Environmental Defense Center v. Ventura Regional Sanitation District
Filing
20
CONSENT DECREE by Judge Virginia A. Phillips (MD JS-6. Case Terminated) (bm)
June 1, 2017
AB for
1
UNITED STATES DISTRICT COURT
2
CENTRAL DISTRICT OF CALIFORNIA
3
4
5
JS-6
ENVIRONMENTAL DEFENSE
CENTER, a non-profit corporation,
6
Plaintiff,
Case No. 2:16-cv-05607-VAP-FFM
[PROPOSED] CONSENT DECREE
7
8
9
10
vs.
VENTURA REGIONAL
SANITATION DISTRICT, a public
agency,
11
12
Defendant.
13
14
15
CONSENT DECREE
WHEREAS, Plaintiff Environmental Defense Center (“EDC”) is a non-profit
16
17
public benefit corporation and law firm dedicated to the preservation and
18
enhancement of the local environment primarily within Ventura, Santa Barbara, and
19
San Luis Obispo Counties through education, advocacy, and legal action;
20
21
WHEREAS, Defendant Ventura Regional Sanitation District (“VRSD”) is a
public waste management agency, formed and authorized pursuant to California
22
23
Health & Safety Code § 4700 et seq., that operates the Toland Road Landfill, a
24
municipal solid waste landfill facility located at 3500 Toland Road in Santa Paula,
25
CA (“Facility”). EDC and VRSD are collectively referred to herein as the “Parties”;
26
WHEREAS, storm water discharges associated with industrial activity at the
27
28
Facility are regulated pursuant to the National Pollutant Discharge Elimination
[PROPOSED] CONSENT DECREE
Case No. 2:16-cv-05607-VAP-FFM
1
1
2
System (“NPDES”) General Permit No. CAS000001 [State Water Resources Control
Board], Water Quality Order No. 92-12-DWQ (as amended by Water Quality Order
3
4
97-03-DWQ and as subsequently amended by Water Quality Order No. 2014-0057-
5
DWQ) (hereinafter the “Permit”), issued pursuant to Section 402 of the Federal Water
6
Pollution Control Act (“Clean Water Act” or “the Act”), 33 U.S.C. §1342;
7
8
WHEREAS, the Permit includes the following requirements for all permittees,
including VRSD: 1) develop and implement a storm water pollution prevention plan
9
10
(“SWPPP”); 2) control pollutant discharges using best available technology
11
economically achievable (“BAT”) and best conventional pollutant control technology
12
(“BCT”) to prevent or reduce pollutants; 3) implement BAT and BCT through the
13
development and application of Best Management Practices (“BMPs”), which must be
14
included and updated in the SWPPP; and 4) when necessary, implement additional
15
16
17
18
19
20
BMPs to prevent or reduce any pollutants that are causing or contributing to any
exceedance of water quality standards;
WHEREAS, on May 3, 2016, EDC served VRSD, the Clerk of VRSD’s Board,
the Administrator of the Environmental Protection Agency (“EPA”), the Executive
Director of the State Water Resources Control Board (“State Board”), the Executive
21
22
Officer of the Los Angeles Regional Water Quality Control Board (“Regional
23
Board”), the U.S. Attorney General, and the Regional Administrator of the EPA
24
(Region 9) with a notice of intent to file suit (“60-Day Notice”) under Sections
25
505(a)(1) and (f) of the Clean Water Act, 33 U.S.C. § 1365(b)(1)(A), alleging
26
27
28
violations of the Act and the Permit at the Facility;
WHEREAS, EDC filed a complaint (“Complaint”) against VRSD in the United
[PROPOSED] CONSENT DECREE
Case No. 2:16-cv-05607-VAP-FFM
2
1
2
States District Court, Central District Court of California on July 27, 2016, entitled
Environmental Defense Center v. Ventura Regional Sanitation District (Case No.
3
4
5
2:16-cv-05607-VAP-FFM);
WHEREAS, EDC contends in its 60-Day Notice and Complaint that, among
6
other things, VRSD has repeatedly discharged polluted storm water in violation of the
7
Permit and the Clean Water Act:
8
WHEREAS, VRSD denies all allegations set forth in the 60-Day Notice and
9
10
11
Complaint and contends that EDC’s Complaint should be dismissed;
WHEREAS, VRSD, whenever there is sufficient storm water flow, has sampled
12
water upstream from the Facility during storm events and has measured high levels of
13
pollutants in said water; and
14
WHEREAS, VRSD has made plans to make significant investments and
15
16
17
improvements to the Facility’s storm water pollution prevention plan;
WHEREAS, the Parties, through their authorized representatives and without
18
either adjudication of EDC’s claims or any admission by VRSD of any alleged
19
violation or other wrongdoing, believe it is in their mutual interest and choose to
20
resolve in full EDC’s allegations in the 60-Day Notice and Complaint through
21
22
settlement and avoid the cost and uncertainties of further litigation;
23
NOW THEREFORE IT IS HEREBY STIPULATED BETWEEN THE
24
PARTIES, AND ORDERED AND DECREED BY THE COURT, AS FOLLOWS:
25
26
27
28
I.
COMMITMENTS OF VRSD
1.
In order to reduce or prevent pollutants associated with industrial activity
from discharging via storm water to the waters of the United States, VRSD shall
[PROPOSED] CONSENT DECREE
Case No. 2:16-cv-05607-VAP-FFM
3
1
2
implement appropriate structural and non-structural BMPs, as required by the Permit,
as described more fully below.
3
4
2.
Maintenance of Implemented Storm Water Controls. VRSD agrees
5
that the Facility shall maintain in good working order all storm water collection and
6
management systems currently installed or to be installed pursuant to this Consent
7
Decree, including but not limited to, existing housekeeping measures.
8
3.
Improvements to Detention Basin.
9
10
a.
In order to increase the capacity and improve the performance of
11
the main storm water detention basin at the Facility, by April 1,
12
2017, VRSD shall raise the riser or intake pipe by at least 5 feet.
13
b.
14
In order to help drain or discharge cleaner and clearer storm water
collected in the main storm water detention basin from the top
15
rather than the bottom, by April 1, 2017, VRSD shall place and put
16
17
into operation two sets of floating skimmers at different heights
18
within the main storm water detention basin to accomplish that
19
goal.
20
c.
In order to allow for more time for storm water to settle in the
21
main storm water detention basin, by April 1, 2017, VRSD shall
22
23
plug the existing French drain outlet in the main storm water
24
detention basin by capping the pipe with a blind flange.
25
26
27
28
d.
Within fourteen (14) days of each of the above storm water
pollution prevention program improvements, VRSD shall e-mail
EDC digital photographs confirming said improvements.
[PROPOSED] CONSENT DECREE
Case No. 2:16-cv-05607-VAP-FFM
4
1
4.
2
Improvements to Slow Velocity of Storm Water Leading to
Detention Basin.
3
a.
4
To slow the velocity of storm water flowing towards the main and
intermediate storm water detention basins, by May 1, 2017, VRSD
5
shall enhance the check dams throughout the Facility by both
6
implementing additional check dams and enhancing the
7
effectiveness of already implemented check dams.
8
9
b.
10
To reduce sediment loading to the detention basin, by June 1,
2017, VRSD shall: (i) ensure that all asphalt or concrete lined
11
storm water drainage channels that lead to the intermediate or main
12
storm water detention basins are fitted with intermittently placed
13
14
gravel bags or sand bags or compost filter socks; (ii) lay down
15
jute-netting over any earthen swales that are not stabilized by
16
vegetation or structural BMPs in the Facility; and (iii) hydroseed
17
and water non-vegetated slopes and areas around the Facility.
18
19
c.
To maintain the effectiveness of check dams and the use of gravel
20
or sand bags or compost filter socks in the Facility’s asphalt or
21
concrete storm water drainage channels, VRSD shall maintain a
22
written, annual log of check dam and sand or gravel bag or
23
24
compost filter sock placements, improvements and adjustments at
25
the Facility along with a map of the Facility showing the location
26
of these check dams and shall provide a digital copy of this log and
27
map to EDC for its review on an annual basis. VRSD agrees to
28
[PROPOSED] CONSENT DECREE
Case No. 2:16-cv-05607-VAP-FFM
5
1
provide EDC with an initial map of check dam and sand or gravel
2
bag or compost filter sock placements at the Facility, and related
3
digital photographs, within thirty (30) days of the effective date of
4
5
this Consent Decree. Within thirty (30) days of receipt of the log,
6
EDC may provide comments to VRSD regarding potential
7
modifications or improvements to the practices described in the
8
log. Should EDC provide such comments, VRSD agrees to meet
9
and confer with EDC to discuss and resolve its concerns, if any,
10
11
that VRSD may have with these EDC comments within sixty (60)
12
days of the receipt of EDC’s comments. Any failure of the Parties
13
to resolve EDC’s or VRSD’s concerns shall be governed by the
14
dispute resolution provisions set forth in Paragraph 12 of this
15
Consent Decree.
16
d.
17
In order to remove or prevent sediment in the storm water drainage
18
channels, VRSD shall conduct post-rain event review and
19
maintenance of these check dams and placement of gravel or sand
20
bags or compost filter socks no less than six (6) times per year.
21
VRSD shall maintain a regular schedule of hydroseeding and
22
23
watering of slopes at the Facility to reduce erosion and sediment in
24
storm water drainage channels.
25
5.
Revised Hydrology Report.
26
27
28
a.
By September 15, 2017, VRSD shall prepare, or cause to be
prepared, an amendment to the existing 2007 Hydraulics and
[PROPOSED] CONSENT DECREE
Case No. 2:16-cv-05607-VAP-FFM
6
Hydrology Drainage Report for Toland Landfill prepared by
1
2
Hawks & Associates and send it to EDC. This hydrology report
3
amendment shall, at a minimum, include the following:
4
5
i.
6
A detailed map of the Facility’s current storm water
conveyance system, including direction of flows and location
7
of the eastern- and western-perimeter conveyance systems,
8
and any pipes, berms, channels, and catch basins used to
9
10
collect, divert, and/or retain storm water runoff.
11
ii.
A detailed, quantitative analysis that further supports or
12
demonstrates that the Facility’s storm water conveyances and
13
14
main storm water detention basin are adequately sized to
15
handle a 100-year, 24-hour rainfall event for both current
16
landfill (i.e., as of February 2017) conditions as well as
17
future (capped or closed) landfill conditions.
18
19
b.
Within thirty (30) days of receipt of the hydrology report
20
amendment, EDC may provide comments to VRSD regarding
21
potential modifications or improvements to the report. Should
22
EDC provide such comments, VRSD agrees to meet and confer
23
with EDC to discuss and resolve its concerns, if any, that VRSD
24
25
may have with these EDC comments within sixty (60) days of the
26
receipt of EDC’s comments. Any failure of the Parties to resolve
27
EDC’s or VRSD’s concerns shall be governed by the dispute
28
[PROPOSED] CONSENT DECREE
Case No. 2:16-cv-05607-VAP-FFM
7
1
resolution provisions set forth in Paragraph 12 of this Consent
2
Decree.
3
4
6.
Updates to SWPPP Map. Within thirty (30) days of the Effective Date,
5
VRSD shall update the site maps included in its SWPPP for the Facility to depict
6
changes made to the Facility, including those described in Paragraphs 2-4 of this
7
Consent Decree.
8
7.
Amendment of SWPPP. Within thirty (30) days of the Effective Date
9
10
of this Consent Decree, VRSD shall amend the Facility’s SWPPP to incorporate all
11
changes, improvements, sample log forms, and best management practices set forth in
12
or resulting from this Consent Decree. VRSD shall ensure that all maps, tables, and
13
text comply with the requirements of the Permit or other applicable regulatory
14
standard. VRSD shall revise, as necessary, the SWPPP to describe all structural and
15
16
non-structural BMPs, details of the measures to be installed, and discuss why such
17
BMPs should be effective in addressing the quality of storm water discharges from the
18
Facility. A copy of the amended SWPPP shall be provided to EDC within thirty (30)
19
days of completion and submittal to the Regional Board.
20
8.
Reports. During the term of this Consent Decree, VRSD shall provide
21
22
EDC with a copy of all documents submitted to the Regional Board or the State Board
23
concerning the Facility’s compliance with the Permit. Such documents and reports
24
shall be transmitted to EDC via electronic mail, if feasible, or by U.S. Mail when
25
electronic transmission is not feasible, at the time the documents are due to be
26
27
submitted to the Regional Board or State Board.
28
[PROPOSED] CONSENT DECREE
Case No. 2:16-cv-05607-VAP-FFM
8
1
2
II.
MITIGATION, FEES, AND COSTS
9.
Mitigation Payment. In recognition of the good faith efforts by VRSD
3
4
to comply with all aspects of the Permit and the Clean Water Act at the Facility, and
5
in lieu of payment by VRSD of any civil penalties under the Act, which may have
6
been assessed in this action if it had been adjudicated adverse to VRSD, the Parties
7
agree that VRSD will pay the sum of seventy-five thousand dollars ($75,000.00) to
8
The Nature Conservancy (“TNC”) for the sole purpose of funding TNC’s on-going
9
10
invasive species removal in the Santa Clara River Watershed in order to improve the
11
quality, flow and quantity of surface water and ground water, to improve aquatic
12
species habitat, and to reduce a serious fire hazard. Payment shall be provided to
13
TNC as follows: The Nature Conservancy, 532 East Main Street, Suite #200, Ventura,
14
CA 93001, Attention: Laura Reige, Santa Clara River & Coast Project Director.
15
16
Payment shall be made by VRSD to TNC within fifteen (15) calendar days of the
17
Effective Date. VRSD shall copy EDC with any correspondence and a copy of the
18
check sent to TNC. TNC shall provide notice to the Parties within thirty (30) days of
19
when the funds are disbursed or used by TNC, setting forth the purpose of the funds.
20
10.
Reimbursement of Fees and Costs. VRSD shall reimburse EDC in an
21
22
amount not to exceed sixty-five thousand dollars ($65,000) to help defray EDC’s
23
reasonable investigation, expert, and attorneys’ fees and costs, and all other
24
reasonable costs incurred as a result of investigating the activities at the Facility
25
related to this Consent Decree, bringing these matters to VRSD’s attention, and
26
27
28
negotiating a resolution of this action in the public interest. VRSD shall tender said
payment, payable to “Environmental Defense Center”, within thirty (30) days of the
[PROPOSED] CONSENT DECREE
Case No. 2:16-cv-05607-VAP-FFM
9
1
2
Effective Date.
11.
Compliance Monitoring Funds. As reimbursement for EDC’s future
3
4
fees and costs that may be incurred in order for EDC to monitor VRSD’s compliance
5
with this Consent Decree and to effectively meet and confer and evaluate storm water
6
monitoring results for the Facility, VRSD agrees to reimburse EDC for fees and costs
7
incurred in overseeing the implementation of this Consent Decree up to, but not
8
exceeding, five thousand dollars ($5,000.00) per reporting year or a total of no more
9
10
than $15,000 for the three reporting years set out in this Consent Decree below.
11
Examples of reimbursable monitoring fees and costs include, but are not limited to,
12
those incurred by EDC or its counsel to conduct review of water quality sampling
13
reports, review of annual summary reports, review of the hydrology report, review of
14
other documents submitted pursuant to this Consent Decree, discussion with
15
16
representatives of VRSD concerning potential changes to compliance requirements,
17
water quality sampling, informal dispute resolution, and other actions necessary to
18
monitor and ensure VRSD’s compliance with this Consent Decree. To request
19
reimbursement, EDC shall provide VRSD with an annual invoice containing an
20
itemized description for any fees and costs claimed for the prior twelve (12) month
21
22
period. Up to a maximum of three payments (one addressing monitoring associated
23
with the 2016-2017 reporting year, one addressing any monitoring associated with the
24
2017-2018 reporting year, and one addressing any monitoring associated with the
25
2018-2019 reporting year) shall be made payable to “Environmental Defense Center”
26
27
28
within thirty (30) days of receipt of an invoice from EDC which contains an itemized
description of fees and costs incurred by EDC to monitor implementation of the
[PROPOSED] CONSENT DECREE
Case No. 2:16-cv-05607-VAP-FFM
10
1
2
Consent Decree during the previous twelve (12) months.
12.
Dispute Resolution. If a dispute between the Parties under this Consent
3
4
Decree arises, or either Party believes that a breach of this Consent Decree has
5
occurred, the Parties shall schedule a meet and confer within ten (10) business days of
6
receiving written notification from the other Party of a request for a meeting to
7
determine whether a violation of this Consent Decree has occurred and to develop a
8
mutually agreed upon plan, including implementation dates, to resolve the dispute. In
9
10
the event that such disputes cannot be resolved through this meet and confer process,
11
the Parties agree to request a settlement meeting before the Magistrate Judge assigned
12
to this action. The Parties agree to file any waivers necessary for the Magistrate Judge
13
to preside over any settlement conference pursuant to this Paragraph. In the event that
14
the Parties cannot resolve the dispute by the conclusion of the settlement meeting with
15
16
the Magistrate Judge, the Parties agree to submit the dispute via motion to the District
17
Court. In resolving any dispute arising from this Consent Decree, the Court shall have
18
discretion to award attorneys’ fees and costs to either party. The relevant provisions
19
of the then-applicable Clean Water Act and Rule 11 of the Federal Rules of Civil
20
Procedure shall govern the allocation of fees and costs in connection with the
21
22
resolution of any disputes before the District Court. The District Court’s award of any
23
relief in a dispute brought pursuant to this paragraph shall be limited to compliance
24
orders and awards of attorneys’ fees and costs, subject to proof.
25
III.
JURISDICTION OVER PARTIES AND SUBJECT MATTER OF
THE CONSENT DECREE
13.
Jurisdiction. For the purposes of this Consent Decree, the Parties
26
27
28
[PROPOSED] CONSENT DECREE
Case No. 2:16-cv-05607-VAP-FFM
11
1
2
stipulate that the United States District Court of California, Central District of
California, has jurisdiction over the Parties and subject matter of this Consent Decree.
3
4
The Parties stipulate that venue is appropriate in the Central District of California and
5
that VRSD will not raise in the future as part of enforcement of this Consent Decree
6
whether EDC has standing to bring the Complaint or any subsequent action or motion
7
pursuant to the Dispute Resolution procedures herein.
8
14.
Submission of Consent Decree to DOJ. Within three (3) business days
9
10
of receiving all of the Parties’ signatures to this Consent Decree, EDC shall submit
11
this Consent Decree to the U.S. Department of Justice (“DOJ”) and EPA for agency
12
review consistent with 40 C.F.R. §135.5. The agency review period expires forty-five
13
(45) calendar days after receipt by the DOJ, evidenced by correspondence from DOJ
14
establishing the review period. In the event DOJ comments negatively on the
15
16
17
provisions of this Consent Decree, the Parties agree to meet and confer to attempt to
resolve the issues raised by DOJ.
18
IV.
WAIVER, RELEASES AND COVENANTS NOT TO SUE
19
15.
In consideration of the payments that are to be made by VRSD above,
20
and except as otherwise provided by this Consent Decree, the EDC hereby covenants
21
22
not to sue or to take administrative action against VRSD for any allegations and
23
claims set forth in the 60-Day Notice Letter and Complaint for storm water pollution
24
discharge at the Facility up to and including the Termination Date of this Consent
25
Decree.
26
27
28
16.
The Parties forever and fully release each other and their respective
parents, affiliates, subsidiaries, divisions, insurers, successors, assigns, and current
[PROPOSED] CONSENT DECREE
Case No. 2:16-cv-05607-VAP-FFM
12
1
2
and former employees, attorneys, officers, directors and agents from any and all
claims and demands of any kind, nature, or description whatsoever, and from any and
3
4
all liabilities, damages, injuries, actions or causes of action, either at law or in equity,
5
which the Parties have against each other arising from EDC’s allegations and claims
6
as set forth in the 60-Day Notice Letter and Complaint for storm water pollution
7
discharges at the Facility up to and including the Termination Date of this Consent
8
Decree.
9
10
11
12
13
14
17.
The Parties acknowledge that they are familiar with section 1542 of the
California Civil Code, which provides:
A general release does not extend to claims which the creditor does not
know or suspect to exist in his or her favor at the time of executing the
release, which if known by him or her must have materially affected his
or her settlement with the debtor.
15
The Parties hereby waive and relinquish any rights or benefits they may have under
16
California Civil Code section 1542 with respect to any other claims against each other
17
arising from, or related to, the allegations and claims as set forth in the 60-Day Notice
18
19
20
21
22
23
24
Letter and Complaint for storm water pollution discharges at the Facility up to and
including the Termination Date of this Consent Decree.
18.
No Admission. The Parties enter into this Consent Decree for the
purpose of avoiding prolonged and costly litigation. Nothing in this Consent Decree
shall be construed as, and VRSD expressly does not intend to imply, any admission as
25
to any fact, finding, issue of law, or violation of law, nor shall compliance with this
26
Consent Decree constitute or be construed as an admission by VRSD of any fact,
27
finding, conclusion, issue of law, or violation of law. However, this Paragraph shall
28
[PROPOSED] CONSENT DECREE
Case No. 2:16-cv-05607-VAP-FFM
13
1
2
not diminish or otherwise affect the obligation, responsibilities, and duties of the
Parties under this Consent Decree.
3
4
5
6
7
8
V.
MISCELLANEOUS PROVISIONS
19.
Effective Date. The Effective Date of this Consent Decree shall be upon
the subsequent entry of the Consent Decree by the Court.
20.
Term of Consent Decree. This Consent Decree shall terminate on
December 21, 2019, or through the conclusion of any proceeding to enforce this
9
10
Consent Decree initiated prior to December 21, 2019, or until the completion of any
11
payment or affirmative duty required by this Consent Decree, whichever is the later
12
occurrence.
13
14
21.
Execution in Counterparts. The Consent Decree may be executed in
one or more counterparts which, taken together, shall be deemed to constitute one and
15
16
17
18
19
20
the same document.
22.
Facsimile Signatures. The Parties’ signatures to this Consent Decree
transmitted by facsimile or electronic mail transmission shall be deemed binding.
23.
Construction. The language in all parts of this Consent Decree, unless
otherwise stated, shall be construed according to its plain and ordinary meaning. The
21
22
23
24
25
26
27
28
captions and paragraph headings used in this Consent Decree are for reference only
and shall not affect the construction of this Consent Decree.
24.
Authority to Sign. The undersigned are authorized to execute this
Consent Decree on behalf of their respective parties and have read, understood and
agreed to all of the terms and conditions of this Consent Decree.
25.
Integrated Consent Decree. All agreements, covenants, representations
[PROPOSED] CONSENT DECREE
Case No. 2:16-cv-05607-VAP-FFM
14
1
2
and warranties, express or implied, oral or written, of the Parties concerning the
subject matter of this Consent Decree are contained herein.
3
4
26.
Severability. In the event that any of the provisions of this Consent
5
Decree are held by a court to be unenforceable, the validity of the enforceable
6
provisions shall not be adversely affected.
7
8
27.
Choice of Law. This Consent Decree shall be governed by the laws of
the United States, and where applicable, the laws of the State of California.
9
10
28.
Full Settlement. This Consent Decree constitutes a full and final
11
settlement of this matter. It is expressly understood and agreed that the Consent
12
Decree has been freely and voluntarily entered into by the Parties with and upon
13
advice of counsel.
14
29.
Negotiated Agreement. The Parties have negotiated this Consent
15
16
Decree, and agree that it shall not be construed against the party preparing it, but shall
17
be construed as if the Parties jointly prepared this Consent Decree, and any
18
uncertainty and ambiguity shall not be interpreted against any one party.
19
20
30.
Modification of the Agreement. This Consent Decree, and any
provisions herein, may not be changed, waived, or discharged unless by a written
21
22
23
instrument signed by the Parties.
31.
Assignment. Subject only to the express restrictions contained in this
24
Consent Decree, all of the rights, duties and obligations contained in this Consent
25
Decree shall inure to the benefit of and be binding upon the Parties, and their
26
27
28
successors and assigns.
32.
Mailing of Documents to EDC/Notices/Correspondence. Any notices
[PROPOSED] CONSENT DECREE
Case No. 2:16-cv-05607-VAP-FFM
15
1
2
or documents required or provided for by this Consent Decree or related thereto that
are to be provided to EDC pursuant to this Consent Decree shall be, to the extent
3
4
feasible, sent via electronic mail transmission to the e-mail addresses listed below or,
5
if electronic mail transmission is not feasible, via certified U.S. Mail with return
6
receipt, or by hand delivery to the following address:
7
EDC:
8
11
Maggie Hall
Environmental Defense Center
906 Garden Street
Santa Barbara, CA 93101
E-mail: mhall@environmentaldefensecenter.org
12
With copies sent to:
13
16
Douglas Chermak
Lozeau Drury LLP
410 12th Street, Suite 250
Oakland, CA 94607
E-mail: doug@lozeaudrury.com
17
Unless requested otherwise by VRSD, any notices or documents required or
9
10
14
15
18
19
provided for by this Consent Decree or related thereto that are to be provided to
VRSD pursuant to this Consent Decree shall, to the extent feasible, be provided by
20
21
electronic mail transmission to the e-mail addresses listed below, or, if electronic mail
22
transmission is not feasible, by certified U.S. Mail with return receipt, or by hand
23
delivery to the addresses below:
24
25
26
27
28
VRSD:
Chris Theisen, General Manager
Ventura Regional Sanitation District
1001 Partridge Drive, Suite #150
Ventura, CA 93003-0704
E-mail: ChrisTheisen@vrsd.com
[PROPOSED] CONSENT DECREE
Case No. 2:16-cv-05607-VAP-FFM
16
1
2
3
4
5
6
7
8
With copies sent to:
Robert N. Kwong
Arnold LaRochelle Mathews VanConas & Zirbel LLP
300 Esplanade Drive, Suite 2100
Oxnard, CA 93036
E-mail: rkwong@atozlaw.com
Notifications of communications shall be deemed submitted on the date that they are
emailed, or postmarked and sent by first-class mail or deposited with an overnight
9
10
11
12
13
mail/delivery service. Any changes of address or addressees shall be communicated
in the manner described above for giving notices.
33.
Impossibility of Performance. No Party shall be considered to be in
default in the performance of any of its obligations under this Consent Decree when
14
15
performance becomes impossible, despite the timely good faith efforts of the Party,
16
due to circumstances beyond the Party’s control, including without limitation any act
17
of God, act of war or terrorism, fire, earthquake, flood, and restraint by court order or
18
public authority. “Circumstances beyond the Party’s control” shall not include normal
19
inclement weather, economic hardship or inability to pay. Any Party seeking to rely
20
21
upon this paragraph shall have the burden of establishing that it could not reasonably
22
have been expected to avoid, and which by exercise of due diligence has been unable
23
to overcome, the impossibility of performance.
24
25
34.
If for any reason the DOJ or the District Court should decline to approve
this Consent Decree in the form presented, the Parties shall use their best efforts to
26
27
28
work together to modify the Consent Decree within thirty (30) days so that it is
acceptable to the DOJ or the District Court. If the Parties are unable to modify this
[PROPOSED] CONSENT DECREE
Case No. 2:16-cv-05607-VAP-FFM
17
1
2
Consent Decree in a mutually acceptable manner that is also acceptable to the District
Court, this Consent Decree shall immediately be null and void as well as inadmissible
3
4
5
6
7
8
as a settlement communication under Federal Rule of Evidence 408 and California
Evidence Code section 1152.
35.
The settling Parties hereto enter into this Consent Decree, Order and
Final Judgment and submit it to the Court for its approval and entry as a final
judgment.
9
10
[SIGNATURES TO APPEAR ON THE FOLLOWING PAGE]
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
[PROPOSED] CONSENT DECREE
Case No. 2:16-cv-05607-VAP-FFM
18
1
2
3
4
5
6
ENVIRONMENTAL DEFENSE CENTER
Date: ________________, 2017
_____________________________________
Judith Pirkowitsch
President, Board of Directors
Environmental Defense Center
7
8
9
10
11
12
VENTURA REGIONAL SANITATION DISTRICT
Date: ________________, 2017
______________________________________
William Weirick
Chairperson, Board of Directors
13
14
15
Approved as to form:
LOZEAU DRURY LLP
16
17
18
19
Date: ________________, 2017
_____________________________________
Douglas Chermak
Attorneys for Environmental Defense Center
20
21
22
23
24
25
26
ENVIRONMENTAL DEFENSE CENTER
Date: ________________, 2017
_____________________________________
Margaret Hall
Attorney for Environmental Defense Center
27
28
[PROPOSED] CONSENT DECREE
Case No. 2:16-cv-05607-VAP-FFM
19
1
2
3
4
5
ARNOLD LAROCHELLE MATHEWS VANCONAS & ZIRBEL LLP
Date: ________________, 2017
______________________________________
Robert N. Kwong
Attorney for Ventura Regional Sanitation District
6
7
8
9
10
APPROVED AND SO ORDERED, this 1st day of June, 2017.
11
12
13
UNITED STATES DISTRICT JUDGE
14
15
______________________________________
Hon. Virginia A. Phillips
16
17
18
19
20
21
22
23
24
25
26
27
28
[PROPOSED] CONSENT DECREE
Case No. 2:16-cv-05607-VAP-FFM
20