FINDINGS OF FACT AND CONCLUSIONS OF LAW signed by Judge Percy Anderson. (See document for specifics) (mrgo)
1
2
3
4
5
6
7
8
UNITED STATES DISTRICT COURT
9
CENTRAL DISTRICT OF CALIFORNIA
10
11
AMERICA UNITES FOR KIDS, et al.,
12
13
14
15
Plaintiffs,
No. CV 15-2124 PA (AJWx)
FINDINGS OF FACT AND
CONCLUSIONS OF LAW
v.
SANDRA LYON, et al.,
Defendants.
16
17
18
19
The Court, sitting without a jury, conducted a bench trial on May 17, 2016.
20
Following the Court Trial, the Court ordered the parties to submit proposed Findings
21
of Fact and Conclusions of Law. Pursuant to the Court’s instructions, the parties reviewed
22
the other side’s proposed Findings of Fact and Conclusions of Law and marked them to
23
indicate the particular factual assertions and legal conclusions they agreed with and those
24
they disputed, and also filed their reasons for their objections. (Dkt. Nos. 300, 303, and
25
304.) The facts that are in dispute on which the Court relies in reaching its conclusion are
26
supported by the record. Unless otherwise noted, where evidence is subject to an evidentiary
27
objection, and the Court has relied on that evidence, the Court has overruled the evidentiary
28
objection for the reason or reasons identified by the party offering the evidence in response
1
to the other side’s objection. Where the Court has refused to consider evidence subject to an
2
objection, the Court will indicate the basis for sustaining the evidentiary objection. All other
3
evidentiary objections to evidence that the Court has not relied on or cited in these Findings
4
of Fact and Conclusions of Law are denied as moot.
5
After reviewing the evidence, the parties’ objections to that evidence, and the parties’
6
pre-trial and post-trial submissions, the Court makes the following Findings of Fact and
7
Conclusions of Law pursuant to Federal Rule of Civil Procedure 52(a). Any finding of fact
8
that constitutes a conclusion of law is hereby adopted as a conclusion of law, and any
9
conclusion of law that constitutes a finding of fact is hereby adopted as a finding of fact.
10
11
I.
Findings of Fact
12
13
1.
Defendants Sandra Lyon and Janece Maez are the Superintendent and
14
Assistant Superintendent of the Santa Monica-Malibu Unified School District (the
15
“District”). Defendants Laurie Lieberman, Dr. Jose Escarce, Craig Foster, Maria
16
Leon-Vasquez, Richard Tahvildaran-Jesswein, Oscar de La Torre and Ralph Mechur are
17
members of the District’s Board of Education. Defendants Lyon, Maez, Lieberman,
18
Escarce, Foster, Leon-Vasquez, and Tahvildaran-Jesswein will be referred to collectively as
19
“Defendants.”
20
2.
The District operates Juan Cabrillo Elementary School (“JCES”) and Malibu
21
Middle and High School (“MHS”) (collectively the “Malibu Campus”) in Malibu,
22
California.
23
3.
Plaintiff America Unites for Kids (“America Unites”) is a non-profit
24
organization that has as its mission to ensure environmental health excellence in schools for
25
all children and those who support them. America Unites advocates for the removal of
26
polychlorinated biphenyls (“PCBs”) from schools. (Dkt. No. 250 (J. DeNicola Test.) at
27
1:7-14.)
28
-2-
1
2
3
4.
America Unites’ members and officers include parents of students who attend
classes at the Malibu Campus. (Dkt. No. 250 (J. DeNicola Test.) at 1:2-22.)
5.
As alleged in the First Amended Complaint (“FAC”), plaintiff Public
4
Employees for Environmental Responsibility (“PEER”), is a non-profit organization that
5
advocates for public employees concerned with environmental issues. The only evidence in
6
support of PEER’s standing submitted at trial is the Declaration of Katy Lapajne, who
7
describes herself as a “supporter” of PEER and is a teacher at MHS. (Dkt. 249 (Lapajne
8
Test.) at 1:2-7.) PEER’s Articles of Incorporation and Bylaws, plaintiffs’ Exhibits 44 and
9
45, to which Defendants have filed an evidentiary objection, were not properly introduced or
10
authenticated through any witness testimony. (Dkt. No. 300, Trial Exhibit (“Ex.”) 2, 2:3-
11
17.) The Court therefore sustains Defendants’ evidentiary objections to Exhibits 44 and 45.
12
6.
The following buildings at MHS were constructed in 1963: Building A (800,
13
Great White Shark, Library), B/C (900, Whale Shark, Administration), D (100 & 200, Mako
14
Shark), E (000, Blue Shark), F (300, Thresher Shark), G (500, Angel Shark), H
15
(Cafeteria/Auditorium), I (400, Leopard Shark), and J (700, Old Gymnasium). (Ex. 548, p.
16
36 (Table 1-1).)
17
7.
At JCES, Building A was constructed in 1958; Building B was constructed in
18
1955; Building C was constructed in 1957; Building D was constructed in 1958; Building E
19
was constructed in 1965; and Building F was constructed between 1961 and 1965. (Id.)
20
8.
Until the enactment of the Toxic Substances Control Act (“TSCA”), 15 U.S.C.
21
§§ 2601-2695d, banned their manufacture and use in the late 1970s, PCBs were used in
22
numerous applications, including as a plasticizing agent in caulking and glazing materials.
23
9.
In the Fall of 2013, the District retained Mark Katchen, a founder and
24
Managing Principal with the Phylmar Group, Inc., to assist in the evaluation of
25
environmental concerns raised at the Malibu Campus. (Dkt. No. 226 (Daugherty Test.) at
26
29; Dkt. No. 230 (Katchen Test.) at 5.)
27
28
10.
The Phylmar Group tested ten rooms at MHS for PCBs. Four of the ten rooms
tested had caulk samples with PCB levels above the regulatory threshold of 50 ppm: (1)
-3-
1
MHS Building A, Library (1,870 ppm); (2) MHS Building E Room 1 (164 ppm); (3) MHS
2
Building E, Room 5 (98.7 ppm); and (4) MHS Building E, Room 8 (52.8 ppm). (Ex. 531, p.
3
19 (Table 3) & p. B1.)
4
11.
In January 2014, the Environmental Protection Agency (“EPA”) instructed the
5
District to prepare a comprehensive work plan to investigate and assess PCBs at the Malibu
6
Campus, which included “removal of all caulk with known concentrations above 50 ppm
7
PCBs” discovered to date, as well as “mitigation or removal of any caulk that is
8
deteriorating in pre-1979 structures” at the Malibu Campus. (Ex. 522 (January 27, 2014
9
EPA Correspondence).)
10
12.
The District hired Ramboll Environ US Corporation, previously known as
11
ENVIRON International Corporation (“Ramboll Environ”), in early 2014 with a team led by
12
Principal-in-Charge Doug Daugherty, to conduct environmental services at the District’s
13
schools, including services related to PCBs. (Daugherty Test., Dkt. No. 226, at ¶¶ 2 & 4.)
14
13.
In April of 2014, Ramboll Environ developed and published a Comprehensive
15
PCB-Related Building Materials Inspection, Management, and Removal Plan
16
(“Comprehensive Plan”) for the District to address investigation of potential building
17
materials impacted by PCBs, establish a Best Management Practices (“BMP”) program to
18
ensure the Malibu Campus was properly cleaned to manage potential PCB exposures, and
19
plan for removal of potential building materials impacted by PCBs during renovations.
20
(Dkt. No. 225 (MacIntosh Test.) at ¶ 58; Dkt. No. 226 (Daugherty Test.) at ¶ 32; Ex. 529.)
21
14.
The Comprehensive Plan was submitted to EPA Region IX via e-mail from
22
Doug Daugherty to Steve Armann on April 25, 2014. (Dkt. No. 226 (Daugherty Test.) at ¶
23
59; Ex. 529.)
24
15.
On June 4, 2014, EPA issued a letter responding to the Comprehensive Plan
25
submittal. The EPA stated that the Comprehensive Plan required significant restructuring,
26
and recommended that the District move forward with the BMPs as described in the
27
Comprehensive Plan, stating that “the ‘PCB Best Management Practices’ contained in the
28
[Comprehensive] Plan do not require EPA approval, and we recommend that the District
-4-
1
move forward with these activities at MHS.” (Dkt. No. 226 (Daugherty Test.) at ¶ 64-65;
2
Ex. 530 (June 4, 2014 EPA Correspondence).)
3
16.
Ramboll Environ submitted to EPA on July 3, 2014, the Site-Specific
4
PCB-Related Building Materials Management, Characterization and Remediation Plan for
5
the Library and Building E Rooms 1, 5, and 8 at Malibu High School (the “Site-Specific
6
Plan”). The Site-Specific Plan included the parameters for a Pilot Study for air and wipe
7
sampling to evaluate the potential for human exposure to PCBs at the Malibu Campus and
8
the efficacy of the BMPs undertaken by the District. (Dkt. No. 226 (Daugherty Test.) at ¶¶
9
32 & 34; Ex. 531 (Site-Specific Plan).)
10
17.
The Site-Specific Plan covered the management practices associated with the
11
potential for PCB-containing materials at the Malibu Campus, specifically addressing the
12
removal of caulk at locations in the Library and in MHS Building E Rooms 1, 5, and 8, and
13
the BMPs the District would implement until the removal of the caulk. (Dkt. No. 226
14
(Daugherty Test.) at ¶ 71; Ex. 531 (Site-Specific Plan).)
15
18.
The Site-Specific Plan committed to EPA that caulk around four windows in
16
Room 801 of Building A (the Library) and Rooms 1, 5, and 8 of Building E would be
17
removed and provided the steps and procedures that would be used during the removal.
18
(Dkt. No. 226 (Daugherty Test.) at ¶ 71; Ex. 531 (Site-Specific Plan).)
19
19.
In a letter from EPA Region IX Administrator Jared Blumenfeld to Sandra
20
Lyon dated August 14, 2014 (the “August 14, 2014 EPA Correspondence”), EPA explained
21
its concurrence with the Site-Specific Plan’s approach for removal of certain caulk at the
22
Malibu Campus by June 30, 2015, and its concurrence with the air and wipe sampling Pilot
23
Study as submitted to EPA. (Dkt. No. 226 (Daugherty Test.) at ¶¶ 26, 38, 72; Ex. 541
24
(August 14, 2014 EPA Correspondence).)
25
20.
EPA confirmed that, based on EPA’s observation of the Summer 2014 Pilot
26
Study sampling work, the air and wipe testing work performed by the District “was
27
consistent with EPA’s national guidance” and that “EPA does not recommend additional
28
testing of caulk unless dust or air samples persistently fail to meet EPA’s health-based
-5-
1
guidelines.” (Dkt. No. 225 (MacIntosh Test.) at ¶ 58; Dkt. No. 226 (Daugherty Test.) at ¶¶
2
26, 38, 72; Ex. 541 (August 14, 2014 EPA Correspondence).)
3
21.
On September 26, 2014, Ramboll Environ, on the District’s behalf, submitted
4
the Supplemental Removal Information for the Library, Building E - Rooms 1, 5, and 8, and
5
Building G, Room 506 at Malibu High (“Removal Supplement”) to EPA Region IX. (Dkt.
6
No. 226 (Daugherty Test.) at ¶ 73; Ex. 544 (Removal Supplement).)
7
22.
In February 2015, Ramboll Environ tested a total of 24 caulk samples in ten
8
rooms in five different buildings at the Malibu Campus. All 24 samples had PCBs over the
9
50 ppm regulatory limit, with most over 100,000 ppm, and measurements up to 570,000
10
ppm. In some rooms, the district sampled multiple areas, all demonstrating levels of PCBs
11
above 50 ppm. The following table summarizes the result of the District’s testing.
12
Room
13
14
15
(ppm)
MHS
Building E, Room 3
1,600
1,800
Building E, Room 7
330
1,800
Building G, Room 505
220,000
Building I, Room 401
190,000
Building J, Room 704 (inside
office)
4,500
1,800
1,500
Building J, Room 704 (hallway)
3,800
16
17
18
19
20
21
22
23
24
JCES
Building F, Room 18
290,000
270,000
230,000
Building F, Room 19
390,000
570,000
560,000
25
26
27
28
Ramboll Environ Results
-6-
1
Building F, Room 22
290,000
470,000
220,000
138,000
Building F, Room 23
350,000
440,000
280,000
180,000
2
3
4
5
6
7
8
(Ex. 554, p. 9 (Table 3).)
23.
The testing conducted by the Phylmar Group and Ramboll Environ revealed
9
PCBs in caulk above the 50 ppm threshold in each of the six buildings constructed at the
10
Malibu Campus prior to 1979 that were tested. Out of 20 total rooms where the District
11
tested caulk, 14 had PCBs above the 50 ppm threshold-containing. Of the 34 samples tested
12
by the District, 28 had PCBs in excess of the 50 ppm threshold.
13
24.
On March 20, 2015, Ramboll Environ submitted a Notification of Additional
14
Locations at Malibu High School and Juan Cabrillo Elementary School to be Addressed in
15
Accordance with October 2014 Approved Plan (“March 2015 Notification”) to EPA Region
16
IX on the District’s behalf. (Dkt. No. 225 (MacIntosh Test.) at ¶ 59; Dkt. No. 226
17
(Daugherty Test.) at ¶ 76; Ex. 554 (Notification of Additional Locations).)
18
25.
The March 2015 Notification committed to EPA that, in addition to the
19
removal activities described in the Site-Specific Plan and Removal Supplement, caulk would
20
be removed within one year at locations within MHS Building E Rooms 3 and 7; MHS
21
Building G Room 505; MHS Building I Room 401; MHS Building J (Old Gym) Rooms 704
22
and 704 Hallway; and JCES Building F Rooms 18, 19, 22, and 23. (Dkt. No. 226
23
(Daugherty Test.) at ¶ 77; Ex. 554 (Notification of Additional Locations).)
24
26.
On March 23, 2015, Ramboll Environ notified EPA of its report of data from
25
the Winter 2014/2015 break sampling event in the 2014/2015 Winter Break PCB Sampling
26
Report for MHS and JCES (“March 2015 Pilot Study Report”). (Dkt. No. 226 (Daugherty
27
Test.) at ¶ 50; Ex. 553 (Winter Break PCB Sampling Report).)
28
-7-
1
27.
During the Winter 2014/2015 school break sampling, 100% of the air samples
2
and 88% of the wipe samples did not detect PCB concentrations above the laboratory’s
3
method reporting limit. (Dkt. No. 226 (Daugherty Test.) at ¶ 50; Ex. 553 (Winter Break
4
PCB Sampling Report).)
5
28.
On March 23, 2015, Plaintiffs commenced this action by filing their Complaint
6
against Defendants alleging a single claim for violation of TSCA. (Dkt. No. 1
7
(“Complaint”).) Plaintiffs filed their First Amended Complaint (“First Amended
8
Complaint”) for declaratory and injunctive relief under the TSCA on April 1, 2015. (Dkt.
9
No. 12.)
10
29.
In accordance with the Site-Specific Plan, Removal Supplement, and March
11
2015 Notification, during the Summer 2015 school break, Ramboll Environ oversaw the
12
completion of removal activities (the “Summer 2015 PCB Removal Activities”) at the
13
locations described in the Site-Specific Plan, Removal Supplement, and March 2015
14
Notification. (Dkt. No. 219 (Herrmann Test.) at ¶ 18; Dkt. No. 222 (Rohr Daniel Test.) at
15
¶ 23; Dkt. No. 226 (Daugherty Test.) at ¶ 79; Dkt. No. 228 (Pacheco Test.) at ¶ 6.) The
16
Summer 2015 PCB Removal Activities included the physical removal of caulk;
17
decontamination of non-porous surface materials adjacent to the caulk and performance of
18
post-decontamination wipe sampling; preparation and encapsulation of porous substrate that
19
had previously been in contact with caulk up to one foot away from caulk/substrate contact
20
and performance of post-encapsulation wipe sampling; and post-removal confirmatory air
21
and wipe sampling to ensure compliance with population-applicable EPA's Exposure Levels
22
for Evaluating PCBs in Indoor School Air and EPA Region IX surface wipe benchmark for
23
the Malibu Campus (i.e., 1 µ g/100 cm2) in the rooms where removal work was undertaken.
24
(Dkt. No. 219 (Herrmann Test.) at ¶ 18; Dkt. No. 222 (Rohr Daniel Test.) at ¶ 23; Dkt. No.
25
226 (Daugherty Test.) at ¶ 79; ECF No. 228 (Pacheco Test.) at ¶¶ 10, 13.)
26
30.
The caulk described in the Site-Specific Plan, Removal Supplement, and
27
March 2015 Notification was physically removed by the District’s contractor, Castlerock
28
Environmental, Inc., under the oversight of the Ramboll Environ team. (Dkt. No. 219
-8-
1
(Herrmann Test.) at ¶¶ 16, 18; Dkt. No. 222 (Rohr Daniel Test.) at ¶¶ 21, 23; Dkt. No. 226
2
(Daugherty Test.) at ¶ 81; Dkt. No. 228 (Pacheco Test.) at ¶¶ 9-16.)
3
31.
Caulk was removed by: (1) sealing off the area of the room where caulk
4
removal was to occur to create a containment area so that debris from the removal would not
5
escape to other areas; (2) physically scraping out the caulk in the removal area; (3) properly
6
disposing of the removed caulk and debris; (4) cleaning the areas from which caulk was
7
removed to ensure no caulk debris remained; and (5) encapsulating any remaining porous
8
substrate that had come into contact with the removed caulk pursuant to EPA approvals.
9
(Dkt. No. 219 (Herrmann Test.) at ¶¶ 16, 18; Dkt. No. 222 (Rohr Daniel Test.) at ¶¶ 21, 23;
10
11
12
13
Dkt. No. 226 (Daugherty Test.) at ¶ 81; Dkt. No. 228 (Pacheco Test.) at ¶¶ 9-14.)
32.
These removal activities were completed by June 30, 2015. (Dkt. No. 226
(Daugherty Test.) at ¶¶ 72, 74; Dkt. No. 228 (Pacheco Test.) at ¶¶ 5, 15.)
33.
Following the removal activities, pursuant to the EPA-approved Site-Specific
14
Plan and Removal Supplement and as described above, any area of the affected rooms where
15
porous substrate had come into contact with the removed caulking was encapsulated and any
16
area of the affected rooms where non-porous substrate had come into contact with the
17
removed caulking was decontaminated. (Dkt. No. 219 (Herrmann Test.) at ¶ 18; Dkt. No.
18
222 (Rohr Daniel Test.) at ¶ 23; (Dkt. No. 226 (Daugherty Test.) at ¶ 83; Dkt. No. 228
19
(Pacheco Test.) at ¶ 11.)
20
34.
The Ramboll Environ field team also conducted confirmatory air and wipe
21
sampling following the caulk removal activities to ensure that exposure levels in the rooms
22
where the Summer 2015 PCB Removal Activities occurred remained below the applicable
23
EPA’s Exposure Levels for Evaluating PCBs in Indoor School Air. (Dkt. No. 219
24
(Herrmann Test.) at ¶ 18; Dkt. No. 222 (Rohr Daniel Test.) at ¶ 23; Dkt. No. 226 (Daugherty
25
Test.) at ¶ 84; Dkt. No. 232 (Bowie Test.) at ¶ 22.)
26
27
35.
Encapsulation and confirmatory sampling was completed in the Summer of
2015. (Dkt. No. 226 (Daugherty Test.) at ¶ 84.)
28
-9-
1
36.
On October 5, 2015, after the Summer 2015 Pilot Study sampling event was
2
concluded in the Summer of 2015, the District submitted to EPA Region IX a letter along
3
with Ramboll Environ’s report entitled Conclusion of PCB Sampling Pilot Study and 2015
4
PCB Removal Activities Report for Malibu High School and Juan Cabrillo Elementary
5
School (“October 2015 Report”), which together certified the completion of the Summer
6
2015 PCB Removal Activities and reported the results of the Summer 2015 Pilot Study
7
sampling event. (Dkt. No. 225 (MacIntosh Test.) at ¶ 60; Dkt. No. 226 (Daugherty Test.) at
8
¶ 51; Ex. 562 (Appendix D, October 2015 Report); Ex. 564 (October 2015 Report).)
9
37.
As described in the October 2015 Report, Ramboll Environ undertook final
10
post-removal confirmatory sampling in each room where removal activities were undertaken
11
which indicated that PCB concentrations were below EPA Region IX’s surface wipe
12
benchmark for the Malibu Campus of 1 µg/100 cm2 for dust and below
13
population-applicable EPA’s Exposure Levels for PCBs in Indoor School Air, confirming
14
that the Summer 2015 PCB Removal Activities were successfully completed. (Dkt. No. 226
15
(Daugherty Test.) at ¶¶ 51, 84, 85; Ex. 559 (Building Materials Guidance) at p. 14.)
16
38.
In addition, during the Summer 2015 Pilot Study sampling, 100% of the air
17
samples and 99% of the wipe samples did not detect PCB concentrations above the
18
laboratory’s method reporting limit. (Dkt. No. 226 (Daugherty Test.) at ¶ 51; Ex. 562
19
(Appendix D, October 2015 Report); Ex. 564 (October 2015 Report).)
20
39.
In response to the October 2015 Report, EPA issued a letter to the District on
21
November 2, 2015, concluding that EPA “determined that the removal work, BMPs, and air
22
and wipe sampling were performed consistent with EPA’s national guidelines to protect
23
public health from PCBs in schools and the terms and conditions of the [October 31, 2014]
24
Approval.” (Dkt. No. 226 (Daugherty Test.) at ¶ 86; Ex. 566 (November 2, 2015 EPA
25
Correspondence).)1/
26
27
28
1/
Plaintiffs objected to the statements in the November 2, 2015 Correspondence.
Because the evidence is not being offered for the truth, the Court overrules the hearsay
objection.
-10-
1
40.
EPA reiterated its prior conclusion that it “does not believe that there is a need
2
for additional testing of potential PCB source materials until planned renovation or
3
demolition” of the pre-1981 buildings at the Malibu Campus. (Dkt. No. 226 (Daugherty
4
Test.) at ¶ 86; Ex. 566 (November 2, 2015 EPA Correspondence).)
5
41.
Based on the air and wipe data to date from the Malibu Campus, EPA
6
concluded that any “PCB remediation wastes remaining in place at MHS and JCES do not
7
pose an unreasonable risk of injury to health or the environment” and that “conditions at
8
both schools continue to meet EPA national guidelines to protect public health from PCBs in
9
schools.” (Dkt. No. 226 (Daugherty Test.) at ¶ 86; Ex. 566 (November 2, 2015 EPA
10
Correspondence).)2/
11
42.
The District is currently undertaking modernization projects at the Malibu
12
Campus utilizing funds from two Board of Education-approved bond measures that will
13
result in the removal and replacement of all pre-1979 windows and doors at MHS and JCES
14
and their surrounding caulk. (Dkt. No. 227 (Maez Test.) at ¶¶ 5, 12.)3/
15
43.
As part of these modernization projects, and in keeping with the
16
Comprehensive Plan and EPA policy and guidance, the District will properly characterize
17
building materials undergoing renovation or demolition, prior to disposal of these materials,
18
19
20
21
22
23
24
25
26
27
28
2/
Plaintiffs objected to the statements in the November 2, 2015 Correspondence.
Because the evidence is not being offered for the truth, the Court overrules the hearsay
objection.
3/
Plaintiffs objected to the testimony of Janece Maez concerning the District’s
renovation plans for the Malibu Campus on relevance, hearsay, and best evidence grounds.
Maez is the District’s Associate Superintendent and Chief Financial Officer. (Dkt. No. 227
(Maez Test.) at ¶ 2.) In this role, she manages the budget for any construction project
undertaken by the District, is responsible for disbursements of funding associated with bond
measures, and meets regularly concerning construction projects, including those at the
Malibu Campus. (Id. at ¶¶ 2-15.) The fact that the District is undertaking to remove and
replace all pre-1979 windows and doors at MHS and JCES is relevant to the scope and
timing of any injunctive relief the Court might grant. The Court overrules the other
evidentiary objections to Maez’s testimony as the statements are based upon her personal
knowledge.
-11-
1
that are planned to occur at the Malibu Campus over the next several years. (Dkt. No. 226
2
(Daugherty Test.) at ¶ 87; Ex. 529 (Comprehensive Plan) at 34.)
3
44.
The Comprehensive Plan sets forth detailed procedures to be followed once a
4
planned building renovation or demolition is scheduled. (Ex. 529 (Comprehensive Plan) at
5
36.) Similarly, the Specific Plan (Ex. 531) and Removal Supplement (Ex. 544) inform the
6
process for renovation and management of Potentially PCB-Impacted Building Materials
7
that will be subject to remediation.
8
9
10
11
12
45.
Measure BB is a District-wide bond measure in the amount of $268 million,
which was passed in 2006. (Dkt. No. 227 (Maez Test.) at ¶ 5.)
46.
With respect to the Malibu Campus, Measure BB bond money was set aside
for a campus improvement project to modernize MHS. (Dkt. No. 227 (Maez Test.) at ¶ 5.)
47.
Measure ES is a District-wide bond measure in the amount of $385 million,
13
which was passed in 2012 to “repair, modernize, construct and acquire classrooms,” to
14
ensure school earthquake and fire safety, and to upgrade technology. (Dkt. No. 227 (Maez
15
Test.) at ¶ 5.)
16
48.
As part of that bond measure, an allocation of approximately $77 million was
17
reserved for improvements to schools located in Malibu, including MHS and JCES. (Dkt.
18
No. 227 (Maez Test.) at ¶ 5.)
19
49.
The Measure BB project at the Malibu Campus, which has already received its
20
required approval from the Division of the State Architect (“DSA”), will result in
21
modernization of a significant portion of MHS. (Dkt. No. 227 (Maez Test.) at ¶ 6.)
22
50.
As part of the approved Measure BB project, Building A (Library and
23
computer labs) and Buildings B and C (Administrative Offices) will be completely
24
demolished and replaced with a new two-story building providing seven new general
25
classrooms and three new science labs for the middle school program; two computer labs; a
26
library with a high-tech classroom and multi-media center; and administrative offices and
27
support spaces. (Dkt. No. 227 (Maez Test.) at ¶ 6.)
28
-12-
1
51.
In addition, Building E will be renovated to provide two new and ten
2
modernized classrooms for the middle school program, and one classroom in Building E will
3
be converted into a modernized Faculty Lounge. (Dkt. No. 227 (Maez Test.) at ¶ 6.)
4
52.
As part of the modernization of Building E, all windows will be replaced with
5
energy-efficient windows, and all doors that have not been upgraded during the past 25 years
6
will be replaced. (Dkt. No. 227 (Maez Test.) at ¶ 6.)
7
53.
The window and door replacement will entail removal of the entire window
8
system and/or door and surrounding caulk in an affected room, re-framing, and installation
9
of a new window system and/or door with new caulk. (Dkt. No. 227 (Maez Test.) at ¶ 6.)
10
54.
The classrooms in Building E will also be re-painted, and any floor coverings
11
that have not been replaced in the past 25 years will be modernized. (Dkt. No. 227 (Maez
12
Test.) at ¶ 6.)
13
55.
The Measure BB project at MHS, which has been planned for several years
14
and which is now able to move forward following the resolution of certain land use issues, is
15
scheduled to begin after the 2015/2016 school year ends in June 2016 with construction of
16
temporary relocatable classrooms on the Malibu Campus. (Dkt. No. 227 (Maez Test.) at
17
¶ 7.)
18
56.
The District has undertaken the necessary administrative processes to permit
19
these classrooms for construction in the limited space available on campus to house them.
20
(Dkt. No. 227 (Maez Test.) at ¶ 7.)
21
57.
These portables will hold students and staff who will be moving from
22
Buildings A, B, C, and E when school resumes in the Fall of 2016. (Dkt. No. 227 (Maez
23
Test.) at ¶ 7.)
24
58.
Demolition and construction activities associated with the Measure BB project
25
are currently scheduled to commence this year, and to be completed by 2020. (Dkt. No. 227
26
(Maez Test.) at ¶ 7.)
27
28
59.
Students will return to new Buildings A, B, and C, and modernized Building
E, upon completion of the project. (Dkt. No. 227 (Maez Test.) at ¶ 7.)
-13-
1
60.
Because there are pre-1979 buildings on the MHS campus other than
2
Buildings A, B, C, and E that have not had windows, doors, or floors replaced in the past 25
3
years, the District has formulated a plan to take advantage of the fact that construction will
4
already be ongoing on the MHS campus to undertake modernization projects in Buildings D,
5
F (Orchestra/Band), G (Special Education/Woodshop), H (Cafetorium), I (Visual Art), and J
6
(Old Gymnasium) as part of a District-wide “Windows, Paint, Floors, and Doors” program
7
that is being administered with the use of Measure ES bond money. (Dkt. No. 227 (Maez
8
Test.) at ¶ 8.)
9
61.
The Windows, Paint, Floors, and Doors program identified a number of
10
campuses District-wide that would benefit from modernization of window systems, paint,
11
floors, and doors in their classrooms. (Dkt. No. 227 (Maez Test.) at ¶ 8.)
12
13
14
62.
All pre-1979 windows in Buildings D, F, G, H, I, and J will be replaced with
new, energy-efficient windows. (Dkt. No. 227 (Maez Test.) at ¶ 8.)
63.
As with the modernization of Building E, the window replacement will entail
15
removal of the entire window system and surrounding caulk, re-framing, and installation of a
16
new window system with new caulk. (Dkt. No. 227 (Maez Test.) at ¶ 8.)
17
64.
In addition, walls will be re-painted, floor coverings that have not been
18
replaced in the past 25 years will be modernized, and doors that have not been replaced in
19
the past 25 years will be replaced. (Dkt. No. 227 (Maez Test.) at ¶ 8.)
20
65.
As with windows, door replacement will entail removal of the entire door and
21
frame, re-framing, and installation of a new door with new caulk. (Dkt. No. 227 (Maez
22
Test.) at ¶ 8.)
23
24
25
66.
The modernization of Buildings D, F, G, H, I, and J is scheduled to begin
during 2017, and to be completed by 2020. (Dkt. No. 227 (Maez Test.) at ¶ 9.)
67.
In addition to the activities that are planned at MHS, modernization activities
26
will be taking place at JCES during 2016 as part of the Windows, Paint, Floors, and Doors
27
program. (Dkt. No. 227 (Maez Test.) at ¶ 10.)
28
-14-
1
2
3
68.
JCES is one of the first campuses to be modernized under the Windows, Paint,
Floors, and Doors program. (Dkt. No. 227 (Maez Test.) at ¶ 10.)
69.
Starting once the Summer 2016 school break commences in June of 2016, all
4
pre-1979 window systems at the JCES campus will be replaced with new, energy-efficient
5
windows. (Dkt. No. 227 (Maez Test.) at ¶ 11.)
6
70.
This primarily affects the window systems in Building F at that school, as most
7
doors and windows throughout the remainder of the JCES campus were modernized in the
8
1990s. (Dkt. No. 227 (Maez Test.) at ¶ 11.)
9
71.
In addition to the window replacement in Building F, all windows and doors
10
that have not been replaced within the past 25 years will be replaced, all floor coverings that
11
have not been replaced within the past 25 years will be modernized, and classrooms will
12
receive a fresh coat of paint. (Dkt. No. 227 (Maez Test.) at ¶ 11.)
13
72.
As with the modernization projects at MHS, the window and door replacement
14
will entail removal of the entire window system and/or door and frame and surrounding
15
caulk in any impacted room, re-framing, and installation of a new window system and/or
16
door with new caulk. (Dkt. No. 227 (Maez Test.) at ¶ 11.)
17
73.
These activities are expected to be fully completed by January of 2017, and the
18
window replacement activities are expected to be completed by the time school resumes at
19
JCES for the Fall 2016 semester. (Dkt. No. 227 (Maez Test.) at ¶ 11.)
20
74.
The Measure BB and ES projects at MHS and the Measure ES-funded
21
Windows, Paint, Floors, and Doors project at JCES, scheduled to be completed by 2020, will
22
address all pre-1979 windows and doors and surrounding caulking at the Malibu Campus.
23
(Dkt. No. 227 (Maez Test.) at ¶ 12.)
24
25
26
75.
The District is already engaging in the necessary administrative processes to
ensure that these projects move forward on schedule. (Dkt. No. 227 (Maez Test.) at ¶ 13.)
76.
The District hired an architect to begin designing the Windows, Paint, Floors,
27
and Doors project at JCES, including replacement of the windows in Building F, in October
28
of 2015. (Dkt. No. 227 (Maez Test.) at ¶ 13.)
-15-
1
77.
Architectural plans were submitted to DSA on March 18, 2016, a window
2
contractor, JEC, Inc., was hired in March of 2016, and bids for the general contractor were
3
opened on April 12, 2016 and will be awarded on May 5, 2016. (Dkt. No. 227 (Maez Test.)
4
at ¶ 13.)
5
6
78.
The work is, as discussed above, slated to begin during the Summer 2016
school break. (Dkt. No. 227 (Maez Test.) at ¶ 13.)
7
79.
With respect to the projects planned for MHS, the District already has an
8
existing DSA approval for the Measure BB project to replace Buildings A, B, and C and to
9
modernize Building E. The District plans to hire a contractor by the end of the 2016
10
calendar year to do this work. (Dkt. No. 227 (Maez Test.) at ¶ 13.)
11
80.
With respect to the Windows, Paint, Floors, and Doors projects to be
12
undertaken at MHS, the District plans to select an architect within the next two months.
13
(Dkt. No. 227 (Maez Test.) at ¶ 13.)
14
15
II.
Conclusions of Law
16
17
A.
Jurisdiction and Venue
18
1.
This Court has jurisdiction over Defendants and America Unites in this action
19
pursuant to 28 U.S.C. § 1331 (federal question), 28 U.S.C. § 2201 (declaratory judgment),
20
and 15 U.S.C. § 2619 (TSCA citizen suit provision). Dkt. No. 218-1 at p. 2:20-22.
21
2.
PEER has not established it has organizational standing sufficient to maintain
22
this lawsuit against Defendants, as set forth in Hunt v. Washington Apple Adver. Comm’n,
23
432 U.S. 333, 343, 97 S. Ct. 2434, 2441 (1977) (“[A]n association has standing to bring suit
24
on behalf of its members when: (a) its members would otherwise have standing to sue in
25
their own right; (b) the interests it seeks to protect are germane to the organization’s
26
purpose; and (c) neither the claim asserted nor the relief requested requires the participation
27
of individual members in the lawsuit.”). The party invoking federal jurisdiction bears the
28
burden of establishing these elements. See FW/PBS, Inc. v. City of Dallas, 493 U.S. 215,
-16-
1
231, 110 S. Ct. 596, 608, 107 L. Ed. 2d 603 (1990). Since they are not mere pleading
2
requirements but rather an indispensable part of the plaintiff’s case, each element must be
3
supported in the same way as any other matter on which the plaintiff bears the burden of
4
proof, i.e., with the manner and degree of evidence required at the successive stages of the
5
litigation. See Lujan v. Nat’l Wildlife Fed’n, 497 U.S. 871, 883-889, 110 S. Ct. 3177, 3186-
6
89, 111 L. Ed. 2d 695 (1990); Gladstone, Realtors v. Village of Bellwood, 441 U.S. 91,
7
114-15 & n.31, 99 S. Ct. 1601, 1615-16, 60 L. Ed. 2d 66 (1979). The Declaration of Katie
8
Lapajne, who identifies herself as a “supporter” of PEER, but not a member, does not
9
establish the necessary facts to support’s PEER’s associational standing to pursue the claims
10
it has asserted in this action. Nor has PEER submitted any other admissible evidence
11
concerning its members or if any such members would have the right to bring this action in
12
their own right. Because PEER has not met its burden to establish its standing to pursue its
13
claim in this action, the Court lacks subject matter jurisdiction over PEER’s claim and
14
dismisses PEER’s claim without prejudice. Fleck & Assocs., Inc. v. Phoenix, 471 F.3d 1100,
15
1106 (9th Cir. 2006) (explaining that lack of standing is a jurisdictional issue requiring
16
dismissal without prejudice).
17
3.
Venue is proper in this district under 15 U.S.C. § 2619(a)(2) because this is the
18
district in which the alleged violations are ongoing, and in which Defendants have their
19
principal place of business. (Dkt. No. 218-1 at p. 2:22-25.)
20
B.
Toxic Substances Control Act
21
4.
PCBs are regulated pursuant to the TSCA and its implementing regulations at
22
40 C.F.R. § 761.
23
5.
24
25
The EPA was authorized by the United States Congress to implement TSCA at
15 U.S.C. § 2601(c).
6.
EPA was authorized by Congress to promulgate rules as follows: “Within six
26
months after January 1, 1977, the Administrator shall promulgate rules to-(A) prescribe
27
methods for the disposal of PCBs, and (B) require PCBs to be marked with clear and
28
adequate warnings, and instructions with respect to their processing, distribution in
-17-
1
commerce, use, or disposal or with respect to any combination of such activities.” 15 U.S.C.
2
§ 2605(e)(1).
3
7.
EPA promulgated regulations regarding PCBs pursuant to TSCA. See 40 CFR
5
C.
Elements of TSCA Claim
6
8.
To establish a violation of the TSCA pursuant to the citizen suit provision at
4
7
§ 761.
15 U.S.C. § 2619, America Unites must show:
8
a.
9
The material or substance at issue constitutes a chemical, substance, or
mixture that is regulated under TSCA; and
10
b.
Defendants’ handling of the material or substance constitutes an
11
ongoing violation of a TSCA statutory provision or a regulation
12
promulgated pursuant to such a provision.
13
14
(Dkt. No. 218-1 at p. 4:11-17.)
9.
With respect to the PCBs alleged to be in issue in this matter, to establish a
15
violation of the citizen suit provision of the TSCA pursuant to the implementing regulations
16
at 40 C.F.R. § 761, America Unites must show:
17
a.
18
Building materials at the Malibu Campus contain PCBs, which are
regulated under TSCA; and
19
b.
Defendants are currently engaging in an ongoing use of building
20
materials containing PCBs at or above 50 ppm or with surface
21
concentrations above 10 µg/100 cm2 at buildings on the Malibu
22
Campus in violation of 15 U.S.C. § 2605(e)(2) and 15 U.S.C. § 2614(l)
23
and its implementing regulation at 40 C.F.R. § 761.20.
24
25
(Dkt. No. 218-1 at p. 4:18-28.)
10.
Among other things, the TSCA prohibits the use of any PCBs in any manner
26
other than in a totally enclosed manner. 15 U.S.C. § 2605(e)(2)(A); see also 40 C.F.R.
27
§ 761.20(a) (“No persons may use any PCB, or any PCB item regardless of concentration, in
28
any manner other than in a totally enclosed manner . . . .”).
-18-
1
12.
Because America Unites and PEER provided notice to Defendants more than
2
60 days prior to the filing of this suit, and neither EPA nor the Attorney General has brought
3
any enforcement action regarding PCBs at the Malibu Campus, this action is not precluded
4
by 15 U.S.C. § 2619(b)(1)(A) and (B).
5
6
7
13.
Under the TSCA’s “citizen suit” provision, a plaintiff may commence a civil
action “to restain” a violation of the TSCA. 15 U.S.C. § 2619(a)(1).
D.
A Preponderance of the Evidence Supports the Conclusion that Despite
8
Defendants’ Past Remediation Efforts, Building Materials Containing
9
PCBs In Excess of 50 ppm Continue to Exist at the Malibu Campus
10
14.
11
Partial Findings.
12
15.
In a separate order, the Court has denied Defendants’ Motion for Judgment on
The results of the testing conducted by the Phylmar Group and Ramboll
13
Environ showed multiple areas in multiple buildings on the Malibu Campus with caulk
14
containing PCBs in excess of the 50 ppm threshold.
15
16.
Although Defendants have removed and replaced the caulk from the specific
16
areas and rooms identified in their testing as exceeding the 50 ppm threshold, and some
17
other areas may have had doors and windows repaired or replaced after 1979, there is no
18
evidence that all of the caulk in the buildings at the Malibu Campus constructed prior to
19
1979 has been tested or removed.
20
17.
The Court concludes, based on common sense, that it is highly likely that the
21
same products were used to construct each of the buildings on the Malibu Campus. As a
22
result, for the buildings completed at the Malibu Campus prior to 1979, and at which certain
23
locations have been tested and found to contain caulk with PCBs in excess of 50 ppm, it is
24
more likely than not that caulk containing PCBs in excess of 50 ppm remain in “use” at the
25
Malibu Campus in areas that have not been tested or repaired.
26
27
18.
As a result of this conclusion, the Court rejects Defendants’ argument that the
TSCA claim brought by America Unites is moot.
28
-19-
1
E.
Appropriate Injunctive Remedy
2
19.
In its May 8, 2015 Minute Order denying plaintiffs’ Motion for Preliminary
3
Injunction, issued just six weeks after this action was filed, the Court highlighted some of
4
the issues that would necessarily guide any injunctive relief the Court might eventually
5
order:
6
While the public certainly has a strong interest in providing safe
7
school environments, there is also a strong public interest in
8
avoiding the confusion and difficulties that would be caused by
9
closing areas of MHS and JCES on shortened notice in the midst
10
of the school year. The public also has a strong interest in
11
having remediation work performed in a well-planned, careful,
12
and cost-effective manner. The mandatory injunction Plaintiffs
13
seek would have the Court interfere in a complex construction
14
and environmental remediation process with very limited
15
information concerning the associated costs and challenges. The
16
public’s interest in an orderly clean-up weighs against the
17
granting of a mandatory preliminary injunction.
18
(Dkt. No. 47.) Despite this guidance, America Unites failed at trial to present any
19
admissible evidence concerning the costs or amount of time it might take to remove any
20
remaining PCB-containing caulk at the Malibu Campus, or how those removal activities
21
might interfere with the educational mission of MHS and JCES and the scheduling of
22
classes.
23
20.
Defendants have provided evidence of their plan to replace some of the pre-
24
1979 buildings at the Malibu Campus and replace the windows and doors and associated
25
caulk of the remaining pre-1979 buildings. According to Defendants, that process will be
26
completed “by 2020.” (Dkt. No. 227 (Maez Test.) at ¶ 12.)
27
28
21.
In light of the failure of America Unites to provide any contrary evidence
concerning an appropriate construction schedule, the District’s continued use of BMPs while
-20-
1
potential PCB-containing materials continue to be “used” at the Malibu Campus, and the
2
Court’s strong desire to preserve the public’s funds, the Court will not require the District to
3
perform costly caulk-removal operations on windows and doors that are already slated for
4
replacement.
5
22.
The Court therefore concludes that the appropriate remedy is to enjoin the
6
District and Defendants from using any office, classroom, or other structure at the Malibu
7
Campus constructed prior to 1979 in which students, teachers, administrators, or staff are
8
regularly present after December 31, 2019, unless the window and door systems and
9
surrounding caulk have been replaced.4/
10
23.
Defendants contend that the primary jurisdiction doctrine bars the claim
11
asserted by America Unites. The primary jurisdiction doctrine “is applicable whenever the
12
enforcement of a claim subject to a specific regulatory scheme requires resolution of issues
13
that are ‘within the special competence of an administrative body.’” Farley Transp. Co. v.
14
Santa Fe Trail Transp. Co., 778 F.2d 1365, 1370 (9th Cir. 1985) (quoting United States v.
15
W. Pac. R.R., 352 U.S. 59, 64, 77 S. Ct. 161, 165, 1 L. Ed. 2d 126 (1956)). When the
16
primary jurisdiction doctrine applies, “the judicial process should be suspended and the
17
issues referred to the appropriate administrative body for its views.” Id. “No fixed
18
formula . . . exists for applying the doctrine, and each case must be examined on its own
19
facts to determine if ‘the reasons for the existence of the doctrine are present and whether
20
the purposes it serves will be aided by its application in the particular litigation.’” Id.
21
(quoting W. Pac. R.R., 352 U.S. at 64, 77 S. Ct. at 165).
22
24.
The EPA has said that as a result of the air and wipe sampling for PCBs
23
undertaken at the Malibu Campus, “and the ongoing and future implementation of BMPs
24
and monitoring at MHS and JCES . . . EPA does not believe that there is a need for
25
additional testing of potential PCB source materials until planned renovation or demolition.”
26
4/
27
28
Defendants shall make every effort to complete the contemplated construction project
by December 31, 2019. However, should construction or other delays slow completion of
the construction project and provide good cause, Defendants may, through noticed motion,
seek an extension of this deadline.
-21-
1
(Dkt. No. 226 (Daugherty Test.) at ¶ 86; Ex. 566 (November 2, 2015 EPA
2
Correspondence).) Because the District has represented to the Court that it is currently
3
engaged in, and will complete, the type of renovation or demolition that would, as
4
contemplated by the EPA, trigger removal and testing obligations, the injunctive relief
5
contemplated by Court is consistent with the EPA’s guidance and expertise. The Court
6
therefore rejects Defendants’ assertion of the EPA’s primary jurisdiction as a defense to the
7
claim for injunctive relief pursued by America Unites.
8
9
Conclusion
10
11
For all of the foregoing reasons, the Court concludes that the preponderance of the
12
evidence supports the conclusion that PCB-containing materials are in “use” at the Malibu
13
Campus. Because the District’s current plan to replace and renovate the pre-1979 buildings
14
on the Malibu Campus is a reasonable and appropriate remedy for the TSCA violation, the
15
Court will enter a permanent injunction that is consistent with the District’s construction
16
plan. PEER is dismissed for lack of standing. The Court will issue a Judgment and
17
Permanent Injunction consistent with these Findings of Fact and Conclusions of Law and the
18
Court’s December 21, 2015 Minute Order concerning sanctions. (Dkt. No. 76.)
19
DATED: September 1, 2016
20
21
___________________________________
Percy Anderson
UNITED STATES DISTRICT JUDGE
22
23
24
25
26
27
28
-22-