ORDER granting Plaintiff's 55 Motion for Judgment on the Pleadings. ORDERED that Counts I, II, III, IV, V, VI, and VII of the 48 Amended Complaint are DISMISSED. IT IS FURTHER ORDERED that the parties are to meet and confer and jointly file a proposed briefing schedule regarding the amount of damages resulting from Defendants' breach of the Settlement Agreement on or before July 10, 2019. Signed by Judge Diane J Humetewa on 6/14/2019. (LFIG)

Download PDF
1 WO 2 NOT FOR PUBLICATION 3 4 5 6 IN THE UNITED STATES DISTRICT COURT 7 FOR THE DISTRICT OF ARIZONA 8 9 Best Western International Incorporated, Plaintiff, 10 11 ORDER v. 12 No. CV-17-01274-PHX-DJH NM Hospitality Roswell LLC, et al., 13 Defendants. 14 15 This matter is before the Court on Plaintiff’s Motion for Partial Judgment on the 16 Pleadings (“Motion”) (Doc. 55). Defendants filed a Response (Doc. 56) and Plaintiff filed 17 a Reply (Doc. 57). 18 I. BACKGROUND 19 Plaintiff filed its Complaint on April 28, 2017, alleging breach of contract, breach 20 of the implied covenant of good faith and fair dealing, open account, stated account, post- 21 termination use of trademarks, state and federal trademark infringement, false designation 22 of origin and unfair competition, and common law trademark infringement against 23 Defendants NM Hospitality Roswell, LLC; Frist Capital Real Estate Investments, LLC; 24 and Ron Cobb, an individual (collectively “Defendants”). (Doc. 1). Shortly thereafter, the 25 parties reached a settlement agreement and requested that the Court stay the matter to allow 26 the parties to finalize the terms of the agreement. (Doc. 19). Accordingly, the Court stayed 27 the case and ordered the parties to file a stipulation to dismiss or status report by September 28 15, 2017. (Doc. 20). 1 On September 20, 2017, Plaintiff filed a Motion to Enforce Settlement Agreement 2 (Doc. 26), in which Plaintiff argued that the parties entered into a fully enforceable 3 Settlement Agreement on June 26, 2017, and that Defendants failed to timely remit 4 payment under its terms. (Id.) In their Response to Plaintiff’s Motion to Enforce 5 Settlement Agreement, Defendants stated that they “still intend[ed] to perform under the 6 settlement agreement,” but were unable to do so by the original deadline of August 31, 7 2017. (Doc. 27 at 2). Defendants stated that they would be able to perform under the 8 settlement agreement by October 31, 2017, and would work with Plaintiff to either file a 9 stipulation to dismiss the action or a status report on that day. (Doc. 27 at 2). Without 10 waiving their rights to enforce the settlement agreement, Plaintiff agreed to the extension 11 and requested the Court hold its Motion to Enforce in abeyance until October 31, 2017. 12 (Doc. 28). The Court so ordered. (Doc. 29). On October 31, 2017, Plaintiff unilaterally 13 filed a Status Report, informing the Court that Defendants had not remitted payment by 14 October 31, 2017. (Doc. 30). Accordingly, Plaintiff requested the Court rule on its pending 15 Motion to Enforce the Settlement Agreement. 16 Plaintiff’s Motion to Enforce, which were uncontested by Defendants, the Court found that 17 the parties entered into a binding agreement to settle this case. (Doc. 32). (Id.) For the reasons articulated in 18 Following the Court’s Order, Defendants made a partial payment to Plaintiff. 19 (Docs. 48, 67). The partial payment was approximately forty-three percent of the total 20 settlement amount. (Docs. 67, 68). On August 20, 2018, Plaintiff filed an Amended 21 Complaint, which included a claim for breach of the Settlement Agreement, as well as 22 seven causes of action that were initially plead in Plaintiff’s original Complaint. (Compare 23 Doc. 48, with Doc. 1).1 On November 16, 2018, Plaintiff filed the pending Motion for 24 Partial Judgment on the Pleadings with respect to its claim for breach of the Settlement 25 Agreement. (Doc. 55). On February 4, 2019, the parties filed a Joint Report, in which the 26 parties represented that Defendants “expect[ed] to complete performance and make 27 reminder of the payment due under the Settlement Agreement by February 15, 2019.” 28 1 Plaintiff’s original Complaint included claims for open and stated accounts that they abandoned in their Amended Complaint. (Doc. 1 at 12-13, Doc. 69 at 2 n.1). -2- 1 (Doc. 58). On February 22, 2019, the parties filed another Joint Status Report, in which 2 they provided that “Defendants still intend to comply with their obligations under the 3 Settlement Agreement, but were unable to make the remainder of the payment due by 4 February 15, 2019. They hope to be able to do so in the near future.” (Doc. 60). On March 5 29, 2019, the parties filed a third Joint Status Report, in which they provide that 6 “Defendants still intend to comply with their obligations under the Settlement Agreement. 7 Defendants anticipate paying 15-20% of the amount outstanding under the Settlement 8 Agreement on or before April 9, 2019, and the remainder outstanding by April 30, 2019.” 9 (Doc. 62). On May 6, 2019, the parties filed a fourth Joint Status Report, in which they 10 provide that “Defendants still intend to comply with their obligations under the Settlement 11 Agreement. Defendants anticipate being able to pay the amount outstanding under the 12 Settlement Agreement within 15 business days.” (Doc. 64). Plaintiff further provided that 13 “[g]iven [Defendants’] history of failing to perform, however, [Plaintiff] has no confidence 14 that the balance will be paid. [Plaintiff] therefore seeks a ruling on its fully-briefed Motion 15 for Judgment on the Pleadings (Docs. 55, 56, 57).” (Doc. 64 at 2). 16 On May 7, 2019, the Court ordered the parties to file supplemental briefing to 17 address the effect of the Settlement Agreement on the causes of action plead in the original 18 Complaint and the Amended Complaint.2 (Doc. 65 at 1). In its supplemental briefing, 19 Plaintiff argued that the “pre-Settlement Agreement claims are still alive because 20 Defendants have not paid [Plaintiff] the full amount owed under the Settlement Agreement, 21 and payment in full was a condition precedent to [Plaintiff’s] obligation to release and 22 dismiss its claims.” (Doc. 69 at 2). Defendants contend that “payment was not the only 23 consideration for the Settlement Agreement” and that Plaintiff cannot simultaneously 24 pursue breach of the Settlement Agreement and the underlying claims that the Settlement 25 2 26 27 28 Specifically, the Court identified the following causes of action plead both in the original Complaint and the Amended Complaint: Count I – Breach of Contract, Count II – Breach of the Implied Covenant of Good Faith and Fair Dealing, Count III – Breach of Contract; Post Termination Use of Trademarks, Count IV – Trademark Infringement under Arizona State Law, Count V – Federal Trademark Infringement, Count VI – False Designation of Origin and Unfair Competition, and Count VII – Common Law Trademark Infringement. (Doc. 48). -3- 1 Agreement purportedly extinguished. (Doc. 70). 2 I. PARTIAL JUDGMENT ON THE PLEADINGS 3 Plaintiff has moved for Partial Judgment on the Pleadings with respect to its claim 4 for breach of the Settlement Agreement, which is Count VIII of the Amended Complaint. 5 (Doc. 55 at 2-4). 6 Pursuant to the Federal Rules of Civil Procedure (“Rule”) 12(c), any party may 7 move for judgment on the pleadings “after the pleadings are closed but within such time as 8 not to delay the trial.” The pleadings are closed once a complaint and an answer have been 9 filed. See Fed. R. Civ. P. 7(a); see also Doe v. U.S., 419 F.3d 1058, 1061 (9th Cir. 2005). 10 A motion for judgment on the pleadings is functionally identical to a motion to dismiss 11 brought under Rule 12(b)(6); the same legal standard applies. See Cafasso v. General 12 Dynamics C4 Sys., Inc., 637 F.3d 1047, 1055 n.4 (9th Cir. 2011). However, unlike Rule 13 12(b)(6), a Rule 12(c) motion for judgment on the pleadings may be made by either party. 14 A plaintiff may move for judgment on the pleadings if the answer fails to controvert 15 material facts alleged in the complaint. Qwest Commc’ns Corp. v. City of Berkeley, 208 16 F.R.D. 288, 290 (N.D. Cal. 2002). The allegations of the non-moving party must be 17 accepted as true, and are construed in the light most favorable to that party. See Jones v. 18 Town of Quartzsite, 2014 WL 12617038, at *2 (D. Ariz. Feb. 24, 2014); see also Lyon v. 19 Chase Bank USA, N.A., 656 F.3d 877, 882 (9th Cir. 2011). “Uncontested allegations to 20 which the other party had an opportunity to respond are taken as true.” Qwest Commc’ns 21 Corp., 208 F.R.D. at 290. 22 Judgment on the pleadings is appropriate “when there are no issues of material fact, 23 and the moving party is entitled to judgment as a matter of law.” 3550 Stevens Creek 24 Assocs. v. Barclays Bank, 915 F.2d 1355, 1357 (9th Cir. 1990). In considering a motion 25 for judgment on the pleadings, the court reviews the pleadings only. However, a document 26 that is not attached to the complaint may be considered if it is referred to in the complaint 27 and the authenticity of the document is not questioned. See The Armored Group, LLC v. 28 Supreme Corp., 2010 WL 2595280, at *2 (D. Ariz. June 24, 2010) (citing Branch v. -4- 1 Tunnell, 14 F.3d 449, 453 (9th Cir. 1994)). 2 In its present Motion, Plaintiff contends that it is entitled to judgment on the 3 pleadings with respect to its claim for breach of the Settlement Agreement because the 4 Court has already found that the Settlement Agreement was valid and enforceable, and 5 Defendants have admitted in their Answer to every fact necessary to establish its liability 6 for breach of the Settlement Agreement. (Doc. 55 at 2-3); see also Honey v. Distelrath, 7 195 F.3d 531, 532–33 (9th Cir. 1999). Plaintiff did not attach a copy of the Settlement 8 Agreement as an exhibit to the Amended Complaint; however, the Court will consider the 9 Settlement Agreement (Doc. 68), because Plaintiff refers to the Settlement Agreement in 10 the Amended Complaint, and there is no dispute over the authenticity of the document. See 11 The Armored Group, 2010 WL 2595280, at *2. The Court agrees that judgment on 12 Plaintiff’s breach of the Settlement Agreement claim is warranted. 13 In the Amended Complaint, Plaintiff alleges that on June 26, 2017, Plaintiff and 14 Defendants entered into an enforceable Settlement Agreement; however, Defendants failed 15 to make the full payment that was required under the Settlement Agreement. (Doc. 48 ¶¶ 16 68, 69). Plaintiff further claims that despite numerous demands for payment of the 17 remaining balance under the Settlement Agreement, Defendants have failed to make 18 payment. (Id. ¶¶ 74-76). Thus, Plaintiff alleges Defendant’s failure to make full payment 19 under the Settlement Agreement is a breach of the Settlement Agreement. (Id. ¶¶ 127-32). 20 To prevail on its breach of settlement claim, Plaintiff must allege the existence of a 21 contract between Plaintiff and Defendants, a specific breach of that contract by Defendant, 22 and resulting damage to Plaintiff. See Coleman v. Watts, 87 F. Supp. 2d 944, 955 (D. Ariz. 23 1998) (citing Clark v. Compania Ganadera de Cananea, S.A., 387 P.2d 235, 237 (Ariz. 24 1963)). Here, Defendants agree that the Settlement Agreement is a valid contract and 25 concede that they failed to make the full required payment under the terms of the Settlement 26 Agreement. (Doc. 51 ¶¶ 65-76, 127-33). Furthermore, in their Response, Defendants 27 failed to address or otherwise defend against the merits of Plaintiff’s Motion and therefore 28 -5- 1 have implicitly conceded to granting it.3 (Doc. 56 at 2); see also Pepper Hamilton L.L.P. 2 v. Intelligent Water Sols., Inc., 2008 WL 4080358, at *1 (D. Ariz. Sept. 2, 2008) (holding 3 that defendant’s failure to respond to plaintiff’s motion for judgment on the pleadings may 4 be deemed a consent to the granting of the motion and the court may dispose of the motion 5 summarily) (citing LRCiv. 7.2(i))). In fact, Defendants provide that they “still intend to 6 perform under the Settlement Agreement in the near future when the Defendants’ financial 7 situation permits them to render performance.” (Id. at 2). Thus, Defendants concede that 8 the Settlement Agreement is valid and that they have not performed as required by the 9 Settlement Agreement. Furthermore, Defendants do not dispute or otherwise contest that 10 Plaintiffs have been damaged as a result of Defendants’ breach. (Compare Doc. 55 at 3-4, 11 with Doc. 56 at 1-2). 12 uncontested by Defendants, the Court finds that Plaintiff is entitled to judgment as to 13 liability on its breach of the Settlement Agreement claim. While Plaintiff has established 14 that it was damaged as a result of the breach, Plaintiff however has not established the 15 amount of damages. Thus, the Court will not rule on the amount of damages at this time 16 and provide the parties with an opportunity to submit briefing regarding amount of 17 damages stemming from Defendant’s breach of the Settlement Agreement. 18 II. For the reasons articulated in Plaintiff’s Motion, which go ELECTION-OF-REMEDIES APPLICATION 19 Next, the Court must address how granting Plaintiff’s Motion for Partial Judgment 20 on the Pleadings affects Plaintiff’s remaining claims. Here, Plaintiff argues that it has the 21 right to simultaneously enforce and recover under the Settlement Agreement and secure 22 redress on the underlying claims that the Settlement Agreement purportedly extinguished.4 23 3 24 25 26 27 28 In their Response, Defendants fail to address the merits of Plaintiff’s claim, instead Defendants state that “Plaintiff’s Motion did not contain the required certification” under Local Rule 12.1(c), and therefore the Court should strike Plaintiff’s Motion. (Doc. 56 at 1-2). However, in its Reply, Plaintiff admit that it “inadvertently omitted the certificate required by Local Rule 12.1,” but provides that Plaintiff did meet and confer with Defendants about the Motion prior to filing it. (Doc. 57 at 2). Local Rule 12.1(c) provides that “[a] motion that does not contain the required certification may be stricken summarily.” (emphasis added). As Plaintiff did confer with Defendants prior to filing the Motion and cured their defect by filing required certification with its Reply, the Court will not strike Plaintiff’s Motion. 4 The Settlement Agreement expressly provides that “the [p]arties have reached a -6- 1 The Court disagrees. Instead, the Court finds that this situation raises the election-of- 2 remedies doctrine, the applicability of which depends on whether Plaintiff’s conduct— 3 Plaintiff’s choice to seek and obtain a judgment on its the breach of Settlement Agreement 4 claim—in this litigation effected a binding election between Plaintiff’s choice of remedies. 5 Typically, “if a party enters into a settlement agreement knowingly and voluntarily, 6 the agreement is treated as a binding contract and the party is precluded from raising the 7 underlying claims. However, if one party breaches a settlement, the other has the option 8 of enforcing the terms of the settlement or rescinding the settlement and suing on the 9 original claims.” Arnold v. United States, 816 F.2d 1306, 1309 (9th Cir. 1987) (emphasis 10 added and internal citations omitted); see also Boulware v. Baldwin, 545 Fed. Appx. 725, 11 728 (10th Cir. 2013) (holding that execution of the settlement agreement did not foreclose 12 legal action on the underlying claims in the event defendants failed to perform as agreed; 13 rather plaintiff has the option to seek relief on those underlying claims in lieu of enforcing 14 the agreement). 15 The election-of-remedies doctrine, which refers to situations where an individual 16 pursues remedies that are legally or factually inconsistent, operates to prevent a party from 17 obtaining double redress for a single wrong. 5 See Aritex Land Co. v. Baker, 482 P.2d 875, 18 883 (Ariz. 1971) (“An election of remedies is the choice of one of two or more co-existing 19 remedial rights where such rights arise out of the same facts.”). “For example, a person 20 who has been fraudulently induced to enter into a contract may sue for damages under the 21 contract or may sue to rescind that contract, but cannot do both—one act being an 22 affirmance of the contract, the other being a disavowal of the contract—an inconsistency 23 giving rise to the doctrine of election of remedies.” Hennesy Equip. Sales Co. v. Valley 24 Nat. Bank, 543 P.2d 123, 124 (Ariz. Ct. App. 1975). The doctrine therefore prevents 25 aggrieved parties from prevailing on logically inconsistent theories of the case, and serves 26 settlement of the Action and seek to resolve all known and unknown disputes between them that are or could be the subject of the Action[.]” (Doc. 68 at 2). 27 5 28 In a diversity case, the doctrine of election of remedies is an element of state substantive law which this Court is bound to apply. See McKinney v. Gannett Co., Inc., 817 F.2d 659, 671 (10th Cir. 1987). -7- 1 to guard against overcompensation. Miller v. Ariz. Bank, 43 P.2d 518, 525 (Ariz. 1935). 2 A party is bound by its election-of-remedies if two or more inconsistent remedies 3 existed at the time of the election and the party to be bound affirmatively chose, or elected, 4 between the available inconsistent remedies. See Caruthers v. Underhill, 326 P.3d 268, 5 272 (Ariz. Ct. App. 2014) (“The election-of-remedies doctrine requires an election between 6 two or more inconsistent remedies that actually exist at the time of the election.”); see also 7 Latman v. Burdette, 366 F.3d 774, 782 (9th Cir. 2004) (citing 25 Am. Jur. 2d Election of 8 Remedies § 8). Here, the Court finds that there were two inconsistent remedies—enforcing 9 the settlement agreement or rescinding the settlement agreement and pursuing the 10 underlying claims. See Caruthers, 326 P.3d at 273 (“The election-of-remedies doctrine 11 provides that a party . . . [to] a contract must choose to either disavow the contract and seek 12 a return to the status quo ante, or affirm the contract and sue for damages for breach.”); see 13 also Boulware v. Baldwin, 545 Fed. Appx. 725, 728 (10th Cir. 2013) (“Enforcing a 14 settlement agreement to recover damages for its breach is plainly exclusive to voiding or 15 rescinding it to pursue the underlying claims; that is why these two courses are 16 characterized as disjunctive options.”). 17 However, whether an election of remedy occurred here, turns on the distinction 18 between pursuit and attainment of a remedy. Plaintiff contends that it was entitled to pursue 19 alternative claims, which—to an extent—is correct. See Lucas v. City of Visalia, 726 F. 20 Supp. 2d 1149, 1159 (E.D. Cal. 2010) (noting Rule 8(d) permits a plaintiff to plead 21 alternate, hypothetical and inconsistent claims). Under federal law, which governs the 22 timing of election,6 a plaintiff does not have to elect a single remedy at the outset of suit, 23 but instead a plaintiff can plead alternative and inconsistent claims. However, here, 24 Plaintiff did not just plead alternative claims; Plaintiff sought, and through this Order, 25 6 26 27 28 The Court notes that “[t]he election of remedies doctrine has two aspects, one procedural and one substantive.” Green v. Altman, 2004 WL 2106552, at *9 (E.D. Pa. Sept. 21, 2004) (internal citation omitted). The timing of the election between remedies is considered procedural, and therefore is governed by federal law pursuant to the Erie Doctrine. See Homeland Training Ctr., LLC v. Summit Point Auto. Research Ctr., 594 F.3d 285, 294 n.1 (4th Cir. 2010). -8- 1 obtained judgment on its breach of the Settlement Agreement claim. Thus, at this point, 2 the Court finds that a binding election has occurred, and the underlying claims addressed 3 in the Settlement Agreement have been extinguished. See Pettennude v. Transnation Title 4 Ins. Co., 2009 WL 10673445, at *7 (D. Ariz. May 6, 2009) (finding that in order to pursue 5 a claim for damages, plaintiffs necessarily affirmed or ratified the contract, and therefore, 6 an election had occurred); see also Homeland Training Ctr., LLC, 594 F.3d at 293 (noting 7 alternative-pleading rule and holding that conclusive election of remedy occurs “where a 8 suit has advanced to judgment”); Haphey v. Linn Cnty., 924 F.2d 1512, 1518 (9th Cir. 9 1991) (same). 10 Plaintiff’s claim regarding breach of the Settlement Agreement precludes relief on 11 the underlying settled claims only upon a clear election of remedies in favor of the former, 12 which does not happen automatically at the outset of litigation, but instead required a 13 deliberate action by Plaintiff. The Court finds here, that Plaintiff’s deliberate choice is 14 reflected in its decision to pursue and obtain a judgment on the breach of the Settlement 15 Agreement. This was Plaintiff’s choice to make, and, as with any litigation decision, it is 16 entirely reasonable to expect Plaintiff to accept the attendant risks and benefits of the choice 17 when it is clearly made. For these reasons, the Court finds that Plaintiff’s claims, Counts 18 I, II, III, IV, V, VI, and VII of the Amended Complaint are subject to dismissal based on 19 Plaintiff’s election to pursue and obtain a judgment for breach of the Settlement 20 Agreement, which resolved those claims. 21 III. CONCLUSION 22 In this Order, the Court has dismissed Counts I, II, III, IV, V, VI, and VII of the 23 Amended Complaint and granted Plaintiff’s Motion for Partial Judgment on the Pleadings 24 as to labiality on Count VIII of the Amended Complaint. Thus, there are no remaining 25 claims to be litigated. Accordingly, the only remaining issue in this matter is the amount 26 of damages7 resulting from the breach of the Settlement Agreement, Count VIII of the 27 7 28 If Plaintiff intends to seek damages beyond the amount outstanding under the Settlement Agreement and any related interest, then Plaintiff should be prepared to clearly identify the authority that entitles them to such damages. -9- 1 Amended Complaint. 2 Accordingly, 3 IT IS ORDERED that Plaintiff’s Motion for Partial Judgment on the Pleadings 4 5 6 (Doc. 55) is GRANTED. IT IS FURTHER ORDERED that Counts I, II, III, IV, V, VI, and VII of the Amended Complaint (Doc. 48) are DISMISSED. 7 IT IS FINALLY ORDERED that the parties are to meet and confer and jointly file 8 a proposed briefing schedule regarding the amount of damages resulting from Defendants’ 9 breach of the Settlement Agreement on or before July 10, 2019. 10 Dated this 14th day of June, 2019. 11 12 13 14 Honorable Diane J. Humetewa United States District Judge 15 16 17 18 19 20 21 22 23 24 25 26 27 28 - 10 -

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?