Trustees of The Operating Engineers Pension Trust et al v. Smith-Emery Company

Filing 186

FINDINGS OF FACT AND CONCLUSIONS OF LAW signed by Judge Christina A. Snyder: The Court concludes that plaintiffs are entitled to unpaid contributions as set forth in these findings of fact and conclusions of law, as well as double prejudgment interes t on these unpaid contributions and attorneys' fees and costs related only to their successful claims. The parties shall address the issue of attorneys' fees for plaintiffs and potential attorneys' fees for defendant by way of post-judgment motions. (Made JS-6. Case Terminated.) (gk)

Download PDF
JS-6 1 2 3 4 5 6 7 8 UNITED STATES DISTRICT COURT 9 CENTRAL DISTRICT OF CALIFORNIA 10 WESTERN DIVISION 11 12 13 14 15 16 17 18 19 TRUSTEES OF THE OPERATING ENGINEERS PENSION TRUST, ET AL. ) ) ) ) Plaintiffs, ) ) vs. ) ) ) SMITH-EMERY COMPANY; ) ) ) Defendant. ) ________________________________ ) I. Case No. CV 09-1476 CAS (VBKx) FINDINGS OF FACT AND CONCLUSIONS OF LAW INTRODUCTION 20 On March 29, 2009, plaintiffs Trustees of the Operating Engineers Pension Trust, 21 Trustees of the Operating Engineers Health and Welfare Fun, Trustees of the Operating 22 Engineers Vacation Holiday Savings Trust, and Trustees of the Operating Engineers 23 Training Trust (collectively, “Trustees”) initiated this suit to collect trust fund 24 contributions from defendant Smith-Emery Company (“SEC”), pursuant to the 25 Employee Retirement Income Security Act (“ERISA”), 29 U.S.C. §§ 1132(g) and 1145. 26 Dkt. No. 1. The gravamen of plaintiffs’ complaint is that defendant has failed to make 27 all of its required fringe benefit remittances to the Trusts, based on a series of collective 28 bargaining agreements (“CBA”) that defendant entered into with the International Union 1 2 3 4 of Operating Engineers, Local Union No. 12 (“Local 12”). On November 2, 2012, the Court issued its ruling on the parties’ cross motions for summary judgment. Dkt. No. 129 (“MSJ Order”). In the MSJ Order, the Court found that the results of a 2006 arbitration proceeding 5 between Local 12 and SEC did not collaterally estop SEC from claiming that certain 6 work is or is not covered by the CBA. Second, the Court found that the scope of the 7 parties’ agreement is, in general, defined as “all field work inspection by licensed or 8 registered Building/Construction Inspectors of concrete, steel, masonry work and non- 9 destructive and/or grading inspection . . . .” Ex. 1 at 2. This phrase was (and will be) 10 referred to as the “Coverage Definition.” The Court found that the crucial question is 11 determining what work, as a matter of custom and practice, has been performed by a 12 licensed or registered Building/Construction Inspector (“BCI”) employed by SEC, and 13 that SEC would owe contributions to the trust funds for the performance of this covered 14 work, whether or not the work was performed by SEC employees classified as BCIs. 15 The text of the CBAs, and Appendix B to the agreement, which sets forth an illustrative 16 list of covered work, are, of course, the starting point for this inquiry. 17 As to the various categories of work included in plaintiffs’ revised audit, the Court 18 found that (1) spray-applied fireproofing, (2) high strength bolting, (3) water control 19 inspection, and (4) steel shop inspection are covered work. All of these types of work 20 are expressly set forth in Appendix B. Second, based on the deposition testimony of 21 James Partridge, SEC’s President, the Court found that “torque testing” and “anchor bolt 22 testing” are covered work. Third, the Court found that material disputes of fact 23 remained as to whether the remaining categories of work identified in plaintiffs’ audit 24 are covered. These were adhesion/cohesion, proof load testing, pull testing, epoxy 25 26 27 28 2 1 dowels, steel framing and backing, expansion bolt inspection work, building inspection, 2 project inspection, and lab tech away. 3 The Court further found that material disputes of fact existed with respect to the 4 statute of limitations; cash disbursements in Parts I and K of the audit; the issue of 5 contributions for holiday time; and inspection work performed on several public works 6 projects for the Los Angeles Unified School District, which comprised part H of the 7 audit. The Court granted summary judgment in plaintiffs’ favor on the issue of travel 8 time in part B of the audit. 9 Thereafter, the Court held a bench trial in this action from December 11 to 10 December 14, 2012, and from December 18 to December 19, 2012. Subsequently, 11 plaintiffs and defendant each filed a closing argument brief on February 11, 2013. 12 Plaintiffs also filed an Evidentiary Brief, and defendant filed a Motion to Strike. Each 13 party filed a response to the respective evidentiary briefs on February 22, 2013. After 14 considering the parties’ arguments, the Court finds and concludes as follows. 15 II. 16 17 18 FINDINGS OF FACT 1. To the extent necessary, each of these findings of fact may be deemed to be a conclusion of law. 2. To the extent that these findings depart from the Court’s prior order 19 granting in part and denying in part plaintiffs’ motion for summary judgment and 20 denying defendant’s motion in its entirety, the findings in the instant judgment control, 21 as they follow from the evidence presented at trial. See Fed. R. Civ. P. 54(b) (“[A]ny 22 order or other decision, however designated, that adjudicates fewer than all the claims or 23 the rights and liabilities of fewer than all the parties does not end the action as to any of 24 the claims or parties and may be revised at any time before the entry of a judgment 25 adjudicating all the claims and all the parties’ rights and liabilities.”). 26 27 28 3. In brief, plaintiffs claim that SEC failed to pay mandatory contributions to various trust funds under the terms of a series of collective bargaining agreements 3 1 between SEC and Local 12. After initiating this suit, plaintiffs conducted an audit of the 2 available books and records, which is the basis for their claims. 3 After various revisions, the following sections of the “revised audit” remain: Part 4 A of the audit makes a claim for clerical errors that resulted in contributions not being 5 paid. Part B covers contributions that are owed for time spent by otherwise covered 6 employees traveling outside of Southern California. 7 Third, Parts E, F, and G encompass contributions that are owed for the work 8 performed by non-union subcontractors on three hospital projects. Part E covers work 9 performed for the Los Angeles County–USC Medical Center project; Part F pertains to 10 the UCLA Medical Center project in Santa Monica; and Part G covers work on the 11 UCLA Medical Center project in Westwood. Ex. 523-1. The types of work for which 12 plaintiffs are making a claim in these parts are styled as: (1) adhesion/cohesion 13 inspection; (2) steel shop inspection; (3) torque test; (4) high strength bolt; (5) 14 fireproofing; (6) lab tech away; (7) pull test; and (8) epoxy dowel inspection. 15 Finally, Parts I and K assert that SEC made “cash disbursements” to various non- 16 union inspection subcontractors who performed inspection work for SEC within Local 17 12's jurisdiction, and that contributions should have been paid for these disbursements. 18 A. Background 19 4. Smith Emery Company (“SEC”) is over 100 years old and has performed 20 construction inspection work on a number of major projects throughout California, 21 including the Los Angeles Coliseum and the new San Francisco-Oakland Bay Bridge. 22 RT 12/13pm, 86:1–10. SEC employs Building/Construction Inspectors (“BCIs”) to 23 complete these inspection tasks. 24 5. BCIs are individuals who perform various inspection and testing activities 25 during the construction of occupied structures. RT 12/18, 64:19–65:1. Determining 26 what comprises the duties of a BCI is the subject of the instant lawsuit. 27 28 4 1 6. BCIs can obtain certifications in various disciplines, including reinforced 2 concrete, pre-stressed concrete, structural masonry, and spray-applied fireproofing, 3 among others, by passing an examination offered by the International Code Council. RT 4 12/11, 41:24–42:16. After obtaining a certification in a particular discipline, some 5 jurisdictions (such as the City of Los Angeles) offer licenses in these disciplines, which 6 permit the inspector to perform inspections within that jurisdiction. “Deputy BCIs” are 7 individuals who have obtained a certification and a license to act as a building inspector 8 for that particular jurisdiction in a particular field; these inspectors are called “deputy 9 building inspectors” in the City of Los Angeles. RT 12/14, 23:4–9. 10 7. Laboratory technicians are individuals under the employ of a materials 11 testing laboratory who perform various materials tests on construction projects. RT 12 12/18, 54:2–13. According to witnesses for both parties, these individuals are also 13 known as “field materials testers.” RT 12/12, 111:3–6; RT 12/18 54:12–13. 14 8. Smith Emery Laboratories (“SEL”) is a separate corporate entity that was 15 formed in 1999. RT 12/13pm, 88:16–18. Formerly, it was a division of SEC. James 16 Partridge, President of SEC and SEL, testified (as did others) that there was no change in 17 the way in which SEL employees operated after the separation into two corporate 18 entities. RT 12/13pm, 90:18–93:22, 95:13–96:1; RT 12/14, 75:8–20. And both before 19 and after the separation into two different legal entities, SEL sent lab personnel into the 20 field to perform certain work on construction projects. RT 12/14, 74:11–75:7. 21 9. At trial, Partridge testified that lawsuits arising out of the Northridge 22 earthquake were the impetus for incorporating SEL as a separate corporation, as these 23 suits threatened to force the company into bankruptcy. Partridge noted that Judge 24 Carolyn Kuhl of the Los Angeles Superior Court found that SEC and SEC’s licensed 25 BCIs who were sued individually were immune from suit, on the grounds that SEC’s 26 deputy or licensed BCIs performed the same function as the building inspectors 27 employed by the City of Los Angeles, and therefore should be entitled to the same 28 5 1 governmental immunity. RT 12/14, 21:19–23:16. Although the inspectors and 2 laboratory personnel had always operated out of separate departments, on the advice of 3 counsel, SEC decided to spin off the laboratory department as a separate company to 4 avoid “clouding” the immunity afforded to the deputy BCIs. RT 12/13pm, 94:18–95:3; 5 RT 12/14, 23:22–24:5. 6 10. Currently, SEC employs BCIs but no laboratory technicians. SEL, on the 7 other hand, does not employ BCIs, but employs laboratory technicians who sometimes 8 perform work in the field. RT 12/13pm, 86:12–18, 88:14–15. 9 B. 10 11 National Labor Relations Board Certification and Collective Bargaining Agreements 11. In 1969, the NLRB certified “all field inspectors in [SEC’s] Los Angeles 12 Physical Testing Department, including deputy concrete inspectors, deputy structural 13 steel inspectors and deputy masonry inspectors.” Ex. 244-4; RT 12/13pm, 85:10–14. 14 This certification specifically excluded “all office clerical employees, professional 15 employees, laboratory employees, guards and supervisors as defined in the [National 16 Labor Relations Act].” Ex. 244-4. Thereafter, Local 12 and SEC entered into a series of 17 collective bargaining agreements (“CBAs”). 18 19 20 12. Since its inception, SEL has never been a signatory to any CBA with Local 12 or any other union. 13. From 1976 until 2004, Partridge was either a participant in or in charge of 21 negotiations with Local 12 over the collective bargaining agreement between these 22 parties. RT12/13pm, 96:16–97:1. Thereafter, Gregory Wolflick, one of defendant’s 23 attorneys in the present action, served as lead negotiator. 24 25 26 27 28 14. All three CBAs relevant to this litigation are three-year agreements, beginning on August 1 of 2001, 2004, and 2007. Exs. 1, 2, and 3. 15. It is undisputed that SEC is not a signatory to the Master Labor Agreement (“MLA”), which is a collective bargaining agreement between Local 12 and the 6 1 Southern California Contractors Association (“SCCA”). RT 12/12, 96:16–97:1. See Ex. 2 99 (Master Labor Agreement for 2007–2011). The MLA contains various job or wage 3 classifications listed in three groups, two of which the parties argue are relevant here. 4 “Group I” includes a classification called “Field Soils and Materials Tester,” among 5 other types of work. “Group II” includes most or all of the categories expressly listed in 6 SEC’s CBA—reinforcing steel, reinforced concrete, pre-tension concrete, post-tension 7 concrete, structural steel and welding inspector, and other similar job descriptions. Ex. 8 99–111. The parties agree that the testing work claimed by plaintiffs in this litigation 9 would be covered work under the MLA, but they dispute whether SEC’s CBA also 10 covers this work. 11 16. In 2004, Local 12 proposed adding a “Group I” to the contact with SEC, a 12 demand that SEC rejected. RT 12/12, 117:2–22; Depo. of Steve Billy, 48:4–20.1 Local 13 12 also made a demand in 2007 to add Group I to SEC’s contract, as well as a Group III, 14 or “the same contract that inspection labs that are working in the [SCCA] have.” RT 15 12/12, 121:20–21. SEC again rejected the demand. Id. at 121:22–23. 16 17. In particular, Local 12 sought to add the job classification “Field Soil 17 Inspection and Soil and Material Testing,” or “Field Soils and Material Tester” to the 18 CBA with SEC. Ex. 58-3, 27–28. Local 12 officers testified that these proposed 19 additions refer to soils and earthwork only, not to material testing in general that was 20 performed by SEL lab technicians at issue in this lawsuit. RT12, 125:24–126:10; Billy 21 Depo. 74:17–76:13. It is plaintiffs’ contention in this lawsuit, of course, that the 22 material testing work performed by laboratory technicians was already covered by 23 SEC’s CBA. Plaintiffs note that the “Appendix B” of this proposed agreement describes 24 a category of work as “Earthwork (Soils and Material Tester).” This proposed category 25 of work details work involving only soils and no other building materials. Ex. 58-28. 26 27 28 1 The parties, by way of a stipulation, submitted excerpts of the deposition testimony of Steve Billy, a former Trustee, in lieu of him testifying in person at trial. See Ex. 706. 7 1 18. Partridge, on the other hand, testified that this “Group I” and the Soils and 2 Material Tester covers all of the services that are in dispute in the instant suit—“post 3 installed anchors, drilled in anchors, proof loading, torque testing, epoxy dowels, 4 adhesion and cohesion,” and “a couple other items . . . but every single one of those 5 items is work that is required by the building code to be done by group one employees.” 6 RT 12/14, 35:4–9; see also id. 38:1–6. He further testified that when Local 12 first 7 raised the issue of material testing in SEC’s CBA, he subcontracted the work to a master 8 labor agreement holder, Cignet Laboratories, who did the work in dispute with “Group 9 I” employees. Id. 39:7–19, 40:1–4. 10 19. Billy also testified that during his entire time as a negotiator for Local 12, 11 the parties to the negotiations never discussed the addition of adhesion/cohesion testing, 12 torque testing, or proof load testing. Billy Depo. 64:5–65:2, 71:13–21.2 According to 13 Billy, although these types of work are not “spelled out” in the CBA, they are 14 nevertheless covered if the type of work is “covered inspection” under the contract 15 between SEC and the contractor or facility owner for whom SEC is performing 16 inspection. In other words, whatever “is required to be inspected on a project is covered 17 work,” as long as its broadly encompassed within one of the categories of work listed in 18 the CBA. Id. at 70:4–22. 19 C. 2006 Arbitration between SEC and Local 12 20 20. The parties also dispute the import of a 2006 arbitration award that resulted 21 from a grievance Local 12 brought against SEC. Among other findings, the arbitrator 22 found that “offsite concrete batch inspection” is not bargaining unit work, and that 23 “anchor bolt testing inspection work” and “water control inspection work” are 24 bargaining work. Ex. 12-12. 25 26 27 28 2 Billy served as Treasurer for Local 12 from 1982 until his retirement on or about April 1, 2012. Billy Depo. 12:18–20, 26:9–18. As Treasurer, he was responsible for negotiating contracts on behalf of Local 12. Id. 26:19–22. 8 1 21. Plaintiffs argue that because the arbitration award does not distinguish 2 between the testing of high strength anchor bolts and other types of anchor bolts, the 3 award should be read to cover all types of torque testing on all different types of bolts. 4 The Court finds that the evidence at trial does not support this contention. As will be 5 discussed in greater detail, the testimony of a number of witnesses demonstrated that 6 pre- and post-installed anchors should be considered separately for purposes of the CBA. 7 Because the arbitration award makes no mention of these important distinctions, among 8 others, it is at best ambiguous as to the proper scope of the CBA. Accordingly, the 9 Court finds that it should be accorded little weight, if any, in deciding what work is 10 covered by the CBA. 11 D. Regulatory Background 12 22. The Office of Statewide Health and Planning (“OSHPD”) is the entity 13 responsible for overseeing the construction of various types of medical facilities 14 (including renovations to existing facilities) in the State of California. Cal. Admin. 15 Code, Title 24, Part 1, § 7-103.3 Because all of the projects at issue in Parts E, F, and G 16 of the revised audit are hospital construction projects, OSHPD is responsible for 17 overseeing construction of these facilities. 18 23. The California Division of State Architect (“DSA”), on the other hand, has 19 jurisdiction over the construction of all public school, community college, and state 20 owned or leased essential service buildings. Cal. Admin. Code, Title 24, Part 1, § 4-202; 21 RT 12/18 156:21–25. 22 24. Title 24 as a whole is known as the California Building Standards Code 23 (“CBSC”). See Title 24, Part 2, § 101.4 Part 1 of Title 24 is known as the California 24 Administrative Code or the California Building Standards Administrative Code. See 25 26 3 OSHPD is also referred to as “the Office” throughout the relevant regulations. 27 28 4 All further references herein are to the 2007 edition of these California regulations. 9 1 Title 24, Part 1, Preface. The California Building Code (“CBC”) is set forth in Title 24, 2 Part 2. 3 25. OSHPD and DSA are responsible for enforcing the requirements of the 4 California Building Code (“CBC”) in Title 24, Part 2, in their respective fields. The 5 parties focused on the requirements of the 2007 version of the CBC at trial, much of 6 which is “co-adopted” by DSA and OSHPD, along with other agencies. RT 12/18 7 157:23–158:13. 8 26. 9 The CBSC distinguishes between two types of “inspectors.” First, OSHPD requires each construction project to employ a “hospital inspector of record” (“IOR”). 10 Cal Admin. Code § 7-141(f). The IOR is responsible for ensuring that inspection is 11 completed in compliance with a Testing, Inspection, and Observation (“TIO”) program 12 that has been approved by OSHPD, under the direction of the architect or engineer in 13 charge of the project. Id. § 7-141(d), (e); id. § 7-145(a)(3); RT 12/11, 44:15–25; RT 14 12/14, 60:3–16, 113:2–9; Ex. 803 (“Instructions for Testing, Inspection, and Observation 15 Program”). This requires the IOR to “maintain field records of construction progress for 16 each day or any portion of a day that they are present at the project site location.” Id. § 17 7-145(a)(6). To become an IOR, an individual must submit an application to OSHPD 18 and take an examination, which then licenses the individual in one of three classes of 19 inspection. Cal. Admin. Code § 7-200; RT 12/18, 14:1–15:11. 20 27. The other type of inspector is a “special inspector”—the individual 21 responsible for performing the various “special inspections” required by the CBC. Cal. 22 Admin. Code § 7-141(f); see also CBC § 1701A.4 9 (“the owner shall employ one or 23 more special inspectors who shall provide inspections during construction”). The 24 “BCIs” at issue in this litigation are all considered to be “special inspectors” within the 25 meaning of the CBC. “Special Inspection” is defined as the “[i]nspection . . . required 26 [in the CBC] of the materials, installation, fabrication, erection or placement of 27 components and connections requiring special expertise to ensure compliance with 28 10 1 2 approved construction documents and referenced standards.” CBC § 1702A.1. 28. Both OSHPD and DSA require construction inspection to be completed in 3 conformance with Chapter 17A of the CBC, which is the primary section at issue here. 4 This section “govern[s] the quality, workmanship and requirements” for “structural tests 5 and special inspections.” CBC § 1701A.1. This chapter requires the owner of a facility 6 to “employ one or more special inspectors to provide inspections during construction on 7 the types of work listed under Section 1704A. The special inspector shall be a qualified 8 person who shall demonstrate competence, to the satisfaction of the building official, for 9 inspection of the particular type of construction or operation requiring special 10 inspection.” Id. § 1704A.1. The categories of work covered by Chapter 17A include 11 steel inspection, welding inspection, high-strength bolt inspection, concrete construction, 12 masonry construction, soils inspection, and sprayed fire-resistant materials. Id. § 13 1704A.1–14. 14 29. In addition to inspection, the CBC sets forth various tests that must be 15 performed on building and construction materials. OSHPD requires that the “testing 16 program” for a project “identify materials and tests to be performed on the project,” as 17 well as “the firm(s) and/or individual(s) to perform each of the required tests.” Cal. 18 Admin. Code § 7-141(e). 19 OSHPD further mandates that “the architect or engineer in responsible charge 20 shall establish and administer the testing program. Where job conditions warrant, the 21 architect or engineer may waive certain specified tests contingent upon the approval of 22 the Office.” Id. § 7-149(a). To conduct the tests, “[t]he governing board or authority of 23 a health facility shall select a qualified person or testing laboratory as the testing 24 agency. . . . The selected person or testing laboratory must be approved by the architect 25 or engineer in responsible charge.” Id. § 7-149(b) (emphasis added); see RT12/18, 26 34:18–21. “Qualified person or testing laboratory” is not further defined in the 27 California regulations. 28 11 1 30. DSA, on the other hand, has a special program for approving testing 2 laboratories known as the Laboratory Evaluation and Acceptance (“LEA”) program. RT 3 12/18, 146:14–147:23. Eric France, the current Administrator of the LEA program, 4 testified at trial. He previously was employed both as a special inspector and a 5 technician for a laboratory testing facility in Sacramento. RT 12/18, 148. The DSA 6 issues “letters of acceptance,” also referred to as “licenses,” to testing agencies that are 7 approved for “the inspection of work and testing of materials” on projects under the 8 DSA’s jurisdiction. Cal. Admin. Code § 4-335(b); RT 12/18, 149:15–23. To obtain a 9 letter of acceptance, a physical testing laboratory must go through a “fairly cumbersome 10 submittal,” which includes on site inspections and review of a written application. RT 11 12/18, 149:24–150:10; see also id. at 57:18–62:23. DSA issues letters of acceptance to 12 companies that perform both inspection and testing services but does not issue 13 acceptance letters to companies that perform only inspections; the latter lack the required 14 physical testing laboratory. Id. at 159:11–14, 168:17–169:4. 15 31. All CBC-mandated testing work for a project falling under DSA’s 16 jurisdiction must be performed by an LEA-approved materials testing laboratory. RT 17 12/18, 156:11–17; 159:21–160:5.5 An LEA-approved materials testing laboratory that 18 also employed special inspectors could perform both testing and special inspections on a 19 DSA-governed project. 20 32. France testified that this testing work includes pull testing and torque 21 testing, which must be performed by an LEA-approved materials testing laboratory on 22 DSA-governed projects. RT 12/18, 162:11–16. In addition, ultrasonic testing and 23 magnetic particle testing must be performed by qualified representatives of a testing 24 25 26 27 28 5 For special inspections on a project under DSA’s jurisdiction, a school district may contract with an LEA-approved laboratory that also performs inspections or with individual special inspectors. There are also certain inspections, such as geothermal and technical inspections, that are not “special inspections” as that term is understood. These types of inspections may be performed by laboratory personnel. RT 12/18, 174:11–20. 12 1 2 laboratory on DSA-governed projects. Id. at 162:17–163:17. 33. SEL, but not SEC, is an LEA-approved laboratory. See Ex. 802 3 (“Laboratories Qualifications” page from DSA website for Smith-Emery Laboratories, 4 Inc.”); RT 12/18, 57:3–18.6 SEL has the required physical materials testing laboratory, 5 has gone through the extensive application and approval process, and is overseen by a 6 civil engineer, John Latiolait. SEL also has a number of other “licenses” that allow it to 7 do testing work on other building projects, including licenses with the Army Corps of 8 Engineers, the California Department of Transportation, and the City of Los Angeles. 9 34. Unlike special inspectors, the laboratory technicians at SEL do not 10 individually hold licenses or certifications in various construction inspection specialties. 11 They instead rely on the licensing of the laboratory (for DSA-governed projects, for 12 example) to qualify them to perform their testing work. Laboratory technicians are also 13 known as “materials testers.” Id. SEL does not employ any special inspectors or 14 “BCIs,” as that term is understood by the parties, and does not do any “inspection” work. 15 RT 12/18, 54:2–13, 55:17–66:1. 16 35. According to the plain terms of the regulations at issue, and confirmed by 17 France, the DSA requirement that all testing be performed by an LEA-approved 18 laboratory does not apply to projects under OSHPD’s jurisdiction. RT 12/18, 19 165:23–166:17. As noted, OSHPD only requires that testing be performed by a 20 “qualified person or testing laboratory,” as OSHPD has not co-adopted Title 24, Part 1, 21 section 3-335 of the California Administrative Code. And because the projects at issue 22 are hospital facilities under OSHPD’s jurisdiction, DSA’s regulation, which requires that 23 all testing work be performed by an LEA-approved testing laboratory, does not apply. 24 25 26 27 28 6 France and John Latiolait, Vice President and General Manager of SEL, testified that “Masonry” should not have been checked under the “Inspection Qualifications” section of this information sheet; this indication was in error. RT 12/18, 124:21–125:8, 166:21–168:16. 13 1 36. However, multiple witnesses testified that SEC was required by the facility 2 owners to contract with a DSA-licensed laboratory in order to provide testing services 3 on the hospital projects at issue. RT 12/14, 44:15–24; RT 12/18, 17:10–18:17, 56:6–21. 4 For each project, SEC and the project owner entered into a contract for the provision of 5 inspection and testing services. SEC then subcontracted all the testing work on the 6 project to SEL. RT 12/14, 124:16–125:8; see Exs. 52, 534, 535 (Contracts between SEC 7 and project owners for USC Hospital, and UCLA Santa Monica and Westwood 8 hospitals). SEL, in turn, billed SEC for the testing services that it performed on these 9 projects. Ex. 40; RT 12/18, 71:16–23. SEC’s witnesses credibly testified that these 10 facility owners relied on SEL’s DSA license in deciding that SEL was a qualified 11 “testing laboratory” employing “qualified persons” for purposes of compliance with 12 OSHPD’s regulations. Apparently, this is the custom and practice in the industry.7 13 37. Michael Weiler was formerly the IOR on the UCLA Westwood 14 replacement hospital project, from 1999 until 2002.8 As IOR, he was employed by the 15 project owner, in this case the University of California Regents—not by SEL or SEC. 16 RT 12/18, 11:16–14:1. He testified that as the IOR for the project, he relied on SEL’s 17 18 19 20 21 22 23 24 25 26 27 28 7 Plaintiffs’ witness David Barton, the person in charge of inspector training for plaintiffs, testified that after tests are performed, the results must be signed off by a civil engineer, who is employed by the “testing agency” for a project. RT 12/11, 70:23–71:10. He further testified that the testing agency must be licensed in order to oversee work such as “proof load” and “pull testing,” although he did not know which agency licensed the laboratory for projects under OSHPD’s jurisdiction. Id. at 76:6–15. 8 Although he was employed as an IOR outside the time period directly relevant to this litigation, his testimony concerns how testing was performed on this project from its inception, as required by the relevant contracts, and therefore informs the analysis here. He also served as Quality Control manager for the LA USC project from 2002 until 2008, under the employ of another company. He credibly testified to his personal familiarity with BCIs who worked on both of these projects; his observations in the field of laboratory technicians and BCIs performing tests and inspections; and his review of laboratory and inspection reports confirming the same. RT 12/18, 15:22–17:11, 26:4–29:22, 36:11–23. 14 1 LEA approval in determining that its employees were qualified to perform the testing 2 work at issue. RT 12/18, 17:18–18:20. According to Weiler, SEL laboratory 3 technicians were the only individuals “qualified” to perform testing work on the UCLA 4 Westwood project, because they were the only individuals working under the employ of 5 an approved testing laboratory. RT 12/18, 44:12–46:2. Moreover, Weiler testified that 6 he would have known if other qualified individuals were performing testing on the 7 project, because the testing reports would have come from an entity besides SEL. Id. 8 The only testing reports that he actually received came from SEL; “laboratory testing 9 was not performed by Smith-Emery Company.” RT 12/18, 49:21–22. 10 38. Of course, none of this evidence directly demonstrates what work is 11 covered by the CBA. But the fact that SEL is not a signatory to the CBA, and that SEL 12 was the only entity approved to perform testing work on the three hospital projects, is 13 evidence that this “testing” work is not covered by the CBA. As will be discussed, 14 numerous witnesses testified that only laboratory technicians performed testing work on 15 these three projects and others—not SEC’s BCIs. 16 While SEC would be liable to plaintiffs if the work was covered by the CBA and 17 SEC nonetheless subcontracted the work to SEL, the regulatory background and custom 18 and practice in the field demonstrate there is a rough dichotomy between “testing” and 19 “inspection” work, mirroring the divide between SEC and SEL.9 20 E. Work of SEC’s Building/Construction Inspectors 21 39. As noted, plaintiffs are claiming that contributions are owed for work that is 22 23 24 25 26 27 28 9 If in fact SEC and SEL were the same corporate entity—an inspection and LEAapproved materials testing laboratory under one roof—then it appears that BCIs could have performed the “testing” work at issue, as BCIs are, if anything, overqualified to perform this testing work. They have significantly more training and expertise than laboratory technicians. Because SEC BCIs do not work for a LEA-licensed testing laboratory, however, SEC offered undisputed testimony that they could not perform testing work on the hospital projects at issue absent a variance granted by the particular project’s IOR. RT 12/14, 114:20–115:22. 15 1 styled as: (1) adhesion/cohesion inspection and fireproofing; (2) steel shop inspection; 2 (3) torque test; (4) high strength bolt; (5) pull and proof load test; (6) epoxy dowel 3 inspection; and (7) lab tech away. To determine what of this work is “the work” of 4 SEC’s BCIs, the Court framed the issue at trial as: “whether any tasks performed by lab 5 personnel have as a matter of custom and practice been treated as work done by 6 inspectors, such that contributions are appropriate.” RT 12/14, 86:1–4. The Court 7 discusses the relevant course of performance below. 8 9 (1) 40. Adhesion/Cohesion and Fireproofing SEC’s witnesses offered uncontroverted testimony that SEC BCIs are 10 involved in some, but not all, aspects of the fireproofing process, of which 11 adhesion/cohesion testing is one facet. 12 41. Two types of fireproofing are at issue. The first is a mixture that is sprayed 13 on to structural steel columns, or “spray-applied fireproofing.” The BCIs’ duties are to 14 ensure that the substance is mixed properly before application; observe the substrate to 15 which the mixture is being applied; and watch the application process and measure the 16 thickness of the mixture as it is being applied. The actual spraying of this mixture is 17 done by the contractor, who is not an employee of SEL or SEC. After observing this 18 process, the BCI completes a daily inspection report documenting their observations. 19 RT 12/14, 104:12–107:25. See, e.g., Ex. 609-1. 20 42. Adhesion/cohesion is a testing method that is used to verify that the spray- 21 applied fireproofing has (1) adhered to the substrate surface (often a steel beam) and (2) 22 that the fireproofing material itself does not pull part. This test is performed by 23 laboratory technicians under the employ of SEL, not BCIs, after the fireproofing 24 material has been allowed to “cure.” RT 12/14, 106:16–107:6. After performing the 25 test, the laboratory technician fills out a laboratory report form. RT 12/18, 69:10–16. 26 27 28 43. SEL technicians also perform dry film thickness testing on intumescent paint. This paint is a fireproof coating applied by the contractor to various surfaces, 16 1 such as handrails and stairways. After the material has dried, the dry film thickness test 2 is performed to test its adhesion to the substrate. RT 12/18, 66:22–67:10. As multiple 3 witnesses testified, BCIs have no role to play with respect to this test either. 4 44. The only witness who testified that inspectors perform the 5 adhesion/cohesion test, David Barton, had not worked in the field for over a decade and 6 lacked personal knowledge of SEC inspections in particular. RT 12/11, 67:18–22. 7 SEC’s witnesses Robert Peet,10 Travis McCall,11 Michael Weiler, John Latiolait,12 Ricky 8 Morgan,13 and Tom Huberty14 all testified to the foregoing division of labor between 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 10 Peet is the current Vice President of Engineering at Smith-Emery International; until 2004, he served in the same role with SEC, but his job duties have remained the same in his new role. He worked briefly as a BCI for SEC beginning in 1997, before becoming a staff engineer later that same year. He became a licensed civil engineer in 1999. From 1997 to the present, he has continually observed and supervised the work of SEC BCIs on various construction projects, and credibly testified as to their job functions. RT 12/14, 88:4–91:23. 11 McCall currently is the sole owner and operator of a construction inspection and management services company, which primarily provides IOR services for construction projects. Previously, he worked as an SEL laboratory technician on the UCLA Westwood project from October 2002 until April or May of 2006. RT 12/18, 143:1–144:24. 12 Latiolait has been Vice President and General Manager of SEL since 2004; he started with SEL as a laboratory engineer in 2000. RT 12/18, 51:4–54:13. He credibly testified as to the work of SEL laboratory technicians under SEL’s employ. 13 Morgan has been employed at SEC since 1994; he became a BCI in 1996, at which time he also became a member of Local 12. He worked on all three hospital projects at issue, and he credibly testified as to the work of laboratory technicians and BCIs on these projects. RT 12/19, 6:19–11:1. 14 Huberty was previously employed with SEC as a BCI from 1994 to 2003, and he has been a member of Local 12 from 1994 to the present. He currently works as an IOR for another company. From 2001 until 2007, he worked as both a BCI and IOR on the UCLA Westwood project. He also credibly testified as to the work of BCIs and laboratory technicians. 17 1 SEC’s BCIs and SEL’s laboratory technicians. RT 12/14, 104:12–107:25 (Peet); RT 2 12/14, 150:5–151:14 (McCall); RT 12/18, 24:13–25:13 (Weiler); RT 12/18, 66:9–73:10 3 (Latiolait); RT 12/19, 20 (Morgan); RT 12/19, 36 (Huberty). 4 45. Plaintiffs also claimed a category of work in their audit called 5 “fireproofing,” but the evidence at trial demonstrated that this category includes time 6 spent by SEL technicians performing adhesion/cohesion and dry film thickness tests, not 7 spray-applied fireproofing inspection.15 For example, plaintiffs claimed a significant 8 amount of the time under “fireproofing” for Jerry Parcone, an employee of SEL who was 9 performing adhesion/cohesion and dry film testing. RT 12/18, 70:25–75:2; Exs. 40-5, 10 512-4–5. Plaintiffs offered no testimony to the contrary or that goes towards proving the 11 remainder of their claim for fireproofing. 12 13 (2) 46. Steel Shop Inspection There was no dispute at trial that steel shop inspection is covered work 14 under the CBA. In Part E of the audit, plaintiffs claim 380.5 hours for work performed 15 by a “Troy McLaurin” (or McLauren), for whom plaintiffs contend that SEC failed to 16 pay contributions. Ex. 523-4. As discussed previously, Part E of the audit pertains to 17 covered work that was allegedly subcontracted to “non-union subemployers” on the 18 UCLA Westwood project. 19 47. However, the evidence at trial demonstrated that Troy McLauren was 20 employed at SEC as a BCI, before passing the OSHPD B certification exam and 21 becoming an IOR on the UCLA Westwood project. RT 12/14, 123:13–23. Plaintiffs 22 offered no evidence to the contrary. Therefore, the Court finds that Troy McLauren is 23 not a “non-union subemployee” as plaintiffs claim. 24 (3) 25 Torque Test; High Strength Bolt; Pull and Proof Load Test; and Epoxy Dowel Inspection 26 27 28 15 Plaintiffs’ auditor did not offer any testimony pertaining to this assessment for fireproofing. 18 1 48. High strength structural steel anchor bolts: These are large bolts made out 2 of high strength structural steel that are used to “anchor” the building and its structure to 3 the foundation. After a template is cast into concrete, the contractor affixes a bolt on top 4 of the anchor and tightens it into place. The ironworker then uses a torque wrench to 5 check whether the anchor bolt has been torqued to the proper foot pounds. These bolts 6 are also referred to as “pre-installed” anchors, as they are installed prior to placement of 7 the concrete. RT 12/14, 96:1–98:22. 8 9 The BCI’s duties with respect to high strength structural steel anchor bolts are to verify that the material meets contract specifications; verify that it is placed in the 10 template to be embedded with concrete to the proper depth; and verify that the bolt has 11 been torqued to the proper foot pounds by the ironworker. Id. The BCI does not 12 actually perform the torquing or torque testing of the bolt but instead observes the 13 ironworker as he performs these tasks. The parties do not dispute that the inspection of 14 high strength structural steel anchor bolts is covered work. 15 49. High strength structural steel bolts (non-anchor): These high strength steel 16 bolts are used to join beams of steel to columns of steel and are not embedded in 17 concrete. The BCI’s duties are to ensure that the proper materials are being used and to 18 observe the ironworker calibrating the “Skidmore Wilhelm” device with the bolt that 19 will be used to join the steel members. After the bolt passes inspection, the BCI will 20 observe the process of connecting the beam and column with the bolt and ensure that the 21 final torquing process (by the ironworker) proceeds according to specifications. RT 22 12/14, 99:3–6, 99:12–104:11. The parties do not dispute that the inspection of high 23 strength structural steel non-anchor bolts is also covered work. Laboratory technicians, 24 on the other hand, have no role to play with respect to these high strength steel bolts, 25 whether of the anchor or non-anchor variety. 26 27 28 50. Post-installed drilled-in anchors: These are bolts that are drilled into concrete after the concrete has hardened, used for connecting various other devices, but 19 1 do not provide structural support to the building. There are numerous types of different 2 anchors made by different manufacturers, most commonly “wedge” anchors, but all are 3 similar in installation and operation. For placement in hardened concrete, the contractor 4 first drills a hole to the correct depth. The BCI verifies the depth of the hole, its 5 diameter, that the hole is clean post-drilling, and reports his findings in an inspection 6 report. RT 12/14, 108:1–112:1. 7 51. Post-installed drilled-in epoxy dowels: These are similar in function to 8 post-installed anchors but involve the use of rebar or a threaded rod in place of an 9 anchor. The BCI’s duties are largely the same with respect to these dowels, with the 10 additional responsibility of verifying that the rebar has been inserted at the correct depth 11 into the epoxy. RT 12/14, 116:18–119:9. 12 52. Multiple witnesses also testified to the role that SEL laboratory technicians 13 play with respect to these post-installed anchors or epoxy dowels. In particular, SEL 14 technicians performed torque testing on the post-installed drilled-in wedge anchors using 15 a calibrated torque wrench, to ensure that the nut on the anchor has been “snapped” to 16 the correct torque. RT 12/14, 111:23–112:9; 146:6–21. Except on rare occasions, BCIs 17 did not perform these tests. 18 53. Laboratory technicians also performed pull or proof load testing, which 19 multiple witnesses testified are essentially synonymous terms. RT 12/14, 148:13–16. 20 These tests are performed on “drop-in” post-installed anchors using a hydraulic ram or 21 hydrometer, in order to ensure that the proper tension has been achieved with the anchor. 22 RT 12/18, 19:1–17. As with torque testing of these post-installed anchors, BCIs did not 23 perform proof or pull tests on hospital projects at issue. RT 12/18, 21:17–22:8, 24 22:22–24:12. BCIs will often, but not always, observe these tests being performed. 25 54. Based on the evidence at trial, the Court finds that all of these tests 26 performed on post-installed anchors have not, as a matter of custom and practice, been 27 the work of SEC’s BCIs. As with the adhesion/cohesion work discussed previously, 28 20 1 multiple witnesses testified that SEC BCIs have never been involved in performing these 2 tests, either before or after the formal separation of SEC from SEL. RT 12/18, 3 18:21–24:12, 36:11–23, 75:8–77:15; RT 12/19, 11:9–18:10; RT 12/14, 106:24–107:6, 4 146:6–147:2, 148:13–150:4; 152:10–22; RT 12/19, 35:1–36:4. 5 A number of plaintiffs’ witnesses also support this finding. For example, Frank 6 Valenti, the current business representative at Local 12 and a former special inspector 7 for SEC from 1988 until 1999, testified that he never performed proof load tests during 8 his time as a special inspector, and that he performed a pull test once in his eleven years 9 on the job. RT 12/12, 109:8–112:2.16 Jason Lampley, a former SEL laboratory 10 technician testifying on behalf of plaintiffs, confirmed that all of the work he performed 11 was in the “post-installation phase”—torque tests, pull tests, and proof load tests—and 12 that the overwhelming majority of the time, inspectors did not “assist” technicians with 13 these tests. RT 12/11, 101:12–102:15, 111:7–23. As noted previously, the inspection 14 tasks related to pre- and post-installed anchors and epoxy dowels are covered work, as 15 there is no dispute that this is the work of a BCI.17 16 55. Plaintiffs also assert a claim for $572.40 for “high strength bolt” inspection 17 work that was performed by Ronald Lai. The testimony at trial, however, revealed that 18 Lai is not an employee of SEC or SEL, but was retained by SEL to perform special 19 inspection work on an SEL-project unrelated to any of the hospital projects at issue. RT 20 21 22 23 24 25 26 27 28 16 Valenti testified that he performed torque tests on post-installed anchors between “one and a million” times per year during his tenure as an SEC BCI. RT 12/12, 103:18–104:13, 107:3–11. He admitted it had been “a long time” since he had performed any tests or inspections for SEC. As no other witnesses corroborated this testimony, other than the non-credible testimony offered by Lorne Leufven, the Court finds that the evidence supports SEC’s contention that this testing is not the work of an SEC BCI. 17 BCIs would, on rare occasion, perform these tests at the request of the IOR for a project, who had the authority to have BCIs perform these test as “a matter of convenience.” RT 12/14, 113:2–115:22. These sporadic tests performed by BCIs does not transform this testing work into “the work” of SEC BCIs. 21 1 12/18, 82:16–86:10. This work was erroneously billed to the UCLA Santa Monica 2 Hospital project and therefore was incorrectly included in the audit. 3 56. Plaintiffs claim $122.80 is owed for “epoxy dowel inspection” in their 4 revised audit. Ex. 523-1, 23. Although this category of work is covered under the CBA, 5 plaintiffs offered no evidence as to what work this individual was actually doing—i.e., 6 whether he was in fact performing testing or inspection related to epoxy dowels. The 7 auditor testified that he claimed all such work, whether testing or inspection. According 8 to plaintiffs’ audit, this particular individual performed the tests identified herein, such 9 as torque testing, on several other occasions. See Ex. 523. 10 11 (4) 57. Lab Tech Away The designation “lab tech away” does not pertain to one particular type of 12 inspection or testing work but is a generic term used on SEL billing invoices to refer to 13 any time spent by a technician “outside of the laboratory on a job site performing some 14 activity.” RT 12/18, 80:2–8. Plaintiffs’ auditor testified that he attempted to confirm 15 what work was actually being performed by cross-referencing time tickets or the testing 16 report when these documents were available. RT 12/12, 149:9–17; 12/13(am) 73:7–13. 17 However, SEC did not produce time-tickets or other records for much of the “lab 18 tech away” work. From the available documentation, plaintiffs’ auditor concluded that 19 much, if not all, of the work billed as “lab tech away” pertained to torque testing, pull 20 testing, adhesion/cohesion testing, and proof load testing. RT 12/13(am), 49:20–54:15. 21 Plaintiffs did not demonstrate that the lab tech away designation corresponded to any 22 types of work other than this testing work. 23 58. Plaintiffs’ auditor was also unsure as to whether, after removing a number 24 of categories of work from plaintiffs’ claim, any of these categories of work were still 25 included within their claim for “lab tech away” work. RT 12/13(am), 54:16–57:9. 26 F. Travel Time 27 59. Part B of plaintiffs’ audit seeks contributions for “travel hours,” primarily 28 22 1 2 for time spent traveling by a Ricky Morgan, an SEC BCI. 60. At trial, SEC contended that a 2003 Settlement Agreement, related to a 3 previous suit brought by the Trustees, bars plaintiffs’ claim in this litigation. This 4 agreement provides in relevant part: 5 As third party beneficiaries to the Local 12 Agreement, Smith-Emery 6 recognizes that the Trustees do not have the ability to negotiate the terms of 7 the Local 12 Agreement between Local 12 and Smith-Emery. 8 Nonetheless[,] the Trustees promise to refrain from making a claim for 9 fringe benefit contributions for travel time . . . after March 1, 2003, up until 10 June 30, 2004, or the time Smith-Emery negotiates its next Collective 11 Bargaining Agreement with Local 12 to resolve the issue of ‘travel time.’ 12 13 Ex. 684-8. 61. In SEC’s view, the evidence at trial demonstrated that the issue of the 14 proper scope of covered “travel time” under the CBA was never subsequently negotiated 15 or resolved, and therefore, any assessment for travel time in this litigation would be 16 inappropriate. See RT 12/13, 103:5–23. 17 62. Plaintiffs contend that the issue of travel time was in fact negotiated by 18 Local 12 and SEC, as demonstrated by SEC’s own evidence. Plaintiffs point to the letter 19 from Gregory Wolflick to James Partridge, noting that SEC had “agreed to modifications 20 for the travel and mileage portions of the contract[,] which provides that the employee’s 21 workday begins when he/she leaves the employer . . . ,” as well as a proposal Local 12 22 sent to SEC that introduces potential modifications to the travel time provisions of the 23 CBA. See Ex. 58-15; Ex. 59. 24 63. The Court finds that Local 12 and SEC did not “resolve” the issue of 25 whether contributions are owed for travel time in adopting either of the subsequent 26 CBAs, and accordingly, no contributions are owed to plaintiffs pursuant to the parties’ 27 2003 settlement agreement. While the evidence in the record supports a finding that 28 23 1 Local 12 and SEC negotiated over minor amendments to the “Travel, Mileage, and 2 Subsistence” section of the CBA, set forth in Article XII, these parties did not negotiate 3 or resolve the issue of whether contributions are owed for travel time by otherwise 4 covered employees. Without any resolution of this issue, plaintiffs’ claim for 5 contributions based upon travel time in this litigation is improper under the 2003 6 settlement agreement. Accordingly, the Court finds that no contributions are owed for 7 Part B of plaintiffs’ audit. 8 G. Cash Disbursements 9 64. Plaintiffs seek contributions in Parts I and K for cash disbursements 10 allegedly made by SEC to several non-union companies for covered work under the 11 CBA. Plaintiffs’ auditor only claimed work that he determined was performed within 12 Local 12's geographic jurisdiction, to the extent that this information was available to 13 him. RT 12/13(am), 67:22–24. 14 65. DC Inspections: SEC does not dispute that contributions are owed for work 15 performed by subemployer DC Inspections on a project for the Bakersfield Hospital. 16 See Ex. 504. Accordingly, the Court finds that plaintiffs have properly claimed 17 contributions for this subcontracted work. 18 66. Forest Products: Plaintiffs contend that contributions are owed for 19 inspection work performed by Forest Products Inspection, Inc. Plaintiffs’ auditor 20 testified that he claimed this work based on the documents available to him, which 21 indicated that at least part of the work was performed within Local 12's jurisdiction. RT 22 12, 153:12–155:13. Defendant offered no testimony of its own as to where the work 23 was performed, but it challenges the sufficiency of plaintiffs’ showing. 24 The Court finds that at least some of the contributions claimed by plaintiffs are for 25 work that Forest Products performed within Local 12's jurisdiction; therefore, plaintiffs 26 may properly claim an entitlement to contributions for this work. The “Certificate of 27 Continuous Inspection of Truss-Joint Members” provides that the inspection work 28 24 1 relates to structural members manufactured by a company in Chino, California, for the 2 “Central Los Angeles Learning Center” project. Ex. 500-1, 3. These locations are all 3 within the geographic coverage of the CBA. Moreover, although Forest Products itself 4 is located outside of Local 12's jurisdiction, the invoices indicate that its inspectors 5 incurred significant “Inspection Mileage” in performing their duties. Ex. 500-3. 6 Accordingly, the Court finds that plaintiffs have made a sufficient showing that at least 7 some of this covered work took place within Local 12's jurisdiction. Contributions are 8 appropriate. 9 67. ES Engineering and CSI Services, Inc.: According to the invoices admitted 10 into evidence, plaintiffs’ claims related to ES Engineering and CSI Services pertain to 11 work performed for Smith-Emery Company, San Francisco. Exs. 503, 506. However, 12 SEC’s records demonstrate that it—not SEC SF—paid the invoices related to these two 13 inspection companies. See id. These records further demonstrate that the companies 14 who performed this “special inspection” and “steel shop inspection” work were located 15 within Local 12's jurisdiction. In fact, ES Engineering performed some of the work at 16 “Robinson Manufacturing” in Placentia, California. Ex. 506-8. SEC offered no 17 evidence to the contrary. 18 68. AP Inspections and Advanced Inspection: At trial, plaintiffs’ auditor 19 testified that he made a claim for work subcontracted to Advanced Inspection because 20 the company is called “Advanced Inspections” and located in Santa Clarita, California, 21 which lies within Local 12's jurisdiction. RT 12/12, 155:14–156:11; Ex. 501. AP 22 Inspections is also located within Local 12's jurisdiction. Ex. 502. Neither party offered 23 additional evidence as to where the work was performed or what work Advanced 24 Inspections or AP Inspections was performing for SEC. 25 III. CONCLUSIONS OF LAW 26 69. 27 finding of fact. 28 To the extent necessary, each of these conclusions of law may be deemed a 25 1 A. ERISA 2 70. Section 15 of ERISA, 29 U.S.C. § 1145, provides that “[e]very employer 3 who is obligated to make contributions to a multiemployer plan under the terms of the 4 plan or under the terms of a collective bargaining agreement shall . . . make such 5 contributions.” Plaintiffs, as Trustees for the various trust funds, are authorized to bring 6 a civil enforcement action to enforce this provision. 29 U.S.C. § 1132(a)(3). 7 B. Legal Standard for Interpreting a CBA 8 71. Federal common law governs the interpretation of the CBAs at issue in this 9 litigation; these agreements, in turn, determine when contributions are owed to plaintiffs 10 under ERISA. In general, “[a] collective bargaining agreement is governed by the 11 detailed provisions of the Labor Management Relations Act, 29 U.S.C. §§ 141–187, and 12 ERISA. It is not ‘governed by the same old common-law concepts which control . . . 13 private contracts.’” Nw. Administrators, Inc. v. B.V. & B.R., Inc., 813 F.2d 223, 226 14 (9th Cir. 1987) (quoting Transportation- Communication Employees Union v. Union 15 Pacific R.R., 385 U.S. 157, 160–61 (1966)). 16 72. As with all contracts, “[t]o ascertain the meaning of [a] collective 17 bargaining agreement, [the Court must] first examine its express written terms.” Nw. 18 Administrators, 813 F.2d at 225. Where these terms are ambiguous or the agreement’s 19 scope is unclear, “the court must determine the ‘parties’ actual intent’ at the time of the 20 agreement’s execution.” Id. (quoting Kemmis v. McGoldrick, 767 F.2d 594, 597 (9th 21 Cir. 1985)). In these circumstances, appeal to extrinsic evidence is appropriate. This 22 includes evidence of the bargaining history, custom in the industry, and conduct of the 23 parties, with the latter to be given “great weight” in determining the parties’ intentions. 24 Kemmis, 767 F.2d at 597; see also Pierce County Hotel Employees & Restaurant 25 Employees Health Trust v. Elks Lodge, 827 F.2d 1324, 1327 (9th Cir. 1987) (where a 26 term is ambiguous, relevant extrinsic evidence may include “earlier negotiations, later 27 conduct, related agreements, and industrywide custom”). 28 26 1 C. Travel Time and Part B of the Revised Audit 2 73. Based on the Court’s findings of fact above, the Court concludes that no 3 4 contributions are owed to plaintiffs for Part B of the audit pertaining to travel time. D. 5 6 Plaintiffs’ Claims under Parts E, F, and G of the Revised Audit (1) 74. The CBAs As set forth in detail in the Court’s MSJ Order, the work that is covered 7 under the parties’ agreement is broadly defined as “all field work inspection by licensed 8 or registered Building/Construction Inspectors of concrete, steel, masonry work and non- 9 destructive and/or grading inspection” within Local 12's jurisdiction. MSJ Order at 16 10 (citing Ex. 1 at 2). The Court further concluded that this “Coverage Definition” is not 11 limited to work required to be performed by a licensed BCI, nor is it limited to only 12 “inspection” versus “testing” work. Id. at 16–17. 13 75. Appendix B of the CBA provides “general descriptions of inspection and 14 testing work covered by this Agreement.” Ex. 2-26. The preface to this appendix states 15 that “any similar duties performed by employees in the classifications covered by this 16 Agreement, or other tasks pertaining to the completion of the work described 17 hereinbelow, shall be covered by this Agreement even if not set forth in this 18 Agreement.” Id. The phrase “employees in the classifications covered by this 19 agreement” refers to SEC’s BCIs, and the work of these BCIs. 20 76. While some types of work are unambiguously covered by the CBA, 21 including Appendix B thereto, the CBA is ambiguous as to whether other types of work 22 at issue in this litigation are covered. Accordingly, resort to extrinsic evidence is 23 necessary and appropriate as described herein. 24 77. The crucial question is determining what work, as a matter of custom and 25 practice, has been performed by a licensed or registered Building/Construction Inspector 26 (“BCI”) employed by SEC. SEC owes contributions to the trust funds for the 27 performance of this covered work, whether or not the work was performed by SEC 28 27 1 BCIs. 2 3 (2) 78. Relevant Extrinsic Evidence Based on the foregoing findings of fact, the Court concludes that the 4 following extrinsic evidence the parties offered at trial that bears on the interpretation of 5 the CBAs at issue, and the Court’s consideration of this evidence is reflected in these 6 findings of fact and conclusions of law. The Court gives “great weight” to the parties’ 7 actual conduct and practice under the CBAs, which is discussed at length in the findings 8 of fact above. Additional bodies of extrinsic evidence are discussed below. 9 79. NLRB Certification: Plaintiffs argue that this certification of a bargaining 10 unit is meant to include all employees performing testing and inspection field work, and 11 exclude all those employees who were not, such as laboratory employees who remained 12 in the laboratory. Defendant maintains that this certification in fact only includes the 13 employees who performed “field inspection” work, and therefore any “laboratory” 14 technicians are necessarily excluded. 15 While the Court agrees with defendant that the certification clearly excludes 16 laboratory employees from its coverage, the certification does not define what the work 17 of “field inspectors in [SEC’s] Los Angeles Physical Testing Department” is, beyond the 18 broad categories listed in the order (concrete, structural steel, and masonry inspection). 19 Since no further testimony was offered as to the meaning of the certification order, the 20 Court cannot definitively determine from the plain language alone whether this 21 limitation to “field inspection” excludes the type of work at issue in this case. However, 22 the limitation to “field inspection,” particularly in light of the other extrinsic evidence 23 presented in this case as to what tasks BCIs customarily have performed, weighs in favor 24 of defendant’s interpretation of the CBA to exclude testing work by laboratory 25 personnel. 26 80. 27 28 Bargaining history: There was not a meeting of the minds between defendant and Local 12 with respect to the “Field Soils and Material Tester” (“FSMT”) 28 1 designation that Local 12 sought to add to the CBA in 2004 and again in 2007. Local 12 2 contends that materials testing was already covered in the CBA, and that the addition of 3 Field Soils and Material Testers would only add duties related to the inspection of soils, 4 and not other building materials. SEC argues that Local 12 was attempting to add 5 coverage for “materials testing” by proposing the addition of Group I work, akin to the 6 coverage of the MLA. At trial, witnesses for SEC and plaintiffs offered conflicting 7 testimony as to whether Local 12's proposed addition would have increased the coverage 8 of the CBA to cover all types of materials testing, not simply the testing related to soils. 9 81. Given this conflicting testimony, the Court finds that there was no meeting 10 of the minds on the meaning of Local 12's proposed increase in coverage; therefore, the 11 bargaining history is only partially informative as to the proper meaning of the CBA. 12 SEC firmly believed that the operative CBA at the time of the 2004 negotiations did not 13 cover materials testing of the type for which plaintiffs seek contributions in this lawsuit. 14 Local 12, on the other hand, sought to add FSMT work to the CBA under the belief that 15 other materials testing work at issue—such as adhesion/cohesion, pull testing, and 16 torque testing—was already covered by the terms of the CBA. Once SEC rejected Local 17 12's offer, SEC continued to assert that the work at issue was not covered by the CBA, 18 and Local 12 continued to assert that the work was covered. The bargaining history in 19 this respect does not shed light on the proper interpretation of the CBA. 20 82. However, the fact that Billy does not recall even discussing 21 adhesion/cohesion testing, torque testing, or proof load testing during his many years as 22 a participant in negotiations, coupled with the fact that SEC offered credible testimony 23 that BCIs have never performed such work as a matter of custom and practice, lends 24 support to SEC’s preferred interpretation of the CBA.18 25 26 27 28 18 As part of finalizing the 2004–2007 CBA, Billy, as Local 12's representative, agreed that the this new CBA would “not in any way expand the scope of the Agreement (continued...) 29 1 83. DSA Requirements for Laboratory Approval: Plaintiffs move to strike all 2 testimony with respect to what testing work DSA requires to be performed by an LEA- 3 licensed laboratory. The Court denies plaintiffs’ motion to strike.19 As noted, the Court 4 finds that SEC demonstrated that it relied on SEL’s license in obtaining and performing 5 the work at issue. Therefore, although these hospital projects are under OSHPD’s 6 jurisdiction, evidence with respect to DSA’s regulatory regime for inspection and testing 7 is relevant and admissible. However, that this evidence is relevant does not mean that it 8 is entitled to significant weight in interpreting the CBA, which must be done in light of 9 the record as a whole. 10 84. Plaintiffs offered evidence that SEC and SEL employees both use the same 11 “Smith-Emery Field Time Tickets,” which do not distinguish between SEC BCIs and 12 SEL laboratory technicians. Both SEC and SEL employees signed on the “Inspector 13 Signature” line on the time ticket, which further reference the minimum charges “per 14 Union Contract.” Ex. 22-4. These time cards were often submitted to LA County USC 15 and UCLA as “backup” for SEC’s (and SEL’s) billing invoices. RT 12/18, 16 140:8–142:15. While using these time tickets for SEL employees may be deceptive, it 17 does not inform what the work of a BCI is. 18 19 20 (3) 85. Adhesion/Cohesion and Fireproofing Appendix B of the CBA provides that the spray-applied fireproofing inspector shall “check the condition of the substrate”; “check all materials used for 21 22 23 24 25 26 27 28 18 (...continued) to include any additional work or job classifications beyond the scope of the parties collective bargaining agreement which expired July 31, 2004.” Ex. 7. 19 Plaintiffs move to strike testimony related to DSA’s requirements for LEAapproved laboratories primarily on relevance grounds, a ground that plaintiffs raised at trial and the Court provisionally overruled subject to a motion to strike. Plaintiffs further objections on hearsay and other grounds are either raised for the first time in their post-trial evidentiary brief, or were conclusively, not provisionally, overruled at trial. See, e.g., RT 12/18, 56:22–23. These latter objections are improper. 30 1 conformance to approved plans”; verify the certification of the “nozzleman”; “monitor 2 the thickness of the . . . material during installation”; and “check and record the 3 thickness of the fire restrictive material . . . and perform sampling as required by job 4 specifications and the UBC and/or IBC.” Exs. 1-38; 2-40. 5 86. In light of the testimony at trial with respect to the duties of a BCI, the 6 Court finds that “the work” of the spray-applied fireproofing BCI, as set forth in the 7 CBA, does not include adhesion/cohesion or dry film testing work. Appendix B’s 8 references to “sampling,” “other duties,” or “similar tasks” do not support plaintiffs’ 9 contention that testing work related to fireproofing is covered work, in the absence of 10 any credible testimony or other evidence that the CBA was intended to cover 11 adhesion/cohesion and related testing work. 12 87. In addition, plaintiffs rest their claim on the fact that the ICC Spray-Applied 13 Fireproofing Inspector examination includes questions regarding intumescent paint and 14 adhesion/cohesion testing. RT 12/11, 66:4–24. While this evidence supports their 15 contention that SEC BCIs may be informed about these tests, plaintiffs failed to offer 16 any credible evidence that SEC BCIs perform these tests as part of their inspection 17 duties. 18 88. Therefore, the Court concludes that the entire assessment by plaintiffs’ 19 auditor in parts E, F, and G of the audit for “adhesion-cohesion inspection” was in error. 20 This is testing, not inspection work, and does not fall within the customary duties of an 21 SEC BCI and is not covered by the CBA. 22 89. The Court also finds that plaintiffs failed to prove that their claim for 23 “fireproofing” pertains to anything other than the testing work that is not covered by the 24 CBA. Accordingly, the Court concludes that the entire assessment by plaintiffs’ auditor 25 in parts E, F, and G of the audit for “fireproofing” is also in error. 26 27 28 (4) 90. Steel Shop Inspection Because the Court finds that Troy McLauren is not a “non-union 31 1 subemployee” as plaintiffs contend, plaintiffs’ claim for contributions related to steel 2 shop inspection work must fail.20 3 (5) 4 Torque Test; High Strength Bolt; Pull and Proof Load Test; and Epoxy Dowel Inspection 5 91. Plaintiffs contend that torque testing, high strength steel bolt inspection, 6 pull and proof load testing, and epoxy dowel inspection are covered according to various 7 sections of the CBA. Of these types of work, only high strength bolt inspection is 8 expressly called out in the CBA, including Appendix B.21 In plaintiffs’ view, the duties 9 of the reinforcing steel, structural steel, and concrete inspector, as set forth in Appendix 10 B, contemplate that the work of SEC BCIs includes all of this testing and inspection 11 work. 12 92. The “reinforcing steel” inspector is first tasked with reviewing the 13 applicable building codes, verifying steel mill reports, sampling material for tests, 14 checking each shipment of reinforcing steel for quality. Next, during “placement of 15 reinforcing” steel, the inspector must make various observations, including checking that 16 the reinforcing steel and “embedded items, including anchorages, inserts and bolts,” 17 remain “solidly cast in place during placement of concrete.” Afterwards, the inspector 18 must submit a written progress report addressing his or her observations. Exs. 1-24, 25; 19 2-26, 27. 20 93. The duties of the “structural steel and welding inspector” extend to both the 21 “shop and field” according to the CBA. Duties include reviewing the applicable 22 building code; reviewing steel mill reports; coordinating “sampling and testing” for the 23 laboratory; “welding observation,” including observation and inspection of welding 24 25 26 27 28 20 To the extent that plaintiffs contend that evidence not admitted at trial undermines this conclusion, the Court finds plaintiffs’ argument unavailing. See Pls.’ Opp’n to Def.’s Mot. to Strike at 7. 21 Appendix B is identical for the 2001, 2004, and 2007 CBAs. 32 1 process; checking the “workmanship” after manipulations of steel are completed; and 2 ensuring that welding is done in proper sequence. These duties also include observation 3 of the “high strength bolting” process, which entails sampling high strength bolts for 4 testing, reviewing the compliance of bolts with project specifications, reviewing the 5 installation procedures, verifying installation of the bolts, and checking calibration of 6 wrenches used for tightening of these bolts. The inspector must then submit written 7 reports detailing the foregoing. Exs.1-29, 30, 31; 2-31, 32, 33. 8 9 94. The “concrete” inspector is tasked with reviewing the approved plans and specifications for the concrete; checking for cleanliness and proper treatment prior to 10 placement of the concrete; and “observing placement procedures for evidence of 11 segregation, possible cold joins, displacement of reinforcing forms and proper support of 12 embedded items, anchor bolts, etc.” Thereafter, the inspector is responsible for 13 “sampling and testing” fresh concrete for conformance with specifications and 14 submitting a written report documenting the “tests and observations” the inspector made. 15 Exs. 1-40, 41; 2-42, 43. 16 95. Based on the plain text of the CBA, the parties agree that the inspection of 17 epoxy dowels and high strength bolts is covered work. The former is referenced, in part, 18 in Appendix B’s description of the BCI’s duties to “check” and “verify” that the 19 “embedded items” are “solidly” placed in concrete. The latter is referenced in Appendix 20 B, within the structural steel and welding inspector section. 21 96. As the Court found above, however, plaintiffs have not demonstrated that 22 contributions are owed for any high strength bolt inspection work that was performed. 23 The high strength bolt inspection work performed by Ronald Lai was subcontracted by 24 SEL, an entity that is not a signatory to the CBA with Local 12. Contributions are not 25 owed for work sublet solely by SEL, as this work arose out of an inspection contract to 26 which SEC was not a party. 27 28 97. In addition, plaintiffs have failed to prove their claim for epoxy dowel 33 1 inspection. Plaintiffs offered no evidence as to whether this individual was performing 2 testing or inspection related to the installation of epoxy dowels, as plaintiffs’ auditor 3 claimed all such work. Because this individual also performed torque testing and other 4 such tests, the Court concludes that he was most likely an SEL employee performing 5 testing related to epoxy dowels, and that therefore, no contributions are owed. 6 98. Although sections of Appendix B briefly note that the “checking” of 7 embedded items is part of the duties of the BCI, the CBA does not otherwise mention 8 proof load testing, pull testing, or torque testing work, at least by name. Moreover, all of 9 the references to the checking and verifying of embedded items relate to checking these 10 items during the placement of concrete and “observ[ing]” the proper support of 11 embedded items. See, e.g., Ex. 1-41. As to torque testing, the CBA does contemplate 12 that inspectors will be responsible for “check[ing] calibration of wrenches for tightening 13 capacity” for high strength bolting, but does not dictate that inspectors are responsible 14 for operating these wrenches with respect to high strength bolts or any other type of bolt. 15 This tracks the evidence at trial of how BCIs actually work in the field with respect to 16 high strength bolts. 17 While perhaps this language, and the CBA taken as a whole, could be read 18 broadly to cover the testing work for which plaintiffs seek contributions in this lawsuit, 19 the clear weight of the evidence at trial, based on the SEC and Local 12's actual practice, 20 bargaining history, and the other extrinsic evidence noted above, supports SEC’s 21 contention that proof load, pull, and torque testing are not covered by this or any other 22 section of the CBA. The failure to specify these testing duties in the CBA was reflected 23 in the actual practice in the field, and plaintiffs have failed to prove that this testing work 24 is otherwise covered under the CBA’s “catch all” provisions, such as the ambiguous 25 references in Appendix B extending coverage to “similar duties” or “other tasks” related 26 to the work expressly covered by the CBA. 27 28 99. Accordingly, the Court concludes that plaintiffs’ claim for damages related 34 1 to torque testing, proof load testing, and pull testing all must fail. Local 12 and SEC did 2 not mutually agree to cover this work under the CBAs.22 3 100. To the extent that the Court concluded otherwise in adjudicating the parties’ 4 cross-motions for summary judgment, the Court finds it appropriate to reconsider this 5 conclusion here based on the clear weight of the evidence adduced at trial. 6 7 (6) Lab Tech Away 101. Because the Court finds that torque testing, pull testing, adhesion/cohesion, 8 and proof load testing are not work covered by the CBA, plaintiffs’ claim for damages 9 related to the “lab tech away” designation must fail as well. Plaintiffs did not 10 demonstrate that lab tech away work corresponded to any work of a BCI that is covered 11 by the CBA. 12 102. Based on the foregoing discussion, the Court concludes that plaintiffs are 13 not entitled to any damages on Parts E, F, and G of their revised audit. Plaintiffs did not 14 demonstrate that contributions are owed for any of the work claimed in these parts of the 15 audit, even where the type of work is otherwise covered by the CBA. 16 103. Because plaintiffs have not demonstrated that defendant failed to report 17 contributions for any of the hours claimed in this section, plaintiffs are not entitled to 18 avail themselves of the “burden-shifting” rule set forth in Brick Masons Pension Trust v. 19 Industrial Fence & Supply, Inc., 839 F.2d 1333 (9th Cir. 1988), as discussed in further 20 detail below. There has been no showing that any employee named as a non-union 21 22 23 24 25 26 27 28 22 Plaintiffs’ auditor confirmed that he does not know whether the work claimed as “torque testing” refers only to work pertaining to post-installed anchors, or whether this also includes torquing of high strength steel bolts. RT 12/13(am), 59:4–14. In fact, plaintiffs’ auditor testified that the vast majority of the employers whom he has audited in the past are signatories to the Master Labor Agreement, not “independent” contracts like SEC’s. RT 12/13(am), 22:15–23:22. Moreover, he admitted that Local 12 officials told him that he should read the SEC CBA to “mirror” the Master Labor Agreement or Master Inspection Agreement, and that he in fact conducted the audit according to these instructions. RT 12/13(am), 24:6–27:20. 35 1 subemployee of SEL in Parts E, F, and G of the audit performed work that is covered 2 under the CBA. 3 E. 4 104. As noted, the Court finds that plaintiffs are entitled to damages for 5 inspection work subcontracted to DC Inspections and Forest Products, two non-union 6 subcontractors, in the amounts of $48,768.40 and $28,898.05, respectively, as claimed in 7 plaintiffs’ audit. 8 9 Plaintiffs’ Claims under Parts I and K of the Revised Audit 105. For the remaining work claimed in Parts I and K, plaintiffs invoke the Ninth Circuit’s “burden-shifting” rule set forth in Brick Masons. Under Brick Masons, “once 10 the Trust Funds prove[] the fact of damage and [the defendant’s] failure to keep 11 adequate records, the burden shift[s] to [the defendant] to come forward with evidence of 12 the extent of covered work performed by the . . . employees [at issue].” 839 F.2d at 13 1338–39. The Ninth Circuit subsequently clarified the parameters of this test, holding 14 that “once the Trustees show (1) that [defendant] failed to keep adequate records, and (2) 15 that there exist some employees who (a) performed covered work that was (b) 16 unreported to the trust funds, then the burden shifts to [defendant] to show the extent of 17 the unreported covered work for those employees.” Motion Picture Indus. Pension & 18 Health Plans v. N.T. Audio Visual Supply, Inc., 259 F.3d 1063, 1066 (9th Cir. 2001). 19 In other words, “once the Trust Funds prove[] the fact of damage and the 20 employer’s failure to keep adequate records, the burden shift[s] to the employer to come 21 forward with evidence of the extent of the damage.” Id. at 1065 (quotation omitted); see 22 also Cent. Pension Fund of Int’l Union of Operating Engineers & Participating 23 Employers v. Ray Haluch Gravel Co., 695 F.3d 1, 9 (1st Cir. 2012) cert. granted on other 24 grounds, No. 12-992 (U.S. June 17, 2013) (“burden-shifting occurs only when a 25 fiduciary seeking remittance of unpaid benefit contributions shows both that some 26 employees performed covered work that was not reported to the benefit plan and that the 27 employer neglected to maintain adequate records”); Brick Masons, 839 F.2d at 1338 28 36 1 (“An employer cannot escape liability for his failure to pay his employees the wages and 2 benefits due to them under the law by hiding behind his failure to keep records as 3 statutorily required.”). 4 106. At trial, defendant did not dispute the Court’s finding in its MSJ Order that 5 defendant did not maintain adequate records for the entire time period at issue. This 6 satisfies the first part of the N.T. Audio or Brick Masons test. See 29 U.S.C. 7 § 1059(a)(1). 8 9 107. Given that SEC failed to pay contributions to plaintiffs based upon cash disbursements to nonunion subemployers, plaintiffs contend that they can properly 10 invoke the burden-shifting rule of Brick Masons for the remainder of the work claimed 11 in Parts I and K, placing the burden on defendant to prove that these cash disbursements 12 do not correspond to covered work under the CBA. Defendant, on the other hand, 13 submits that the proper interpretation of Brick Masons is that plaintiffs must prove the 14 fact of damage as to each subemployer in Parts I and K to invoke the burden shifting 15 rule. In its view, demonstrating that defendant owes at least some contributions for one 16 subemployer does not entitle plaintiffs to invoke Brick Masons for all the other 17 subemployers claimed in Parts I and K. 18 108. Applying these principles, the Court concludes that plaintiffs are entitled to 19 contributions for the remainder of the subcontracted work claimed in Parts I and K of 20 their audit. Plaintiffs have proven that SEC has sublet covered work, performed within 21 Local 12's jurisdiction, on more than one occasion. Moreover, the balance of the work at 22 issue in Parts I and K was sublet to inspection companies located within Local 12's 23 jurisdiction, which performed tasks such as “special inspection” and “steel shop” 24 inspection. And least some of this sublet inspection work was actually performed by 25 these subcontractors within Local 12's jurisdiction. 26 109. The foregoing is circumstantial evidence that SEC subcontracted covered 27 inspection work that plaintiffs have claimed in Parts I and K of their audit, sufficient to 28 37 1 prove the “fact” of damage. Defendant, however, remained silent in the face of 2 plaintiffs’ showing, offering no evidence that the work in question was performed 3 outside of Local 12's jurisdiction or was not otherwise covered by the CBA. If 4 defendant had evidence that some or all of this work was not performed in Southern 5 California, for example, defendant could have easily presented such evidence at trial. 6 Defendant did not do so. Accordingly, the Court concludes that plaintiffs are entitled to 7 contributions for all of the remaining work in Parts I and K, as SEC has not otherwise 8 “come forward with [its own]” evidence of the extent of the damage.” N.T. Audio, 259 9 F.3d at 1065. 10 110. Finally, defendant’s contention that contributions are not owed for work 11 performed for Smith-Emery Company, San Francisco is without merit here, because the 12 evidence demonstrates that SEC paid for all of the work in question. Since SEC is the 13 one who paid for the work in question, it matters not for whom the work was 14 performed—it is as if SEC sublet the covered work itself and paid the subcontractor. 15 Indeed, defendant’s argument is belied by its admission of liability with respect to the 16 work sublet to DC Inspections. The relevant invoices indicate that DC Inspections 17 performed this work for Smith-Emery Company, San Francisco, CA. See, e.g. Ex. 504- 18 12. 19 F. 20 111. SEC also moves to strike exhibits 107–109, 523, 525, and 533, which taken 21 as a whole comprise plaintiffs’ revised audit. The Court concludes that plaintiffs’ audit, 22 as the Court found once before, is admissible evidence. Admissibility of Plaintiffs’ Audit 23 112. Under Federal Rule of Evidence 1006, 24 [t]he proponent may use a summary, chart, or calculation to prove the 25 content of voluminous writings, recordings, or photographs that cannot be 26 conveniently examined in court. The proponent must make the originals or 27 duplicates available for examination or copying, or both, by other parties at 28 38 1 a reasonable time and place. And the court may order the proponent to 2 produce them in court. 3 To be admissible under this rule, “[a] proponent of summary evidence must establish 4 that the underlying materials upon which the summary is based (1) are admissible in 5 evidence and (2) were made available to the opposing party for inspection.” United 6 States v. Rizik, 660 F.3d 1125, 1130 (9th Cir. 2011). Both of these requirements are 7 satisfied here. 8 9 First, all of the underlying materials are business records of either SEC or public entities for which SEC performed the work in question. Under Federal Rule of Evidence 10 803(6), these records all qualify as records of a regularly conducted activity. Second, 11 plaintiffs made all of these records available to SEC for inspection, to the extent that 12 SEC did not itself already have these documents in its possession. 13 113. Contrary to SEC’s argument, there is no requirement that plaintiffs 14 “identify” every document which directly led plaintiffs’ auditor to assert claims for 15 contributions in the revised audit. Plaintiffs identified all of the documents that their 16 auditor relied on in developing the audit, supplied to defendant the auditor’s original 17 notes used in creating the audit and the revised audit (exhibits 107–109,525, and 533) 18 and have summarized the resulting damages calculations in Exhibit 523, after removing 19 claims for work that took place four years before the initiation of this lawsuit. 20 Defendant’s remaining contentions for excluding these exhibits are similarly 21 unpersuasive. It is irrelevant what sources the auditor relied on in deciding whether to 22 claim certain types of work, where the hours spent performing these job tasks is reflected 23 in the underlying business records. Accordingly, the Court denies defendant’s motion to 24 strike. 25 G. 26 114. Section 1132(g) sets forth the damages that plaintiffs are entitled to on their 27 28 Damages successful claims for contributions. In particular, the Court must award the plan: 39 1 (A) the unpaid contributions, 2 (B) interest on the unpaid contributions, 3 (C) an amount equal to the greater of– 4 (I) interest on the unpaid contributions, or 5 (ii) liquidated damages provided for under the plan in an amount not in 6 excess of 20 percent (or such higher percentage as may be permitted under 7 Federal or State law) of the amount determined by the court under 8 subparagraph (A), [and] 9 (D) reasonable attorney's fees and costs of the action[.] 10 Id. § 1132(g)(2). This section is “mandatory and not discretionary,” where “(1) the 11 employer [is] delinquent at the time the action is filed; [and] (2) the district court [enters] 12 a judgment against the employer.” Nw. Adm’rs, Inc. v. Albertson’s, Inc., 104 F.3d 253, 13 257 (9th Cir. 1996) (citation omitted). 14 115. Here, the Court finds that plaintiffs are entitled to the following unpaid 15 contributions for Part A of the audit pertaining to Clerical Errors and Parts I and K for 16 Non-Union Subemployer Cash Disbursements, per Exhibit 523: 17 18 19 20 21 22 23 24 25 26 27 28 Part A Clerical Errors Parts I/K Forest Products Advanced Inspection AP Inspection ES Engineering CSI Services DC Inspections Total Amount $ 5,335.54 $ 28,898.05 $ 862.05 $ 27,951.60 $ 4,978.23 $ 2,874.00 $ 48,768.40 $ 119,667.87 116. Under section 1132(g)(2), plaintiffs are also entitled to double interest on the unpaid contributions, as well as reasonable attorney’s fees and costs that arise only from the pursuit of plaintiffs’ meritorious claims. 40 1 117. In addition, under section 1132(g)(1), the Court has discretion to award “a 2 reasonable attorney’s fee and costs of the action to either party.” 3 IV. CONCLUSION 4 In accordance with the foregoing, the Court concludes that plaintiffs are entitled to 5 unpaid contributions as set forth in these findings of fact and conclusions of law, as well 6 as double prejudgment interest on these unpaid contributions and attorneys’ fees and 7 costs related only to their successful claims. The parties shall address the issue of 8 attorneys’ fees for plaintiffs and potential attorneys’ fees for defendant by way of post- 9 judgment motions. 10 11 IT IS SO ORDERED. 12 13 Dated: July 5, 2013 14 15 _____________________ 16 CHRISTINA A. SNYDER United States District Judge 17 18 19 20 21 22 23 24 25 26 27 28 41

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?