USA v. Sterling Centrecorp Inc. et al
Filing
298
MEMORANDUM AND ORDER signed by District Judge Morrison C. England, Jr on 9/21/16 ORDERING Plaintiffs' Motion for Partial Summary Judgment as to Amount of Recoverable CERCLA Response Costs is GRANTED. Defendant Sterling's corresponding Motion for Summary Judgment as to the recoverability of certain response costs in the Lava Cap Mine Site's Operable Units One and Two is DENIED. (Becknal, R)
1
2
3
4
5
6
7
8
UNITED STATES DISTRICT COURT
9
EASTERN DISTRICT OF CALIFORNIA
10
11
12
UNITED STATES OF AMERICA,
and CALIFORNIA DEPARTMENT
OF TOXIC SUBSTANCES CONTROL,
13
14
15
16
17
Plaintiffs,
No. 2:08-cv–02556-MCE-JFM
MEMORANDUM AND ORDER
v.
STERLING CENTRECORP INC.,
STEPHEN P. ELDER and ELDER
DEVELOPMENT, INC.,
Defendants.
18
19
Both the United States and the California Department of Toxic Substances
20
(hereinafter collectively referred to as “Plaintiffs” or “government” unless otherwise
21
specified) have designated the former Lava Cap Mine, located in Nevada County,
22
California, as a Superfund site polluted by elevated levels of arsenic that were
23
disseminated through tailings and waste materials generated by mine operations.
24
Plaintiffs have undertaken cleanup efforts designed to remediate that arsenic
25
contamination. The present action, filed pursuant to the Comprehensive Environmental
26
Response, Compensation and Liability Act of 1980, 42 U.S.C. § 9601, et seq.
27
(“CERCLA”), seeks contribution for the costs of those activities both from former owners
28
1
1
of the site and operators responsible for its mining. After bifurcating the case between
2
liability and damages, a bench trial as to the liability of Defendant Sterling Centrecorp
3
Inc. (“Sterling”) was held over four days between October 31, 2012, and November 7,
4
2012. Those proceedings resulted in Findings of Fact and Conclusions of Law filed
5
June 20, 2013, and June 24, 2013, that found Sterling liable for all proper removal and
6
remedial costs incurred by Plaintiffs at the Mine. ECF Nos. 211, 213.1
7
Presently before the Court are two related motions for summary judgment
8
pertaining to the second damages phase of this case. Both Plaintiffs and Defendant
9
Sterling Centrecorp Inc. (“Sterling”) ask the Court to summarily adjudicate the extent and
10
recoverability of Plaintiff’s response costs under Section 107 of CERCLA. As set forth
11
below, Plaintiffs’ Motion is GRANTED and Defendant Sterling’s Motion is DENIED. 2
12
13
BACKGROUND
14
15
The Lava Cap Mine Superfund Site is located on approximately thirty acres in a
16
rural residential area in the foothills of the Sierra Nevada Mountains. Gold and silver
17
mining activities at the site began in approximately 1860. Between 1943 and 1945
18
mining was conducted at the site by the Lava Cap Gold Mining Corporation (“LCGMC”).
19
Mining operations resulted in two piles of mining waste, a waste rock pile and a mill
20
tailings pile. Findings of Fact ¶¶ 34-35.3 The waste rock pile, estimated to be several
21
stories high, was situated immediately next to the mine and mill building. Id. at ¶ 34.
22
The fine-grained materials comprising the mill tailings were impounded downstream from
23
the mill behind a timber dam on Little Clipper Creek. Id. at ¶¶ 12, 35. In 1938, LCGMC
24
25
26
27
1
The liability of the remaining Defendants, Stephen P. Elder and Elder Development, had already
been adjudicated by orders Dated February 23, 2010, September 20, 2011, and December 8, 2011 (ECF
Nos. 78, 149 and 153, respectively.
2
Because it determined that oral argument would not have been of material assistance, the Court
ordered both Motions submitted on the briefing in accordance with Eastern District Local Rule 230(g).
3
28
Citations to “Findings of Fact” refer to the Court’s Findings of Fact in the liability portion of this
case, filed June 20, 2013. ECF No. 211.
2
1
created another dam on Greenhorn Creek to also trap mill tailings, thereby creating Lost
2
Lake. Id. at ¶13.
3
In 1979, a partial log dam collapse led to a release of mine tailings into Little
4
Clipper Creek which, in turn, caused downstream neighbors to complain about pollution
5
from the resulting silt. Findings of Fact ¶¶ 142-43, 166. In October of that year, the
6
Central Valley Regional Control Board and the California Department of Fish and Game
7
investigated and found that arsenic contaminated tailings had entered Little Clipper
8
Creek and flowed downstream to Lost Lake. Id. at ¶ 142-43, 21. The Regional Water
9
Quality Control Board thereafter issued a Cleanup and Abatement Order to Keystone,
10
which technically held title to the Mine at the time. Id. at ¶ 144.
11
Following an ultimately unsuccessful attempt to sell the Lava Cap Mine to another
12
company, Keystone sold the property in1989 to Banner Mountain Properties, Ltd., an
13
entity controlled by Defendant Stephen Elder, who currently owns four of the seven
14
parcels comprising the former mine site. The remaining three parcels are owned by
15
another Elder business interest, Defendant Elder Development, Inc.
16
The United States Environmental Protection Agency (“EPA”) completed a
17
Preliminary Assessment on the mine site in April of 1993, after Elder’s purchase of the
18
property. Sediment and soil samples revealed elevated concentrations of both arsenic
19
and lead.
20
Heavy rainstorms in 1997 washed mine wastes downstream into Little Clipper
21
Creek and Lost Lake. The upper half of the log dam thereafter collapsed, discharging an
22
estimated 10,000 cubic yards of additional tailings contaminated with arsenic. Findings
23
of Fact ¶ 21. In October of 1997, the EPA determined that the tailings release from the
24
Mine met the National Contingency Plan (“NCP”) criteria for a removal action under
25
40 C.F.R. § 300.415(b)(2). During 1997 and 1998, the EPA conducted a physical
26
removal action at the Site. Pls.’ Compl., ¶¶ 35-39. Thereafter, in January of 1999, the
27
Site was officially designated a Superfund site in light of its potential risk to human health
28
///
3
1
and the environment. Soil, sediment, surface water and groundwater contamination
2
from mining operations continues at the Site.
3
The EPA has conducted a variety of response activities to address this
4
contamination. Plaintiffs’ Statement of Undisputed Facts (“PUF”) No. 12. It has
5
reviewed information and sampling data for prior assessments, performed and analyzed
6
groundwater, surface water, sediment and soil sampling to determine the extent of
7
contamination, analyzed alternatives for eliminating or reducing said contamination, and
8
performed several response actions to prevent exposure to hazardous contaminants. Id.
9
at 13-24.
10
Because of the size of the Site, the EPA elected to divide it into four operable
11
units. Sterling’s Statement of Undisputed Facts (“DUF”) at No. 7. Only two of those
12
operative units are at issue in the current motions. Operative Unit 1 (“OU1”) consisted
13
of: 1) the residences on the mine property; 2) building, soils, and surface water
14
contamination on the mine property; and 3) contaminated soils along Little Clipper Creek
15
downstream to Greenhorn Road. Id. at 8. The EPA selected remedial treatment for
16
OU1 consisting of removing “hot spots” of soil contamination near the mine buildings,
17
removing mine equipment, constructing surface water diversions around the tailings and
18
waste rocks piles, and installing a system to collect and treat water flowing from the mine
19
entrance and seeping from the buttress containing the failings. Id. at 11. In addition, the
20
treatment employed also included covering the waste rock pile with soil and vegetation,
21
and covering the tailings pile with a High Density Polyethylene (“HDPE”) synthetic liner
22
and vegetated soil. Id. at 12.
23
Operative Unit 2 (“OU2”) addressed risks posed by contaminated groundwater,
24
including groundwater then used for drinking water by five residences. The remedy
25
chosen by EPA was interim in nature because studies for possible long-term
26
groundwater treatment were still ongoing, and potentially years away. See id. at 18. As
27
an interim measure, EPA built a $3.795 million pipeline to connect the impacted
28
///
4
1
residences to a municipal water supply provided by the Nevada Irrigation District. Id. at
2
24.
3
According to the government, through November 30, 2012, it incurred
4
$32,205,011.39 in response costs at the Site. PUF at No. 42. Additionally, the
5
California Department of Toxic Substances Control (“DTSC”) has $781,878.01 in
6
unreimbursed response costs through October 31, 2014, and expects that figure to
7
increase. Id. at 56. Of those amounts, the government claims it spent $3,611,624 on
8
enforcement and legal costs that will be presented to the Court at a later date, and the
9
DTSC spent some $58,151.25 for similar costs. Id. at 47, 56. Plaintiffs accordingly
10
argue that Defendants, including Sterling, are liable for $28,593,387.39 in response
11
costs to the government at this time, and $723,726.78 for response costs to DTSC. Id.4
12
On October 27, 2008, the United States and the DTSC commenced this civil
13
action to recover both their past response costs under CERCLA and to obtain a
14
declaratory judgment that Defendants are responsible for future response costs at the
15
Site. Plaintiffs’ motion now before the Court seeks to establish its unreimbursed
16
response costs as set forth below. Sterling, on the other hand, seeks summary
17
adjudication that because some of Plaintiffs’ costs incurred at OU1, and all in OU2, were
18
arbitrary or capricious or otherwise inconsistent with the NCP, they are unrecoverable.
19
20
STANDARD
21
22
The Federal Rules of Civil Procedure provide for summary judgment when “the
23
movant shows that there is no genuine dispute as to any material fact and the movant is
24
entitled to judgment as a matter of law.” Fed. R. Civ. P. 56(a); see also Celotex Corp. v.
25
Catrett, 477 U.S. 317, 322 (1986). One of the principal purposes of Rule 56 is to
26
dispose of factually unsupported claims or defenses. Celotex, 477 U.S. at 325.
27
///
28
4
DTSC calculates the total balance owed as $847,912.86 after the addition of interest.
5
1
Rule 56 also allows a court to grant summary judgment on part of a claim or
2
defense, known as partial summary judgment. See Fed. R. Civ. P. 56(a) (“A party may
3
move for summary judgment, identifying each claim or defense—or the part of each
4
claim or defense—on which summary judgment is sought.”); see also Allstate Ins. Co. v.
5
Madan, 889 F. Supp. 374, 378-79 (C.D. Cal. 1995). The standard that applies to a
6
motion for partial summary judgment is the same as that which applies to a motion for
7
summary judgment. See Fed. R. Civ. P. 56(a); State of Cal. ex rel. Cal. Dep’t of Toxic
8
Substances Control v. Campbell, 138 F.3d 772, 780 (9th Cir. 1998) (applying summary
9
judgment standard to motion for summary adjudication).
10
In a summary judgment motion, the moving party always bears the initial
11
responsibility of informing the court of the basis for the motion and identifying the
12
portions in the record “which it believes demonstrate the absence of a genuine issue of
13
material fact.” Celotex, 477 U.S. at 323. If the moving party meets its initial
14
responsibility, the burden then shifts to the opposing party to establish that a genuine
15
issue as to any material fact actually does exist. Matsushita Elec. Indus. Co. v. Zenith
16
Radio Corp., 475 U.S. 574, 586-87 (1986); First Nat’l Bank v. Cities Serv. Co., 391 U.S.
17
253, 288-89 (1968).
18
In attempting to establish the existence or non-existence of a genuine factual
19
dispute, the party must support its assertion by “citing to particular parts of materials in
20
the record, including depositions, documents, electronically stored information,
21
affidavits[,] or declarations . . . or other materials; or showing that the materials cited do
22
not establish the absence or presence of a genuine dispute, or that an adverse party
23
cannot produce admissible evidence to support the fact.” Fed. R. Civ. P. 56(c)(1). The
24
opposing party must demonstrate that the fact in contention is material, i.e., a fact that
25
might affect the outcome of the suit under the governing law. Anderson v. Liberty Lobby,
26
Inc., 477 U.S. 242, 248, 251-52 (1986); Owens v. Local No. 169, Assoc. of W. Pulp and
27
Paper Workers, 971 F.2d 347, 355 (9th Cir. 1987). The opposing party must also
28
demonstrate that the dispute about a material fact “is ‘genuine,’ that is, if the evidence is
6
1
such that a reasonable jury could return a verdict for the nonmoving party.” Anderson,
2
477 U.S. at 248. In other words, the judge needs to answer the preliminary question
3
before the evidence is left to the jury of “not whether there is literally no evidence, but
4
whether there is any upon which a jury could properly proceed to find a verdict for the
5
party producing it, upon whom the onus of proof is imposed.” Anderson, 477 U.S. at 251
6
(quoting Improvement Co. v. Munson, 81 U.S. 442, 448 (1871)) (emphasis in original).
7
As the Supreme Court explained, “[w]hen the moving party has carried its burden under
8
Rule [56(a)], its opponent must do more than simply show that there is some
9
metaphysical doubt as to the material facts.” Matsushita, 475 U.S. at 586. Therefore,
10
“[w]here the record taken as a whole could not lead a rational trier of fact to find for the
11
nonmoving party, there is no ‘genuine issue for trial.’” Id. 87.
12
In resolving a summary judgment motion, the evidence of the opposing party is to
13
be believed, and all reasonable inferences that may be drawn from the facts placed
14
before the court must be drawn in favor of the opposing party. Anderson, 477 U.S. at
15
255. Nevertheless, inferences are not drawn out of the air, and it is the opposing party’s
16
obligation to produce a factual predicate from which the inference may be drawn.
17
Richards v. Nielsen Freight Lines, 602 F. Supp. 1224, 1244-45 (E.D. Cal. 1985), aff’d,
18
810 F.2d 898 (9th Cir. 1987).
19
20
ANALYSIS
21
22
A. Statutory Framework
23
The EPA is authorized until CERCLA § 104(a) to address a release or a
24
substantial threat of release of hazardous substances. 42 U.S.C. § 9604(a).
25
Permissible responses in that regard include “removal” actions, “remedial” actions, and
26
any other actions necessary to protect the public health or welfare or the environment.
27
Id. “Removal” actions including evaluative, assessment, and monitoring activities and
28
related investigations, as well as actions necessary to prevent, minimize or mitigate
7
1
environmental damage. 42 U.S.C. § 9601(23). “Remedial” actions refer to measures
2
taken to permanently deal with hazardous substances. 42 U.S.C. § 9601(24). In
3
addition, CERCLA provides that the term “response” means either a removal or remedial
4
action as well as enforcement activities related thereto. 42 U.S.C. § 9601(25).
5
The National Contingency Plan, or NCP, “provide[s] the organizational structure
6
and procedures for preparing for and responding to . . . releases of hazardous
7
substances.” Washington State Dep’t of Transp. v. Washington Natural Gas Co.,
8
Pacificorp, 59 F.3d 793, 799 (9th Cir. 1995) (quoting 40 C.F.R. § 300.1). A party found
9
liable under CERCLA § 107 is liable for “all costs of removal or remedial action incurred
10
11
by the United States . . . not inconsistent with the [NCP].” 42 U.S.C. § 9604(a)(4)(A).
Once Plaintiffs establish a prima facie case that their response costs were
12
incurred in connection with the release of hazardous substances from the Lava Cap
13
Mine Site, such costs are presumed to be consistent with the NCP, and the burden shifts
14
to Defendants to prove otherwise. Id. at 1170-71. Pursuant to CERCLA § 113(j) and
15
well established Ninth Circuit precedent, Defendant Sterling then has the burden, in
16
showing that a particular action was inconsistent with the NCP, to show that such
17
response was “arbitrary and capricious” based on the administrative record. 42 U.S.C.
18
§ 9613(j); Chapman, 146 F.3d at 1170. The arbitrary and capricious standard of review
19
is indicated “because determining the appropriate removal and remedial action involves
20
specialized knowledge and expertise, [and therefore] the choice of a particular cleanup
21
method is a matter within the discretion of the [government]. United States v. Hardage,
22
982 F.2d 1436, 1442 (10th Cir. 1992) (quoting United States v. Northeastern
23
Pharmaceutical & Chem. Co., 810 F.2d 726, 748 (8th Cir. 1986)).
24
“If the Court finds that the selection of a response action was arbitrary and
25
capricious or otherwise not in accordance with law, the court shall award (A) only the
26
response costs or damages that are not inconsistent with the [NCP], and (B) such other
27
relief as is consistent with the [NCP].” 42 U.S.C. § 9613(j)(3). In making that
28
determination, the NCP identifies guides for investigation as well as the consideration of
8
1
remedial alternatives, and establishes criteria to be used in selecting remedies for the
2
identified alternatives. First, the EPA requires that a remedial investigation/feasibility
3
study be undertaken for both the assessment and evaluation of site conditions and
4
associated risks, with a range of alternatives then develop to address those concerns.
5
40 C.F.R. §300,420, 300.430. Then, the proposed alternatives must be addressed using
6
nine different criteria divided into three general categories denominated as Threshold,
7
Balancing, and Modifying Criteria. The two Threshold Criteria are overall protection of
8
human health and the environment, and compliance with applicable or relevant and
9
appropriate requires. Threshold Criteria are essentially “pass-fail” screening criteria
10
designed to determine whether proposed alternatives should be further considered. The
11
Balancing Criteria contain five factors used to evaluate and compare alternatives that
12
passed screening criteria. Those factors include long-term effectiveness and
13
permanence, reduction of toxicity, mobility or volume through treatment, short-term
14
effectiveness, implementability and cost. Finally, the two Modifying Criteria are state and
15
community acceptance. 40 C.F.R. § 430(e)(9).
16
In addition to overall cost, the NCP also requires that the EPA analyze the cost-
17
effectiveness of each remedial alternative. 40 C.F.R. § 300.43(f)(1)(ii)(D). A remedy is
18
deemed cost-effective only if “its costs are proportional to its overall effectiveness.” Id.
19
B. Recoverable Response Costs
20
In opposing Plaintiffs’ Motion, Defendant Sterling does not question that either the
21
government or the DTSC incurred the costs they claim through clean-up efforts at the
22
site, or that the figures are improperly calculated, documented, and/or presented.
23
Sterling’s Opp., ECF No. 284, 1:4-7. Instead, Sterling argues only that because some of
24
the remedies utilized were arbitrary or capricious or otherwise inconsistent with the NCP,
25
not all of Plaintiffs’ claimed costs can be recovered.
26
Specifically, as indicated above, Sterling takes issue with the remedies employed
27
at the Site for part of OU1, as well as the entirety of the interim remedy for OU2.
28
///
9
1
2
1.
Operable Unit One (“OU1”)
Turning first to OU1, the EPA chose so-called Alternative 2-3 over Alternative 2-2
3
to address contamination from the mine buildings, tailings, waste rock and acid
4
drainage. Sterling argues that Plaintiff’s selection of Alternative 2-3 was arbitrary and
5
capricious because the EPA: 1) failed to conduct the required NCP analysis before
6
deciding to cover the waste rock with a vegetated soil cover; 2) failed to similarly analyze
7
its decision to cover the tailings pile with an HDPE liner; and 3) failed to explain why its
8
decision to excavate contaminated soil near the mine buildings was cost effective.
9
These arguments will be addressed in turn.
10
11
a. Waste Rock Cover
Samples taken of the waste rock and mine tailings revealed that arsenic
12
concentrations as high as 3,190 mg/kg. See Pls.’ Statement of Disputed Material Facts
13
(“SOF”), ¶ 7. Given those results, the EPAA decided to regrade the waste rock pile and
14
cap it with vegetated soil. Sterling does not dispute the need to regrade the pile and
15
reduce infiltration, since that measure was included within Alternative 2-2, the remedial
16
measure Sterling advocates. Sterling instead challenges the EPA’s decision to cap the
17
regraded pile as set forth in Alternative 2-3.
18
The EPA claims it determined that capping was needed in order to make the
19
waste rock more difficult to disturb and to further reduce infiltration. Id. at 8-14. The
20
government maintains that a cap does a better job of preventing people from disturbing
21
the waste rock than no cap, a conclusion which seems obvious, and a distinction that
22
Sterling appears reluctant to recognize. Sterling’s only counter is to take the
23
unpersuasive position that the EPA should have discussed the likelihood that intruders
24
would break into the Site to remove waste rock, an estimation that would be virtually
25
impossible to quantify.
26
Sterling’s main argument against the selection of a vegetated soil cap rests with
27
its contention that arsenic concentrations were primarily bound up in the rock matrix, and
28
that, accordingly, they did not have the same potential to erode or leach into the soil as
10
1
the tailings pile. According to Sterling, in the absence of field investigation and/or
2
solubility testing to determine just how much arsenic was apt to leach into the
3
environment from the waste rock, the EPA’s decision to install the cap was arbitrary and
4
capricious.
5
The Court disagrees. Evidence in the record indicates that EPA’s concern about
6
infiltration from the waste rock was justified. Although Sterling is correct that the larger
7
pieces of waste rock were less problematic in this regard, waste rock at the site ranged
8
from eight inches in diameter to very small, sand-size particles, with fine-grained material
9
situated throughout the waste rock pile to a depth of some 21 feet. Id. at 9, 10. As EPA
10
Remedial Project Manager David Seter noted in public hearings on its planned
11
remediation, the Site’s waste rock “needs to be shaped to shed the rainwater, it needs to
12
be capped, because there probably are some fine materials interspersed with the rock,
13
and we just want to try to keep it all in place.” Id. at 14. Installing a cap under these
14
circumstances would appear the prudent approach and it hardly can be considered
15
arbitrary and capricious.
16
Sterling’s other objections are no more availing. While Sterling argues that the
17
necessary data gathering failed to take place, it appears that solubility testing was done
18
and that those results are part of the administrative record even if they were not
19
expressly flagged by the EPA. Two of the three waste rock samples contained arsenic
20
at levels in both in excess of the applicable maximum contaminant level and Site goals
21
for the clean-up of arsenic in surface water. See SOF at Nos. 18-21. Making a
22
determination that the EPA’s remedial choice was arbitrary and capricious solely
23
because it failed to directly rely on adverse testing results already contained in the
24
record would be nonsensical. Additionally, in response to Sterling’s argument that cost-
25
effectiveness was not considered, because capping created a better long-term barrier,
26
the EPA determined that Alternative 2-3 (the next most economical option after
27
Alternative 2-2, which did not envision installation of a cap) provided the best balance of
28
///
11
1
cost in combination with both long and short-term effectiveness. SOF at No. 26. That
2
conclusion itself was sufficient for NCP purposes.
3
b.
Waste Tailings Cover
4
The tailings pile posed an even greater environmental risk than did the
5
concentration of waste rock at the Site. The EPA concluded that the tailings pile was
6
both highly toxic and mobile, with surface water seeping from the tailings pile and
7
groundwater beneath it containing elevated arsenic levels. Id. at 28. Alternative 2-3,
8
the treatment choice adopted by the EPA, included six inches of sand over the tailings,
9
followed by an impermeable HDPE liner and eighteen inches of vegetated low-
10
permeability soil. Alternative 2-2 as advocated by Sterling, on the other hand, called for
11
only twelve inches of non/low-permeability soil to assist in revegetation, and no liner. Id.
12
at 4. As Sterling itself indicates, the EPA judged the engineered cap to be more
13
effective because it concluded that the combination of an impermeable liner and low-
14
permeability soil deflected nearly all direct precipitation away from the tailings pile. See
15
Sterling Mot., ECF No. 273-1, pp. 8-9. The EPA determined that Alternative 2-2, on the
16
other hand, “would allow water flow to enter the tailings and continue to produce
17
leachate.” SOF at No. 29. Additionally, the EPA found that because it provided more of
18
an access barrier to the tailings pile it made it more difficult for people and animals to
19
come into contact with the contaminated tailings. Id. at 30.
20
In an argument similar to that employed against the EPA’s remedial choice for the
21
Site’s waste rock pile, Sterling argues that the government’s choice to use an HDPE liner
22
was arbitrary and capricious because the EPA failed to conduct appropriate testing and
23
modeling to determine what, if any, increased benefit to groundwater and soil
24
contamination was achieved by covering the tailings with the liner. According to Sterling,
25
because the EPA failed to determine the amount of water infiltrating the pile and the
26
arsenic migration caused thereby, it acted inconsistently with the NCP. Sterling also
27
contends that the agency did not determine whether the HDPE liner was cost-effective.
28
See Sterling Mot., ECF No. 273-1, 9:19-22.
12
1
Sterling’s argument notwithstanding, the EPA need not calculate the precise
2
amount of water deterred by the engineered cap in order to satisfy the NCP. Section
3
300.430(d)(2) of the NCP, which Sterling cites to support that proposition, requires no
4
such calculation. The record does show, however, that the impermeable liner reduces
5
some 99 percent of infiltration and resists cracking, as opposed to the soil cap
6
envisioned in Alternative 2-2 which the EPA determined would continue to allow for both
7
infiltration and the generation of tailings leachate. SOF at Nos. 32-33. As indicated
8
above, the EPA knew that the tailings released arsenic into both surface and
9
groundwater. Common sense dictates that Alternative 2-3 was a safer choice under
10
these circumstances, irrespective of whether precise testing was employed. Moreover,
11
and in any event, although the EPA did not explicitly rely on testing to support its
12
conclusion , a waste extraction test on the tailings using deionized water was
13
performed, and arsenic levels in the sample showed levels in excess of the applicable
14
maximum contaminant level and Site clean-up goals. Id. at 34, 21.
15
Even Sterling cannot challenge the superior long-term effectiveness of the liner,
16
which was expected to last hundreds of years. See SOF at No. 36. Finally, with regard
17
to cost-effectiveness, Sterling argues only that because the EPA did not determine the
18
incrementally increased protection the HDPE liner offered, it could not determine
19
whether the increased cost was proportional to that greater efficacy. Again, however,
20
the EPA concluded that Alternative’s 2-3’s significantly better benefits were worth the
21
additional cost. SOF at No. 41. A quantitative comparison of risk reduction under the
22
circumstances was not necessary.
23
24
25
26
Given all these factors, the EPA’s decision to employ Alternative 2-3 in treating
the waste tailings pile cannot be deemed arbitrary and capricious.
c.
Excavation of Contaminated Soil
The EPA determined that the soils near the mine buildings were the most heavily
27
contaminated on the entire Site, with arsenic and cyanide contaminant levels at 31,200
28
and 419 ppm, respectively. Id. at 43. Sterling nonetheless faults the EPA for removing
13
1
those “hot spots” rather than simply fencing the affected areas and claims that the EPA
2
did not explain in the record why excavating the polluted soils was more cost-effective.
3
Given the superior protection provided by removing the soils as compared to fencing,
4
whose protection against human exposure would depend on enforcement and whose
5
deterrence to animal intrusion was at best, questionable, it appears plain to this Court
6
that EPA’s remedial choice was not arbitrary or capricious.
7
2. Operable Unit Two (“OU2”)
8
OU2 addressed contaminated groundwater at the Site, and because a long-term
9
solution was complex, and potentially years away, the EPA determined that residents of
10
the area drinking from contaminated groundwater wells needed a safe and reliable
11
source of drinking water. Consequently, as an interim and partial remediation measure,
12
EPA connected area residents to Nevada Irrigation District water through construction of
13
a pipeline costing some $3.795 million. Sterling argues that the EPA’s interim decision
14
to construct the pipeline was arbitrary and capricious because it did not require residents
15
to abandon their private wells and that therefore the underlying risk of contaminated
16
groundwater was not addressed. That consideration, particularly when balanced against
17
the significant cost of the pipeline and the fact that it affected only five residential wells
18
used for drinking water (two additional wells were used only for irrigation, see DUF at
19
No. 21), underlies Sterling’s belief that the remedy chosen did not pass muster under the
20
NCP. Sterling also contends that because pipelining an additional water source does
21
not technically involve treatment, that factor has to be balanced against water treatment
22
measures at the wellheads themselves.
23
Sterling urges the Court to therefore find that wellhead treatment should have
24
been employed for the residences at issue at a significantly lower cost of some $943,000
25
over a 50-year treatment for both installation and maintenance. DUF at No. 27. The
26
EPA determined that construction of the pipeline was nonetheless the safer choice since
27
it met threshold criteria like implementability, short-term effectiveness and treatment
28
without qualification and provided a solution that required, unlike well treatment, no
14
1
additional maintenance from the EPT, the State of California, or the property owner. Id.
2
at 68-69.5
3
Again, while Sterling may disagree with the EPA’s selected remedy, that does not
4
mean that the government’s choice to pipe in safe drinking water from a public supply
5
was arbitrary and capricious.6 Wellhead treatment would require continuous monitoring
6
and maintenance and coordination with individual residents, who could change over
7
time, for access to ensure that treatment units were operating properly and were
8
consequently safeguarding drinking supply. SOF at Nos. 56, 60, 65. This was not a
9
hypothetical concern since wellhead treatment units at the site had failed before. Id. at
10
59. On the other hand, the pipeline could deliver safe drinking water to affected
11
residents in perpetuity without the necessity of any ongoing monitoring. Selecting a
12
more protective remedy in that regard cannot be arbitrary and capricious.
13
The cost of building the treatment as opposed to maintaining wellhead treatments
14
is nonetheless a balancing factor that has to be considered. Although the cost
15
difference between those options is clearly significant, it is equally clear that the pipeline
16
provides a fail-free method for delivering safe water without the need for ongoing, and
17
potentially problematic, monitoring needed to maintain wellhead systems. Given those
18
considerations, the Court again cannot say that EPA’s decision to employ the more
19
expensive pipeline was arbitrary and capricious.
20
///
21
///
22
///
23
///
24
///
25
26
27
28
5
Wellhead systems, once professionally installed, require two filter and membrane changes and
a water quality analysis each year. See ECF No. 289-4 at EPA011112.
6
The fact that individual residents could not be required to disconnect their individual wells does
not alter this conclusion. As the EPA has noted, individual residents could be continuing to use wellhead
water for reasons other than drinking purposes.
15
1
CONCLUSION
2
3
Based on all the foregoing, Plaintiffs’ Motion for Partial Summary Judgment as to
4
Amount of Recoverable CERCLA Response Costs is GRANTED. Defendant Sterling’s
5
corresponding Motion for Summary Judgment as to the recoverability of certain
6
response costs in the Lava Cap Mine Site’s Operable Units One and Two is DENIED.7
7
IT IS SO ORDERED.
8
Dated: September 21, 2016
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
7
27
28
The Court notes that Plaintiff DTSC has filed a reply memorandum (ECF No. 291) that purports
to take issue with Defendant Sterling’s alleged claim that certain costs incurred by DTSC are divisible and
are accordingly not property attributable to Sterling. Since neither Motion presently before the Court
purports to ask it to make any such determination, that issue is not before the Court at this time.
16
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.
Why Is My Information Online?