Morales et al v. United States of America

Filing 52

ORDER - IT IS THEREFORE ORDERED granting Defendant United States' Motion toDismiss Plaintiffs' Complaint and/or for Judgment on the Pleadings (Doc. 36 ) and dismissing Plaintiffs' claims against the United States for lack of subject matter jurisdiction. IT IS FURTHER ORDERED denying Plaintiffs' Motion for Partial Summary Judgment (Doc. 37 ). IT IS FURTHER ORDERED directing the Clerk of Court to enter judgment accordingly and close this case. (See document for further details). Signed by Judge John J Tuchi on 1/6/17. (LAD)

Download PDF
1 WO NOT FOR PUBLICATION 2 3 4 5 6 IN THE UNITED STATES DISTRICT COURT 7 FOR THE DISTRICT OF ARIZONA 8 9 Steven Morales, et al., Plaintiffs, 10 11 12 No. CV-14-08110-PCT-JJT ORDER v. United States of America, Defendant. 13 14 At issue is Defendant United States’ Motion to Dismiss Plaintiffs’ Complaint 15 and/or for Judgment on the Pleadings (Doc. 36, MTD), to which Plaintiffs Steven 16 Morales and Nicole Perry, Co-Personal Representatives of the Estate of Raymond Perry, 17 and Chopper II, LLC filed a Response (Doc. 46, Resp. to MTD) and the United States 18 filed a Reply (Doc. 48, Reply to MTD). Also at issue is Plaintiffs’ Motion for Partial 19 Summary Judgment (Doc. 37, MSJ), to which the United States filed a Response (Doc. 20 44, Resp. to MSJ) and Plaintiffs filed a Reply (Doc. 49, Reply to MSJ). The Court finds 21 these matters appropriate for resolution without oral argument. See LRCiv 7.2(f). 22 I. BACKGROUND 23 On June 30, 2012, a helicopter piloted by Raymond Perry was flying over the 24 Prescott National Forest, which is located in Arizona and managed by the United States 25 Forest Service (“USFS”), when it struck an unmarked cable that the United States 26 Geological Survey (“USGS”) had hung across the Verde River canyon in 1934 as part of 27 a stream-gaging cableway. The helicopter’s impact with the cable caused the helicopter 28 to crash in the canyon, killing Mr. Perry and all three passengers. The unmarked cable 1 spanned about 300 feet across the Verde River canyon and was about 40 feet above the 2 low-flow water surface, and the cable’s location did not appear on the aeronautical charts 3 available to pilots. The rock walls on either side of the canyon rise about 200 feet above 4 the river. 5 On June 30, 2014, Plaintiffs, comprised of Steven Morales and Nicole Perry— 6 Raymond Perry’s children and the representatives of his estate—and Chopper II, LLC—a 7 limited liability company that owned the helicopter and is part of Mr. Perry’s estate— 8 filed a Complaint against the United States under the Federal Tort Claims Act, 28 U.S.C. 9 §§ 1346(b), 1402(b), 2401(b) and 2671-80 (“FTCA”), for wrongful death and property 10 damage based on the USGS’s placement of the cable (or cableway) across the canyon 11 with no marking. (Doc. 1, Compl. ¶¶ 1-4.) On January 15, 2016, at the parties’ request, 12 the Court bifurcated the discovery in this matter, with Phase 1 discovery to focus on the 13 United States’ theories of sovereign discretionary immunity and preemption, and Phase 2 14 discovery, if needed, to focus on the remaining issues. (Doc. 31.) Having reached the end 15 of Phase 1 discovery, the United States has filed a Motion to Dismiss Plaintiffs’ 16 Complaint and/or for Judgment on the Pleadings, and Plaintiffs have filed a Motion for 17 Partial Summary Judgment, both asking the Court to resolve whether Plaintiffs’ claims 18 are barred by the doctrine of sovereign discretionary immunity or preempted by federal 19 regulations. 20 A. FAA Regulations on Marking Obstructions to Airspace 21 The Federal Aviation Administration (“FAA”) prescribes rules to govern all 22 aviation activities in the United States, which are known as the Federal Aviation 23 Regulations (“FARs”) and contained in Title 14 of the Code of Federal Regulations 24 (“CFRs”). FAR Part 77 regulates obstructions to air navigation and sets forth the 25 requirements for providing notice to the FAA of certain types of construction or 26 alteration of structures in navigable airspace. 14 CFR § 77.9. Notice must be provided to 27 the FAA for any construction or alteration that is more than 200 feet above ground level 28 or at lower levels within certain distances from an airport or heliport. Id. 2 1 B. USGS Policy on Marking Cables 2 The USGS maintains policies for marking its cableways. Dr. James Leenhouts is 3 currently the Director of the USGS Arizona Water Science Center and was the Associate 4 Director of Investigations at the time of the accident. (Doc. 36, Ex. C, Declaration of 5 James Leenhouts (“Leenhouts Decl.”) ¶ 1.) He stated that “[t]wo functionally consistent 6 expressions of USGS policy regarding marking of cableways were in effect at the time of 7 the accident”—Water Resources Division Policy Memorandum (“WRD”) 2000.13, and 8 Survey Manual (“SM”) 445-2-H Chapter 2, accompanied by Appendix 27-8. (Leenhouts 9 Decl. ¶ 13.) According to these documents, the Verde River cableway did not require an 10 FAA aeronautical study for marking because it was lower than 200 feet above the 11 ground. (Leenhouts Decl. ¶ 16.) 12 USGS headquarters-level upper management has revisited its policy for marking 13 cableways several times, usually in response to wire-strike accidents involving 14 cableways. (Leenhouts Decl. ¶ 17.) At each reconsideration, USGS officials “balanced 15 social, economic, and political considerations in an effort to establish national policies for 16 marking cables that would be most effective in ensuring public safety.” (Leenhouts Decl. 17 ¶ 17.) 18 In 2000, USGS Safety Specialist William Simonds met Air Space Specialist Ted 19 Melland for advice on whether cableways placed over rivers in Washington state should 20 be marked. (Leenhouts Decl. ¶ 20.) Mr. Melland reviewed photographs of the cableways 21 and an FAA aeronautical chart and recommended against marking any of the cableways 22 because none of them met FAA obstruction marking criteria. (Leenhouts Decl. ¶ 20.) Mr. 23 Melland “also advised that routine marking of cableways that do not meet the Part 77 24 marking criteria could potentially have harmful effects to pilots who expect to see 25 obstruction markers only at higher levels.” (Leenhouts Decl. ¶ 20.) After the meeting, the 26 USGS issued a new policy—WRD 2000.13—that superseded the prior policy—WRD 27 84.57. (Leenhouts Decl. ¶ 21.) 28 3 1 As part of its cableway inspection process, USGS’s cableway inspection form asks 2 two questions about aircraft warning markers—whether a warning marker is required and 3 whether one is in place. (Leenhouts Decl. ¶ 27.) The form, depending on the version, 4 cites to WRD 2000.13 or SM 445-2-H for guidance, both of which contain identical 5 guidelines in this context and do not require marking of cables lower than 200 feet above 6 ground. (Leenhouts Decl. ¶ 27.) The inspector’s assessment whether aerial markers are 7 required is not the final decision on the matter. (Leenhouts Decl. ¶ 28.) Rather, any 8 issues an inspector notes “are elevated to the management of the Center for final 9 decision.” (Leenhouts Decl. ¶ 28.) The USGS balances a variety of factors when 10 determining whether or not to mark a cableway, and many of those factors are site- 11 specific. (Leenhouts Decl. ¶ 32.) 12 1. WRD 2000.13 13 Water Resources Division Policy Memorandum No. 2000.13, dated September 19, 14 2000, specifically addresses the USGS’s policy on the use of aircraft-warning markers at 15 cableways. (Leenhouts Decl., Ex. 2, WRD 2000.13.) WRD 2000.13 recognizes that the 16 FAA has sole authority to set obstruction-marking standards and explains that it is 17 WRD’s policy to comply with FAA requirements regarding use of aircraft warning 18 markers on cableways because “Congress has charged the FAA with the responsibility to 19 promote the safety of aircraft and the efficient use of navigable airspace.” WRD 2000.13 20 notes that the FAA’s regulations for evaluating potential obstructions are found in FAR 21 Part 77 and that, under this regulatory framework, the FAA makes recommendations on 22 marking structures that are considered obstructions. For unmarked cableways already in 23 existence at the time WRD 2000.13 was issued, the policy required that the USGS 24 District Chiefs verify to the Regional Hydrologist within six months of the 25 implementation of the policy that no cableways were over 200 feet above ground or 26 within 20,000 feet of an airport or 5,000 feet of a heliport, such that FAA regulations 27 would ordinarily require marking. WRD 2000.13 had a “sunset date” of September 2005, 28 4 1 but its policies were thereafter incorporated into the Survey Manual, SM 445-2-H, which 2 is the USGS’s authoritative policy manual. 3 2. WRD 84.57 4 The predecessor to WRD 2000.13, Water Resources Division Memorandum 5 84.57, dated February 3, 1984, also did not require marking of cables below 200 feet 6 above the surrounding terrain but stated that “[r]ecent WRD Regional surveys identified 7 115 . . . cableways which might be hazardous to low-flying aircraft—not so much 8 because of their height, but because of their location.” (Leenhouts Decl., Ex. 7, WRD 9 84.57.) It further stated that because of increased use of helicopters, which have no 10 minimum regulated flying altitude in uninhabited areas, the USGS “should consider 11 marking those cableways which we feel may be potential hazards to low-flying aircraft— 12 not as a regulatory requirement, but out of concern for the safety of our personnel who 13 use the cableways as well as those people on board the aircraft.” WRD 84.57 requested 14 that each USGS District review its cableways and decide which may be hazardous to 15 low-flying aircraft. It stated that “[a] plan should . . . be developed by each District to 16 install markers on those cableways designated as potentially hazardous.” 17 3. USGS Survey Manual: SM 445-2-H Chapter 27 18 The policies of WRD 2000.13 were incorporated into the USGS’s policy manual, 19 the Survey Manual. (Leenhouts Decl. ¶ 13.) SM 445-2-H addresses wire strike prevention 20 for the USGS’s own flights. (Leenhouts Decl., Ex. 3, USGS Manual, SM 445-2-H Ch. 21 27.) Like WRD 2000.13, SM 445-2-H states that the USGS’s policy is to comply with 22 FAA recommendations under FAR Part 77 “regarding establishment of an obstruction 23 evaluation program and use of structural aircraft warning markers.” USGS Survey 24 Manual Appendix 27-8 copies verbatim from FAA Notification Requirements. 25 (Leenhouts Decl., Ex. 4, USGS Manual, App. 27-8.) It states that notice shall be provided 26 to the FAA Administrator for “[a]ny construction or alteration of more than 200 feet in 27 height above ground level at its site.” (App. 27-8.) 28 5 4. 1 Discretionary Factors 2 To determine whether cableways need to be marked, the USGS Arizona Water 3 Science Center looks first to USGS policy. (Leenhouts Decl. ¶ 32.) With regard to the 4 cableway that is the subject of this lawsuit, neither USGS nor FAA policy required 5 marking of the cable or submission to the FAA for an aeronautical study. (Leenhouts 6 Decl. ¶ 32.) While the relevant policies do not require the marking of any of the 58 7 cableways within the jurisdiction of the USGS Arizona Water Science Center, 11 of those 8 cableways have warning markers. (Leenhouts Decl. ¶ 32.) The USGS balances a variety 9 of factors—many of which are site-specific—in determining whether to mark a cableway 10 even when the relevant policies do not require marking. (Leenhouts Decl. ¶ 32.) 11 The USGS found that a variety of factors counseled against marking the subject 12 cableway, including: (a) marking cables that are ordinarily too low to mark under FAA 13 regulations may create “unintended hazards to air traffic;” (b) no record exists of a prior 14 accident involving the subject cableway since its installation in 1934; (c) the cableway is 15 “below FAA recommended elevations for aircraft,” and helicopters that fly below 500 16 feet above ground are required to do so without creating a hazard to persons or property 17 on the surface; (d) cableway installation “imposes a financial burden on the government;” 18 (e) cableway installation over a river involves “an element of physical risk to 19 employees;” (f) marking cables that are ordinarily too low to mark under FAA 20 regulations may confuse pilots; (g) warning markers attract vandals such as marksmen 21 who try to shoot the markers from the cable, and such vandalism may cause damage to 22 the primary cable and place employees’ safety in peril when using the cableway; and (h) 23 warning markers require regular maintenance, particularly in light of the frequency of 24 vandalism. (Leenhouts Decl. ¶ 33.) 25 C. Other Policy Considerations 26 The USGS must also balance the factors regarding marking cableways with the 27 priorities of the land-management agency responsible for the land on which the cableway 28 is to be installed. (Leenhouts Decl. ¶ 34.) The Verde River canyon, in which the crash 6 1 occurred, is located in the Prescott National Forest, which is managed by the USFS, part 2 of the Department of Agriculture. (Leenhouts Decl. ¶ 9.) Congress designated portions of 3 the Verde River as a Wild and Scenic River in the Arizona Wilderness Act of 1984, 4 Public Law 98-406. (Leenhouts Decl. ¶ 34.) Pursuant to the Act, “the U.S. Department of 5 Agriculture developed the Verde Wild and Scenic River Comprehensive River 6 Management Plan [CRMP] to establish ‘a comprehensive approach to managing the free- 7 flowing natural character of the river and its values.’” (Leenhouts Decl. ¶ 34 (quoting 8 CRMP).) The CRMP identifies 51 threatened, endangered or special-status species within 9 the river corridor, and a Bald Eagle Nesting Area, which is noted on maps, is located in 10 the area of the subject cableway. (Leenhouts Decl. ¶ 34.) As a result, with regard to 11 deciding whether to mark a cableway, “low-flying aircraft are not anticipated through the 12 area.” (Leenhouts Decl. ¶ 34.) 13 Moreover, the subject cableway is located in an area that the CRMP identifies as a 14 Wild and Scenic Corridor, which receives the highest amount of management by the 15 USFS for scenic values. (Leenhouts Decl. ¶ 34.) The CRMP calls for the reduction or 16 elimination of visual distractions to meet scenic integrity objectives, and “researchers and 17 cooperators” such as the USGS must take scenic values into consideration when placing 18 anything into the river corridor, including gaging stations, cableways, fences and power 19 lines. (Leenhouts Decl. ¶ 34.) Indeed, when the USGS planned to reinstall the cableway 20 after the subject crash, the USFS asked that the cableway be camouflaged with the native 21 surroundings. (Leenhouts Decl. ¶ 34.) 22 II. LEGAL STANDARDS 23 A. Dismissal for Lack of Subject Matter Jurisdiction 24 “A motion to dismiss for lack of subject matter jurisdiction under Rule 12(b)(1) 25 may attack either the allegations of the complaint as insufficient to confer upon the court 26 subject matter jurisdiction, or the existence of subject matter jurisdiction in fact.” 27 Renteria v. United States, 452 F. Supp. 2d 910, 919 (D. Ariz. 2006) (citing Thornhill 28 Publ’g Co. v. Gen. Tel. & Elecs. Corp., 594 F.2d 730, 733 (9th Cir. 1979)). “Where the 7 1 jurisdictional issue is separable from the merits of the case, the [court] may consider the 2 evidence presented with respect to the jurisdictional issue and rule on that issue, resolving 3 factual disputes if necessary.” Thornhill, 594 F.2d at 733; see also Autery v. United 4 States, 424 F.3d 944, 956 (9th Cir. 2005) (“With a 12(b)(1) motion, a court may weigh 5 the evidence to determine whether it has jurisdiction.”). The burden of proof is on the 6 party asserting jurisdiction to show that the court has subject matter jurisdiction. See 7 Indus. Tectonics, Inc. v. Aero Alloy, 912 F.2d 1090, 1092 (9th Cir. 1990). 8 “[B]ecause it involves a court’s power to hear a case,” subject matter jurisdiction 9 “can never be forfeited or waived.” United States v. Cotton, 535 U.S. 625, 630 (2002). 10 Courts “have an independent obligation to determine whether subject-matter jurisdiction 11 exists, even in the absence of a challenge from any party.” Arbaugh v. Y&H Corp., 546 12 U.S. 500, 513-14 (2006). 13 B. Judgment on the Pleadings 14 Federal Rule of Civil Procedure 12(c) permits a party to move for judgment on the 15 pleadings “[a]fter the pleadings are closed but within such time as not to delay the trial.” 16 A Rule 12(c) motion is functionally identical to a Rule 12(b) motion to dismiss for failure 17 to state a claim, and the same legal standard applies to both motions. Dworkin v. Hustler 18 Magazine, Inc., 867 F.2d 1188, 1192 (9th Cir. 1989). Specifically, a complaint must 19 include “only ‘a short and plain statement of the claim showing that the pleader is entitled 20 to relief,’ in order to ‘give the defendant fair notice of what the . . . claim is and the 21 grounds upon which it rests.’” Bell Atl. Corp. v. Twombly, 550 U.S. 544, 555 (2007) 22 (quoting Conley v. Gibson, 355 U.S. 41, 47 (1957)); see also Fed. R. Civ. P. 8(a). A 23 dismissal for failure to state a claim can be based on either (1) the lack of a cognizable 24 legal theory or (2) insufficient facts to support a cognizable legal claim. Balistreri v. 25 Pacifica Police Dep’t, 901 F.2d 696, 699 (9th Cir. 1990). “While a complaint attacked by a 26 Rule 12(b)(6) motion does not need detailed factual allegations, a plaintiff’s obligation to 27 provide the ‘grounds’ of his ‘entitle[ment] to relief’ requires more than labels and 28 conclusions, and a formulaic recitation of the elements of a cause of action will not do.” 8 1 Twombly, 550 U.S. at 555 (citations omitted). The complaint must thus contain “sufficient 2 factual matter, accepted as true, to ‘state a claim to relief that is plausible on its face.’” 3 Ashcroft v. Iqbal, 556 U.S. 662, 678 (2009) (quoting Twombly, 550 U.S. at 570). 4 C. Summary Judgment 5 Under Rule 56(c) of the Federal Rules of Civil Procedure, summary judgment is 6 appropriate when: (1) the movant shows that there is no genuine dispute as to any 7 material fact; and (2) after viewing the evidence most favorably to the non-moving party, 8 the movant is entitled to prevail as a matter of law. Fed. R. Civ. P. 56; Celotex Corp. v. 9 Catrett, 477 U.S. 317, 322–23 (1986); Eisenberg v. Ins. Co. of N. Am., 815 F.2d 1285, 10 1288–89 (9th Cir. 1987). Under this standard, “[o]nly disputes over facts that might affect 11 the outcome of the suit under governing [substantive] law will properly preclude the 12 entry of summary judgment.” Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248 (1986). 13 A “genuine issue” of material fact arises only “if the evidence is such that a reasonable 14 jury could return a verdict for the non-moving party.” Id. 15 In considering a motion for summary judgment, the court must regard as true the 16 non-moving party’s evidence if it is supported by affidavits or other evidentiary material. 17 Celotex, 477 U.S. at 324; Eisenberg, 815 F.2d at 1289. The non-moving party may not 18 merely rest on its pleadings; it must produce some significant probative evidence tending 19 to contradict the moving party’s allegations, thereby creating a question of material fact. 20 Anderson, 477 U.S. at 256–57 (holding that the plaintiff must present affirmative 21 evidence in order to defeat a properly supported motion for summary judgment); First 22 Nat’l Bank of Ariz. v. Cities Serv. Co., 391 U.S. 253, 289 (1968). 23 “A summary judgment motion cannot be defeated by relying solely on conclusory 24 allegations unsupported by factual data.” Taylor v. List, 880 F.2d 1040, 1045 (9th Cir. 25 1989). “Summary judgment must be entered ‘against a party who fails to make a showing 26 sufficient to establish the existence of an element essential to that party’s case, and on 27 which that party will bear the burden of proof at trial.’” United States v. Carter, 906 F.2d 28 1375, 1376 (9th Cir. 1990) (quoting Celotex, 477 U.S. at 322). 9 1 III. ANALYSIS 2 In its Motion, the United States argues that the Court should dismiss Plaintiffs’ 3 claims for lack of subject matter jurisdiction because they are barred by the doctrine of 4 sovereign discretionary immunity. (MTD at 1.) The United States also argues that it is 5 entitled to judgment on the pleadings because the basis of Plaintiffs’ claims, Arizona tort 6 law, is preempted by certain FAA regulations in this instance. (MTD at 1.) In their 7 Motion, Plaintiffs argue that the Court should grant summary judgment to them on each 8 of these questions. (MSJ at 1.) Because resolution of the question of sovereign 9 discretionary immunity is dispositive in this case, the Court will limit its analysis to that 10 question. 11 The FTCA generally authorizes suits against the United States for damages 12 resulting from injury or loss of property, including serious personal injury or death, 13 caused by the negligent or wrongful act or omission of any employee of the government 14 acting within the scope of his or her office or employment, under circumstances where 15 the United States, if a private person, would be liable to the claimant in accordance with 16 the law of the place where the act or omission occurred. 28 U.S.C. § 1346(b). An 17 exception to this waiver of the United States’ sovereign immunity arises under the 18 doctrine of sovereign discretionary immunity as expressed in 28 U.S.C. § 2680(a), which 19 provides that the United States shall not be liable for claims “based upon the exercise or 20 performance or the failure to exercise or perform a discretionary function on the part of a 21 federal agency or an employee of the Government, whether or not the discretion involved 22 be abused.” This exception “marks the boundary between Congress’ willingness to 23 impose tort liability upon the United States and its desire to protect certain governmental 24 activities from exposure to suit by private individuals.” United States v. Varig Airlines, 25 467 U.S. 797, 808 (1984). 26 To determine whether sovereign discretionary immunity applies, the United States 27 Supreme Court has prescribed a two-part test for determining whether a particular 28 governmental act or omission is a discretionary function. Berkovitz v. United States, 486 10 1 U.S. 531, 536 (1988). First, a court must consider whether the governmental action “is a 2 matter of choice for the acting employee” and is therefore discretionary because it 3 involves an element of judgment. Id. at 536. An action cannot be discretionary when “a 4 federal statute, regulation, or policy specifically prescribes a course of action for an 5 employee to follow” because, “[i]n this event, the employee has no rightful option but to 6 adhere to the directive.” Id. 7 Second, if the action involves an element of judgment, a court must determine 8 “whether that judgment is of the kind that the discretionary exception was designed to 9 protect.” Id. The discretionary exception was designed to protect only those government 10 actions that were “based on considerations of public policy.” Id. at 537. The “focus of the 11 inquiry is not on the agent’s subjective intent in exercising the discretion . . . but on the 12 nature of the actions taken and on whether they are susceptible to policy analysis.” 13 United States v. Gaubert, 499 U.S. 315, 325 (1991). Thus, to meet its burden to show the 14 sovereign discretionary immunity doctrine applies, the United States need not prove that 15 it actually considered policy factors in the particular act or omission; it need only show 16 that “these decisions are the type grounded in social, economic, or political policy 17 judgments.” Kennewick Irrigation Dist. v. United States, 880 F.2d 1018, 1028 (9th Cir. 18 1989). 19 The United States argues that its decision not to mark the Verde River cableway 20 was discretionary because no statute, regulation, or policy specifically directed the USGS 21 to mark the cable and its decision not to mark the cableway is susceptible to policy 22 analysis and therefore the type of decision that the discretionary function exception was 23 designed to shield. (MTD at 11.) Plaintiffs argue that the USGS’s decision not to mark 24 the cableway is not the kind of decision entitling the United States to immunity from suit 25 because it involved a safety—not public policy—decision arising from a condition the 26 USGS itself created by placing the cable across the Verde River canyon. (Resp. to MTD 27 at 5; MSJ at 11.) Plaintiffs contend that “the Government has not shown that its decision 28 not to mark cables is susceptible to any valid policy consideration.” (Resp. to MTD at 8.) 11 1 A. Element of Judgment 2 The general conduct under scrutiny in this case is the USGS’s decision not to mark 3 the cable it first placed over the Verde River canyon in 1934. With regard to the first 4 element of the sovereign discretionary immunity test, the Court agrees with the United 5 States that the evidence does not show that a statute, regulation or policy was in place at 6 the time of the accident—June 30, 2012—requiring the USGS to mark the cable. As 7 detailed above, the FAA did not require an aeronautical study or marking for an 8 obstruction less than 200 feet above ground level (so long as the obstruction was not 9 within certain distances from an airport or heliport). See 14 CFR § 77.9. The USGS 10 policy regarding marking cableways mirrored the FAA regulations regarding airspace 11 obstructions. See WRD 2000.13; SM 445-2-H. The Court disagrees with Plaintiffs’ 12 characterization that, by not requiring marking of cables below 200 feet, “the FAA does 13 not regulate these cables.” (Resp. to MTD at 5.) The FAA has jurisdiction over all 14 airspace, and the fact that it established no requirement for the marking of cables below 15 200 feet does not mean it is not concerned with all airspace. 16 The evidence shows that the decision whether to mark the cableway required 17 judgment on the part of the USGS, satisfying the first element of the sovereign 18 discretionary immunity test. In the absence of a requirement for the marking of a 19 cableway, the USGS has to consider a number of factors in making the decision. The 20 United States proffers evidence that the USGS’s aircraft safety considerations include 21 whether to defer to FAA guidelines regarding marking obstructions to air space, 22 including, for example, consideration of the fact that marking cableways may help pilots 23 in certain instances but cause problems in others, in which pilots may be confused by a 24 marker placed on an object below 200 feet above ground. Economic considerations are 25 also present, including the cost to the USGS of installing and maintaining safety markers, 26 particularly in light of the likelihood of vandalism. The USGS also assesses how 27 foreseeable it is that an aircraft may hit a particular cableway by considering a number of 28 factors, including the cableway’s elevation below 200 feet above the ground, a helicopter 12 1 pilot’s obligation to avoid obstacles when flying below 500 feet, any history of airstrikes 2 (in this instance, since 1934), and the infrequency of helicopters flying through certain 3 areas like a delineated Bald Eagle Nesting Area, among other factors. The USGS also 4 must consider the safety of its own employees, both with respect to installing and 5 maintaining warning markers on a cable strung over a river in national forest land and 6 with respect to the danger arising from damage to the cable from vandalism—by, for 7 example, shooting at the markers and hitting the cable—keeping in mind that the cable 8 must support USGS workers as they move over the river to complete their stream-gaging 9 tasks. And the USGS must consider the priorities of the agency in charge of managing the 10 land—in this instance, the USFS—including preserving scenic integrity pursuant to the 11 requirements of maintaining a Wild and Scenic Corridor under the Arizona Wilderness 12 Act of 1984. 13 Plaintiffs point to evidence that, after an earlier wirestrike accident, the USGS 14 issued memoranda requesting that the FAA and the Bureau of Reclamation “install 15 markers on cableways, regardless of height, to prevent more tragic fatal accidents.” 16 (Resp. to MTD at 6.) Plaintiffs argue that “the Government’s decision to leave all cables 17 unmarked and to defer to Part 77 regulations (that do not apply to USGS cableways) was 18 a decision based solely out of a desire to avoid additional lawsuits rather than protect the 19 safety of the public.” (Resp. to MTD at 8.) Plaintiffs also assert that despite the existence 20 of several inspection reports that indicated the subject cableways should be marked, the 21 USGS failed to install markers. (Resp. to MTD at 9.) 22 Plaintiffs’ evidence simply supports the conclusion that the decision whether to 23 mark cableways, including the one that caused the accident at the base of this lawsuit, is 24 discretionary, and the USGS has multiple factors to consider—many of them site- 25 specific—in making the decision. Although the USGS has occasionally revisited its 26 policy for marking cableways, it never decided to adopt a more stringent requirement 27 than what is required by the FAA. 28 13 1 B. Social, Economic and Political Policy 2 With regard to the second element of the sovereign discretionary immunity test, 3 the USGS’s reliance on FAA regulations pertaining to obstructions to air space in 4 deciding whether to mark a cableway is rooted in public policy. In Mitchell v. United 5 States, an analogous case, a crop duster airplane struck unmarked power transmission 6 ground wires installed by the Bonneville Power Administration (BPA). 787 F.2d 466, 7 468 (9th Cir. 1986). The Ninth Circuit Court of Appeals held that the BPA’s decision 8 whether to mark ground wires was discretionary and, because the FAA is particularly 9 authorized by statute to regulate air safety, the BPA’s “choice to leave air space safety 10 standards to be set chiefly by the FAA was ‘grounded in social, economic, and political 11 policy’” and thus the type of agency decision that Congress sought to protect from 12 judicial review. Id. (quoting United States v. Varig Airlines, 467 U.S. 797, 798 (1984)). 13 Among other cases, Plaintiffs cite Sutton v. Earles to argue that, because the 14 cableway was a known hazard for which the USGS was responsible, the failure to mark it 15 was not the kind of policy decision the discretionary function exception was intended to 16 protect. 26 F. 3d 903, 910 (9th Cir. 1994). In Sutton, boat passengers were injured and 17 killed when the boat hit an unmarked mooring buoy placed by the Navy. Id. at 906-907. 18 But, in making its decision not to mark the buoy in that case, the Navy did not defer to 19 the regulation of another agency responsible for regulating obstructions to navigation, as 20 the USGS did by relying on FAA regulations in this instance and the BPA did in 21 Mitchell.1 The USGS’s choice to defer to the air safety standards set by the FAA, the 22 agency statutorily charged with regulating navigation safety in all airspace, is the type of 23 discretion that is grounded in social, economic and political policy. See Mitchell, 787 24 25 26 27 28 1 In Sutton, while the Navy complained that it should not be liable when the Coast Guard, who had discretion to mark obstructions to water navigation, never marked the buoy, 26 F.3d at 911, that is quite different from the present case, in which the USGS relied on a specific FAA regulation regarding when obstructions to air navigation should be marked or considered for marking, which regulation was adopted by the agency responsible for controlling all airspace—including that through which Mr. Perry’s helicopter flew. 14 1 F.2d at 468; Weiss v. United States, 889 F.2d 937, 939-40 (10th Cir. 1989) (concluding 2 that USFS’s decision to adopt the FAA policy regarding marking of obstructions to air 3 space below 500 feet was an exercise of discretion subject to the discretionary function 4 exception); Mellott v. United States, 808 F. Supp. 746 (D. Mont. 1992). 5 Because Plaintiffs’ claims arise from acts subject to the discretionary function 6 exemption to the government’s waiver of its sovereign immunity in the FTCA, the Court 7 lacks subject matter jurisdiction over those claims. The Court thus does not address the 8 second question posed by the parties: whether the state law basis of Plaintiffs’ claims is 9 preempted by federal regulation. 10 IT IS THEREFORE ORDERED granting Defendant United States’ Motion to 11 Dismiss Plaintiffs’ Complaint and/or for Judgment on the Pleadings (Doc. 36) and 12 dismissing Plaintiffs’ claims against the United States for lack of subject matter 13 jurisdiction. 14 15 16 17 18 IT IS FURTHER ORDERED denying Plaintiffs’ Motion for Partial Summary Judgment (Doc. 37). IT IS FURTHER ORDERED directing the Clerk of Court to enter judgment accordingly and close this case. Dated this 6th day of January, 2017. 19 20 Honorable John J. Tuchi United States District Judge 21 22 23 24 25 26 27 28 15

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?