgment rate found in 28 U.S.C. § 1961.
11
Section 726 does not apply to this case.
Section 726 governs Chapter 7
12
(liquidation) cases. Cathay filed under Chapter 11 (reorganization). A review of the
13
bankruptcy docket shows that the trustee moved to convert the case to Chapter 7 on
14
multiple occasions, but all of those motions were withdrawn or denied. The docket
15
indicates that Cathay’s case remains in Chapter 11.
16
The Court could locate no provision from Chapter 11 governing interest on
17
preexisting claims.
The Court assumes this is because Chapter 11 relies on the
18
formulation of a court-approved plan, and such plans could address interest in many ways
19
depending on the circumstances of the estate in bankruptcy. See generally 11 U.S.C.
20
§§ 1121–29.
21
This case is equivalent to a diversity case removed to federal court. As such, the
22
Court applies the law of state governing the contract, which is Arizona law. See In re
23
Banks, 225 B.R. 738, 750 (Bankr. C.D. Cal. 1998) (“The removed [adversary proceeding]
24
is equivalent to a diversity action, as it is not brought under any aspect of federal law and
25
is in this court only due to its relationship to the [core] bankruptcy. In diversity cases,
26
state law governs the award of pre-judgment interest.”). The Court will therefore award
27
interest according to Arizona state law.
28
-6
1
B.
2
In Arizona, “[p]rejudgment interest is awarded as a matter of right on a liquidated
3
claim.” John C. Lincoln Hosp. & Health Corp. v. Maricopa County, 208 Ariz. 532, 544,
4
96 P.3d 530, 542 (Ct. App. 2004). Liquidated claims are those for which “‘the evidence
5
furnishes data which, if believed, makes it possible to compute the amount with
6
exactness, without reliance upon opinion or discretion.’”
7
McCormick, Handbook on the Law of Damages § 54, at 213 (1935)) (emphasis
8
removed). Unliquidated claims are those for which “‘the exact amount of the sum to be
9
allowed cannot be definitely fixed from the facts proved, disputed or undisputed, but
10
must in the last analysis depend upon the opinion or discretion of the judge or jury as to
11
whether a larger or a smaller amount should be allowed.’”
12
considered unliquidated merely because the [trier of fact] must find certain facts in favor
13
of the [claimant] in order to determine the amount of damages. All that is necessary is
14
that the evidence furnish data which, if believed, makes it possible to compute the amount
15
with exactness.” Trus Joist Corp. v. Safeco Ins. Co. of Am., 153 Ariz. 95, 109, 735 P.2d
16
125, 139 (Ct. App. 1986) (emphasis in original). The fact that a claim is subject to
17
offsets does not make it unliquidated. Fairway Builders, Inc. v. Malouf Towers Rental
18
Co., Inc., 124 Ariz. 242, 265–67, 603 P.2d 513, 536–38 (Ct. App. 1979).
19
Whether Design Trend’s Claim Was Liquidated
Id. (quoting Charles T.
Id.
“A claim is not
In modern practice, few claims fall into the unliquidated category.
Punitive
20
damages, attorneys fees, and benefit-of-the-bargain damages (for fraud) are considered
21
unliquidated. Alta Vista Plaza, Ltd. v. Insulation Specialists Co., Inc., 186 Ariz. 81, 82–
22
83, 919 P.2d 176, 177–78 (Ct. App. 1995). Most other sorts of claims have come to be
23
considered liquidated. See 1 Dan B. Dobbs, Law of Remedies § 3.6(2), at 340 (2d ed.
24
1993) (“as courts have come to accept interest as necessary for full compensation they
25
have expanded the concept of [liquidated damages]”).
26
In this case, Design Trend’s claim was liquidated. Cathay knew that the reduced
27
contract price was $1,209,737.45 and that it had paid only $986,707.80. It also knew
28
-7
1
with certainty as of the second ALJ decision (June 5, 2003) that Design Trend had
2
completed its work and payment was due, subject to certain offsets. This “data . . . makes
3
it possible to compute the amount [owed] with exactness.” Trus Joist, 153 Ariz. at 109,
4
735 P.2d at 139.
5
Cathay nonetheless protests that its contract with Design Trend did not require a
6
final payment until an architect issued a certificate of completion. To this day, Design
7
Trend has not obtained a certificate of completion, and therefore, Cathay argues, it was
8
never under an obligation to pay until this Court entered judgment on March 29, 2011.
9
But Cathay’s position all along is that Design Trend never completed the project. In any
10
event, the Court is satisfied that the Registrar’s June 5, 2003 ruling, preceded by two
11
Registrar inspections (see Doc. 29 at 4–5), is the substantial equivalent of an architect’s
12
certificate of completion. Accordingly, Cathay became obligated at least as of June 5,
13
2003.
14
C.
15
The date on which a sum became liquidated is not necessarily the date from which
16
17
18
19
20
21
22
23
24
25
26
27
Whether Design Trend Made a Demand
interest accrues. Rather,
[p]rejudgment interest on a liquidated claim accrues from the
date of demand of a sum certain. . . .
Furthermore,
prejudgment interest will not accrue until the claimant
provides sufficient information and supporting data to allow
the debtor to determine the amount owed. Consequently, a
demand for a lump sum payment without an itemization is
insufficient.
Scottsdale Ins. Co. v. Cendejas, 220 Ariz. 281, 289, 205 P.3d 1128, 1136 (Ct. App. 2009)
(citations and internal quotation marks omitted); see also Alta Vista Plaza, 186 Ariz. at
83, 919 P.2d at 178; Rawlings v. Apodaca, 151 Ariz. 180, 186, 726 P.2d 596, 602 (Ct.
App. 1985), vacated in part on other grounds, 151 Ariz. 149, 726 P.2d 565 (1986). All
of these decisions involve insufficient demands before filing suit, and all concluded that,
in such a circumstance, prejudgment interest accrues from the date the claimant filed its
28
-8
1
complaint. Id. (as to all citations). None of these cases addresses the question of when
2
interest begins to accrue for a claim that becomes liquidated after filing suit.
3
On this record, Design Trend never made an itemized demand on Cathay.
4
Therefore, the earliest date on which interest could begin accruing is May 8, 2002, the
5
date on which Design Trend filed its “complaint” (really a counterclaim) in state court.
6
Nonetheless, the claim did not become liquidated until June 5, 2003. Prejudgment
7
interest will be calculated from that date.
8
D.
9
Until last year, the prejudgment interest in Arizona was provided for as follows:
10
“Interest on any loan, indebtedness, judgment or other obligation shall be at the rate of
11
ten per cent per annum, unless a different rate is contracted for in writing, in which event
12
any rate of interest may be agreed to.” A.R.S. § 44-1201(A) (2003 & Supp. 2010). On
13
April 13, 2011, the Governor signed into law the following amendment to that provision
14
(strikeout shows deletions, underline shows additions):
15
16
17
18
19
20
21
22
23
24
25
26
Interest Rate
A. Interest on any loan, indebtedness, judgment or other
obligation shall be at the rate of ten per cent per annum,
unless a different rate is contracted for in writing, in which
event any rate of interest may be agreed to. Interest on any
judgment that is based on a written agreement evidencing a
loan, indebtedness or obligation that bears a rate of interest
not in excess of the maximum permitted by law shall be at the
rate of interest provided in the agreement and shall be
specified in the judgment.
B. Unless specifically provided for in statute or a different
rate is contracted for in writing, interest on any judgment
shall be at the lesser of ten per cent per annum or at a rate per
annum that is equal to one per cent plus the prime rate as
published by the board of governors of the federal reserve
system in statistical release H.15 or any publication that may
supersede it on the date that the judgment is entered. The
judgment shall state the applicable interest rate and it shall
not change after it is entered.
27
28
-9
1
2011 Ariz. Sess. Laws., ch. 99 § 15. Under this new law, judgments no longer accrue
2
interest at ten percent unless the presumptive interest rate of prime-plus-one-percent
3
happens to exceed ten percent, which is not the case here.
4
This amendment raises an unusual issue in this case. The Court originally entered
5
judgment on March 29, 2011 (Doc. 30) — before the amendment took effect — without
6
any mention of prejudgment interest due to uncertainty in that regard. Design Trend then
7
moved — also before the statutory amendment took effect — to amend the judgment to
8
include prejudgment interest. Without resolving that motion, however, the Court vacated
9
the judgment to reconsider certain issues that were not previously raised and the
10
relevance of which could not have been reasonably foreseen given the posture of the case
11
leading up to the March 29, 2011 judgment.
12
concluded that Design Trend is entitled to a somewhat smaller amount, but given the
13
intervening statutory change, the Court will enter the judgment nunc pro tunc, retroactive
14
to March 29, 2011. The revised judgment embodies what the original judgment should
15
have been had the parties and the Court been able to foresee the issues resolved here.
16
Accordingly, interest will be awarded at ten percent per annum.
17
III.
18
After reconsideration, the Court has
DESIGN TREND’S MOTION FOR ATTORNEYS FEES
Design Trend filed its motion for attorneys fees in response to the since-vacated
19
March 29, 2011 judgment.
In other words, Design Trend filed its motion before
20
incurring fees in these reconsideration proceedings. Because Cathay established the
21
merit of some of the offsets it sought upon reconsideration (certain FF&E and sales tax),
22
the Court concludes that — although Design Trend is still the “successful party” in a
23
“contested action arising out of a contract,” A.R.S. § 12-341.01 — additional attorneys
24
fees to Design Trend for reconsideration proceedings are not warranted. For clarity,
25
Cathay’s success in reconsideration proceedings does not make it, to that extent, a
26
“successful party” in a “contested action arising out of a contract.”
27
28
- 10
1
Having reviewed Design Trend’s fees motion, the Court finds that Design Trend is
2
entitled to such fees, and that the fees incurred are reasonable. The Court will award the
3
requested amount of $382,966.44 in fees and $10,203.93 in taxable costs.
4
IT IS THEREFORE ORDERED that “Appellant’s Motion to Amend Judgment”
5
(Doc. 31) and Design Trend’s “Motion for Award of Attorneys’ Fees and Costs” (Doc.
6
46) are GRANTED.
7
8
9
10
IT IS FURTHER ORDERED that the final decision of the bankruptcy court is
REVERSED.
IT IS FURTHER ORDERED that the portion of this Court’s February 15, 2012
order (Doc. 87) requiring supplemental briefing on attorneys’ fees is VACATED.
11
IT IS FURTHER ORDERED that the Clerk shall enter judgment nunc pro tunc
12
effective March 29, 2011, in favor of Design Trend and against Cathay, for: (1) the
13
principal sum of $169,025.22, with prejudgment interest at 10 percent per annum from
14
June 5, 2003 to March 28, 2011, and post judgment interest at the federal judgment rate
15
(as of March 29, 2011) of 0.26 percent from March 29, 2011 until paid; (2) attorneys fees
16
in the amount of $382,966.44; and (3) taxable costs and the amount of $10,203.93. The
17
Clerk shall terminate this case.
18
Dated this 6th day of March, 2012.
19
20
21
22
23
24
25
26
27
28
- 11