MD Helicopters Incorporated v. Boeing Company

Filing 50

ORDER: IT IS ORDERED that Plaintiff MD Helicopters Incorporated's Motion to Dismiss, (Doc. 21 ), is GRANTED in part and DENIED in part in accordance with this Order. IT IS FURTHER ORDERED that Defendant's Counterclaims 1 and 2 are dismiss ed without prejudice so the parties may resolve the claims in accordance with their contractual alternative dispute resolution procedures. IT IS FURTHER ORDERED that Defendant's Counterclaim 4 is dismissed with prejudice. IT IS FURTHER ORDERED that Defendant's Counterclaims 3, 6, 7, 8 and 9 are not dismissed in accordance with this Order [see attached Order for details]. Signed by Senior Judge James A Teilborg on 4/23/18. (MAW)

Download PDF
1 WO 2 3 4 5 6 IN THE UNITED STATES DISTRICT COURT 7 FOR THE DISTRICT OF ARIZONA 8 9 MD Helicopters Incorporated, Plaintiff, 10 11 ORDER v. 12 No. CV-17-02598-PHX-JAT The Boeing Company, 13 Defendant. 14 15 Pending before the Court is Plaintiff MD Helicopters Inc.’s (“MDHI”) Motion to 16 Dismiss Defendant The Boeing Company’s (“Boeing”) Counterclaims 1–4 and 6–9, 17 (Doc. 21). Boeing filed a Response in Opposition to the Motion to Dismiss, (Doc. 25), 18 and MDHI filed a Reply in Support of Plaintiff’s Motion to Dismiss, (Doc. 26). 19 I. Background 20 MDHI manufactures helicopters for commercial, military, and law enforcement 21 markets. (Doc. 9 at 2). Boeing is an aerospace business that, among other product 22 offerings, designs, develops, produces, sells, and offers support for military helicopters. 23 (Doc. 9 at 3); (Doc. 16 at 2). In February of 2005, MDHI and Boeing entered into an 24 Asset Acquisition Agreement (“AAA”), (Doc. 16-1 at 2–39), and a Cross License, (Doc. 25 16-2 at 1–21), so that Boeing could purchase some of MDHI’s intellectual property and, 26 in turn, license the purchased assets back to MDHI on a non-exclusive basis, (Doc. 16 at 27 8); (Doc. 29 at 1–2). In July of 2010, Boeing and MDHI entered into a Memorandum of 28 Agreement (“2010 MOA”), (Doc. 16-2 at 22–46), providing that “MDHI and Boeing will 1 cooperatively produce and support the AH-6i Aircraft in the worldwide market,” (Doc. 2 16 at 12); (Doc. 9 at 3). On October 6, 2011, MDHI and Boeing signed a Long Term 3 Requirements Contract (“LTRC”) whereby MDHI agreed to sell and Boeing agreed to 4 buy airframes and related components for the AH-6i helicopter. (Doc. 9 at 3); (Doc. 16 at 5 12). The LTRC incorporated the Boeing Company General Provisions 1, (Doc. 16-3 at 6 36–45), dated April 1, 2009 (“GP1”), (Doc. 9 at 4); (Doc 16 at 13). In November 2011, 7 the parties agreed to the Master Purchase Contract No. 524842 (“Master PC”), which 8 incorporates the terms of the LTRC. (Doc. 16 at 14); (Doc. 9 at 4). 9 Boeing claims, and MDHI denies, that, from late 2011 to the middle of 2012, 10 MDHI complained to Boeing that there had not been any orders for parts under the 11 LTRC. (Doc. 16 at 15); (Doc. 29 at 4). Boeing likewise claims, and MDHI denies, that in 12 April of 2012, MDHI announced that it would compete against Boeing for an Army 13 contract by bidding its own helicopter, the MD 540F, against Boeing’s AH-6i. Id. 14 On July 26, 2012, Boeing issued Purchase Contract No. 648538 to MDHI for the 15 purchase of airframes and related components for the AH-6i. Id. Boeing claims, and 16 MDHI denies, that MDHI initially refused to sign this Purchase Contract in an alleged 17 violation of the LTRC. Id. Eventually, in September of 2012, MDHI signed Purchase 18 Contract No. 648538. Id. 19 Following these events, Boeing claims, and MDHI denies, that MDHI attempted 20 to frustrate Boeing’s AH-6i program, by engaging in delivery delays and poor 21 production. Id. MDHI claims, and Boeing denies, that during the course of performance 22 under the purchase contract for airframes for the AH-6i, MDHI raised various issues 23 regarding the pricing, delivery schedule, and additional work required. (Doc. 9 at 4); 24 (Doc. 16 at 3). In May of 2015, MDHI prepared and submitted to Boeing a formal 25 Request for Equitable Adjustment (“REA”). Id. Additionally, in response to the various 26 issues surrounding the production and delivery of the AH-6i parts, in August of 2015, the 27 parties entered into a Memorandum of Agreement (“2015 MOA”). (Doc. 9 at 5); (Doc. 28 16 at 3). Boeing claims that after the parties entered into the 2015 MOA, MDHI timely -2- 1 delivered five AH-6i airframes. (Doc. 16 at 16). However, after that, on March 7, 2016, 2 Boeing and MDHI entered into the Purchase Contract Change No. 32 (“PCC-32”), which 3 Boeing alleges established a new schedule setting deadlines for delivery of the remaining 4 airframes. (Doc. 16 at 16); (Doc. 29 at 5). Boeing further alleges that, despite that agreed- 5 upon schedule under the PCC-32, MDHI failed to timely deliver the remaining seventeen 6 airframes as required. (Doc. 16 at 16). MDHI claims that AH-6i production delays were 7 caused, in part, by labor unrest issues in Monterrey, Mexico. (Doc. 29 at 5). Boeing 8 conducted an investigation into the delays and does not accept MDHI’s explanation, but 9 rather believes that MDHI’s reasons for the post-2015 MOA delays were pretextual and 10 that MDHI’s true objective was to undermine Boeing’s efforts so MDHI could promote 11 its own MD 540F helicopter. (Doc. 16 at 16–18). 12 After the performance period of the LTRC, Boeing sought out other suppliers to 13 supply parts for the AH-6i. Boeing claims, and MDHI denies, that MDHI instructed 14 other suppliers not to work with Boeing. (Doc. 16 at 20–21); (Doc. 29 at 6). Boeing 15 likewise claims, and MDHI denies, that MDHI did not provide written notice to MDHI’s 16 suppliers that they could work with Boeing as allegedly required by the AAA and the 17 Cross License. (Doc. 16 at 20); (Doc. 29 at 6). 18 MDHI claims Boeing has failed to pay MDHI for the AH-6i airframes delivered to 19 Boeing. (Doc. 9 at 6). Boeing admits that it is in possession of the AH-6i airframes 20 MDHI delivered, but states that MDHI’s delivery of the final airframe was incomplete 21 and nonconforming, thus MDHI was not entitled to payment. (Doc. 16 at 4). 22 Boeing also claims that MDHI is in possession of parts that rightfully belong to 23 Boeing and its customers. (Doc. 16 at 22–23). Boeing believes that MDHI is holding 24 these parts as a method to extract payment on MDHI’s contract claims. (Doc. 16 at 24). 25 MDHI has presented two claims: 1) Breach of the 2015 MOA and 2) Breach of 26 Implied Covenant of Good Faith and Fair Dealing. Boeing has presented nine 27 counterclaims: 1) Breach of the AAA; 2) Breach of the Cross License; 3) Breach of 28 LTRC; 4) Breach of the GP1; 5) Breach of the 2015 MOA and PCC-32; 6) Breach of the -3- 1 Implied Covenant of Good Faith and Fair Dealing; 7) Conversion; 8) Tortious 2 Interference with Contract and Business Expectancy; and 9) Declaratory Judgment. 3 MDHI has moved to dismiss all of Boeing’s counterclaims except its fifth counterclaim. 4 II. Legal Standard 5 MDHI has moved to dismiss the Boeing’s Counterclaims 1–4 and 6–9 for failure 6 to state a claim upon which relief can be granted pursuant to Rule 12(b)(6) of the Federal 7 Rules of Civil Procedure. Under Rule 12(b)(6), a motion to dismiss should not be granted 8 “unless it appears beyond doubt that the plaintiff can prove no set of facts in support of 9 his claims which would entitle him to relief.” Barnett v. Centoni, 31 F.3d 813, 816 (9th 10 Cir. 1994) (citations and internal quotation marks omitted). 11 To survive a Rule 12(b)(6) motion to dismiss, a complaint must meet the 12 requirements of Rule 8. Rule 8(a)(2) requires a “short and plain statement of the claim 13 showing that the pleader is entitled to relief,” so that the defendant has “fair notice of 14 what the . . . claim is and the grounds upon which it rests.” Bell Atl. Corp. v. Twombly, 15 550 U.S. 544, 555 (2007) (quoting Conley v. Gibson, 355 U.S. 41, 47 (1957)). Although a 16 complaint attacked for failure to state a claim does not need detailed factual allegations, 17 the pleader’s obligation to provide the grounds for relief requires “more than labels and 18 conclusions, and a formulaic recitation of the elements of a cause of action will not do.” 19 Id. (citing Papasan v. Allain, 478 U.S. 265, 286 (1986)). The factual allegations of the 20 complaint must be sufficient to raise a right to relief above a speculative level. Id. 21 Rule 8’s pleading standard demands more than “an unadorned, the-defendant 22 unlawfully-harmed-me accusation.” Ashcroft v. Iqbal, 556 U.S. 662, 678 (2009) (citing 23 Twombly, 550 U.S. at 555). A complaint that offers nothing more than blanket assertions 24 will not suffice. A complaint must contain sufficient factual matter, which, if accepted as 25 true, states a claim to relief that is “plausible on its face.” Iqbal, 556 U.S. at 678. Facial 26 plausibility exists if the pleader pleads factual content that allows the court to draw the 27 reasonable inference that the defendant is liable for the misconduct alleged. Id. 28 Plausibility does not equal “probability,” but it requires more than a sheer possibility that -4- 1 a defendant has acted unlawfully. Id. “Where a complaint pleads facts that are ‘merely 2 consistent’ with a defendant’s liability, it ‘stops short of the line between possibility and 3 plausibility of entitlement to relief.’” Id. (quoting Twombly, 550 U.S. at 557). 4 When analyzing a complaint for failure to state a claim, all factual allegations are 5 taken as true and construed in the light most favorable to the nonmoving party. Iolab 6 Corp. v. Seaboard Sur. Co., 15 F.3d 1500, 1504 (9th Cir. 1994). All reasonable 7 inferences are to be drawn in favor of the nonmoving party. Jacobsen v. Hughes Aircraft 8 Co., 105 F.3d 1288, 1296 (9th Cir. 1997), rev’d on other grounds, 525 U.S. 432 (1999). 9 Moreover, “[i]f a complaint is accompanied by attached documents, the court is not 10 limited by the allegations contained in the complaint. These documents are part of the 11 complaint and may be considered in determining whether the plaintiff can prove any set 12 of facts in support of the claim.” Durning v. First Boston Corp., 815 F.2d 1265, 1267 (9th 13 Cir. 1987). 14 Furthermore, absent specific exceptions, the Court will not consider evidence or 15 documents beyond the complaint in the context of a Rule 12(b)(6) motion to dismiss. See 16 Hal Roach Studios, Inc. v. Richard Feiner & Co., Inc., 896 F.2d 1542, 1550 (9th Cir. 17 1990) (amended decision). There are two exceptions to the general rule. First, “[i]f the 18 documents are not physically attached to the complaint, they may be considered if the 19 documents’ authenticity . . . is not contested and the plaintiff’s complaint necessarily 20 relies on them.” Lee v. City of Los Angeles, 250 F.3d 668, 688 (9th Cir. 2001) (internal 21 quotations and citations omitted). “Second, under Fed. R. Evid. 201, a court may take 22 judicial notice of matters of public record.” Id. at 688–89 (internal quotations and 23 citations omitted). 24 Finally, this Court has diversity jurisdiction under Section 1332. See 28 U.S.C. 25 § 1332. A court sitting in diversity applies federal procedural law and state substantive 26 law. See Erie R. Co. v. Tompkins, 304 U.S. 64, 78 (1938). Accordingly, this Court will 27 apply the substantive law of Arizona. Med. Lab. Mgmt. Consultants v. Am. Broad. Cos., 28 Inc., 306 F.3d 806, 812 (9th Cir. 2002). -5- 1 III. Analysis A. First Counterclaim: Breach of Contract—AAA 2 3 In order to state a claim for breach of contract, the counterclaimant must allege the 4 existence of a contract between the parties, a breach of the contract, and damages. 5 Chartone, Inc. v. Bernini, 83 P.3d 1103, 1111 (Ariz. Ct. App. 2004). 6 a. Failure to Allege Damages 7 Boeing alleges that it was damaged as a result of MDHI’s alleged breach of the 8 AAA contract. MDHI argues that the alleged damages are “claims for impermissible 9 future and speculative damages,” (Doc. 26 at 6); however, based on Boeing’s 10 counterclaim, it is plausible that Boeing has suffered and will suffer economic damages 11 from MDHI’s alleged conduct. Thus, construing the facts alleged in the light most 12 favorable to the nonmoving party, this Court holds that Boeing sufficiently alleged 13 damages. b. Failure to Allege Sufficient Detail 14 15 MDHI contends that Boeing failed to allege sufficient detail in its first 16 counterclaim because Boeing did not explicitly list within the counterclaim the provisions 17 of the AAA that were breached. 1 However, although Boeing did not reference the exact 18 numerical section of the contract within the counterclaim, the allegations are clearly 19 related to particular clauses within the contract, specifically, the Field of Use and Notice 20 provisions in sections 2.1.1(a) and 8.1(a), respectively. Accordingly, while references 21 within the counterclaim to those specific provisions may have assisted in the Court’s 22 review, the general factual allegations were sufficient to support the breach of contract 23 24 25 26 27 28 1 MDHI cites several cases arguing that failure to reference the exact provision in a contract amounts to failure to allege sufficient facts, however, the cases cited do not go that far, they only require that the allegations relate to specific provisions, not that the specific provisions be referenced in the counterclaim itself. See Warring v. Green Tree Servicing LLC, No. CV-14-0098-PHX-DGC, 2014 WL 2605425, at *3 (D. Ariz. June 11, 2014); Howard v. JPMorgan Chase Bank, N.A., No. CV12-0952-PHX DGC, 2012 WL 6589330, at *2 (D. Ariz. Dec. 17, 2012); Thompson v. SunTrust Mortg., Inc., No. CV11-0284-PHX-DGC, 2011 WL 3320774, at *4 (D. Ariz. Aug. 2, 2011); Wright v. Chase Home Fin. LLC, No. CV-11-0095-PHX-FJM, 2011 WL 2173906, at *2 (D. Ariz. June 2, 2011). -6- 1 counterclaim. Thus, construing the facts alleged in the light most favorable to the 2 nonmoving party, this Court finds that Boeing pleaded sufficient facts to establish a 3 breach of contract claim. 4 5 c. Failure to Comply with Alternative Dispute Resolution Procedures 6 A strong federal policy favoring arbitration exists, and courts must rigorously 7 enforce agreements to arbitrate. Volt Info. Scis., Inc. v. Bd. of Trs. of the Leland Stanford 8 Junior Univ., 489 U.S. 468, 476 (1989); Dean Witter Reynolds, Inc. v. Byrd, 470 U.S. 9 213, 221 (1985). The Federal Arbitration Act “leaves no place for the exercise of 10 discretion by a district court, but instead mandates that district courts shall direct the 11 parties to proceed to arbitration on issues as to which an arbitration agreement has been 12 signed.” Byrd, 470 U.S. at 218 (citing 9 U.S.C. §§ 3, 4). “The court’s role under the 13 [FAA] is therefore limited to determining (1) whether a valid agreement to arbitrate 14 exists and, if it does, (2) whether the agreement encompasses the dispute at issue.” 15 Chiron Corp. v. Ortho Diagnostic Sys., Inc., 207 F.3d 1126, 1130 (9th Cir. 2000) (citing 16 9 U.S.C. § 4) (other citations omitted). If a district court decides that an arbitration 17 agreement is valid and enforceable, “then it should stay or dismiss the action pending 18 arbitration proceedings to allow the arbitrator to decide the remaining claims, including 19 those relating to the contract as a whole.” Nagrampa v. MailCoups, Inc., 469 F.3d 1257, 20 1276–77 (9th Cir. 2006). 21 Courts interpret agreements to arbitrate “by applying general state-law principles 22 of contract interpretation, while giving due regard to the federal policy in favor of 23 arbitration by resolving ambiguities as to the scope of arbitration in favor of arbitration.” 24 Wagner v. Stratton Oakmont, Inc., 83 F.3d 1046, 1049 (9th Cir. 1996). “[A]s a matter of 25 federal law, any doubts concerning the scope of arbitrable issues should be resolved in 26 favor of arbitration, whether the problem at hand is the construction of the contract 27 language itself or an allegation of waiver, delay, or a like defense to arbitrability.” Moses 28 H. Cone Mem’l Hosp. v. Mercury Constr. Corp., 460 U.S. 1, 24–25 (1983). Courts -7- 1 “ordinarily will not except a controversy from coverage of a valid arbitration clause 2 unless it may be said with positive assurance that the arbitration clause is not susceptible 3 of an interpretation that covers the asserted dispute.” Marchese v. Shearson Hayden 4 Stone, Inc., 734 F.2d 414, 419 (9th Cir. 1984) (internal quotation and citation omitted). 5 However, the federal policy favoring arbitration cannot “override[ ] the principle that a 6 court may submit to arbitration only those disputes . . . that the parties have agreed to 7 submit.” Granite Rock Co. v. Int’l Bhd. of Teamsters, 561 U.S. 287, 302 (2010) (internal 8 quotation and citation omitted). 9 Here, there is no dispute between the parties that the AAA contains a mandatory 10 dispute resolution clause, requiring that “the procedures specified in this Section 8.19 11 shall be the sole and exclusive procedures for the resolution of disputes between the 12 Parties arising out of or relating to this Agreement and any of the Related Agreements.” 13 (Doc. 16-1 at 69). What is disputed is whether subsequent agreements, the 2010 MOA 14 and the GP1, supersede or conflict with the mandatory arbitration provisions of the AAA. 15 Section 8.3 of the 2010 MOA incorporates by reference the provisions of GP1. (Doc. 16- 16 3 at 33). Furthermore, the GP1 provides: 17 18 19 20 Any dispute that arises under or is related to this contract that cannot be settled by mutual agreement of the parties may be decided by a court of competent jurisdiction. Pending final resolution of any dispute, Seller shall proceed with performance of this contract according to Buyer’s instructions so long as Buyer continues to pay amounts not in dispute. 21 (Doc 16-3 at 39). Ultimately, whether the 2010 MOA provision supersedes or conflicts 22 with the AAA depends on whether the agreements cover the same subject matter. This 23 Court finds, based on review of the relevant agreements, that although the AAA and 2010 24 MOA are related, the two agreements cover different subjects and serve different 25 purposes. The AAA concerns the purchase of intellectual property, (see generally Doc. 26 16-1 at 40–72), while the 2010 MOA concerns how the parties will work together to 27 manufacture and produce the AH-6i aircraft, specifically, what Boeing would purchase 28 and what MDHI would sell to Boeing through the Purchase Contracts, (see Doc. 16-2 at -8- 1 24). 2 Under its first counterclaim, Boeing alleges that MDHI breached the AAA for 3 failing to issue written notices to third-parties, taking a contrary position with the 4 government that the AH-6i was in Boeing’s Field of Use, and soliciting opportunities to 5 support the AH-6i without Boeing’s permission in contravention of the AAA’s Field of 6 Use. (Doc. 16 at 29). These allegations fall within the subject matter of the AAA, 7 specifically, the Field of Use and Notice provisions in sections 2.1.1(a) and 8.1(a), and do 8 not relate to the work agreement within the MOA. Accordingly, the dispute resolution 9 provisions of the AAA apply to the allegations within Boeing’s first counterclaim and 10 Boeing’s first counterclaim is dismissed without prejudice. B. Second Counterclaim: Breach of Contract—Cross License 11 12 a. Failure to Allege Damages 13 Boeing alleges that it was damaged as a result of MDHI’s alleged breach of the 14 Cross License contract. MDHI argues that the alleged damages are “claims for 15 impermissible future and speculative damages,” (Doc. 26 at 6); however, based on 16 Boeing’s counterclaim it is plausible that Boeing has suffered and will suffer economic 17 damages from MDHI’s alleged conduct. Thus, construing the facts alleged in the light 18 most favorable to the nonmoving party, this Court holds that Boeing sufficiently alleged 19 damages. 20 b. Failure to Allege Sufficient Detail 21 MDHI contends that Boeing failed to allege sufficient detail in its second 22 counterclaim because Boeing did not explicitly list within the counterclaim the provisions 23 of the Cross License that were breached. However, although Boeing did not reference the 24 exact numerical section of the contract within the counterclaim, the allegations are clearly 25 related to particular clauses within the contract, specifically, the Field of Use in sections 2 26 and 3 and the Notice provision in section 3.5. Accordingly, while references within the 27 counterclaim to those specific provisions may have assisted in the Court’s review, the 28 general factual allegations were sufficient to support the breach of contract counterclaim. -9- 1 Thus, construing the facts alleged in the light most favorable to the nonmoving party, this 2 Court finds that Boeing pleaded sufficient facts to establish a breach of contract claim. 3 4 c. Failure to Comply with Alternative Dispute Resolution Procedures 5 The parties do not dispute that section 6.10 of the Cross License requires dispute 6 resolution. (Doc. 16-2 at 20). The parties dispute whether subsequent agreements, the 7 2010 MOA and the GP1, supersede or conflict with the mandatory arbitration provisions 8 of the Cross License. Ultimately, whether the 2010 MOA provisions supersede or conflict 9 with the Cross License depends on whether the agreements cover the same subject 10 matter. After reviewing the relevant agreements, this Court finds that, although the 2010 11 MOA and the Cross License are related, the two agreements cover different subjects and 12 serve different purposes. The Cross License concerns a licensing agreement, (see 13 generally Doc. 16-2 at 1–21), while the 2010 MOA concerns how the parties will work 14 together to manufacture and produce the AH-6i aircraft, (see Doc. 16-2 at 24). 15 Under its second counterclaim, Boeing alleges that MDHI breached the Cross 16 License for failing to issue written notices to third-parties, taking a contrary position with 17 the government that the AH-61 was in Boeing’s Field of Use, and soliciting opportunities 18 to support the AH-6i without Boeing’s permission in contravention of the Cross License 19 Field of Use. (Doc. 16 at 30). Boeing’s allegations concerning failure to provide notice 20 fall under section 3.5 of the Cross License; likewise, Boeing’s allegations concerning the 21 Field of Use fall under sections 2 and 3 of the Cross License. Boeing’s claims do not 22 relate to the work agreement within the 2010 MOA. Accordingly, the dispute resolution 23 provisions of the Cross License apply to the allegations within Boeing’s second 24 counterclaim and Boeing’s second counterclaim is dismissed without prejudice. 25 26 C. Third Counterclaim: Breach of Contract—LTRC a. Failure to Allege Existence of a Valid Contract 27 Boeing alleges that MDHI breached its obligations under the LTRC. In response, 28 MDHI alleges that the LTRC is no longer valid. First, MDHI claims the agreement is no - 10 - 1 longer valid because the performance period for the agreement only extended to August 2 18, 2014. Section 3.1 of the LTRC provides “[t]his Agreement will be in effect for 3 thirty[-four] (34) months from the date of the execution of this Agreement (such period, 4 hereinafter, the ‘Term’) by both Parties.” (Doc. 16-3 at 7). Section 3.2 also provides 5 “SELLER will accept and process all Orders issued by BUYER that are in accordance 6 with the Matrix during the Term, even if the delivery dates of any Orders placed during 7 the Term extend beyond the end of the Term.” Id. 8 Boeing argues that section 3.2 extends the period of the contract until orders are 9 delivered. However, section 3.2 does not apply to the extension of the contract with 10 respect to all obligations under the agreement, but rather just the processing of orders that 11 have already been placed. Accordingly, Boeing’s first allegation under counterclaim 12 three, that MDHI breached “its contractual obligation not to undertake any action or 13 communicate any information to maliciously or unfairly influence Boeing’s efforts to sell 14 and support its AH-6i” does not fall under the 3.2 extension and any alleged breach after 15 August 18, 2014 would be outside the scope of the agreement. However, Boeing’s second 16 and third allegations that MDHI failed “to supply parts that are free from defects in 17 materials and workmanship” and failed “to promptly fix any defects identified by 18 Boeing” may fall within the 3.2 extension. Thus, construing the facts in favor of the 19 nonmoving party, Boeing’s second and third allegation under its third counterclaim will 20 not be dismissed for lack of a valid contract. 2 21 22 23 24 25 26 27 28 2 MDHI also argues that Boeing’s third counterclaim regarding breach of the LTRC is barred by Delaware’s three-year statute of limitation for breach of contract claims. The LTRC has a choice of law provision requiring Delaware law be applied. Under Delaware law, the statute of limitations for a breach of contract claim is three years. Del. Code Ann. tit. 10, § 8106. Furthermore, the cause of action accrues “at the time of the wrongful act, even if the plaintiff is ignorant of the cause of action.” Wal– Mart Stores, Inc. v. AIG Life Ins. Co., 860 A.2d 312, 319 (Del. 2004). Accordingly, any breach of the LTRC must have been pursued by Boeing within three years of the breach; however, it is unclear based on the alleged facts when the alleged breaches for failure to supply parts free from defect and failure to promptly fix defects actually occurred. Nevertheless, any alleged breach under Boeing’s first allegation would have occurred before August 18, 2014, thus, any action alleging a breach would have needed to be brought by August 18, 2017. Here, Boeing did not file their counterclaims until October 3, 2017; therefore, the first allegation under Boeing’s third counterclaim is barred by the - 11 - 1 b. Superseding Agreement—2015 MOA 2 MDHI argues that the LTRC is superseded by the 2015 MOA. MDHI attached a 3 copy of the 2015 MOA to its Motion to Dismiss (see Doc. 21-1); however, the Court 4 cannot consider the content of the 2015 MOA in resolving this motion because the 5 document was not attached to the complaint or counterclaims and no exceptions apply. 6 Consequently, part “a” of Boeing’s third counterclaim fails but parts “b” and “c”— 7 “failure to supply parts that are free from defects in materials and workmanship” and 8 “failure to promptly fix any defects identified by Boeing” survive. Accordingly, 9 construing the facts in favor of the nonmoving party, Boeing’s third counterclaim is not 10 11 dismissed because of the plausibility of parts “b” and “c” of the counterclaim. D. Fourth Counterclaim: Breach of Contract—GP1 12 In its fourth counterclaim, Boeing claims that MDHI breached the GP1 contract. 13 However, Boeing acknowledges under its counterclaim that the GP1 is relevant because 14 it was incorporated into the LTRC and the 2015 MOA. (Doc. 16 at 31). The GP1 is not 15 its own contract, but rather only part of other contracts for which Boeing has already 16 alleged breaches. Accordingly, Boeing’s fourth counterclaim is dismissed for failure to 17 allege breach of a valid contract. Any alleged breaches of the provisions within the GP1 18 must be pursued through Boeing’s third or fifth counterclaims—counterclaims alleging 19 breaches of the LTRC and the 2015 MOA, respectively. Accordingly, Boeing’s fourth 20 counterclaim is dismissed. 21 E. Sixth Counterclaim: Breach of the Covenant of Good Faith and Fair 22 Dealing—AAA, Cross License, LTRC, GP1, and the 2015 MOA 23 Arizona “law implies a covenant of good faith and fair dealing in every contract.” 24 Rawlings v. Apodaca, 726 P.2d 565, 569 (Ariz. 1986). The covenant’s purpose is to 25 ensure that “neither party will act to impair the right of the other to receive the benefits 26 which flow from their agreement or contractual relationship.” Bike Fashion Corp. v. 27 Kramer, 46 P.3d 431, 434 (Ariz. Ct. App. 2002). A party can breach the covenant “both 28 Delaware statute of limitations. - 12 - 1 by exercising express discretion in a way inconsistent with a party’s reasonable 2 expectations and by acting in ways not expressly excluded by the contract’s terms but 3 which nevertheless bear adversely on the party’s reasonably expected benefits of the 4 bargain.” Id. at 435. 5 The AAA and Cross License are subject to alternative dispute resolution 6 requirements as set forth within their contract; thus, claims concerning a breach of the 7 Implied Covenant of Good Faith and Fair Dealing with regard to those contracts must be 8 pursued through the proper alternative dispute resolution channels. 9 As discussed above, the performance period of the LTRC ended on August 18, 10 2014, except for the extensions granted to claims regarding MDHI’s alleged failure to 11 “supply parts that are free from defects in materials and workmanship” and to “promptly 12 fix any defects identified by Boeing.” See supra Section III.C.a. Accordingly, the three- 13 year Delaware statute of limitations, which applies to breach of the covenant of good 14 faith and fair dealing claims, see Del. Code Ann. tit. 10, § 8106, bars all claims except 15 those relating to the two extended categories. 16 The GP1 is not a standalone contract, but rather is incorporated through the LTRC 17 and the 2015 MOA. Accordingly, any breach of the provisions of the GP1 must be 18 pursued through the 2015 MOA. 19 Moreover, MDHI argues that Boeing’s sixth counterclaim claim should be 20 dismissed because the implied covenant of good faith and fair dealing does not apply 21 when the contract addresses the conduct at issue. However, although, Boeing did allege 22 breaches that were directly contemplated by the contract, Boeing also addressed the 23 implied covenant of good faith and fair dealing, beyond the explicit provisions of the 24 contract, when it alleged that: MDHI damaged “Boeing’s business reputation with its 25 current and potential customers,” MDHI “generally act[ed] with an objective to 26 undermine Boeing’s efforts so that MDHI could promote its own MD 540F helicopter 27 over the AH-6i,” and MDHI “maliciously and unfairly influenc[ed] Boeing’s ability to 28 obtain parts from other suppliers or distributors for the [Mission Enhanced Little Bird - 13 - 1 (“MELB”)] and AH-6i helicopter lines.” (Doc. 16 at 33). Accordingly, construing the 2 facts in favor of the nonmoving party, Boeing’s sixth counterclaim is not dismissed 3 because, although the sixth counterclaim fails with regard to the AAA, Cross License, 4 LTRC, and GP1, Boeing’s counterclaim survives with regard to the 2015 MOA. F. Seventh Counterclaim: Conversion 5 6 Conversion is an “intentional exercise of dominion or control over a chattel which 7 so seriously interferes with the right of another to control it that the actor may justly be 8 required to pay the other the full value of the chattel.” Focal Point, Inc. v. U–Haul Co., 9 746 P.2d 488, 489 (Ariz. Ct. App. 1986). Boeing alleges that it has a right to possess or 10 control Boeing-owned parts and customer furnished equipment (the MELB rotor hub 11 assembly owned by the United States Government Special Operations Command). (Doc. 12 25 at 16). Boeing also alleges that MDHI refuses to give the parts back after repeated 13 requests. Id. MDHI argues that Boeing’s only rights to the property involved are rights 14 pursuant to contract. (Doc. 21-1 at 22). Conversely, Boeing is not claiming conversion 15 for parts that MDHI never delivered, but rather, conversion for parts actually delivered 16 and other pieces of equipment that were sent to MDHI for repair. 3 Accordingly, Boeing is 17 not merely claiming economic harm for MDHI failing to perform under the contract, but 18 for MDHI failing to return property—whether defective or not—which may rightfully 19 belong to Boeing. Accordingly, construing the facts in favor of the nonmoving party, 20 Boeing’s seventh counterclaim is not dismissed. 21 G. Eighth Counterclaim: Tortious Interference with Contract and 22 Business Expectancy 23 Arizona courts will apply the law of the state chosen by the parties to govern their 24 contractual relationship as long as the chosen law has some nexus with the parties or the 25 26 27 28 3 In its answer, Boeing admits that certain initial deliveries of the AH-6i from MDHI did not constitute final acceptance or “contractual delivery” because the parts were “incomplete and nonconforming.” (Doc. 16 at 4). Boeing made this statement to argue that certain payments were not due to MDHI. As such, any AH-6i parts that were never “contractually delivered” as stated by Boeing and sent back to MDHI for repair were never owned by Boeing and thus would not qualify for a claim of conversion. - 14 - 1 contract. Nanini v. Nanini, 802 P.2d 438, 441 (Ariz. Ct. App. 1990). However, “[c]laims 2 arising in tort are not ordinarily controlled by a contractual choice of law provision. 3 Rather, they are decided according to the law of the forum state.” Sutter Home Winery, 4 Inc. v. Vintage Selections, Ltd., 971 F.2d 401, 407 (9th Cir. 1992) (internal citation 5 omitted); see also S. Union Co. v. Sw. Gas Co., 165 F. Supp. 2d. 1010, 1028 (D. Ariz. 6 2001). 7 MDHI argues that Delaware law should be applied, but the language of the various 8 choice-of-law provisions cited by MDHI do not reference disputes arising out of or 9 relating to the contract but simply the rights and obligations under the contracts. 10 Accordingly, because Boeing’s eighth counterclaim arises from tort law and is not an 11 issue concerning the rights and obligations under the contract, Boeing’s eighth 12 counterclaim is not controlled by the contractual choice of law provision and Arizona law 13 applies. 14 Nevertheless, Arizona law and Delaware law concerning Tortious Interference 15 with Contract and Business Expectancy are substantially the same. Arizona requires: (1) 16 “the existence of a valid contractual relationship or business expectancy”; (2) “the 17 interferer’s knowledge of the relationship or expectancy”; (3) “intentional interference 18 inducing or causing a breach or termination of the relationship or expectancy”; and (4) 19 “resultant damage to the party whose relationship or expectancy has been disrupted.” 20 Miller v. Hehlen, 104 P.3d 193, 202 (Ariz. Ct. App. 2005) (quoting Wallace v. Casa 21 Grande Union High Sch. Dist. No. 82 Bd. of Governors, 909 P.2d 486, 494 (Ariz. Ct. 22 App. 1995). Meanwhile, Delaware requires: “(1) the existence of either a valid contract 23 or reasonable probability of a business expectancy; (2) the interferer’s knowledge of the 24 contract or expectancy; (3) intentional interference that induces or causes a breach or a 25 termination of the business expectancy; and (4) damages.” All Pro Maids, Inc. v. Layton, 26 No. CIV.A. 058-N, 2004 WL 1878784, at *6 (Del. Ch. Aug. 9, 2004), aff’d, 880 A.2d 27 1047 (Del. 2005). 28 MDHI argues that Boeing’s claim for loss of business expectancy fails because - 15 - 1 Boeing does not identify the specific suppliers with whom it has a relationship, yet, 2 Boeing clearly referenced its relationship with the U.S Army (Doc. 16 at 25), as well as 3 various distributors, specifically naming “Aviall,” (Doc. 16 at 21). Furthermore, MDHI 4 argues that “[j]ust because ‘MDHI’s interference made it more expensive and 5 burdensome for Boeing to complete the contract’ with the Army, does not mean Boeing’s 6 contract was breached or terminated.” (Doc. 26 at 10). However, the test for tortious 7 interference with contract and business expectancy under both Delaware and Arizona law 8 does not require an actual breach of contract, but rather, requires inducing or causing a 9 breach or termination of the “relationship or expectancy.” 4 Thus, construing the facts 10 alleged in the light most favorable to the nonmoving party, this Court finds that Boeing 11 sufficiently pleaded its eighth counterclaim. 12 H. Ninth Counterclaim: Declaratory Judgment 13 The Declaratory Judgment Act provides courts with discretion to either grant or 14 dismiss a counterclaim for declaratory judgment. See Wilton v. Seven Falls Co., 515 U.S. 15 277, 288 (1995); Gov’t Emps. Ins. Co. v. Dizol, 133 F.3d 1220, 1223 (9th Cir. 1998) 16 (“The [Declaratory Judgment] Act ‘gave the federal courts competence to make a 17 declaration of rights; it did not impose a duty to do so.’”) (quoting Pub. Affairs Assocs., 18 Inc. v. Rickover, 369 U.S. 111, 112 (1962)). 19 In MDHI’s Motion to Dismiss, MDHI offers no arguments or support for 20 dismissing Boeing’s ninth counterclaim, accordingly, this court exercises its discretion 21 and chooses not to dismiss Boeing’s counterclaim for declaratory judgment. 22 IV. Conclusion 23 Based on the foregoing, 24 IT IS ORDERED that Plaintiff MD Helicopters Incorporated’s Motion to 25 Dismiss, (Doc. 21), is GRANTED in part and DENIED in part in accordance with this 26 4 27 28 MDHI cites to the test provided in Irwin & Leighton, Inc. v. W.M. Anderson Co., 532 A.2d 983, 992 (Del. Ch. 1987) to support its proposition that a contract must actually be breached, but that test only relates to the “tortious interference of contractual relations” and does not fully encompass Boeing’s claims for “tortious interference with contract and business expectancy.” - 16 - 1 Order. 2 IT IS FURTHER ORDERED that Defendant’s Counterclaims 1 and 2 are 3 dismissed without prejudice so the parties may resolve the claims in accordance with 4 their contractual alternative dispute resolution procedures. 5 6 7 IT IS FURTHER ORDERED that Defendant’s Counterclaim 4 is dismissed with prejudice. IT IS FURTHER ORDERED that Defendant’s Counterclaims 3, 6, 7, 8 and 9 8 are not dismissed in accordance with this Order. 9 Dated this 23rd day of April, 2018. 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 - 17 -

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?