Sun State Towers LLC v. Coconino, County of

Filing 30

ORDER - IT IS THEREFORE ORDERED that the Request for Expedited Review Pursuant to 47 U.S.C. § 332(c)(7)(B)(v) of Plaintiff Sun State Towers, LLC (Doc. 1 ) is DENIED without prejudice to its renewal based on subsequent facts. IT IS FURTHER ORDERED directing the Clerk of Court to terminate this action and enter judgment accordingly. (See document for further details). Signed by Judge G Murray Snow on 10/25/17. (LAD)

Download PDF
1 WO 2 3 4 5 6 IN THE UNITED STATES DISTRICT COURT 7 FOR THE DISTRICT OF ARIZONA 8 9 Sun State Towers LLC, 10 Plaintiff, 11 ORDER v. 12 No. CV-17-08075-PCT-GMS County of Coconino, 13 Defendant. 14 15 Pending before the Court is the Request for Expedited Review Pursuant to 47 16 U.S.C. § 332(c)(7)(B)(v) of Plaintiff Sun State Towers, LLC (“Sun State”) (Doc. 1). For 17 the following reasons, the Court denies the request without prejudice to its renewal on 18 appropriate subsequent facts. BACKGROUND 19 20 Plaintiff Sun State is a limited liability corporation registered and doing business 21 in Arizona. Plaintiff’s business is to build wireless service facilities and lease those 22 facilities to wireless service providers. In this case, Plaintiff seeks to build a wireless 23 service facility in Coconino County, Arizona and lease the facility to Verizon Wireless 24 (“Verizon”). Verizon identified two gaps in its coverage (a two-mile and a five-mile gap) 25 around the I-40 near Flagstaff which were leading to dropped calls for Verizon 26 customers. 27 Verizon hired consultants to study the area with the coverage gap and determine 28 possible locations for a new wireless service facility. These consultants identified three 1 potential locations that could fill the coverage gap. In the first location, about 1,000 feet 2 further from the I-40 than the Toonerville site, the land was in escrow and the private 3 owner was not interested in disturbing that sale by leasing land to Sun State.1 R000022; 4 R000067; R000132. A second location, and Sun State’s preference (“the Toonerville 5 site”), is located on private land adjacent to the first location. In both of these locations, a 6 wireless service facility would need to be built. A third possibility was for Verizon to co- 7 locate with an existing wireless service facility located one mile away from the 8 Toonerville site. This wireless facility is owned and operated by the Navajo Tribal Utility 9 Authority (“NTUA” and “the NTUA site,” respectively); it is located on tribal land and 10 governed by tribal law. Co-location allows one wireless service facility to house 11 equipment for multiple wireless service providers. Verizon’s consultants rejected the 12 NTUA site because they determined it would not adequately fill the coverage gap, it 13 would take too long to implement, and it was too expensive. Therefore, Verizon and Sun 14 State moved forward on plans to build a wireless service facility at the Toonerville site. 15 In Coconino County, a Conditional Use Permit (“CUP”) is required to build most 16 wireless service facilities. Coconino County Zoning Ordinance § 3.9.B(1).2 The County’s 17 zoning regulations seek to “protect the county’s environmental resources and to minimize 18 adverse impacts on visual resources,” “minimize the number of towers by encouraging 19 the joint use (co-location) of facilities,” and “enhance the ability to provide wireless 20 telecommunication services to county residents, businesses and visitors.” Id. at § 3.9.A. 21 To achieve these goals, the Ordinance provides an order of preference for ten types of 22 new wireless service facilities, ranging from most preferred to least preferred. Relevant to 23 this case, co-location on an existing tower is ranked as the most preferred; a new tower of 24 100 to 199 feet in a G zone is ranked as the eighth preferred. Id. at § 3.9.C(1)(a). A new 25 26 27 28 1 This location is no longer in private ownership. It is now controlled by the Navajo Housing Authority. It is unclear whether they would be interested in leasing the land to Sun State. 2 Coconino County approved a new Ordinance on April 18, 2017. The relevant provisions have not changed. -2- 1 facility “shall use the most preferred facility type and location where technically feasible, 2 even if it results in an increase in the number of facilities or a higher cost.” Id. at § 3.9.C 3 (1)(b) (emphasis added). The County may only permit a lesser-preferred facility when 4 “the applicant presents substantial evidence to show that it will have a lesser visual 5 impact or is more technically necessary than the use of more preferred facilities.” Id. The 6 Ordinance also lists disfavored sites, which includes “[a]ny site within a visual corridor 7 or scenic vista, for example in view of the San Francisco Peaks, . . . unless the facility 8 blends with the surrounding natural and human made environment. Id. at 3.9.C(2)(b). 9 To receive a CUP, applicants first apply to the Coconino County Planning and 10 Zoning Commission (“the Commission”). Sun State filed an application with the 11 Commission on January 20, 2016. The Commission held public hearings and eventually 12 granted the CUP on November 30, 2016. R000161. NTUA appealed the Commission’s 13 decision on December 14, 2016. R000163–65. An appeal of the Commission’s zoning 14 decision goes to the Coconino County Board of Supervisors (“the Board”). The Board 15 hears appeals de novo. 16 The Board first held a public hearing on February 14, 2017. The first hearing 17 centered primarily on whether the NTUA site and the Toonerville site would equally 18 close the coverage gap. See R000013–117. Sun State’s studies showed that the NTUA 19 site would provide coverage for the five-mile gap, but not the two-mile gap. R000094. 20 NTUA, however, disputed that their site would not be able to provide sufficient coverage. 21 R000050–57. The Board continued the hearing, giving the parties time to determine 22 standards for measuring the coverage at each location and to discuss the possibility of co- 23 location. R000108–16. The second hearing was held on March 21, 2017. At this hearing, 24 both Sun State and NTUA agreed that the NTUA site could effectively meet Verizon’s 25 coverage needs. R000242. Instead, Sun State focused their arguments on other reasons 26 why the NTUA site was not a viable alternative: the short duration of the lease, delays, 27 and the cost. R000242–43. At the end of the hearing, the Board voted 5–0 to approve the 28 appeal and deny the CUP. R000317. The statements of the Board members and the -3- 1 subsequent written denial identified two key reasons why the Board denied the CUP: the 2 Toonerville site is in a disfavored location and the NTUA site is an alternative which is 3 both not in a disfavored location and would provide the opportunity for co-location. 4 R000407–08. 5 6 Sun State seeks this Court’s review of the Board’s decision pursuant to 47 U.S.C. § 332(c)(7)(B)(v). 7 8 DISCUSSION I. The Telecommunications Act of 1996 9 This case arises under the Telecommunications Act of 1996 (TCA), Pub. L. No. 10 104-104, 110 Stat. 56. The TCA was enacted with two primary purposes. First, Congress 11 sought to “promote competition and reduce regulation in order to secure lower prices and 12 higher quality services for American telecommunications consumers and encourage the 13 rapid deployment of new telecommunications technologies.” T-Mobile USA, Inc. v. City 14 of Anacortes, 572 F.3d 987, 991 (9th Cir. 2009) (quoting TCA, 110 Stat. at 56). At the 15 same time, Congress also sought to “preserve the authority of State and local 16 governments over zoning and land use matters except in the limited circumstances set 17 forth in the [TCA] conference agreement.” Sprint Telephony PCS, L.P. v. County of San 18 Diego, 543 F.3d 571, 576 (9th Cir. 2008) (quoting H.R. Conf. Rep. No. 104-458, § 704, 19 at 207–08). 20 In striking this balance between preserving local authority and encouraging 21 technological development, the TCA proscribes only certain, limited behaviors by 22 localities. 47 U.S.C. § (c)(7)(B)(i). Localities may not “unreasonably discriminate” 23 amongst providers nor may they “prohibit or have the effect of prohibiting” wireless 24 services. Id. Localities also must act quickly on permit requests and denials of permits 25 must be based on “substantial evidence in a written record.” Id. at § (c)(7)(B)(ii)–(iii). A 26 person or entity believing that the locality violated these provisions of the TCA can seek 27 review of the decision in the federal courts. Id. at § (c)(7)(B)(v). 28 /// -4- 1 II. Analysis 2 Sun State raises two challenges under the TCA. First, Sun State alleges that the 3 Board’s decision was not supported by substantial evidence. Second, Sun State argues 4 that even if there was substantial evidence, the denial violates the TCA because it 5 constitutes an effective prohibition. The Court considers each argument in turn. 6 A. 7 The TCA requires that “[a]ny decision by a State or local government . . . to deny 8 a request to place, construct, or modify personal wireless service facilities shall be in 9 writing.” 47 U.S.C. § 332(c)(7)(B0(iii). Although the TCA does not define “substantial 10 evidence,” courts have held that “this language is meant to trigger ‘the traditional 11 standard used for judicial review of agency decisions.’” Metro PCS, Inc. v. City and 12 County of San Francisco, 400 F.3d 715, 723 (9th Cir. 2005) (abrogated on other grounds) 13 (quoting H.R. Conf. Rep. No. 104-458, at 208 (1996)). This is a deferential form of 14 review, and courts can “neither engage in [their] own fact-finding nor supplant the Town 15 Board’s reasonable determinations.” Metro PCS, 400 F.3d at 725 (quoting Cellular 16 Telephone Co. v. Town of Oyster Bay, 166 F.3d 490, 494 (2d Cir. 1999)). Substantial Evidence 17 The substantial evidence determination “does not require incorporation of 18 substantive federal standards.” Metro PCS, 400 F.3d at 723. Instead, it “requires a 19 determination whether the zoning decision at issue is supported by substantial evidence in 20 the context of applicable state and local law.” Id. at 723–24. The evidence in the record 21 is substantial when there is “less than a preponderance but more than a scintilla of 22 evidence.” Id. at 725 (internal citations omitted). There must be enough “relevant 23 evidence as a reasonable mind might accept as adequate to support a conclusion.” Id. 24 Taken together, a Court may not overturn a locality’s decision if (1) the local zoning 25 ordinance allows the denial and (2) there is more than a scintilla of evidence. 26 1. The Local Ordinance Supports a Denial 27 The Coconino County Zoning Ordinance (“the Ordinance”) specifically takes into 28 consideration the preservation of scenic views. It also places a high priority on co- -5- 1 location. Both of the grounds on which the Board denied the permit are supported by the 2 plain text of the ordinance. The Ordinance seeks to “minimize adverse impacts on visual 3 resources” and does so in part by disfavoring sites “within a visual corridor or scenic 4 vista.” Coconino County Zoning Ordinance §§ 3.9.A(1)(c), 3.9.C(2)(b). Localities are 5 allowed to take aesthetic considerations into account when issuing permits. Sprint PCS 6 Assets, LLC v. City of Palos Verdes Estates, 583 F.3d 716, 725 (9th Cir. 2009). Nothing 7 in the TCA prohibits localities from considering aesthetics, and nothing in Arizona law 8 does so. 9 Similarly, the Ordinance “encourag[es] the joint use (co-location) of facilities” in 10 order to minimize the number of towers. Coconino County Zoning Ordinance 11 § 3.9.A(1)(e). This is further reflected by the fact that “[c]o-location on an existing 12 tower” is listed as the most preferred type of new facility. Id. at § 3.9.C(1)(a)(1). The 13 Toonerville tower is listed as the eighth most preferred (out of ten), as a new tower of 100 14 to 199 feet in a G zone. Id. at § 3.9.C(1)(a)(8). The Ordinance explicitly states that 15 “[n]ew facilities shall use the most preferred facility type and location where technically 16 feasible.” Id.at § 3.9.C(1)(a). Even without taking into account the Toonerville tower’s 17 location in a scenic view corridor, the Ordinance uses mandatory language requiring co- 18 location in place of a new, tall tower. The Board had clear statutory authority to deny Sun 19 State’s permit request. 20 2. There is Substantial Evidence in the Record to Support a Denial 21 The County denied the CUP on two grounds: its location in a scenic view corridor 22 and the presence of an alternative site for co-location. There is substantial evidence in the 23 record for both grounds. The Board did not simply make generalized statements of 24 concern. With regards to the visual impact of the proposed Toonerville tower, the Board 25 had photo simulations to consider. R000123–26; R000130; R000177–81. The County’s 26 staff testified that the Toonerville tower was within a scenic view corridor and informed 27 the Board that a permit for the same location had previously been denied due to visual 28 concerns. R000020–26; R000100; R000127.The Ninth Circuit has held that substantial -6- 1 evidence exists when a city council reviewed propagation maps, reports detailing 2 aesthetic values, public comment, and oral remarks from the parties. Palos Verdes, 583 3 F.3d at 726. Substantial evidence was also found when a handful of residents testified 4 that a wireless service facility would harm their property values and interfere with their 5 views of mountains. Anacortes, 572 F.3d at 994–95. It is not this Court’s role to review 6 the photo simulations and decide for itself whether the proposed facility negatively 7 impacts the scenic view. The Board had a sufficient amount of evidence before it, 8 between the staff report and the photo simulations, to decide that that tower would 9 negatively impact the scenic view. 10 The Board also had substantial evidence to determine that co-location on the 11 NTUA site was feasible. By the second meeting, both parties agreed that co-location on 12 the NTUA site was technologically feasible and that it would provide substantially 13 similar coverage for Verizon customers. Plaintiff asserts that the Board failed to evaluate 14 whether the NTUA site was economically feasible. The substantial evidence analysis, 15 however, does not take into account federal standards. At this stage, the only question is 16 whether there is substantial evidence to support a decision made pursuant to state and 17 local law. Metro PCS, 400 F.3d at 723–24. The Ordinance explicitly states that cost need 18 not be taken into account if there is a more-preferred, technically feasible facility. 19 Coconino County Zoning Ordinance § 3.9.C. The Board heard extensive evidence and 20 presentations from NTUA representatives about the process for co-location, the 21 technological capabilities of the NTUA tower, and NTUA’s willingness to negotiate with 22 Verizon. The Board had substantial evidence to determine that the NTUA site was an 23 option for co-location. 24 B. 25 While the substantial evidence analysis is focused on state and local standards for 26 the zoning of wireless service facilities, the effective prohibition analysis brings in 27 federal standards. Under the TCA, the “regulation of the placement, construction, and 28 modification of personal wireless services facilities by any State or local government . . . Effective Prohibition -7- 1 shall not prohibit or have the effect of prohibiting the provision of personal wireless 2 services.” 47 U.S.C. § 332(c)(7)(B)(i)(II). A plaintiff must “establish either an outright 3 prohibition or an effective prohibition[;] . . . a plaintiff’s showing that a locality could 4 potentially prohibit the provision of telecommunications services is insufficient.” Sprint 5 Telephony, 543 F.3d at 579. There is no allegation that the Ordinance constitutes an 6 outright ban on wireless service facilities. An effective prohibition claim “involves a two- 7 pronged analysis requiring (1) the showing of a “significant gap” in service coverage3 8 and (2) some inquiry into the feasibility of alternative facilities or site locations.” 9 MetroPCS, 400 F.3d at 731. 10 In the Ninth Circuit, the provider has the burden of making a “prima facie showing 11 of effective prohibition by submitting a comprehensive application, which includes 12 consideration of alternatives, showing that the proposed [wireless service facility] is the 13 least intrusive means of filling a significant gap.” Anacortes, 572 F.3d at 998. If that 14 prima facie showing is rejected, the locality “must show that there are some potentially 15 available and technologically feasible alternatives.” Id. The locality must give the 16 provider the opportunity to dispute the alternatives identified by the locality. Id. 17 1. 18 The Toonerville Site is Not the Least Intrusive on the Values the Denial Sought to Serve 19 For the reasons set forth in further detail below, this Court cannot conclude based 20 on the present record that the Board’s determination that the NTUA co-location site is an 21 available alternate location is erroneous. Given that determination, it also concludes that 22 the Toonerville site is not the least intrusive on the values the denial sought to serve. The 23 least intrusive means standard “requires that the provider show that the manner in which 24 it proposes to fill the significant gap in services is the least intrusive on the values that 25 26 27 28 3 A significant gap in coverage exists when “the provider in question is prevented from filling a significant gap in its own service network.” Metro PCS, 400 F.3d at 732. Therefore, if Verizon cannot fill its own gap, a significant gap in coverage is present. It does not matter whether other wireless providers serve the same area without any gaps. In this case, both parties agree that a significant gap in Verizon’s coverage exists. Doc. 24, pg. 2; Doc. 25, pg. 9. -8- 1 the denial sought to serve.” Anacortes, 572 F.3d at 995. To determine whether Sun State 2 met their burden, the Court must first “examine the [locality’s] stated ground for 3 concluding otherwise.” American Tower Corp. v. City of San Diego, 763 F.3d 1035, 1056 4 (9th Cir. 2014). Defendant denied Sun State’s CUP because of concerns about the impact 5 on the scenic view corridor and the county’s preference for co-location. Therefore, Sun 6 State must show that the Toonerville site is the least intrusive means of meeting the 7 county’s goals of minimizing the aesthetic impact on the scenic view corridor and of 8 encouraging co-location. 9 Sun State has not met this burden. The NTUA site is further removed from the 10 I-40, and therefore is, at least arguably, less visible and has a lower impact on the scenic 11 view corridor. Building a new wireless service facility at the Toonerville site instead of 12 co-locating at the NTUA site does not further the goals of encouraging co-location and 13 minimizing the number of wireless facilities. Plaintiff has not established that the 14 Toonerville site is the least intrusive means of filling the service gap. 15 16 2. The NTUA Site is an Available and Technologically Feasible Alternative 17 The parties do not dispute that the NTUA site is technologically feasible.4 Rather, 18 plaintiff asserts that the County erred by failing to consider the commercial feasibility of 19 the NTUA tower. The Ninth Circuit has never framed the effective prohibition analysis as 20 containing a commercial feasibility component. However, Plaintiff is essentially arguing 21 that the NTUA site is not truly an available alternative—the costs and delays associated 22 with the NTUA site are so high that it is effectively unavailable and that in denying the 23 4 24 25 26 27 28 At the March 2017 Board hearing, Sun State’s engineer admitted that the NTUA site would provide Verizon the coverage needed to fill their service gaps. R000247 (“Now, the NTUA site does a pretty good job of covering. . . . it’s not a significant variation.”). Sun State’s attorney similarly stated that “[w]e think we can get enough coverage, if we had to, on NTUA.” R000250. Because both parties now agree that colocation on the NTUA site will fill Verizon’s significant service gap, there is no technological reason preventing co-location. -9- 1 permit and forcing Verizon to contract with the NTUA, they are effectively prohibiting 2 cell coverage. 3 There are two difficulties in assessing this argument. First, to the extent that Sun 4 State specifies certain asserted regulatory delays attributable to tribal governmental 5 processes or prospective lease terms that Verizon found to be unacceptable in collocating 6 on the NTUA site, the record reflects that NTUA either contested that such delays 7 existed, or represented to the County that it was prepared to negotiate the terms that 8 Verizon indicated were unacceptable.5 This Court cannot find, based on the materials in 9 the record which establish these assertions by the NTUA, that the Board acted 10 inappropriately. 11 Second, and relatedly, there is no indication in the present record that Verizon ever 12 actually attempted to discuss with any specificity the actual terms of any lease that it 13 might enter with the NTUA,6 nor does the record reflect that the NTUA unreasonably 14 5 15 16 17 18 19 20 21 22 23 24 25 26 27 28 See R000268 (“[O]ur fees are negotiable. What we gave the appellant was our standard rates. We have in instances accommodated to be competitive with other carriers.”); id (noting that the duration of the lease and the lease termination provisions are negotiable as well); R000276–277 (noting the negotiability of price); R000279 (noting that prices have been negotiated with other providers in the past). R000284 (stating that negotiability of the lease term and one-year lease termination provision). 6 See R000039 (“NTUA has not received any information for application nor has been officially contacted about timeframes, fees, duration, technical aspects, or any things of that nature, or on the [NTUA] tower or any tower whatsoever in the NTUA portfolio.”); R000067–68 (discussing that Verizon did not apply to and has not worked with the Navajo Nation); R000085 (“I got a letter from NTUA indicating that they had not been contacted by the applicant about collocating on the tower while the applicant had said that they had contacted NTUA and it wasn’t available.”); R000096 (stating that the Sun State attorney “called NTUA in November of 2016 and asked them to please explain their application process” but that “everyone’s going to be asking me, why didn’t you go to the NTUA site? Well, there’s two reasons. Number one, it doesn’t fill the gap. And number two, it’s going to take far too long to get a site up and operating and all the agreements pulled together and final.”); R000156 (noting discussion at the Commission about NTUA’s invitation to co-locate and a Sun State representative’s promise to speak with Verizon about co-locating with NTUA); R000158 (noting that a Sun State lawyer called NTUA and was told about the leasing process and timeline); R000250 (stating that “we took the NTUA rate matrix . . . and the rent matrix renders a monthly rent of $5400,” but failing to discuss where this rent matrix came from or whether there were negotiations to deviate from the matrix); R000256–57 (stating that during the continuance between the two Board hearings, NTUA and Verizon discussed only the coverage differences); R000271 (containing a statement from the NTUA attorney that there were not co-location discussions during the continuance because it was not in Sun State or Verizon’s interests at the time); R000280–81 (“[Verizon] would prefer to find - 10 - 1 delayed such negotiations so that Verizon could not enter such a lease within a reasonable 2 period.7 Nor does the record reflect that given the terms of any actual lease Verizon 3 determined it was not feasible to provide coverage.8 Thus, while the Board may have 4 erred in refusing to consider whether the economic practicalities of an alternative site 5 effectively prohibited Verizon cell coverage, there is in the present record no sufficient 6 factual basis on which this Court can conclude that it does amount to such an effective 7 prohibition. The Board gave Sun State the opportunity to dispute the alternatives that it 8 identified, Anacortes, 572 F.3d at 998, Sun State simply did not adequately establish on 9 the present record that the NTUA alternative was an effective prohibition. 10 a. Delays 11 Before the Board, Plaintiff first expressed concern that the application and 12 approval process with NTUA itself would take almost two years. NTUA, however, 13 strenuously disagreed with this claim. NTUA represented to the Board that the 14 15 16 17 18 19 20 21 22 23 24 25 something that was more beneficial to our objectives, which was the highway. So that’s what we did. It’s not that we never looked at the NTUA tower. I conferred with Verizon and [the Toonerville site] was the one that they preferred.”); R000281 (“When we asked for the rent sheets, they gave us what they had, and they did not say they were negotiable.”). 7 Additionally, there is some evidence in the record suggesting that Verizon simply did not want to work with the Navajo Nation. See R000022 (containing testimony from County staff that “[s]tatements from Verizon to staff indicate that they are unwilling to collocate on a tower on tribal land because in the past when there have been disputes, Verizon was unable to prevail in those disputes”); R000118 (noting the same in a staff report); R000308 (“I’ve been informed by Sun State Towers and Mr. Chad [Ward, the Principal and Director of Operations of Sun State,] that Verizon would not be willing to work with us on further business.”). To the extent that Verizon, actually does assert that commercial relationships with Navajo Nation entities are not commercially reasonable due to the Tribe’s inadequate or biased dispute-resolution mechanisms or otherwise, such assertions, to the extent detailed before the Board, might be a relevant factor in determining whether the Board’s requirement that Verizon co-locate amounts to an effective prohibition. Still, Sun State did not make a sufficiently detailed record in this respect, for the Court to conclude that the Board erred. 8 26 27 28 Sun State is at least in some sense NTUA’s competitor for purposes of providing an available cell phone tower to Verizon. To the extent that Sun State is also Verizon’s agent for purposes of conducting such negotiations with NTUA it is not unreasonable for the Board, in determining whether such negotiations were conducted in good faith, to consider Sun State’s possible self-interest. Nor is it unreasonable, in the absence of an actual record of attempted negotiations demonstrating effective prohibition, for the Board to find that the NTUA site is a realistic alternative. - 11 - 1 application process with NTUA could be completed in 30 to 60 days. R000093; 2 R000165; R000359. NTUA also provided the Board with a letter from the Navajo Nation 3 Land Development Department stating that the timeframe for approval of leases by the 4 Navajo Nation “can take anywhere from one week to one month.” R000377. The Board 5 was not shown any countervailing evidence that would impeach that projected timeline. 6 In absence of any such evidence this Court cannot say the Board erred in finding that 7 such delays were not enough to constitute an effective prohibition. 8 In addition to concerns about delays on NTUA’s end, Plaintiff told the Board that 9 there would be separate delays outside of NTUA’s control. First, Verizon would have to 10 restart internal administrative procedures. R000254. Second, Verizon would have to 11 reapply for permits from the Federal Communications Commission. R000255. Plaintiff 12 prepared a timeline for the Board taking these delays into account, and they are more 13 substantial than the delays associated with the NTUA application and lease process. 14 R000405. Delays associated with internal company processes and government 15 regulations are not properly part of the analysis in determining whether a site is an 16 available alternative. If localities were required to take delays like these into account— 17 delays that exist for all alternative sites—it would disrupt the balance the TCA sought to 18 achieve. A provider could choose their preferred location and then claim that all existing 19 alternatives were not available due to delay. This would allow the providers’ preferred 20 location to trump all other local zoning considerations and leave no recourse for local 21 authorities. However, delays connected with the alternative site itself—like the 22 consideration of the NTUA process above—must be taken into account. 23 The Ninth Circuit expressed similar concerns in American Tower Corp. when the 24 provider failed to consider modifications that would bring their applications in line with 25 the zoning ordinances. Although not discussing delays specifically, the Ninth Circuit 26 clearly rejected providers’ behavior that “would make the applicant—rather than the 27 locality—the arbiter of feasibility and intrusiveness, gutting the ‘least intrusive means’ 28 standard with predictable, applicant-friendly results.” American Tower Corp., 763 F.3d at - 12 - 1 1056. Plaintiff has not established that the delays from moving to the NTUA site render 2 the NTUA tower unavailable. 3 b. Cost 4 Cost can and should be taken into account as a factor in determining whether there 5 is an available alternative. Just as an excessive delay with an alternative site might render 6 it effectively unavailable, so too could a prohibitively high cost render an alternative site 7 unavailable. Refusing to consider cost also allows the owners of the potential alternative 8 sites to act as monopolists, which is expressly counter to the goals of the TCA. 9 Anacortes, 572 F.3d at 991. Without considering cost at all, the owners of the alternative 10 sites could ask for exorbitant prices. In this case, NTUA could price their co-location 11 fees as high as they wanted and would have no incentive to negotiate fees with Verizon in 12 good faith. Cost must be considered in determining whether an alternative site is truly 13 available. The Ninth Circuit, in Anacortes, listed cost as one of multiple considerations 14 that made potential alternative sites unavailable. Id. at 998 (listing environmental impact, 15 additional cost, and location outside of the city’s jurisdiction as factors in finding that the 16 city did not identify available alternative sites); see also Metro PCS, 400 F.3d at 731 17 (rejecting the Fourth Circuit’s strict effective prohibition standard as not being 18 sufficiently permissive to serve Congress’s “twin goals of encouraging competition in the 19 wireless services industry and facilitating efficient use of bandwidth”). 20 But Plaintiff has put forward no evidence that would allow the Board to determine 21 that the lease rate of the NTUA site was unreasonable because the record contains no 22 evidence of any actual negotiation of such rates when the NTUA indicated that its rates 23 were negotiable. The estimated monthly lease price for the Toonerville property will cost 24 $2,250 per month, whereas the NTUA site is projected to cost $5,400 per month.9 25 26 27 28 9 NTUA repeatedly asserted during both Board hearings that all terms of their leases are negotiable, including price. The only cost submitted at hearing was the “list” price of $5,400 per month. Since the NTUA insisted this price was negotiable, and there was no evidence that an attempt had been made to negotiate a lower price, it is not possible for the Court to say the County erred in determining that the co-location site is not cost-prohibitive. - 13 - 1 R000250; R000404; R000406. The NTUA site may be more expensive. But an 2 alternative site is not made unavailable simply because it is more expensive than the 3 providers’ preferred choice. The cost of the alternative site must, in conjunction with 4 other factors, make the site effectively unavailable. Plaintiff can only establish this by 5 putting the relative prices into context. This could include comparisons of the costs of 6 other wireless service facilities in the area or a study of how the alternative site would 7 impact the provider’s overall budget.10 But if Plaintiff could exclude a site as an 8 alternative simply because the cost is not at their desired price, they too would lack the 9 incentive to negotiate honestly with NTUA. It is not the Court or the Board’s role to 10 ensure that providers have locations available at their preferred price point. It is the 11 Board’s responsibility to ensure that their decisions do not effectively prohibit a provider 12 from filling a gap in coverage. 13 Although the Board should have considered cost when raised by the applicant 14 during the hearings, the burden remains on the applicant to make a prima facie showing 15 of effective prohibition. Effective prohibition is not met by just stating that one facility 16 may be considerably more expensive than the other. Therefore, the Court will not reverse 17 the Board’s decision on these grounds. 18 c. Lease Termination Provision 19 The standard NTUA lease with co-locators lasts for five year. However, the lease 20 contains a provision that allows NTUA to terminate the lease on one-year’s notice. 21 R000251. Plaintiff asserts that this essentially converts the lease into only a one-year 22 lease, and that it is not economically feasible for Verizon to invest in the technology for 23 co-location with such a short lease. At the hearings, NTUA noted that all terms in their 24 standard leases were negotiable, including duration. R000268. They also stated that they 25 have never kicked a co-locator off of an NTUA tower.11 Id; R000278. NTUA has a 26 10 27 28 For example, NTUA asserted that their rates are “comparable to other carriers.” R000277. The only counterexample Sun State provided in the record and at oral argument was the price of its own tower. 11 For reference, NTUA currently has 80 co-locations on their towers. R000032. - 14 - 1 twenty-year lease with the Navajo Nation, and noted that it would be possible to draw out 2 the leases of co-locators to coincide with the length of the lease NTUA has with the 3 Navajo Nation. R000268. While Sun State asserts in its briefing that the NTUA would 4 not abandon its one year lease termination provisions, the Court can find little support in 5 the record that suggests as much. Sun State told the Board once that NTUA did not agree 6 to pull out the lease termination provision, but this conclusory statement combined with a 7 lack of evidence of actual negotiations with or applications to NTUA is not enough when 8 looking at the record as a whole for the Court to conclude that the County erred. 9 R000281. A termination clause is not the same thing as the length of a lease term, and 10 more importantly, Sun State has presented no evidence that such notice provisions are not 11 common in cell phone tower leases. NTUA’s express statements of willingness to extend 12 the lease term also weaken any claim for effective prohibition. 13 d. Speculative Nature of Site 14 The NTUA site is not sufficiently speculative to not qualify as an available 15 alternative site. It is true that the lease has not been negotiated and that there is no firm 16 agreement between the parties. However, this would be true of every alternative site; in 17 fact, that is part of what makes it an alternative site. But this is not the case of the Board 18 pointing to a random alternative location and just hoping that Verizon will be able to 19 locate the wireless facility there. Rather, NTUA is actually engaging in this process 20 presumably because they desire to work with Verizon and have their site house Verizon’s 21 technology. NTUA made repeated representations to the Board that they are invested in 22 contracting with Verizon. The NTUA site is not too speculative. 23 Conclusion 24 Defendant Coconino County’s denial of the CUP complied with the local zoning 25 ordinances and there was substantial evidence to support the Board’s decision. Plaintiff 26 Sun State did not establish that the Toonerville site was the least intrusive means of 27 filling a significant gap and comporting with the values sought to be served by the denial 28 of the CUP. Because the Board identified an available and technologically feasible - 15 - 1 alternative, the denial of the CUP does not amount to an effective prohibition. The NTUA 2 site provides Verizon with the same coverage as the Toonerville site. The NTUA site 3 does have some drawbacks for Verizon, but the Board provided evidence that the NTUA 4 was willing to negotiate on these points. In contrast Sun State provides no evidence that 5 Verizon actually entered into such negotiations, that such negotiations became too 6 protracted, or that NTUA insisted on terms that, singularly or in combination, effectively 7 prohibited the provision of Verizon cell phone coverage if Verizon were restricted to that 8 site. 9 IT IS THEREFORE ORDERED that the Request for Expedited Review 10 Pursuant to 47 U.S.C. § 332(c)(7)(B)(v) of Plaintiff Sun State Towers, LLC (Doc. 1) is 11 DENIED without prejudice to its renewal based on subsequent facts. 12 13 14 IT IS FURTHER ORDERED directing the Clerk of Court to terminate this action and enter judgment accordingly. Dated this 25th day of October, 2017. 15 16 17 18 Honorable G. Murray Snow United States District Judge 19 20 21 22 23 24 25 26 27 28 - 16 -

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?