Bel Air Mart et al v. Arnold Cleaners, Inc. et al

Filing 245

MEMORANDUM AND ORDER signed by Chief Judge Morrison C. England, Jr. on 2/21/2014 DENYING IN ITS ENTIRETY WITHOUT PREJUDICE 205 Motion for Sanctions; GRANTING IN PART AND DENYING IN PART WITHOUT PREJUDICE 214 Motion for Leave to file a Second Amended Counterclaim; DENYING WITHOUT PREJUDICE 215 Motion for Leave to file a Third-Party Complaint; DENYING 231 Motion to Strike. (Michel, G)

Download PDF
1 2 3 4 5 6 7 8 UNITED STATES DISTRICT COURT 9 EASTERN DISTRICT OF CALIFORNIA 10 11 BEL AIR MART, et al., 12 13 14 15 No. 2:10-cv-02392-MCE-EFB Plaintiffs, v. MEMORANDUM AND ORDER ARNOLD CLEANERS, INC. et al., Defendants. 16 17 In September 2010, Plaintiffs Bel Air Mart (“Bel Air”) and Wong Family Investors, 18 L.P. (“WFI”) (collectively, “Plaintiffs”), filed this environmental cleanup action against 19 numerous Defendants. Plaintiffs seek recovery for property damage and cleanup costs 20 caused by contamination from a dry cleaning facility (“the Facility”) formerly operated on 21 the real property located at the southeast corner of Arden Way and Eastern Avenue in 22 Sacramento, California (the “Property”). Defendants in this case include parties who 23 allegedly owned and/or operated the Facility, or owned and/or operated the Property, for 24 various periods of time from an uncertain date before the 1970s through about 2007. 25 Plaintiffs’ claims against the Defendants include claims for Cost Recovery pursuant to 26 section 107 of the Comprehensive Environmental Response, Compensation and Liability 27 Act of 1980, as amended by the Superfund Amendments and Reauthorization Act of 28 1986 (“CERCLA”); contribution pursuant to California Health and Safety Code 1 1 section 25300; Declaratory Relief pursuant to CERCLA section 113(g), 42 U.S.C. 2 § 9613(g); Declaratory Relief pursuant to 28 U.S.C. § 2201; Equitable Indemnification; 3 Declaratory Relief for Equitable Indemnification; Contribution under state common law; 4 Negligence; Negligence Per Se; Private Nuisance pursuant to California Civil Code 5 section 3479; Nuisance Per Se; Trespass; and Breach of Contract. See First Amended 6 Complaint, Dec. 9, 2010, ECF No. 7. As discussed below, three motions by various 7 Defendants are currently pending before this Court, ECF Nos. 205, 214 and 215.1 8 9 BACKGROUND 10 11 On January 31, 2011, Defendant and counterclaimants R. Gern Nagler, as 12 Trustee of the John W. Burns Testamentary Trust, and Robert Gern Nagler (collectively, 13 “Nagler”) filed a Counterclaim against Plaintiffs and the former owners/operators of the 14 facility who are named defendants in the underlying action. See ECF No. 38. On 15 February 2, 2011, Nagler filed a First Amended Counterclaim. Nagler alleges claims for 16 Negligence, Declaratory Relief, Equitable Indemnity and Contribution. See ECF No. 41. 17 Nagler now seeks leave to file a Second Amended Counterclaim to include a 18 breach of contract claim against Bel Air Mart and two statutory claims against the other 19 parties for, in essence, indemnity/contribution. Mot., Nov. 3, 2013, ECF No. 214. By 20 way of a separate Motion, Nagler also seeks leave to file an additional Third-Party 21 Complaint against the Wong family members, individually and in their capacities as 22 trustees for their respective trusts, for breach of guaranty and/or liability as general 23 partners of WFI, under section 15643 of the California Corporations Code. Mot., Nov. 3, 24 2013, ECF No. 215. 25 /// 26 /// 27 28 1 Because oral argument would not be of material assistance, the Court ordered this matter submitted on the briefs. E.D. Cal. Local R. 230(g). See Minute Order, Jan. 7, 2014, ECF No. 244. 2 1 On July 20, 2012, Defendant and Counter and Cross-Claimant Century Indemnity 2 Company (“Century Indemnity”)2 filed a Counter and Cross-Claim against Plaintiffs and 3 the former owners/operators of the Facility who are named defendants in the underlying 4 action, alleging claims for relief for Contribution, Declaratory Relief, Negligence, 5 Hazardous Substance Statutory Indemnity and Equitable Indemnity. See ECF No. 149. 6 Century Indemnity now moves for sanctions against Bel Air on the basis of 7 spoliation of evidence. Mot., Oct. 8, 2013, ECF No. 205. Specifically, Century Indemnity 8 asks that the Court dismiss Plaintiff’s entire action as a spoliation sanction, or, in the 9 alternative, for evidentiary and monetary sanctions. See id. Several of Century 10 Indemnity’s co-Defendants joined its Motion. See ECF Nos. 208-213. 11 For the following reasons, Century Indemnity’s Motion to dismiss, or, in the 12 alternative, for evidentiary and monetary sanctions, ECF No. 205, is denied without 13 prejudice. Further, Nagler’s motion for leave to file a Second Amended Counterclaim, 14 ECF No. 214, is granted in part and denied in part, and Nagler’s motion for leave to file a 15 Third Party Complaint, ECF No. 215, is denied, all without prejudice. 16 ANALYSIS 17 18 A. 19 In 2007, Bel Air retained environmental consultant Klenfelder, who conducted a 20 preliminary investigation which showed possible PCE and TECE contamination at the 21 Property. In 2008, Bel Air nonetheless destroyed the Facility, purportedly in the normal 22 course of business, as part of a long planned expansion of its Arden Way facility. In 23 2010, Plaintiffs brought this environmental cleanup action against the various owners 24 and operators of the Facility.3 25 26 27 28 Century Indemnity’s Motion for Sanctions (ECF No. 205) 2 Century Indemnity is successor to CCI Insurance Company, which in turn is successor to Insurance Company of North America, the alleged insurer of The Estate of Ronald G. Armstrong, Deceased, pursuant to California Probate Code section 550. 3 With respect to Plaintiffs’ first ex parte application, ECF No. 233, on December 12, 2013, on the Court’s own motion, the Court granted, in part, Plaintiff’s request to file a Sur-Reply to Century Indemnity's Reply re Motion for Sanctions (ECF No. 229). ECF No. 241. The Court also permitted a response to that 3 1 The crux of Defendants’ argument for spoliation sanctions is that by destroying 2 the Facility, Bel Air destroyed the most critical evidence in this case with full knowledge 3 and acquiescence of its attorneys. Defendants allege that Bel Air made no attempt to 4 preserve any evidence relating to the contamination and contend they will therefore have 5 difficulty proving what or where the source of the contamination was or whether Bel Air 6 or other parties are responsible for the cleanup and other resulting costs. According to 7 Defendants, Bel Air’s destruction of evidence has rendered meeting this burden 8 extremely difficult, if not impossible. More specifically, Defendants contend that the only 9 way to conclusively determine the effect of the demolition on the spread of 10 contamination is to compare the soil and soil gas results before the demolition to the 11 results after the demolition. As a result of the Facility’s removal, this comparison is no 12 longer possible. 13 Defendants thus move for dismissal of this action as a spoliation sanction, or in 14 the alternative, for evidentiary sanctions and monetary sanctions. Specifically, 15 Defendants argue that as of September 13, 2007, Bel Air had knowledge of potential 16 environmental problems related to the Facility, and had a duty to preserve evidence, 17 because: (1) its in-house and outside counsel were involved with the contamination 18 issues at the Property since the initial site investigation; (2) it specifically carved out 19 future environmental claims against one of the operators of Arnold Cleaners, Han Joo; 20 (3) discussions between Bel Air’s counsel and its environmental consultant regarding 21 “pursuing the matter” had already taken place; (4) there was extensive correspondence 22 to and from both Bel Air’s in-house and outside counsel related to the "legal 23 representation of Bel Air Mart" well before the demolition took place; and (5) Bel Air’s 24 use of the attorney work product privilege for activities that took place before the 25 demolition evidences Bel Air’s specific contemplation of this CERCLA action. 26 27 28 Sur-Reply by Defendants. Id. Thereafter, Plaintiffs and Century Indemnity filed supplemental briefing. See ECF Nos. 242, 243. The Court did not permit any further filings by the parties prior to the scheduled oral argument. See ECF No. 241. Because all of the parties were allowed to submit supplemental briefing, the Court declines to strike any portion of Century Indemnity’s Reply (ECF No. 229). Thus, Plaintiffs’ first ex parte application, ECF No. 233, is denied as moot. 4 1 In opposition, Bel Air asserts that, at the time of demolition in 2008, it did not know 2 of the extent and potential cost of the contamination and therefore did not view litigation 3 as likely. Furthermore, Bel Air states that the notion that it knew or should have known 4 that litigation was imminent because it had knowledge of potential environmental 5 problems is “nonsense,” and numerous environmental problems are resolved without 6 litigation such that the facts known to Bel Air at that time did not trigger a duty to 7 preserve the Facility.4 8 9 “Spoliation of evidence is the destruction or significant alteration of evidence, or the failure to preserve property for another's use as evidence, in pending or future 10 litigation.” Kearney v. Foley & Lardner, LLP, 590 F.3d 638, 649 (9th Cir. 2009). “The 11 duty to preserve material evidence arises not only during litigation but also extends to 12 that period before the litigation when a party reasonably should know that the evidence 13 may be relevant to anticipated litigation.” World Courier v. Barone, C 06-3072 TEH, 14 2007 WL 1119196 (N.D. Cal. Apr. 16, 2007) (citing Kronisch v. United States, 150 F.3d 15 112, 126 (2d Cir. 1998)). “This is an objective standard, asking not whether the party in 16 fact reasonably foresaw litigation, but whether a reasonable party in the same factual 17 circumstances would have reasonably foreseen litigation.” Micron Tech., Inc. v. Rambus 18 Inc., 645 F.3d 1311, 1320 (Fed. Cir. 2011). 19 “Although the Ninth Circuit has not precisely defined when the duty to preserve is 20 triggered, trial courts in this Circuit generally agree that, ‘[a]s soon as a potential claim is 21 identified, a litigant is under a duty to preserve evidence which it knows or reasonably 22 should know is relevant to the action.’” Apple Inc. v. Samsung Electronics Co., Ltd., 23 888 F. Supp. 2d 976, 991 (N.D. Cal. 2012) (citing In re Napster, Inc. Copyright Litig., 24 4 25 26 27 28 Bel Air objects to Century Indemnity’s evidence on several grounds. Those objections, ECF No. 221-1, are overruled without prejudice because it was unnecessary for the Court to rely on that evidence to resolve this dispute. The Court similarly denies Century Indemnity’s Motion to Strike Bel Air’s opposition (ECF No. 231), which the Court considers timely under Local Rule 230. The Court is also not persuaded that Bel Air’s admitted error in exceeding the page limits warrants striking the Opposition either, which Defendant does not indicate resulted in any prejudice. Century Indemnity’s Motion to Strike, ECF No. 231, is thus denied. However, all parties are admonished to scrupulously follow the terms of this Court’s Scheduling Order going forward. 5 1 462 F. Supp. 2d 1060, 1067 (N.D. Cal. 2006)); see AmeriPride Servs., Inc. v. Valley 2 Indus. Serv., Inc., S-00-113 LKK/JFM, 2006 WL 2308442, at *4 (E.D. Cal. Aug. 9, 2006) 3 (anticipated litigation date is when a potential claim is identified); see also Hynix 4 Semiconductor Inc. v. Rambus Inc., 645 F.3d 1336, 1346-47 (Fed. Cir. 2011) (litigation 5 need only be reasonably foreseeable, not immediate or certain). The duty to preserve 6 evidence also attaches when “a party should have known that the evidence may be 7 relevant to future litigation.” In re Napster, Inc. Copyright Litig., 462 F.Supp.2d 1060, 8 1068 (N.D. Cal. 2006) (citing Zubulake v. UBS Warburg LLC, 220 F.R.D. 212, 216 9 (S.D.N.Y. 2003)). However, “[a] general concern over litigation does not trigger a duty to 10 preserve evidence.” Realnetworks, Inc. v. DVD Copy Control Ass'n, Inc., 264 F.R.D. 11 517, 526 (N.D. Cal. 2009). 12 13 14 15 16 17 18 19 When litigation is “reasonably foreseeable” is a flexible factspecific standard that allows a district court to exercise the discretion necessary to confront the myriad factual situations inherent in the spoliation inquiry. This standard does not trigger the duty to preserve documents from the mere existence of a potential claim or the distant possibility of litigation. However, it is not so inflexible as to require that litigation be “imminent, or probable without significant contingencies.” Micron Tech., 645 F.3d at 1320. “The moving party has the burden of demonstrating sanctionable conduct and 20 prejudice. The weight of that burden depends on the [specific] circumstances.” Rev 973 21 LLC v. Mouren-Laurens, CV 98-10690 AHM (EX), 2009 WL 273205 at *1 (C.D. Cal. 22 Feb. 2, 2009). To decide which specific spoliation sanction to impose, courts generally 23 consider three factors: “(1) the degree of fault of the party who altered or destroyed the 24 evidence; (2) the degree of prejudice suffered by the opposing party; and (3) whether 25 there is a lesser sanction that will avoid substantial unfairness to the opposing party.” 26 Apple, Inc. v. Samsung Electronics Co., Ltd., 888 F. Supp. 2d 976, 992 (N.D. Cal. 2012). 27 “While a district court has broad discretion in choosing an appropriate sanction for 28 spoliation, the applicable sanction should be molded to serve the prophylactic, punitive, 6 1 and remedial rationales underlying the spoliation doctrine.” Silvestri v. Gen. Motors 2 Corp., 271 F.3d 583, 590 (4th Cir. 2001). “In addition, a court must find some degree of 3 fault to impose sanctions. . . . But dismissal should be avoided if a lesser sanction will 4 perform the necessary function.” Id. 5 “The exercise of a court's inherent powers must be applied with restraint and 6 discretion and only to the degree necessary to redress the abuse.” Reinsdorf v. 7 Skechers U.S.A., Inc., 86 Fed. R. Serv. 3d 377 (C.D. Cal. 2013) (citing Chambers v. 8 NASCO, Inc., 501 U.S. 32, 45 (1991)). Accordingly, the determination of an appropriate 9 sanction for spoliation is “confined to the sound discretion of the trial judge, and is 10 assessed on a case-by-case basis.” Fujitsu Ltd. v. Fed. Express Corp., 247 F.3d 423, 11 436 (2d Cir. 2001) (internal citations omitted). “A party's destruction of evidence need 12 not be in ‘bad faith’ to warrant a court's imposition of sanctions.” Rev 973 LLC v. 13 Mouren-Laurens, CV 98-10690 AHM (EX), 2009 WL 273205 at *1 (C.D. Cal. Feb. 2, 14 2009). 15 “Dismissal under a court's inherent powers is justified in extreme circumstances. 16 In the Ninth Circuit, extraordinary circumstances exist where there is a pattern of 17 disregard for Court orders and deceptive litigation tactics that threaten to interfere with 18 the rightful decision of a case.” In re Napster, Inc. Copyright Litig., 462 F. Supp. 2d 19 1060, 1071 (N.D. Cal. 2006) (internal citations omitted). 20 Dismissal is an available sanction when a party has engaged deliberately in deceptive practices that undermine the integrity of judicial proceedings because courts have inherent power to dismiss an action when a party has willfully deceived the court and engaged in conduct utterly inconsistent with the orderly administration of justice. Before imposing the ‘harsh sanction’ of dismissal, however, the district court should consider the following factors: (1) the public's interest in expeditious resolution of litigation; (2) the court's need to manage its dockets; (3) the risk of prejudice to the party seeking sanctions; (4) the public policy favoring disposition of cases on their merits; and (5) the availability of less drastic sanctions. 21 22 23 24 25 26 27 /// 28 /// 7 1 Leon v. IDX Sys. Corp., 464 F.3d 951, 958 (9th Cir. 2006). “While the district court need 2 not make explicit findings regarding each of these factors, a finding of ‘willfulness, fault, 3 or bad faith’ is required for dismissal to be proper. Additionally, the district court must 4 consider ‘less severe alternatives’ than outright dismissal.” Id. (internal citations 5 omitted). 6 As noted above, Defendants point to five events which they claim circumstantially 7 demonstrate that Bel Air spoliated evidence, some of which are more compelling than 8 others. Bel Air strongly contests each of these contentions. However, even if all of 9 Defendants’ contentions are true, their accusations do not rise to the level of a “pattern 10 of deception and discovery abuse” that would make “it impossible for the district court to 11 conduct a trial with any reasonable assurance that the truth would be available.” Valley 12 Engineers Inc., 158 F.3d at 1057. Defendants present no evidence that Bel Air “willfully 13 deceived the court and engaged in conduct utterly inconsistent with the orderly 14 administration of justice.” Id. Public policy favors disposition of cases on their merits, 15 and even if the rest of Defendant’s allegations are true, it will nonetheless be possible for 16 this Court to conduct a fair and adequate trial. This is particularly true given the variety 17 of less drastic sanctions at the Court’s disposal which can be narrowly tailored to 18 address any potential prejudice suffered by Defendants. See Advantacare Health 19 Partners, LP v. Access IV, No. C 03-04496 JF, 2004 WL 1837997 at *5 (N.D. Cal. 20 Aug.17, 2004) (citing Halaco Eng'g Co. v. Costle, 843 F.2d 376, 381 (9th Cir. 1988)) 21 (noting that dismissal is appropriate in extraordinary circumstances such as where there 22 is a pattern of disregard for Court orders and deceptive litigation tactics that threaten to 23 interfere with the rightful decision of a case). Therefore, the Court denies without 24 prejudice Century Indemnity’s motion for dismissal. 25 Nor will the Court impose any other sanctions at this time. Defendant’s Motion 26 requires this Court to make, at least in part, a credibility determination. However, as set 27 forth in Century Indemnification’s motion, supporting evidence, and subsequent reply 28 and supplemental briefing, it is not clear that Bel Air knew or reasonably should have 8 1 known that the destroyed evidence might be relevant to future litigation at the time it 2 removed the building in question. 3 That being said, the Court cannot predict how a reasonable jury might resolve the 4 spoliation question. Therefore, the Court does not reach the issue of whether spoliation 5 occurred in this matter. See Kronisch v. United States, 150 F.3d 112, 127 (2d Cir. 1998) 6 (noting that where a district court could not rule out the possibility that a reasonable jury 7 would find that spoliation occurred, the veracity of a party’s reasons for destroying the 8 evidence “is an issue of credibility best left for trial”) (quoting the district court in that 9 matter). Cf. Josendis v. Wall to Wall Residence Repairs, Inc., 662 F.3d 1292, 1322 10 (11th Cir. 2011) (Korman, J., dissenting) (noting that “[a] factual finding of spoliation is 11 necessary only where the district judge seeks to impose a particular sanction beyond 12 submitting the issue to the jury”). Instead, it will be up to the jury to determine whether 13 Bel Air had an obligation to preserve evidence and, if the jury makes such a finding, it 14 will then be entitled to draw an adverse inference against that party. Kronisch, 150 F.3d 15 at 130. 16 Accordingly, Century Indemnity may renew the issue of spoliation in a pre-trial 17 motion and present the issue to the jury for adjudication. See, e.g., Glover v. BIC Corp., 18 6 F.3d 1318, 1332 (9th Cir. 1993) (noting that the district court properly submitted all the 19 evidence to the jury concerning the alleged spoliation of evidence). Cf. Josendis, 20 662 F.3d at 1322 (Korman, J., dissenting) (observing that where there is sufficient 21 probative evidence for a jury to find an act of spoliation, a court may deny a motion for 22 summary judgment and the issue should therefore reach the jury).5 23 24 25 26 27 28 5 Moreover, even if the Court were to find that Bel Air engaged in spoliation when it destroyed the Facility, spoliation sanctions must be narrowly tailored to remedy the prejudice to Defendants. Because discovery has not closed, the Court would be unable to determine the extent of any potential prejudice created by Bel Air’s alleged failure to preserve evidence. See Phillip M. Adams & Assocs., L.L.C. v. Dell, Inc., 621 F. Supp. 2d 1173, 1195 (D. Utah 2009) (noting that “[p]rejudice by loss of evidence must be measured in light of other evidence available. . . . Therefore the degree of prejudice and the appropriate sanction cannot be determined until the close of discovery”); In re Napster, Inc. Copyright Litig., 462 F. Supp. 2d 1060, 1077 (N.D. Cal. 2006) (noting that “[a]t this stage of the proceedings, when the full evidentiary record has not yet been considered by the court, . . . the court cannot determine the extent of prejudice created” by a party’s failure to preserve evidence). 9 1 2 Based on the record before it, the Court denies Century Indemnity’s Motion for spoliation sanctions, ECF No. 205, without prejudice. 3 4 B. 5 Nagler had an ownership interest in the real Property that is the subject of this Nagler’s Motion for Leave to File an Amended Counterclaim 6 litigation from December 1980 to April 1988. In October 1984, Nagler and Bel Air 7 entered into a written lease for the property. Plaintiffs named Nagler as a one of the 8 Defendants in its action for damages and cleanup costs resulting from the 9 contamination. Nagler subsequently filed counterclaims on January 31, 2011, against 10 several parties, including Plaintiffs, asserting causes of action for: (1) Negligence, 11 (2) Declaratory Relief, (3) Equitable Indemnity, and (4) Contribution. See ECF 38. 12 Nagler filed a First Amended Counter Claim on February 2, 2011, that contained the 13 same four claims. See ECF No. 41. On November 4, 2013, Nagler filed a motion for 14 leave to file a Second Amended Counterclaim. See ECF No. 214. 15 The amended counterclaim seeks to add additional theories of recovery under 16 (1) breach of contract, (2) contribution pursuant to CERCLA § 113(f), and (3) Hazardous 17 Substance Statutory Indemnity. See ECF 214-4. Nagler contends that that the breach 18 of contract claim arises from its allegation that Bel Air breached the parties’ lease by 19 letting the property to a polluter—a fact Nagler contends he was unaware of until 20 Plaintiffs filed the Complaint.6 21 /// 22 /// 23 /// 24 /// 25 /// 26 6 27 28 In opposing Nagler’s two motions, Plaintiffs requested that this Court take judicial notice of an “Individual Gift Deed” recorded by the Sacramento County Clerk-Recorder on October 20, 1982. See ECF Nos. 218, 220. The Court did not consider that document and thus Plaintiffs’ requests for judicial notice, ECF Nos. 218, 220, are denied as moot. 10 1 This case was stayed on multiple occasions, notably from October 6, 2011, to 2 January 31, 2012, from June 4, 2012 to October 31, 2012, and from June 5, 2013, until 3 October 31, 2013. See, e.g., ECF No. 198. Nagler filed his motion on November 4, 4 2013, shortly after the third stay was lifted. Discovery in this case is ongoing and does 5 not close until July 25, 2014. See PTSO, ECF No. 202.7 6 1. 7 Amendment under Rule 16(b) Generally, the Court is required to enter a pretrial scheduling order within 120 8 days of the filing of the complaint. Fed. R. Civ. P. 16(b). The scheduling order "controls 9 the subsequent course of the action" unless modified by the Court. Fed. R. Civ. P. 10 16(e). Orders entered before the final pretrial conference may be modified upon a 11 showing of "good cause," Fed. R. Civ. P. 16(b), but orders "following a final pretrial 12 conference shall be modified only to prevent manifest injustice." Fed. R. Civ. P. 16(e); 13 see also Johnson v. Mammoth Recreations, 975 F.2d 604, 608 (9th Cir. 1992). 14 Rule 16(b)'s "good cause" standard primarily considers the diligence of the party 15 seeking the amendment. Johnson, 975 F.2d at 609. The district court may modify the 16 pretrial schedule "if it cannot reasonably be met despite the diligence of the party 17 seeking the extension." Fed. R. Civ. P. 16 advisory committee's notes (1983 18 amendment); id. Moreover, carelessness is not compatible with a finding of diligence 19 and offers no reason for a grant of relief. Johnson, 975 F.2d at 609. Although the 20 existence or degree of prejudice to the party opposing the modification might supply 21 additional reasons to deny a motion, the focus of the inquiry is upon the moving party's 22 reasons for seeking modification. 23 /// 24 25 26 27 28 7 Plaintiffs objected to Nagler’s Reply, ECF No. 227, on the grounds that he included new arguments and new evidence that was not included in his Motion (ECF Nos. 214). See ECF Nos. 234. Plaintiffs asked that the Court strike the new arguments and evidence, or in the alternative, grant leave for Plaintiffs to file a Sur-Reply. Id. On December 12, 2013, on the Court’s own motion, the Court denied Plaintiff’s request to file a Sur-Reply. See Minute Order, ECF No. 241. The Court declines to strike any portion of Nagler’s Reply Brief. Because the Court does not consider the contested new argument in Nagler’s Reply brief (ECF Nos. 227) and the accompanying contested evidence in this Order, the Court declines to address the merits of Plaintiffs’ motions to strike. Thus, Plaintiffs’ second ex parte application, ECF No. 234, is denied as moot. 11 1 Id. (citing Gestetner Corp. v. Case Equip. Co., 108 F.R.D. 138, 141 (D. Me. 1985)). If 2 the moving party was not diligent, the Court’s inquiry should end. Id. 3 This Court’s July 25, 2013 Amended Pretrial Scheduling Order requires that a 4 party seek leave of the Court to amend its pleadings and that good cause be shown 5 before amendments to pleadings are permitted. See ECF No. 202. Therefore, Nagler 6 must meet the Rule 16 standard of good cause and the Rule 15 standard for 7 amendment of pleadings. 8 The focus of the Court’s Rule 16 inquiry is the moving party's reasons for seeking 9 modification. Here, Nagler purports to have delayed in bringing his motion because of 10 the three stays halting the proceedings in this case, delays from mediation proceedings 11 in this case held in October 2012 and October 2013 and the facts required for his 12 amendments came through discovery. Plaintiffs object on the grounds that Nagler has 13 been aware of the facts and theories supporting amendment since the inception of the 14 action. Plaintiffs also contend that the issue of the stay is a red herring because Nagler 15 could have amended his Complaint before and in between the stays. 16 In light of the unique circumstances of this case, specifically the three stays 17 imposed by this Court and the fact that Nagler brought his amended motion to amend 18 days after the third stay was lifted on October 31, 2013, the Court finds that Nagler acted 19 with reasonable diligence in amending his existing Counterclaims for the purposes of 20 Rule 16 and the general strictures of Rule 15 thus apply. 21 22 2. Amendment under Rule 15 The court should freely give leave when justice so requires. Fed. R. Civ. P. 23 15(a)(2). Generally, the five factors of bad faith, undue delay, prejudice to opposing 24 party, futility of amendment and whether plaintiff has previously amended complaint are 25 considered when assessing the propriety of a motion to amend. Ahlmeyer v. Nevada 26 Sys. of Higher Educ., 555 F.3d 1051, 1055 (9th Cir. 2009). Here, Plaintiffs argue that: 27 (1) Nagler unduly delayed in seeking leave to amend, (2) Nagler’s proposed 28 counterclaim for breach of contract would be futile, and (3) Nagler’s proposed 12 1 amendment to add the additional indemnity and contribution claims at this late date 2 would prejudice Plaintiffs. 3 Plaintiffs contend that Nagler delayed in bringing his Motion despite the fact that 4 he knew or should have known of the facts supporting his claim at the very latest when 5 he first appeared in the action. In addition, Plaintiffs assert that Nagler should have 6 sought to amend his counterclaim in the eight months before enactment of the first stay 7 or between the various stays. In his Reply, Nagler admits that “[he] may have known 8 about the facts required for an amended [C]omplaint.” ECF No. 227 at 8. Because 9 Plaintiff admits that he may have known about the relevant facts, this factor weighs 10 against allowing Nagler to amend his Counterclaims. See AmerisourceBergen Corp. v. 11 Dialysist W., Inc., 465 F.3d 946, 953 (9th Cir. 2006). 12 Next, Plaintiffs contend that leave to amend should be denied because Nagler’s 13 proposed counterclaim for breach of contract would be futile because the statute of 14 limitations for contract claims is four years. ECF No. 219 at 11. In addition, Plaintiffs 15 assert that the statute of limitations began to run on the alleged breach for allowing a dry 16 cleaner to operate at the leased remises when the breach first occurred. Id. Both 17 parties agree that the statute of limitations for a breach of written contract is four years. 18 See Cal. Code Civ. Proc. § 337. 19 Nagler argues that the breach of Contract claim is not premised on Plaintiffs 20 merely allowing a dry cleaner to operate on the premises, but is instead predicated on 21 the fact that PCE, HVOC, or VOC were released at the site. Nagler therefore contends 22 that the breach was not the mere letting of the property, but the letting of the property to 23 an alleged polluter. Thus, Nagler asserts that because he was not aware of the 24 contamination until the filing of Plaintiffs’ Complaint, the four-year statute of limitations 25 has not run. See ECF No. 227 at 9. As for Nagler’s claim that Plaintiffs breached the 26 contract for failing to insure Nagler, Nagler similarly argues that no breach was known or 27 discoverable until Nagler was sued. Id. 28 /// 13 1 Although Nagler cites no authority to support his claim that the statute of 2 limitations did not accrue until Plaintiffs’ Complaint was filed, it appears that Nagler may 3 be relying on California’s “Discovery Rule.” See April Enterprises, Inc. v. KTTV, 147 Cal. 4 App. 3d 805, 826-27 (1983) (explaining that “a cause of action under the discovery rule 5 accrues when the plaintiff discovers or should have discovered all facts essential to his 6 cause of action . . . this has been interpreted under the discovery rule to be when plaintiff 7 either (1) actually discovered his injury and its negligent cause or (2) could have 8 discovered injury and cause through the exercise of reasonable diligence”); see also 9 William L. Lyon & Assocs., Inc. v. Superior Court, 204 Cal. App. 4th 1294, 1310 (2012), 10 as modified on denial of reh'g (May 11, 2012), review denied (July 25, 2012) (applying 11 the discovery rule to a breach of contract claim). 12 “The discovery rule itself contains procedural safeguards protecting against 13 lengthy litigation on the issue of accrual. It presumes that a plaintiff has knowledge of 14 injury on the date of injury. In order to rebut the presumption, a plaintiff must plead facts 15 sufficient to convince the trial judge that delayed discovery was justified. And when the 16 case is tried on the merits the plaintiff bears the burden of proof on the discovery issue.” 17 William L. Lyon & Assocs., Inc., 204 Cal. App. 4th at 1310 (emphasis added). Here, 18 Nagler’s proposed breach of contract claim does not plead facts sufficient to convince 19 the Court that delayed discovery was justified. In fact, Nagler’s proposed fifth cause of 20 action for Breach of Contract, ECF No. 214-4 at 11, contains no facts relating to 21 discovery of the breach of contract claim. 22 “[F]utility is analyzed under the same standard of legal sufficiency as a motion to 23 dismiss under Fed. R. Civ. P. 12(b)(6).” SmithKline Beecham Corp. v. Geneva Pharm., 24 Inc., 287 F. Supp. 2d 576, 581 (E.D. Pa. 2002). Thus, “[f]actual allegations must be 25 enough to raise a right to relief above the speculative level.” Bell Atl. Corp. v. Twombly, 26 550 U.S. 544, 555 (2007) (citing 5 Charles Alan Wright & Arthur R. Miller, Federal 27 Practice and Procedure § 1216 (3d ed. 2004) (stating that the pleading must contain 28 something more than “a statement of facts that merely creates a suspicion [of] a legally 14 1 cognizable right of action.”)). Under the pleading standards of Rule 12(b)(6), Nagler’s 2 breach of contract claim fails because it does not state a claim upon which relief can be 3 granted. 4 Nagler’s motion for leave to amend with respect to his contract claim is thus 5 denied without prejudice. Nagler is granted one final opportunity to seek leave to amend 6 the Counterclaim in order to state a legally cognizable cause of action for breach of 7 contract. He may (but is not required to) renew his Motion not later than twenty (20) 8 days following the date this Order is electronically filed. If Nagler does not timely renew 9 his Motion, no further leave to amend this Counterclaim will be permitted. 10 3. 11 12 Prejudice Suffered by Amendment to Add Indemnity and Contribution Claims Finally, Plaintiffs contend that because Nagler already asserted indemnity and 13 contribution counterclaims under state law, his HSAA indemnity and contribution under 14 CERCLA claims cause unnecessary complication and delay. See ECF No 219 at 13. 15 Nagler responds that his proposed new claims for HSAA indemnity and contribution 16 under CERCLA do not prejudice Plaintiffs because co-Defendants Century Indemnity 17 and Arrowood Indemnity have already pled these same claims in this action. See ECF 18 No. 227 at 10. 19 In their Opposition, Plaintiffs admit that Nagler has “already asserted indemnity 20 and contribution counterclaims under state law.” ECF No. 219 at 13. Therefore, it 21 appears that the amendment will not involve a great deal of additional discovery. 22 Because discovery relating to these similar state claims is ongoing, Plaintiffs are not 23 prejudiced by the inclusion of these federal claims. Cf. Bleiler v. Cristwood Contracting 24 Co., Inc., 868 F. Supp. 461, 463 (D. Conn. 1994) aff'd in part, rev'd in part on different 25 grounds sub nom. Bleiler v. Cristwood Const., Inc., 72 F.3d 13 (2d Cir. 1995) 26 (“Permitting a proposed amendment also may be prejudicial if discovery already has 27 been completed, but this concern may be alleviated if the new claim arises from a similar 28 set of operative facts and a similar time as the existing claims.”); Citizens & S. Sec. 15 1 Corp. v. Braten, 733 F. Supp. 655, 660 (S.D.N.Y. 1990) (“Prejudice has been found 2 when proposed amendment contained an unexpected allegation or defense. Prejudice 3 may also occur when the proposed amended pleading is interposed after the completion 4 of discovery, or is based upon a new set of operative facts.”) (internal citations omitted). 5 Thus, the Court grants Nagler leave to amend his Counterclaim with new claims 6 for HSAA indemnity and Contribution under CERCLA, but denies without prejudice his 7 Counterclaim with a breach of contract claim. 8 C. 9 Nagler also seeks leave of this Court to file a third party complaint against eight 10 individuals, the “Wong Individuals,” in their capacity as the general partners of Plaintiff 11 WFI. Nagler seeks to assert six claims that he included in his proposed second 12 amended counterclaim against Plaintiffs: negligence, declaratory relief, equitable 13 indemnity, contribution, hazardous substance statutory indemnity and contribution 14 pursuant to CERCLA, as well as a new claim for breach of guaranty.8 Nagler’s Motion for Leave to File a Third Party Claim 15 As outlined above, this Court’s July 25, 2013, Amended Pretrial Scheduling Order 16 requires a party seek leave of Court and that good cause be shown before amendments 17 to pleadings are permitted. See ECF No. 202. Therefore, Nagler must meet the Rule 16 18 standard of good cause and the Rule 14(a) standard for impleader. 19 Unlike with his above claims, the Court concludes that Nagler was not diligent in 20 bringing his current complaint against these new individuals. While Nagler claims that 21 he was unaware of the facts necessary for these claims, in 2011 Nagler brought several 22 of the same claims based on the same facts against Plaintiffs. Thus, Nagler was not 23 reasonably diligent in delaying for two years in naming eight new parties to the matter. 24 25 26 27 28 8 Plaintiffs also objected to Nagler’s Reply, ECF No. 228, on the grounds that he included new arguments and new evidence that was not included in his Motion (ECF Nos. 215). See ECF Nos. 235. Plaintiffs asked that the Court strike the new arguments and evidence, or in the alternative, grant leave for Plaintiffs to file a Sur-Reply. Id. On December 12, 2013, on the Court’s own motion, the Court denied Plaintiff’s request to file a Sur-Reply. See Minute Order, ECF No. 241. The Court declines to strike any portion of Nagler’s Reply Brief. Because the Court does not consider the contested new argument in Nagler’s Reply brief (ECF Nos. 228) and the accompanying contested evidence in this Order, the Court declines to address the merits of Plaintiffs’ motions to strike. Thus, Plaintiffs’ third ex parte application, ECF Nos. 235, is denied as moot. 16 1 Nagler could have, at the very least, brought the negligence, declaratory relief, equitable 2 indemnity and contribution claims against these eight third-party defendants when he 3 brought his initial and amended Counterclaims, yet he neglected to do so and fails to 4 adequately explain why he could not do so. “Late amendments to assert new theories 5 are not reviewed favorably when the facts and the theory have been known to the party 6 seeking amendment since the inception of the cause of action.” Royal Ins. Co. of Am. v. 7 Sw. Marine, 194 F.3d 1009, 1016-17 (9th Cir. 1999) (internal citations omitted); see In re 8 W. States Wholesale Natural Gas Antitrust Litig., 715 F.3d 716, 737 (9th Cir. 2013) 9 (upholding a district court’s finding that a party was not diligent in seeking to amend their 10 complaint because “[t]he good cause standard typically will not be met where the party 11 seeking to modify the scheduling order has been aware of the facts and theories 12 supporting amendment since the inception of the action”) (emphasis added). The Court 13 therefore denies Nagler’s motion for leave to file a third-party claim, ECF No. 215. 14 Moreover, even if Nagler had established good cause to modify the pretrial 15 scheduling order for leave to file a third-party claim, Nagler’s Motion would still fail, 16 because he has not shown that his amendment meets the requirements of Rule 14. 17 Rule 14 permits parties to bring a lawsuit against, or "implead," a third party who is not 18 already a party to the lawsuit in order to transfer liability being asserted against it in the 19 underlying lawsuit. Specifically, Rule 14 provides that “at any time after commencement 20 of the action, a defending party, as a third-party plaintiff, may cause a summons and 21 complaint to be served upon a person not a party to the action who is or may be liable to 22 the third-party plaintiff for all or part of the plaintiff's claim against the third-party plaintiff." 23 Fed. R. Civ. P. 14(a). Rule 14 is to be construed liberally in favor of allowing impleader. 24 Lehman v. Revolution Portfolio L.L.C., 166 F.3d 389, 393 (1st Cir. 1999). However, the 25 District Court has broad discretion in determining the propriety of a third-party claim 26 under Rule 14. See Sw. Admin., Inc. v. Rozay's Transfer, 791 F.2d 769, 777 (9th Cir. 27 1986). The Court is to consider all relevant factors of each individual case including 28 whether the delay in seeking leave was excusable and whether the delay would 17 1 prejudice a party. In addition, the Court does not abuse its discretion by denying an 2 application that will disadvantage an existing action. Id. 3 Here, Nagler’s third-party complaint would unnecessarily complicate and delay 4 discovery in this matter. Plaintiffs contend that “Nagler’s proposed third-party complaint 5 expands the issues in the current litigation by, among other things, raising partnership 6 issues, potentially complicated breach of contract and guaranty issues, and issues 7 relating to the viability of claims against additional deceased individuals, all of which are 8 not currently part of the litigation.” ECF No. 217 at 10. Plaintiffs concerns are well 9 taken. 10 “If bringing in the third party will introduce unrelated issues and unduly complicate 11 the original suit, impleader may be denied. Moreover, a lack of similarity between the 12 issues and evidence required to prove the main and third-party claims may be sufficient 13 to warrant the dismissal of an impleaded party.” Dishong v. Peabody Corp., 219 F.R.D. 14 382, 385 (E.D. Va. 2003) (internal citations omitted); see United States Fid. & Guar. Co. 15 v. Perkins, 388 F.2d 771, 773 (10th Cir.1968) (“If impleading a third party defendant 16 would require the trial of issues not involved in the controversy between the original 17 parties without serving any convenience, there is no good reason to permit the third- 18 party complaint to be filed.”). Although most of Nagler’s claims against the third-party 19 defendants, the general partners of Plaintiff WFI, are similar to those alleged against 20 Plaintiffs in Nagler’s amended Counterclaim, Nagler’s third-party complaint raises 21 several new issues and adds eight new individual parties to this matter. Nagler now 22 asserts that the Third Party Defendants are liable as either general partners or as 23 guarantors. By raising new partnership issues, guaranty issues and claims against 24 deceased individuals, Nagler seeks to broaden this litigation and unnecessarily 25 complicate the trial and discovery. Unlike Nagler’s motion for leave to amend his 26 existing Counterclaims—where discovery has been ongoing on the same and 27 substantially similar issues with the existing parties—Nagler here seeks to bring in new 28 parties and new issues. Further, no discovery has been conducted on these new issues 18 1 with respect to these new parties. Although Rule 14 is to be construed liberally in favor 2 of allowing impleader, Nagler fails to satisfy this standard. See Sw. Admin., Inc., 3 791 F.2d at 777. 4 Thus, the Court denies Nagler’s Motion for Leave to File a Third-Party Claim (ECF 5 No. 215) without prejudice. Again, Nagler will be permitted twenty (20) days from the 6 date this Order is electronically filed in which to renew his Motion. Should he fail to do 7 so, no further leave to add these parties will be permitted. 8 9 CONCLUSION 10 11 For the reasons set forth above, IT IS HEREBY ORDERED THAT: 12 1. 13 14 Century Indemnity’s Motion for Sanctions, ECF No. 205, is DENIED in its entirety without prejudice. 2. Nagler’s Motion for Leave to File a Second Amended Counterclaim, ECF 15 No. 214, is GRANTED in part and DENIED in part without prejudice as 16 explained in this Order. 17 3. 18 19 20 21 22 Nagler’s Motion for Leave to File Third-Party Complaint, ECF No. 215, is DENIED without prejudice. 4. Century Indemnity’s Motion to Strike Plaintiff Bel Air Mart's Opposition, ECF No. 231, is DENIED. IT IS SO ORDERED. Dated: February 21, 2014 23 24 25 26 27 28 19

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?