THE COURT GRANTS VENOCO'S MOTION TO REMAND by Judge Philip S. Gutierrez. granting 216 MOTION to Remand Case to State Court Case Remanded to Superior Court of California Santa Barbara County, 16CV01319. MD JS-6. Case Terminated. (rolm)
UNITED STATES DISTRICT COURT
CENTRAL DISTRICT OF CALIFORNIA
JS-6
CIVIL MINUTES - GENERAL
Case No.
CV 16-2988 PSG (JEMx)
Title
Venoco LLC v. Plains Pipeline LP
Present: The Honorable
Date
July 26, 2022
Philip S. Gutierrez, United States District Judge
Wendy Hernandez
Not Reported
Deputy Clerk
Court Reporter
Attorneys Present for Plaintiff(s):
Attorneys Present for Defendant(s):
Not Present
Not Present
Proceedings (In Chambers):
The Court GRANTS Venoco’s motion to remand.
Before the Court is a motion to remand filed by Plaintiff Venoco, LLC (“Venoco”). See
generally Dkt. # 216 (“Mot.”). Defendants Plains Pipeline, L.P.; Plains All American Pipeline,
L.P.; Plains GP Holdings, L.P.; Plains AAP, L.P.; Plains All American GP LLC; and PAA GP
LLC (collectively, “Plains”) opposed. See generally Dkt. # 220 (“Opp.”). Venoco replied. See
generally Dkt. # 222 (“Reply”). The Court finds this matter appropriate for decision without oral
argument. See Fed. R. Civ. P. 78; L.R. 7-15. After considering the moving, opposing, and reply
papers, the Court GRANTS the motion and REMANDS this case to Santa Barbara County
Superior Court.
I.
Background
This case arises out of the May 2015 rupture of Line 901, Plains’ oil pipeline located off
the coast of Santa Barbara County, California. Second Amended Complaint, Dkt. # 78 (“SAC”),
¶¶ 1, 18. The rupture resulted in the deposit of more than 140,000 gallons of crude oil onto the
California coastline. Id. ¶¶ 18, 20. Line 901 was shut down and has not since resumed
operations. Id. ¶ 21; see also Mot. 1:9. Prior to the oil spill, Venoco relied on Line 901 to
transport crude oil produced at its offshore “Holly” platform to onshore contactors. SAC
¶¶ 10–11. The spill left Venoco unable to produce or sell crude oil from the Holly platform. Id.
¶ 14.
In 2016, Venoco sued Plains in Santa Barbara County Superior Court, and Plains
removed the case to this Court, invoking the Court’s federal question and supplemental
jurisdiction. See generally Dkts. # 1, 1-1. The Court granted in part and denied in part Plains’
first motion to dismiss, allowing Venoco’s negligence, willful misconduct, and negligent
interference with prospective economic advantage claims to proceed. See generally Dkt. # 71
(“MTD I Order”). The Court dismissed with leave to amend Venoco’s claims under the federal
CV-90 (10/08)
CIVIL MINUTES - GENERAL
Page 1 of 10
UNITED STATES DISTRICT COURT
CENTRAL DISTRICT OF CALIFORNIA
CIVIL MINUTES - GENERAL
Case No.
CV 16-2988 PSG (JEMx)
Date
Title
Venoco LLC v. Plains Pipeline LP
July 26, 2022
Oil Pollution Act of 1990 (“OPA”) and California Lempert-Keene-Seastrand Oil Spill
Prevention and Response Act (“OSPRA”) as well as Venoco’s claims for intentional interference
with contractual and prospective economic advantage. See generally id.
In early 2017, the Court granted in part and denied in part Plains’ second motion to
dismiss, dismissing Plaintiff’s OPA and OSPRA claims without leave to amend and otherwise
denying the motion (the “2017 Order”). See generally Dkt. # 100 (“MTD II Order”). After
dismissing the sole federal claim that provided the basis for federal question jurisdiction, the
Court exercised its discretion to retain supplemental jurisdiction over the remaining state law
claims. See id. at 7–9.
In 2019, Plains moved for judgment on the pleadings as to each of Venoco’s remaining
claims on the grounds that Plains, as a public utility, did not owe Venoco a duty of care to
prevent harm from the discontinuation of Line 901. See generally Dkt. # 152. The Court
granted the motion, finding that California’s public utility rule barred Venoco’s claims, and
entered judgment in Plains’ favor. See generally Dkts. # 181, 184.1 The Ninth Circuit affirmed
the dismissal of Venoco’s OPA and OSPRA claims, found that the Court did not abuse its
discretion by retaining supplemental jurisdiction over the remaining state law claims,2 and
affirmed the dismissal of Venoco’s state law claims based on California’s public utility rule.
Venoco, LLC v. Plains Pipeline, L.P. (Venoco I), 814 F. App’x 318, 319–21 (9th Cir. 2020).
In November 2020, a California Court of Appeal rejected this Court’s and the Ninth
Circuit’s interpretation of California law, concluding that the public utility rule does not shield
Plains from liability for injuries caused by the Line 901 oil spill. See State Lands Comm’n v.
Plains Pipeline, L.P. (State Lands), 57 Cal. App. 5th 582, 586–88 (2020). In that case, the
California State Lands Commission (the “Commission”) claimed that Plains’ negligent
maintenance of Line 901 and the disruption of the flow of oil following the 2015 spill (1)
deprived the State of royalty income from leasing offshore lands to Venoco to operate the Holly
platform and (2) damaged the Commission’s property. Id. at 584–85. The Commission brought
1
The Court entered judgment on May 9, 2019. See generally Dkt. # 184. At the time, nearly
two months of fact discovery and five months of expert discovery remained. See generally Dkt.
# 163.
2
The Ninth Circuit did not address the factors of judicial economy, convenience, fairness, or
comity but found that this Court “was ‘in the best position to judge the extent of resources
invested’” and properly exercised its discretion in doing so. 814 F. App’x at 320 (quoting
Schneider v. TRW, Inc., 938 F.2d 986, 993–94 (9th Cir. 1991)).
CV-90 (10/08)
CIVIL MINUTES - GENERAL
Page 2 of 10
UNITED STATES DISTRICT COURT
CENTRAL DISTRICT OF CALIFORNIA
CIVIL MINUTES - GENERAL
Case No.
CV 16-2988 PSG (JEMx)
Date
Title
Venoco LLC v. Plains Pipeline LP
July 26, 2022
many of the same claims against Plains as did Venoco, including claims for negligence, willful
misconduct, and negligent interference with prospective economic advantage. See id. at 585.
The Court of Appeal reversed the trial court’s dismissal of the Commission’s claims, finding that
Plains was not exempt from liability under the public utility rule because it does not provide an
essential service to the general public. Id. at 586–88.
The following month, Venoco moved to set aside the judgment in this case and to reopen
the case pursuant to Federal Rule of Civil Procedure 60(b)(6), arguing that State Lands
constituted an intervening change in controlling law. See generally Dkt. # 204. The Court
denied the motion, finding that the divided State Lands decision did not clearly and
authoritatively change the governing law and that the interest in finality outweighed Venoco’s
interest in relitigating its claims. See generally Dkt. # 209.
The Ninth Circuit disagreed. In April 2022, it reversed this Court’s denial of Venoco’s
motion to set aside the judgment and remanded with directions to reopen the case. Venoco, LLC
v. Plains Pipeline, L.P. (Venoco II), No. 21-55193, 2022 WL 1090947, at *1–3 (9th Cir. Apr. 12,
2022). The Ninth Circuit held that State Lands constituted an intervening change of law for
purposes of Rule 60(b)(6) and found that, considering the relevant factors, “Venoco
demonstrated extraordinary circumstances warranting Rule 60(b)(6) relief.” Id. The Ninth
Circuit particularly highlighted the “close connection” between the two cases, noting that “State
Lands involved the same oil spill, the same legal doctrine, [] the same defendant,” and “virtually
identical facts” as this case. See id. at *2–3 (citation omitted). The court also reasoned that this
case raises important issues of comity because it “hinges on the application of a California
common law doctrine.” Id. at *3. The mandate issued on May 4, 2022. See generally Dkt.
# 214.
Venoco now asks the Court to exercise its discretion to decline to exercise supplemental
jurisdiction over Venoco’s revived state law claims. See generally Mot.
II.
Legal Standard
If a district court possesses original jurisdiction over one or more claims in an action, it
also has supplemental jurisdiction over all other claims that “form part of the same case or
controversy under Article III of the United States Constitution.” 28 U.S.C. § 1367(a). However,
a district court has discretion to decline to exercise supplemental jurisdiction when it “has
dismissed all claims over which it has original jurisdiction.” Id. § 1367(c)(3). Before doing so,
a district court must additionally consider the Gibbs “animating values” of supplemental
jurisdiction—comity, fairness, convenience, and judicial economy. See Acri v. Varian Assocs.,
CV-90 (10/08)
CIVIL MINUTES - GENERAL
Page 3 of 10
UNITED STATES DISTRICT COURT
CENTRAL DISTRICT OF CALIFORNIA
CIVIL MINUTES - GENERAL
Case No.
CV 16-2988 PSG (JEMx)
Date
Title
Venoco LLC v. Plains Pipeline LP
July 26, 2022
Inc., 114 F.3d 999, 1001 (9th Cir. 1997) (en banc) (citing United Mine Workers v. Gibbs, 383
U.S. 715 (1966)).
III.
Discussion
The Court begins by addressing (A) Plains’ argument that Venoco’s motion is an
untimely motion for reconsideration and then considers (B) whether the Gibbs factors now
counsel in favor of declining to exercise supplemental jurisdiction.
A.
Motion for Reconsideration
Plains first argues that Venoco’s motion is actually one for reconsideration of the Court’s
2017 Order and should be denied. Opp. 3:17–5:28. The Court disagrees.
To be sure, the Court previously decided to exercise supplemental jurisdiction over
Venoco’s remaining state law claims after dismissing the sole federal claim and considering the
parties’ supplemental briefing on the issue. MTD II Order at 7–9. The Court’s decision was
based in part on the fact that it was already presiding over four other cases related to the 2015
Santa Barbara oil spill and that splintering the cases between federal and state court would risk
inconsistent and unfair results. Id. at 8.
Five years later, Venoco asks the Court to, in its discretion, decline to exercise
supplemental jurisdiction over the recently revived state law claims in light of the present
circumstances. See generally Mot. As Venoco argues, it is not asking for reconsideration of the
2017 decision to exercise supplemental jurisdiction based on the circumstances at that time. See
Reply 2:15–17. Instead, Venoco asks the Court to consider whether, at this stage of the litigation
and considering the circumstances regarding the now-pending federal and state cases involving
the 2015 oil spill, the Gibbs factors counsel in favor of exercising supplemental jurisdiction. See
id. 2:17–7:19; see also Mot. 5:25–8:18.
The Supreme Court has made clear that the doctrine of supplemental jurisdiction is one of
discretion and flexibility. See Carnegie-Mellon Univ. v. Cohill, 484 U.S. 343, 350–51 (1988);
Gibbs, 383 U.S. at 726. “Under Gibbs, a federal court should consider and weigh in each case,
and at every stage of the litigation, the values of judicial economy, convenience, fairness, and
comity in order to decide whether to exercise” supplemental jurisdiction. Carnegie-Mellon
Univ., 484 U.S. at 350 (emphasis added).
CV-90 (10/08)
CIVIL MINUTES - GENERAL
Page 4 of 10
UNITED STATES DISTRICT COURT
CENTRAL DISTRICT OF CALIFORNIA
CIVIL MINUTES - GENERAL
Case No.
CV 16-2988 PSG (JEMx)
Date
Title
Venoco LLC v. Plains Pipeline LP
July 26, 2022
Thus, the Court has discretion—if not an imperative—to consider whether the Gibbs
factors counsel in favor of the continued exercise of supplemental jurisdiction over Venoco’s
state law claims at this stage. As discussed further below, the relevant circumstances have
evolved since the Court last considered the question more than five years ago. As a result, the
Court declines to treat Venoco’s motion as one for reconsideration of the 2017 Order and instead
proceeds to determine whether to continue to exercise supplemental jurisdiction in light of the
present circumstances.
B.
Gibbs Factors
Under 28 U.S.C. § 1367(c)(3), a district court may decline to exercise supplemental
jurisdiction when the claims conferring original jurisdiction have been dismissed. But before
declining to exercise supplemental jurisdiction, district courts must consider the Gibbs factors of
(i) comity, (ii) fairness, (iii) convenience, and (iv) judicial economy. See Acri, 114 F.3d at 1001.
The Supreme Court and Ninth Circuit have counseled “that in the usual case in which all federallaw claims are eliminated before trial, the balance of factors to be considered . . . will point
toward declining to exercise jurisdiction over the remaining state law claims.” Carnegie-Mellon
Univ., 484 U.S. at 350 n.7; see also Acri, 114 F.3d at 1000 (“[S]tate law claims should be
dismissed if federal claims are dismissed before trial.” (internal quotations and citations
omitted)). The Court addresses each factor in turn.
i.
Comity
Venoco argues that remand would further the interests of comity and avoid the risk of
inconsistent rulings between this case and those currently pending in state court. Mot.
7:20–8:18; Reply 4:14–5:1, 5:26–6:9.3 The Court agrees.
In the 2017 Order, the Court noted that it was already presiding over four other cases
involving the 2015 Santa Barbara oil spill and that, therefore, remanding Venoco’s claims would
risk inconsistent results. MTD II Order at 8. That calculus has since changed. Two of the
aforementioned cases have been dismissed, and the Court has preliminary approved a settlement
in a third case. See CV 16-3283 PSG (JEMx), Dkt. # 90 (dismissing case); SACV 16-1521 PSG
(JEMx), Dkt. # 48 (same); CV 15-4113 PSG (JEMx), Dkt. # 949 (preliminarily approving
3
Although Plains generally contends that all four Gibbs factors weigh in favor of continuing to
exercise supplemental jurisdiction, Plains does not raise any particular arguments as to how
doing so would further the interests of comity. See generally Opp.
CV-90 (10/08)
CIVIL MINUTES - GENERAL
Page 5 of 10
UNITED STATES DISTRICT COURT
CENTRAL DISTRICT OF CALIFORNIA
CIVIL MINUTES - GENERAL
Case No.
CV 16-2988 PSG (JEMx)
Date
Title
Venoco LLC v. Plains Pipeline LP
July 26, 2022
settlement). The only other remaining oil spill case pending before this Court involves
differently situated plaintiffs—owners of real property subject to easements for Line
901—asserting mostly distinct claims, with only a negligence claim in common with Venoco.
See generally Grey Fox, LLC et al. v. Plains All American Pipeline, L.P. et al., CV 16-3157 PSG
(JEMx), Dkt. # 107.
Meanwhile, three cases against Plains involving the 2015 oil spill remain pending in
Santa Barbara County Superior Court. See Mot. 7:22–26. At least one of these cases overlaps
far more significantly with this action than does Grey Fox. Three of Venoco’s remaining state
law claims in this action—for negligence, willful misconduct, and negligent interference with
prospective economic advantage—overlap with those asserted by the Commission in State
Lands, arising out of Plains’ interruption of Venoco’s use of Line 901. See 57 Cal. App. 5th at
584–85. As the Ninth Circuit recently explained, “State Lands involve[s] the same oil spill, the
same legal doctrine, [] the same defendant,” and “virtually identical facts” as this case. Venoco
II, 2022 WL 1090947, at *2–3. Continuing to exercise supplemental jurisdiction over Venoco’s
claims in federal court, while nearly identical claims proceed against Plains in state court, would
unnecessarily risk inconsistent rulings. See Gibbs, 383 U.S. at 726 (“Needless decisions of state
law should be avoided both as a matter of comity and to promote justice between the parties, by
procuring for them a surer-footed reading of applicable law.”).
The Ninth Circuit also noted that this case raises important issues of comity because it
“hinges on the application of a California common law doctrine.” Venoco II, 2022 WL
1090947, at *3 (“Rejecting the California Court of Appeal’s interpretation of its own state law
doctrine would only injure comity interests, especially because it applied this doctrine to the
same defendant on the basis of virtually identical facts.”). Although the Ninth Circuit
considered comity in the context of whether to follow the California Court of Appeal’s
determination that the public utility rule does not bar the claims against Plains, comity similarly
counsels in favor of remand here. This Court would otherwise proceed to apply many of the
same California common law doctrines in resolving Venoco’s remaining claims against Plains as
those applicable to the Commission’s claims proceeding in state court. And “state claims are not
required to be complicated or novel to raise comity concerns.” See U.S. Colo, LLC v. Coresite
One Wilshire, No. CV 14–4044 PSG (PLAx), 2014 WL 6682637, at *2 (C.D. Cal. Nov. 21,
2014); Danner v. Himmelfarb, 858 F.2d 515, 524 (9th Cir. 1988) (“[P]rinciples of comity will be
well-served by allowing the state courts to resolve claims solely of state law.”).
In sum, the Court finds that considerations of comity weigh in favor of declining to
exercise supplemental jurisdiction over Venoco’s remaining state law claims.
CV-90 (10/08)
CIVIL MINUTES - GENERAL
Page 6 of 10
UNITED STATES DISTRICT COURT
CENTRAL DISTRICT OF CALIFORNIA
CIVIL MINUTES - GENERAL
Case No.
CV 16-2988 PSG (JEMx)
Title
Venoco LLC v. Plains Pipeline LP
ii.
Date
July 26, 2022
Fairness
Plains argues that it would be unfair to remand this action given the length of time that
has passed and accuses Venoco of forum shopping for not seeking reconsideration after the 2017
Order. Opp. 8:21–9:3. The Court disagrees.
First, Plains’ accusations of forum shopping do not hold water. Venoco brought this
action—asserting mostly state law claims—in state court, and Plains removed the case to this
Court. See U.S. Colo, LLC, 2014 WL 6682637, at *3 (rejecting forum shopping argument where
“Plaintiff did not – with improper motive” file its claim in federal court and then “voluntarily
dismiss its own claim so that it could change forums”). As described above, the circumstances
have changed since the Court issued its 2017 Order. The Court is unconvinced that Venoco’s
decision to seek remand now that the Ninth Circuit has revived its state law claims—rather than
immediately after the 2017 Order—constitutes forum shopping.
While this case has been pending in federal court for more than six years, much of that
time was spent on appeal to the Ninth Circuit, and the case has not progressed on the merits in
more than three years. The case is beyond its initial stages, but discovery is ongoing, and no
trial date has been set. See generally Dkt. # 163 (listing the close of fact discovery more than
seven weeks, and the close of expert discovery more than five months, after the date on which
the Court entered judgment in May 2019); see also Mot. 2:15 (stating that “discovery has not
progressed beyond document production”). Given the relatively early stage of the proceedings
and the fact that trial preparations are far from complete, the Court does not find that declining to
exercise supplemental jurisdiction would be unfair to the parties. See Alvarez v. City of Oxnard,
CV 19-8044 PSG (JCx), Dkt. # 80 (slip op.), at *6–7 (C.D. Cal. Dec. 1, 2021) (declining to
exercise supplemental jurisdiction approximately three months before trial would not be so
unfair to the litigants as to override comity concerns); cf. Trs. of Constr. Indus. & Laborers
Health & Welfare Tr. v. Desert Valley Landscape & Maint., 333 F.3d 923, 926 (9th Cir. 2003)
(finding abuse of discretion where district court declined supplemental jurisdiction seven days
before trial after the parties were “essentially done with trial preparation”).4
4
Further, “there is no basis for assuming that a state forum will not provide ‘as fair a proceeding
as a federal one.’” Medina v. S. Cal. Permanente Med. Grp., No. CV16–3109 PSG JCx, 2017
WL 3575278, at *6–7 (C.D. Cal. July 17, 2017) (quoting Millar v. Bay Area Rapid Transit Dist.,
236 F. Supp. 2d 1110, 1120 (N.D. Cal. 2002)).
CV-90 (10/08)
CIVIL MINUTES - GENERAL
Page 7 of 10
UNITED STATES DISTRICT COURT
CENTRAL DISTRICT OF CALIFORNIA
CIVIL MINUTES - GENERAL
Case No.
CV 16-2988 PSG (JEMx)
Title
Venoco LLC v. Plains Pipeline LP
iii.
Date
July 26, 2022
Convenience
Venoco argues that convenience weighs in favor of remand because the state court is
already adjudicating several other cases against Plains involving the 2015 oil spill, including
State Lands, which “will likely involve depositions of former Venoco employees” and other
witnesses likely to be deposed in this action. Mot. 2:17–3:3; id. 7:20–8:18. Plains does not raise
any particular arguments as to convenience aside from suggesting that “counsel can efficiently
coordinate discovery between and among state and federal cases.” See Opp. 9:20–21. While
that may be true, the Court agrees with Venoco that the potential overlap in discovery between
this action and State Lands counsels in favor of both actions proceeding before the same court.
In contrast, there is little—if any—convenience to be gained by coordinating this action with
Grey Fox. Not only does Grey Fox involve differently situated plaintiffs and largely distinct
claims, but fact discovery in that case is already complete, and less than two months of expert
discovery remain. See generally CV 16-3157 PSG (JEMx), Dkt. # 194. On balance, the Court
finds that convenience considerations weigh in favor of declining to exercise supplemental
jurisdiction over Venoco’s state law claims.
iv.
Judicial Economy
Plains argues that judicial economy counsels in favor of the continued exercise of
supplemental jurisdiction given the work that the Court has already put into this case and the
other 2015 oil spill cases. Opp. 7:14–8:18. The Court disagrees.
The parties and the Court have no doubt expended some effort litigating Venoco’s claims
in this action. The Court has performed two rounds of substantive analysis of the merits of
Venoco’s state law claims, in addition to granting Plains’ motion for judgment on the pleadings
based on the public utility rule and addressing Venoco’s motions to alter and set aside the
judgment. See generally MTD I Order; MTD II Order; Dkts. # 181, 199, 209. Although some
of these efforts may be duplicated by the state court on remand,5 the extent of this potential
duplication does not tilt the scales of judicial economy heavily enough to counsel against
5
In State Lands, the California Court of Appeal determined that Plains “is not exempt from
liability for the interruption in service” to Venoco under the public utility rule. 57 Cal. App. 5th
at 584, 586–88. As such, the Court’s application of the public utility rule in this case will not
need to be duplicated by the state court on remand. And the Ninth Circuit has already reversed
this Court’s denial of Venoco’s motion for reconsideration in light of State Lands and revived
Venoco’s pertinent state law claims, Venoco II, 2022 WL 1090947, at *3, so the state court will
not need to duplicate this effort either.
CV-90 (10/08)
CIVIL MINUTES - GENERAL
Page 8 of 10
UNITED STATES DISTRICT COURT
CENTRAL DISTRICT OF CALIFORNIA
CIVIL MINUTES - GENERAL
Case No.
CV 16-2988 PSG (JEMx)
Date
Title
Venoco LLC v. Plains Pipeline LP
July 26, 2022
remand. See Hodgon v. Roper, No. 2:20-cv-00650, 2022 WL 297089, at *8 (E.D. Cal. Feb. 21,
2022) (declining to exercise supplemental jurisdiction over remaining state law claims and
finding the case fell within the “usual” scenario counseling in favor of doing so even though the
district court had already resolved motions to dismiss (quoting Carnegie-Mellon Univ., 484 U.S.
at 364 n.7)); cf. Miller Aviation v. Milwaukee Cnty. Bd. of Supervisors, 273 F.3d 722, 732 (7th
Cir. 2001) (reversing remand of state law claims on judicial efficiency grounds because the
district court had expended “considerable” resources on the case by resolving 22 motions,
issuing 19 detailed orders, and holding nine hearings). Further, as Venoco points out, the Santa
Barbara County Superior Court is already familiar with the pertinent factual and legal context,
having already resolved motions to dismiss the Commission’s largely overlapping claims against
Plains involving the same oil spill. See Reply 4:1–13.
Plains correctly notes that this Court has gained extensive knowledge of the issues
surrounding the 2015 oil spill over the past several years. Opp. 7:14–8:2. However, Venoco’s
claims are far more similarly situated to the claims in State Lands than those at issue in Grey Fox
or the other 2015 oil spill cases over which this Court has presided. And the state courts have no
doubt also developed substantial expertise in the factual and legal issues surrounding the 2015
oil spill over the past several years. As Venoco notes, the Santa Barbara County Superior Court
has presided over a total of 11 cases arising out of the 2015 oil spill, eight of which are now
dismissed. See Mot. 7 n.5; Reply 5:24–26.
Finally, Plains argues that remand “would require a state court to learn a complex
document discovery issue that Judge McDermott already has experience adjudicating,” pointing
to Judge McDermott’s order setting a deadline for Venoco to produce documents related to
Plains’ motion to compel. Opp. 8:6–20 (citing Dkt. # 177). But the state court is eminently
capable of continuing to oversee the parties’ discovery dispute, and the Court is unconvinced
that “[s]ignificant judicial efficiencies will be lost if . . . the parties must educate a new state
court judge on these issues.” See id. 8:19–20. Nor is there any reason to think that the parties’
discovery efforts thus far in federal court will not serve them equally in state court.
In sum, although judicial economy counseled in favor of exercising supplemental
jurisdiction at the time of the 2017 Order, the circumstances have changed such that this factor
now weighs slightly against continuing to exercise supplemental jurisdiction, despite the
potential for some duplication of effort.
v.
Conclusion
On balance, the Court finds that the Gibbs factors now weigh in favor of declining to
CV-90 (10/08)
CIVIL MINUTES - GENERAL
Page 9 of 10
UNITED STATES DISTRICT COURT
CENTRAL DISTRICT OF CALIFORNIA
CIVIL MINUTES - GENERAL
Case No.
CV 16-2988 PSG (JEMx)
Date
Title
Venoco LLC v. Plains Pipeline LP
July 26, 2022
exercise supplemental jurisdiction over Venoco’s state law claims. See Carnegie-Mellon Univ.,
484 U.S. at 350 n.7 (1988) (“[I]n the usual case in which all federal-law claims are eliminated
before trial, the balance of factors to be considered . . . will point toward declining to exercise
jurisdiction over the remaining state-law claims.”); Gibbs, 383 U.S. at 726–27 (“Certainly, if the
federal claims are dismissed before trial, . . . the state claims should be dismissed as well.”).
Accordingly, the Court GRANTS Venoco’s motion to remand.
IV.
Conclusion
For the foregoing reasons, the Court DECLINES to exercise supplemental jurisdiction
over Venoco’s remaining state law claims and GRANTS Venoco’s motion to remand. The
Court accordingly REMANDS this action to Santa Barbara County Superior Court. This order
closes the case.
IT IS SO ORDERED.
cc: Court of Appeals