Sunburst Minerals LLC v. Emerald Copper Corporation et al
Filing
112
ORDER granting in part and denying in part 52 Motion for Summary Judgment. Sunburst is entitled to judgment in its favor as to both counts of its complaint and both counts of Emerald's counter-complaint with regard to Copper Hill Mill Site N os. 18, 1012; Hermes Mill Site No. 13; Copper Hill Mill No. 1 Mill Site Nos. 1415; Copper Hill No. 2; Hermes; Hermes No. 2; Jimtown Copper No. 1; Valley Copper Nos. 13; and FDR. In all other respects the motion is denied. Signed by Judge John W Sedwick on 9/25/17.(JWS)
1
2
3
4
5
6
7
8
UNITED STATES DISTRICT COURT
9
DISTRICT OF ARIZONA
10
11
SUNBURST MINERALS, LLC,
12
Plaintiff/Counterdefendant,
13
vs.
14
15
EMERALD COPPER CORP.,
Defendant/Counterclaimant.
)
)
)
)
)
)
)
)
)
)
3:15-cv-08274 JWS
ORDER AND OPINION
[Re: Motion at Docket 52]
16
17
18
I. MOTION PRESENTED
At docket 52 plaintiff and counterdefendant Sunburst Minerals, LLC (“Sunburst”)
19
moves for partial summary judgment pursuant to Federal Rule of Civil Procedure 56.
20
Sunburst supports the motion with a separate statement of facts at docket 53.
21
Defendant and counterclaimant Emerald Copper Corp. (“Emerald”) opposes the motion
22
at docket 70, supported by controverting statement of facts and separate statement of
23
additional facts at docket 71. Sunburst replies at docket 76 and supports its reply with
24
a “supplemental statement of facts” at docket 78. 1 Oral argument was requested, but
25
would not assist the court.
26
27
28
1
Although this latter filing is not contemplated by LRCiv 56.1, the court will consider it
because Emerald has not objected to or moved to strike it.
1
II. BACKGROUND
2
Sunburst’s complaint refers to 53 unpatented lode claims and mill sites in
3
Mohave County, Arizona, commonly known as “the Emerald Isle Mine,” but identifies
4
only the following 52:2
5
Mill Sites:
6
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
7
8
9
10
11
12
Copper Hill Mill Site No. 1
Copper Hill Mill Site No. 2
Copper Hill Mill Site No. 3
Copper Hill Mill Site No. 4
Copper Hill Mill Site No. 5
Copper Hill Mill Site No. 6
Copper Hill Mill Site No. 7
Copper Hill Mill Site No. 8
Copper Hill Mill Site No. 10
Copper Hill Mill Site No. 11
Copper Hill Mill Site No. 12
Hermes Mill Site No. 13
Copper Hill Mill No. 1 Mill Site 14
Copper Hill Mill No. 1 Mill Site No. 15
13
Lode Claims:
14
15
16
17
18
19
20
21
22
23
24
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
Copper Hill No. 2
Hermes
Hermes No. 2
Jimtown Copper No. 1
Valley Copper No. 1
Valley Copper No. 2
Valley Copper No. 3
FDR
Emerald No. 1
Emerald No. 2
Emerald 5
Emerald 6
Emerald 7
Emerald 8
Emerald 9
Emerald 10
Emerald 11
Emerald 12
Emerald 13
Emerald 14
Emerald 15
25
26
27
28
2
Compare doc. 45 at 1 ¶ 1 (53 claims and mill sites), with doc. 45-1 at 1–2; doc. 45-2
(52 claims and mill sites). The discrepancy may have resulted from the fact that Emerald #19 is
listed twice in the trustee’s deed conveying the claims and mill sites to Sunburst. See doc. 78-1
at 54–57.
-2-
1
2
3
4
5
6
7
8
9
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
Emerald 16
Emerald 17
Emerald 18
Emerald 19
Emerald 20
Emerald #21
Emerald #22
Emerald #30
Emerald 31
Emerald #43
Emerald 44
Emerald #45
Emerald 2B
Emerald 3A
Emerald 4A
Emerald 40
Emerald 41
10
Sunburst located these last five claims (claims 34–38) in June 2016. 3 Sunburst’s
11
motion does not seek summary judgment regarding these new claims; it seeks partial
12
summary judgment regarding the remaining claims and mill sites, which were located
13
on various dates between 1907 and 2004. All subsequent references to “Sunburst’s
14
claims” excludes the claims Sunburst located in 2016.
15
In 2012, 2014, and 2016, Emerald located unpatented mining claims in the same
16
general location as Sunburst’s claims.4 Sunburst brings this quiet title and trespass
17
action against Emerald, alleging that Emerald’s claims are invalid because they overlap
18
with and are junior to Sunburst’s valid claims. Emerald’s counterclaim alleges that its
19
claims were staked on open ground, and therefore asserts quiet title and trespass
20
causes of action against Sunburst. The parties recognize that the fate of their
21
competing trespass causes of action depends solely on the success of their respective
22
quiet title actions. 5
23
24
25
26
3
27
4
28
5
Doc. 45 at 4 ¶ 22.
Doc. 46 at 7 ¶ 2.
Doc. 52 at 17; doc. 70 at 11.
-3-
1
III. STANDARD OF REVIEW
2
Summary judgment is appropriate where “there is no genuine dispute as to any
3
material fact and the movant is entitled to judgment as a matter of law.”6 The
4
materiality requirement ensures that “only disputes over facts that might affect the
5
outcome of the suit under the governing law will properly preclude the entry of summary
6
judgment.”7 Ultimately, “summary judgment will not lie if the . . . evidence is such that a
7
reasonable jury could return a verdict for the nonmoving party.”8 However, summary
8
judgment is appropriate “against a party who fails to make a showing sufficient to
9
establish the existence of an element essential to that party’s case, and on which that
10
11
party will bear the burden of proof at trial.”9
The moving party has the burden of showing that there is no genuine dispute as
12
to any material fact.10 Where the nonmoving party will bear the burden of proof at trial
13
on a dispositive issue, the moving party need not present evidence to show that
14
summary judgment is warranted; it need only point out the lack of any genuine dispute
15
as to material fact.11 Once the moving party has met this burden, the nonmoving party
16
must set forth evidence of specific facts showing the existence of a genuine issue for
17
trial.12 All evidence presented by the non-movant must be believed for purposes of
18
summary judgment, and all justifiable inferences must be drawn in favor of the
19
20
21
22
6
Fed. R. Civ. P. 56(a).
7
23
Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248 (1986).
8
24
25
Id.
9
Celotex Corp. v. Catrett, 477 U.S. 317, 322 (1986).
26
10
27
11
28
12
Id. at 323.
Id. at 323–25.
Anderson, 477 U.S. at 248–49.
-4-
1
non-movant.13 However, the non-moving party may not rest upon mere allegations or
2
denials, but must show that there is sufficient evidence supporting the claimed factual
3
dispute to require a fact-finder to resolve the parties’ differing versions of the truth at
4
trial.14
5
6
IV. DISCUSSION
At the outset, it is necessary to define the nature of the parties’ causes of action.
7
Although the parties denominate their respective suits as quiet title actions, they are
8
properly classified as competing possessory actions.15 In an ordinary quiet title action,
9
such as an action that involves patented mining claims, the fee title is at issue. Actions
10
such as this, where the parties assert competing possessory rights to mine the land but
11
paramount title is held by the United States, are determined by the law of possession.16
12
The plaintiff need not rely solely on the strength of her own title, as in a quiet title action.
13
Rather, the prevailing party is the one with better possessory rights.17 Emerald does not
14
dispute that Sunburst is in possession of the disputed land and that Sunburst’s claim s
15
were located first. Thus, Emerald bears the burden of proving that its mining rights are
16
superior, and Sunburst’s evidence will be viewed in the most favorable light.18
17
18
13
19
20
21
22
23
24
25
26
27
28
Id. at 255.
14
Id. at 248–49.
15
See Rundle v. Republic Cement Corp., 341 P.2d 226, 228–29 (Ariz. 1959).
16
Id. at 228. See also 2 Rocky Mountain Mineral Law Foundation, American Law of
Mining § 36.03 (2d ed. 2017) (“The statute grants a possessory right, a term that is more
correct than possessory title, because the United States retains the equitable title until
application has been made for patent and the purchase price paid and retains the legal title until
patent is issued.”).
17
Rundle, 341 P.2d at 229 (quotation omitted).
18
Bagg v. New Jersey Loan Co., 354 P.2d 40, 45 (Ariz. 1960) (“[W]here the party in
possession seeks to free its property from the adverse claims of a subsequent locator,” the
subsequent locator bears the burden of showing “a superior right to possession in himself” and
“the evidence of the prior locator will be viewed in the most favorable light it will justify.”).
-5-
1
Sunburst’s motion essentially argues that Emerald cannot produce sufficient
2
evidence to meet its burden of proving the invalidity of any of Sunburst’s senior claims.
3
In response, Emerald argues that there are “disputes of material fact concerning:
4
(1) Sunburst’s title; (2) abandonment of Sunburst’s claims; (3) claim monumenting;
5
(4) mineralization of millsite claims; and (5) Sunburst’s predecessor’s failure to act when
6
notified of oversized claims.”19 The court will address these arguments in turn. But
7
before doing so, it is necessary to address Emerald’s argument that a motion for
8
summary judgment is premature “[w]here discovery on the merits is not complete and
9
the case is not ready for trial.”20 This argument is without merit. Neither of the cases
10
upon which Emerald relies involved summary judgment motions.21 Rule 56(b) provides
11
that “a party may file a motion for summary judgment at any time until 30 days after the
12
close of all discovery.” Thus, even though discovery remains open, Sunburst will be
13
entitled to summary judgment on each claim and defense for which it can show there is
14
no genuine dispute of material fact and it is entitled to judgment as a matter of law.22 If
15
Emerald believed that it lacked evidence necessary to support its opposition, it was
16
required to submit an affidavit or declaration that specifically explained why it could not
17
18
19
20
21
22
23
19
24
20
25
21
26
27
28
Doc. 70 at 2.
Id.
Bishop v. Petro-Chem. Transp., LLC, 582 F. Supp. 2d 1290, 1292 (E.D. Cal. 2008)
(involving class certification motion); Morisky v. Pub. Serv. Elec. & Gas Co., 111 F. Supp. 2d
493, 493 (D.N.J. 2000) (involving motion to certify claim as collective action under the Fair
Labor Standards Act).
22
Fed. R. Civ. P. 56(a).
-6-
1
yet present this evidence.23 Simply observing that “[d]iscovery remains open”24 does
2
not suffice.25
3
A.
4
Sunburst’s Title
In a March 22, 2010 deed and bill of sale, Redstone Resources Corp.
5
(“Redstone”) sold its interest in the Emerald Isle Mine to Medina Property Group, LLC
6
(“Medina”).26 About three months lather, Medina sold its interest in the mine to Sierra
7
Resource Group, Inc. (“Sierra”). 27 Then, in 2015, Sunburst obtained Sierra’s interest in
8
the mine via trustee’s deed. 28 Emerald acknowledges these facts, but argues that there
9
may be a gap in the chain of title because Sierra might not have owned the title to the
10
11
property.29 In support of this argument, Emerald points to two pieces of evidence.
The first is a press release issued by Copper Mesa Mining Corp. (“Copper
12
Mesa”), Redstone’s parent company. The release states that on October 2, 2009,
13
Copper Mesa “announced the transfer of Redstone Resources’ properties to the lender
14
of a bridge loan facility . . . as a result of a non-payment by [Copper Mesa] in June
15
16
23
Fed. R. Civ. P. 56(d).
17
24
18
Doc. 70 at 9.
25
19
20
21
22
23
24
25
See State of Cal., on Behalf of California Dep’t of Toxic Substances Control v.
Campbell, 138 F.3d 772, 779 (9th Cir. 1998) (failure to submit necessary affidavit is proper
ground for denying request for additional discovery and proceeding to summary judgment);
THI-Hawaii, Inc. v. First Commerce Fin. Corp., 627 F.2d 991, 994 (9th Cir. 1980) (“THI’s failure
to move for a continuance under [a previous version of Rule 56(d)] prevents it from complaining
of the timing of summary judgment in this case.”); 10B Charles Alan Wright, Arthur R. Miller, et
al., Fed. Prac. & Proc. Civ. § 2740 (4th ed. 2017) (“[W]hen the movant has met the initial
burden required for the granting of a summary judgment, the opposing party either must
establish a genuine issue for trial under Rule 56(c) or explain why it cannot yet do so under
Rule 56(d).”).
26
Doc. 78-1 at 8.
26
27
27
28
28
29
Id. at 11.
Doc. 78-1 at 54–57.
Doc. 70 at 3.
-7-
1
2009.”30 Emerald argues that this evidence creates a factual dispute as to whether
2
Redstone sold its interest to some unspecified lender in 2009, as the press release
3
states, instead of to Medina in 2010. In response, Sunburst argues that the press
4
release is hearsay and there is no evidence corroborating its statement that Redstone
5
transferred its interest in the mine in 2009.31
6
The second piece of evidence is the 2010 complaint that the Securities and
7
Exchange Commission (“SEC”) filed against Jaime Santiago Gomez (“Gomez”), who
8
was the president of Quri Resources, Inc. (“Quri”) and, according to Emerald, a
9
managing member of Medina.32 The SEC’s complaint alleges that in February 2009
10
Gomez issued false and misleading press releases stating that Quri “had signed a letter
11
of intent with Copper Mesa Corp. to acquire the Emerald Isle Copper Mines.”33
12
According to the SEC’s complaint, Gomez did not actually sign the letter of intent until
13
August 2009 and the deal was doomed anyway because Quri was in “no financial
14
position to complete an acquisition.”34
15
Emerald’s evidence is insufficient to raise a question of material fact. In light of
16
the signed and recorded bill of sale that purports to transfer Redstone’s interest in the
17
mine to Sierra, no reasonable jury could find that Redstone lacked a valid interest in the
18
mine based on Copper Mesa’s vague press release or the SEC’s tangentially-related
19
allegations.
20
B.
21
22
Abandonment
Emerald argues that Sunburst’s predecessors-in-interest abandoned the claim s
under two theories: (1) failure to make necessary filings and (2) failure to properly
23
30
24
25
Doc. 71-1 at 119.
31
Doc. 76 at 3.
26
32
27
33
28
34
Doc. 71-1 at 142–57.
Id. at 146 ¶¶ 20–21.
Id. at 147 ¶ 22.
-8-
1
monument the claims’ boundaries. Emerald bears the burden of proving abandonment
2
with clear and convincing evidence.35
3
1.
Failure to make necessary filings
4
The Federal Land Policy and Management Act of 1976 (“FLPMA”) imposed a
5
new requirement on claim owners to make certain filings in order to maintain their
6
possessory title.36 This included an annual requirement to file with the BLM an affidavit
7
of assessment work, a notice of intention to hold the claim, or a related report. 37 The
8
consequence for not filing such an instrument was abandonment of the claim.38
9
Emerald argues that there are disputed questions of material fact regarding
10
whether Sunburst’s “Mineral Survey Claims” were abandoned in this manner.39
11
Emerald asserts, without any evidentiary support, that the BLM’s records “provide no
12
evidence that annual assessment work was performed” for these claims between 1980
13
and 1992. 40 This assertion is refuted by the records that Sunburst submitted in support
14
of its reply, which show that Sunburst’s predecessors-in-interest filed FLPMA-compliant
15
notices with the BLM between 1980 and 1992. 41
16
17
18
19
20
21
35
Velasco v. Mallory, 427 P.2d 540, 546 (Ariz. Ct. App. 1967) (“Proof of abandonment or
forfeiture lies with the party asserting the fact and it must be established by clear and
convincing evidence.”). See also Kinney v. Fleming, 56 P. 723, 724 (Ariz. 1899) (“Referring to
a mine in a location notice casts upon the party attacking the notice the burden of showing that
there is no such mine as referred to.”).
36
43 U.S.C. § 1744.
22
37
23
Id. § 1744(a)(2).
38
24
25
26
Id. § 1744(c).
39
The “Mineral Survey Claims” consist of Copper Hill No. 2; Hermes; Hermes No. 2;
Jimtown Copper No. 1; Valley Copper No. 1; Valley Copper No. 2; and Valley Copper No. 3.
Doc. 52 at 3.
27
40
28
41
Doc. 70 at 9.
Doc. 78-1 at 59–119.
-9-
1
2.
Claim monumenting
2
Section 27-203 of the Arizona Revised Statutes provides that the locator of a
3
claim must, among other things, “[m]onument the claim on the ground within ninety
4
days from the time of the location so that its boundaries can be read ily traced.”42 With
5
respect to lode claims, the monuments must consist of either “six substantial posts
6
projecting at least four feet above the surface of the ground” or “substantial stone
7
monuments at least three feet high, one at each corner of the claim and one at the
8
center of each end line of a lode claim.”43 A locator’s failure to comply with the
9
requirements of A.R.S. § 27-203 results in “an abandonment of the claim, and all right
10
and claim of the locator shall be forfeited.”44
11
Emerald argues that the affidavits of Kenneth E. Schaaf (“Schaaf”), Brian Dirk
12
Hatter (“Hatter”), Donald T. Scoretz (“Scoretz”), Howard Metzler (“Metzler”), and Llao
13
David Hutzinger (“Hutzinger”) create a genuine dispute as to whether Sunburst’s
14
predecessors-in-interest complied with A.R.S. § 27-203(A)(2). 45 Specifically, Emerald
15
argues that these affidavits show that (1) Sunburst’s predecessor, El Paso Natural Gas
16
(“El Paso”), failed to re-stake the Mineral Survey Claims after it abandoned its patent
17
application,46 and (2) Sunburst’s predecessor St. Genevieve Resources (“SGR”) failed
18
to monument the 20 new claims it located in 2004. 47
19
20
Schaaf is a co-owner of Southwest Land Surveying and Consulting (“Southwest
Land Surveying”). He states in his affidavit that he and surveyor Earnest Schaaf visited
21
22
42
23
A.R.S. § 27-203(A)(2).
43
24
25
A.R.S. § 27-204.
44
A.R.S. § 27-203(E).
26
45
27
46
28
47
Doc. 71 at 2 ¶ 6.
Doc. 70 at 4; doc. 71 at 6 ¶ 17.
Doc. 70 at 4–5; doc. 70 at 6–7 ¶¶ 22–24.
-10-
1
the Emerald Isle Mine site in 2012 and looked for monuments.48 “Of the 20 claims
2
purported to be located on the eastern side of the property,” Schaaf states, “there was
3
minimal evidence of monuments being placed on the site.” 49 Southwest Land
4
Surveying’s 2012 survey of mining claims states in pertinent part that no location
5
monuments were found for each of the seven Mineral Survey Claims or the following
6
five claims that SGR located in 2004: Emerald 22, 31, 43, 44, and 45. 50
7
Hatter is a surveyor Emerald hired to conduct a field evaluation in 2015. With
8
regard to monumentation, Hatter’s report generally concurs with Earnest Schaaf’s
9
findings51 and additionally states as follows:
10
11
12
13
14
A 1 ½” aluminum cap on a No. 5 rebar was found at all of the corners that
I found that were not destroyed by mining activity. This clearly does not
meet Statute. There was no evidence that a post or rock mound meeting
the Arizona Statute was placed at the center of each end line or at the
corner. Older 4” x 4” wood posts were found in the area and it is my
opinion that these posts predate Mineral Survey 4732 A & B and were not
placed at the corners after Mineral Survey 4732 A & B Final Certificate
was withdrawn. I did find some ¾” PVC pipe at or near some of the
corners that were not shown on the Record of Survey by Mr. Schaaf.
These clearly do not meet Arizona Statute. 52
15
Scoretz is Emerald’s CEO. His affidavit merely states that [t]hrough the work of
16
Southwest Land Surveying and Consulting, [he] learned of numerous deficiencies
17
18
involving prior claims on the site.”53 Metzler is a geologist who states that “[i]n 20052006” he worked at the Emerald Isle Mine for at least a year, and during that time he
19
“noticed a few occasional markers in the ground, but the markers were not of the sort
20
21
48
Doc. 71-1 at 3.
22
49
23
Id.
50
24
25
26
Doc. 52-7 at 39.
51
Doc. 71-1 at 8 (“In conclusion it is my opinion that the field conditions shown on
Mr. Schaaf’s Record of Survey . . . has not substantially changed in the exception of the ¾”
PVC Pipe.”).
27
52
28
53
Id.
Id. at 11.
-11-
1
that would give [him] any indication that [he] was on unpatented mining claims.”54
2
Finally, Hutzinger states that he has worked at the mine since 2004, and “the only
3
claims on the land that [he] witnessed and recognize are the claims made by Emerald
4
Copper Corporation and the one claim located by Howard Metzler.”55
5
6
a.
The Mineral Survey Claims
Sunburst responds to Emerald’s arguments regarding the Mineral Survey Claims
7
by noting that Emerald cites no authority that requires a locator to re-stake the
8
boundaries of a claim after it abandons a patent application. A.R.S. § 27-203 m erely
9
requires a locator to monument his claim within 90 days “from the time of the location.”
10
Sunburst also argues that Emerald’s witnesses shed no light on whether Sunburst’s
11
predecessors complied with A.R.S. § 27-203 because they did not observe those
12
claims anywhere near the time of location (which occurred on various dates “between
13
1907 and the 1970s”). 56 At most, Emerald’s evidence shows that the Mineral Survey
14
Claim monuments were not maintained over time, Sunburst argues, and “[t]he failure to
15
maintain the monuments does not invalidate the claims.”57
16
The court agrees with Sunburst that El Paso was under no obligation to re-stake
17
the monuments after it withdrew its patent application. As the Nevada Supreme Court
18
stated in Nichols v. Ora Tahoma Mining Co.:
19
20
The general rule is that when a location is once sufficiently marked on the
surface so that its boundaries can be readily traced, and all other acts of
location are performed as required by law, the right of possession is fully
21
22
54
23
55
24
56
25
57
26
27
28
Id. at 15.
Id. at 21.
Doc. 76 at 5.
Id. (citing 2 Rocky Mountain Mineral Law Foundation, supra, § 33.04[8] (“Once a
location is properly marked, the claimant has complied with the requirements of the law, and in
almost all states he need not, to preserve his right of possession as against rival claimants,
maintain or restore the monuments or markings if they are removed or obliterated without his
fault. The inability of a subsequent locator to find monuments or to trace the boundaries of a
location is not proof that it was not marked on the ground.”)).
-12-
1
2
vested in the locator, and he cannot be divested of this right by the
removal or obliteration or destruction of the monuments, stakes, marks, or
notices done without his fault, while he continues to perform the
necessary work upon the claim.58
3
Thus, the pertinent question is whether Emerald’s evidence tends to clearly and
4
convincingly show that Sunburst’s predecessors failed to place the required monuments
5
within 90 days of when the claims were located.
6
The California Supreme Court addressed a similar question in Temescal Oil
7
8
Mining & Development Co. v. Salcido.59 Salcido involved a dispute over oil-mining
rights. Although the defendant located his claim in 1891 and the plaintiff did not locate
9
its claim until 1900, the plaintiff argued that its claim was superior in part because the
10
defendant had failed to adequately monument his claim.60 At trial, the plaintiff
11
presented the testimony of witnesses who “did not see the monuments when they
12
looked for them some years after they were placed” and argued that this evidence
13
created a jury question regarding whether the monuments were ever constructed.61
14
The California Supreme Court upheld the trial court’s refusal to submit this question to
15
the jury, finding that the plaintiff’s evidence did “not raise a substantial conflict with the
16
17
testimony of the parties who placed the monuments.”62 “The evidence that the stakes
were placed there in 1891 is not disputed,” the court held, “and, as ag ainst that
18
evidence, testimony to the effect that the stakes could not be found in 1899 raises no
19
presumption.”63
20
21
22
58
23
Nichols v. Ora Tahoma Mining Co., 151 P.2d 615, 622 (Nev. 1944).
59
24
25
69 P. 1010 (Cal. 1902).
60
Id. at 1010.
26
61
27
62
28
63
Id. at 1011.
Id.
Id.
-13-
1
In accord with Salcido, the court finds that Earnest Schaaf’s and Hatter’s failure
2
to find monuments placed on the Mineral Survey Claims in 2012 and 2015 does not
3
raise a genuine issue of material fact. No reasonable jury could find that these
4
observations, which occurred between 40 and 105 years after the fact, clearly and
5
convincingly dispute the locators’ attestations that the m onuments were posted at the
6
time of location.64
7
b.
The claims that SGR located in 2004
8
The claims that SGR located in 2004 present a different story, however.
9
Emerald first asserts that “SGR’s records [show] that [it] failed to monument its claims
10
within 90 days.”65 This is an apparent reference to “[i]nternal reports generated by the
11
project manager of the site, Joe Sawyer,” that according to Emerald, “indicate that on
12
the weeks of January 23, 2005 and January 30, 2005, [the individual who located these
13
claims, Robert Cameron,] was still in the process of ‘staking the claims.’”66 But in
14
support of these factual assertions, Emerald merely cites the five affidavits discussed
15
above, generally.67 This citation violates both Rule 56(c)(1)(A) and LRCiv 56.1(b)
16
because it does not refer to any specific parts of any materials in the record. Further,
17
the court has reviewed the cited affidavits and finds that they contain no mention of any
18
reports generated by Joe Sawyer. The court will disregard Emerald’s argument
19
regarding Joe Sawyer’s reports for lack of evidentiary support.
20
Emerald next cites Huntzinger’s affidavit, in which he states that SGR hired him
21
in November 2004 to “perform maintenance on the heap leach.” 68 After a couple of
22
months, Huntzinger was “assigned the job of checking the monitor wells around the
23
64
24
25
See doc. 52-2 at 2–69.
65
Doc. 70 at 11.
26
66
27
67
28
68
Id. at 4.
Doc. 71 at 7 ¶ 25.
Doc. 71-1 at 18.
-14-
1
site,” which involved traveling “to different parts of the mine site where the monitor wells
2
were located.”69 Huntzinger states that the claim posts placed by Metzler in “[s]ometime
3
around 2006-2007” were the only ones “he recognized on the site” until Emerald started
4
placing its posts in 2012. 70 Around that time, Huntzinger states, then-owner Sierra
5
Resources told him to “go into town and get some PVC pipe and [start] putting stakes
6
on the claims.”71
7
In response, Sunburst argues that strict compliance with the claim
8
monumentation requirement is not required; substantial compliance suffices.72 This
9
argument is of no avail to Sunburst, however, because Sunburst does not explain how
10
SGR might have substantially complied with the monumentation requirement. Sunburst
11
next challenges the weight of Huntzinger’s observation that no monuments were posted
12
because Huntzinger “was not tasked with inspecting the claims staked by SGR.”73
13
Sunburst also argues that Huntzinger’s observation is refuted by (1) Hatter’s and
14
Metzler’s statements that they found “claim markers on the ground;”74 (2) Southwest
15
Land Surveying’s 2012 survey, which located “various markers on Emerald 5–20;” and
16
(3) Emerald’s position in this litigation that the “Block Claims” (Emerald Claims Nos. 1A,
17
18
19
20
21
69
Id. at 19.
70
Id.
22
71
23
Id. at 20.
72
24
25
26
Doc. 76 at 9 (citing Hagan v. Dutton, 181 P. 578, 582 (Ariz. 1919) (“We find no
indication in the evidence that there was any intentional concealment of the notices, and it fairly
appears that there was a substantial compliance with the statute in posting the notices, and we
shall not disturb the finding of the court that sufficient and legal notices of location had been
posted on the Red Metal claims.”)).
27
73
28
74
Id.
Id.
-15-
1
2A and 3–20) 75 are oversized, “which relies on the distance between monuments for
2
these claims that were found on the ground.”76
3
Sunburst’s factual assertions are either not supported by the record or do not
4
effectively refute Huntzinger’s observations. Contrary to Sunburst’s insinuation, Hatter
5
and Metzler did not specifically state that they located claim markers on any claims that
6
SGR located in 2004. And, although Southwest Land Surveying’s 2012 survey and
7
Emerald’s litigation position regarding the Block Claims reflect that some markers were
8
placed on some of these claims, not even Sunburst contends that this evidence shows
9
compliance (substantial or otherwise) with A.R.S. § 27-203. The court finds that
10
Huntzinger’s affidavit, which includes his observations of the mine site at the same time
11
the monuments were allegedly placed in 2004, coupled with Sunburst’s lack of any
12
evidence showing that the required monuments were timely placed, is sufficient to
13
create a genuine dispute of fact regarding whether the 2004 claims were properly
14
monumented.
15
C.
16
Mineralization of the Mill Site Claims
A lode mine operator may use land “not contiguous” to the lode for milling
17
purposes.77 By statute, a mill site may only be located on non-mineral land.78 The
18
widely-recognized test for determining whether a mill site is located on mineral land
19
asks, “does such land contain minerals of a quantity and quality which can be extracted
20
at a profit?”79 If the land contains “mineral of such quality and quantity to render
21
22
23
75
24
25
Doc. 52 at 4.
76
Doc. 76 at 10.
26
77
27
78
28
79
30 U.S.C. § 42(a).
Id. § 42.
Cleary v. Skiffich, 65 P. 59, 61 (Colo. 1901).
-16-
1
expenditures for its extraction reasonable and prudent,” the land is m ineral in character
2
and unsuitable for a mill site.80
3
Sunburst asserts that its mill site claims are all located on non-mineral land,
4
relying on two authorities. The first is a report prepared by Burrett W. Clay (“Clay”), a
5
Certified Mineral Examiner.81 In that report Clay opines that the drill hole data and the
6
cost data demonstrate “that there is no known commercial grade mineralization under
7
the mill sites.”82 The second authority is the Non-Mineral Affidavit executed in 1975 by
8
Harold W. Horst and W.T. Hollis in support of El Paso’s patent application. 83
9
Emerald argues that whether Sunburst’s mill sites are located on mineral land
10
presents a genuine factual dispute for two reasons. First, Emerald argues that “SGR
11
attempted to overlap multiple load claims on the Sunburst Millsites,” something it could
12
not do unless it “believed minerals were present and could be extracted
13
economically.”84 As Sunburst points out, however, Emerald “provides no evidence that
14
SGR made a discovery of valuable mineral deposits or that those deposits, if they were
15
discovered, were on the millsites.”85 Second, Emerald argues that Schaaf’s affidavit
16
creates a genuine question of fact. In paragraph ten of his affidavit, Schaaf states that
17
in 2014 he “was involved in drill testing,” including horizontal drilling across the mill
18
sites, which showed “trace mineralization of copper and cobalt.” 86 He states that he and
19
professional geologist Barry Price (“Price”) concluded that “the mineralization and
20
21
22
80
Silver Chief Mining Co., Inc., 40 IBLA 244, 248–49 (1979). See also California v.
Rodeffer, 75 Interior Dec. 176, 179 (IBLA 1968).
81
23
Doc. 52-7 at 2–29.
82
24
25
Id. at 27.
83
Id. at 31–37.
26
84
27
85
28
86
Doc. 70 at 5 (citing A.R.S. § 27-201).
Doc. 76 at 7.
Doc. 71-1 at 3 ¶ 10.
-17-
1
discovery of cobalt are indicative of sufficient mineralization so that the mill site claims
2
could be designated as being mineral in character.”87 In response, Sunburst contends
3
that Schaaf’s statement is outside the scope of his expertise as a surveyor and as to
4
Price it is hearsay.
5
Schaaf’s affidavit is insufficient to create an issue for trial. “[T]here is no issue
6
for trial unless there is sufficient evidence favoring the nonmoving party for a jury to
7
return a verdict for that party. If the evidence is merely colorable, or is not significantly
8
probative, summary judgment may be granted.”88 Schaaf’s opinion that Sunburst’s mill
9
sites are located on land that is mineral-in-character is one that requires scientific,
10
technical, or other specialized knowledge within the scope of Rule 702. And Emerald
11
has not established that Schaaf, a surveyor, possesses the requisite expertise to offer
12
expert opinion testimony on this topic.89 Further, the court finds that Sunburst’s hearsay
13
objection to Schaaf’s statement about Price’s opinion is well-taken. But, even setting
14
aside these two deficiencies, Schaaf’s affidavit still fails to raise a question of material
15
fact. His affidavit does not set out the quantity of minerals that their drill testing
16
uncovered, the quality of those minerals, or the expenditures needed to extract the
17
minerals. Even if Schaaf’s opinion were admissible, it would still fall well-short of
18
creating a jury question as to whether the Sunburst mill sites are located on land that is
19
mineral-in-character.
20
21
22
23
24
87
25
88
26
27
28
Id.
Anderson, 477 U.S. at 249–50 (citations omitted).
89
See, e.g., Kumho Tire Co. v. Carmichael, 526 U.S. 137, 156 (1999) (the trial court
must decide whether an individual offering expert testimony has sufficient “specialized
knowledge to assist the jurors in deciding the particular issues in the case.”) (internal quotation
omitted).
-18-
1
D.
Oversized Claims
2
The Mining Law of 1872 establishes that the width of a lode claim may not
3
exceed 600 feet (300 feet on each side of the center of the claim).90 A claim that
4
violates this size limitation is void if the locator acted in bad faith.91 The Arizona
5
Supreme Court has defined good faith in this context “as honesty of purpose and
6
absence of intent to defraud.”92 Where an oversized claim is the product of an honest
7
mistake (for example, where the claim is not “so excessive as to show bad faith”), bad
8
faith may be found only where the locator was notified of the excess, was given an
9
opportunity to correct it, and subsequently failed to remedy the problem.93 Whether a
10
11
locator acted in bad faith is ordinarily a question of fact for the jury.94
Sunburst concedes that its Block Claims are oversized,95 but argues that they
12
are “not so excessive as to indicate bad faith” and Sunburst’s predecessor was never
13
given an opportunity to fix the problem before Emerald staked its claims.96 In response,
14
Emerald asserts that Scoretz’s affidavit creates a question of material fact as to
15
16
17
18
19
20
21
90
30 U.S.C. § 23 (“No claim shall extend more than three hundred feet on each side of
the middle of the vein at the surface . . . .”).
91
Velasco, 427 P.2d at 548 (“Had the Hogvalls and the subsequent Black Eagles been
so excessive as to show bad faith, they would have been void.”).
92
Geomet Expl., Ltd. v. Lucky Mc Uranium Corp., 601 P.2d 1339, 1343 (Ariz. 1979).
22
93
23
24
25
Velasco, 427 P.2d at 548 (quoting Jones v. Wild Goose Mining & Trading Co., 177 F.
95, 98 (9th Cir. 1910) (“Until [the defendants] had received [notice of the excess], and were
given an opportunity to exercise [their right to select and cast off], the whole claim, including
any excess due to honest mistake and free from fraud, was so far segregated from the public
domain as to exempt it or any part thereof from relocation.”)).
26
94
27
95
28
96
Id.
Doc. 52 at 11.
Id. at 7, 12.
-19-
1
whether Sierra was notified of the problem, given an opportunity to fix it, yet did
2
nothing.97 Again, the evidence upon which Emerald relies is deficient.
3
In his affidavit, Scoretz merely states that he discussed with Sierra’s CEO, Rod
4
Martin, the “numerous deficiencies” he had discovered with Sierra’s claims.98 “After
5
Mr. Martin denied that any deficiencies existed and expressed no interest in remedying
6
those deficiencies,” Scoretz states, “[he] directed Southwest Land Surveying and
7
Consulting to place several mining claims on the Emerald Isle mine site.”99 Scoretz
8
does not specifically state that he notified Sierra that the Block Claims were oversized,
9
a fact essential to Emerald’s assertion of bad faith. Lacking this evidence, Emerald has
10
failed to raise a question of material fact.
11
12
V. CONCLUSION
For the reasons above, the motion at docket 52 is granted in part and denied in
13
part as follows. Sunburst is entitled to judgment in its favor as to both counts of its
14
complaint and both counts of Emerald’s countercomplaint with regard to Copper Hill Mill
15
Site Nos. 1–8, 10–12; Hermes Mill Site No. 13; Copper Hill Mill No. 1 Mill Site Nos.
16
14–15; Copper Hill No. 2; Hermes; Hermes No. 2; Jimtown Copper No. 1; Valley
17
Copper Nos. 1–3; and FDR. In all other respects the m otion is denied.
18
DATED this 25th day of September 2017.
19
20
/s/ JOHN W. SEDWICK
SENIOR JUDGE, UNITED STATES DISTRICT COURT
21
22
23
24
25
26
97
27
98
28
99
Doc. 70 at 7.
Doc. 71-1 at 11.
Id. ¶¶ 4–6.
-20-