Boston Post Partners II, LLP v. Paskett et al

Filing 152

ORDER granting in part and denying in part 123 Motion for Summary Judgment. See attached Order for details. Signed by Judge Douglas L Rayes on 08/28/2017.(KAS)

Download PDF
1 WO 2 3 4 5 6 IN THE UNITED STATES DISTRICT COURT 7 FOR THE DISTRICT OF ARIZONA 8 9 Boston Post Partners II LLP, Plaintiff, 10 11 ORDER v. 12 No. CV-16-02401-PHX-DLR Michael Paskett, Todd Hines, FTW LLC, Cascade Land Holdings LLC, and Venture Group Unlimited LLC, 13 14 Defendants. 15 16 17 This case arises out of the sale of farmland located in Maricopa County, Arizona 18 (“Property”) and the convoluted efforts to raise capital for that purchase. At issue is 19 Defendants’ Motion for Summary Judgment, which is fully briefed. (Docs. 123, 131, 20 138.) For the following reasons, the motion is granted in part and denied in part.1 21 I. The Parties 22 23 Plaintiff is Boston Post Partners II LLP (“BPP”). Herberden Ryan is the principal of BPP, and Timothy Kulka is a partner. Neither is a party to this action. 24 Former Defendants Nopal Cactus Farms LLC (“Nopal”) and Golden Sands 25 Partnership (“Golden Sands”) owned the Property during the relevant time period. 26 Former Defendant Charles Newman is the principal of Nopal and Golden Sands. The 27 28 1 Defendants’ request for oral argument is denied. See Fed. R. Civ. P. 78(b); LRCiv. 7.2(f). 1 Court will refer to these parties collectively as “Sellers” for purposes of this order. BPP 2 and Sellers settled the claims between them on August 16, 2017. (Doc. 146.) 3 4 5 6 Defendant Michael Paskett is the principal of Defendant Venture Group Unlimited LLC (“Venture Group”). Defendant Todd Hines is the principal of Defendant Cascade Land Holdings, LLC (“Cascade”). 7 Venture Group and non-parties Douglas Larsen, Northwest Gypsum LLC 8 (“Northwest”), and Venture Capital Group, Inc. (“Venture Capital”) are members of non- 9 party GSJV, LLC, an Arizona limited liability company. 10 Non-party John Boley is GSJV’s statutory agent. 11 Cascade, Venture Group, and non-party Stahl Hutterian Brethren (“SHB”) are 12 each members of Defendant FTW, LLC, an Arizona limited liability company. Non- 13 party John Stahl is the president of SHB. 14 II. Factual Background2 15 Paskett, Hines, Ryan, and Kulka had a working relationship throughout 2014. 16 During that time, Paskett worked as a consultant for one of Hines’ companies, and he and 17 Hines worked with Ryan and Kulka on a separate transaction. Paskett also talked to 18 Ryan and Kulka about plans to purchase the Property. Though Paskett stopped working 19 for Hines in January 2015, he cannot recall whether he informed Ryan and Kulka of this 20 separation. 21 On February 13, 2015, Paskett organized GSJV. That same day, GSJV entered 22 into an agreement with Sellers to purchase the Property for over $10 million (“GSJV 23 Contract”). 24 purchase price. Of that, Paskett paid $150,000 in the form of a credit from Sellers, 25 another party paid $50,000, and Hines—though not identified as a member of GSJV— GSJV was required to make an initial deposit of $500,000 toward the 26 27 28 2 The following facts are drawn from the parties separate statements of facts and the record items cited therein. (Docs. 124, 133.) For purposes of this order, the facts are presented and all reasonable inferences are drawn in the light most favorable to BPP, the non-moving party. -2- 1 paid $300,000. The GSJV Contract had a closing deadline of March 31, 2015. 2 During the following week, Paskett and Hines communicated with Ryan and 3 Kulka via text message about BPP’s involvement in the purchase of the Property and a 4 potential equity sharing arrangement. 5 memorialized in a February 24, 2015 agreement under which, in exchange for an equal 6 share in the equity compensation received from the Property, BPP agreed to identify and 7 source third-party capital, on an exclusive basis, to fund the purchase and development of 8 the Property (“Letter Agreement”). The Letter Agreement was to expire 75 days after 9 execution (May 10, 2015), unless the parties agreed in writing to extend the term or the 10 These negotiations culminated and were closing date of the GSJV Contract was extended. 11 Thereafter, BPP worked to raise capital to fund the purchase. BPP solicited 12 investors to raise between $25 and $28 million, and several investors were willing to 13 proceed if given sufficient time for due diligence. On March 10, 2015, BPP asked Sellers 14 for a 90-day due diligence extension for potential third-party capital investors, but this 15 request was not granted. On April 1, 2015, Sellers cancelled the GSJV Contract for lack 16 of funding. 17 All parties nonetheless continued negotiations after the cancellation of the GSJV 18 Contract. On April 7, 2015, BPP, Paskett, and Sellers met to again discuss a possible 90- 19 day due diligence extension. BPP offered Sellers a 5% equity interest in the Property in 20 exchange for an extension. The parties failed, however, to reach an agreement at the 21 meeting. On April 13, 2015, BPP sent Sellers an email renewing its request for a 90-day 22 extension. BPP also sent the email to Paskett. Although no agreement was reached, 23 Paskett responded approvingly to BPP’s proposal. Paskett also alluded to a possible 24 alternative purchasing arrangement involving Stahl. Paskett assured BPP that he would 25 close the transaction and that the parties could then “run down the road together without 26 worry.” Paskett continued to make similar representations to BPP in the following 27 weeks. 28 On April 13, 2015, however, Paskett organized FTW, which then contracted with -3- 1 Sellers on April 20, 2015 to purchase the Property (“FTW Contract”). 2 Contract had the same sale price as the GSJV Contract, but required a $1.5 million 3 payment at closing. Of this, Stahl paid $1 million and GSJV’s deposit was credited 4 toward the remaining $500,000. The FTW 5 Paskett represented to BPP that SHB was making a bridge loan through FTW, and 6 that it could be bought out for recovery of its investment plus a reasonable return. 7 Unbeknownst to BPP, however, Paskett’s discussions with Stahl contemplated that he 8 would be a long-term investor in the Property. When the FTW Contract closed on 9 May 1, 2015, none of the governing documents included a provision for BPP to purchase 10 SHB’s interest or otherwise invest in the Property. 11 In November 2015, BPP initiated this action in the District of Massachusetts. The 12 initial complaint and first amended complaints allege claims against Paskett, Hines, 13 Newman, Nopal, and Golden Sands, only. In addition to damages, BPP demanded that a 14 constructive trust be created “over the assets of BPP held by Defendants.” (Doc. 1 at 20; 15 Doc. 7 at 20; Doc. 79 at 19.) To that end, in January 2016 BPP recorded Notice of Lis 16 Pendens against the Property, which at the time was owned by FTW, with the Maricopa 17 County Recorder. 18 In April 2016, the Massachusetts court transferred the case to this Court. Several 19 months later, Nopal and Golden Sands noticed a Trustee’s Sale of the Property on the 20 basis that BPP’s recordation of the lis pendens breached the deed of trust encumbering 21 the Property. FTW obtained a preliminary injunction enjoining the trustee’s sale from the 22 Maricopa County Superior Court, and that state court action remains ongoing. After 23 FTW became involved in the state court litigation, BPP amended its complaint in this 24 action to name FTW, Cascade, and Venture Group as defendants. 25 BPP’s second amended complaint alleges that Paskett and Hines breached the 26 Letter Agreement and the implied covenant of good faith and fair dealing inherent 27 therein. 28 negotiations, BPP and Defendants formed a joint venture to invest in Arizona farmland, It also alleges that, through the Letter Agreement and the surrounding -4- 1 and that all Defendants breached the fiduciary duties flowing from that joint venture. 2 Finally, BPP claims that Paskett defrauded it, that Paskett and Hines were unjustly 3 enriched by BPP’s labor, and that all Defendants conspired to deprive BPP of its equity 4 share of the Property. 5 In December 2016, FTW answered the second amended complaint and asserted a 6 counterclaim against BPP, seeking a declaratory judgment that the lis pendens is invalid 7 and statutory damages under A.R.S. § 33-420. Defendants now move for summary 8 judgment on all claims against them and on FTW’s counterclaims. 9 III. Legal Standard 10 Summary judgment is appropriate when there is no genuine dispute as to any 11 material fact and, viewing those facts in a light most favorable to the nonmoving party, 12 the movant is entitled to judgment as a matter of law. Fed. R. Civ. P. 56(a). Facts are 13 material if they might affect the outcome of the case under governing law, and a dispute 14 over those facts is genuine “if the evidence is such that a reasonable jury could return a 15 verdict for the nonmoving party.” Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248 16 (1986). Summary judgment may also be entered “against a party who fails to make a 17 showing sufficient to establish the existence of an element essential to that party’s case, 18 and on which that party will bear the burden of proof at trial.” Celotex Corp. v. Catrett, 19 477 U.S. 317, 322 (1986). 20 IV. Discussion3 21 A. Breach of Contract (Against Paskett and Hines) 22 Paskett and Hines contend that they cannot be liable for breach of contract because 23 they are not parties to the Letter Agreement and, even if they are, BPP materially 24 breached the Letter Agreement by failing to source third-party capital within the Letter 25 3 26 27 28 Defendants devote several pages of their motion to arguing that Arizona law, rather than Massachusetts law, should apply to Plaintiff’s claims. (Doc. 123 at 5-7.) Plaintiff responds that “no substantive conflicts exist between the laws of Arizona and Massachusetts on the legal issues presented by” the motion and, therefore, “a choice of law analysis is unnecessary.” (Doc. 131 at 8.) Plaintiff also relies on Arizona authorities throughout its response memorandum. Accordingly, the Court will rely on Arizona law for purposes of this order. -5- 1 Agreement’s term, thereby relieving them of any further obligation to perform. After 2 careful consideration, the Court concludes that none of these arguments mandate 3 summary judgment. 4 1. Parties to the Letter Agreement 5 First, the Court cannot say as a matter of law that Paskett and Hines were not 6 parties to the Letter Agreement because there is substantial ambiguity in the record 7 regarding the actual or intended parties to the transaction. Defendants contend that the 8 Letter agreement was between BPP and non-party GSJV. BPP argues, however, that the 9 Letter Agreement was between it, Paskett, Hines, Larsen, and Boley. BPP’s position is 10 colorable, especially when viewing the facts and drawing all reasonable inferences in its 11 favor. 12 The Letter Agreement identifies the contracting parties as “Herberden W. Ryan, 13 Timothy Kulka and their affiliates (‘BPP’) and Michael Paskett, John Boley, [and] Doug 14 Larsen (‘GSJV,’ each a ‘Party’ and together, the ‘Parties’).” (Doc. 52-1 at 32.) It 15 therefore appears to define “GSJV” as “Michael Paskett, John Boley, [and] Doug 16 Larsen,” rather than as the GSJV entity that contracted with Sellers. Indeed, neither 17 Paskett nor Boley are members of GSJV. Boley is identified as GSJV’s statutory agent, 18 but not as a member, and although Paskett is the principal of Venture Group, he is not, 19 individually, a member of GSJV. (Doc. 124-1 at 4-5.) Moreover, the Letter Agreement 20 omits GSJV members Venture Group, Northwest, and Venture Capital from the 21 definition of “GSJV.” Given these ambiguities, a jury reasonably could conclude that 22 “GSJV” was used in the Letter Agreement as shorthand or a term-of-art to refer to 23 Paskett, Boley, and Larsen, individually, and that when Paskett signed the agreement as 24 “GSJV representative” he was signing on behalf of himself, Boley, and Larsen. 25 Further, BPP cites evidence that Hines was an active participant in the transaction, 26 but that his name deliberately was omitted from the relevant contracts because he was 27 going through a divorce at the time and did not want to complicate those proceedings. 28 This evidence, coupled with evidence that Paskett had previously dealt with BPP in his -6- 1 capacity as a consultant for Hines’ company, would permit a jury to reasonably find that 2 Paskett acted in an agency capacity on behalf of Hines when he negotiated with Sellers to 3 purchase the Property and with BPP to obtain capital to fund the purchase. 4 2. Breach of BPP’s Obligations Under the Letter Agreement 5 The Court also is not persuaded that BPP materially or anticipatorily breached the 6 Letter Agreement such that Paskett and Hines were excused from further performance. 7 Preliminarily, the Court rejects BPP’s argument that it was required only to make best 8 efforts to source third-party capital, but not to actually obtain it. The Letter Agreement 9 unambiguously states that “BPP will identify and source third party capital.” (Doc. 10 52-1.) Moreover, the Letter Agreement uses the phrase “make best efforts” to describe 11 other obligations, but not BPP’s obligation to source third-party capital. Finally, BPP’s 12 interpretation of the Letter Agreement would lead to an absurd result: namely, that it 13 would be entitled to an equal equity share in the transaction despite failing to fund the 14 purchase of the Property.4 15 It is undisputed that BPP failed to obtain third-party capital within the Letter 16 Agreement’s 75-day term. Nonetheless, the Court is not convinced that BPP’s failure 17 defeats its breach of contract claim because the evidence would permit a jury to 18 reasonably find that Paskett and Hines breached other obligations prior to BPP’s breach. 19 For example, the Letter Agreement clearly states that “[i]n all cases, BPP will serve as 20 the exclusive provider of third party financing.” (Doc. 52-1 at 32.) But prior to the 21 Letter Agreement’s termination date—meaning prior to BPP’s deadline to perform— 22 Paskett and Hines explored alternative purchasing arrangements with Stahl and SHB. If 23 BPP was to serve as the exclusive provider of third party capital until May 10, 2015, it is 24 unclear why Paskett and Hines were seeking alternative funding sources as early as April 25 of that year. 26 Indeed, these facts highlight a strange feature of the Letter Agreement. The Letter 27 4 28 For this reason, the Court need not address Defendants’ alternative argument that the Letter Agreement would be unenforceable for lack of consideration if BPP was not required to obtain third-party capital. -7- 1 Agreement was to expire on May 10, 2015, unless the parties agreed in writing to extend 2 the term or the closing date of the GSJV Contract was extended. The Letter Agreement 3 was silent, however, on what would happen if, as occurred here, the closing date was not 4 extended and the transaction did not close. It therefore is unclear whether BPP was to 5 continue sourcing third-party capital after March 31, 2015 and until May 10, 2015, even 6 though the underlying purchase contract for which those funds were to be raised had been 7 cancelled. There is evidence, however, that BPP, Paskett, Hines, and Sellers continued 8 negotiating even after the GSJV Contract had been cancelled, and that Paskett 9 contemplated BPP’s continued involvement in the transaction. A jury therefore could 10 reasonably conclude that, despite the cancellation of the GSJV Contract, BPP, Paskett, 11 and Hines contracted to continue their joint efforts to purchase the Property until May 10, 12 2015, and that during that time BPP was to serve as the exclusive source of third-party 13 capital. For these reasons, the Court denies summary judgment on BPP’s breach of 14 contract claims. 15 B. Breach of Good Faith and Fair Dealing (Against Paskett and Hines) 16 Defendants fail to mention, let alone analyze, BPP’s claim for breach of the 17 implied covenant of good faith and fair dealing, presumably because they believe its fate 18 is tied to the underlying breach of contract claim. Because the Court declines to grant 19 summary judgment on the breach of contract claim, it likewise declines to grant summary 20 judgment on BPP’s claim for breach of the implied covenant of good faith and fair 21 dealing. 22 C. Breach of Fiduciary Duty (Against All Defendants) 23 BPP claims the Letter Agreement formed a joint venture or partnership between it 24 and Defendants to purchase and develop the Property, and that under Arizona law 25 partners owe each other fiduciary duties to place the interests of the partnership above 26 their own. 27 Agreement was merely a service contract, and that no fiduciary duties flowed from it 28 because no partnership was created. See A.R.S. § 29-1035. Defendants contend, however, that the Letter -8- 1 A jury reasonably could find that the Letter Agreement was intended to create a 2 partnership. 3 example, the Letter Agreement states that the parties would each become shareholders in 4 another corporation, which would be used as an “Acquisition Vehicle” to acquire by 5 merger the assets of the Property. (Doc. 52-1 at 32.) The parties were then to share 6 equally in the equity compensation received from the Property. 7 communications between Paskett, Hines, and BPP, both before and after execution of the 8 Letter Agreement, suggest that the parties contemplated BPP’s long-term involvement in 9 the development of the Property. Accordingly, the Court denies summary judgment on 10 BPP’s breach of fiduciary duty claims as they pertain to Paskett and Hines because a jury 11 reasonably could find that both were parties to the Letter Agreement, that the Letter 12 Agreement created a partnership or joint venture, and that Paskett and Hines placed their 13 own interests above the interests of the partnership as a whole. 14 summary judgment in favor of Cascade, Venture Group, and FTW, however, because 15 none of these entities are parties to the Letter Agreement.5 The Letter Agreement discusses matters beyond mere services. (Id.) For Further, The Court grants 16 D. Unjust Enrichment (Against Paskett and Hines) 17 Unjust enrichment is an equitable claim available only when the plaintiff lacks an 18 adequate remedy at law. See Freeman v. Sorchych, 245 P.3d 927, 936 (Ariz. Ct. App. 19 2011). “To recover under a theory of unjust enrichment, a plaintiff must demonstrate five 20 elements: (1) an enrichment, (2) an impoverishment, (3) a connection between the 21 enrichment and impoverishment, (4) the absence of justification for the enrichment and 22 impoverishment, and (5) the absence of a remedy provided by law.” Id. 23 Paskett and Hines argue that they received no benefit and, even if they did, they 24 were justified in receiving it. BPP cites evidence, however, that it provided work product 25 concerning capital investment and development plans to Paskett and Hines, that it 26 devoted a substantial amount of time and resources to the GSJV Contract, and that 27 28 5 Indeed, BPP does not argue otherwise. BPP contends that the Letter Agreement was between it, Paskett, Hines, Larsen, and Boley. (Doc. 133 ¶ 29.) -9- 1 ordinarily it would earn over $1 million for comparable work. A jury reasonably could 2 find that Paskett and Hines received a benefit from BPP, and that “in good conscience 3 [they] should provide compensation.” Id. 4 E. Fraud (Against Paskett) 5 To prevail on a fraud claim, a plaintiff must prove the concurrence of the 6 7 8 9 10 11 following elements: (1) a representation, (2) its falsity, (3) its materiality, (4) the speaker’s knowledge of its falsity or ignorance of its truth, (5) the speaker’s intent that the information should be acted upon by the hearer and in a manner reasonably contemplated, (6) the hearer’s ignorance of the information’s falsity, (7) the hearer’s reliance on its truth, (8) the hearer’s right to rely thereon, and (9) the hearer’s consequent and proximate injury. 12 Green v. Lisa Frank, Inc., 211 P.3d 16, 34 (Ariz. Ct. App. 2009). Here, Paskett argues 13 that he made no false statements. BPP cites evidence, however, that Paskett misled it to 14 believe either than the GSJV Contract had been extended or that negotiations to 15 essentially reach a new purchase agreement that would include BPP’s involvement were 16 ongoing. BPP contends that these representations were false because the GSJV Contract 17 was, in fact, cancelled, and because Paskett knew that SHB would remain a long-term 18 partner in the FTW Contract and that BPP would not have an opportunity to buy out 19 SHB’s interest or otherwise invest. A jury reasonably could conclude that Paskett made 20 false statements. 21 Paskett also argues that BPP’s reliance on these statements was not reasonable 22 because BPP had already breached the Letter Agreement and because it knew the GSJV 23 Contract had expired. As previously noted, however, whether BPP knew the GSJV 24 Contract had expired or was misled to believe that it had been extended or was being 25 renegotiated is genuinely disputed. 26 occurred prior to May 10, 2015, BPP’s deadline for performing. A jury reasonably could 27 find that BPP was not in breach of the Letter Agreement at the time Paskett made the 28 relevant representations. For these reasons, summary judgement on BPP’s fraud claim is Further, Paskett’s alleged misrepresentations all - 10 - 1 denied. 2 F. Civil Conspiracy (Against All Defendants) 3 Defendants argue that BPP’s civil conspiracy claim fails for want of an underlying 4 tort. Because the Court denies summary judgment on BPP’s tort claims, it likewise 5 denies summary judgment on BPP’s civil conspiracy claim. 6 G. Validity of Lis Pendens (Counterclaim Against BPP) 7 In its counterclaim, FTW asks the Court to declare BPP’s lis pendens to be invalid 8 and seeks an award damages under A.R.S. § 33-420. 9 repeatedly that if a lis pendens is filed with respect to an action that does not affect title to 10 real property, the lis pendens is a groundless document[.]” Hatch Co. Contracting, Inc., 11 v. Ariz. Bank, 826 P.2d 1179, 1183 (Ariz. Ct. App. 1991). Notwithstanding a plaintiff’s 12 characterization of his claims, “[a] general claim for money damages will not give rise to 13 a constructive trust.” Burch & Cracchiolo, P.A. v. Pugliani, 697 P.2d 674, 679 (Ariz. 14 1985). “Arizona courts have held 15 Though BPP’s prayer for relief requests a constructive trust over property owned 16 by Defendants, at the time it recorded its lis pendens its complaint stated no claims 17 against FTW, the owner of the Property. Even now, BPP asserts no claim against FTW 18 that would affect its title to the Property. BPP argues that its lis pendens is valid because 19 “[i]n Arizona ‘courts will impose constructive trusts if there has been a breach of 20 fiduciary duty.’” (Doc. 131 at 16 (quoting Turley v. Ethington, 146 P.3d 1282, 1285 21 (Ariz. Ct. App. 2006).) The Court, however, has already concluded that FTW owed BPP 22 no fiduciary duty. BPP argues that FTW’s fiduciary duties flow from the partnership 23 created by the Letter Agreement, but FTW did not exist at the time the Letter Agreement 24 was executed. Nor does BPP claim that FTW was a party to it. (Doc. 133 ¶ 29.) For 25 these reasons, the Court grants summary judgment on Count II of FTW’s counterclaim, 26 which seeks a declaration that the lis pendens is invalid under A.R.S. § 33-420(B). 27 It is unclear, however, if FTW also seeks summary judgment on Count I of its 28 counterclaim, which seeks damages from BPP for recording the lis pendens. Under - 11 - 1 A.R.S. § 33-420(A): 2 A person purporting to claim an interest in, or a lien or encumbrance against, real property, who causes a document asserting such claim to be recorded in the office of the county recorder, knowing or having reason to know that the document is forged, groundless, contains a material misstatement or false claim or is otherwise invalid is liable to the owner or beneficial title holder of the real property for the sum of not less than five thousand dollars, or for treble the actual damages caused by the recording, whichever is greater, and reasonable attorney fees and costs of the action. 3 4 5 6 7 8 To the extent FTW seeks summary judgment on this claim, it is denied for three reasons. 9 First, FTW fails to discuss it in its motion. Second, though the Court concludes that the 10 lis pendens is groundless, given the complexity of the underlying transaction a jury 11 reasonably could conclude that BPP did not know the lis pendens was groundless at the 12 time it was recorded. Third, FTW does not clearly elect statutory damages, and offers no 13 evidence of actual damages. For these reasons, 14 15 IT IS ORDERED that Defendants’ Motion for Summary Judgment (Doc. 123) is GRANTED IN PART AND DENIED IN PART as follows: 16 1. Summary judgment on Count I of the second amended complaint (breach of 17 fiduciary duties) is granted in favor of Venture Group, Cascade, and FTW, and denied 18 with respect to Paskett and Hines. 19 2. Summary judgment on Counts II-VIII of the second amended complaint 20 (breach of contract and the covenant of good faith and fair dealing, civil conspiracy, 21 unjust enrichment, and fraud) is denied. 22 3. Summary judgment on Count I of FTW’s counterclaim (A.R.S. § 33-420(A)) is 23 denied. 24 // 25 // 26 // 27 // 28 // - 12 - 1 2 3 4. Summary judgment on Count II of FTW’s counterclaim (A.R.S. § 33-420(B)) is granted in favor of FTW. Dated this 28th day of August, 2017. 4 5 6 7 8 Douglas L. Rayes United States District Judge 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 - 13 -

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?