Speros v. Sentinel Insurance Company Limited

Filing 125

ORDER - IT IS THEREFORE ORDERED denying Plaintiff's Application to Confirm (in Part) Appraisal Award (Doc. 73 ). IT IS FURTHER ORDERED denying Defendant's Counter-Motion to Vacate Appraisal Award (Doc. 79 ). (See document for further details). Signed by Judge John J Tuchi on 3/29/18. (LAD)

Download PDF
1 WO NOT FOR PUBLICATION 2 3 4 5 6 IN THE UNITED STATES DISTRICT COURT 7 FOR THE DISTRICT OF ARIZONA 8 9 James D. Speros, No. CV-14-00224-PHX-JJT Plaintiff, 10 11 v. 12 ORDER Sentinel Insurance Company Limited, 13 Defendant. 14 15 At issue is Plaintiff James D. Speros’s Application to Confirm (in Part) Appraisal 16 Award (Doc. 73, Applic.), to which Defendant Sentinel Insurance Company, Ltd. filed a 17 Motion Opposing Application to Confirm (in Part) Appraisal Award and Counter-Motion 18 to Vacate Appraisal Award (Doc. 79, Mot. to Vacate), Plaintiff filed a Response to 19 Counter-Motion to Vacate Appraisal Award and Reply in Support of Application to 20 Confirm (in Part) Appraisal Award (Doc. 84, Resp.), and Defendant filed a Reply to 21 Plaintiff’s Opposition to Motion to Vacate Appraisal Award (Doc. 92, Reply). 22 I. Plaintiff’s Application to Confirm (in Part) Appraisal Award 23 In his Application, Plaintiff asks that the Court apply 9 U.S.C. § 9 to confirm the 24 Appraisal Award reached by two appraisers and a Court-appointed umpire and issued on 25 March 30, 2017 (Doc. 71-1 at 2-7, Award). Plaintiff bases the request on a provision of 26 the operative insurance policy, which states that Defendant will pay any loss amount 27 within 30 days after Defendant receives proof of loss and “1) Reach[es] an agreement 28 with [Plaintiff]; 2) There is an entry of final judgment; or 3) There is a filing of an 1 appraisal award with [Defendant].” (Applic. Ex. 3.) Because appraisals in the insurance 2 context are like arbitrations under Arizona and federal law, see, e.g., Meineke v. Twin 3 City Fire Ins. Co., 892 P.2d 1365, 1369 (Ariz. Ct. App. 1994), Plaintiff invokes the 4 federal statute addressing arbitration awards, 9 U.S.C. § 9, which provides: 5 6 7 8 9 10 If the parties in their agreement have agreed that a judgment of the court shall be entered upon the award made pursuant to the arbitration, . . . then at any time within one year after the award is made any party to the arbitration may apply to the court so specified for an order confirming the award, and thereupon the court must grant such an order unless the award is vacated, modified, or corrected as prescribed in sections 10 and 11 of this title. 9 U.S.C. § 9. 11 Section 10 of that title provides in part that a court may vacate an arbitration 12 award upon application by any party if the award “was procured by corruption, fraud, or 13 undue means” or “there was evident partiality or corruption in the arbitrators, or either of 14 them.” 9 U.S.C. § 10(a). Similarly, under Arizona law, a court “shall decline to confirm 15 and award and enter judgment [on an arbitration award] where . . . [it] was procured by 16 corruption, fraud, or other undue means [or] [t]here was evident partiality by an arbitrator 17 appointed as a neutral or corruption in any of the arbitrators or misconduct prejudicing 18 the rights of any party.” A.R.S. § 12-1512(A). These nearly identical provisions are 19 derived from the Uniform Arbitration Act. See Hirt v. Hervey, 578 P.2d 624, 626 (Ariz. 20 Ct. App. 1978). 21 The next section of the federal code provides in part that a court may modify or 22 correct an arbitration award upon application by any party “[w]here there was an evident 23 material miscalculation of figures or an evident material mistake in the description of any 24 person, thing, or property referred to in the award.” 9 U.S.C. § 11(a). Arizona law has the 25 same provision, codified at A.R.S. § 12-1513(A). Thus, where the parties have agreed 26 that a disputed value shall be finally resolved by an appraisal, the appraisal award is 27 “entitled to finality in all but narrowly defined circumstances,” and thus “the award is not 28 -2- 1 subject to attack merely because one party believes that the [appraisers] erred with 2 respect to factual determinations or legal interpretations.” Hirt, 578 P.2d at 626. 3 Here, the parties’ agreement, by way of the operative insurance policy, provides 4 that payment of an appraisal award requires both proof of loss and a valuation by way of 5 the appraisal award. Defendant has never agreed that the proof of loss portion has been 6 satisfied, particularly in light of the fact that multiple events occurred and caused damage 7 to Plaintiff’s property but the Court has found Defendant agreed to cover only one 8 event—the water line leak near the fountain in the courtyard of the property. At this 9 point, a dispute between the parties remains as to proof of loss from the covered event, as 10 opposed to loss from other events. 11 Put another way, in its prior Order, the Court stated: 12 It is the function of the appraisers to arrive at a figure representing appraised damages for a covered event, and they have done so, in the alternative, as set forth above. It is for the Court, or the ultimate finder of fact, to determine causation of the damage to the home—in other words, whether the appraisers are right or wrong about the scope of causation. If the Court or the finder of fact concludes the appraisers are correct, the appraisers’ larger damages number comes into play. If not, the smaller number they arrived at—representing the geographic limitation—may apply, or another number, depending on the finder of fact’s ultimate conclusion as to the limits of causation. . . . See, e.g., TMM Invs., Ltd. v. Ohio Cas. Ins. Co., 730 F.3d 466, 473-75 (5th Cir. 2013). 13 14 15 16 17 18 19 20 (Doc. 72, Order at 2-3 (emphasis added).) 21 Because proof of loss related to the covered event is not yet resolved, the Court 22 cannot grant Plaintiff’s Application for immediate payment of the Appraisal Award under 23 the insurance policy. Plaintiff argues that it is entitled to “at least the incontestable 24 portion” of the Appraisal Award—the value of the damage to the property within the 25 geographic limits initially set by the Court (Applic. at 5-6)—but, as the Court stated in its 26 prior Order, resolution of the causation issue may lead to another number within the 27 Appraisal Award. 28 -3- 1 II. Defendant’s Motion to Vacate Appraisal Award 2 In response to Plaintiff’s Application, Defendant moves to vacate the Appraisal 3 Award on two independent grounds: (1) Plaintiff had a prior, undisclosed relationship 4 with one of the appraisers; and (2) the Appraisal Award exceeds the scope of appraisal by 5 including a valuation of the cost of content removal from the property, lost rental income, 6 and the cost to investigate. (Mot. to Vacate at 13-16.) 7 As a threshold matter, Defendant challenges the Court’s decision to compel 8 appraisal to begin with (see Mot. to Vacate at 1-2), a decision that the Court entered 9 nearly three years ago, on May 13, 2015 (Doc. 37, Order Compelling Appraisal). In 10 response, Plaintiff takes great issue with Defendant’s attempt to re-litigate matters 11 already decided by the Court. (Resp. at 3-7.) 12 As the Court noted in its decision to compel appraisal, enforcement of an appraisal 13 clause to compel appraisal is appropriate when the parties agree as to the covered loss 14 and the disagreement is to the amount of damage. See Harvey Prop. Mgmt. Co. v. 15 Travelers Indem. Co., No 2:12-CV-01536-SLG, 2012 WL 5488898, at *3-4 (D. Ariz. 16 Nov. 6, 2012). Because Defendant did not oppose the proposition that it had explicitly 17 agreed to cover damage from the courtyard water line leak—which it termed a “very 18 narrow subset of Plaintiff’s claimed loss” (Doc. 31, Resp. to Mot. to Compel Appraisal at 19 11)—and only opposed coverage for other leaks on the property, such as sewer line leaks, 20 the Court found that appraisal was appropriate based on the parties’ agreement that at 21 least the courtyard water line leak was covered. Although Defendant changed counsel 22 after submitting its brief on Plaintiff’s Motion to Compel Appraisal (but some three 23 months before the Court ruled on the Motion) (Doc. 35), the change of counsel does not 24 provide an excuse for Defendant’s failure to oppose, to this Court, the proposition that 25 Defendant agreed that Plaintiff’s insurance policy covered any damage to the property 26 caused by the courtyard water line leak. Indeed, Defendant filed no Motion for 27 Reconsideration of the Court’s Order Compelling Appraisal—which was predicated on 28 -4- 1 Defendant’s agreement to cover the specified event—and Defendant participated in the 2 appraisal process for the next two years. 3 Now, three years later, Defendant’s Motion to Vacate the Appraisal Award 4 implies that the Court’s Order compelling appraisal was unfounded because Defendant 5 never agreed to cover any damage to Plaintiff’s property. Defendant contends that it 6 made a mistake in describing the courtyard water line leak coverage to Plaintiff—even 7 though it did so repeatedly and in writing—and that it was Plaintiff who “never informed 8 the Court of [Defendant’s] actual coverage position that the damage to his home was 9 excluded under the earth movement exclusion.” (Mot to Vacate at 2.) Alas, it was not 10 Plaintiff’s burden or responsibility in the Motion to Compel Appraisal to inform the 11 Court of what Defendant now calls its “actual coverage position” with regard to the 12 courtyard water line leak—it was Defendant’s. Defendant had a full and fair opportunity 13 to do so three years ago, and had access to all of the relevant information at that time. Yet 14 Defendant did not try to demonstrate, to this Court, that it did not agree to cover any of 15 Plaintiff’s property damage until two years after the Court had entered an Order 16 compelling appraisal. 17 Thus, the estoppel or preclusive effect at work here is not simply as Defendant 18 frames it (Mot. to Vacate at 2 n.1), that is, whether Defendant is precluded from denying 19 coverage by its explicit representations in writing to Plaintiff that damage from the 20 courtyard water line leak was covered. The question is whether Defendant can now argue 21 to this Court that it never agreed to cover the courtyard water line leak when it failed to 22 demonstrate that—or even demonstrate that a genuine dispute existed—in conjunction 23 with its brief in response to the Motion to Compel Appraisal.1 The Court ordered 24 appraisal in reliance on the coverage agreement between the parties, and appraisal could 25 1 26 27 28 Indeed, Defendant did not make this argument until it filed a motion for summary judgment on June 7, 2017, two years after the Court’s Order compelling appraisal. (Doc. 82.) The Court denied that motion pending resolution of the present motions. -5- 1 not have been ordered absent the Court’s finding that the parties agreed that the policy 2 covered the courtyard water line leak. Defendant presents no new facts in now making an 3 argument it could have made years ago. 4 It is the doctrine of “law of the case” that may prevent Defendant from attempting 5 to demonstrate to the Court that Defendant did not agree to cover the damage to 6 Plaintiff’s property from the courtyard water line leak. “Under the ‘law of the case’ 7 doctrine, a court is ordinarily precluded from reexamining an issue previously decided by 8 the same court, or a higher court, in the same case.” Minidoka Irrigation Dist. v. Dep’t of 9 Interior of U.S., 406 F.3d 567, 573 (9th Cir. 2005) (quoting Old Person v. Brown, 312 10 F.3d 1036, 1039 (9th Cir. 2002)); see also United States v. Johns, 154 Fed. App’x 646, 11 647 (9th Cir. 2005) (concluding that reconsideration of factual findings leading to 12 sentence was barred by the law of the case doctrine where no new evidence was 13 presented and no other exceptions to doctrine applied). “[T]he law of the case doctrine is 14 subject to three exceptions that may arise when ‘(1) the decision is clearly erroneous and 15 its enforcement would work a manifest injustice, (2) intervening controlling authority 16 makes reconsideration appropriate, or (3) substantially different evidence was adduced at 17 a subsequent trial.’” Minidoka Irrigation Dist., 406 F.3d at 573 (quoting Old Person, 312 18 F.3d at 1036). 19 Without application of this preclusive doctrine, the parties will have been heavily 20 prejudiced by the waste of time and resources in engaging in a years-long appraisal 21 process. Although Defendant states it “does not seek a coverage ruling” in its Motion or 22 Reply (Reply at 2), the Court advises the parties that any request for a “coverage ruling” 23 must address the Court’s concerns set forth above, including whether Defendant is 24 precluded by the law of the case doctrine (or an analogous proposition) from arguing for 25 less coverage than the Court has already determined the parties agreed to, whether 26 Defendant can seek reconsideration of the Court’s decision far beyond the deadline for 27 filing a motion for reconsideration under the Local Rules, and how the prejudice resulting 28 from a substantial waste of time and resources is to be addressed. -6- 1 Presuming the appraisal was well-founded, as it must, the Court will now address 2 whether Defendant has demonstrated either of the two grounds on which it argues the 3 Appraisal Award should be vacated. 4 A. Prior Relationship Between Plaintiff and Appraiser 5 As the Court laid out above, under both federal and Arizona law, the Court may 6 set aside an appraisal award if there is “evident partiality by an [appraiser] appointed as a 7 neutral.” A.R.S. § 12-1512(A); see also 9 U.S.C. § 10(a). Defendant cites cases from 8 other states to argue that a party has a duty to disclose a prior relationship with an 9 appraiser and that the requirement that an appraiser be impartial is violated if the 10 appraiser has a relationship with a party. (Mot. to Vacate at 13-14.) Defendant contends 11 that the Court should vacate the Appraisal Award because Plaintiff 1) failed to disclose 12 his relationship with his appraiser, Mr. Berger, at the Examination Under Oath (“EUO”), 13 and 2) “hedged and obfuscated” as to his relationship with Mr. Berger in the mutual 14 disclosures made at Plaintiff’s request. 15 In his Response, Plaintiff states that he was an appraiser himself and knows 16 Mr. Berger from the period in which he too conducted appraisals. (Resp. at 10.) As for 17 the EUO, which took place in 2013, well before the parties chose appraisers in this 18 lawsuit, Plaintiff disclosed that he knows Mr. Berger and has been the opposing appraiser 19 to him many times. (Resp. at 12.) Defendant was thus unquestionably on notice that 20 Plaintiff and Mr. Berger had a professional relationship well before Plaintiff chose 21 Mr. Berger as his appraiser. Defendant provides no evidence that there was something 22 untoward in the relationship that would lead the Court to conclude that Mr. Berger was 23 not impartial. 24 As for the parties’ mutual disclosures, Plaintiff filed a Summary of Discovery 25 Dispute with the Court on November 17, 2015. (Doc. 47.) In that document, Plaintiff 26 provided evidence that Plaintiff’s counsel had suggested that the parties exchange a 27 disclosure of any engagements their chosen appraisers had had with the parties during the 28 past three years. Defendant’s counsel stated she “did not believe the disclosures are -7- 1 required by Arizona law” but agreed to the disclosures “to get the appraisal moving.” 2 (Doc. 47-1 at 2.) For Plaintiff, Mr. Berger disclosed that he “was involved in a few 3 appraisals where [he] was the appraiser appointed by the insured(s) and [Plaintiff] was 4 the appraiser appointed by the insurance carrier(s)” and that Plaintiff “served as an 5 umpire in the appraisal process wherein he was agreed upon by the other appraiser and 6 myself (as appraiser) on two occasions.” (Doc. 47-1 at 6.) For his part, Defendant’s 7 appraiser disclosed he had worked on two cases for the law firm of Defendant’s counsel 8 in the past three years, and his company had worked on two cases for Defendant in the 9 past three years. (Doc. 47-1 at 5.) Concerned about impartiality, it was Plaintiff who then 10 asked for Defendant’s appraiser to disclose the names of the cases he worked on and the 11 capacity in which he was engaged, and Defendant resisted disclosure, leading to the 12 discovery dispute hearing before the Court. (Doc. 47.) 13 Although Defendant itself never proposed mutual disclosures and resisted 14 providing details to Plaintiff, Defendant now argues that the disclosures were insufficient 15 because Plaintiff had hired Mr. Berger four years prior for an appraisal, and the “look 16 back” period proposed by Plaintiff was three years. The Court notes that the very nature 17 of a fixed “look back” period is that, beyond that period, an additional disclosure might 18 be required. Defendant never objected to the three-year period—indeed it never 19 expressed an opinion that mutual disclosures were required at all—and thus cannot be 20 heard to complain about the lack of disclosure of a professional relationship between 21 Mr. Berger and Plaintiff four years prior. Moreover, as in the EUO, Plaintiff and 22 Mr. Berger openly disclosed that they had worked together or opposite to one another, 23 even within the three year period, yet Defendant did not object. See Fidelity Fed. Bank v. 24 Durga Ma Corp., 386 F.3d 1306, 1313 (9th Cir. 2004) (concluding that, “where a party to 25 an arbitration has constructive knowledge of a potential conflict but fails to timely 26 object,” the party waives its right to object). None of the facts Defendant provides in its 27 lengthy recitation of appraisal events enable the Court to conclude that Mr. Berger 28 colluded with Plaintiff or acted without impartiality. As Plaintiff contends, Defendant’s -8- 1 argument amounts to a disagreement with the results of the appraisal more than a legal 2 basis for the Court to vacate the Appraisal Award. For these reasons, the Court will deny 3 Defendant’s request to vacate on this basis. 4 B. Scope of Appraisal Award 5 Defendant next moves to vacate the Appraisal Award by arguing that it exceeds 6 the scope of the request for appraisal by including a cost of content removal, loss of 7 rental income, and investigation costs. (Mot. to Vacate at 16.) For support, Defendant 8 relies on Hanson v. Commercial Union Insurance Company, in which the Arizona Court 9 of Appeals stated that appraisers must decide only issues within the “scope of the 10 submission agreement,” and appraisers’ acts that exceed their authority are not binding 11 on the parties. 723 P.2d 101, 103-104 (Ariz. Ct. App. 1986). The appraisers’ affidavit in 12 that case did not allow the Court to determine which portion of the net appraisal award 13 was within the scope of the submission agreement and which portion exceeded the scope. 14 Id. at 104. 15 The Court first notes that the Appraisal Award in this instance is itemized, and any 16 individual portion of the appraised amount that exceeded the appraisers’ authority by 17 providing a value for damage beyond that contemplated by the policy, or for some other 18 reason, is not binding on the parties. But that does not mean that the entire Appraisal Award 19 must be vacated. As the Court stated above, under both Arizona and federal law, an 20 Appraisal Award may be modified or corrected. See 9 U.S.C. § 11(a); A.R.S. § 12-1513(A). 21 In its prior Order, the Court noted that it may not limit the appraisers’ valuation of 22 damage caused by a covered event, including by specifying a geographic boundary where 23 the boundary does not have a rational relationship to actual causation of the damage or 24 lack thereof. (Doc. 72, Order at 2.) The Court tasked the appraisers with arriving at a 25 figure representing the damages for a covered event—the courtyard water line leak on 26 Plaintiff’s property. (Doc. 72, Order at 2.) Here, aside from asking the Court to vacate the 27 entire Appraisal Award for exceeding the scope of the appraisal request—a proposition 28 for which the Court finds no support—Defendant does not provide any detail regarding -9- 1 why it believes the cost of content removal, loss of rental income, or cost to investigate 2 are not allowable damages arising from the covered event. In the absence of any support, 3 the Court must decline to modify the Appraisal Award. 4 The balance of Defendant’s argument takes issue with the size of the final 5 appraised amount of damage. (Mot. to Vacate at 16.) As the Court noted above, a motion 6 to vacate may not be based solely on disagreement with the appraisal amount. See Hirt, 7 578 P.2d at 626. For all of these reasons, the Court will deny Defendant’s Motion to 8 Vacate the Appraisal Award. 9 III. Conclusions 10 This is a case in which the evidence indicates that multiple events may have 11 caused damage to Plaintiff’s property, and the Court has only found that the parties 12 agreed as to coverage for damage arising from the courtyard water line leak—damage on 13 which the Appraisal Award has now put an itemized value. However, the Court or finder 14 of fact must determine causation, and the Appraisal Award can then be overlain on that 15 causation determination to resolve the value of damages, which may be the Appraisal 16 Award’s larger number, its smaller number, or some other number within the Award, 17 depending on the limits of causation. For this reason, the Court cannot yet confirm the 18 Appraisal Award. On the other hand, Defendant has not demonstrated a basis for the 19 Court to vacate the Appraisal Award. 20 21 22 23 24 IT IS THEREFORE ORDERED denying Plaintiff’s Application to Confirm (in Part) Appraisal Award (Doc. 73). IT IS FURTHER ORDERED denying Defendant’s Counter-Motion to Vacate Appraisal Award (Doc. 79). Dated this 29th day of March, 2018. 25 26 27 Honorable John J. Tuchi United States District Judge 28 - 10 -

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?