ORDER granting in part and denying in part 59 Motion in Limine. Signed by Honorable Timothy L. Brooks on November 12, 2015. (jn)
IN THE UNITED STATES DISTRICT COURT
WESTERN DISTRICT OF ARKANSAS
FAYETTEVILLE DIVISION
HARTFORD FIRE INSURANCE
COMPANY
V.
PLAINTIFF
CASE NO. 2:14-CV-2096
THE HARRIS COMPANY OF
FORT SMITH, INC.
DEFENDANT/
THIRD PARTY PLAINTIFF
V.
LIMESTONE DEVELOPMENT, LLC and
ARK-CON TESTING SERVICE, INC.
THIRD-PARTY DEFENDANTS
OPINION AND ORDER
Currently before the Court are The Harris Company of Fort Smith’s (“Harris”)
Motion in Limine (Doc. 59), and Hartford Fire Insurance Company’s (“Hartford”)
Response. For the reasons discussed herein, Harris’s Motion is GRANTED IN PART
AND DENIED IN PART.
I. DISCUSSION
The background facts of this matter are set forth in detail in the Court’s Order
adjudicating the other pending motions in this case. (Doc. 82). In short, the case stems
from the expansion of the Fort Smith National Cemetery (the “Cemetery”) in Fort Smith,
Arkansas. Following several alleged issues with the construction—including the failure
of the equipment maintenance building structure (the “Building”)—Limestone, the
general contractor, defaulted, and its indemnitor, Hartford, filed suit against Harris, a
subcontractor on the project.
1
Harris filed its First Motion in Limine on August 31, 2015, asking this Court to
prevent Hartford’s expert witness, James Reddick, from testifying about the “causation
of the structural failure of the Building or other engineering issues.” (Doc. 59, p. 3).
Whether Reddick’s testimony is admissible on these issues is governed primarily by
Federal Rule of Evidence 702. The requirements of Rule 702 have been summarized by
the Eighth Circuit into a three-part test:
First, evidence based on scientific, technical, or other specialized
knowledge must be useful to the finder of fact in deciding the ultimate
issue of fact. This is the basic rule of relevancy. Second, the proposed
witness must be qualified to assist the finder of fact. Third, the proposed
evidence must be reliable or trustworthy in an evidentiary sense, so that, if
the finder of fact accepts it as true, it provides the assistance the finder of
fact requires.
Johnson v. Mead Johnson & Co., LLC, 754 F.3d 557, 561 (8th Cir. 2014) (quoting
Polski v. Quigley Corp., 538 F.3d 836, 839 (8th Cir. 2008)). Rule 702 implements a
liberal admission standard, and courts should accordingly “resolve doubts regarding the
usefulness of an expert’s testimony in favor of admissibility.” Marmo v. Tyson Fresh
Meats, Inc., 457 F.3d 748, 758 (8th Cir. 2006). However, “a court should not admit
opinion evidence that is connected to existing data only by the ipse dixit of the expert”
and, “[w]hen the analytical gap between the data and proffered opinion is too great, the
opinion must be excluded.” Id. (quotation omitted).
The first issue raised by Harris’s Motion is whether Reddick should be allowed to
testify about the causation of the structural failure of the Building. As a part of its subcontract with Limestone, Harris was tasked with performing earth-fill work for the site
upon which the Building was to be constructed. Broadly speaking, this process involves
the removal of soil unsuitable to build upon, followed by the layer-by-layer addition of
2
suitable soil. The end result of this process is commonly referred to as a building pad. In
order to be suitable to build upon, the added soil must have certain compaction rates
and moisture contents. Typically, the general contractor or owner of a project hires a
company to test the added soil to ensure that it is satisfactory. That company will then
“pass” or “fail” the soil based on whether its compaction rate and moisture content meet
the project’s specifications. In this case, Limestone contracted with Ark-Con Testing
Service (“Ark-Con”) to provide this testing service. Ark-Con tested the soil based on a
95% compaction rate and found that Harris’s earth-fill work passed on this basis.
However, while some versions of the project specifications possibly included this 95%
compaction rate, other, possibly later, versions included a 98% compaction rate. Based
on a 98% compaction rate, only one of the measurements of Harris’s work taken by ArkCon would have passed.
After construction of the Building began atop of Harris’s earth-fill work, the
Building structure began to settle—i.e. sink into the ground by some amount—and
eventually crack. While some remedial measures were discussed and attempted, the
structure was ultimately torn down, the earth-fill work was redone by a third party, and
the Building was re-built.
After the original Building structure failed and Hartford took over supervision of
the project for Limestone, Hartford hired Reddick, an architect, to help complete the
project. Hartford later retained Reddick as an expert witness in the instant matter. On
February 9, 2015, Reddick authored a report that assigned to Harris the cost of
replacing the Building based on its failure to comply with the 98% compaction rate. He
wrote:
3
The fact that the pad failed is evidence that the industry standard was not
followed by Harris for this work and thus the damages were all caused by
this failure to comply.
The Building pad was the responsibility of Harris Company to construct. Of
the seven (7) field densities taken on the building pad, including retesting
of failed portions, only one (1) reached the minimum specified density of
98% Standard Proctor. In the opinion of this writer, Harris failed to meet
the industry’s established “standard of care” and thus has assessed the
damages to be $234,970.00.
(Doc. 70-12, p. 5) (emphasis added). Reddick was questioned about this conclusion
during his deposition, and he testified in relevant part as follows:
Q:
A:
Q:
A:
You are not an engineer?
No, sir.
You do not intend to express any engineering opinions in this
lawsuit, correct?
No, sir.
(Doc. 61-6, p. 43).
Q:
A:
Q:
A:
The conclusion that the pad failed, I assume you’re talking about
from a structural standpoint; is that correct?
Yes.
And would you agree with me that a structural failure is an
engineering question?
Yes.
(Doc. 61-6, p. 78).
Q:
A:
Q:
A:
Q:
A:
Q:
A:
Are you aware of any engineer that has said or opined that a 3
percent difference between the 98 percent and the 95 percent
compaction rate caused or contributed to this building’s failure?
I haven’t talked to any about it.
Are you aware of any opinion along those lines?
No.
And you do not have any knowledge or expertise with regard to
whether or 3 percent [sic] difference would cause or contribute to a
building failure, would you?
It would be a question I would ask a structural engineer.
And so you do not – go ahead.
If there were discrepancies that I was concerned about, I would
depend upon my engineer to tell me whether they were significant
or insignificant.
4
Q:
A:
Q:
A:
Q:
A:
Q:
A:
Q:
A:
You’re not going to express those opinions, because you’re not an
engineer?
Correct.
So why have you not asked an engineer whether the 3 percent
discrepancy would have caused the building failure in light of the
fact you’re giving the opinion in this lawsuit that the pad and the
building failed because of a 3 percent compaction difference?
Well, because my experience is that there’s often a swing of 5
percent in contract documents, depending upon what you’re trying
to do with the soil and what it’s under. And so, if 5 percent is
significant, I would think 3 percent would be pretty significant as
well. That’s just my opinion.
Well, that’s your opinion, but that’s not a professional opinion.
True.
And you don’t have any engendering [sic] expertise to make that
statement?
Just my experience of reading specs and writing specs for 35
years.
And, again, the question is: You do not have an engineering basis
to give that opinion?
No.
(Doc. 61-6, pp. 90-91).
Applying Rule 702 and the Eighth Circuit’s three-factor test, Reddick is not an
expert who is qualified to testify as to the causation of the structural failure of the
Building. In his report, Reddick opines that the damages to the building structure “were
all caused by” Harris’s failure to comply with the 98% compaction rate. (Doc. 70-12, p.
5). When pressed on how he came to that conclusion, however, Reddick
unambiguously demonstrated that he is not “qualified to assist the finder of fact” on this
matter, nor is his offered evidence “reliable or trustworthy in an evidentiary sense.”
Johnson, 754 F.3d at 561. Rather, Reddick stated that he would have to consult a
structural engineer to determine whether a 3 percent difference would cause or
contribute to building failure. He further admitted that his conclusion that “3 percent
5
would be pretty significant” was just his opinion, based on his understanding of
construction contracts, and that it was not a “professional opinion.” (Doc. 61-6, p. 91).
Reddick has, in other words, specifically disavowed his expertise in this area.
See American Auto. Inc. Co. v. Omega Flex, Inc., 783 F.3d 720, 723 (8th Cir. 2015)
(affirming a district court’s decision to exclude expert testimony regarding product
design and warnings after a metallurgy expert “specifically disavowed” his expertise in
those areas). It is not unusual for district courts to limit the scope of an expert’s
testimony to ensure that it does not exceed his area of expertise. “We have found no
abuse of discretion in the limitation of the testimony of witnesses who, although
considered experts in certain areas, were not well-versed in the particular discipline
relevant to their testimony.” Smith v. Rasmussen, 249 F.3d 755, 759 (8th Cir. 2001)
(listing cases). This task of ensuring that an expert’s testimony does not exceed its
proper scope is particularly important for the district court to undertake when the
testimony goes directly to “the primary issue upon which the jury ha[s] to make a
judgment.” Wheeling Pittsburgh Steel Corp. v. Beelman River Terminals, Inc., 254 F.3d
706, 715 (8th Cir. 2001) (reversing a district court’s decision to allow an expert in flood
management to testify about the standard of care required in the warehouse industry).
Given this Court’s “gatekeeping responsibility to ‘ensure that an expert's testimony rests
on a reliable foundation and is relevant to the task at hand,’” allowing Reddick to testify
to the causation of the structural failure of the Building would be an abuse of its
discretion and a dereliction of its gatekeeping duties. Id. at 714-15 (quoting Kumho Tire
Co., Ltd. v. Carmichael, 526 U.S. 137, 141 (1999)).
6
Harris next asks the Court to bar Reddick from testifying about “other engineering
issues.” While Reddick did state during his deposition that he was not an engineer and
did not intend to express any engineering opinions, the Court finds Harris’s Motion to be
far too broad to grant. This is so primarily because there is a substantial overlap
between the responsibilities of an engineer and an architect. Indeed, this overlap has
been recognized by many courts. See Sch. Dist. No. 11 v. Sverdrup & Parcel and
Assoc., Inc., 797 F.2d 651 (8th Cir. 1986) (engineer was qualified to offer opinion in
regard to performance of architect); Corner Pocket v. Travelers Ins., 2013 WL 3993967,
*4 (W.D. Pa. Aug. 5, 2013) (architect was qualified to testify about an engineering
matter because “the roles of architects and engineering intersect significantly”); Imperial
Trading Co., Inc. v. Travelers Prop. Cas. Co. of Am., 2009 WL 2408412 (E.D. La. July
28, 2009) (architect was qualified to testify about an engineering matter).
Reddick has nearly 40 years of experience as an architect, and has been
President of Guest+Reddick Architects, Inc. for nearly a decade. His qualification as an
expert architect cannot be disputed. Given the overlap in job responsibilities and the
resulting difficulty in precisely defining what constitutes an engineering issue versus an
architectural one, the Court cannot say that Reddick’s substantial experience as an
architect leaves him unqualified to opine on any issue that may be categorized as an
engineering one. Certainly, there are some engineering issues—such as the causation
issue discussed above—that exceed the scope of Reddick’s expertise. But to
categorically bar Reddick from testifying about so-called “engineering issues” would be
beyond what Rule 702 allows.
7
To summarize , Reddick is prohibited from testifying about the causation of the
structural failure of the Building . However, due to the difficulty in defining what
constitutes an engineering issue versus an architectural one , and due to the overlap
between the duties of an engineer and an architect, he is not categorically barred from
testifying about what might be classified as engineering issues. Instead , the Court will
determine the propriety of his testimony on such issues on a case-by-case basis.
Harris's First Motion in Limine (Doc. 59) is, therefore, GRANTED IN PART AND
DENIED IN PART.
IT IS SO ORDERED on this
f'I..
Jkday of Novembe ,
OKS
S DISTRICT JUDGE
8
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.
Why Is My Information Online?