Insight Public Sector Incorporated v. Proteam Solutions Incorporated
Filing
94
ORDER granting in part and denying in part 83 Motion for Summary Judgment; denying 84 Motion for Partial Summary Judgment. (See document for further details). Signed by Judge H Russel Holland on 11/10/16. (LAD)
WO
IN THE UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF ARIZONA
INSIGHT PUBLIC SECTOR, INC.,
)
)
)
Plaintiff,
)
)
vs.
)
)
PROTEAM SOLUTIONS, INC.,
)
)
Defendant.
)
_______________________________________)
No. 2:14-cv-2529-HRH
ORDER
Cross-Motions for Summary Judgment
Plaintiff moves for summary judgment.1 This motion is opposed2 and defendant
cross-moves for partial summary judgment.3 Defendant’s cross-motion is opposed.4 Oral
argument was requested and has been heard.
Procedural History
Plaintiff Insight Public Sector, Inc. (IPS) is an Illinois-based subsidiary of Insight
Enterprises, Inc. which sells computer hardware, software and related products to
1
Docket No. 83.
2
Docket No. 88.
3
Docket No. 84.
4
Docket No. 87.
-1-
government agencies. Defendant Proteam Solutions, Inc. is a qualified Minority Business
Enterprise (MBE) contractor which has conducted business with the state government in
Ohio for many years. “Pursuant to regulations adopted by the State of Ohio, departments and
agencies of the State government are required to purchase a portion of all goods and services
from Minority Business Enterprises.”5 “MBEs are required to offer goods and services to
State agencies in conformity with State Term Schedules (STSs), which establish ceiling
prices at which specified goods can be offered for sale.”6
Keith Stevens, Proteam’s president, avers that he was contacted by IPS in early 2010
because IPS “wanted to ‘partner’ with Proteam for the purpose of selling computer products
through the Ohio MBE program.”7 In March 2010, the parties entered into an agreement
under which “Proteam agree[d] to provide IPS with information about specific sales
opportunities from public entities within the State of Ohio that Proteam believes may have
a need for or interest in procuring information technology products.”8 The 2010 Agreement
provided that “Proteam will take no further action on IPS’ behalf with respect to such sales
5
Affidavit of Keith Stevens at ¶ 3, Exhibit A, Defendant Proteam Solution, Inc.’s
Motion for Partial Summary Judgment as to Plaintiff’s Complaint, Docket No. 84.
6
Id.
7
Id. at ¶ 4.
8
Agreement between DKS Group, Inc. d/b/a Proteam Technical and Insight Public
Sector, Inc. at 1, ¶ 1, Exhibit 1, Insight Public Sector Inc.’s Motion for Summary Judgment,
Docket No. 83.
-2-
opportunities unless IPS authorizes Proteam to do so in writing.”9 The 2010 Agreement
further provided that
[a]ny sales opportunities identified by Proteam and selected by
IPS in writing pursuant to this Section 1 shall be referred to
herein as “Designated Opportunity” or “Designated Opportunities.” Proteam will introduce IPS to Designated Opportunities
and facilitate initial communications between the Designated
Opportunities and IPS for the sole purpose of bringing about the
sale of information technology products.[10]
The 2010 Agreement provided that
IPS agree[d] to pay Proteam by the 30th working day following
the end of each calendar quarter during the term of this Agreement, a royalty in the amount of fifty percent (50%) of the gross
profit .... for closed sales, net of returns, fees, and shipping,
generated by orders specifically identified as Designated
Opportunities for which IPS received timely payment in full
during that calendar quarter....[11]
The 2010 Agreement further provided that “[t]his royalty shall apply only to purchase orders
that reference Proteam in the body of the order document. IPS will not be obligated to
compensate Proteam for orders that are not appropriately designated by the Designated
Opportunity at the time of order entry.”12
9
Id.
10
Id.
11
Id. at 1, ¶ 2.1.
12
Id.
-3-
The 2010 Agreement also provided that IPS was to “provide a quarterly report to
Proteam of all closed sales, net of returns, generated by orders specifically identified as
Designated Opportunities for which IPS received timely payment in full during that calendar
quarter....”13
The 2010 Agreement provided that it would “continue for a period of one year” and
that the Agreement would “automatically renew for successive one year periods unless either
party provides written notice of its decision to terminate the agreement in accordance with
Section 18....”14 Section 18 provided, in relevant part, that “[e]ither party may terminate this
Agreement without cause upon sixty (60) days prior written notice to the other party.”15
At the same time the parties entered into the 2010 Agreement, they executed First and
Second Addendums to the 2010 Agreement. The First Addendum provided that “Proteam
shall ensure that all orders received by it under this contract will be made out to IPS. The end
users will order all products directly through IPS.”16 The First Addendum also provided that
it would be a material breach if “Proteam takes an order directly from a Public Sector Agency
against the IPS STS for products or services” and if “Proteam accepts payments from [a]
13
Id. at 2, ¶ 3.
14
Id. at ¶ 7.
15
Id. at 4, ¶ 18.1.
16
First Addendum to Agreement Between DKS Group, Inc. d/b/a/ Proteam Technical
and Insight Public Sector, Inc. at 1, ¶ 2.2, Exhibit 1, Insight Public Sector Inc.’s Motion for
Summary Judgment, Docket No. 83.
-4-
Public Sector Agency for an order against the IPS STS.”17 The Second Addendum provided
that “Proteam shall ensure that all orders received by it under this contract will be made out
to IPS. The end users will order all products directly through IPS.”18
There is no dispute that the parties never followed the sales procedure laid out in the
2010 Agreement because Ohio’s MBE program required that state agency purchase orders
be made out to the MBE. Instead, Proteam would receive requests for quotes (RFQs) from
Ohio state agencies and then it would forward the RFQs to IPS, which would quote a price.
Proteam would then add a certain percentage to that price and submit the quotes to the State
agencies. Proteam could decide what that percentage was although IPS provided input as to
what the mark-up should be.19 If the State agencies accepted the quotes, then Proteam
submitted purchase orders to IPS for products to be shipped directly to Ohio governmental
agencies. After the orders were filled by IPS, the Ohio governmental agencies paid Proteam
for the products pursuant to invoices issued to them by Proteam. And Proteam paid IPS
pursuant to invoices issued to Proteam by IPS.
17
Id. at 3, ¶ 7.
18
Second Addendum to Agreement Between DKS Group, Inc. d/b/a Proteam
Technical and Insight Public Sector, Inc at 1, ¶ 2.2, Exhibit 1, Insight Public Sector Inc.’s
Motion for Summary Judgment, Docket No. 83.
19
Deposition at Keith Stevens at 70:17-22, Exhibit B, Insight Public Sector Inc.’s
Response to ... Proteam Solutions Inc.’s Motion for Partial Summary Judgment as to
Plaintiff’s Complaint, Docket No. 87.
-5-
From May 2010 through October 2013, the parties followed the foregoing procedure
for the sales that IPS made to Proteam. For all of the sales prior to July 2013, Proteam timely
paid IPS. However, when IPS invoiced Proteam for the July-October 2013 sales, which
totaled $726,498.07, Proteam did not pay the total amount due.
After taking into
consideration a credit that Proteam had, the total due under the July-October 2013 invoices
was $702,950.07, but Proteam only paid IPS $350,000.
Proteam contends that it withheld some of the payment for the July-October 2013
invoices because it had come to believe that IPS was not paying the correct royalty amount
under the 2010 Agreement. Stevens avers that
[d]uring the second half of 2013, I obtained the SEC form 10-K
shareholder reports of IPS parent corporation Insight Enterprises, Inc. Those reports state that during years 2010-2012,
Insight Enterprises’ gross profit margin on sales was 13.6%.[20]
Given that “Proteam’s gross compensation was 1.62% of total sales of IPS-supplied
goods[,]” Proteam believed it had not been properly paid its royalty pursuant to the 2010
Agreement and Stevens “delayed Proteam’s remittance of the last State agency payments and
requested that IPS substantiate Proteam’s Contract royalties.”21
20
Stevens Affidavit at ¶ 13, Exhibit A, Defendant Proteam Solution, Inc.’s Motion for
Partial Summary Judgment as to Plaintiff’s Complaint, Docket No. 84.
21
Id. at ¶¶ 12 & 15.
-6-
On November 18, 2013, Proteam gave IPS 60-day written notice that Proteam
intended to terminate the 2010 Agreement without cause.22 Proteam stated that it was
“terminating [its] agreement with Insight Public Sector due to the diminishing profitability
of our efforts. It is our hope that we can unwind our working relationship in a professional
and organized manner.”23
The parties attempted to resolve the dispute over the remaining $350,000 that IPS
believed Proteam owed, but they were unable to reach a resolution. On October 16, 2014,
IPS commenced this action in state court. The matter was subsequently removed to this court
on the basis of diversity jurisdiction. In its complaint, IPS asserts a breach of contract claim
and an unjust enrichment claim. IPS alleges that Proteam still owes it $352,950.07.24
Proteam has asserted three counterclaims against IPS: 1) breach of contract, 2)
breach of the implied covenant of good faith and fair dealing, and 3) intentional misrepresentation. Proteam alleges that IPS has breached the 2010 Agreement and the duty of good faith
and fair dealing by not paying Proteam all of the royalties it is due and that IPS has concealed
the gross profits realized from the Proteam-brokered sales.25
22
Exhibit A-1, Defendant Proteam Solution, Inc.’s Motion for Partial Summary
Judgment as to Plaintiff’s Complaint, Docket No. 84.
23
Id.
24
Complaint at 4, ¶ 17, attached to Notice of Removal, Docket No. 1.
25
Amended Counterclaim at 6-7, Docket No. 28.
-7-
IPS now moves for summary judgment on its breach of contract claim and on each of
Proteam’s counterclaims. Proteam cross-moves for summary judgment on IPS’s breach of
contract and unjust enrichment claims.
Discussion
Summary judgment is appropriate when there are no genuine issues of material fact
and the moving party is entitled to judgment as a matter of law. Fed. R. Civ. P. 56(c). The
initial burden is on the moving party to show that there is an absence of genuine issues of
material fact. Celotex Corp. v. Catrett, 477 U.S. 317, 325 (1986). If the moving party meets
its initial burden, then the non-moving party must set forth specific facts showing that there
is a genuine issue for trial. Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 247-48 (1986).
In deciding a motion for summary judgment, the court views the evidence of the non-movant
in the light most favorable to that party, and all justifiable inferences are also to be drawn in
its favor. Id. at 255. “[T]he court’s ultimate inquiry is to determine whether the ‘specific
facts’ set forth by the nonmoving party, coupled with undisputed background or contextual
facts, are such that a rational or reasonable jury might return a verdict in its favor based on
that evidence.” T.W. Elec. Service, Inc. v. Pacific Elec. Contractors Ass’n, 809 F.2d 626,
631 (9th Cir. 1987).
IPS’s Breach of Contract Claim
IPS contends that each of the July-October 2013 Proteam purchase orders and
corresponding IPS invoices constituted a separate contract, contracts which Proteam
-8-
breached by not paying IPS the full amount due under the invoices. Under Arizona law,26
“[t]o bring an action for [a] breach of [a] contract, the plaintiff has the burden of proving the
existence of the contract, its breach and the resulting damages.” Graham v. Asbury, 540 P.2d
656, 657 (Ariz. 1975). “For an enforceable contract to exist, there must be an offer, an
acceptance, consideration, and sufficient specification of terms so that obligations involved
can be ascertained.” K-Line Builders, Inc. v. First Federal Sav. & Loan Ass’n, 677 P.2d
1317, 1320 (Ariz. Ct. App. 1983). A purchase order can constitute a contract. Koenen v.
Royal Buick Co., 783 P.2d 822, 826 (Ariz. Ct. App. 1989).
IPS argues that the July-October 2013 purchase orders and corresponding invoices can
constitute enforceable contracts because by submitting the purchase orders, Proteam offered
to purchase goods for certain prices and requested that IPS send the goods to Proteam’s
clients. IPS accepted Proteam’s offer by sending the requested goods to Proteam’s customers
and then sent invoices to Proteam which contained sufficient terms and conditions. If the
26
Each invoice provides:
The Terms and Conditions and Return Policy and Procedures set
forth on www.ips.insight.com/TermsandConditions are specifically incorporated herein unless purchase is made pursuant to a
separate written agreement in which case the terms of the
separate written agreement shall govern.
Invoice at 2, Exhibit 10 at 2, Insight Public Sector Inc.’s Motion for Summary Judgment,
Docket No. 83. The Terms and Conditions on IPS’s website provide that “[t]his Agreement
will be governed by the substantive laws of the state of Arizona without giving effect to any
choice of law rules.” Exhibit 11 at 2, Insight Public Sector Inc.’s Motion for Summary
Judgment, Docket No. 83.
-9-
July-October 2013 purchase orders and corresponding invoices are enforceable contracts,
then IPS argues that there is no dispute that Proteam has not paid the full amount due under
those contracts and thus Proteam has breached its contracts with IPS.
Proteam argues, however, that the 2010 Agreement governs the parties’ transactions.
This argument is based on Proteam’s contention that the parties orally modified the sales
procedure portion of the 2010 Agreement. The court is mindful that Proteam’s answer and
amended counterclaim are devoid of any reference to an oral modification, but the court is
not prepared to conclude that Proteam cannot advance an oral modification argument.
Although the 2010 Agreement contained a provision that any amendments had to be
in writing, “[u]nder Illinois law,[27] parties to a written contract may alter or modify its terms
by a subsequent oral agreement, even though the terms of the contract preclude oral
modification.” A.W. Wendell and Sons, Inc. v. Qazi, 626 N.E.2d 280, 287 (Ill. Ct. App.
1993).28 “The existence of an oral modification—as well as its terms, conditions, and the
intent of the parties—are all questions of fact that must be determined by a trier of fact.”
27
The 2010 Agreement contained a choice of law clause that provided that “[t]his
agreement shall be governed by and construed in accordance with the laws of the State of
Illinois.” 2010 Agreement at 5, ¶ 22, Exhibit 1, Insight Public Sector Inc.’s Motion for
Summary Judgment, Docket No. 83.
28
The same is true if Arizona law applies. See Phoenix Orthopaedic Surgeons, Ltd.
v. Peairs, 790 P.2d 752, 755–56 (Ariz. Ct. App. 1989) (quoting Park v. Dealers Transit, Inc.,
596 F.2d 203, 204 (7th Cir.1979), overruled on other grounds by Valley Medical Specialists
v. Farber, 982 P.2d 1277 (Ariz. 1999) (“‘The general rule in most jurisdictions is that parties
to a written contract may alter or modify its terms by a subsequent oral agreement even
though the contract precludes oral modification’”).
-10-
Household Financial Services, Inc. v. Coastal Mortgage Services, Inc., 152 F. Supp. 2d 1015,
1022 (N.D. Ill. 2001).29
Proteam has come forward with sufficient evidence to create a question of fact as to
whether the 2010 Agreement was orally modified. First, Proteam has offered the affidavit
of Stevens, in which he avers that
IPS and Proteam agreed to amend the Contract to conform with
Ohio MBE requirements and IPS agreed to draft a written
Contract amendment which memorialized that oral agreement.
However, IPS never sent a written amendment of the Contract
to Proteam. Instead, commencing in 2010 and continuing
through calendar year 2013, IPS and Proteam operated in
accordance with their oral Contract amendment. Ohio agencies
issued all purchase orders to Proteam, and remitted their
corresponding payments to Proteam.[30]
IPS argues that Proteam cannot rely on Stevens’ affidavit because it was not disclosed
during discovery and because it contradicts his deposition testimony. But even assuming that
these arguments have merit, Proteam has offered other evidence that creates a genuine issue
of material fact as to whether there was an oral modification of the 2010 Agreement. Mark
Woods, who was a territory account manager for IPS, was asked at his deposition if it was
his “understanding that all of these deals were governed by that contract that was in place
29
The existence of an oral modification is also a question of fact under Arizona law.
Lindsey v. Univ. of Ariz., 754 P.2d 1152, 1157 (Ariz. Ct. App. 1987).
30
Stevens Affidavit at ¶ 7, Exhibit A, Defendant Proteam Solution, Inc.’s Motion for
Partial Summary Judgment as to Plaintiff’s Complaint, Docket No. 84.
-11-
[between] IPS and Proteam?”31 Woods answered that “[l]egally, yeah, all of the deals were
governed by that contract.”32 David O’Connor, who became Proteam’s primary IPS contact
after Woods left IPS’s employ, testified that he understood that the relationship between IPS
and Proteam was governed by the 2010 Agreement.33 Woods’ and O’Connor’s testimony34
creates a genuine issue of material fact as to whether the parties had orally modified the
2010 Agreement such that the parties’ transactions continued to be governed by that contract.
Other evidence that suggests that there may have been an oral modification of the
2010 Agreement includes the “lockbox” evidence. In the fall of 2010, the parties exchanged
numerous emails about setting up a “lockbox” arrangement so that the Ohio state agencies
could send their payments directly to a bank lockbox for deposit into an account held by
31
Deposition of Mark Woods at 90:1-3, Exhibit B, Defendant Proteam Solution, Inc.’s
Motion for Partial Summary Judgment as to Plaintiff’s Complaint, Docket No. 84.
32
Id. at 90:4-5.
33
Deposition of David O’Connor at 23:18-21, Exhibit C, Defendant Proteam Solution,
Inc.’s Motion for Partial Summary Judgment as to Plaintiff’s Complaint, Docket No. 84.
34
Proteam also cited to a statement by Justin Hurlburt but that statement was made in
an email marked “Private and Confidential Settlement Communications under Rule 408.”
Exhibit A-2, Defendant Proteam Solution Inc.’s Motion for Partial Summary Judgment,
Docket No. 84. The text of FRE 408 “is clear: evidence from settlement negotiations may
not be considered in court ‘when offered to prove liability for, invalidity of, or amount of a
claim that was disputed as to validity or amount, or to impeach through a prior inconsistent
statement or contradiction.’” Rhoades v. Avon Products, Inc., 504 F.3d 1151, 1161 (9th Cir.
2007) (quoting FRE 408) (emphasis omitted). Thus, Proteam cannot rely on Hurlburt’s
statement.
-12-
Proteam but from which only IPS could make withdrawals.35 This is evidence that the parties
knew they could not comply or were not complying with the sales procedure provision of the
2010 Agreement, which creates an inference that the parties had orally modified the 2010
Agreement.
Other evidence that suggests that the parties had orally modified the 2010 Agreement
is the Third Addendum. The parties executed a Third Addendum to the 2010 Agreement 18
months after they started doing business with each other. This suggests that the parties had
orally modified the 2010 Agreement, as opposed to abandoning it, because it would not have
been necessary to execute an addendum if the 2010 Agreement had been abandoned.
In sum, there is a genuine issue of material fact as to whether the parties orally
modified the 2010 Agreement. Neither party is entitled to summary judgment on IPS’s
breach of contract claim.
IPS’s Unjust Enrichment Claim
Because there are disputes of fact as to IPS’s breach of contract claim, Proteam is not
entitled to summary judgment on IPS’s unjust enrichment claim.
Proteam’s Breach of Contract Counterclaim
Proteam’s breach of contract counterclaim is based on allegations that IPS breached
the 2010 Agreement by not properly paying Proteam the fifty percent royalty. IPS argues that
35
Exhibit E-3, Defendant Proteam’s Memorandum in Opposition to Plaintiff Insight
Public Sector, Inc.’s Motion for Summary Judgment, Docket No. 88.
-13-
Proteam’s breach of contract counterclaim fails because Proteam did not perform under the
2010 Agreement. IPS argues that under the express language of the 2010 Agreement,
Proteam is only entitled to a royalty payment if it complied with the terms of the 2010
Agreement, which Proteam did not. The First Addendum to the 2010 Agreement provided
that Proteam was to “ensure that all orders received by it under this contract will be made out
to IPS. The end users will order all products directly through IPS.”36 And the 2010
Agreement provided that the “royalty shall apply only to purchase orders that reference
Proteam in the body of the order document” and that “IPS will not be obligated to
compensate Proteam for orders that are not appropriately designated by the Designated
Opportunity at the time of order entry.”37 Because it is undisputed that Proteam invoiced the
Ohio governmental agencies and received payment from them and Proteam then paid IPS,
IPS argues that it is undisputed that Proteam did not perform under the contract, which means
that Proteam’s breach of contract counterclaim fails.
But, as discussed above, there is a genuine issue of material fact as to whether the
parties orally modified the sales provisions in the 2010 Agreement. If the 2010 Agreement
were orally modified, then IPS’s foregoing argument would fail. But, IPS argues that even
if the parties orally modified the 2010 Agreement and in doing so, intended to retain the
36
First Addendum to Agreement [etc.] at 1, ¶ 2.2, Exhibit 1, Insight Public Sector
Inc.’s Motion for Summary Judgment, Docket No. 83.
37
2010 Agreement at 1, ¶ 2.1, Exhibit 1, Insight Public Sector Inc.’s Motion for
Summary Judgment, Docket No. 83.
-14-
royalty payment provision, it would still be entitled to summary judgment on Proteam’s
breach of contract counterclaim because Proteam has waived its right to royalty payments by
continuing to engage in sales transactions for three years without enforcing this right. “An
implied waiver of a legal right may arise when conduct of the person against whom waiver
is asserted is inconsistent with an intent to enforce that right.” Wells v. Minor, 578 N.E.2d
1337, 1346 (Ill. Ct. App. 1991). “A party to a contract may not lull another into false
assurance that strict compliance with a contract duty will not be required and then sue for
noncompliance.” Id. Yet, that is exactly what Proteam has done here according to IPS;
Proteam has lulled IPS into believing that it did not believe it was due royalty payments
under the 2010 Agreement but rather that its profits would be determined by the mark-up it
made on the goods that it obtained from IPS and then resold to its customers.
While IPS’s waiver argument has some merit, there are questions of fact as to what
the parties orally agreed to. These questions of fact preclude summary judgment on
Proteam’s breach of contract counterclaim.
Proteam’s Breach of the Implied Covenant Counterclaim
Proteam’s breach of the implied covenant of good faith and fair dealing counterclaim
is based on the same allegations as Proteam’s breach of contract counterclaim. Under Illinois
law, “an independent cause of action for breach of th[e] implied covenant does not exist
except in the narrow context of cases involving an insurer’s obligation to settle with a third
-15-
party who has sued a policyholder.” D’Attomo v. Baumbeck, 36 N.E.3d 892, 912 (Ill. Ct.
App. 2015).
Proteam concedes that it cannot have an independent cause of action for breach of the
implied covenant of good faith and fair dealing38 but argues that this counterclaim should not
be dismissed because it is entitled to present evidence that IPS breached the 2010 Agreement
by dealing with Proteam in bad faith and unfairly. While Proteam may be able to present
evidence relating to a breach of the implied covenant of good faith and fair dealing as part
of its breach of contract claim, that does not mean that Proteam’s implied covenant
counterclaim should not be dismissed. Proteam has no right to assert an independent breach
of the implied covenant of good faith and fair dealing counterclaim. Thus, IPS is entitled to
summary judgment on this counterclaim.
Proteam’s Intentional Misrepresentation Counterclaim
Proteam contends that its third counterclaim is actually a claim for fraudulent
concealment, not an intentional misrepresentation claim, and that this claim is governed by
Illinois law. Under Illinois law,
[t]o prove fraudulent concealment, a plaintiff must establish that
(1) the defendant concealed a material fact under circumstances
that created a duty to speak; (2) the defendant intended to induce
a false belief; (3) the plaintiff could not have discovered the
truth through reasonable inquiry or inspection, or was prevented
from making a reasonable inquiry or inspection, and justifiably
38
Defendant Proteam’s Memorandum in Opposition to Plaintiff Insight Public Sector,
Inc.’s Motion for Summary Judgment at 9, Docket No. 88.
-16-
relied upon the defendant’s silence as a representation that the
fact did not exist; (4) the concealed information was such that
the plaintiff would have acted differently had he or she been
aware of it; and (5) the plaintiff’s reliance resulted in damages.
Bauer v. Giannis, 834 N.E.2d 952, 957–58 (Ill. Ct. App. 2005).39
Proteam argues that its fraudulent concealment claim is based on allegations that IPS
concealed the amount of gross profit that it was earning on the Proteam-brokered sales, sales
that were covered by the 2010 Agreement, and on allegations that IPS purchased all of its
products from its sister company, IDUSA, and that IPS has concealed what it actually paid
for these products, which means that Proteam had no way of knowing what royalties it should
have been paid.
The only evidence Proteam has that IPS was concealing the amount of gross profit it
was earning is Stevens’ averment that Insight Enterprises’ gross profit margin in 2010-2012
39
The elements of a fraudulent concealment claim under Arizona are similar:
(1) the concealment of a material existing fact that in equity
and good conscience should be disclosed; (2) knowledge on the
part of the party against whom the claim is asserted that such a
fact is being concealed; (3) ignorance of that fact on the part of
the one from whom the fact is concealed; (4) the intention that
the concealment be acted upon; and (5) action on the concealment resulting in damages.
Coleman v. Watts, 87 F. Supp. 2d 944, 951–52 (D. Ariz. 1998)
-17-
was 13.6%.40 This evidence does not create a genuine issue of matieral fact as to whether
IPS was concealing its gross profit on the products that Proteam was reselling. Stevens’
averment does not tie Insight Enterprises’ gross profit margin to IPS’s profit margin. IPS is
entitled to summary judgment on Proteam’s fraudulent concealment counterclaim.
Conclusion
IPS’s motion for summary judgment41 is granted in part and denied in part. IPS’s
motion is granted as to Proteam’s breach of the implied covenant of good faith and fair
dealing counterclaim (counterclaim two) and Proteam’s fraudulent concealment counterclaim
(counterclaim three). It is otherwise denied. Proteam’s motion for partial summary
judgment42 is denied.
DATED at Anchorage, Alaska, this 10th day of November, 2016.
/s/ H. Russel Holland
United States District Judge
40
Stevens Affidavit at ¶ 13, Exhibit A, Defendant Proteam Solution, Inc.’s Motion for
Partial Summary Judgment as to Plaintiff’s Complaint, Docket No. 84.
41
Docket No. 83.
42
Docket No. 84.
-18-
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.