BNSF Railway Company v. San Joaquin Valley Railroad Company
Filing
216
ORDER Denying Defendant's Motion to Amend Its Counterclaims [Docs. 179 and 204], signed by Magistrate Judge Sandra M. Snyder on 8/2/2011. (Herman, H)
1
2
3
4
5
6
UNITED STATES DISTRICT COURT
7
EASTERN DISTRICT OF CALIFORNIA
8
9
BNSF RAILWAY COMPANY,
10
11
CASE NO. 1:08-cv-01086-AWI-SMS
Plaintiff,
ORDER DENYING DEFENDANT’S MOTION
TO AMEND ITS COUNTERCLAIMS
v.
12
13
14
15
SAN JOAQUIN VALLEY RAILROAD
COMPANY, et al.,
Defendants.
(Docs. 179 and 204)
/
16
17
On January 11, 2010, Defendant San Joaquin Valley Railroad Company (“SJVR”) moved
18
for leave to amend its counterclaim to add two new tort claims (fraud and fraudulent
19
misrepresentation). The Magistrate Judge denied SJVR’s motion on December 14, 2010. SJVR
20
moved for reconsideration by the District Court, which vacated the December 14, 2010 order and
21
22
remanded the motion to the Magistrate Judge for reconsideration of Plaintiff BNSF Railway
23
Company’s (“BNSF”) contentions of (1) prejudice, (2) untimeliness, and (3) futility arising from
24
the general California rule that a breach of contract will not give rise to a tort claim. Having
25
reviewed the record, the parties’ arguments, and applicable law, this Court denies SJVR’s motion
26
to amend its counterclaims to add tort claims.
27
1
1
I.
2
Discussion
If a party has already amended its pleadings once as a matter of course, further
3
amendment requires the consent of the adverse party or leave of the court. F.R.Civ.P. 15(a).
4
5
Courts should freely grant leave to amend when justice so requires. Id. In general, courts should
6
apply this policy with “extreme liberality.” Owens v. Kaiser Found. Health Plan, Inc., 244 F.3d
7
708, 712 (9th Cir. 2001), quoting Moronga Band of Mission Indians v. Rose, 893 F.2d 1074, 1079
8
(9th Cir. 1990). The Supreme Court directed district courts to consider the following specific
9
factors in deciding whether to grant a motion to amend:
10
13
In the absence of any apparent or declared reason–such as undue delay, bad faith
or dilatory motive on the part of the movant, repeated failure to cure deficiencies
by amendments previously allowed, undue prejudice to the opposing party by
virtue of allowance of the amendment, futility of amendment, etc.–the leave
sought should, as the rules require, be “freely given.”
14
Foman v. Davis, 371 U.S. 178, 182 (1962).
11
12
15
The factors are not to be given equal weight. Eminence Capital, LLC v. Aspeon, Inc., 316
16
17
F.3d 1048, 1052 (9th Cir. 2003). Prejudice to the opposing party must be given the greatest
18
weight. Id. The factors should not be understood rigidly or evaluated mechanically; the court
19
should “examine each case on its facts” and determine the propriety of granting leave to amend
20
on that basis. SAES Getters S.p.A. v. Aeronex, Inc., 219 F.Supp.2d 1081, 1086 (S.D.Cal. 2002),
21
quoting 6 Charles Alan Wright, et al., Federal Practice and Procedure Civil 2d § 1430 (2d ed.
22
23
1990). “Absent prejudice, or a strong showing of any of the other the remaining Foman factors,
24
there exists a presumption under Rule 15(a) in favor of granting leave to amend.” SAES Getters,
25
219 F.Supp.2d at 1086.
26
///
27
2
1
2
The District Court remanded this matter to the Magistrate Judge for reconsideration of
SJVR’s motion to amend in light of three factors: (1) prejudice to BNSF; (2) untimeliness of the
3
motion to amend; and (3) futility arising from the general California rule that a breach of contract
4
5
will not give rise to a tort action.
6
A.
7
In evaluating a motion for leave to amend, a court may consider the moving party’s undue
8
delay in pursuing the amendment. Bowles v. Reade, 198 F.3d 752, 757-58 (9th Cir. 1999). BNSF
9
Untimeliness and Prejudice
contends that, because SJVR’s motion to amend was filed after the close of discovery, SJVR
10
11
unduly delayed moving to add the tort counterclaims. Granting leave to amend at this late date
12
would greatly prejudice BNSF. This Court agrees that SJVR unduly delayed in bringing its tort
13
counterclaims, thereby prejudicing BNSF.
14
15
Delay alone is generally insufficient justification for denying a motion to amend unless
the court also specifically finds prejudice to the opposing party, bad faith of the moving party, or
16
17
futility of amendment. Id. at 758. Certain factors may justify permitting late amendment of
18
pleadings: restatement of a claim already in issue; new instances of previously alleged statutory
19
violations; timing early in the discovery period or long before trial; the party’s loss of its claim if
20
it were not added to the pending suit; delay but no prejudice to the opposing party; or a claim that
21
may be tried on its merits with no additional facts. Chrysler Corp. v. Fedders Corp., 540
22
23
F.Supp. 706, 715-16 (S.D.N.Y. 1982).
24
Undue delay is delay that prejudices the nonmoving party or imposes unwarranted
25
burdens on the court. Mayreaux v. Louisiana Health Service and Indem. Co., 376 F.3d 420, 427
26
(5th Cir. 2004). Prejudice results when an amendment would unnecessarily increase costs or
27
3
1
would diminish the opposing party’s ability to respond to the amended pleading. Morongo Band,
2
893 F.2d at 1079. “Prejudice and undue delay are inherent in an amendment asserted after the
3
close of discovery and after dispositive motions have been filed, briefed, and decided.”
4
5
6
7
8
9
Campbell v. Emory Clinic, 166 F.3d 1157, 1162 (11th Cir. 1999). As BNSF reminds us, SJVR’s
motion to amend was brought after discovery had closed.
A moving party’s inability to acceptably explain its delay may also indicate that the delay
was undue. Swanson v. United States Forest Service, 87 F.3d 339, 345 (9th Cir. 1996); Jackson
v. Bank of Hawaii, 902 F.2d 1385, 1388 (9th Cir. 1990); E.E.O.C. v. Boeing Co., 843 F.2d 1213,
10
11
1222 (9th Cir.), cert. denied, 488 U.S. 889 (1988). Whether the moving party knew or should
12
have known the facts and theories raised in the proposed amendment at the time it filed its
13
original pleadings is a relevant consideration in assessing untimeliness. Jackson, 902 F.2d at
14
1388. For example, in Campbell, the district court did not abuse its discretion in denying a
15
plaintiff’s motion to amend which was filed one year after discovery ended, after dispositive
16
17
motions had been filed, and between five and six years after the complaint was filed, and which
18
incorporated allegations based on facts that were available to the plaintiff when he filed his
19
complaint. 166 F.3d at 1162.
20
21
In Mayreaux, the Fifth Circuit considered a motion to amend that was clearly untimely
since the case had been in the court for years and the discovery period was ending. 376 F.3d at
22
23
427-28. An untimely motion to amend, said the court, may either (1) present alternative theories
24
of recovery under the existing facts or (2) fundamentally alter the nature of the case. Id. at 427.
25
When an amendment merely incorporates alternative theories using existing facts, it falls safely
26
within Rule 15(a)’s policy of promoting litigation on the merits over procedural technicalities.
27
4
1
Id. But when, after a period of extensive discovery, a party proposes a late-tendered amendment
2
that would fundamentally change the case to incorporate new causes of action and that would
3
require additional discovery, the amendment may be appropriately denied as prejudicial to the
4
5
opposing party. Id. See also Solomon v. North American Life and Cas. Ins. Co., 151 F.3d 1132,
6
1139 (9th Cir. 1998) (finding that the district court did not abuse its discretion in denying leave to
7
amend based on undue delay and prejudice since the motion, made on the eve of the discovery
8
deadline, would have required re-opening discovery and delaying the proceedings); Morongo
9
Band, 893 F.2d at 1079 (holding that the district court did not abuse its discretion in denying
10
11
leave to amend when plaintiffs moved to amend two years after the initial filing, and the new
12
claims would have greatly altered the nature of the litigation and required the opposing party to
13
prepare “an entirely new course of defense”); Singh v. City of Oakland, 295 Fed. Appx.118, 122
14
(9th Cir. 2008) (holding that the district court did not abuse its discretion in denying the plaintiff
15
leave to amend his complaint a month before the scheduled trial when the plaintiff had known
16
17
the facts alleged in the proposed amendment for at least two years before moving for leave to
18
amend and the new claims would have required additional discovery and trial preparation,
19
prejudicing the opposing parties and delaying the proceedings).
20
21
“A need to reopen discovery and therefore delay the proceedings supports a district
court’s finding of prejudice from a delayed motion to amend.” Lockheed Martin Corp. v.
22
23
Network Solutions, Inc., 194 F.3d 980, 986 (9th Cir. 1999). See also Elite Entertainment, inc. v.
24
Khela Brothers Entertainment, 227 F.R.D. 444, 448 (E.D.Va. 2005) (finding the defendants’
25
motion to file amended counterclaims that would expand scope and theory of liability just before
26
///
27
5
1
the expiration of the previously extended discovery period and weeks before trial to be untimely
2
and prejudicial).
3
In assessing whether SJVR unduly delayed in moving to amend its counterclaims, both
4
5
SJVR and the District Court focus on SJVR’s September 30, 2010 filing of its motion to amend
6
its counterclaims and attribute SJVR’s undue delay to delays associated with the Court’s
7
resolution of pending summary judgment motions. Attributing SJVR’s delay to the pending
8
motions misses the point. Factual discovery ended on November 30, 2009. SJVR filed its
9
answer to the amended complaint on the same date without any indication of a need or desire to
10
11
amend its counterclaims to incorporate tort claims. SJVR did not even disclose its tort
12
counterclaims until January 11, 2010, in the First Amended Counterclaim that was stricken for
13
SJVR’s failure to move for leave to amend or to secure the consent of BNSF. Having first filed
14
the amended counterclaims after the close of discovery, SJVR unduly delayed asserting the tort
15
counterclaims.
16
17
SJVR attempts to justify its delay by claiming that it was not aware that it had potential
18
tort counterclaims until the deposition of its executive, Mike Haeg, on November 20, 2009. This
19
is not a case of a litigant being surprised by the deposition testimony of a representative of its
20
opponent. As SJVR’s employee, Haeg was available to SJVR and its attorneys well before the
21
deposition date. SJVR knew or should have known relevant facts known to its employees and
22
23
24
25
26
executives, including Haeg, well before the end of discovery. That SJVR and its attorneys had
not determined Haeg’s factual knowledge about its pending claims is not credible.
Even if this Court were to accept SJVR’s assertions that it had no actual knowledge of the
alleged torts until Haeg’s deposition, SJVR filed an answer to the amended complaint ten days
27
6
1
after Haeg was deposed without pleading the tort counterclaims nor disclosing any intent to do
2
so. SJVR had actual knowledge of Haeg’s testimony by that time.
3
SJVR’s delay was unquestionably prejudicial to BNSF, which had no clue that it might be
4
5
required to respond to tort claims of fraud and misrepresentation until after discovery had closed.
6
In the absence of these tort claims, BNSF had no reason to further probe Haeg for facts relevant
7
to fraud or fraudulent misrepresentation. Having reviewed the transcript of Haeg’s deposition,
8
this Court finds first that Haeg’s vague testimony regarding the timing and content of the
9
statements of BNSF employee Galassi was not sufficient to have alerted an opposing party’s
10
11
attorney to probe more deeply into possibilities of tortious fraud or misrepresentation. Second,
12
although BNSF’s attorneys actually did attempt to further develop and refine Haeg’s account of
13
his conversation with Galassi, Haeg’s responses continued to be vague and uncertain. Nor did
14
the later deposition of Patterson, necessitated by the actions of SJVR’s attorney in an earlier
15
attempt at deposing Patterson, serve to provide sufficient discovery of facts relevant to SJVR’s
16
17
18
tort claims.
Although the costs of prosecuting or defending a lawsuit may be substantial, cost alone is
19
not prejudicial. Discovery or other litigation costs become prejudicial only when the additional
20
costs could easily have been avoided had the proposed amendments been included within the
21
original pleading. Amerisource-Bergen Corp. v. Dialysist West, Inc., 465 F.3d 946, 653 (9th Cir.
22
23
2006). In Amerisource-Bergen, the plaintiff filed a breach of contract action alleging that the
24
defendant had provided various counterfeit drugs; the defendant counterclaimed for payment for
25
a particular drug, Procit, that the plaintiff conceded was genuine. Id. at 949. At the end of the
26
discovery period, the defendant moved for summary judgment on its counterclaim. The plaintiff
27
7
1
then sought to amend its complaint to allege that the Procit that it received from the defendant
2
was tainted, providing no explanation for its change of position or its failure to plead the claim in
3
its original complaint. Id. at 953, n. 9. The court found the additional discovery would be more
4
5
expensive than usual in light of the short discovery time remaining and the additional time
6
demands on opposing counsel. The additional cost was prejudicial since it could have been
7
avoided if the plaintiff had alleged that the product was tainted in the original complaint. Id. at
8
953.
9
The additional costs in time and money are similarly prejudicial here. The scope of
10
11
discovery in this case was nationwide, requiring attorneys for both parties to travel substantial
12
distances and expend substantial time to depose witnesses and to secure other discovery.
13
Reopening discovery would require duplication of time and expense to again depose witnesses
14
regarding SJVR’s last minute tort claims. SJVR’s undue delay is prejudicial to BNSF, weighing
15
strongly against a grant of permission to amend.
16
17
B.
Futility of Claims
18
An amendment may be denied if it is futile. Kiser v. General Elec. Corp., 831 F.2d 423,
19
428 (3d Cir.), cert. denied, 485 U.S. 906 (1987). The test for futility “is identical to the one used
20
when considering the sufficiency of a pleading challenged under Rule 12(b)(6).” Miller v.
21
Rykoff-Sexton, Inc., 845 F.2d 209, 214 (9th Cir. 1988). “[W]here the proposed amendment is
22
23
24
insufficient in law and would thus be a useless act, it is proper, at least in this Circuit, to deny
leave to amend.” Gilbertson v. City of Fairbanks, 262 F.2d 734, 740 (9th Cir. 1959).
25
“[D]ismissal for failure to state a claim is ‘proper only where there is no cognizable legal
26
theory or an absence of sufficient facts alleged to support a cognizable legal theory.’” Shroyer v.
27
8
1
New Cingular Wireless Services, Inc., 622 F.3d 1035, 1041 (9th Cir. 2010), quoting Navarro v.
2
Block, 250 F.3d 729, 732 (9th Cir. 2001). Put another way, “dismissal without leave to amend is
3
proper if it is clear that the complaint could not be saved by amendment.” Eminence Capital,
4
5
316 F.3d at 1052. See also Chaset v. Fleer/Skybox Internat’l, LP, 300 F.3d 1083 (9th Cir. 2002)
6
(concluding that the motion to amend was futile since a basic flaw in the pleading could not be
7
cured by further amendment). “[T]o survive a motion to dismiss, a complaint must contain
8
sufficient factual matter to state a facially plausible claim to relief.” Shroyer, 622 F.3d at 1041,
9
citing Ashcroft v. Iqbal, 129 S.Ct. 1937, 1949 (2009).
10
11
The District Court directed that, on remand, the Magistrate Judge address the legal, not
12
factual, sufficiency of SJVR’s tort claims. BNSF contends that SJVR’s proposed amended
13
counterclaims are futile since, under California law, a party may not plead tort claims that are
14
properly breach of contract issues.
15
Hammering away on the factual sufficiency of its claims of fraud and fraudulent
16
17
misrepresentation, SJVR never addresses the California rule. Instead, SJVR concedes that the
18
claims are duplicative, arguing that the tort claims “are based on the same facts about BNSF’s
19
misrepresentations” that have been pled to defeat BNSF’s argument that the breach of contract
20
action is barred by the statute of limitations.
21
Contracts are the means by which parties mutually define their respective obligations,
22
23
risks, and rewards. Erlich v. Menezes, 21 Cal.4th 543, 558 (1999). Limiting available damages
24
to those contemplated by the parties when they entered into the contract encourages commercial
25
activity by enabling parties to assess in advance the financial risks of the enterprise. Erlich, 21
26
Cal.54th at 558.
27
9
1
2
“A person may not ordinarily recover in tort for the breach of duties that merely restate
contractual obligations.” Aas v. Superior Court of San Diego County, 24 Cal.4th 627, 643
3
(2000), superseded by statute on other grounds, Rosen v. State Farm Gen’l Ins. Co., 30 Cal.4th
4
5
1070 (2003). “‘[C]ourts will generally enforce the breach of a contractual promise through
6
contract law, except when the actions that constitute the breach violate a social policy that merits
7
the imposition of tort remedies.’” Erlich, 21 Cal.4th at 552, quoting Freeman & Mills, Inc. v.
8
Belcher Oil Co., 11 Cal.4th 85, 107 (1995) (Mosk, J., concurring and dissenting).
9
The California Supreme Court has explained that in analyzing tort claims arising out of
10
11
12
13
14
15
commercial contracts:
The benefits of broad compensation must be balanced against the burdens on
commercial stability. Courts should be careful to apply tort remedies only when
the conduct in question is so clear in its deviation from socially useful business
practices that the effect of enforcing such tort duties will be . . . to aid rather than
discourage commerce.
Erlich, 21 Cal.4th at 554 (internal quotations and citations omitted).
16
17
Providing tort remedies in connection with a breach of contract is particularly
18
inappropriate when the sole injury to the plaintiff is economic. Id. at 554-55. In California,
19
economic losses are defined as “damages for inadequate value, costs of repair and replacement of
20
the defective product or consequent loss of profits–without any claim of personal injury or
21
damages to other property.” Frank M. Booth, Inc. v. Reynolds Metal Co., 754 F.Supp. 1441,
22
23
1449 n. 4 (E.D.Cal. 1991). “The line between physical injury to property and economic loss
24
reflects the line of demarcation between tort theory and contract theory.” Id. When a fraud
25
claim is based on a parties’ alleged failure to comply with a contractual duty, “the proper cause
26
of action is breach of contract, not fraud.” Auto Industries Supplier Employee Stock Ownership
27
10
1
Plan (ESOP) v. Snapp Systems, Inc., 2006 WL 3627935 at *5 (E.D. Mich., December 12, 2006)
2
(No. 03-74357).
3
“[T]he economic loss rule ‘prevent[s] the law of contract and the law of torts from
4
5
dissolving one into the other.’” Robinson Helicopter Co., Inc. v. Dana Corp., 34 Cal.4th 979,
6
988 (2004), quoting Rich Products Corp. v. Kemutec, Inc., 66 F.Supp.2d 937, 969 (E.D. Wis.
7
1999), aff’d, 241 f.3d 915 (7th Cir. 2001). The rule depends on the distinction between
8
commercial transactions in which economic expectations are protected by commercial and
9
contract law, and transactions with individual consumers who are injured in a manner
10
11
traditionally addressed through tort law. Robinson Helicopter, 34 Cal.4th at 988. “The
12
economic loss rule requires a purchaser to recover in contract for purely economic loss due to
13
disappointed expectations, unless he can demonstrate harm above and beyond a broken
14
contractual promise.” Id. Accordingly, the economic loss rule will bar a party’s claim of tortious
15
breach of contract unless the party alleges tortious behavior independent of the breach of
16
17
18
contract. Id. at 991.
Nonetheless, a party may allege a tortious breach of contract for intentional actions not
19
typically contemplated by parties entering a contract. “[C]onduct amounting to a breach of
20
contract becomes tortious only when it also violates a duty independent of the contract arising
21
from principles of tort law.” Erlich, 21 Cal.4th at 551. “[O]utside the insurance context, ‘a
22
23
tortious breach of contract . . . may be found when (1) the breach is accompanied by a traditional
24
common law tort, such as fraud or conversion; (2) the means used to breach the contract are
25
tortious, involving deceit or undue coercion or, (3) one party intentionally breaches the contract
26
intending or knowing that such a breach will cause severe, unmitigable harm in the form of
27
11
1
mental anguish, personal hardship or substantial consequential damages.’” Id. at 553-54, quoting
2
Freeman & Mills, 11 Cal. 4th at 105 (conc. and dis. opin. of Mosk, J.). “Focusing on intentional
3
conduct gives substance to the proposition that a breach of contract is tortious only when some
4
5
6
independent duty arising from tort law is violated.” Erlich, 21 Cal.4th at 554.
The California Supreme Court has “strongly suggested” that, in the absence of the
7
violation of a duty arising under tort law independently of the breach of contract itself, lower
8
courts should limit tort recovery in breach of contract actions to the insurance area. Freeman &
9
Mills, 11 Cal.4th at 95. California courts have only permitted tort damages in contract cases in
10
11
which the tort liability is “either completely independent of the contract”; arises from intentional
12
conduct intended to harm, such as when a breach of duty causes a physical injury; in insurance
13
contract actions involving a breach of the covenant of good faith and fair dealing; for wrongful
14
discharge in violation of fundamental public policy; or when the plaintiff was fraudulently
15
induced to enter the contract. Erlich, 21 Cal.4th at 551-52. Because this case involves neither a
16
17
18
19
20
21
physical injury, wrongful discharge, nor fraudulent inducement, SJVR’s claims may only proceed
if they constitute a duty arising under tort law independent of the breach of contract itself.
The California Supreme Court performed an analysis focusing on intentional conduct in
tortious contractual breach in Robinson Helicopter, 34 Cal.4th at 989. Robinson, a helicopter
manufacturer, contracted with Dana for sprag clutches, a component that permits the rotor blades
22
23
24
to continue spinning if a helicopter loses power during flight, allowing the pilot to safely land the
helicopter. Id. at 985. Robinson’s type certificates1 for two helicopter models required the
25
1
26
27
A type certificate is issued by the Federal Aviation Administration (FAA) for each type of aircraft
manufactured in the United States. Each aircraft must be produced exactly in compliance with the design set forth in
its type certificate. Any changes in specifications require prior FAA approval.
12
1
hardness level of the sprag clutches to be “50/55 Rockwell.” Id. During the course of the
2
contract, Dana modified its manufacturing process to produce the sprag clutches with a hardness
3
of “61/63 Rockwell” without disclosing the change to Robinson or the FAA. Id. at 985-86.
4
5
Despite the change from the required specification, with each delivery of sprag clutches, Dana
6
continued to provide Robinson with written certification that the sprag clutches had been
7
manufactured to the 50/55 Rockwell specifications of the type certificates. Id. at 986. At some
8
point thereafter, Dana switched back to manufacturing the sprag clutches with a hardness of
9
50/55 Rockwell, again without notifying Robinson or the FAA of the change. Id.
10
11
The sprag clutches manufactured to 61/63 Rockwell proved substantially more likely to
12
fail in use that those manufactured to 50/55 Rockwell. Id. Following investigation of eleven
13
failed sprag clutches returned to Robinson by its operator customers, Dana disclosed that it had
14
manufactured the failed sprag clutches to a hardness of 61/63 Rockwell but refused to provide
15
the serial and lot number identification necessary to identify the nonconforming sprag clutches
16
17
for several months. Id. at 987. Documents provided later in discovery revealed that Dana had
18
included the identification numbers in the draft of its disclosure letter but deleted them from the
19
final version. Id. at 987 n. 4.
20
21
Ultimately, the FAA and its British equivalent required Robinson to recall and replace all
990 clutch assemblies in which the sprag clutch had been manufactured to 61/63 Rockwell. Id.
22
23
24
25
26
at 986. Recall and replacement cost Robinson $1,555,924 in replacement parts and employee
time. Id. at 986-87.
After Robinson identified the sprag clutches as defective, it submitted the necessary order
to Dana, noting that allocating the cost of the replacement parts could be addressed later. Id.
27
13
1
Dana, the sole manufacturer of sprag clutches, disclaimed responsibility, contending that the
2
defect resulted from Robinson’s defective designs, and refused to ship any parts except on a
3
COD or assured payment basis. Id. at 987. Having no alternative supplier, Robinson purchased
4
5
the necessary replacements from Dana but later sued Dana for breach of contract, breach of
6
warranty, and negligent and intentional misrepresentation. Id. Robinson alleged three separate
7
bases for its fraud and misrepresentation claims: (1) Dana’s provision of false certificates of
8
conformance, (2) Dana’s failure to provide the serial numbers of affected clutches until five
9
months after the clutches failed, and (3) a Dana employee intentionally redacted reference to the
10
11
clutches’ hardness on a list of products requested by Robinson. Id. at 990.
12
In its review of the proceedings below, the California Supreme Court determined that
13
Dana’s provision of false certificates of conformance constituted a tort (fraud) independent of
14
Dana’s breach of contract:
15
16
17
18
19
20
21
By issuing false certificates of conformance, Dana unquestionably made
affirmative representations that Robinson justifiably relied on to its detriment.
But for Dana’s affirmative misrepresentations by supplying false certificates of
conformance, Robinson would not have accepted delivery and used the
nonconforming clutches over the course of several years, not would it have
incurred the cost of investigating the cause of the faulty clutches. Accordingly,
Dana’s tortious conduct was separate from the breach itself, which involved
Dana’s provision of nonconforming clutches. In addition, Dana’s provision of
faulty clutches exposed Robinson to liability for personal damages if a helicopter
crashed and to disciplinary action by the FAA. Thus, Dana’s fraud is a tort
independent of the breach.
22
23
Id. at 990-91.
24 Having found that Dana’s fraud and intentional misrepresentation was independent of its breach,
25 that is, the provision of nonconforming sprag clutches, the court held that the economic loss rule
26 did not bar Robinson Helicopter’s tort claims. Id. at 991.
27
14
1
2
Rejecting the dissent’s argument that the economic loss rule should bar tort recovery in
every case with only economic damages, the court emphasized, “The economic loss rule is
3
designed to limit liability in commercial activities that negligently or inadvertently go awry, not to
4
5
reward malefactors who affirmatively misrepresent and put people at risk.” Id. at 991 n.7. Public
6 policy, said the court, favors an exception to the general rule of enforcing breaches through
7 contract law “when the actions that constitute the breach violate a social policy that merits the
8 imposition of tort remedies.” Id. at 991-92, quoting Freeman & Mills, 11 Cal.4th at 107. Because
9
fraud, such as that practiced by Dana, is not a socially desirable business practice, permitting
10
Robinson’s claims for fraud and misrepresentation to proceed discourages fraud and deceptive
11
12 practices in business. Robinson Helicopter, 34 Cal.4th at 992. Rejecting Dana’s arguments that it
13 apply the economic loss rule, the court added:
14
22
A breach of contract remedy assumes that the parties to a contract can
negotiate the risk of loss occasioned by a breach. When two parties make a
contract, they agree upon the rules and regulations that will govern their
relationship; the risks inherent in the agreement and the likelihood of its breach.
The parties to the contract in essence create a mini-universe for themselves, in
which each voluntarily chooses his contracting partner, each trusts the other’s
willingness to keep his word and honor his commitments, and in which they define
their respective obligations, rewards and risks. Under such a scenario, it is
appropriate to enforce only such obligations as each party voluntarily assumed, and
to give him only such benefits as he expected to receive; this is the function of
contract law. However, a party to a contract cannot rationally calculate the
possibility that the other party will deliberately misrepresent terms critical to that
contract. No rational party would ever enter into a contract anticipating that they
are or will be lied to.
23
Id. at 992-93 (internal quotations and citations omitted).
15
16
17
18
19
20
21
24
Nonetheless, the court emphasized that its holding was intended to be “narrow in scope
25
and limited to a defendant’s affirmative representations on which a plaintiff relies and which
26
27
15
1 expose a plaintiff to liability for personal damages independent of the plaintiff’s economic loss.”
2
Id. at 993.
3
In contrast, the absence of exposure to additional liability independent of economic loss is
4
5
the factor that prevents SJVR’s tort claims from being cognizable independent of its breach of
6 contract claims. Assuming the truth of SJVR’s allegations, as we must do for purposes of this
7 order, BNSF’s fraudulent representations are an inseparable component of the breach of its
8 contract to pay a specific calculated amount to SJVR as through rates for SJVR’s carriage of
9
BNSF’s rail cars on its lines. As SJVR itself wrote, “BNSF’s contractual obligation to provide
10
rate information under the 1992 Agreement presupposes that it has to provide truthful rate
11
12 information.” Doc. 211 at 6. Although BNSF’s fraudulent representations offend public policy,
13 they do not expose SJVR to any liability separate from its economic claims. Accordingly, since
14 California law precludes SJVR’s recasting its breach of contract claims as tort claims, the
15
proposed amendment of the counterclaims would be futile.
16
17
III.
Conclusion and Order
Even if SJVR’s undue delay were not prejudicial to BNSF, its proposed tort claims are
18
19 futile under California law precluding tort remedies for breaches of contract. Accordingly,
20 granting SJVR’s motion to amend its counterclaims is inappropriate.
21
This Court HEREBY DENIES SJVR’s motion to amend its counterclaims to add tort
22
23
claims of fraud and fraudulent misrepresentation.
24 IT IS SO ORDERED.
25 Dated:
icido3
26
August 2, 2011
/s/ Sandra M. Snyder
UNITED STATES MAGISTRATE JUDGE
27
16
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.