Linde, LLC v. Valley Protein, LLC et al

Filing 76

ORDER GRANTING IN PART Plaintiff's 52 Motion for Summary Judgment; Status Conference to be held August 20, 2019 at 9:30 a.m. in Courtroom 5 before the undersigned, signed by District Judge Dale A. Drozd on 7/11/2019. (Martin-Gill, S)

Download PDF
1 2 3 4 5 6 7 8 9 UNITED STATES DISTRICT COURT 10 FOR THE EASTERN DISTRICT OF CALIFORNIA 11 12 LINDE, LLC, 13 14 15 No. 1:16-cv-00527-DAD-EPG Plaintiff, v. ORDER GRANTING IN PART PLAINTIFFS’ MOTION FOR SUMMARY JUDGMENT VALLEY PROTEIN, LLC, (Doc. No. 52) 16 Defendant. 17 18 19 VALLEY PROTEIN, LLC, Counter-claimant, 20 21 22 23 v. LINDE, LLC, Counter-defendant. 24 25 This matter is before the court on plaintiff and counter-defendant Linde, LLC’s (“Linde”) 26 motion for summary judgment, or in the alternative for partial summary judgment, filed on 27 August 7, 2018. (Doc. No. 52.) Defendant and counter-claimant Valley Protein, LLC (“Valley 28 1 1 Protein”) filed an opposition on September 4, 2018. (Doc. No. 53.) Linde filed its reply on 2 September 11, 2018. (Doc. No. 58.) On September 18, 2018, the court held a hearing on the 3 motion at which attorney Adam Scott Hamburg appeared for Linde, and attorney Russell K. Ryan 4 appeared for Valley Protein. Having considered the parties’ briefing and heard from counsel, the 5 court will grant Linde’s motion for summary judgment in part. 6 BACKGROUND 7 The facts of this case are as follows, and are undisputed except where noted. On January 8 27, 2011, Linde and Valley Protein entered into a Product Supply Agreement (the “2011 9 Agreement”), in which Valley Protein agreed to purchase from Linde its requirements for CO2 for 10 its meat processing plant located at 1828 E. Hedges Avenue, Fresno, CA 93703 (the “Plant”). 11 (Doc. No. 52-5 (“UMF”) at ¶ 1.) The 2011 Agreement also contained an Application Equipment, 12 Ancillary Equipment, and Services Term Sheet, wherein Valley Protein agreed to lease a Cryoline 13 (Cryowave) Tunnel 48-30 (the “2011 Freezer”) from Linde (the “2011 Rental Agreement”). (Id. 14 at ¶ 2.) In addition, the 2011 Agreement contained an Application Equipment, Ancillary 15 Equipment, and Services Rider (the “2011 Equipment Rider”), which provided that Valley 16 Protein was obligated to keep the 2011 Freezer clean at all times, and to “maintain the [2011 17 Freezer] in a good and fully functional condition, in accordance with any written instructions 18 provided by Linde.” (Id.) Further, the 2011 Equipment Rider stated that Valley Protein “is solely 19 responsible for determining the suitability, compatibility, and use of the [2011 Freezer].” (Id.) 20 By early 2012, Valley Protein realized that it was not meeting its target conversion rates 21 using the 2011 Freezer.1 (Id. at ¶ 6.) In addition, by October 1, 2012, Valley Protein’s 22 production increased due to additional business it acquired, and there is some evidence that it was 23 unable to fully meet this increased demand due to the 2011 Freezer malfunctioning. (Id. at ¶ 7; 24 Doc. No. 54 (“DMF”) at ¶ 7.) Although it is undisputed that Valley Protein did not lose 25 customers as a result of these malfunctions, Valley Protein contends that “it did lose business.” 26 (DMF at ¶ 7.) In September 2014, Valley Protein was awarded a new contract with Safeway, 27 28 1 The court understands “target conversion rate” to refer to the freezer’s efficiency, specifically the amount of CO2 that was needed to operate it. 2 1 because of which it sought ways to improve and expand its freezing operations. (UMF at ¶ 8.) 2 To that end, Valley Protein’s president Robert Coyle contacted Michael Iannelli, a sales manager 3 employed by Linde, to inquire whether Linde possessed any newer technology or equipment that 4 would permit Valley Protein to increase its production rate and reduce its CO2 consumption. 5 (Doc. No. 52-1 (“Iannelli Decl.”) at ¶ 9; Doc. No. 52-2 at 17–18.) On September 4, 2014, Linde 6 engineer Amanda Guzman contacted Coyle with a questionnaire to enable Linde to identify the 7 appropriate equipment that would suit Valley Protein’s needs. (UMF at ¶ 9; Iannelli Decl. at 8 ¶ 11; Doc. No. 52-2 at 20–21.) On September 29, 2014, Coyle returned this questionnaire to Ms. 9 Guzman. (Iannelli Decl. at ¶ 12; Doc. No. 52-2 at 23–31.) According to the questionnaire, Coyle 10 represented to Linde that the “desired production rate” was 3,500 pounds of poultry per hour. 11 (Iannelli Decl. at ¶ 12; Doc. No. 52-2 at 25–31). 12 There is some lack of clarity about what occurred next. Iannelli stated his understanding 13 that Valley Protein originally requested the ability to process 3,500 pounds of poultry per hour, as 14 indicated in the questionnaire, but “ultimately ended up” increasing that requirement to 5,000 15 pounds of poultry per hour. (Doc. No. 57-2 at 12.) In addition, Coyle stated that in October 16 2014, he received assurances from Ms. Guzman, one of Linde’s engineers, that Linde’s new 17 equipment would process 5,000 pounds of poultry per hour. (Doc. No. 56 (“Coyle Decl.”) at ¶ 9.) 18 However, there does not appear to be any evidence that Valley Protein conveyed to Linde that the 19 capability to process 5,000 pounds of poultry per hour was a requirement in October 2014: Coyle 20 stated that information was not conveyed to Linde until at least November 5. (Doc. No. 52-4 at 21 19.) In addition, Iannelli stated that he was unaware of this 5,000-pound requirement as of 22 September or October, implying that he was made aware of it only later. (Doc. No. 57-2 at 12.) 23 Effective November 1, 2014, Linde and Valley Protein entered into a new agreement, 24 referred to as the “2014 Agreement.”2 (UMF at ¶ 11.) The 2014 Agreement included the Product 25 Supply Agreement, which contained the following provisions relevant to this action: 26 27 28 2 For ease of reference, this order will refer collectively to all agreements entered into on November 1, 2014 as “the 2014 Agreement.” However, as the court’s analysis below reflects, the “agreement” is in fact composed of multiple separate contracts. 3 1 9. Warranty, Sole Remedies, and Limitation of Damages. 2 ... 3 (e) Statute of Limitations. A Party must commence an action for a breach of contract within one year after the action has accrued. 4 ... 5 15. General Provisions. 6 ... 7 (b) Entire Agreement. Each Term Sheet, in conjunction with the terms specified in this document and the related Riders: (1) constitutes a separate contract between the Parties; (2) constitutes all of the terms of the contract between the Parties regarding its subject matter; and (3) supersedes and terminates all previous agreements between the Parties regarding this agreement’s subject matter. Any term contained in a delivery document used by Linde, or a purchase order, confirmation, or acknowledgement used by Valley Protein, that conflicts with, is different from, or is additional to, the terms of this agreement is not part of the contract between the parties. 8 9 10 11 12 13 (UMF at ¶ 11; Doc. No. 52-2 at 35, 37–38.) In addition, the 2014 Agreement included an 14 Application Equipment, Ancillary Equipment and Services Term Sheet and accompanying Rider 15 (the “2014 Rental Agreement”), wherein Valley Protein agreed to lease a Spiral Freezer 20-175S 16 from Linde (UMF at ¶ 13; Doc. No. 52-2 at 45–55.) The 2014 Agreement also contained a Bulk 17 Term Sheet and Rider, pursuant to which Valley Protein agreed to purchase its CO2 gas 18 requirements exclusively from Linde. (UMF at ¶ 12; Doc. No. 52-2 at 40–44.) The Bulk Term 19 Sheet also authorized Linde to charge Valley Protein a fuel surcharge for the delivery of the CO2 20 gas. (UMF at ¶ 12; Doc. No. 52-2 at 43.) According to the Coyle Declaration, a few weeks after the 2014 Agreement was executed, 21 22 Iannelli contacted Coyle and advised him the equipment that served as the core of the 2014 23 Agreement had been “mis-engineered,” and was only capable of processing less than 2,000 24 pounds of poultry per hour. (Coyle Decl. at ¶ 12.) Iannelli acknowledged that the new equipment 25 was insufficient to meet Valley Protein’s needs and asked for a “do-over,” agreeing to release 26 Valley Protein from the 2014 Agreement. (Id.; Doc. No. 57-2 at 30–31.) According to Coyle, 27 having equipment sufficient to meet its poultry production requirements “was an absolutely 28 ///// 4 1 essential requirement and the primary and perhaps sole reason Valley Protein entered in the 2014 2 Agreement.” (Coyle Decl. at ¶ 12.) Linde does not appear to contest this version of events. 3 On December 1, 2014, Coyle sent an email to Iannelli, which stated in relevant part that 4 Valley Protein would “like to rescind the contract we signed previously requesting an extension 5 of the contract date and the new equipment, the [2014 Freezer.]” (UMF at ¶ 14; Iannelli Decl. at 6 ¶ 16; Doc. No. 52-2 at 57.) Iannelli responded by email the same day, agreeing to let Valley 7 Protein rescind the 2014 Rental Agreement, but declining to accept Valley Protein’s request to 8 rescind the 2014 Agreement as a whole. (UMF at ¶ 15; Iannelli Decl. at ¶ 17.) On December 12, 9 2014, Valley Protein entered into an Equipment Lease Agreement with Linde’s competitor, Air 10 Liquide, for a Spiral Freezer Model MB1-30-0550-09. (UMF at ¶ 17.) Concurrently, Valley 11 Protein also executed a Product Supply Agreement with Air Liquide to obtain CO2 from Air 12 Liquide, despite Iannelli’s email to Coyle notifying him that “Linde does not accept [Valley 13 Protein’s] request to rescind the contract renewal of the CO2 agreement.” (Id.; Doc. No. 52-2 at 14 57.) On January 25, 2015, Coyle sent a Termination Notice to Iannelli, wherein Coyle notified 15 Linde that Valley Protein would not be renewing the 2011 Product Supply Agreement. (UMF at 16 ¶ 18; Iannelli Decl. at ¶ 18; Doc. No. 52-2 at 59–60.) In response to Coyle’s email, Iannelli again 17 advised Coyle that Linde and Valley Protein had a valid supply agreement for CO2 that was 18 renewed in November 2014, and that according to the terms of that agreement, Valley Protein 19 was obligated to obtain its CO2 from Linde for the term of five years after that date. (UMF at 20 ¶ 19; Iannelli Decl. at ¶¶ 19–20; Doc. No. 52-2 at 59–60.) On February 1, 2016, Valley Protein 21 notified Linde that it would no longer be purchasing its CO2 from Linde. (UMF at ¶ 20; Iannelli 22 Decl. at ¶ 22; Doc. No. 52-2 at 64.) 23 In addition to moving for summary judgment as to its own claims, Linde also moves for 24 summary judgment in its favor as to Valley Protein’s counter-claims for breach of contract, 25 breach of the covenant of good faith and fair dealing, intentional misrepresentation, negligent 26 misrepresentation, and unfair competition. These allegations center primarily on alleged 27 malfunctioning of the 2011 Freezer. (See Doc. No. 29 at ¶¶ 11–15.) In addition to those 28 allegations, Valley Protein alleges that between mid-2014 and the beginning of 2016, Linde 5 1 obtained the CO2 delivered to the Plant from its competitor’s plant in Pixley, California, as 2 opposed to Richmond, California. (UMF at ¶ 22.) Linde admits that it sometimes improperly 3 billed Valley Protein a surcharge that was based on the transportation of the gas from Richmond 4 to the Plant. (Id.) Valley Protein characterizes this as a breach of the 2011 Agreement (See Doc. 5 No. 53 at 11), while Linde contends that it was “merely an oversight,” and that Linde 6 subsequently reimbursed Valley Protein for any unwarranted transportation surcharges. (Doc. 7 No. 52 at 17–18.) 8 As a result of what Linde contends was Valley Protein’s breach of the 2014 Agreement, 9 Linde asserts damages in the form of lost profits totaling $963,084.00. (UMF at ¶ 23.) Linde 10 also asserts that at the time Valley Protein breached the 2014 Agreement, Valley Protein had a 11 past due balance for CO2 totaling $38,963.89, and that this amount remains unpaid. (Id. at ¶ 24.) 12 LEGAL STANDARD 13 Summary judgment is appropriate when the moving party “shows that there is no genuine 14 dispute as to any material fact and the movant is entitled to judgment as a matter of law.” Fed. R. 15 Civ. P. 56(a). 16 In summary judgment practice, the moving party “initially bears the burden of proving the 17 absence of a genuine issue of material fact.” In re Oracle Corp. Sec. Litig., 627 F.3d 376, 387 18 (9th Cir. 2010) (citing Celotex Corp. v. Catrett, 477 U.S. 317, 323 (1986)). The moving party 19 may accomplish this by “citing to particular parts of materials in the record, including 20 depositions, documents, electronically stored information, affidavits or declarations, stipulations 21 (including those made for purposes of the motion only), admissions, interrogatory answers, or 22 other materials” or by showing that such materials “do not establish the absence or presence of a 23 genuine dispute, or that an adverse party cannot produce admissible evidence to support the fact.” 24 Fed. R. Civ. P. 56(c)(1)(A), (B). When the non-moving party bears the burden of proof at trial, as 25 plaintiff does here, “the moving party need only prove that there is an absence of evidence to 26 support the non-moving party’s case.” Oracle Corp., 627 F.3d at 387 (citing Celotex, 477 U.S. at 27 325); see also Fed. R. Civ. P. 56(c)(1)(B). Indeed, summary judgment should be entered, after 28 adequate time for discovery and upon motion, against a party who fails to make a showing 6 1 sufficient to establish the existence of an element essential to that party’s case, and on which that 2 party will bear the burden of proof at trial. See Celotex, 477 U.S. at 322. “[A] complete failure of 3 proof concerning an essential element of the nonmoving party’s case necessarily renders all other 4 facts immaterial.” Id. at 322–23. In such a circumstance, summary judgment should be granted, 5 “so long as whatever is before the district court demonstrates that the standard for the entry of 6 summary judgment . . . is satisfied.” Id. at 323. 7 If the moving party meets its initial responsibility, the burden then shifts to the opposing 8 party to establish that a genuine issue as to any material fact actually does exist. See Matsushita 9 Elec. Indus. Co. v. Zenith Radio Corp., 475 U.S. 574, 586 (1986). In attempting to establish the 10 existence of this factual dispute, the opposing party may not rely upon the allegations or denials 11 of its pleadings but is required to tender evidence of specific facts in the form of affidavits or 12 admissible discovery material in support of its contention that the dispute exists. See Fed. R. Civ. 13 P. 56(c)(1); Matsushita, 475 U.S. at 586 n.11; Orr v. Bank of Am., NT & SA, 285 F.3d 764, 773 14 (9th Cir. 2002) (“A trial court can only consider admissible evidence in ruling on a motion for 15 summary judgment.”). The opposing party must demonstrate that the fact in contention is 16 material, i.e., a fact that might affect the outcome of the suit under the governing law, see 17 Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248 (1986); T.W. Elec. Serv., Inc. v. Pac. Elec. 18 Contractors Ass’n, 809 F.2d 626, 630 (9th Cir. 1987), and that the dispute is genuine, i.e., the 19 evidence is such that a reasonable jury could return a verdict for the non-moving party, see 20 Anderson, 477 U.S. at 250; Wool v. Tandem Computs. Inc., 818 F.2d 1433, 1436 (9th Cir. 1987). 21 In the endeavor to establish the existence of a factual dispute, the opposing party need not 22 establish a material issue of fact conclusively in its favor. It is sufficient that “the claimed factual 23 dispute be shown to require a jury or judge to resolve the parties’ differing versions of the truth at 24 trial.” T.W. Elec. Serv., 809 F.2d at 631. Thus, the “purpose of summary judgment is to ‘pierce 25 the pleadings and to assess the proof in order to see whether there is a genuine need for trial.’” 26 Matsushita, 475 U.S. at 587 (citations omitted). 27 28 “In evaluating the evidence to determine whether there is a genuine issue of fact,” the court draws “all inferences supported by the evidence in favor of the non-moving party.” Walls v. 7 1 Cent. Contra Costa Cty. Transit Auth., 653 F.3d 963, 966 (9th Cir. 2011). It is the opposing 2 party’s obligation to produce a factual predicate from which the inference may be drawn. See 3 Richards v. Nielsen Freight Lines, 602 F. Supp. 1224, 1244–45 (E.D. Cal. 1985), aff’d, 810 F.2d 4 898, 902 (9th Cir. 1987). Finally, to demonstrate a genuine issue, the opposing party “must do 5 more than simply show that there is some metaphysical doubt as to the material facts. . . . Where 6 the record taken as a whole could not lead a rational trier of fact to find for the non-moving party, 7 there is no ‘genuine issue for trial.’” Matsushita, 475 U.S. at 587 (citation omitted). 8 “‘When as is the case here, the moving party is a plaintiff, he or she must adduce 9 admissible evidence on all matters as to which he or she bears the burden of proof.’” Grimmway 10 Enters., Inc. v. PIC Fresh Glob., Inc., 548 F. Supp. 2d 840, 845 (E.D. Cal. 2008) (quoting Zands 11 v. Nelson, 797 F. Supp. 805, 808 (S.D. Cal. 1992)); see also S. Cal. Gas Co. v. City of Santa Ana, 12 336 F.3d 885, 888 (9th Cir. 2003) (noting that because plaintiffs are “the party with the burden of 13 persuasion at trial, the Gas Company must establish ‘beyond controversy every essential element 14 of its’ Contract Clause claim.” (quoting William W. Schwarzer, et al., California Practice Guide: 15 Federal Civil Procedure Before Trial § 14:124–127 (2001))). 16 DISCUSSION 17 As noted above, Linde moves for summary judgment on all of its causes of action: breach 18 of contract, breach of the implied covenant of good faith and fair dealing, account stated, and 19 goods and services rendered. (Doc. No. 52 at 2–3.) In addition, Linde also moves for summary 20 judgment in its favor on Valley Protein’s counter-claims for breach of contract, breach of the 21 covenant of good faith and fair dealing, intentional misrepresentation, negligent misrepresentation 22 and unfair competition, respectively. 23 A. 24 Choice of Law Before turning to the individual claims at issue, the court first addresses the parties’ 25 choice-of-law dispute. Linde filed its motion for summary judgment under California law. (See 26 generally Doc. No. 52.) However, in its opposition, Valley Protein points out that both the 2011 27 Agreement and the 2014 Agreement specifically provide that New Jersey law “governs all 28 matters pertaining to the validity, construction, and effect” of the Agreements. (Doc. No. 53 at 8 1 16–17.) Linde disputes whether New Jersey law applies, but nonetheless devotes much of its 2 reply to rearguing its motion under New Jersey law. (Doc. No. 58 at 6, 8–17.) 3 District courts sitting in diversity apply the substantive law of the state in which they sit. 4 Mason & Dixon Intermodal, Inc. v. Lapmaster Int’l LLC, 632 F.3d 1056, 1060 (9th Cir. 2011). In 5 such circumstances, district courts look to the law of the forum state when making choice of law 6 determinations. Hoffman v. Citibank (S. Dakota), N.A., 546 F.3d 1078, 1082 (9th Cir. 2008). In 7 making these determinations, the California Supreme Court has adopted the approach outlined in 8 § 187(2) of the Restatement (Second) of Conflict of Laws. See Nedlloyd Lines B.V. v. Superior 9 Court, 3 Cal. 4th 459, 464–66 (1992). Under this rubric, courts are instructed to first determine 10 whether (1) the chosen state has a substantial relationship to the parties or their transaction, or (2) 11 there is any other reasonable basis for the parties’ choice of law. Id. at 466. If neither of these 12 tests is met, the inquiry ends, and the court need not enforce the parties’ choice of law. Id. 13 However, if one of these tests is satisfied, the court must next determine whether the chosen 14 state’s law is contrary to a fundamental policy of California. Id. If there is no such conflict, the 15 court enforces the parties’ choice of law. If there is a conflict, the court must determine whether 16 California has a “materially greater interest than the chosen state in the determination of the 17 particular issue.” Id. If California’s interest is materially greater, California law applies despite 18 the choice of law provision. Id. The burden of demonstrating the existence of a fundamental 19 policy of California rests with the party opposing application of the choice of law provision, as 20 does the burden of demonstrating that California has a materially greater interest in the outcome 21 of the case than the chosen state. Wash. Mut. Bank, FA v. Superior Court, 24 Cal. 4th 906, 917 22 (2001). 23 New Jersey plainly has a substantial relationship to the parties. As alleged in Linde’s 24 complaint, Linde is a limited liability company organized under the laws of Delaware with its 25 principal place of business in New Jersey. (Doc. No. 1 at ¶ 1.) Accordingly, for purposes of 26 diversity jurisdiction, Linde is a citizen of New Jersey. (Id.) This is sufficient to establish a 27 substantial relationship between the chosen state and the parties. See Restatement (Second) of 28 ///// 9 1 Conflict of Laws § 187 cmt. f (Am. Law. Inst. 1971) (finding a substantial relationship where 2 “one of the parties is domiciled or has his principal place of business” in the chosen state). 3 Next, the court must determine whether the chosen state’s law is contrary to a 4 fundamental policy of California. Neither party has identified any differences between California 5 and New Jersey law that are relevant to this action, and the court is unaware of any “fundamental 6 policies” of California that are implicated by the facts of this case. The burden on this point rests 7 with Linde as the party seeking to apply California law notwithstanding the parties’ choice of law 8 provision. See Wash. Mut. Bank, 24 Cal. 4th at 917. Because Linde has failed to carry that 9 burden, this court will apply New Jersey law in addressing the breach of contract claims. 10 However, to say that New Jersey law applies to the breach of contract claims is not to say 11 that New Jersey law also applies to the remaining claims in this action. On the contrary, courts 12 routinely recognize that a valid choice-of-law provision contained in a contract does not 13 necessarily govern the entire relationship between the parties. “The question of whether [the 14 choice-of-law] clause is ambiguous as to its scope . . . is a question of contract interpretation that 15 in the normal course should be determined pursuant to [the selected forum’s law.]” Nedlloyd 16 Lines, 3 Cal. 4th at 469 n.7; see also Cannon v. Wells Fargo Bank N.A., 917 F. Supp. 2d 1025, 17 1051 (N.D. Cal. 2013) (examining Florida law, the law specified in the choice-of-law provision, 18 to determine whether a contractual choice-of-law provision covers related tort claims). The court 19 will therefore consult New Jersey law to determine the breadth of the choice-of-law provisions 20 here. 21 The parties have provided no briefing on this issue—indeed, plaintiff Linde did not 22 recognize the existence of a choice-of-law issue in seeking summary judgment under California 23 law despite the existence of the New Jersey choice-of-law provision. However, the court’s 24 research has revealed some, albeit limited, authority addressing how New Jersey law would apply 25 to the provision at issue here. After conducting a thorough survey of the relevant law, a New 26 Jersey district court recently concluded that “New Jersey principles of statutory construction 27 would counsel a narrow reading of the choice-of-law provision [at issue].” Portillo v. Nat’l 28 Freight, Inc., 323 F. Supp. 3d 646, 655 (D.N.J. 2018). In Portillo, the choice-of-law provision 10 1 stated that the agreement “shall be interpreted in accordance with, and governed by, the laws of 2 the United States and, of the State of New Jersey.” Id. at 648. The court noted that the phrase 3 “governed by” could be interpreted to encompass more than the breach of contract claim, and that 4 some courts have construed it in that manner. See, e.g., Nat’l Seating & Mobility, Inc. v. Parry, 5 No. C 10-02782 JSW, 2012 WL 2911923, at *2 (N.D. Cal. July 16, 2012) (finding that a choice- 6 of-law provision stating that the agreement would be “governed by and construed in accordance” 7 with Tennessee law was “broad enough to encompass the breach of contract, the tort claims, and 8 the UCL claim”). Nonetheless, the district court in Portillo concluded that New Jersey law did 9 not sweep so broadly and the court is persuaded by that analysis of this issue. See Portillo, 323 F. 10 11 Supp. 3d at 655–58. Applying New Jersey’s rules governing the scope of choice-of-law provisions here, the 12 court concludes that the provision in this case extends only to the parties’ breach of contract 13 claims. By their terms, the choice-of-law provisions at issue here apply to matters “pertaining to 14 the validity, construction, and effect of [the agreements.]” (Doc. No. 52-2 at 7, 38.) Compared 15 with other choice-of-law provisions which courts have been called upon to consider, this 16 language is quite narrow. See, e.g., Country Visions, Inc. v. MidSouth LLC, No. 2:15-cv-01740- 17 TLN-CKD, 2016 WL 1614585, at *2 (E.D. Cal. Apr. 22, 2016) (“Both parties agree to submit to 18 exclusive jurisdiction in California and further agree that any cause of action arising under this 19 Agreement shall be brought in an appropriate federal or state court located in California.”) 20 (emphasis added); Brigham Young Univ. v. Pfizer, Inc., No. 2:06-CV-890 TS, 2012 WL 918744, 21 at *1 (D. Utah Mar. 16, 2012) (“The validity, interpretation and performance of this Agreement 22 and any dispute connected herewith shall be governed and construed in accordance with the laws 23 of the State of Missouri.”) (emphasis added); Van Gundy v. P.T. Freeport Indonesia, 50 F. Supp. 24 2d 993, 994 (D. Mont. 1999) (“Included in the offer was a choice of law provision which stated 25 that all disputes arising out of the employment relationship would be governed by Louisiana 26 law.”) (emphasis added). As the court interprets the choice-of-law provisions here, they are 27 cabined solely to the contracts themselves, and do not indicate that resolution of any other 28 disputes will be “governed by” New Jersey law. See Bd. of Educ. of Twp. of Cherry Hill v. 11 1 Human Res. Microsystems, Inc., No. CIV. 09-5766 JBS/JS, 2010 WL 3882498, at *4 (D.N.J. 2 Sept. 28, 2010) (“Generally, when a choice-of-law provision is intended to apply not only to 3 interpretation and enforcement of the contract but also to any claims related to the contract, the 4 language used is broader.”). Thus, although it may ultimately make little difference in the final 5 analysis and resolution of the issues before it, the court will apply New Jersey law only to the 6 breach of contract claims and will apply California law to the parties’ remaining claims. 7 B. 8 9 Linde’s Breach of Contract Claim Linde first seeks summary judgment on its breach of contract claim as it relates to the 2014 Agreement. To prevail on a breach of contract claim, a party must prove (1) the existence 10 of a valid contract between the parties, (2) the opposing party’s failure to perform a defined 11 obligation under the contract, and (3) that the breach caused the claimant to sustain damages. 12 EnviroFinance Grp. v. Envtl. Barrier Co., 113 A.3d 775, 787 (N.J. App. Div. 2015). Linde 13 contends that these elements are all satisfied here as a matter of law. As for the existence of a 14 valid contract, the 2014 Agreement was executed on November 1, 2014. (UMF at ¶ 11.) Under 15 the terms of the 2014 Agreement, Valley Protein was required to purchase all of its CO2 16 exclusively from Linde for five years, but instead began purchasing CO2 from Linde’s competitor, 17 Air Liquide. (Id. at ¶¶ 12, 17.) The failure to purchase CO2 from Linde led directly to Linde’s 18 lost sales volume, causing the damages it now seeks to recover. (Id. at ¶ 23.) 19 Valley Protein does not directly challenge these contentions in its opposition but rather 20 asserts that it is entitled to rescission of the contract. Rescission is a remedy founded on 21 “considerations of equity,” the object of which is to “restore the parties to the status quo ante and 22 prevent the party who is responsible for the misrepresentation from gaining a benefit.” Rutgers 23 Cas. Ins. v. LaCroix, 946 A.2d 1027, 1034–35 (N.J. 2008). In support of this argument, Valley 24 Protein contends that Linde’s representations about the production capacity of its equipment 25 amounted to an equitable fraud, providing the basis for rescission of the contract. Under New 26 Jersey law, “equitable fraud provides a basis for a party to rescind a contract.” First Am. Title 27 Ins. v. Lawson, 827 A.2d 230, 237 (N.J. 2003) (citing Jewish Ctr. of Sussex Cty. v. Whale, 432 28 A.2d 521 (N.J. 1981)). “‘In general, equitable fraud requires proof of (1) a material 12 1 misrepresentation of a presently existing or past fact; (2) the maker’s intent that the other party 2 rely on it; and (3) detrimental reliance by the other party.’” Id. (quoting Liebling v. Garden State 3 Indem., 767 A.2d 515, 518 (N.J. App. Div. 2001)). Rescission voids the contact, meaning that it 4 is considered “null from the beginning” and treated as if it does not exist. Id. 5 The parties agree that a rescission occurred as to at least some portion of the 2014 6 Agreement, as evidenced by Iannelli’s email to Coyle agreeing to Valley Protein rescinding the 7 agreement to rent the 2014 Freezer. (UMF at ¶ 15; Iannelli Decl. at ¶ 17; Doc. No. 52-2 at 57.) 8 Iannelli confirmed this rescission at his deposition. (Doc. No. 57-2 at 34.) The parties’ dispute 9 centers on the scope of that rescission—namely, whether that rescission was effective only as to 10 the rental of the 2014 Freezer, or whether it amounted to a rescission of the entire 2014 11 Agreement. Linde contends that the rescission was only with respect to the rental of the 2014 12 Freezer, while Valley Protein argues that this rescission nullified the parties’ entire 2014 13 Agreement. If the entire 2014 Agreement was nullified as Valley Protein suggests, it was free to 14 purchase its CO2 from sources other than Linde. 15 As stated above, the 2014 Agreement was comprised of several components: The Product 16 Supply Agreement, the Bulk Rider, the Bulk Term Sheet, the Application Equipment, Ancillary 17 Equipment, and Services Rider, and the Application Equipment, Ancillary Equipment, and 18 Services Term Sheet. (Doc. No. 52-2 at 33–55.) The 2014 Freezer was rented to Valley Protein 19 pursuant to the Application Equipment, Ancillary Equipment, and Services Rider and Term Sheet 20 and Rider, whereas Valley Protein’s agreement to purchase its CO2 requirements was contained 21 in the Bulk Rider and Term Sheet. (See id.) The Product Supply Agreement specifies that “Each 22 Term Sheet, in conjunction with the terms specified in this document and the related Riders . . . 23 constitutes a separate contract between the parties.” (UMF at ¶ 11; Doc. No. 52-2 at 38.) Linde 24 therefore contends that although it agreed to rescind the Application Equipment, Ancillary 25 Equipment, and Services Rider and Term Sheet, it did not rescind the Bulk Term Sheet and Rider. 26 If the Bulk Term Sheet and Rider remained in force, as Linde argues, Valley Protein remained 27 obligated to purchase its CO2 requirements from Linde. 28 ///// 13 1 Valley Protein contests this conclusion, arguing that all of the agreements constituted a 2 single contract. (See Doc. No. 53 at 18–19.) As evidence of this, Valley Protein points to 3 Iannelli’s deposition, in which Iannelli testified that he understood all three documents “to be 4 integrated and [to] form essentially the application equipment, ancillary equipment and services 5 term sheet.” (Doc. No. 57-2 at 19.) In addition, Iannelli also acknowledged at deposition that 6 Linde did not offer rental of the 2014 Freezer separate and apart from the CO2, but that they were 7 offered only as a package. (Id. at 14–15.) Iannelli further understood that the only reason Valley 8 Protein entered into the agreement to purchase CO2 was because Valley Protein was interested in 9 renting the 2014 Freezer. (Id. at 27–28.) Relying on this testimony, Valley Protein contends that 10 11 all of the agreements signed by the parties in 2014 were a single contract. The court must resolve the question of whether the various agreements constituted 12 multiple contracts or were instead just one contract. See Bosshard v. Hackensack Univ. Med. 13 Ctr., 783 A.2d 731, 740 (N.J. App. Div. 2001) (“The interpretation of the terms of a contract are 14 decided by the court as a matter of law unless the meaning is both unclear and dependent on 15 conflicting testimony.”); Great Atl. & Pac. Tea Co. v. Checchio, 762 A.2d 1057, 1061 (N.J. App. 16 Div. 2000) (“The construction of a written contract is usually a legal question for the court, but 17 where there is uncertainty, ambiguity or the need for parol evidence in aid of interpretation, then 18 the doubtful provision should be left to the jury.”). In interpreting the terms of a contact, courts 19 “should give contractual terms their plain and ordinary meaning unless specialized language is 20 used peculiar to a particular trade, profession, or industry.” Kieffer v. Best Buy, 14 A.3d 737, 743 21 (N.J. 2011) (internal quotation marks and citations omitted). A contract provision is ambiguous 22 “if the terms of the contract are susceptible to at least two reasonable alternative interpretations,” 23 Schor v. FMS Financial Corp., 814 A.2d 1108, 1112 (N.J. App. Div. 2002) (brackets omitted) 24 (quoting Nester v. O’Donnell, 693 A.2d 1214, 1220 (N.J. App. Div. 1997)), but “a court should 25 not torture the language of a contract to create ambiguity.” Nester, 693 A.2d at 1220; see also 26 Kieffer, 14 A.3d at 743 (noting that it is not the court’s task “to rewrite a contract for the parties 27 better than or different from the one they wrote for themselves”). However, “[e]ven when the 28 contract on its face is free from ambiguity, evidence of the situation of the parties and the 14 1 surrounding circumstances and conditions is admissible in aid of interpretation.” Great Atl. & 2 Pac. Tea Co., 762 A.2d at 1061. 3 As the court interprets the language at issue here, the agreement for Linde to provide 4 Valley Protein with CO2 and the agreement for Linde to rent the 2014 Freezer to Valley Protein 5 were not merely separate transactions within the same contract. Instead, according to the plain 6 language of the Product Supply Agreement, they constituted separate contracts altogether. (See 7 Doc. No. 52-2 at 38) (“Each Term Sheet, in conjunction with the terms specified in this document 8 and the related Riders . . . constitutes a separate contract between the parties.”) (emphasis 9 added). In the court’s view this clear language is susceptible of only one reasonable 10 interpretation—namely, that the Application Equipment, Ancillary Equipment, and Services 11 Rider and Term Sheet was an entirely separate contract from the Bulk Rider and Term Sheet. 12 Although the parties devote some of their briefing to the issue of whether the 2014 Agreement 13 was partially rescinded, partial rescission does not apply where, as here, the 2014 Agreement was 14 composed of multiple, distinct contracts.3 Partial rescission is available only with respect to 15 different transactions within the same contract. See Bonnco Petrol, 560 A.2d at 662. The fact 16 that Linde and Valley Protein agreed to rescind one contract could not and did not effectuate a 17 rescission of an entirely separate contract. 18 The court acknowledges that portions of Iannelli’s deposition testimony arguably evince a 19 contrary understanding of these agreements. It is also relevant that, as Iannelli testified, it was 20 “standard practice in the industry” to rent freezing equipment and purchase CO2 or nitrogen from 21 the same company. (Doc. No. 57-2 at 28.) However, such extrinsic statements may be 22 considered only to “aid in interpretation,” and may not be considered “for the purpose of 23 changing the writing.” Great Atl. & Pac. Tea Co., 762 A.2d at 1061. Here, the written 24 3 25 26 27 28 Partial rescission of a contract is disfavored under New Jersey law. See County of Morris v. Fauver, 707 A.2d 958, 966 (N.J. 1998) (“As a general rule, rescission ‘must be exercised in toto and is to be applied to the contract in its entirety with the result that what has been done is wholly undone and no contract provisions remain in force to bind either of the parties’”) (quoting Merickel v. Erickson Stores Corp., 95 N.W.2d 303, 306 (Minn. 1959)). “Only where a contract is severable into different transactions may one of those separate transactions be avoided.” Id.; see also Bonnco Petrol, Inc. v. Epstein, 560 A.2d 655, 662 (N.J. 1989). 15 1 agreement of the parties itself is clear: although entered into at the same time and between the 2 same parties, the Application Equipment, Ancillary Equipment, and Services Rider and Term 3 Sheet was a separate contract from the Bulk Rider and Term Sheet. 4 Because the Bulk Rider and Term Sheet were not rescinded, Valley Protein remained 5 under a contractual obligation to purchase its CO2 gas requirements from Linde unless it can 6 establish some other basis to avoid that obligation. Valley Protein suggests that the doctrine of 7 equitable fraud provides such a basis. (Doc. No. 53 at 17.) “‘[E]quitable fraud requires proof of 8 (1) a material misrepresentation of a presently existing or past fact; (2) the maker’s intent that the 9 other party rely on it; and (3) detrimental reliance by the other party.’” First Am. Title Ins., 827 10 A.2d at 237 (quoting Liebling, 767 A.2d at 518). A review of the evidence before the court on 11 summary judgment establishes that with respect to the Bulk Rider and Term Sheet, no reasonable 12 juror could find the existence of an equitable fraud that would entitle Valley Protein to rescission 13 of the Bulk Rider and Term Sheet. At deposition, Coyle testified that with respect to surcharges 14 charged by Linde for the delivery of CO2 gas to Valley Protein, no Linde employee ever made 15 false or misleading statements regarding where the CO2 gas was being delivered from. (Doc. No. 16 52-4 at 30:3–5.) Coyle also testified that any overcharging for delivery of CO2 gas amounted 17 only to an “honest mistake.” (Id. at 31:3–5.) Based upon this testimony, the court finds no 18 evidence supporting a claim of equitable fraud with respect to the Bulk Rider and Term Sheet. 19 By failing to comply with the terms of the Bulk Rider and Term Sheet, Valley Protein breached 20 that contract. 21 With respect to damages, Linde claims that as a result of this breach, it has suffered lost 22 profits totaling $963,084.00. (UMF at ¶ 23.) In support of this claimed loss amount, Linde has 23 submitted an exhibit prepared by Iannelli and attached to his Declaration. (Doc. No. 52-2 at 66– 24 68.) Iannelli states that this projection provides an estimate of Linde’s gross margins if Valley 25 Protein had continued to purchase its CO2 gas from Linde through 2018, as required under the 26 Bulk Rider and Term Sheet. (Iannelli Decl. at ¶ 24.) Valley Protein objects to this evidence on 27 the ground that Iannelli’s projections lack foundation, are not based on personal knowledge, and 28 amount to nothing more than speculation. (Doc. No. 55 at ¶ 8.) 16 1 “Under contract law, a party who breaches a contract is liable for all of the natural and 2 probable consequences of the breach of that contract.” Pickett v. Lloyd’s, 621 A.2d 445, 454 3 (N.J. 1993). “Lost profits are one measure of compensatory damages that may be recoverable in 4 a breach of contract action, if they can be established with a reasonable degree of certainty.” RSB 5 Lab. Servs., Inc. v. BSI, Corp., 847 A.2d 599, 608 (N.J. App. Div. 2004). Notably, “[p]ast 6 experience of an ongoing, successful business provides a reasonable basis for the computation of 7 lost profits with a satisfactory degree of definiteness.” V.A.L. Floors, Inc. v. Westminster Cmtys., 8 Inc., 810 A.2d 625, 631 (N.J. App. Div. 2002). Accordingly, Valley Protein’s objections to this 9 evidence are overruled. 10 Iannelli’s projections are neither speculative nor lacking in foundation; rather, they are 11 extrapolations based on the prior dealings of the parties, which New Jersey courts have explicitly 12 held to be a proper basis for calculating lost profits. See Weiss v. Revenue Bldg. & Loan Ass’n, 13 182 A. 891, 893 (N.J. 1936) (“[P]ast experience has demonstrated the success of the enterprise 14 and provides a reasonably certain basis for the calculation of plaintiff’s probable loss consequent 15 upon the breach of the contract to lease.”); V.A.L. Floors, Inc., 810 A.2d at 631. Nor do these 16 calculations lack personal knowledge. Iannelli is a sales manager employed by Linde (Iannelli 17 Decl. at ¶ 1) and would be expected to be intimately familiar with sales calculations. This is 18 particularly so with respect to Linde’s dealings with Valley Protein, since Iannelli was involved in 19 forming the 2014 Agreement and has reviewed all of Linde’s records pertaining to its contractual 20 relationship with Valley Protein. (Id. at ¶¶ 2, 9–13.) Under these circumstances, the court finds 21 that Iannelli’s projections provide a “reasonable basis for the computation of lost profits.” V.A.L. 22 Floors, Inc., 810 A.2d at 631. Moreover, Valley Protein has not submitted any evidence of its 23 own on summary judgment that would call these lost profit calculations into question. 24 Accordingly, the court will grant summary judgment in favor of Linde on Linde’s breach 25 of contract claim, both with respect to liability and damages. 26 C. 27 28 Linde’s Claim for Breach of Implied Covenant of Good Faith and Fair Dealing Next, the court addresses Linde’s motion for summary judgment with regard to its claim against Valley Protein for breach of the implied covenant of good faith and fair dealing. 17 1 “The [implied] covenant of good faith and fair dealing [is] implied by law in every 2 contract.” Durell v. Sharp Healthcare, 183 Cal. App. 4th 1350, 1369 (2010). “In order to 3 establish a breach of the covenant of good faith and fair dealing, a plaintiff must show: (1) the 4 parties entered into a contract; (2) the plaintiff fulfilled his obligations under the contract; (3) any 5 conditions precedent to the defendant’s performance occurred; (4) the defendant unfairly 6 interfered with the plaintiff’s rights to receive the benefits of the contract; and (5) the plaintiff 7 was harmed by the defendant’s conduct.” In re Yahoo! Inc. Customer Data Sec. Breach Litig., 8 No. 16-MD-02752-LHK, 2017 WL 3727318, at *48 (N.D. Cal. Aug. 30, 2017). Notably, to 9 succeed on such a claim, it is not “necessary that the party’s conduct be dishonest.” Carma 10 Developers (Cal.), Inc. v. Marathon Dev. Cal., Inc., 2 Cal. 4th 342, 373 (1992). 11 Linde’s motion only briefly addresses whether it should be granted summary judgment on 12 this claim. Linde’s argument appears to be premised on the notion that summary judgment is 13 proper because “[t]he elements of Linde’s claim for breach of the implied covenant of good faith 14 and fair dealing are identical to its breach of contract claim.” (Doc. No. 52 at 23.) Thus, in 15 Linde’s view, because summary judgment in its favor is proper on its breach of contract claim for 16 the reasons discussed above, it is also proper with respect to its claim of breach of the implied 17 covenant of good faith and fair dealing. Linde’s argument is not persuasive in this regard. To be 18 sure, Linde is correct that under California law, “a breach of the implied covenant of good faith is 19 a breach of the contract.” Carson v. Mercury Ins. Co., 210 Cal. App. 4th 409, 429 (2012) (citing 20 Careau & Co. v. Sec. Pac. Bus. Credit, Inc., 222 Cal. App. 3d 1371, 1393 (1990)). The converse, 21 however, is not necessarily true—that is, a breach of contract does not automatically give rise to 22 liability for breach of the implied covenant of good faith and fair dealing. Indeed, the California 23 Court of Appeal has clarified that while “breach [of the covenant of good faith and fair dealing] 24 will always result in a breach of the contract, . . . a breach of a consensual (i.e., an express or 25 implied-in-fact) contract term will not necessarily constitute a breach of the covenant.” Careau & 26 Co., 222 Cal. App. 3d at 1393–94. Because the court finds Linde’s argument unpersuasive, and 27 because Linde offers no other basis upon which to grant summary judgment on its claim for 28 ///// 18 1 breach of the implied covenant of good faith and fair dealing, Linde’s motion will be denied as to 2 this claim. 3 D. 4 Linde’s Claim for Account Stated Next, the court addresses Linde’s motion for summary judgment on its account stated 5 claim. “An account stated is an agreement, based on prior transactions between the parties, that 6 all items of the account are true and that the balance struck is due and owing from one party to the 7 other.” Trafton v. Youngblood, 69 Cal. 2d 17, 25 (1968). “The essential elements of an account 8 stated are: (1) previous transactions between the parties establishing the relationship of debtor 9 and creditor; (2) an agreement between the parties, express or implied, on the amount due from 10 the debtor to the creditor; (3) a promise by the debtor, express or implied, to pay the amount due.” 11 Zinn v. Fred R. Bright Co., 271 Cal. App. 2d 597, 600 (1969). As evidence of an account stated, 12 Linde claims that between January 14, 2016 and February 4, 2016, Linde issued a total of twenty- 13 two invoices to Valley Protein for CO2 that was delivered to Valley Protein, totaling $38,963.89. 14 (UMF at ¶ 24.) 15 As addressed above, under the terms of the 2014 Agreement, Valley Protein agreed to 16 purchase its CO2 gas requirements from Linde. (UMF at ¶ 12; Iannelli Decl. at ¶ 15.) Linde has 17 submitted an invoice for each delivery, as well as its demand letter sent to Valley Protein 18 requesting payment for those deliveries. (Doc. No. 52-2 at 70–71.) Valley Protein does not 19 appear to dispute that those deliveries occurred, nor does it dispute that it has not paid for the CO2 20 gas delivered. Instead, Valley Protein’s opposition to Linde’s motion in this regard is limited to 21 the argument that it was relieved of its obligation to pay by virtue of rescission of the 2014 22 Agreement. As discussed above, the court has rejected this argument. Finding no material issue 23 of fact in dispute with respect to this claim, Linde’s motion for summary judgment on its account 24 stated claim will be granted in the amount of $38,963.89. 25 E. 26 Goods and Services Rendered Next, the court addresses Linde’s cause of action for goods and services rendered. “A 27 common count for Goods and Services Rendered ‘is a simplified form of pleading normally used 28 to aver the existence of various forms of monetary indebtedness.’” Ever Win Int’l Corp. v. 19 1 Premier Accessory Grp., No. 2:15-CV-07208-RGK (JCx), 2016 WL 11263125, at *4 (C.D. Cal. 2 Sept. 22, 2016) (quoting McBride v. Boughton, 123 Cal. App. 4th 379, 394 (2004)); see also 3 McBride, 123 Cal. App. 4th at 394 (noting that “[a] common count is not a specific cause of 4 action”); Martini E Ricci Iamino S.P.A.--Consortile Societa Agricola v. Trinity Fruit Sales Co., 5 30 F. Supp. 3d 954, 975 (E.D. Cal. 2014) (“Under California law, ‘common counts’ are general 6 pleadings that seek to recover money owed without necessarily specifying the nature of the 7 claim.”). “The only essential allegations of a common count are (1) the statement of indebtedness 8 in a certain sum, (2) the consideration, i.e., goods sold, work done, etc., and (3) nonpayment.” 9 Farmers Ins. Exch. v. Zerin, 53 Cal. App. 4th 445, 460 (1997). Common counts are frequently 10 coextensive with other causes of action pleaded in a complaint: “[w]hen a common count is used 11 as an alternative way of seeking the same recovery demanded in a specific cause of action, and is 12 based on the same facts, the common count is demurrable if the cause of action is demurrable.” 13 McBride, 123 Cal. App. 4th at 394. 14 Linde’s complaint demonstrates that its common count claim is based on the same facts as 15 its claim for account stated, namely that Linde delivered CO2 and equipment to Valley Protein for 16 which it has not been paid. (Doc. No. 1 at ¶ 31–34.) Once more, Valley Protein’s only 17 opposition to Linde’s motion for summary judgment is based on its argument that the 2014 18 Agreement was rescinded. Because the court has already found that Linde is entitled to summary 19 judgment on its claim for account stated, and because the common count claim is coextensive 20 with it, the court will also grant Linde’s motion for summary judgment as to the common count 21 claim. However, in light of the court’s award of $38,963.89 on Linde’s account stated claim, the 22 court finds that Linde will be fully compensated for Valley Protein’s failure to pay for the CO2 23 delivery. Any further award of damages would overcompensate Linde. Accordingly, while 24 summary judgment for Linde will be granted as to this claim, no additional damages will be 25 awarded with respect to it. 26 F. Valley Protein’s Counter-claims for Breach of Contract 27 Next, the court addresses the counter-claim for breach of contract brought by Valley 28 Protein in which Valley Protein contends that Linde breached the provisions of the 2011 and 2014 20 1 Agreements. As noted, Linde also moves for summary judgment in its favor on this claim 2 brought by Valley Protein.4 3 As both parties acknowledge, the 2011 Agreement contained a provision requiring that 4 “[a] Party must commence an action for a breach of contract within one year after the action has 5 accrued.” (UMF at ¶ 1.) The default statute of limitations for actions to enforce a breach of 6 contract in New Jersey is six years from the time the cause of action accrued. N.J. Stat. Ann. 7 § 2A:14-1. However, “[c]ontract provisions limiting the time parties may bring suit have been 8 held to be enforceable, if reasonable.” Eagle Fire Prot. Corp. v. First Indem. of Am. Ins., 678 9 A.2d 699, 704 (N.J. 1996). 10 Multiple courts in New Jersey have found contract provisions imposing one-year 11 limitations on breach of contract actions to be reasonable. See, e.g., id.; Weinroth v. N.J. Mfrs. 12 Ass’n Fire Ins., 189 A. 73, 75 (N.J. 1937); A.J. Tenwood Assocs. v. Orange Senior Citizens Hous. 13 Co., 491 A.2d 1280, 1284 (N.J. App. Div. 1985). Valley Protein directs the court to one contrary 14 case, but the court finds it to be readily distinguishable in light of the facts here. See Rodriguez v. 15 Raymours Furniture Co., 138 A.3d 528 (N.J. 2016). In Rodriguez, an employment application 16 contained a provision requiring the applicant, if hired, to bring any employment-related cause of 17 action against the employer within six months of the challenged employment action and to waive 18 any statute of limitations to the contrary. Id. at 529–30. An employee brought an action against 19 his former employer, alleging a violation of New Jersey’s Law Against Discrimination which 20 claim was governed by a two-year statute of limitations. Id. at 530. In finding the application’s 21 six-month limitations period to be unreasonable, the New Jersey Supreme Court noted that the 22 Law Against Discrimination “exists for the good of all the inhabitants of New Jersey,” and 23 therefore “concerns more than a purely private cause of action affecting only private interests.” 24 4 25 26 27 28 The parties dispute whether the 2011 Agreement remained in force following execution of the 2014 Agreement. Linde contends that the 2014 Agreement amounts to a novation, which “substitutes a new contract and extinguishes the old one.” Wells Reit II-80 Park Plaza, LLC v. Dir., Div. of Taxation, 999 A.2d 489, 497 (N.J. App. Div. 2010). By contrast, Valley Protein argues that “the 2011 Agreement arguably remained in effect.” (Doc. No. 53 at 9.) The court acknowledges this dispute but need not reach this issue since Linde’s counter-claim for breach of contract may be disposed of on alternative grounds, as explained below. 21 1 Id. at 538. Because of these competing public policy considerations, the Supreme Court declined 2 to enforce the contractual limitation period. However, such considerations are absent here, and 3 Valley Protein has offered no further argument as to how the holding in Rodriguez should compel 4 the court to reject the limitations period agreed to by the parties under the circumstances of this 5 case. Accordingly, the court finds that the one-year statute of limitations contained within the 6 2011 Agreement is reasonable and must be applied. 7 According to Valley Protein’s counter-claim, Linde breached the 2011 Agreement by 8 failing to provide Valley Protein with an adequate freezer, as it was required to do. (See Doc. No. 9 29 at ¶ 27.) However, the counter-claim indicates that Valley Protein became aware of that 10 inadequacy no later than September of 2014. (Id. at ¶¶ 13–14 (stating that by 2014, the freezing 11 equipment provided by Linde had become “inoperable”).) By the terms of the 2011 Agreement, 12 Valley Protein had until September of 2015 to bring causes of action based on a breach of a 2011 13 Agreement. See County of Morris, 707 A.2d at 972 (under New Jersey law, “a cause of action 14 will not accrue until the injured party discovers, or by exercise of reasonable diligence and 15 intelligence should have discovered, facts which form the basis of a cause of action”). However, 16 Valley Protein’s claim for breach of contract was not brought until February 2017, far after the 17 one-year limitations period had expired. (Doc. No. 29.) 18 The same logic holds true with respect to the 2014 Agreement. The evidence before the 19 court on summary judgment establishes that Valley Protein was dissatisfied with the freezer 20 provided by Linde under that Agreement no later than December 2014. (UMF at ¶ 14; Iannelli 21 Decl. at ¶ 16; Doc. No. 52-2 at 57.) This dissatisfaction is what prompted Valley Protein to 22 attempt to rescind that Agreement. Therefore, Valley Protein had until December 2015 to sue for 23 breach of contract. Its counter-claim, brought in February 2017, falls far outside of that filing 24 deadline. 25 Thus, even if Valley Protein is correct that the 2011 Agreement remained in force, its 26 claim for breach of that contract is time-barred. The court will therefore grant summary judgment 27 in favor of Linde on Valley Protein’s counter-claims for breach of contract. 28 ///// 22 1 G. Valley Protein’s Claim for Breach of the Implied Covenant of Good Faith and Fair 2 Dealing 3 Next, the court addresses Valley Protein’s counter-claim for breach of the implied 4 covenant of good faith and fair dealing. The relevant California law governing this claim has 5 already been discussed above. Valley Protein contends that Linde breached the covenant with 6 respect to the 2011 Agreement by providing it with faulty equipment, and then by refusing to 7 properly maintain that equipment. (Doc. No. 29 at ¶ 34.) Valley Protein also contends that Linde 8 breached the covenant with respect to the 2014 Agreement by “failing to comply with its 9 obligation to provide poultry-freezing equipment sufficient to meet Valley Protein’s needs.” (Id. 10 at ¶ 35.) As with Valley Protein’s claim for breach of contract, Linde argues that this cause of 11 action is time-barred. (Doc. No. 52 at 29–30.) 12 California mandates a four-year statute of limitations for actions for breach of the implied 13 covenant of good faith and fair dealing. Frazier v. Metro. Life Ins., 169 Cal. App. 3d 90, 102 14 (1985) (citing Cal. Civ. Proc. Code § 337). Moreover, under normal circumstances, “plaintiff’s 15 ignorance of the cause of action, or of the identity of the wrongdoer, does not toll the statute.” 16 Neel v. Magana, Olney, Levy, Cathcart & Gelfand, 6 Cal. 3d 176, 187 (1971). However, to avoid 17 the often-harsh consequences of this rule, California courts also recognize the “discovery rule,” 18 under which the statute of limitations begins to run “when plaintiff either (1) actually discovered 19 his injury and its negligent cause or (2) could have discovered injury and cause through the 20 exercise of reasonable diligence.” Apr. Enters., Inc. v. KTTV, 147 Cal. App. 3d 805, 826 (1983) 21 (internal quotation marks omitted). 22 Here, having reviewed Valley Protein’s counter-claim and the evidence before the court 23 on summary judgment, the court concludes that the applicable statute of limitations bars some of 24 Valley Protein’s theories of recovery. As noted, in its counter-claim Valley Protein alleges 25 breaches of the covenant of good faith and fair dealing with respect to both the 2011 and 2014 26 Agreements. Moreover, within those two agreements, Valley Protein advances multiple 27 allegations which could potentially form the basis of a misrepresentation claim. (See generally 28 Doc. No. 29 at 34–47.) For instance, with respect to the 2011 Agreement, Valley Protein asserts 23 1 that Linde breached the covenant of good faith and fair dealing by “failing to supply Valley 2 Protein with modern, reliable, and efficient poultry-freezing equipment and instead providing 3 equipment that was unreliable, obsolete and often inoperable.” (Id. at ¶ 34(a).) Valley Protein 4 also alleges a breach of the covenant for “failing to maintain the poultry-freezing equipment as it 5 was required to do pursuant to the terms of the 2011 Agreement.” (Id. at ¶ 34(c).) Thus, as pled 6 by Valley Protein, multiple theories of liability are contained within this cause of action. 7 The evidence before the court on summary judgment—which Valley Protein does not 8 dispute (see Doc. No. 54 at 8)—demonstrates that Valley Protein President Robert Coyle was 9 aware by early 2012 that the poultry-freezing equipment provided by Linde was not meeting its 10 target CO2 conversion rate. (Doc. No. 52-4 at 142:25, 143:1–5.) Applying California’s discovery 11 rule, the statute of limitations is tolled until that date. Nonetheless, because Valley Protein’s 12 counter-claim for breach of the covenant of good faith and fair dealing was not filed until 13 February 2017, any recovery under this theory of liability is barred by the applicable four-year 14 statute of limitations which expired by early 2016. 15 However, with respect to whether Valley Protein’s remaining theories of liability on this 16 claim remain viable, Linde has not pointed to any evidence presented on summary judgment 17 demonstrating that those theories are time-barred as a matter of law. It is conceivable that other 18 evidence may exist in the record demonstrating that these remaining theories of liability are also 19 foreclosed by the applicable statute of limitations. However, Linde has not cited to any such 20 evidence in its motion, and the court declines to comb through the record to find support for 21 Linde’s motion. See Indep. Towers of Wash. v. Washington, 350 F.3d 925, 929 (9th Cir. 2003) 22 (“Our adversarial system relies on the advocates to inform the discussion and raise the issues to 23 the court.”). Accordingly, the court finds that Valley Protein’s counter-claim for breach of the 24 implied covenant of good faith and fair dealing is time-barred only as to Valley Protein’s claim 25 that Linde breached the implied covenant of good faith and fair dealing with respect to the issue 26 of the CO2 conversion rate. 27 Regardless of the theory of liability relied upon by Valley Protein, however, Valley 28 Protein’s claim for breach of the implied covenant of good faith and fair dealing fails for a 24 1 separate reason. The California Supreme Court has held that where a claim for breach of the 2 implied covenant of good faith and fair dealing is based upon the same breaches as those alleged 3 in a breach of contract claim, the good faith and fair dealing claim fails as a matter of law. Guz v. 4 Bechtel Nat’l, Inc., 24 Cal. 4th 317, 327 (2000) (“[W]here breach of an actual term is alleged, a 5 separate implied covenant claim, based on the same breach, is superfluous.”). Thus, district 6 courts in California routinely dismiss claims for breach of the implied covenant of good faith and 7 fair dealing where those allegations essentially repeat those already made in a breach of contract 8 claim. See, e.g., Tryfonas v. Splunk, Inc., No. 17-CV-01420-HSG, 2018 WL 534287, at *2 (N.D. 9 Cal. Jan. 24, 2018) (dismissing plaintiff’s claim for breach of the covenant of good faith and fair 10 dealing as duplicative because “[p]laintiff’s claim . . . relies on the same acts as his claim for 11 breach of contract”); Tam v. Qualcomm, Inc., 300 F. Supp. 3d 1130, 1146 (S.D. Cal. 2018) (“[A] 12 plaintiff may bring both a breach of contract claim and a claim for breach of the implied covenant 13 of good faith and fair dealing, but when both causes of action cite the same underlying breach, the 14 implied covenant claim is superfluous.”); Landucci v. State Farm Ins., 65 F. Supp. 3d 694, 716 15 (N.D. Cal. 2014) (citing the decision in Guz for the proposition that “although . . . a plaintiff may 16 bring both a breach of contract claim and a claim for breach of the implied covenant of good faith 17 and fair dealing, . . . when both causes of action cite the same underlying breach, the implied 18 covenant cause of action will be superfluous with the contract cause of action”). 19 A review of Valley Protein’s counter-claim reveals that the claim for breach of the 20 implied covenant of good faith and fair dealing is based on the same conduct as the breach of 21 contract claim. In fact, the factual allegations contained within each cause of action are identical. 22 (Compare Doc. No. 29 at ¶¶ 27, 30, with id. at ¶¶ 34–35.) Therefore, under California law, 23 Valley Protein’s claim for breach of the implied covenant of good faith and fair dealing must fail. 24 The court accordingly will grant summary judgment in Linde’s favor on Valley Protein’s counter- 25 claim for breach of the implied covenant of good faith and fair dealing. 26 H. Valley Protein’s Claims for Intentional and Negligent Misrepresentation 27 The court next addresses Valley Protein’s counter-claims for intentional and negligent 28 misrepresentation, respectively. Linde argues that it is entitled to summary judgment on these 25 1 claims since they are barred by the applicable statute of limitations and, alternatively, because 2 Valley Protein cannot establish these claims as a matter of law. (Doc. No. 52 at 31–33.) Linde 3 also argues that these claims are barred by the economic loss rule. (Id. at 33.) 4 To establish a claim for intentional misrepresentation a plaintiff must plead and prove: 5 “(1) a misrepresentation (false representation, concealment, or nondisclosure); (2) knowledge of 6 falsity (or scienter); (3) intent to defraud, i.e., to induce reliance; (4) justifiable reliance; and (5) 7 resulting damage.” Robinson Helicopter Co. v. Dana Corp., 34 Cal. 4th 979, 990 (2004) (citing 8 Lazar v. Superior Court, 12 Cal. 4th 631, 638 (1996)). Meanwhile, “[n]egligent 9 misrepresentation is a form of deceit, the elements of which consist of (1) a misrepresentation of a 10 past or existing material fact, (2) without reasonable grounds for believing it to be true, (3) with 11 intent to induce another’s reliance on the fact misrepresented, (4) ignorance of the truth and 12 justifiable reliance thereon by the party to whom the misrepresentation was directed, and (5) 13 damages.” Fox v. Pollack, 181 Cal. App. 3d 954, 962 (1986). 14 The court first turns to the Coyle Declaration, the evidence relied upon by Valley Protein 15 in opposing summary judgment as to this claim. In that declaration, submitted under penalty of 16 perjury, Coyle averred that “[a]t the time the 2011 Agreement was executed in January 2011, 17 Linde’s Vice President of Western Markets, Michael Beckman, represented that the equipment 18 provided to Valley Protein by Linde was high quality, reliable, and efficient.” (Coyle Decl. at 19 ¶ 5.) The Coyle Declaration also states that during the course of the 2011 Agreement, Valley 20 Protein discovered that the freezer provided by Linde was outdated, obsolete, and frequently 21 inoperable. (Id. at ¶ 6.) In his declaration Coyle lists a variety of misrepresentations Linde made 22 to Valley Protein, relating to the size and capabilities of the equipment, the age of the equipment, 23 and how much CO2 the equipment would use. (Id. at ¶ 8.) Coyle declares that these 24 representations and promises induced Valley Protein to enter into the 2011 Agreement, and that 25 absent those representations, Valley Protein would not have done so. (Id.) Linde acknowledges, 26 at least implicitly, the Coyle Declaration would create a triable issue of fact as to whether Linde 27 employees made material misrepresentations to Valley Protein. However, Linde argues that 28 ///// 26 1 Coyle’s declaration is self-serving and contradicted by his own deposition testimony, because of 2 which the court should disregard it. (Doc. No. 58 at 15.) 3 At the outset, the court observes that many of the statements made in Coyle’s declaration 4 filed in opposition to summary judgment are markedly different from the testimony he gave at his 5 deposition. Whereas his declaration attributed at least some of the misrepresentations to Linde 6 employee Michael Beckman, Coyle at his deposition testified that he never had any conversations 7 with Michael Beckman, and that in fact he was unfamiliar with any Linde employee with that 8 name. (Compare Coyle Decl. at ¶ 5, with Doc. No. 52-4 at 6.) In addition, while Coyle’s 9 declaration lists numerous alleged misrepresentations by Linde employees that induced Valley 10 Protein to enter into the 2011 Agreement, Coyle testified at his deposition that all such statements 11 made by Linde employees were accurate at the time they were made to the best of his knowledge. 12 (Compare Coyle Decl. at ¶¶ 5, 8, with Doc. No. 52-4 at 25.) Finally, when questioned at his 13 deposition whether he believed any Linde employee had ever made any misleading statements to 14 him regarding the equipment at issue, Coyle responded, “knowingly, no.” (Doc. No. 52-4 at 15 26:5–7.) 16 “‘The general rule in the Ninth Circuit is that a party cannot create an issue of fact by an 17 affidavit contradicting his prior deposition testimony.’” Van Asdale v. Int’l Game Tech., 577 F.3d 18 989, 998 (9th Cir. 2009) (quoting Kennedy v. Allied Mut. Ins., 952 F.2d 262, 266 (9th Cir. 1991)). 19 This rule, known as the sham affidavit rule, “prevents a party who has been examined at length on 20 deposition from raising an issue of fact simply by submitting an affidavit contradicting his own 21 prior testimony, which would greatly diminish the utility of summary judgment as a procedure for 22 screening out sham issues of fact.” Yeager v. Bowlin, 693 F.3d 1076, 1080 (9th Cir. 2012) 23 (internal quotation marks and brackets omitted). As courts have acknowledged, this rule is at 24 least somewhat in tension with normal procedures employed in connection with summary 25 judgment motions, in which courts are prohibited from making credibility determinations or 26 weighing conflicting evidence. See Van Asdale, 577 F.3d at 998. Accordingly, the sham 27 affidavit rule is to be employed sparingly, and only when “the inconsistency between a party’s 28 deposition testimony and subsequent affidavit [is] clear and unambiguous.” Id. at 998–99. 27 1 Here, the court finds that Coyle’s declaration submitted in opposition to summary 2 judgment cannot logically be reconciled with his deposition testimony. Coyle testified that 3 Beckman was not involved at all with negotiations leading to the 2011 Agreement and that sworn 4 testimony simply cannot be squared with Coyle’s statement in his declaration that Beckman 5 “represented that the equipment provided to Valley Protein by Linde was high quality, reliable, 6 and efficient.” (Coyle Decl. at ¶ 5.) Nor can the court credit the alleged misrepresentations 7 leading up to the execution of the 2011 Agreement set forth in Coyle’s declaration in light of his 8 deposition testimony that all statements made by Linde employees were accurate at the time they 9 were made. Because Coyle’s deposition is clearly and unambiguously inconsistent with his later 10 declaration submitted in support of the opposition to summary judgment, the court will disregard 11 Coyle’s declaration to the extent it is in conflict with his sworn deposition testimony. 12 Coyle’s deposition testimony affirmatively establishes that, in his opinion, any false 13 statements made to Valley Protein were not knowingly made by Linde employees. As noted, 14 under California law, a party must establish “knowledge of falsity” in order to prevail on an 15 intentional misrepresentation claim. Robinson Helicopter Co., 34 Cal. 4th at 990. Linde has thus 16 satisfied its burden of “produc[ing] evidence negating an essential element of the nonmoving 17 party’s case.” See Nissan Fire & Marine Ins. v. Fritz Cos., 210 F.3d 1099, 1106 (9th Cir. 2000). 18 The burden therefore shifts to Valley Protein to establish that a genuine issue of disputed fact 19 actually does exist with respect to this claim. See Matsushita, 475 U.S. at 586. However, in 20 opposing summary judgment on its intentional misrepresentation claim, Valley Protein has relied 21 solely on Coyle’s declaration to create a triable issue of fact. (Doc. No. 53 at 25–26.) As a sham 22 affidavit, Coyle’s declaration fails to establish the existence of a genuinely disputed factual issue 23 with respect to the knowingness of the alleged misrepresentations. The undersigned therefore 24 ///// 25 ///// 26 ///// 27 ///// 28 ///// 28 1 finds that summary judgment in favor of Linde is warranted as to Valley Protein’s counter-claim 2 for intentional misrepresentation.5 3 By contrast, a party need not prove that a false statement was “knowing” in order to 4 prevail on a claim for negligent misrepresentation. Small v. Fritz Cos., 30 Cal. 4th 167, 173 5 (2003) (“The tort of negligent misrepresentation does not require scienter or intent to defraud.”). 6 Therefore, the court will next consider Linde’s argument that Valley Protein’s misrepresentation 7 claims are barred by the economic loss doctrine. The California Supreme Court recently 8 discussed the economic loss rule, stating as follows: 9 Economic loss consists of damages for inadequate value, costs of repair and replacement of [a] defective product or consequent loss of profits—without any claim of personal injury or damages to other. Simply stated, the economic loss rule provides: Where a purchaser’s expectations in a sale are frustrated because the product he bought is not working properly, his remedy is said to be in contract alone, for he has suffered only “economic” losses. This doctrine hinges on a distinction drawn between transactions involving the sale of goods for commercial purposes where economic expectations are protected by commercial and contract law, and those involving the sale of defective products to individual consumers who are injured in a manner which has traditionally been remedied by resort to the law of torts. The economic loss rule requires a purchaser to recover in contract for purely economic loss due to disappointed expectations, unless he can demonstrate harm above and beyond a broken contractual promise. Quite simply, the economic loss rule prevents the law of contract and the law of tort from dissolving one into the other. 10 11 12 13 14 15 16 17 18 19 Robinson Helicopter, 34 Cal. 4th at 988 (emphasis added). 20 At its heart, this rule requires a plaintiff to rely on the law of contracts and implied and 21 express warranties to recover based upon any defect in the product sold to plaintiff, rather than 22 resort to tort law. When applied to product liability suits, one may still sue for damage to 23 24 25 26 27 28 5 While the court finds that this particular statement within Coyle’s declaration must be disregarded under the sham affidavit rule, it does not follow that all statements contained within it must also be disregarded. For instance, Coyle states in his declaration that Linde’s engineer, Amanda Guzman, represented in October 2014 that the poultry-freezing equipment to be provided under the 2014 Agreement would be capable of processing 5,000 pounds of poultry per hour. (Coyle Decl. at ¶ 9.) Although the evidence establishes that Linde was unaware that a 5,000-pound-per-hour processing capacity was a requirement for Valley Protein at the time the 2014 Agreement was executed (see Doc. No. 52-4 at 19), that does not affirmatively prove that the statement contained within the Coyle declaration was never made. 29 1 property other than the product under the economic loss rule, but losses to the allegedly defective 2 product itself are barred as “economic” losses. Jimenez v. Superior Court of San Diego Cty., 29 3 Cal. 4th 473, 456 (2002). The economic loss rule has also been applied to bar general negligence 4 claims. See Robinson Helicopter, 34 Cal. 4th at 989 (citing Aas v. Superior Court, 24 Cal. 4th 5 627, 640 (2000) and Seely v. Liberty Mut. Fire Ins., 63 Cal. 2d 41, 45 (1965)). 6 In Robinson Helicopter, the California Supreme Court noted other exceptions to the 7 economic loss rule besides those carved out for certain products liability cases. Thus, the court 8 recognized that aside from cases involving physical injury or damage to other property, plaintiffs 9 may also recover for “breach of the covenant of good faith and fair dealing in insurance contracts; 10 for wrongful discharge in violation of fundamental public policy; or where the contract was 11 fraudulently induced.” Id. at 989–90 (emphasis added). “In each of these cases, the duty that 12 gives rise to tort liability is either completely independent of the contract or arises from conduct 13 which is both intentional and intended to harm.” Id. at 990 (citations and quotations omitted). 14 “Focusing on intentional conduct gives substance to the proposition that a breach of contract is 15 tortious only when some independent duty arising from tort law is violated.” Id. However, if 16 “every negligent breach of a contract gives rise to tort damages the limitation would be 17 meaningless, as would the statutory distinction between tort and contract remedies.” Id. Thus, 18 the focus for the California Supreme Court in Robinson Helicopter centered on the intentional 19 nature of the defendant’s behavior, because courts should only apply tort remedies to contract 20 suits “when the conduct in question is so clear in its deviation from socially useful business 21 practices that the effect of enforcing such tort duties will be to aid rather than discourage 22 commerce.” Id. at 991–92 (citations and quotations omitted). “California also has a legitimate 23 and compelling interest in preserving a business climate free of fraud and deceptive practices,” 24 and therefore fraudulent conduct cannot be considered a “socially useful business practice.” Id. at 25 992 (citations and quotations omitted). 26 No published Ninth Circuit opinion nor California Supreme Court decision has analyzed 27 how the exceptions to the economic loss rule identified in Robinson Helicopter apply to claims of 28 negligent misrepresentation which, by their very nature, occupy the space between negligence 30 1 and fraud claims. However, two unpublished Ninth Circuit decisions have suggested negligent 2 misrepresentation claims are not barred by the economic loss rule. See Hannibal Pictures, Inc. v. 3 Sonja Prods. LLC, 432 Fed. App’x 700, 701 (9th Cir. 2011) (holding that a jury verdict in favor 4 of a negligent misrepresentation claim was not precluded by the economic loss rule where “one 5 party has lied to the other”); Kalitta Air, L.L.C. v. Cent. Texas Airborne Sys., Inc., 315 Fed. App’x 6 603, 607 (9th Cir. 2008) (holding that negligent misrepresentation is a “species of fraud” under 7 California law, for which “economic loss is recoverable”). A third unpublished Ninth Circuit 8 decision reached a contrary holding. See Astrium S.A.S. v. TRW, Inc., 197 Fed. App’x 575, 577 9 (9th Cir. 2006) (citing Robinson Helicopter for the proposition that the economic loss rule barred 10 recovery for fraud and negligent misrepresentation “because, even if fraud were shown, there is 11 no showing that people or property were placed at risk or that Astrium was exposed to ‘personal 12 damages’ beyond economic losses”); accord Crystal Springs Upland Sch. v. Fieldturf USA, Inc., 13 219 F. Supp. 3d 962, 969 n.3 (N.D. Cal. 2016) (recognizing this split of authority).6 14 Numerous district courts in California have considered this issue, reaching varying 15 conclusions. See, e.g., Shahinian v. Kimberly-Clark Corp., No. CV 14-8390 DMG(SHx), 2015 16 WL 4264638, at *8 (C.D. Cal. July 10, 2015); UMG Recordings, Inc. v. Glob. Eagle Entm’t, Inc., 17 117 F. Supp. 3d 1092, 1104 (C.D. Cal. 2015); Ladore v. Sony Comput. Entm’t Am., LLC, 75 F. 18 Supp. 3d 1065, 1074–76 (N.D. Cal. 2014); Tasion Commc’ns, Inc. v. Ubiquiti Networks, Inc., No. 19 C-13-1803-EMC, 2013 WL 4530470, at *3–9 (N.D. Cal. Aug. 26, 2013); NuCal Foods, Inc. v. 20 Quality Egg LLC, 918 F. Supp. 2d 1023, 1030 (E.D. Cal. 2013); Castro Valley Union 76, Inc. v. 21 Vapor Sys. Techs., Inc., No. C 11-0299 PJH, 2012 WL 5199458, at *4 (N.D. Cal. Oct. 22, 2012); 22 United Guar. Mortg. Indem. Co. v. Countrywide Fin. Corp., 660 F. Supp. 2d 1163, 1179 (C.D. 23 Cal. 2009); Barrier Specialty Roofing & Coatings, Inc. v. ICI Paints N. Am., Inc., No. CV F 07- 24 1614-LJO-TAG, 2008 WL 2724876, at *5–6 (E.D. Cal. July 11, 2008). One district court has 25 observed that “reasonable minds can and do disagree on the applicability of the economic loss 26 rule to negligent representation claims, and this issue is ripe to be revisited by the California 27 28 6 Citation to these unpublished Ninth Circuit opinions is appropriate pursuant to Ninth Circuit Rule 36-3(b). 31 1 Supreme Court.” Broomfield v. Craft Brew All., Inc., No. 17-CV-01027-BLF, 2017 WL 2 3838453, at *9 (N.D. Cal. Sept. 1, 2017), on reconsideration in part, 2017 WL 5665654 (N.D. 3 Cal. Nov. 27, 2017). 4 Because this question is one of state law, this court is obligated to resolve it as the court 5 believes the California Supreme Court would. Astaire v. Best Film & Video Corp., 116 F.3d 6 1297, 1300 (9th Cir. 1997), as amended, 136 F.3d 1208 (9th Cir. 1998). “In the absence of a 7 controlling California Supreme Court decision, [the court] must predict how the California 8 Supreme Court would decide the issue, using intermediate appellate court decisions, statutes, and 9 decisions from other jurisdictions as interpretive aids.” Gravquick A/S v. Trimble Navigation Int’l 10 Ltd., 323 F.3d 1219, 1222 (9th Cir. 2003). As the above-cited cases demonstrate, both district 11 courts and panels of the Ninth Circuit have arrived at differing conclusions. However, having 12 reviewed all of these decisions, the court finds the opinion in Lincoln General Insurance Co. v. 13 Access Claims Administrators, Inc., No. CIV. S-07-1015 LKK/EFB, 2007 WL 2492436 (E.D. 14 Cal. Aug. 30, 2007) to be persuasive. In confronting this issue in that case, Judge Karlton held 15 that the economic loss rule bars negligent misrepresentation claims where the allegation runs 16 “closely parallel” to a concurrent breach of contract claim. Lincoln Gen. Ins. Co., 2007 WL 17 2492436, at *8. Rather than adopting a bright-line rule that negligent misrepresentation claims 18 either are or are not barred by the economic loss rule, this analysis examines the factual basis of 19 the claim to determine whether, as a practical matter, the negligent misrepresentation claim is in 20 actuality a breach of contract claim in disguise. This approach is in keeping with that employed 21 by the California Supreme Court in Robinson Helicopter, where that court concluded that the 22 fraud and intentional misrepresentation claims were not barred “because they were independent 23 of Dana’s breach of contract.” Robinson Helicopter, 34 Cal. 4th at 991.7 Accordingly, the court 24 7 25 26 27 28 California courts undertake a similarly functional analysis in other areas. For instance, in determining whether a particular cause of action sounds in tort or contract, California courts eschew a more formalistic approach in favor of an examination of “the quintessence of the action.” Voth v. Wasco Pub. Util. Dist., 56 Cal. App. 3d 353, 356 (1976) (“Whether an action is contractual or tortious depends upon the nature of the right sued upon, and not the form of the pleading or the relief demanded.”); accord Amtower v. Photon Dynamics, Inc., 158 Cal. App. 4th 1582, 1602 (2008). 32 1 will compare Valley Protein’s counter-claims for breach of contract and negligent 2 misrepresentation to determine whether they are predicated on the same or similar factual 3 allegations. See Bret Harte Union High Sch. Dist. v. FieldTurf, USA, Inc., No. 1:16-cv-00371- 4 DAD-SMS, 2016 WL 3519294, at *5 (E.D. Cal. June 27, 2016) (declining to dismiss plaintiff’s 5 negligent representation claim despite the additional allegation of a breach of contract claim 6 because the negligent representation allegations “are, by nature, different”); Tasion Commc’ns, 7 2013 WL 4530470, at *9 (collecting cases and noting that “courts have nonetheless dismissed 8 negligent misrepresentation claims as barred by the economic loss rule where the complained-of 9 misrepresentations were simply those made in the course of forming the contract”). If Valley 10 Protein’s breach of contract and negligent misrepresentation claims are predicated on the same or 11 similar factual allegations, summary judgment in Linde’s favor as to the negligent 12 misrepresentation claim is appropriate. 13 Here, Valley Protein’s breach of contract claim is based on the following factual 14 allegations: (1) Linde’s failure to supply Valley Protein with modern, reliable, and efficient 15 poultry-freezing equipment; (2) causing Valley Protein to use significantly more CO2 gas than 16 was necessary; (3) failing to properly maintain its poultry-freezing equipment; (4) improperly 17 charging Valley Protein fuel surcharge and delivery fees by delivering CO2 gas from Richmond, 18 CA instead of Pixley, CA; and (5) failing to deliver the poultry-freezing equipment it was 19 obligated to provide under the 2014 Agreement. (Doc. No. 29 at ¶¶ 27, 30.) Its negligent 20 misrepresentation claim is based on alleged misrepresentations that (1) Linde would provide 21 Valley Protein with modern, reliable, and efficient equipment that would satisfy Valley Protein’s 22 needs; (2) Linde would deliver CO2 gas from Pixley, CA rather than Richmond, CA; and (3) 23 Linde would supply Valley Protein with poultry-freezing equipment sufficient to meet Valley 24 Protein’s production needs in connection with the 2014 Agreement. (Id. at ¶¶ 49, 54, 56.) An 25 examination and comparison of these claims reveals that not only do they “closely parallel” one 26 another, they are effectively identical. Valley Protein’s negligent misrepresentation claim plainly 27 seeks to redress the same grievances as the breach of contract claim, namely the economic 28 damages Valley Protein allegedly suffered as a result of entering into the 2011 and 2014 33 1 Agreements. Under such circumstances, the economic loss rule limits Valley Protein to recovery 2 under contract law rather than tort law. See JMP Sec. LLP v. Altair Nanotechnologies Inc., 880 F. 3 Supp. 2d 1029, 1043 (N.D. Cal. 2012) (dismissing claims for fraud and negligent 4 misrepresentation after finding those claims “consist of nothing more than Altair’s alleged failure 5 to make good on its contractual promises”). Summary judgment in Linde’s favor is therefore also 6 appropriate as to Valley Protein’s claim for negligent misrepresentation. 7 I. 8 Valley Protein’s Claims for Unfair Competition Finally, the court addresses Valley Protein’s counter-claim under California Business and 9 Professions Code § 17200, commonly referred to as the Unfair Competition Law (“UCL”). Linde 10 argues that this counter-claim is also time-barred, that Valley Protein has not raised a triable issue 11 of fact with respect to the claim, and that Valley Protein is not entitled to any of the remedies 12 available under the UCL. 13 The UCL prohibits “unfair competition,” which is defined as including “any unlawful, 14 unfair or fraudulent business act or practice.” Cal. Bus. & Prof. Code § 17200. This language is 15 broad, and deliberately so. As the California Supreme Court has observed, 16 17 18 19 The Legislature intended by this sweeping language to permit tribunals to enjoin on-going wrongful business conduct in whatever context such activity might occur. Indeed, the section was intentionally framed in its broad, sweeping language, precisely to enable judicial tribunals to deal with the innumerable new schemes which the fertility of man’s invention would contrive. 20 Cel-Tech Commc’ns, Inc. v. Los Angeles Cellular Tel. Co., 20 Cal. 4th 163, 181 (1999) (internal 21 quotation marks, brackets, and ellipses omitted); see also Rubin v. Green, 4 Cal. 4th 1187, 1200 22 (1993) (stating that the law “embraces anything that can properly be called a business practice 23 and that at the same time is forbidden by law”). 24 Notably, courts give independent effect to each of the three prongs of § 17200. With 25 respect to the “unlawful” prong, § 17200 “borrows violations of other laws and treats them as 26 unlawful practices that the unfair competition law makes independently actionable.” De La Torre 27 v. CashCall, Inc., 5 Cal. 5th 966, 980 (2018) (internal quotation marks omitted). As to the 28 “unfair” prong, § 17200 makes clear that “a practice may be deemed unfair even if not 34 1 specifically proscribed by some other law.” Cel-Tech Commc’ns, 20 Cal. 4th at 180. “In other 2 words, a practice is prohibited as ‘unfair’ or ‘deceptive’ even if not ‘unlawful’ and vice versa.” 3 State Farm Fire & Cas. Co. v. Superior Court, 45 Cal. App. 4th 1093, 1102 (1996), abrogated on 4 other grounds by Cel-Tech Commc’ns, 20 Cal. 4th at 184–85. Finally, California courts 5 recognize a distinct cause of action under the “fraudulent” prong of § 17200. Under this prong, 6 “it is necessary only to show that the plaintiff was likely to be deceived, and suffered economic 7 injury as a result of the deception.” Zhang v. Superior Court, 57 Cal. 4th 364, 380 (2013) (citing 8 Kwikset Corp. v. Superior Court, 51 Cal. 4th 310, 322 (2011) and In re Tobacco II Cases, 46 Cal. 9 4th 298, 312 (2009)). Although the scope of relief under this provision is broad, the available 10 remedies are limited. “Prevailing plaintiffs are generally limited to injunctive relief and 11 restitution . . . [and] Plaintiffs may not receive damages, much less treble damages, or attorneys 12 fees.” Cel-Tech Commc’ns, 20 Cal. 4th at 179. 13 With respect to whether Valley Protein’s claim filed in February of 2017 is time-barred, 14 the analysis set forth above in addressing the breach of the implied covenant of good faith and fair 15 dealing claim applies to this cause of action as well. As with that cause of action, claims brought 16 under the UCL are subject to a four-year statute of limitations. Cal. Bus. & Prof. Code § 17208. 17 Again, the undisputed evidence before the court on summary judgment demonstrates that Valley 18 Protein was aware by early 2012 that the equipment provided by Linde was not meeting its target 19 CO2 conversion rate. (Doc. No. 52-4 at 142:25, 143:1–5.) Even accounting for tolling because of 20 California’s discovery rule, any recovery under this theory of liability is barred by the four-year 21 statute of limitations which would have expired by early 2016. However, the court finds no basis 22 to apply the statute of limitations with respect to Valley Protein’s other theories of recovery with 23 respect to this claim for the same reasons explained above in addressing Valley Protein’s counter- 24 claim for breach of the covenant of good faith and fair dealing. 25 The court next addresses whether Valley Protein is entitled to the relief sought. For 26 violation of § 17200, Valley Protein’s counter-claim seeks injunctive relief, restitution, and 27 attorneys’ fees. (Doc. No. 29 at 18–19.) A plaintiff must demonstrate standing “with respect to 28 each form of relief sought, whether it be injunctive relief, damages, or civil penalties.” See Bates 35 1 v. United Parcel Serv., Inc., 511 F.3d 974, 985 (9th Cir. 2007) (en banc); see also Haro v. 2 Sebelius, 747 F.3d 1099, 1108 (9th Cir. 2013) (citing DaimlerChrysler Corp. v. Cuno, 547 U.S. 3 332, 352 (2006)). 4 The matter of attorneys’ fees is easily resolved since such fees are not recoverable under 5 § 17200. Cel-Tech Commc’ns, 20 Cal. 4th at 179. Nor has Valley Protein demonstrated its 6 entitlement to injunctive relief. Linde asserts in its motion that Valley Protein and Linde are not 7 presently engaged in any business relationship, and there is no evidence before the court 8 indicating to the contrary. (Doc. No. 52 at 35.) Thus, any injunctive relief Valley Protein seeks is 9 necessarily prospective in nature. Indeed, Valley Protein’s counter-claim indicates that it seeks 10 injunctive relief “prohibiting Linde from engaging in such false, deceptive and fraudulent conduct 11 in the future.” (Doc. No. 29 at ¶ 63) (emphasis added). However, to have standing to seek 12 injunctive relief, the threat of injury to plaintiffs “must be actual and imminent, not conjectural or 13 hypothetical.” Summers v. Earth Island Inst., 555 U.S. 488, 493 (2009). “In other words, the 14 ‘threatened injury must be certainly impending to constitute injury in fact’ and ‘allegations of 15 possible future injury are not sufficient.’” Davidson v. Kimberly-Clark Corp., 889 F.3d 956, 967 16 (9th Cir. 2018) (quoting Clapper v. Amnesty Int’l USA, 568 U.S. 398, 409 (2013)). Past wrongs 17 do not by themselves amount to real and immediate threats of injury. See San Diego Cty. Gun 18 Rights Comm. v. Reno, 98 F.3d 1121, 1126 (9th Cir. 1996); see also O’Shea v. Littleton, 414 U.S. 19 488, 495–96 (1974) (“Past exposure to illegal conduct does not in itself show a present case or 20 controversy regarding injunctive relief . . . if unaccompanied by any continuing, present adverse 21 effect”). However, “past wrongs are evidence bearing on whether there is a real and immediate 22 threat of repeated injury.” O’Shea, 414 U.S. at 496. “In addition, the claimed threat of injury 23 must be likely to be redressed by the prospective injunctive relief.” Bates, 511 F.3d at 985–86. 24 Valley Protein’s brief in opposition to summary judgment does not respond to Linde’s argument 25 that injunctive relief is foreclosed here. (See Doc. No. 53 at 27–28.) Having reviewed the 26 evidence submitted on summary judgment, the court agrees with Linde that Valley Protein has 27 not demonstrated any “certainly impending” harm. Rather, the evidence establishes that Valley 28 Protein began purchasing CO2 from Air Liquide, and that its business relationship with Linde has 36 1 terminated. Under these circumstances, the court finds that injunctive relief is unavailable to 2 Valley Protein. 3 Finally, the court looks to whether Valley Protein is entitled to restitution damages. 4 California Business & Professions Code § 17203 provides that restitution is an available remedy 5 under the UCL “to restore to any person in interest any money or property, real or personal, 6 which may have been acquired by means of such unfair competition.” Linde argues that Valley 7 Protein is not entitled to restitution because it “has not alleged and cannot establish that Linde has 8 obtained money from Valley Protein to which it was not entitled, nor has it established that it 9 gave up money that it was otherwise entitled to keep.” (Doc. No. 52 at 36.) At bottom, this 10 amounts to an assertion that Valley Protein’s UCL counter-claim fails on the merits. The court 11 therefore turns to Linde’s alternative argument that Valley Protein’s UCL claim fails as a matter 12 of law, whether couched as unlawful, unfair, or fraudulent. 13 Under the unlawful prong of the UCL, “a violation of another law is a predicate for stating 14 a cause of action under the UCL’s unlawful prong.” Berryman v. Merit Prop. Mgmt., Inc., 152 15 Cal. App. 4th 1544, 1554 (2007). Although Valley Protein’s counter-claim alleges generally that 16 “Linde engaged in, and continues to engage in, unlawful and unfair claims practices [sic] as 17 alleged herein,” it does not identify which law Linde has allegedly violated. (Doc. No. 29 at 18 ¶ 62.) Likewise, in its opposition to Linde’s motion for summary judgment Valley Protein has 19 failed to point to any violation of law. The only possible such violations are the common law 20 causes of action asserted in Valley Protein’s counter-claim, discussed above. However, “a 21 common law violation . . . is insufficient” as a predicate for a UCL claim under the unlawful 22 prong of the statute. Shroyer v. New Cingular Wireless Servs., Inc., 622 F.3d 1035, 1044 (9th 23 Cir. 2010) (citing Allied Grape Growers v. Bronco Wine Co., 203 Cal. App. 3d 432, 450–54 24 (1988)). Finding no other basis to support a claim under the unlawful prong of the UCL, the 25 court will grant Linde’s motion for summary judgment with respect to the unlawful prong of 26 Valley Protein’s UCL claim. 27 28 Next, the court considers whether Linde is entitled to summary judgment on Valley Protein’s UCL claim brought under the fraudulent prong of the statute. A business practice is 37 1 “fraudulent” under the UCL if members of the public are likely to be deceived. Davis v. HSBC 2 Bank Nev., N.A., 691 F.3d 1152, 1169 (9th Cir. 2012) (citing Puentes v. Wells Fargo Home 3 Mortg., Inc., 160 Cal. App. 4th 638 (2008)). “A UCL claim based on the fraudulent prong can be 4 based on representations that deceive because they are untrue, but also those which may be 5 accurate on some level, but will nonetheless tend to mislead or deceive . . . A perfectly true 6 statement couched in such a manner that it is likely to mislead or deceive the consumer, such as 7 by failure to disclose other relevant information, is actionable under the UCL.” Morgan v. AT&T 8 Wireless Servs., Inc., 177 Cal. App. 4th 1235, 1255 (2009). 9 Here, Valley Protein has not come forward on summary judgment with any evidence of 10 harm to the general public resulting from Linde’s misrepresentations. A plaintiff must plead and 11 prove harm to the public as a prerequisite to succeed on a UCL claim under the fraudulent prong. 12 See, e.g., Travelers Prop. Cas. Co. of Am. v. Centex Homes, No. 11-3638-SC, 2013 WL 4528956, 13 at *5 (N.D. Cal. Aug. 26, 2013) (dismissing plaintiff’s claim under the fraudulent prong with 14 prejudice and noting that “both private individuals and corporations must show that the alleged 15 wrongdoing has some impact on the general public”); Med. Instrument Dev. Labs. v. Alcon Labs., 16 No. C 05-1138 MJJ, 2005 WL 1926673, at *5 (N.D. Cal. Aug. 10, 2005) (“Plaintiff fails to allege 17 in its Complaint that any ‘members of the public are likely to be deceived’ by Defendant’s 18 allegedly fraudulent conduct.”). Here, Valley Protein appears to base its UCL claim entirely on 19 Linde’s conduct in relation to the 2011 and 2014 Agreements. (See Doc. No. 53 at 27) (“In the 20 case at hand, there are facts that support claims for unfair business practices, both in the 21 fraudulent conduct used to include [sic] Valley Protein into the 2011 Agreement as well as the so- 22 called ‘mistake’ made by Linde on the sizing of the freezing equipment in connection with the 23 2014 Agreement[.]”). However, there is no evidence before the court on summary judgment 24 evincing that those Agreements caused any harm to the public. Indeed, Valley Protein has not put 25 forward evidence that Linde ever communicated to the public in any way. In essence, Valley 26 Protein “is trying to use the UCL fraud prong to vindicate its contractual . . . rights.” Travelers 27 Prop. Cas. Co. of Am., 2013 WL 4528956, at *5. Because of this, Linde is entitled to judgment 28 in its favor with respect to Valley Protein’s claim under the fraudulent prong of the UCL. See 38 1 Capella Photonics, Inc. v. Cisco Sys., Inc., 77 F. Supp. 3d 850, 865 (N.D. Cal. 2014) (dismissing 2 the defendant’s UCL counter-claim brought under the fraudulent prong after finding that the 3 defendant “does not allege that members of the public have been deceived by [plaintiff’s] alleged 4 fraudulent misrepresentations about the strength of its patent rights”). 5 Finally, the court considers whether summary judgment is warranted in favor of Linde 6 under the unfair prong of Valley Protein’s UCL claim. In the wake of the California Supreme 7 Court’s decision in Cel-Tech, appellate courts have been split regarding the proper test to be 8 employed in determining whether a business practice is “unfair.” Under one line of cases, an 9 unfair business practice occurs “when that practice offends an established public policy or when 10 the practice is immoral, unethical, oppressive, unscrupulous or substantially injurious to 11 consumers.” Graham v. Bank of Am., N.A., 226 Cal. App. 4th 594, 612 (2014). A second line of 12 cases considers the factors for unfairness set forth in section 5 of the Federal Trade Commission 13 Act: “‘(1) the consumer injury must be substantial; (2) the injury must not be outweighed by any 14 countervailing benefits to consumers or competition; and (3) it must be an injury that consumers 15 themselves could not reasonably have avoided.’” Id. at 613 (quoting Camacho v. Auto. Club of S. 16 Cal., 142 Cal. App. 4th 1394, 1403 (2006)). Yet a third line of cases holds that “a plaintiff 17 alleging an unfair business practice must show the defendant’s conduct is tethered to an 18 underlying constitutional, statutory or regulatory provision, or that it threatens an incipient 19 violation of an antitrust law, or violates the policy or spirit of an antitrust law.” Id. (internal 20 quotation marks and brackets omitted).8 21 Regardless of the correct test, however, “where the unfair business practices alleged under 22 the unfair prong of the UCL overlap entirely with the business practices addressed in the 23 fraudulent and unlawful prongs of the UCL, the unfair prong of the UCL cannot survive if the 24 claims under the other two prongs of the UCL do not survive.” Hoai Dang v. Samsung Elecs. 25 Co., No. 14-CV-00530-LHK, 2018 WL 6308738, at *10 (N.D. Cal. Dec. 3, 2018); Hadley v. 26 27 28 8 Neither Linde nor Valley Protein acknowledge that a split of authority exists on this point nor have they briefed the issue of which test this court should adopt. In the absence of any briefing addressing this point, the court declines to resolve the question of what test should properly apply. 39 1 Kellogg Sales Co., 243 F. Supp. 3d 1074, 1104–05 (N.D. Cal. 2017) (same). Here, Valley Protein 2 makes no distinction between its UCL claims, whether alleged under the unlawful, unfair, or 3 fraudulent prongs. Because the undersigned has already found that Linde is entitled to summary 4 judgment with respect to Valley Protein’s claims under the unlawful and fraudulent prongs, the 5 court finds that summary judgment is also appropriate in favor of Linde with respect to the unfair 6 prong. 7 CONCLUSION 8 For the reasons set forth above, 9 1. Linde’s motion for summary judgment (Doc. No. 52) is granted with respect to its 10 breach of contract claim, with damages to be awarded in the amount of 11 $963,084.00; 12 2. 13 breach of the implied covenant of good faith and fair dealing; 14 3. 15 Linde’s motion for summary judgment is granted with respect to its claim for account stated, with damages to be awarded in the amount of $38,963.89; 16 4. 17 Linde’s motion for summary judgment is granted with respect to its claim for goods and services rendered; 18 5. 19 Linde’s motion for summary judgment is granted with respect to Valley Protein’s counter-claim for breach of contract; 20 6. 21 Linde’s motion for summary judgment is granted with respect to Valley Protein’s counter-claim for breach of the implied covenant of good faith and fair dealing; 22 7. 23 Linde’s motion for summary judgment is granted with respect to Valley Protein’s counter-claim for intentional misrepresentation; 24 8. 25 Linde’s motion for summary judgment is granted with respect to Valley Protein’s counter-claim for negligent misrepresentation; 26 9. 27 28 Linde’s motion for summary judgment is denied with respect to its claim for Linde’s motion for summary judgment is granted with respect to Valley Protein’s counter-claim for violation of California’s Unfair Competition Law; ///// 40 1 10. 2 The total amount to be awarded to Linde, LLC on its claims for breach of contract and account stated against Valley Protein, LLC is $1,002,047.89; and 3 11. A status conference to be held on August 20, 2019 at 9:30 a.m. in Courtroom 5 4 before the undersigned, telephonic appearance authorized, to address the 5 remaining claim in this action.9 However, if the court receives a notice of 6 voluntary dismissal from plaintiff as to its remaining claim for breach of the 7 implied covenant of good faith and fair dealing prior thereto, the status conference 8 will be vacated and judgment will be entered in accordance with this order. 9 10 IT IS SO ORDERED. 11 Dated: 12 July 11, 2019 UNITED STATES DISTRICT JUDGE 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 9 If the parties are unavailable on August 20, 2019 at 9:30 a.m., they are directed to contact Courtroom Deputy Jami Thorp at (559) 499-5652, or JThorp@caed.uscourts.gov, within ten days of service of this order to reschedule the status conference to a mutually agreeable date. 41

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?