E. & J. Gallo Winery, et al. v. Strategic Materials, Inc.
Filing
71
ORDER GRANTING IN PART AND DENYING IN PART Defendant and Counterclaimant Strategic Materials, Inc's Motion to Strike Expert Opinions Based on Undisclosed Damages Claims 53 . Order signed by Magistrate Judge Erica P. Grosjean on 8/7/2019. (Timken, A)
1
2
3
4
5
6
7
8
9
10
UNITED STATES DISTRICT COURT
11
EASTERN DISTRICT OF CALIFORNIA
12
13
14
E.& J. GALLO WINERY, a California
corporation; GALLO GLASS COMPANY a
Nevada corporation,
15
16
Case No. 1:17-cv-01709-EPG
ORDER GRANTING IN PART AND
DENYING IN PART DEFENDANT AND
COUNTERCLAIMANT STRATEGIC
MATERIALS, INC’S MOTION TO
STRIKE EXPERT OPINIONS BASED
ON UNDISCLOSED DAMAGES
CLAIMS
Plaintiffs,
v.
17
18
19
STRATEGIC MATERIALS, INC., a Delaware
corporation.
(ECF No. 53)
Defendants.
20
21
Plaintiffs E. & J. Gallo Winery and Gallo Glass Company (referred to herein as “Gallo”)
22
filed this suit against Defendant Strategic Materials, Inc. (“SMI”) alleging breaches of the parties’
23
Supply Agreement. (ECF No. 1.) On June 19, 2019, SMI filed the instant “Motion to Strike
24
Expert Opinions Based on Undisclosed Damage Claims.” (ECF No. 53.) SMI seeks to preclude
25
portions of the expert report of Stuart H. Harden (“Mr. Harden”) and the entirety of the expert
26
report of C. Philip Ross (“Mr. Ross”). SMI argues that the contested opinions concern claims for
27
damages that Gallo failed to properly disclose under the Federal Rules of Civil Procedure. For the
28
following reasons, the motion is GRANTED IN PART and DENIED IN PART.
1
1
I.
BACKGROUND
2
A. Gallo’s Complaint and Initial Disclosures
3
According to the Complaint, SMI is a Texas-based corporation that supplies recycled
4
glass and plastic. (ECF No. 1, ¶1.) Gallo is a wine producer and bottle manufacturer that
5
purchases recycled glass (also known as “cullet”) from SMI to produce wine bottles. (Id. at ¶2.)
6
Gallo and SMI entered into a 10-year Supply Agreement in which SMI agreed to make
7
available certain volumes of cullet to Gallo each year at certain prices, subject to volume and
8
price adjustments. (Id. at ¶12-22.)
9
Gallo filed this lawsuit in December 2017, alleging that SMI breached the Supply
10
Agreement. Gallo’s complaint sought “consequential damages.” (Id. at ¶VI.) More specifically,
11
the breach of contract allegations assert, in pertinent part that: (1) Gallo was forced to obtain
12
alternative sources of cullet due to SMI’s breach of the supply agreement; (2) Gallo was forced to
13
pay higher prices for cullet from SMI’s Madera, Sacramento, San Leandro, Commerce, and
14
Vernon glass processing plants and incurred additional costs to make glass due to SMI’s failure to
15
supply the appropriate amount of cullet under the Supply Agreement; and (3) Gallo suffered
16
damage due to the failure of certain SMI cullet shipments to meet the specifications in the supply
17
agreement. (Id. at ¶25-28.)
18
19
20
The parties served their initial disclosures on March 21, 2018. Gallo’s disclosures related
to its computation of damages read as follows:
1. Damages of at least $15,823,747.00, reflecting overpayments by Gallo, and rebates
21
and other adjustments provided by the Supply Agreement as a consequence of SMI’s
22
failure to comply with the terms of the Supply Agreement. See damages chart and
23
supporting calculations attached to these initial disclosures.
24
2. Mitigation damages incurred by Plaintiffs to identify and secure alternative cullet
25
supplies due to SMI’s threatened and improper termination of the Supply Agreement
26
(to be determined).
27
3. Attorneys’ fees in an amount that will be determined at the conclusion of this matter.
28
4. Costs to litigate this matter in an amount that will be determined at the conclusion of
2
1
2
3
this matter.
5. Pre-and post-judgment interest on such damages that will be computed using the
appropriate legal rate.
4
(ECF 55-7, p. 4.) The supporting damages calculations quantified the $15,823,747 as follows: (1)
5
$1,310,830 as “corrected price adjustments,” based on the formula in the Supply Agreement for
6
annual price adjustments; (2) $9,764,390 in overpayments for cullet from sources outside
7
Modesto; and (3) an overall volume penalty of $4,748,528 based on a provision in the Supply
8
Agreement that allegedly imposes a penalty on SMI for cullet volume shortfalls. (Id. Ex. 1, p. 1.)
9
Throughout discovery, Gallo sent what it describes as a “revised” appendix to the
10
damages calculations. (ECF No. 60, p. 3.) This revised appendix, which was updated throughout
11
discovery, referenced batch costs. (ECF No. 68, Exh. 7.) As Gallo acknowledged at oral
12
argument, this revised appendix was not sent as a stand-alone document; nor was it labeled as a
13
supplement to the initial disclosures. See ECF No. 60. p. 3 (cataloging the names of the files
14
containing reference to batch costs). Gallo also produced various other documents that referenced
15
batch costs. See generally ECF No. 68, Exh. 7-25. At no point did Gallo amend the actual initial
16
disclosures to reference batch costs stemming from the breach of contract, energy costs stemming
17
from the breach of contract, or damages related to a February 2019 furnace shutdown supposedly
18
caused by excess fines in cullet that SMI sold to Gallo.
19
20
B. The Contested Expert Reports, Meet and Confer Attempts, and the Instant
Motion
On May 31, 2019, the expert-disclosure deadline, Gallo served expert reports from Mr.
21
Harden and Mr. Ross. According to SMI, Mr. Harden’s report set forth new damages theories.
22
Mr. Harden opined in part that because SMI failed to produce the requisite cullet under the supply
23
agreement, Gallo was forced to make its bottles out of raw materials. He also opined that Gallo
24
expended extra amounts in furnace energy costs to process the raw materials (sand, soda ash, and
25
limestone). This combination of raw materials is referred to by the parties as “batch,” and the
26
Court adopts that description herein. Mr. Harden set forth a damages theory related to the
27
purchase of batch to make up for the shortfall in cullet. Mr. Harden also set forth a computation
28
3
1
of damages for the higher processing costs for manufacturing bottles using batch materials,
2
including higher furnace costs and credit costs.
3
Mr. Harden also claimed that Gallo incurred $1,959,186 in lost margin and extra cost due
4
to a February 2019 furnace shop closure allegedly caused by defective cullet from SMI. This
5
February 2019 incident is not mentioned in Gallo’s Complaint.
6
For his part, Mr. Ross opined that Gallo purchased cullet from SMI with excess fines that
7
caused the February 2019 furnace shutdown. According to SMI, the “Harden and Ross reports
8
assert a total of $12,485,509 in damages under the previously-undisclosed damage theories.”
9
(ECF No. 53 p. 8.)
10
After receiving the expert reports, SMI notified Gallo that it considered the reports
11
inappropriate to the extent they contained previously-undisclosed evidence and damages theories.
12
Gallo disagreed with SMI’s assertion that the damages theories were previously undisclosed.
SMI filed the instant motion to exclude on June 19, 2019, contending that Gallo’s
13
14
damages theories related to batch cost, energy costs, and the February 2019 furnace shutdown
15
were not properly disclosed. (ECF No. 53.) Gallo filed an opposition on July 5, 2019. (ECF No.
16
60.) SMI filed a reply on July 12, 2019. (ECF No. 62.) The Court heard oral argument on the
17
motion on July 19, 2019. At the Court’s instruction, SMI filed a statement with the Court
18
indicating what discovery it wished to undertake relating to the batch and energy cost damages
19
theories. (ECF No. 70.)
20
II.
LEGAL STANDARDS
21
The Federal Rules of Civil Procedure require parties to provide to other parties “a
22
computation of each category of damages claimed by the disclosing party—who must also make
23
available for inspection and copying as under Rule 34 the documents or other evidentiary
24
material, unless privileged or protected from disclosure, on which each computation is based,
25
including materials bearing on the nature and extent of injuries suffered…” Fed.R.Civ.P.
26
26(a)(1)(A)(iii).
27
28
And “[a] party who has made a disclosure under Rule 26(a)…must supplement or correct
its disclosure” in a “timely manner if the party learns that in some material respect the
4
1
disclosure…is incomplete or incorrect, and if the additional or corrective information has not
2
otherwise been made known to the other parties during the discovery process or in writing.” Id. at
3
R. 26(e). If a party fails to properly disclose its damage claims under Rule 26(a) or (e), Rule 37
4
provides that “the party is not allowed to use that information or witness to supply evidence on a
5
motion, at a hearing, or at a trial, unless the failure was substantially justified or is harmless.” Id.
6
at R. 37(c)(1).
7
In determining whether exclusion sanctions are appropriate, the Court looks to whether
8
the failure to supplement or disclose is substantially justified or harmless. “The party facing
9
sanctions bears the burden of proving that its failure to disclose the required information was
10
substantially justified or is harmless.” R&R Sails, Inc. v. Insurance Co. of Pennsylvania, 673 F.3d
11
1240, 1246 (9th Cir. 2012) (citations omitted). Courts look at a variety of factors to gauge
12
substantial justification and harmlessness including “(1) prejudice or surprise to the party against
13
whom the evidence is offered; (2) the ability of that party to cure the prejudice; (3) the likelihood
14
of disruption of trial; and (4) bad faith or willfulness in not timely disclosing the evidence.”
15
Silvagni v. Wal-Mart Stores, Inc., 320 F.R.D. 237, 242 (D. Nev. 2017) (collecting cases). “At
16
bottom, this is an equitable analysis entrusted to the Court’s discretion.” Id.
17
18
19
20
21
22
23
Generally, courts in this circuit find that disclosure must occur within the confines of the
fact-discovery period:
Orderly procedure requires timely disclosure so that trial efforts are enhanced and
efficient, and that the trial process is improved. The late disclosure of witnesses
throws a wrench into the machinery of trial. A party might be able to scramble to
make up for the delay, but last-minute discovery may disrupt other plans. And if
the discovery cutoff has passed, the party cannot conduct discovery without a court
order permitting extension. This in turn threatens whether a scheduled trial date is
viable. And it impairs the ability of every trial court to manage its docket.
24
Ollier v. Sweetwater Union High School Dist., 768 F.3d 843, 862-63 (9th Cir. 2014); see also
25
Goins v. Cty. of Merced, 2015 WL 3991628 (E.D. Cal. June 30, 2015) (refusing to allow damages
26
theory disclosed for the first time in the plaintiff’s deposition near the close of fact discovery);
27
Apple, Inc. v. Samsung Electronics Co., Ltd., 2012 WL 3155574 at *5 (N.D. Cal. Aug. 2, 2012)
28
5
1
(refusing to allow new damages theories asserted for the first time in an expert report after the
2
close of fact discovery).
3
In practice, exclusion sanctions are not automatic, even assuming a failure to show
4
substantial justification or harmlessness. Instead, the text of Rule 37(c) provides that, “[i]n
5
addition to or instead of” exclusion sanctions, the Court may impose other sanctions, including
6
payment of reasonable expenses, including attorneys’ fees, caused by the failure to disclose;
7
informing the jury of the party’s failure; and any other appropriate sanction. Fed. R. Civ. P.
8
37(c)(1)(A)-(C). Factors courts use to determine whether exclusion sanctions are appropriate
9
include: “(1) the public’s interest in expeditious resolution of litigation; (2) the court’s need to
10
manage its dockets; (3) the risk of prejudice to the party seeking sanctions; (4) the public policy
11
favoring disposition of cases on their merits; and (5) the availability of less drastic sanctions.”
12
Valley Eng’rs Inc. v. Electric Eng’g Co., 158 F.3d 1051, 1057 (9th Cir. 1998). And “[a]lthough a
13
finding of willfulness or bad faith is not otherwise required, willfulness or bad faith is a factor in
14
deciding the appropriate level of sanction to impose.” Silvagni, 320 F.R.D. at 242.
15
In all, the trial court has considerable discretion in determining the appropriate sanction
16
for a party’s failure to comply with the disclosure obligations under Rule 26. See Yeti by Molly,
17
Ltd. v. Deckers Outdoor Corp., 259 F.3d 1101, 1106 (9th Cir. 2001) (“Furthermore, although we
18
review every discovery sanction for an abuse of discretion, we give particularly wide latitude to
19
the district court’s discretion to issue sanctions under Rule 37(c)(1).”) (citations omitted).
20
21
III.
ANALYSIS
A. Batch Costs
22
Much of the parties’ briefing addresses whether Gallo adequately disclosed its intention to
23
seek batch costs during the fact discovery period. It is undisputed that Gallo did not include batch
24
costs in its initial disclosures as originally submitted. Nor is there any dispute that Gallo failed to
25
supplement its initial disclosures to include damages for batch costs. The issue, then, is whether
26
Gallo adequately satisfied its disclosure obligations through other means.
27
28
Gallo contends that it disclosed its intention to seek batch costs through supplementing its
appendix to the initial damages calculations. On October 26, 2018, Gallo provided a “revised
6
1
version of the appendix to its Initial Disclosures.” (ECF No. 60 p. 3.) This revision estimated the
2
cost for additional batch. Gallo also points to a variety of other documents produced in discovery
3
that contained “batch cost estimates or supporting data for costs for raw materials and energy.”
4
(Id.)
5
The Court acknowledges that this disclosure provided some additional information.
6
Nevertheless, it falls well short of a true supplement to Gallo’s required disclosures. As SMI
7
notes, the pages containing batch information do not state that Gallo is seeking batch costs as
8
damages; nor do they state that they are components of a damages evaluation. Moreover, it
9
appears that the documents referencing batch costs were not stand-alone documents; rather, they
10
were produced during discovery without indicating a clear intent to supplement Gallo’s damage
11
calculations. Courts have rejected this kind of “needle-in-the-haystack” approach to disclosure.
12
See Asia Vital Components Co. v. Asetek Danmark A/S, 2019 WL 1369908 at *3 (N.D. Cal. Mar.
13
26, 2019) (noting that “the post-hoc identification of a needle in the haystack” does not satisfy
14
formal disclosure obligations).
15
Moreover, some of the documents produced actually seem to disclaim batch costs as a
16
form of damages sought. For example, Exhibit 10 to the Fieber declaration (ECF No. 68) contains
17
a page with a reference to “delivered batch,” but this batch figure does not appear on the page that
18
provides damages calculations. The same is true of Exhibit 11, a power-point presentation that
19
includes a damages calculation without batch costs. Id.
20
Further, SMI served discovery requests that presumably would have unearthed documents
21
showing how Gallo was arriving at their figures for batch cost damages. Specifically, request for
22
production numbers 64 and 68, which, respectively, called for documents relating to “Gallo’s
23
alleged damages as referenced in Gallo’s Complaint, including any related communications,” and
24
“all documents relating to Gallo’s allegation in the complaint that Gallo has ‘incurred additional
25
costs to make glass.’” (ECF No. 55-8.) But despite these requests, Gallo did not produce
26
documents sufficient to allow SMI to determine how Gallo was calculating batch costs.
27
28
Gallo also asks the Court to find disclosure from a broad request for “consequential
damages” in the Complaint. SMI responds that treating such a vague, formulaic recitation as
7
1
sufficient disclosure would render the initial damages disclosure requirement meaningless. The
2
Court agrees. A party may not avoid its duty to adequately state its damages categories and
3
computations simply by asking for consequential damages in the Complaint. If that were the rule,
4
there would be little reason for a party to set forth the damage categories it seeks. 1
5
Gallo also points to interrogatory responses to interrogatories 19 and 23. Interrogatory
6
number 19 asked Gallo to “[d]escribe in detail any efforts made by Gallo since June 2011 to
7
mitigate its purported damage due to SMI’s alleged breaches of contract.” (ECF 55-14, p. 18.)
8
Gallo responded that “Gallo mitigated its damages by, among other things, purchasing cullet from
9
other sources, including other SMI plants at higher prices; manufacturing from batch; reducing
10
cullet usage.” (Id.) Interrogatory response number 23 reiterated that Gallo compensated for SMI’s
11
failure under the contract by “manufacturing glass from batch…” (ECF No. 55-7, p. 8.)
12
These disclosures provided some notice to SMI that Gallo intended to claim batch costs as
13
part of its damages. They nevertheless fall short of complying with Rule 26. The description is
14
brief and contains no computation or methodology. See City and County of San Francisco v.
15
Tutor-Saliba Corp., 218 F.R.D. 219, 221 (N.D. Cal. 2003) (citing cases for the proposition that
16
damage disclosures must contain analysis and a computation of damages). Moreover, neither
17
interrogatory asked Gallo to state its affirmative damages claims.
18
19
Most significantly for the Court, Gallo also points to the deposition testimony of its
representative most knowledgeable on damages, Steven Nicholai, as follows:
20
Q.
Does the April version of this document include any batch costs
that Gallo alleges it incurred as a result of volume shortfalls from
SMI?
23
A.
It does.
24
Q.
How much batch costs did you calculate in April?
21
22
25
26
27
28
1
Gallo also points out that the Complaint mentions incurring additional costs to make glass. But it is far from clear
that this was in reference to a damages claim for batch costs. The phrase seems more aligned with seeking damages
for alternative cullet supplies, as it follows an assertion of breach of contract due to Gallo having to seek alternative
sources of cullet.
8
1
2
A.
As I remember, I think it’s like $10 million.
(ECF No. 64, Ex. 26 to the Fieber declaration at 317:24-318:6.)2
This deposition testimony is still far short of a Rule-26 compliant disclosure. It is not
3
4
identified as a supplement to Gallo’s initial disclosures and lacks the computation required. It also
5
took place at the tail-end of the discovery period. That said, this testimony provided some
6
meaningful notice that Gallo was claiming batch costs as damages. Moreover, the fact that SMI’s
7
counsel knew to ask the question suggests that SMI had some understanding that batch costs
8
could be part of claimed damages.
9
After reviewing the disclosures regarding batch costs, the Court finds that Gallo did not
10
comply with its Rule 26 disclosure requirements regarding batch costs and that sanctions under
11
Rule 37 apply here. The Court does not find the violation was harmless or substantially justified.
12
See Brown v. Wal-Mart Store, Inc., 2018 WL 2011935 at *4 (N.D. Cal. April 27, 2018) (rejecting
13
argument that the plaintiffs “have not suffered any prejudice because they still have time to
14
conduct expert discovery and prepare their rebuttal reports”). Moreover, the Ninth Circuit has
15
held that a failure to disclose that upsets the Scheduling Order is not harmless. See Wong v.
16
Regents of the Univ. of Cal., 410 F.3d 1052, 1062 (9th Cir. 2005), as amended.
17
Yet, in considering whether exclusion or some other sanction is appropriate as addressed
18
below, the Court finds that Gallo made some limited disclosure of its intentions regarding batch
19
costs, and that SMI had some notice, before the close of discovery.
20
B.
Energy Costs
Another category of allegedly undisclosed damages relates to energy costs. Mr. Harden
21
22
opines that Gallo incurred higher energy costs due to the need to use batch materials to
23
manufacture glass. Specifically, Mr. Harden claims that processing raw materials requires more
24
energy than processing cullet, and that replacing cullet with raw materials causes furnaces to emit
25
more carbon, forcing Gallo to consume more carbon credits than it otherwise would have, and
26
that SMI should be charged for the cost of those credits.
27
2
28
The document referenced is a version of the revised appendix tied to Gallo’s damages calculations.
9
1
2
3
As an initial matter, neither the Complaint nor the initial disclosures reference energy
costs.
At oral argument, when pressed to identify a document that disclosed Gallo’s intention to
4
seek energy costs, Gallo’s counsel indicated that these costs were folded into batch costs. Even
5
setting aside the insufficiency of Gallo’s disclosures regarding batch costs, an implied addition of
6
energy costs within batch costs provides no meaningful disclosure or notice.
7
Gallo also points to an internal 2016 presentation that mentions “energy savings.” (ECF
8
No. 68, Ex. 13.) The Court finds this document insufficient to alert SMI of a potential damages
9
claim based upon energy costs. The document does not state that Gallo is seeking such
10
11
damages—indeed, it does not mention this lawsuit at all.
Further, as SMI argues, it submitted requests in discovery—particularly requests 64 and
12
68 as detailed above—that should have captured information about this damage category. But
13
Gallo does not point to any documents related to the purchase of carbon credits; proof of labor
14
costs; or invoices for electricity, gas, or propane that it has produced. This undermines any
15
argument that Plaintiff appropriately disclosed its intention to seek energy costs as a category of
16
damages.
17
Last, it is unclear that the documents Mr. Harden relied upon to determine energy costs
18
were produced in discovery. For example, SMI maintains that it did not receive a calculation
19
sheet (filed in the record as Exhibit Q to the Powell declaration) that Mr. Harden considered in
20
formulating his opinions. Counsel for Gallo clarified that Exhibit Q did not exist until May 30,
21
2019—after the discovery deadline. However, it is unclear to the Court that the documents upon
22
which Exhibit Q was derived were produced in discovery. And to the extent that documents were
23
withheld that Mr. Harden relied upon, this belies Gallo’s arguments that its damages theories and
24
calculations were properly disclosed. See Brown, 2018 WL 2011935 at *4 (finding Rule
25
26(a)(1)(A) violated when expert relied upon documents not produced in discovery).
26
For all these reasons, the Court finds that Gallo did not sufficiently disclose its intention to
27
seek energy costs as a category of damages, and no meaningful disclosure or notice was given
28
before the close of discovery. The Court finds this failure to disclose is neither harmless nor
10
1
2
3
substantially justified.
C. Damages Related to a February 2019 Furnace Shutdown
The expert reports at issue also analyze damages related to a February 2019 furnace
4
shutdown. Gallo claims that SMI supplied cullet with excess fines (smaller pieces of glass) that
5
caused a temporary furnace shutdown and cost Gallo almost $2 million. This alleged incident
6
occurred long after Gallo filed its Complaint and submitted initial disclosures, but Gallo made no
7
attempt to amend either of those documents. Accordingly, the Court agrees with SMI and finds
8
that this theory of damages was not properly disclosed. None of Gallo’s arguments to the contrary
9
are persuasive.
10
Gallo first argues that the furnace shutdown came out in the depositions of multiple
11
employees such as Joseph Majewski. This is not sufficient disclosure under Ninth Circuit
12
precedent. In Ollier, for example, the Ninth Circuit rejected a similar argument from a litigant
13
who claimed witnesses were adequately disclosed when they were mentioned in deposition
14
testimony. Ollier, 768 F.3d at 862. So too here, that some deposition testimony—which did not
15
set forth a damage computation or analysis of damages—discussed the February 2019 furnace
16
shutown is insufficient to alert SMI that Gallo was seeking damages related to it, especially when
17
Gallo did not amend its Complaint or initial disclosures to assert this theory. See also City and
18
County of San Francisco, 218 F.R.D. at 221 (noting that damage disclosures generally must
19
contain analysis and computation).
20
Next, Gallo maintains that its employees told SMI’s employees about the incident at the
21
time it happened. But disclosure to SMI’s employees outside of discovery in this case that an
22
incident occurred is much different than disclosing to SMI and its attorneys that Gallo is seeking
23
a new category of damages related to that incident in a civil lawsuit.
24
Next, Gallo acknowledges that witnesses with knowledge of the furnace shut down,
25
including Sean Sabet, Myralina Turrecha, and Patrick Hurocy, were not disclosed to SMI prior to
26
the close of discovery. However, Gallo believes that SMI was able to take an equivalent
27
deposition of one James Rhodes who shared interchangeable duties with Mr. Hurocy. The Court
28
disagrees. This deposition obviously does not cure the lack of disclosure, as SMI deposed Mr.
11
1
Rhodes without knowledge that Gallo planned to seek damages in connection with the
2
undisclosed furnace shutdown theory. Moreover, that Mr. Hurocy might have shared
3
interchangeable duties with Mr. Rhodes does not necessarily make the two witnesses
4
“interchangeable.”
5
As to Gallo’s argument that SMI did not obtain information related to the furnace shut
6
down because it did not ask the right questions in discovery, the Court finds the argument flawed.
7
Initial disclosures are designed to alert the opposing party of the damages claims at issue so they
8
can address discovery accordingly—not the other way around. See Ollier, 768 F.3d at 862 (noting
9
that “[t]he theory of disclosure under the Federal Rules of Civil Procedure is to encourage parties
10
11
to try cases on the merits, not by surprise, and not by ambush”).
Finally, Gallo’s argument that SMI knew about the furnace shutdown theory because it
12
was able to find an expert to counter it fails to persuade. That a party can scramble to find an
13
expert at the last minute does not absolve the non-disclosing party of its obligations under Rule
14
26(a) or (e). See id. (noting that a party’s ability to obtain a last-minute expert does not cure a
15
Rule 26(a) or (e) violation).
16
The Court finds that Gallo failed to comply with its Rule 26 disclosures regarding the
17
furnace shutdown. Moreover, there was no mitigating disclosure or notice before the close of
18
discovery regarding this theory of damages. And again, the failure to disclose is not harmless or
19
sufficiently justified.
20
21
D. Sanctions
As noted, the Court has considerable discretion when issuing sanctions under Rule 37(c).
22
After thorough consideration the Court will not order the exclusion of evidence related to the
23
batch cost theory of damages. Instead the Court will allow for a supplemental discovery period in
24
which SMI may probe the theory through the discovery set forth in its July 26, 2019 Statement to
25
the Court. (ECF No. 70.) The Court will also allow SMI to supplement its expert reports or, if
26
necessary obtain a new expert to address the batch cost damages. As a sanction for Gallo’s failure
27
to disclose, however, the Court will order Gallo to pay for the attorney fees and costs SMI
28
12
1
incurred in bringing this motion, as well as the costs of one supplemental deposition.
2
However, the Court will exclude Gallo’s expert reports related to the energy costs and the
3
February 2019 furnace shutdown. The Court finds the prejudice to SMI would be substantial if it
4
had to defend against these claims, as Gallo failed to provide any notice of them. The Court also
5
finds that additional discovery to address the claims would unduly upset the Scheduling Order
6
and a timely trial in this matter. The Court also finds that Gallo has not offered a persuasive
7
explanation for its failure to amend its Complaint or the initial disclosures to address the furnace
8
upset. Again, a party’s explanation for the failure to disclose evidence also bears on the analysis.
9
See San Francisco Baykeeper v. West Bay Sanitary Dist., 791 F.Supp.2d 719, 733 (N.D. Cal.
10
2011).
11
IV.
CONCLUSION
12
Accordingly, based on the foregoing, IT IS ORDERED THAT:
13
1. SMI’s Motion to Strike (ECF No. 53) is GRANTED IN PART to the extent it seeks a
14
sanction against Gallo for failure to disclose its intention to seek batch costs as an item
15
of damages. Gallo shall pay SMI’s reasonable attorney fees and costs related to this
16
motion, as well as the costs of one supplemental deposition related to batch costs. The
17
parties are directed to meet and confer regarding the amount of attorney fees and costs
18
to be awarded to SMI. No later than 30 days after the issuance of this Order, the
19
parties shall file a stipulation with the Court to the extent they are able to agree on the
20
amount of attorney fees and costs. Otherwise, SMI shall file a motion seeking a
21
specific amount of attorney fees and costs consistent with this order, with supporting
22
documentation no later than 30 days after the issuance of this Order.
23
24
25
2. To the extent that SMI’s motion for sanctions seeks exclusion sanctions regarding
batch costs, the motion is DENIED.
3. The parties shall meet and confer regarding a timeline to complete the supplemental
26
discovery related to batch costs set forth in ECF No. 70, as well as the timeline for
27
SMI to supplement its expert reports or obtain a new expert to address the batch costs
28
theory of damages. To the extent the parties are able to agree on a time period to
13
1
complete this discovery, including adjustment of other pertinent dates in the
2
Scheduling Order, the parties shall file a stipulation to that effect no later than 30 days
3
from the issuance of this Order. Otherwise, the parties shall seek the Court’s assistance
4
in any dispute concerning the schedule.
5
4. SMI’s Motion to Strike is GRANTED to the extent it seeks exclusion sanctions related
6
to Gallo’s claim for energy cost damages. The portions of Stuart H. Harden’s expert
7
report opining as to energy costs are STRICKEN, and Gallo is precluded from
8
offering any evidence on this theory of damages.
9
5. SMI’s Motion to Strike is GRANTED to the extent it seeks exclusion sanctions related
10
to the February 2019 furnace shutdown. The expert report of C. Phillip Ross is
11
STRICKEN in its entirety, paragraphs 60-65 of the expert report of Stuart H. Harden
12
are STRICKEN, and Gallo is precluded from offering any evidence on this theory of
13
damages.
14
IT IS SO ORDERED.
15
16
17
Dated:
August 7, 2019
/s/
UNITED STATES MAGISTRATE JUDGE
18
19
20
21
22
23
24
25
26
27
28
14