UNITED STATES DISTRICT COURT
EASTERN DISTRICT OF CALIFORNIA
10
11
12
CALIFORNIA SPORTFISHING PROTECTION
ALLIANCE, a California non-profit corporation,
CONSENT DECREE
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Civil Case No. 2:14-CV-01255-KJM-CKD
Plaintiff,
vs.
SYAR INDUSTRIES, INC., a California
corporation; SYAR CONCRETE, LLC, a California
limited liability company;
Defendants.
1
CONSENT DECREE
2
The following Consent Decree is entered into by and between Plaintiff California Sportfishing
3
Protection Alliance (“Plaintiff” or “CSPA”), and Defendants Syar Concrete, LLC and Syar Industries,
4
Inc. (“Defendants”). The entities entering into this Consent Decree are each an individual “Settling
5
Party” and collectively the “Settling Parties.”
6
WHEREAS, CSPA is a non-profit public benefit corporation dedicated to the preservation,
7
protection, and restoration of the environment, the wildlife, and the natural resources of all waters of
8
California, including the foothill and valley floor streams such as Markham Ravine, the Sacramento
9
River, the American River, and the Sacramento-San Joaquin River Delta;
10
11
12
13
14
WHEREAS, Defendants are the owners and/or operators of the readymix concrete batch plant
facility located at 960 Gladding Road, Lincoln, California 95648 (“Syar Facility” or “Facility”);
WHEREAS, Plaintiff contends that Defendants discharge polluted storm water into Markham
Ravine, which flows to the Sacramento River;
WHEREAS, Plaintiff contends that discharges from the Facility are regulated by the National
15
Pollutant Discharge Elimination System (“NPDES”) General Permit NO CAS000001 [State Water
16
Resources Control Board] Water Quality Order No. 92-12-DWQ, as amended by Order No. 97-03-
17
DWQ (“Storm Water Permit”) and the Federal Water Pollution Control Act, 33 U.S.C. §§ 1251 et seq.
18
(“Clean Water Act” or “CWA”);
19
WHEREAS, on March 21, 2014, Plaintiff served Defendants, the United States Environmental
20
Protection Agency (“EPA”), EPA Region IX, the State Water Resources Control Board (“State Board”)
21
and the Regional Water Quality Control Board (“Regional Board”) with a notice of intent to file suit
22
(“Notice Letter”) under Sections 505(a) and (b) of the CWA, 33 U.S.C. § 1365(a) and (b). The Notice
23
Letter alleged violations of Sections 301(a) and 402 of the Clean Water Act, 33 U.S.C. §§ 1311(a) and
24
1342, and violations of the Storm Water Permit;
25
WHEREAS, on May 21, 2014, Plaintiff filed a complaint against Defendants, in the United
26
States District Court, Eastern District of California (Case No. 2:14-CV-01255-KJM-CDK) alleging
27
ongoing violations of the CWA (hereinafter “Complaint”);
28
WHEREAS, Defendants denies all allegations in the Notice Letter and Complaint;
2
1
WHEREAS, Plaintiff and Defendants have agreed that it is in the Settling Parties’ mutual
2
interest to enter into a Consent Decree setting forth terms and conditions appropriate to resolving the
3
allegations set forth in the Complaint without further proceedings and without any admission of liability
4
on the part of the Defendants;
5
6
WHEREAS, all actions taken by Defendants pursuant to this Consent Decree shall be made in
compliance with all applicable Federal and State laws and local rules and regulations.
NOW THEREFORE IT IS HEREBY STIPULATED BETWEEN THE SETTLING
PARTIES AND ORDERED AND DECREED BY THE COURT AS FOLLOWS:
7
8
9
10
1.
The Court has jurisdiction over the subject matter of this action pursuant to Section
505(a)(1)(A) of the Clean Water Act, 33 U.S.C. § 1365(a)(1)(A).
11
2.
Venue is appropriate in the Eastern District pursuant to Section 505(c)(1) of the Clean
12
Water Act, 33 U.S.C. § 1365(c)(1), because the Facility at which the alleged violations took place is
13
located within this District.
14
15
3.
The Complaint states claims upon which relief may be granted pursuant to Section 505 of
the Clean Water Act, 33 U.S.C. § 1365.
16
4.
Plaintiff has standing to bring this action.
17
5.
The Court shall retain jurisdiction over this matter for purposes of enforcing the terms of
18
this Consent Decree for the life of the Consent Decree, or as long thereafter as is necessary for the Court
19
to resolve any pending motion to enforce this Consent Decree.
20
I.
21
AGENCY REVIEW AND TERM OF CONSENT DECREE.
6.
Plaintiff shall submit this Consent Decree to the United States Department of Justice and
22
the United States Environmental Protection Agency (collectively “Federal Agencies”) within three (3)
23
days of the final signature of the Settling Parties for agency review consistent with 40 C.F.R. § 135.5. In
24
the event that the Federal Agencies object to entry of this Consent Decree, the Settling Parties agree to
25
meet and confer within a reasonable amount of time to attempt to resolve the issue(s) raised by the
26
Federal Agencies.
27
28
7.
The term “Effective Date” as used in this Consent Decree shall mean the last day for the
Federal Agencies to comment on the Consent Decree, i.e., the forty-fifth (45th) day following the
3
1
Federal Agencies’ receipt of the Consent Decree, or the date on which the Federal Agencies provide
2
notice that they require no further review, whichever occurs earlier.
3
8.
This Consent Decree will terminate two (2) years from the Effective Date, unless there is
4
an ongoing, unresolved dispute regarding Defendants’ compliance with this Consent Decree, in which
5
case the Consent Decree will terminate upon final resolution of the dispute.
6
II.
7
A.
8
9
COMMITMENTS OF THE SETTLING PARTIES.
Storm Water Pollution Control Best Management Practices.
9.
It is the express purpose of the Parties entering into this Consent Decree to further the
objectives set forth in the Clean Water Act and to resolve those issues alleged by CSPA in its
10
Complaint. In light of these objectives and as set forth fully below, Defendants agree, inter alia, to
11
comply with the provisions of this Consent Decree, the requirements of the Storm Water Permit, and all
12
applicable provisions of the CWA.
13
10.
In addition to maintaining the current structural and non-structural Best Management
14
Practices (“BMPs”) described in the Facility’s current Storm Water Pollution Prevention Plan
15
(“SWPPP”), Defendants shall (1) develop and implement BMPs identified herein, and (2) develop and
16
implement additional BMPs necessary to comply with the provisions of this Consent Decree and the
17
Storm Water Permit, including but not limited to those that achieve the Best Available Technology
18
Economically Achievable (“BAT”) and the Best Conventional Treatment Technology (“BCT”).
19
Defendant shall revise the Facility’s SWPPP to incorporate those BMPs.
20
21
a. Containment of Material to Sand and Gravel Storage Areas. Defendants shall ensure
all sand and gravel storage areas are maintained to prevent migration of materials from the storage areas.
22
b. Cleaning and Maintaining Conveyor Infrastructure. Within thirty (30) days prior to
23
the start of the 2014-2015 storm water season, Defendants shall clean the conveyor by brushing
24
accumulated aggregate, sand, dust, and other accumulated materials from areas accessible from the
25
existing access walkway on the conveyor and accessible portions of all conveyor support structures.
26
Defendants shall thereafter perform similar cleaning within thirty (30) days prior to the start of each
27
storm water season.
28
/////
4
1
c. Filtering Discharges from Western Facility Boundary. Prior to October 1, 2014,
2
Defendants shall install a system for collecting and filtering all storm water discharged from the western
3
boundary of the Facility. Defendants may install a system similar to that used to collect and filter storm
4
water that is subsequently discharged from the northeast of the Facility via a culvert to Markham
5
Ravine. Defendants shall ensure no sheet flow from the western portion of the Facility leaves the site.
6
d. Sweeping Impervious Surfaces. Within thirty (30) days of the Effective Date,
7
Defendants shall implement a plan that ensures all impervious areas of the Facility are swept with a
8
regenerative sweeper weekly (during each and every week the Facility is open any day), as well as
9
within twenty-four (24) hours of any day predicted to receive precipitation of greater than 0.1 inches and
10
on which the Facility is scheduled to operate, provided the Facility is in operation that previous day. In
11
the event the Facility is going to be closed more than five (5) consecutive days during the Wet Season,
12
Defendants shall sweep on the last day the Facility is open.
13
e. Preventing Pollutant Track-Off. Within thirty (30) days of the Effective Date,
14
Defendants shall require each concrete delivery truck, including tires, to be washed at the process water
15
area before exiting the Facility to minimize the tracking of pollutants from the Facility to Gladding
16
Road.
17
B.
18
19
SWPPP Revisions.
11.
Within thirty (30) days of the Effective Date, Defendants shall revise the Facility’s
SWPPP to include:
20
a. All current BMPs developed and implemented at the Facility;
21
b. All BMPs and storm water treatment requirements identified and developed pursuant to
22
this Consent Decree;
23
c. Specific identification of all individuals responsible for compliance with the Storm Water
24
Permit and this Consent Decree, including specifying which individual(s) is/are responsible for each
25
area of compliance (e.g., John Doe, collecting samples);
26
d. A detailed site map that includes at a minimum all information required by the Storm
27
Water Permit;
28
/////
5
1
2
e. A description of each industrial activity, all potential pollutant sources, and each potential
pollutant associated with each industrial activity and/or pollutant source; and
3
4
f. Provisions that address all the requirements of the Storm Water Permit and this Consent
Decree.
5
C.
6
Storm Water Sampling and Monitoring and Reporting Plan Revisions.
12.
Sampling. During the life of this Consent Decree, Defendants shall collect storm water
7
samples from each location storm water is discharged from the Facility from at least four (4) “qualifying
8
rain events” per Wet Season. The Facility’s storm water discharge locations shall be identified on the
9
Facility site map which shall be included in the SWPPP and Monitoring and Reporting (“M&RP”). All
10
sampling shall be conducted as described in subparagraphs a. through i. below.
11
12
a.
A “qualifying rain event” is one where: (1) a discharge occurs during operating hours,
and (2) there was no storm water discharge for three (3) days prior to the rain event.
13
b.
If, prior to March 1, Defendants has been unable to collect samples from four (4)
14
qualifying storm events, Defendants shall satisfy the sampling requirements of this Consent Decree by
15
sampling discharges occurring during normal operating hours and without regard to the Storm Water
16
Permit requirements that the sample be collected during the first hour of storm water discharge or that
17
the storm water discharge be preceded by three (3) working days without storm water discharge.
18
19
c.
d.
pursuant to this Consent Decree.
22
23
A laboratory accredited by the State of California shall analyze all samples collected
Table 1.1
20
21
Defendants shall analyze each storm water sample for the contaminants set forth in
e.
The laboratory shall use analytical methods adequate to detect the individual
contaminants at or below the values specified in Table 1.
24
f.
All samples collected from the Facility shall be delivered to the laboratory as
25
necessary to ensure that sample “hold time” is not exceeded for each contaminant listed in Table 1.
26
/////
27
1
28
Defendants may discontinue sampling for mercury if two consecutive samples contain mercury at
levels below the Table 1 level.
6
1
2
g.
days of laboratory receipt of the sample, or as soon as possible without incurring “rush” charges.
3
4
Defendants shall request that sample analysis results be reported to it within ten (10)
h.
Defendants shall request that all sample results for metals be reported by the
laboratory in total concentrations.
5
i.
Defendants shall provide CSPA with the complete laboratory results, including a copy
6
of the Quality Assurance/Quality Control and the laboratory report for all samples collected at the
7
Facility, within five (5) days of receiving the results.
8
9
13.
Monitoring & Reporting Plan (“M&RP”) Revisions. Within thirty (30) days of the
Effective Date, Defendants shall revise the Facility’s M&RP to include:
10
a. The sampling requirements set forth in this Consent Decree;
11
b. Specific identification of all individuals responsible for implementing the storm water
12
sampling and monitoring requirements of the Storm Water Permit and this Consent Decree, including
13
specifying which individual is responsible for each area of compliance (e.g., John Doe, collecting
14
samples); and
15
16
17
18
19
20
c. Provisions that address all the requirements of the Storm Water Permit and this Consent
Decree.
D.
Total Nitrogen Source Identification and Control
14.
Defendants shall develop and implement a plan to control the discharge of total nitrogen
from the Facility as follows:
a. Within thirty (30) days of the Effective Date, Defendants shall prepare a work plan for
21
identifying the source of total nitrogen in Defendants’ storm water discharges (“Total Nitrogen Source
22
Identification Work Plan”). The Total Nitrogen Source Identification Work Plan shall include a
23
schedule for identifying the source of total nitrogen in Defendants’ discharges over the course of the
24
2014-2015 wet season. Defendants shall submit the Total Nitrogen Source Identification Work Plan to
25
CSPA for review and comment. CSPA shall review the Total Nitrogen Source Identification Work Plan
26
and provide any comments within ten (10) days of receipt. Within ten (10) days of receipt of comments
27
from CSPA, Defendants shall incorporate CSPA’s comments into the Total Nitrogen Source
28
Identification Work Plan, or shall justify in writing why any comment is not incorporated. Any disputes
7
1
over the adequacy of the Total Nitrogen Source Identification Work Plan shall be resolved pursuant to
2
the dispute resolution provisions of this Consent Decree, set out in Section III below.
3
b. By October 1, 2015, Defendants shall implement a plan to control total nitrogen in their
4
discharges from the Facility (“Total Nitrogen Control Plan”). The Total Nitrogen Control Plan shall
5
include source control measures and/or treatment technologies that are designed to ensure that
6
discharges form the Facility do not contain total nitrogen concentrations in excess of those set forth
7
below in Table 1. By June 30, 2015, Defendants shall submit the draft Total Nitrogen Control Plan to
8
CSPA for review and comment. CSPA shall review the draft Total Nitrogen Control Plan and provide
9
any comments within thirty (30) days of receipt. Within thirty (30) days of receipt of comments from
10
CSPA, Defendants shall incorporate CSPA’s comments into the Total Nitrogen Control Plan, or shall
11
justify in writing why any comment is not incorporated. Any disputes over the adequacy of the Total
12
Nitrogen Control Plan shall be resolved pursuant to the dispute resolution provisions of this Consent
13
Decree, set out in Section III below.
14
E.
15
16
15.
Contaminant Reduction. Discharges shall not contain levels of pollutants above the limits
set forth below in Table 1.
17
Table 1. Numeric Values for Facility Discharges
18
Contaminant
19
Value
Total Suspended Solids
Total Recoverable Copper2
Oil and Grease
Total Recoverable Aluminum
Total Recoverable Iron
Total Recoverable Mercury
Chemical Oxygen Demand
pH
N+N
20
21
22
23
24
25
Reduction of Pollutants in Discharges.
100 mg/L
0.0123 mg/L
15 mg/L
0.750 mg/L
1.0 mg/L
0.0014 mg/L
120 mg/L
6.5-8.5 units
0.68 mg/L
Source of Value
2008 EPA Benchmark
2008 EPA Benchmark
2008 EPA Benchmark
2008 EPA Benchmark
2008 EPA Benchmark
2008 EPA Benchmark
2008 EPA Benchmark
Basin Plan
2008 EPA Benchmark
/////
26
27
28
2
Defendants may adjust the benchmark value for copper using the methods provided for in Appendix J
to the EPA 2008 MSG Permit, in which case the adjusted hardness value shall replace the value
currently provided in Table 1.
8
1
16.
Action Plan for Table 1 Exceedances. If the result(s) from any sampling event(s)
2
conducted during a Wet Season3 reveals any contaminant at a concentration above the numeric values
3
specified in Table 1, Defendants shall submit a plan to Plaintiff for reducing the level of the
4
contaminant(s) to Table 1 levels (“Action Plan”). An Action Plan shall be submitted by June 1 following
5
the Wet Season during which the numeric value exceedance(s) occurs.
6
17.
Action Plan Requirements. Each Action Plan submitted shall include at a minimum: (1)
7
the identification of the contaminant(s) discharged in excess of the numeric value(s); (2) an assessment
8
of the source of each contaminant discharged in excess of the numeric value(s); (3) the identification of
9
additional BMPs, including improved treatment of storm water prior to discharge from the Facility, that
10
will reduce pollutant concentrations; and (4) time schedules for implementation of the proposed BMPs.
11
The time schedule(s) for implementation shall ensure that all BMPs are implemented as soon as possible
12
but at least by the beginning of the upcoming Wet Season (i.e., by October 1) unless the Settling Parties
13
agree on a later date based on the time needed to design, procure, and install the necessary equipment.
14
Any disputes over the deadline for implementation of additional BMPs identified in an Action Plan shall
15
be resolved pursuant to the dispute resolution provisions of this Consent Decree set out in Section III
16
below.
17
18.
Action Plan Review. CSPA shall have thirty (30) days from receipt of Defendants’
18
Action Plan to provide Defendants with comments on the Action Plan. Within fifteen (15) days of
19
Defendants’ receipt of CSPA’s comments on the Action Plan, Defendants shall consider CSPA’s
20
comments and shall either incorporate them into the Action Plan or, if Defendants declines to accept one
21
or more of CSPA’s comments, provide CSPA with a written explanation of the grounds for rejection.
22
Disputes regarding the adequacy of a particular BMP shall not impact the schedule for implementing
23
any other BMP set forth in the Action Plan. Any disputes as to the adequacy of the Action Plan shall be
24
resolved pursuant to the dispute resolution provisions of this Consent Decree set out in Section III
25
below.
26
/////
27
28
3
The Wet Season is October 1 – May 30.
9
1
19.
Defendants shall contact Plaintiff to request an extension of any deadline set forth in this
2
Consent Decree, if necessary, to implement any structural BMPs requiring agency approval. Plaintiff’s
3
consent to Defendants’ requested extension shall not be unreasonably withheld.
4
20.
Defendants shall revise its SWPPP and/or M&RP as applicable within thirty (30) days of
5
receipt of Plaintiff’s comments to reflect the changes to the Action Plan. Defendants shall notify CSPA
6
in writing when the Action Plan has been completely implemented, and the SWPPP and/or M&RP has
7
been revised.
8
F.
Visual Observations.
9
21.
All visual observations shall be conducted in accordance with the terms of the Storm
10
Water Permit and this Consent Decree. During the life of this Consent Decree, Defendants shall conduct
11
visual observations at each point where storm water is discharged during each qualifying rain event.
12
Defendants shall maintain logs of the visual observations, which shall be included in Defendants’
13
Annual Reports submitted to the Regional Board, and within ten (10) days of Plaintiff’s written request.
14
15
G.
22.
Employee Training.
Within sixty (60) days of the Effective Date, Defendants shall conduct additional
16
employee training in order to familiarize employees at the Facility with the requirements of the Storm
17
Water Permit and this Consent Decree. The training program shall include use of written training
18
materials needed for effective implementation of the training program. Defendants shall also ensure that
19
there are a sufficient number of employees assigned to implement the BMPs and conduct other
20
compliance activities required by the Storm Water Permit and this Consent Decree, and that these
21
employees are properly trained to perform the required activities.
22
23
23.
The training program shall require at least the following:
a.
Non-Storm Water Discharge Training. Defendants shall train employees on the Storm
24
Water Permit’s prohibition of non-storm water discharges, so that employees know what non-storm
25
water discharges are, which can result from improper practices that may produce non-storm water
26
discharges at the Facility, and how to detect and prevent them.
27
28
b.
BMP Training. Defendants shall train employees on BMP implementation and
maintenance to ensure that BMPs are implemented effectively to prevent or minimize the exposure of
10
1
pollutants to storm water, to prevent or minimize the discharge of contaminated storm water, and to
2
ensure the proper treatment of storm water at the Facility.
3
c.
Sampling Training. Defendants shall designate an adequate number of employees to
4
ensure the collection of storm water samples from each discharge location as required by this Consent
5
Decree and/or the Storm Water Permit. The training shall include the proper sampling protocols,
6
including chain of custody requirements, to ensure storm water samples are properly collected, stored,
7
and submitted to a certified laboratory.
8
9
d.
Visual Observation Training. Defendants shall provide training to all individuals
performing visual observations at the Facility pursuant to this Consent Decree and/or the Storm Water
10
Permit, including when visual observations are required, the different types of visual observations
11
required, and instruction on proper record keeping under the Storm Water Permit.
12
24.
Training shall be provided on an annual basis, or as otherwise required to ensure
13
compliance with the terms of this Consent Decree, by a private consultant or a representative of
14
Defendants who is familiar with the requirements of this Consent Decree and the Storm Water Permit.
15
The training shall be repeated as necessary to ensure that employees are familiar with the requirements
16
of this Consent Decree, the Storm Water Permit, and the Facility’s SWPPP and M&RP, as appropriate
17
to the particular employee’s job descriptions. Any new employee who is responsible for implementation
18
of any portion of the SWPPP, the M&RP, or compliance with other terms of the Storm Water Permit or
19
Consent Decree shall receive training within ten (10) days after being hired, or before being responsible
20
for compliance with the terms of the Storm Water Permit or Consent Decree.
21
25.
Defendants shall maintain training records to document compliance with Section II.G of
22
this Consent Decree, and shall make these records available for Plaintiff’s review at the Facility. The
23
Training Program shall be specified in the SWPPP and Defendants shall modify the SWPPP as
24
necessary to reflect the training program required by this Consent Decree.
25
26
H.
26.
Storm Water Pollution Prevention Plan and Monitoring and Reporting Plan Revisions.
Ongoing Duty to Revise SWPPP and M&RP. Defendants shall revise the SWPPP and
27
M&RP if there are any changes in the Facility’s operations that may possibly affect the quality of storm
28
water discharges at the Facility, including but not limited to changes to storm water discharge point(s) or
11
1
changes or additions to the BMPs at the Facility resulting from an Action Plan. Defendants shall submit
2
any revised SWPPP and M&RP to CSPA for review and comment within five (5) days of completion.
3
CSPA shall provide comments, if any, to Defendants within thirty (30) days of receipt of any revised
4
SWPPP and M&RP. Within thirty (30) days of receiving comments from CSPA, Defendants shall
5
incorporate CSPA’s comments into any revised SWPPP and M&RP or shall justify in writing why any
6
comment is not incorporated. Any disputes as to the adequacy of the SWPPP and M&RP shall be
7
resolved pursuant to the dispute resolution provisions of this Consent Decree, set out in Section III
8
below.
9
I.
10
Commenting on the SWPPP and M&RP Revisions.
27. Defendants shall submit the revised SWPPP and M&RP required by paragraphs Sections II.B
11
and II.C above to CSPA for review and comment as soon as they are completed. CSPA shall provide
12
comments, if any, to Defendants within thirty (30) days of receipt of the revised SWPPP and M&RP.
13
Within thirty (30) days of receipt of comments from CSPA, Defendants shall incorporate CSPA’s
14
comments into the SWPPP and M&RP, or shall justify in writing why any comment is not incorporated.
15
Any disputes over the adequacy of the revised SWPPP and M&RP shall be resolved pursuant to the
16
dispute resolution provisions of this Consent Decree, set out in Section III below.
17
18
J.
Compliance Monitoring and Reporting.
28.
Site Inspections. Plaintiff and its representatives may conduct three (3) site inspections at
19
the Facility during the life of this Consent Decree, plus an additional inspection if there is a dispute
20
regarding compliance with the terms of this Consent Decree. The site inspections shall occur during
21
normal business hours, and Plaintiff shall provide Defendants with three (3) days notice of an intended
22
inspection. If an inspection is noticed during the Wet Season, CSPA will continue to follow the weather
23
forecast, and will confirm the inspection at least twenty-four (24) hours prior to the start of the
24
inspection in an effort to ensure CSPA is present during a rain event producing a discharge during the
25
inspection.
26
29.
During the site inspection, Plaintiff and/or its representatives shall be allowed access to
27
the Facility’s SWPPP, M&RP, and other monitoring records, reports, and sampling data for the Facility.
28
In addition, during the site inspection, Plaintiff and/or its representatives may collect samples of
12
1
discharges from the Facility. If Plaintiff and/or its representatives collect samples, Syar shall be given an
2
opportunity to collect a sample at the same location immediately following (or prior to) Plaintiff.
3
Results of sampling must be exchanged. Any samples collected by either party shall be submitted to a
4
certified California laboratory for analysis in accordance with the provisions of Section II.C of this
5
Consent Decree. Copies of the complete laboratory reports shall be provided to the other party within
6
five (5) business days of receipt.
7
30.
Compliance Monitoring and Oversight. Defendants shall pay ten thousand ($10,000.00)
8
to fund Plaintiff’s costs of monitoring and overseeing Defendants’ compliance with this Consent Decree
9
(including review of the plans identified in paragraph 14 and, if any, the plans identified in paragraphs
10
16 and 17). Payment shall be made within sixty (60) days after the Effective Date. Defendants’ check
11
shall be made payable to: “Lawyers for Clean Water Attorney Client Trust Account” and shall be
12
delivered by certified mail or overnight delivery to: Lawyers for Clean Water, Inc., 1004-A O’Reilly
13
Avenue, San Francisco, California 94129. Any unexpended funds remaining at the termination of this
14
Consent Decree shall be refunded to Defendants within ten (10) business days after the date of
15
termination.
16
31.
Reporting and Documents. During the life of this Consent Decree, Defendants shall copy
17
Plaintiff on all documents related to storm water quality at the Facility that are submitted to the Regional
18
Board, the State Board, and/or any State or local agency or municipality. Such reports and documents
19
shall be provided to Plaintiff within five (5) days of submission to the agencies and/or municipalities.
20
Any correspondence related to Defendants’ compliance with the Storm Water Permit or storm water
21
quality received by Defendants from any regulatory agency, State or local agency, county or
22
municipality shall be provided to CSPA within five (5) calendar days of receipt by Defendants.
23
24
K.
32.
Environmental Project, Litigation Fees and Costs, and Stipulated Penalties.
Environmental Mitigation Project. To remediate environmental harms as alleged in the
25
Complaint, Defendants shall pay Thirty Thousand Dollars ($30,000.00) to be used to fund
26
environmental project activities that will benefit the Sacramento-San Joaquin River Delta and its
27
watershed (“the Mitigation Payment”). The Mitigation Payment shall be paid to the Rose Foundation for
28
Communities and the Environment, and mailed via certified mail or overnight delivery to: 6008 College
13
1
Avenue, Suite 10, Oakland, California 94618, Attention: Tim Little. The Mitigation Payment shall be
2
made within ninety (90) days of the Effective Date, and Defendants shall concurrently provide Plaintiff
3
with a copy of such payment. No funds from such payment shall be used for investigation of, or
4
litigation or advocacy against, Syar or any of its affiliates.
5
33.
CSPA’s Fees and Costs. Defendants shall partially reimburse CSPA for its investigation
6
fees and costs, expert/consultant fees and costs, reasonable attorneys’ fees, and other costs incurred as a
7
result of investigating and preparing this lawsuit and negotiating a resolution of this matter, in an
8
amount totaling Forty Seven Thousand Dollars ($47,000.00). Such payment shall be made within thirty
9
(30) days of the Effective Date, payable to: “Lawyers for Clean Water Attorney Client Trust Account”
10
and delivered by certified mail or overnight delivery to: Lawyers for Clean Water, Inc., 1004-A O’Reilly
11
Avenue, San Francisco, California 94129.
12
34.
Interest Payments. In the event of late payment of any of the sums due under this Consent
13
Decree, the Defendants shall pay ten percent (10%) APR interest to Plaintiff, which shall accrue from
14
the first day past the date the payment was due until the date Defendants tenders payment. All such
15
payments shall be made payable to: “Lawyers for Clean Water Attorney Client Trust Account” and
16
delivered by certified mail or overnight delivery to: Lawyers for Clean Water, Inc., 1004-A O’Reilly
17
Avenue, San Francisco, California 94129.
18
III.
19
DISPUTE RESOLUTION.
35.
This Court shall retain jurisdiction over this matter until the Consent Decree terminates in
20
accordance with Paragraph 8 for the purposes of implementing and enforcing the terms and conditions
21
of this Consent Decree, and adjudicating all disputes among the Settling Parties that may arise under the
22
provisions of this Consent Decree. The Court shall have the power to enforce this Consent Decree with
23
all available legal and equitable remedies, including contempt.
24
36.
Meet and Confer. A party to this Consent Decree shall invoke the dispute resolution
25
procedures of this Section by notifying all other Settling Parties in writing of the matter(s) in dispute.
26
The Settling Parties shall then meet and confer in good faith (either telephonically or in person) in an
27
attempt to resolve the dispute informally over a period of twenty (20) calendar days from the date of the
28
notice.
14
1
37.
If the Settling Parties cannot resolve a dispute by the end of informal meet and confer
2
negotiations, the party initiating the dispute resolution provision may invoke formal dispute resolution
3
by filing a motion before the United States District Court for the Eastern District of California. The
4
Settling Parties agree not to object to an expedited hearing schedule on the motion if requested by one of
5
the Settling Parties.
6
38.
Burden of Proof. In the event of any disagreement or dispute between Plaintiff and
7
Defendants over the necessity or appropriateness of implementing any particular BMP or set of BMPs,
8
including in any formal or informal proceeding brought to enforce the terms of this Consent Decree,
9
Defendants shall bear the burden of demonstrating that its BMPs, collectively, constitute BAT/BCT for
10
the Facility, or that they are in compliance with the terms of this Consent Decree. Plaintiff shall not be
11
required to prove that Defendants’ BMPs do not constitute BAT/BCT.
12
39.
Litigation costs and fees incurred in conducting meet and confer or otherwise addressing
13
and/or resolving any dispute, including an alleged breach of this Consent Decree, shall be awarded in
14
accord with the standard established by Sections 505 and 309 of the Clean Water Act, 33 U.S.C. §§
15
1365 and 1319, and case law interpreting those provisions.
16
IV.
17
MUTUAL RELEASE OF LIABILITY.
40.
CSPA’s Release. Upon the Effective Date of this Consent Decree, CSPA, on its own
18
behalf and on behalf of its current and former officers, directors, employees, subsidiaries, and affiliates,
19
and each of their successors and assigns, and its agents, attorneys, and other representatives releases all
20
persons including, without limitation, Defendants and each of its current and former officers, directors,
21
members, employees, shareholders and each of their predecessors, successors and assigns, and each of
22
their agents, attorneys, consultants, and other representatives from, and waives all claims which arise
23
from or pertain to, this action, including all claims for injunctive relief, damages, penalties, fines,
24
sanctions, mitigation, fees (including fees of attorneys, experts, and others), costs, expenses or any other
25
sum incurred or claimed, and/or claims that were asserted in CSPA’s Complaint up to the Effective
26
Date.
27
28
41.
Defendants’ Release. Upon the Effective Date of this Consent Decree, Defendants, on its
own behalf and on behalf of its current and former officers, directors, employees, members, and each of
15
1
their successors and assigns, and its agents, attorneys, and other representatives releases CSPA (and its
2
current and former officers, directors, employees, members, parents, subsidiaries, and affiliates, and
3
each of their successors and assigns, and its agents, attorneys, and other representatives) from, and
4
waives all claims which arise from or pertain to this action, including all claims for fees (including fees
5
of attorneys, experts, and others), costs, expenses, or any other sum incurred or claimed or which could
6
have been claimed for matters associated with or related to CSPA’s Complaint up to the Effective Date.
7
42.
Nothing in this Consent Decree limits or otherwise affects CSPA’s right to address or
8
take any position that it deems necessary or appropriate in any formal or informal proceeding before the
9
Regional Board, EPA, or any other judicial or administrative body on any other matter relating to storm
10
water discharges from the Facility occurring or arising after the Effective Date of the Consent Decree,
11
but specifically excluding the discharges and all other matters addressed by this Consent Decree.
12
V.
13
MISCELLANEOUS PROVISIONS.
43.
No Admission of Liability. Neither this Consent Decree, the implementation of additional
14
BMPs, nor any payment pursuant to the Consent Decree shall constitute or be construed as a finding,
15
adjudication, admission, or acknowledgment of any fact, law, or liability, nor shall it be construed as an
16
admission of violation of any law, rule, or regulation. Defendants maintains and reserves all defenses it
17
may have to any alleged violations that may be raised in the future.
18
44.
Force Majeure. Force Majeure includes any act of God, war, fire, earthquake, or natural
19
catastrophe; civil disturbance, or terrorism; restraint by court order or public authority or agency; or
20
action or non-action by, or inability to obtain the necessary authorizations or approvals from, any
21
governmental agency. Force Majeure shall not include normal inclement weather, economic hardship, or
22
inability to pay. Any party seeking to rely upon this paragraph to excuse or postpone performance shall
23
have the burden of establishing that it could not reasonably have been expected to avoid the force
24
majeure event and that, by exercise of due diligence, it has been unable to overcome the failure of
25
performance. The Settling Parties shall exercise due diligence to resolve and remove any force majeure
26
event.
27
/////
28
/////
16
1
45.
Construction. The language in all parts of this Consent Decree shall be construed
2
according to its plain and ordinary meaning, except as to those terms defined in the Storm Water Permit,
3
the Clean Water Act, or specifically herein.
4
46.
Choice of Law. The laws of the United States shall govern this Consent Decree.
5
47.
Severability. In the event that any provision, paragraph, section, or sentence of this
6
Consent Decree is held by a court to be unenforceable, the validity of the enforceable provisions shall
7
not be adversely affected.
8
9
10
11
12
13
14
48.
Correspondence. All notices required herein or any other correspondence pertaining to
this Consent Decree shall be sent by overnight mail, or via electronic mail, with email confirmation of
receipt by the receiving party, to the following individuals:
If to Plaintiff:
Drevet Hunt
drev@lawyersforcleanwater.com
Lawyers for Clean Water, Inc.
1004-A O’Reilly Avenue
San Francisco, California 94129
California Sportfishing Protection Alliance
Bill Jennings, Executive Director
Deltakeep@me.com
3536 Rainier Avenue
Stockton, California 95204
15
16
17
18
19
20
21
If to Defendants:
Toby Goyette
Environmental Manager
Syar Industries, Inc.
2301 Napa-Vallejo Highway
P.O. Box 2540
Napa, CA 94558
tgoyette@syar.com
22
With copies to:
23
Michael D. Corrigan
Assistant General Counsel
Syar Industries, Inc.
2301 Napa-Vallejo Highway
P.O. Box 2540
Napa, CA 94558
mcorrigan@syar.com
Chris Carr
Morrison & Foerster LLP
425 Market Street
San Francisco, CA 94105-2482
ccarr@mofo.com
24
25
26
Any change of address or addresses shall be communicated in the manner described above for
27
giving notices. In addition, the Settling Parties may agree to transmit documents electronically or by
28
facsimile.
17
1
49.
Effect of Consent Decree. Except as provided herein, Plaintiff does not, by its consent to
2
this Consent Decree, warrant or aver in any manner that Defendants’ compliance with this Consent
3
Decree will constitute or result in compliance with any Federal or State law or regulation. Nothing in
4
this Consent Decree shall be construed to affect or limit in any way the obligation of Defendants to
5
comply with all Federal, State, and local laws and regulations governing any activity required by this
6
Consent Decree.
7
50.
Counterparts. This Consent Decree may be executed in any number of counterparts, all of
8
which together shall constitute one original document. Telecopy, email of a .pdf signature, and/or
9
facsimile copies of original signature shall be deemed to be originally executed counterparts of this
10
Consent Decree.
11
51.
Modification of the Consent Decree. This Consent Decree, and any provisions herein,
12
may not be changed, waived, discharged, or terminated unless by a written instrument, signed by the
13
Settling Parties.
14
52.
Full Settlement. This Consent Decree constitutes a full and final settlement of this matter.
15
53.
Integration Clause. This is an integrated Consent Decree. This Consent Decree is
16
intended to be a full and complete statement of the terms of the agreement between the Settling Parties
17
and expressly supersedes any and all prior oral or written agreements covenants, representations, and
18
warranties (express or implied) concerning the subject matter of this Consent Decree.
19
54.
Authority. The undersigned representatives for Plaintiff and Defendants each certify that
20
he/she is fully authorized by the party whom he/she represents to enter into the terms and conditions of
21
this Consent Decree.
22
55.
The provisions of this Consent Decree apply to and bind the Settling Parties, including
23
any successors or assigns. The Settling Parties certify that their undersigned representatives are fully
24
authorized to enter into this Consent Decree, to execute it on behalf of the Settling Parties, and to legally
25
bind the Settling Parties to its terms.
26
56.
The Settling Parties agree to be bound by this Consent Decree and not to contest its
27
validity in any subsequent proceeding to implement or enforce its terms. By entering into this Consent
28
/////
18
1
Decree, the Defendants does not admit liability for any purpose as to any allegation or matter arising out
2
of this Action.
3
4
5
IN WITNESS WHEREOF, the undersigned have executed this Consent Decree as of the date first
set forth above.
Having considered the foregoing, and also having reviewed the letter from the U.S. Department of
6
Justice filed on November 14, 2014, IT IS SO ORDERED:
7
Date: February 9, 2015.
8
9
UNITED STATES DISTRICT JUDGE
10
11
12
13
14
15
16
17