Donnie Cummings et al v. Cenergy International Services, LLC

Filing 22

MEMORANDUM Decision and ORDER DENYING Defendant's 17 Motion to Dismiss, signed by Chief Judge Lawrence J. O'Neill on 09/20/17. (2-day deadline) (Martin-Gill, S)

Download PDF
1 2 3 4 5 6 UNITED STATES DISTRICT COURT 7 FOR THE EASTERN DISTRICT OF CALIFORNIA 8 9 DONNIE CUMMINGS, et al., 1:17-cv-00484-LJO-JLT Plaintiffs, 10 MEMORANDUM DECISION AND ORDER DENYING DEFENDANT'S MOTION TO DISMISS v. 11 CENERGY INTERNATIONAL SERVICES, 12 LLC, Defendant. 13 (Doc. 17) 14 15 I. INTRODUCTION 16 17 Currently pending before the Court are Plaintiffs' Donnie Cummings and Charles Beaty's 18 ("Plaintiffs") motion for a preliminary injunction against Defendant Cenergy International Services, 19 LLC ("Cenergy") and Cenergy's Federal Rule of Civil Procedure 12(b)(1) motion to dismiss Plaintiffs' 20 complaint for lack of subject matter jurisdiction on standing and ripeness grounds. Plaintiffs' motion 21 for a preliminary injunction has been held in abeyance until Cenergy's motion to dismiss on 22 jurisdictional grounds is resolved. For the reasons set forth below, Cenergy's motion to dismiss is 23 DENIED. 24 25 1 II. FACTUAL BACKGROUND 1 2 Plaintiffs performed work for the Chevron corporation as well site/drill site managers, and 3 allege they were intentionally misclassified as independent contractors by Chevron and impermissibly 4 denied overtime wages pursuant to the Fair Labor Standards Act ("FLSA"), 29 U.S.C. § 216(b). 5 Plaintiffs are pursuing claims in collective actions under the FLSA against Chevron in separate 6 proceedings: McQueen, et al. v. Chevron, No. 4:16-cv-02089-JSW (N.D. Cal.), filed on April 20, 2016 7 (referred to herein as the "underlying FLSA litigation"), and Cummings v. Chevron, JAMS Arbitration 8 Reference No. 1100086694. 9 According to Plaintiffs, although Chevron controlled Plaintiffs' work and directly supervised 10 Plaintiffs, Chevron attempted to insulate itself from FLSA liability by creating an artificially complex 11 structure to employ Plaintiffs. (Doc. 16, ¶ 3.) Specifically, Chevron contracted with Cenergy to be an 12 intermediary between Chevron and Plaintiffs. When Plaintiff Cummings began working for Chevron 13 through Cenergy, he was required to sign a Master Services Agreement ("MSA") as an individual that 14 set out the rate of pay and described some of the rights and obligations of Cummings as a site manager. 15 (Doc. 16, ¶ 34.) However, in late 2013, Cummings was notified that policies for consultant site 16 managers were changing and all independent contractor site managers could no longer receive pay as 17 individuals, and would instead be required to receive their pay through an LLC or other corporate form. 18 Plaintiff Cummings created Cummings Consulting LLC ("CCLLC"), for the sole purpose of continuing 19 to work for Chevron through Cenergy, and then executed a new MSA on behalf of CCLLC, the entity 20 through which he was paid for his services to Chevron as a site manager. (Id.) 21 Plaintiff Charles Beaty was contacted through Cenergy by a Chevron superintendent and told of 22 an individual work opening. He was informed that before he could perform any work for Chevron, 23 however, he was required to attend Chevron's training. Completion of that training was required for 24 any site manager to perform work for Chevron. Plaintiff Beaty was also informed that as a condition of 25 working for Chevron through Cenergy, he was required to form a corporate entity through which to 2 1 receive wages. Plaintiff Beaty formed Drilling Consultants, Inc. through which he received payments 2 for his work for Chevron, and executed an MSA with Cenergy. (Doc. 16, ¶¶ 26-33.) 3 The MSAs with Cenergy required the corporate entities to (1) be classified as independent 4 contractors and not employees; (2) be solely responsible for payment of all wages to Plaintiffs; and 5 (3) indemnify Cenergy and Chevron against any loss arising out of the agreement. These MSAs were 6 presented to Plaintiffs as-is with no negotiation, and signing the MSAs was a condition of working for 7 Chevron through Cenergy. An indemnity provision contained in the MSAs required the following: 8 9 10 11 12 13 14 15 Contractor [corporate entity] shall be liable for any claim arising out of any illness, injury or death to Contractor employees, agents or vendors, or for any claim arising out of any loss or damage to the property of Contractor, its employees agents or vendors arising out of or relating to the Agreement or performance of the Services under this Agreement and REGARDLESS OF WHETHER CAUSED OR BROUGHT ABOUT BY CIS [Cenergy] OR CIS CUSTOMER'S [Chevron] NEGLIGENCE OR FAULT (INCLUDING ACTIVE, PASSIVE, SOLE, JOINT OR CONTRIBUTORY NEGLIGENCE) OR ANY OTHER THEORY OF LEGAL LIABILITY, INCLUDING BREACH OF WARRANTY, BREACH OF AGREEMENT, STATUTE OR STRICT LIABILITY and Contractor shall defend, protect, indemnify and hold harmless CIS, its parent, subsidiary and affiliated companies and all of their officers, directors, employees and representatives and Customers from and against any loss, cost, claim, obligation to indemnify another, suit, judgment, award or damage (including reasonable attorney's fees and costs) on account of such illness, injury, death, loss or damage. 16 (Doc. 16-2, p. 10; Doc. 16-3, p. 10.) The MSAs also contained an arbitration provision that requires all 17 disputes be resolved through arbitration in Texas under the American Arbitration Association's 18 "Construction Industry Rules": 19 20 21 Arbitration. All claims, disputes or controversies arising out of, in connection with or in relation to this Agreement or the Services, including any and all issues of arbitration of such claim, dispute or controversy (hereinafter "Dispute"), and regardless of whether the Dispute is based or claimed to be based in whole or in part on a claim by either Party of breach of this Agreement shall be subject to the following dispute resolution procedure: 22 24 (a) Notice. In the event that a Dispute arises between Contractor and [Cenergy], and/or between Contractor and a [Cenergy] Customer, Contractor shall immediately notify [Cenergy] of such Dispute in writing in order to provide [Cenergy] with an opportunity to informally resolve the Dispute. 25 (b) Mediation. In the event that the informal dispute resolution efforts set out in 21 (a) 23 3 1 2 above fail to settle the Dispute between Contractor and [Cenergy] within 30-days of such written notice the parties shall submit the Dispute to formal mediation which shall be conducted by the American Arbitration Association ("AAA") in Houston, Texas in accordance with the AAA Energy Industry Rules for Mediation then in effect. 3 4 5 6 7 8 (c) Arbitration. In the event that the mediation fails to settle the Dispute, then, subject to Article 20(d) below, the Dispute shall be submitted to mandatory and binding arbitration conducted by the AAA in accordance with its Construction Industry Rules then in effect. Such arbitration shall be conducted before a single arbitrator in Houston, Texas. The arbitration shall be conducted in accordance with the International Institute for Conflict Prevention and Resolutions Rules at present in force, exclusive of its principles of conflicts of laws for the determination of the rights and remedies under the Agreement and for all aspects of the award hereunder, except to the extent that United States General Maritime law, exclusive of its principles of conflicts of laws governs the Dispute at issue. The arbitrator shall have the power to award reasonable attorney's fees, costs and expenses to the prevailing party in any such arbitration proceeding. 9 10 (Doc. 16-2, p. 11-12; Doc. 16-3, p. 11-12.) 11 On March 21, 2017, Cenergy sent a demand letter to CCLLC indicating it had become aware 12 that "an employee of Cummings Consulting, LLC" (i.e., Plaintiff Donnie Cummings) had opted to be a 13 member of the purported FLSA class action against Chevron pending before the U.S. District Court for 14 the Northern District of California in case number 4:16-cv-02089-JSW. (Doc. 16-4, Exh. D, p. 2.) 15 Cenergy advised CCLLC that, "pursuant to a separate agreement," Cenergy "may be obligated to 16 defend and indemnify Chevron Corporation for any costs, expenses, or other damages sustained as a 17 result of that lawsuit" and that Chevron had already demanded that Cenergy pay for legal fees and costs 18 incurred in the defense of that FLSA lawsuit. (Id. at 4.) Citing the MSA agreement between CCLLC 19 and Cenergy executed in January 2014, Cenergy demanded that CCLLC "reimburse [Cenergy] for any 20 and all costs that it incurs or owes as a result of the Lawsuit," including any attorneys' fees, amounts 21 reimbursed to Chevron, costs, penalties, damages, or any other losses. (Id.) Cenergy indicated it had 22 already incurred $15,488.50 in costs and fees related to the FLSA lawsuit against Chevron, and 23 demanded that CCLLC remit that amount within 15 days of the date of the demand letter. (Id.) If 24 CCLLC failed to remit that amount within the 15-day window, Cenergy stated it would "take 25 immediate action to enforce its rights under the MSA" and would initiate legal proceedings against 4 1 CCLLC in Houston, Texas. (Id.) 2 On April 5, 2017, Plaintiffs filed suit in this Court, on behalf of themselves and all others 3 similarly situated, seeking a declaration under 28 U.S.C. § 2201, the Declaratory Judgment Act 4 ("DJA"), that Cenergy has no legal right to attempt to collect or obtain, through court or arbitration, the 5 wages that Plaintiffs seek from Chevron or associated penalties, damages, and interest, or Chevron's or 6 Cenergy's defenses costs, including attorneys' fees. Plaintiffs contend Chevron and Cenergy have 7 improperly attempted to "contract around the FLSA" by insisting Plaintiffs pay, through their corporate 8 entities, the wages Chevron is legally obligated to pay Plaintiffs under the FLSA and the costs of 9 Chevron's defense in the separate FLSA collective action. 10 On May 1, 2017, Plaintiffs filed a motion for preliminary injunction asserting that Cenergy has 11 commenced arbitration against Plaintiffs' corporate entities pursuant to the MSAs. Plaintiffs seek to 12 enjoin those arbitration proceedings and to halt Cenergy from attempting to collect indemnification. 13 On May 2, 2017, Cenergy filed a motion to dismiss for lack of subject matter jurisdiction pursuant to 14 Federal Rule of Civil Procedure 12(b)(1) and for failure to state a claim under Federal Rule of Civil 15 Procedure 12(b)(6). Cenergy's motion to dismiss was granted, and Plaintiffs filed an amended 16 complaint June 29, 2017. (Doc. 16.) Currently pending is Cenergy's motion to dismiss Plaintiffs' First 17 Amended Complaint ("FAC") on the grounds that Plaintiffs lack standing in their individual capacities 18 to challenge the MSAs, and that their request for declaratory relief is not ripe. 19 20 III. LEGAL STANDARD A defendant may move for dismissal of an action for lack of subject matter jurisdiction under 21 Federal Rule of Civil Procedure 12(b)(1). A motion to dismiss for lack of subject matter jurisdiction 22 will be granted if the complaint, on its face, fails to allege facts sufficient to establish subject matter 23 jurisdiction. See Savage v. Glendale Union High Sch., 343 F.3d 1036, 1039 n.2 (9th Cir. 2003). If a 24 plaintiff lacks standing under Article III of the U.S. Constitution, then the court lacks subject matter 25 jurisdiction and the case must be dismissed. See Steel Co. v. Citizens for a Better Env't, 523 U.S. 83, 5 1 101-02 (1998). The related doctrine of ripeness is a means by which federal courts dispose of matters 2 that are premature for review because the purported injuries are too speculative and may never occur. 3 As standing and ripeness pertain to the federal courts' subject matter jurisdiction, they are properly 4 raised in a Rule 12(b)(1) motion to dismiss. Once a party has moved to dismiss for lack of subject 5 matter jurisdiction under Rule 12(b)(1), the opposing party bears the burden of establishing the Court's 6 jurisdiction. See Kokkonen v. Guardian Life Ins. Co., 511 U.S. 375, 377 (1994); Chandler v. State 7 Farm Mut. Auto. Ins. Co., 598 F.3d 1115, 1122 (9th Cir. 2010); St. Clair v. City of Chico, 880 F.2d 8 199, 201 (9th Cir. 1989). IV. ANALYSIS 9 10 A. Plaintiffs Have Standing to Challenge Enforceability of MSAs 11 Plaintiffs maintain they have standing in their individual capacities to challenge the MSAs with 12 Cenergy because they are third-party beneficiaries of the MSAs and because Cenergy has threatened 13 suit against them in their individual capacities, causing "injury in fact." 14 1. Plaintiffs Sufficiently Allege they are Third-Party Beneficiaries of the MSAs 15 A third party may qualify as a beneficiary under a contract where the contracting parties have 16 intended to benefit that third party and such intent appears on the terms of the contract. Ascherman v. 17 Gen. Reinsurance Corp., 183 Cal. App. 3d 307, 311 (1986). It is well settled, however, that 18 enforcement of a contract by persons who are only incidentally or remotely benefitted by it is not 19 permitted. Lucas v. Hamm, 56 Cal. 2d 583, 590-91 (1961) ("A third party should not be permitted to 20 enforce covenants made not for his benefit, but rather for others. He is not a contracting party; his right 21 to performance is predicated on the contracting parties' intent to benefit him . . . . "). While intent is 22 pivotal, there is no requirement that "both of the contracting parties must intend to benefit the third 23 party . . . ." Schauer v. Mandarin Gems of Cal. Inc., 125 Cal. App. 4th 949, 958 (2005). Whether a 24 third party is an intended beneficiary or merely an incidental beneficiary to the contract is predicated on 25 the parties' intent, which is gleaned from reading the contract as a whole in light of the circumstances 6 1 under which it was entered. Walters v. Marler, 83 Cal. App. 3d 1, 33 (1978).1 2 Ultimately, the third-party determination turns on the manifestation of intent by the contracting 3 parties to confer a benefit on a third party. Hess v. Ford Motor Co., 27 Cal. 4th 516, 524 (2002). 4 "Ascertaining this intent is a question of ordinary contract interpretation." Id. The central goal of 5 contract interpretation is to give effect to the parties' intent as it existed at the time of contracting. Cal. 6 Civ. Code § 1636; Waller v. Truck Ins. Exchange, Inc., 11 Cal. 4th 1, 18 (1995). Intent should be, if 7 possible, inferred solely from the written provisions of the contract. 8 Waller, 11 Cal. 4th 1, 18 (1995). Nevertheless, an inflexible "rule that would limit the determination 9 of the meaning of a written instrument to its four corners merely because it seems to the court to be Cal. Civ. Code § 1636; 10 clear and unambiguous, would either deny the relevance of the intention of the parties or presuppose a 11 degree of verbal precision and stability our language has not attained." Pac. Gas & Elec. v. G.W. 12 Thomas Drayage etc. Co., 69 Cal. 2d 33, 37 (1968). "A contract may be explained by reference to the 13 circumstances under which it was made, and the matter to which it relates." Civ. Code § 1647. "In 14 determining the meaning of a written contract allegedly made, in part, for the benefit of a third party, 15 evidence of the circumstances and negotiations of the parties in making the contract is both relevant 16 and admissible." Garcia v. Truck Ins. Exchange, 36 Cal. 3d 426, 437 (1984). The FAC's bolstered allegations pertaining to Plaintiffs' third-party beneficiary status are 17 18 sufficient, at the pleading stage, to establish Plaintiffs' standing in their individual capacities. While the 19 MSAs do not identify Plaintiffs by name, Plaintiffs allege Cenergy understood, based on the 20 circumstances under which the MSAs were signed, that Plaintiffs were the only workers of their 21 respective corporate entities who would provide any services to Cenergy's customers. Plaintiff Beaty 22 was contacted by a Chevron superintendent notifying Beaty of an individual work opening for which he 23 24 25 1 To sue as a third-party beneficiary of a contract under federal law, the analysis is the same: the third party must show that the contract reflects the express or implied intention of the parties to the contract to benefit the third party. See Klamath Water Users Protective Ass'n v. Patterson, 204 F.3d 1206, 1211 (9th Cir. 1999). 7 1 might be qualified. Before he could work for Chevron, however, Beaty was required to complete 2 training as a consultant site manager. (Doc. 16, ¶ 31.) Moreover, the complaint alleges it was always 3 understood that only Beaty would perform work for Chevron: 4 5 6 7 8 9 At no point leading up to the execution of his agreement did Mr. Beaty discuss a role with Chevron or Cenergy other than him performing all the work and receiving all the compensation. At no point did Cenergy, Chevron, or Mr. Beaty suggest that anyone other than Mr. Beaty would perform work under the name Drilling Consultants. At no point did Cenergy, Chevron, or Mr. Beaty suggest that anyone other than Mr. Beaty would receive compensation paid to Drilling Consultants, or that Drilling Consultants had any officers, staff, or employees other than Mr. Beaty. (Doc. 16, ¶ 33.) As to Plaintiff Cummings, he was already working for Chevron prior to forming the corporate 10 entity and he had previously signed an MSA as an individual. (Doc. 16, ¶ 34.) In 2013, Cummings 11 was notified that the policies for consultant site managers were changing and that site managers could 12 no longer receive pay as individuals, but instead would be required to receive their pay through a 13 corporate form. Cummings was informed that unless he provided a corporate entity to receive 14 payments, invoices submitted to Cenergy after December 20, 2013, would not be paid. There was 15 never any discussion or suggestion that anyone other than Cummings would provide services to 16 Chevron or that Cummings' corporate entity had any staff or other employees. Cenergy knew 17 Cummings was the only individual to benefit under the MSA with his corporate entity because site 18 managers who worked for Chevron had to undergo specific training, and hiring of any additional 19 workers would have required the involvement of both Cenergy and Chevron. (Doc. 16, ¶¶ 35-36.) 20 Plaintiffs allege Cenergy understood that individual site managers would be the only direct 21 beneficiaries of the MSAs. 22 Reading the MSAs in the light of these alleged circumstances, the situation is analogous to 23 Schauer v. Mandarin Gems of Cal., Inc., 125 Cal. App. 4th 949, 957-58 (2005), where the court 24 concluded a woman was a third-party beneficiary to a sales contract between her betrothed and the 25 jewelry store for an engagement ring. The court explained that the couple went shopping for the ring 8 1 together, the plaintiff selected the ring she wanted, she caused it to be purchased for her, and the ring 2 was purchased for the sole and stated purpose of giving the ring to the plaintiff. Id. at 958. Under these 3 circumstances, the court concluded the jeweler must have understood the intent was to enter into the 4 sales contract for plaintiff's benefit and she was therefore a third-party beneficiary of the sales contract. 5 Id. Here, Plaintiffs formed corporate entities at the specific request of Cenergy, and it was Cenergy 6 who implemented this policy and ensured that all necessary changes were made by Plaintiffs. Cenergy 7 also communicated directly with its site managers about how to create these corporate entities. 8 Chevron and Cenergy specifically solicited Plaintiff Beaty to perform work for Chevron and then 9 conditioned payment for Plaintiff Beaty's services on Plaintiff Beaty's formation of a corporate entity. 10 Cenergy must have understood the MSA was entered into for Plaintiff Beaty's benefit. Similarly, by 11 mandatorily conditioning Plaintiff Cummings' payment for work performed for Chevron on formation 12 of a corporate entity, Cenergy must have understood the MSA with Cummings' corporate entity was 13 entered into for Plaintiff Cummings' benefit alone. At the pleading stage, this is sufficient to confer 14 standing on Plaintiffs as a third-party beneficiary under the MSAs. 15 2. Threat of Lawsuit Sufficient to Confer Standing 16 Cenergy maintains Plaintiffs have failed to allege adequately standing in their personal 17 capacities to challenge the MSAs between Cenergy and the corporate entities. (Doc. 17, 10:20-12:4.) 18 Plaintiffs contend they were threatened with suit in their personal capacities, giving rise to standing. 19 Cenergy argues there has not been any actual threat of litigation against Plaintiffs in their individual 20 capacities – only the corporate entities Plaintiffs formed. While Cenergy reserves the right to pursue 21 claims against Plaintiffs in their individual capacities should it be necessary, Cenergy asserts nothing 22 demonstrates that any threat of litigation has occurred against Plaintiffs individually. 23 The threat of litigation is a cognizable injury sufficient to confer standing in a contract dispute, 24 even where the threatened individual/entity is not a party to the challenged contract. Newcal Industries, 25 Inc. v. IKON Office Solution, 513 F.3d 1038, (9th Cir. 2008) (citing Societe de Conditionnement en 9 1 Aluminium v. Hunter Engineering Co., Inc., 655 F.2d 938 (9th Cir. 1981)). While Cenergy asserts it 2 has not yet expressly threatened suit against Plaintiffs in their individual capacity, the allegations of the 3 complaint and the exhibits attached to it sufficiently establish a realistic threat of suit against Plaintiffs 4 individually. First, Plaintiffs allege that the corporate entities were formed by Plaintiffs as a specific 5 requirement of Cenergy to either obtain work with Chevron or to continue work with Chevron. 6 Payment for any services was conditioned upon Plaintiffs creating a corporate entity to receive payment 7 for work provided. These allegations create a reasonable inference that the corporate entities were 8 created for no purpose of Plaintiffs and solely for the benefit of Cenergy, maintained only as a 9 corporate fiction, and potentially renders Plaintiffs vulnerable to suit in their individual capacities. Second, Cenergy has expressly stated it will initiate suit against Plaintiffs in their individual 10 11 capacities if there are any indications the corporations have dissolved or otherwise did not maintain 12 proper corporate formalities. Attached to Plaintiffs' complaint are two letters from Cenergy's counsel 13 that indicate Cenergy's reservation of right to maintain claims against Plaintiffs individually, should 14 facts indicate suit is necessary. (Docs. 16-5, 16-6.) In a footnote, Plaintiffs indicate they offered to 15 dismiss this action in exchange for Cenergy's agreement not to pursue indemnification against them 16 personally, but this was refused by Cenergy. (Doc. 19, 5:2 n. 1.) Cenergy contends this footnote 17 improperly discloses confidential settlement negotiations and is not admissible under Federal Rule of 18 Evidence 408. Rule 408 prohibits the introduction of settlement evidence when offered to prove or 19 disprove the validity or amount of a disputed claim or to impeach by a prior inconsistent statement. 20 Fed. R. Evid. 408. The Court may admit evidence of settlement negotiations for other purposes, 21 however. Id. In this case, Plaintiffs offer statements made in a settlement negotiation not to prove 22 liability or damages, but to demonstrate Plaintiffs have standing. This is not an inadmissible use of 2 23 settlement negotiations under Rule 408. Cenergy is unwilling to relinquish any right it may have to 24 25 2 This information is not being admitted for use at trial but to determine jurisdiction. 10 1 pursue its indemnity claim, and has expressly maintained it will bring suit when it deems necessary. 2 These facts together constitute a threat of suit against Plaintiffs in their individual capacity giving rise 3 to standing. Newcal, 513 F.3d at 1056. 4 B. Plaintiffs Have Established Their Declaratory Relief Claim is Constitutionally Ripe 5 The Declaratory Judgement Act ("DJA") states, "In a case of actual controversy within its 6 jurisdiction . . . any court of the United States . . . may declare the rights and other legal relations of any 7 interested party seeking such declarations." 28 U.S.C. § 2201(a). Therefore, a district court must first 8 inquire whether there is an actual case or controversy within its jurisdiction. Am. States Ins. Co. v. 9 Kearns, 15 F.3d 142, 143 (9th Cir. 1994). The constitutional ripeness of a declaratory judgment action 10 depends upon "whether the facts alleged, under all the circumstances, show that there is a substantial 11 controversy, between parties having adverse legal interests, of sufficient immediacy and reality to 12 warrant the issuance of a declaratory judgment." Md. Cas. Co. v. Pac. Coal & Oil Co., 312 U.S. 270, 13 273 (1941); see also Principal Life Ins. Co. v. Robinson, 394 F.3d 665, 671 (9th Cir. 2005). 14 Plaintiffs' sole claim is for a declaration under the DJA that finds the indemnification clauses in 15 the MSAs unenforceable as contrary to public policy under the FLSA. Cenergy contends Plaintiffs 16 have failed to allege a controversy that is of "sufficient immediacy and reality," and their claim for 17 declaratory relief is therefore not ripe. According to Cenergy, Plaintiffs' theory that the MSAs' 18 indemnity clauses are unenforceable as contrary to public policy is necessarily contingent on the legal 19 applicability of the FLSA in the underlying suit with Chevron – a finding that Court may or may not 20 (due to settlement) reach at an unknown time in the future. Specifically, if Plaintiffs are deemed 21 independent contractors in that lawsuit, the FLSA will not apply and cannot govern the enforceability 22 of any contractual indemnity clause in the MSAs between Plaintiffs and Cenergy. See, e.g., Taylor v. 23 Waddell & Reed Inc., No. 09-cv-02909-AJB-WVG, 2013 WL 435907, at *7 (S.D. Cal. Feb. 1, 2013) 24 (FLSA does not apply to independent contractors, only employees). As the employee-employer 25 relationship between Plaintiffs and Chevron (a non-party in this litigation) will only be determined, if at 11 1 all, in a separate FLSA suit, Cenergy contends the controversy between Plaintiffs and Cenergy over the 2 enforceability of the MSAs' indemnity clauses in view of FLSA public policy is not "sufficiently 3 immediate" to be considered ripe. 4 Plaintiffs argue their declaratory relief claim is not dependent on Plaintiffs' employment 5 relationship with Chevron. If Plaintiffs win the underlying FLSA suit, Plaintiffs argue any attempt by 6 Chevron to shift FLSA liability is contrary to law and public policy, regardless of whether the liability 7 is shifted to an employee or some other individual or entity. Plaintiffs further argue that, to the extent 8 Chevron prevailed in proving Plaintiffs are not employees under the FLSA, public policy is nonetheless 9 violated if Chevron, through Cenergy and the MSAs with Plaintiffs' corporations, is able to shift its 10 attorney's fees stemming from the FLSA litigation to Plaintiffs. Plaintiffs maintain one of the remedial 11 purposes of the FLSA is to encourage private enforcement by protecting workers who file claims. 12 Plaintiffs’ argument continues as follows. Congress promoted this policy by awarding attorney's fees 13 only to prevailing FLSA plaintiffs, not prevailing defendants. 29 U.S.C. § 216(b). Congress also 14 provided workers a cause of action for retaliation, even where no FLSA liability was ultimately 15 established. 29 U.S.C. § 215(a). By not providing attorney's fees for prevailing defendants and by 16 permitting retaliation suits even where there is no FLSA violation, Congress codified a policy of 17 protecting workers' ability to enforce the statute by filing claims and engaging in protected activity (i.e., 18 submitting complaints to their employers), not simply protecting those workers who prove their rights 19 were violated under the FLSA. Given this strong policy of protecting workers, even if they do not 20 prevail under the FLSA, a contractual indemnity clause that shifts attorney's fees to workers of 21 unsuccessful FLSA claims vitiates these policy objectives and acts as a deterrent. For these reasons, 22 Plaintiffs contend a declaration that the indemnity provision violates public policy is constitutionally 23 ripe – it is not contingent on the outcome of the underlying FLSA suit. 24 The pivotal concern of the ripeness inquiry is "whether the case involves uncertain or contingent 25 future events that may not occur as anticipated, or indeed may not occur at all." Richardson v. City & 12 1 County of Honolulu, 124 F.3d 1150, 1160 (9th Cir. 1997) (quotations omitted). Where a dispute hangs 2 on "future contingencies that may or may not occur," Clinton v. Acequia, Inc., 94 F.3d 568, 572 (9th 3 Cir. 1996), it may be too "impermissibly speculative" to present a justiciable controversy. Portland 4 Police Ass'n v. City of Portland, 658 F.2d 1272, 1273 (9th Cir. 1981). Cenergy maintains Plaintiffs' 5 theory that the indemnity clause is void as contrary to public policy under the FLSA is not ripe. 6 Under California law, "a contractual provision that contravenes public policy, as expressed in 7 statute or implied from its language, is 'either void or unenforceable.'" Santillan v. USA Waste of Cal., 8 Inc., 853 F.3d 1035, 1045-46 (9th Cir. 2017) (quoting Akopyan v. Wells Fargo Home Mortg., Inc., 215 9 Cal. App. 4th 120, 135-36 (2013) (disregarding an express contract term that was contrary to public 10 policy)). "Federal 'public policy' is typically found in the Constitution, treaties, federal statutes and 11 regulations, and court cases." Thomas James Assocs., Inc. v. Jameson, 102 F.3d 60, 66 (2d Cir. 1996) 12 (arbitration clause in employment agreement unenforceable as against public policy). 13 The Ninth Circuit has not yet considered whether contractual indemnity provisions shifting a 14 defendant's damages and/or attorney's fees stemming from FLSA litigation are unenforceable as 15 violating public policy. Several district court decisions from other circuits, however, have considered 16 contractual indemnity in misclassification FLSA cases, but they are split on this question. As Cenergy 17 notes, in Spellman v. Am. Eagle Express, Inc., 680 F. Supp. 2d 188, 189 (D.D.C. 2010), the court 18 denied a motion to dismiss the employer's counterclaim for contractual indemnity. The court reasoned 19 the counterclaim alleged the worker-plaintiffs were independent contractors and not employees under 20 the FLSA. Accepting these allegations as true for purposes of pleading, the FLSA did not apply and 21 would not operate to preempt or invalidate the indemnity provision. As such, the court determined it 22 could not assess the viability of the indemnity claim until the employment relationship was determined 23 on the merits. The same reasoning was adopted by the court in Dobbins v. Scriptfleet, Inc., No. 8:1124 cv-1923-AEP, 2012 WL 2282560 (M.D. Fla. June 18, 2012), in denying a motion to dismiss a 25 defendant's counterclaim for contractual indemnity based on allegations the plaintiffs were independent 13 1 contractors and the FLSA did not apply to invalidate the indemnity provisions. This is Cenergy's 2 central contention: if Plaintiffs' are independent contractors, the FLSA does not apply and its public 3 policy does not govern the enforceability of the MSAs. 4 Plaintiffs and Chevron is being litigated in the underlying FLSA action, and it is uncertain whether or 5 when that determination will be made. The employment relationship between 6 On the other hand, as Plaintiffs indicate, at least two district courts have concluded the public 7 policies underpinning the FLSA are implicated when FLSA claims are filed – not only when the 8 plaintiff prevails. For example, in Fernandez v. Kinray, Inc., No. 1:13-cv-04938-LDH-SMG, 2014 9 U.S. Dist. LEXIS 17954 (E.D.N.Y. Feb. 5, 2014), the court dismissed a defendant's indemnity 10 counterclaim in an FLSA misclassification case reasoning the indemnity provision was unenforceable 11 as violating the public policy of the FLSA even if the plaintiffs were determined to be independent 12 contractors. The court noted that in enacting the FLSA, Congress intended to protect plaintiffs' ability 13 to bring claims and encourage private enforcement of the statute – "a policy that applies before the 14 parties know whether or not the claim will be successful." Id. As indicia of this public policy, the 15 court observed that the FLSA provides for prevailing plaintiffs to recover attorney's fees, but does not 16 permit fee shifting for prevailing defendants. Id. This was designed to curb a deterrent to private 17 enforcement by eliminating the financial risk of filing a claim. Id. Allowing a prevailing defendant to 18 shift attorney's fees pursuant to a contractual indemnity provision would have a chilling effect on 19 private enforcement. Id. The court concluded the defendant's indemnity claim was therefore contrary 20 to the FLSA's public policy, whether or not the plaintiffs ultimately were determined to be employees 21 under the statute. 22 In another FLSA misclassification collective action, the court refused to issue a notice to 23 prospective opt-in class members indicating they may be liable for attorney's fees pursuant to an 24 indemnity agreement within their independent contractor agreement with defendants. Abdul-Rasheed v. 25 Kablelink Commc'n, LLC, No. 8:13-cv-00879-MAP, 2013 WL 6182321, at *5 (M.D. Fla. Nov. 25, 14 1 2013). The court reasoned even if the plaintiffs were deemed independent contractors, the defendants 2 would still only be entitled to attorney's fees under the court's inherent powers if the litigation was 3 conducted in bad faith, vexatiously, wantonly, or for oppressive reasons. Id. The court concluded that 4 to interpret the law to permit the award of attorney's fees to defendants pursuant to the contractual 5 indemnity provision in the independent contractor agreement "would impose a chilling effect that 6 would defeat the remedial purpose of the FLSA." Id. Compellingly, the district court in Abdul- 7 Rasheed reasoned: 8 9 10 Whether a person is an employee or an independent contractor is a threshold issue in many FLSA cases. If courts imposed an attorneys' fees award against unsuccessful independent contractors that have indemnity agreements, it would incentivize employers to mis-classify employees as independent contractors in an independent contractor agreement that contains an indemnity provision based on the hope that the possibility of an attorneys' fee award would dissuade litigation on the issue. 11 12 Id. at *6. 13 Plaintiffs have established their theory of the unenforceability of the indemnity provision is not 14 necessarily contingent on the employee-employer relationship determination in the underlying FLSA 15 suit and is, therefore, jurisdictionally ripe. Plaintiffs have articulated a plausible theory, supported by 16 caselaw, that the MSAs' indemnity clauses violate public policy whether or not Plaintiffs are found to 17 be employees of Chevron because the FLSA's public policy is implicated when a worker files an FLSA 18 claim, not just when a worker prevails in the litigation and, in misclassification cases, proves the 19 applicability of the statute to their claims. Despite the split of authority articulated by the parties and 20 outlined above, at least two district courts have concluded FLSA public policy forecloses indemnity 21 provisions that shift attorney's fees for FLSA suits onto the workers who file those suits, regardless of 22 the outcome of the case on the merits. Fernandez, 2014 U.S. Dist. LEXIS 17954; Abdul-Rasheed, 2013 23 WL 6182321, at *5. The Court finds these two decisions well reasoned and persuasive and follows 24 them here. 25 15 1 Notably, the MSAs' indemnity clauses attempt to bind Plaintiffs' corporate entities, not 2 Plaintiffs who filed the FLSA claim. As the indemnity sought through Cenergy would not shift to 3 Plaintiffs themselves, the public policy protecting private enforcement of the FLSA by workers is not 4 necessarily impinged. The Court finds, however, that Plaintiffs are not precluded, as a matter of law, 5 from suffering pecuniary loss in their individual capacities as a result of the indemnity. Although 6 Plaintiffs may not be liable on an individual basis for the obligations of their respective corporate 7 entities, a loss to the corporate entities due to indemnity for liability and/or fees arising out of FLSA 8 litigation may result in a loss to Plaintiffs' capital investment in their respective entities. In that way, 9 attorney's fees from the FLSA litigation would be, at least in part, shifted onto the workers who filed 10 suit and create the type of deterrence to private enforcement the statute was designed to avoid. Local 11 1035 Int'l Bhd. of Teamsters v. Pepsi Allied Bottlers, Inc., 99 F. Supp. 2d 219, 221-22 (D. Conn. 2000) 12 (FLSA suit where indemnification clause in collective bargaining agreement deemed unenforceable 13 against union because "the union would probably be utilizing funds collected as dues from the plaintiffs 14 themselves in order to satisfy the judgment," which is against the public policy of the FLSA). 15 Additionally, as alleged in the FAC and discussed in the prior section on standing (section III.A.2), 16 there is a possibility indemnity sought against the corporate entities would pass through to Plaintiffs as 17 individuals if the entities failed, for example, to observe proper corporate formalities or were not 18 maintained or formed properly under the law. For the purposes of pleading, this establishes ripeness – 19 i.e., it is possible the indemnity will pass through the corporations to Plaintiffs individually – the 20 workers who filed in the FLSA claim. Factual questions remain about the state of Plaintiffs' corporate 21 entities, and whether Plaintiffs in their individual capacity are actually subject to pecuniary loss as 22 implied by the FAC. 23 In sum, Plaintiffs' suit for declaratory relief is jurisdictionally ripe. Plaintiffs have plausibly 24 established the declaration they seek is not necessarily contingent on any finding the court may make in 25 the underlying FLSA suit. Plaintiffs seek a declaration that the public policy of the FLSA is violated 16 1 by contractual indemnity provisions attempting to shift liability and/or attorney's fees stemming from 2 an FLSA claim regardless of the outcome of that FLSA litigation. 3 declaration Plaintiffs seek is both viable and the controversy is sufficiently immediate such that it is 4 jurisdictionally ripe.3 Whether Plaintiffs' theory prevails on the merits will be tested on a more detailed 5 record and with more thorough briefing, and Cenergy is not precluded from raising this issue again at 6 that time. At the pleading stage, the 7 Finally, because the FAC includes more developed allegations relevant to standing and 8 Plaintiffs' theory of unenforceability of the MSAs indemnity clauses, Plaintiffs shall inform the Court 9 whether there is any need to amend their pending motion for a preliminary injunction. Plaintiffs shall 10 also provide a brief status of the arbitration proceedings. 11 /// 12 /// 13 /// 14 /// V. 15 CONCLUSION For the reasons set forth above, the Court finds that Plaintiffs have standing to challenge the 16 17 enforceability of the indemnity provision in the MSAs. Moreover, the claim for declaratory relief is 18 ripe because it is not contingent on the occurrence of any event or finding in the underlying FLSA 19 litigation. It is hereby ORDERED that: 20 1. Cenergy's motion to dismiss for lack of subject matter jurisdiction is DENIED; 21 2. Within 2 days, Plaintiffs shall notify the Court whether (1) they wish to amend their 22 motion for a preliminary injunction in light of the First Amended Complaint and the 23 time they need to do so; and (2) provide a brief status update on the pending arbitration 24 25 3 Cenergy has not raised any prudential ripeness arguments relating to the Court's discretionary exercise of jurisdiction, and the Court does not find any Brillhart factors militate in favor of declining jurisdiction. Brillhart v. Excess Ins. Co., 316 U.S. 491, 495 (1942). 17 with Cenergy; and 1 2 3. If no amended briefing is required on Plaintiffs' motion for a preliminary injunction, the Court will take that matter under submission and issue an order. 3 4 5 6 IT IS SO ORDERED. Dated: /s/ Lawrence J. O’Neill _____ September 20, 2017 UNITED STATES CHIEF DISTRICT JUDGE 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 18

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?