Innovative Construction Solutions-Norcal v. CH2M Hill Constructors, Inc., et al.,

Filing 37

MEMORANDUM and ORDER signed by Chief Judge Morrison C. England, Jr on 11/18/14 ORDERING for all the foregoing reasons, Defendants' Motion to Dismiss 23 is granted in part and denied in part. Defendant Berkley Regional Insurance Company� 39;s request that the Seventh Cause of Action, for unfair insurance practices, be dismissed is conceded by Plaintiff and is therefore GRANTED. Defendant CH2M Hill's request, however, that the Third and Sixth Causes of Action against it be dismissed for failure to state a viable claim, is DENIED. (Becknal, R)

Download PDF
1 2 3 4 5 6 7 8 UNITED STATES DISTRICT COURT 9 EASTERN DISTRICT OF CALIFORNIA 10 11 12 13 THE UNITED STATES OF AMERICA for the use and benefit of INNOVATIVE CONSTRUCTION SOLUTIONSNORCAL, a California corporation, MEMORANDUM AND ORDER Plaintiff, 14 v. 15 16 17 18 19 No. 2:14-cv-01376-MCE-KJN CH2M HILL CONSTRUCTORS, INC., a Delaware corporation; BERKLEY REGIONAL INSURANCE COMPANY, a Delaware corporation; BERKLEY SURETY GROUP, LLC, a Delaware corporation; and DOES 1 through 10, inclusive, Defendants. 20 21 Through the present action, Plaintiff Innovative Construction Solutions-Norcal 22 23 (“Plaintiff”) seeks money owed pursuant to a subcontract with Defendant CH2M Hill 24 Constructors, Inc. (“CH2M Hill). The work in question was performed on a federal 25 project located at McClellan Air Force Base in Sacramento, California. CH2M Hill now 26 moves to dismiss the Third, Sixth, and Seventh Causes of Action contained in Plaintiff’s 27 Complaint for failure to state a viable cause of action pursuant to Federal Rule of Civil 28 /// 1 1 Procedure 12(b)(6). For the reasons set forth below, that Motion will be GRANTED in 2 part and DENIED in part.1 3 4 BACKGROUND 5 6 In April 2011, CH2M Hill entered into an agreement with the United States, by and 7 through the Department of the Air Force, to serve as the general contractor for a project 8 designed to remediate radioactive contaminated soils at McClellan. Compl., ¶ 10. Two 9 separate task orders, encompassing two different locations, were entered into between 10 the United States and CH2M Hill for this purpose in April and December of 2011, 11 respectively. Id. at 12-13. CH2M Hill thereafter issued, on March 28, 2012, a Request 12 for Proposal (“RFP”) with respect to necessary work at both sites. Id. at 15. That RFP 13 provided detailed technical information about each site, including square footage, total 14 excavation depth, the volume of excavation necessary, and the amount of backfill 15 needed. 16 Based on the March 28, 2012 RFP, CH2M Hill and Plaintiff entered into both a 17 Subcontract and a subsequent Change Order (collectively referred to as “Subcontract”), 18 under the terms of which Plaintiff agreed to furnish labor, materials, equipment and 19 supervision necessary for the removal of contaminants at both sites. The Subcontract 20 specified how prices would be determined if additional work had to be performed. 21 Adjustments would be made on the basis of “reasonable expenditures and savings” 22 attributable to any unanticipated change. Cost factors to be considered in determining 23 such adjustment included, among other things, overhead and profit numbers, labor 24 costs, and costs of materials, supplies and equipment. Id. at 22. 25 In the course of performing necessary work on the two sites subject to 26 remediation, Plaintiff had to undertake a large amount of work due to site conditions 27 1 28 Because oral argument was not deemed of material assistance, the Court ordered this matter submitted on the briefs. E.D. Cal. Local R. 230(g). 2 1 differing from those specified in the RFP, other changes, and attendant delays that could 2 not, according to Plaintiff, have been reasonably anticipated. Id. at 23. This drove up 3 the price of Plaintiff’s services substantially, and, despite the provisions in the 4 Subcontract specifying how additional costs were to be calculated, Plaintiff alleges that 5 CH2M Hill has refused to pay Plaintiff for a substantial portion of its services. Id. at 213, 6 221. According to Plaintiff, those amounts included some $245,618.16 under the 7 agreed-upon terms of the Subcontract, and in excess of $3,000,000.00 when additional 8 costs were included. Id. at 202. Plaintiff’s Complaint specifically asserts that it has been 9 paid only $4,295,592.10 of at least $7,445,856.37 owed by CH2M Hill. Id. at 213. 10 In addition to the failure to pay itself, Plaintiff further asserts that CH2M Hill 11 employed “slow-play” tactics in processing its invoices through the course of the project, 12 “allowing them to sit in its office for weeks, if not months, before even acknowledging 13 that they had been submitted.” Id. at 244. Plaintiff alleges that this unfairly caused it to 14 carry debt with its own vendors and suppliers, and further alleges that CH2M Hill’s 15 conduct in this regard has “severely hurt” Plaintiff’s business. As a result, according to 16 Plaintiff, it has been forced to rely upon “un-preferred vendors/suppliers” and has been 17 paying higher interest rates. Id. 18 CH2M Hill, for its part, denies breaching any part of the Subcontract (Mot., p. 6, 19 n.1). Consequently, in addition to a breach of contract claim asserting a failure to abide 20 by the express terms of the Subcontract (as set forth in the Second Cause of Action), 21 Plaintiff also, by way of its Third Cause of Action, alleges a claim for breach of the 22 implied covenant, arguing that CH2M Hill had an “implicit obligation” to make 23 adjustments to the Subcontract price based on the amorphous “reasonable 24 expenditures” provision contained in the Subcontract as mentioned above. Id. at 226. 25 Moreover, in its Sixth Cause of Action, Plaintiff further alleges that CH2M Hill violated 26 California Business and Professions Code section 17200 by including unlawful “pay if 27 paid” provisions in the Subcontract, whereby CH2M Hill purported to condition its 28 /// 3 1 obligation to pay under the Subcontract to payments it obtained, as the general 2 contractor, from the government. Id. at 243. 3 In now moving to strike portions of the Complaint, CH2M alleges that because 4 Plaintiff’s claim for breach of the implied covenant of good faith and fair dealing is 5 duplicative of Plaintiff’s claim for express contractual breach, any separate claim for an 6 implied breach cannot stand. Moreover, in attacking the Sixth Cause of Action, for unfair 7 and unlawful business practices in violation of California Business and Professions Code 8 section 17200, et seq., CH2M Hill argues that because Plaintiff has successfully pled 9 nothing more than a simple breach of contract, she cannot successfully assert an unfair 10 business practices claim. Plaintiff opposes the premise of Plaintiff’s argument as to both 11 the Third and Sixth claims. 12 Plaintiff’s Seventh and final cause of action alleges a claim for unfair insurance 13 practices against Defendant Berkley Regional Insurance Company, the insurer who 14 acted as CH2M Hill’s surety and delivered a payment bond on this federal project as 15 required by the Miller Act, 40 U.S.C. § 3131, et seq. Berkley Regional moves to dismiss 16 the Seventh Cause of Action on grounds that the statutory predicate for that claim, 17 California Insurance Code section 790.03, does not confer a private right of action 18 against insurers. Plaintiff’s Opposition, however, specifies that it agrees to dismiss that 19 claim. Consequently, this Memorandum and Order need not further address the 20 Seventh Cause of Action.2 21 22 STANDARD 23 24 On a motion to dismiss for failure to state a claim under Federal Rule of Civil 25 Procedure 12(b)(6), all allegations of material fact must be accepted as true and 26 construed in the light most favorable to the nonmoving party. Cahill v. Liberty Mut. Ins. 27 28 2 It should also be noted that Plaintiff initially sued another Defendant, Berkley Surety Group, LLC, as well. On August 13, 2014, however, Plaintiff filed a Notice of Voluntary Dismissal as to that Defendant. ECF No. 28. 4 1 Co., 80 F.3d 336, 337-38 (9th Cir. 1996). Rule 8(a)(2) requires only “a short and plain 2 statement of the claim showing that the pleader is entitled to relief” in order to “give the 3 defendant fair notice of what the . . . claim is and the grounds upon which it rests.” Bell 4 Atl. Corp. v. Twombly, 550 U.S. 544, 555 (2007) (quoting Conley v. Gibson, 355 U.S. 41, 5 47 (1957)). A complaint attacked by a Rule 12(b)(6) motion to dismiss does not require 6 detailed factual allegations. However, “a plaintiff’s obligation to provide the grounds of 7 his entitlement to relief requires more than labels and conclusions, and a formulaic 8 recitation of the elements of a cause of action will not do.” Id. (internal citations and 9 quotations omitted). A court is not required to accept as true a “legal conclusion 10 couched as a factual allegation.” Ashcroft v. Iqbal, 129 S. Ct. 1937, 1950 (2009) 11 (quoting Twombly, 550 U.S. at 555). “Factual allegations must be enough to raise a right 12 to relief above the speculative level.” Twombly, 550 U.S. at 555 (citing 5 Charles Alan 13 Wright & Arthur R. Miller, Federal Practice and Procedure § 1216 (3d ed. 2004) (stating 14 that the pleading must contain something more than “a statement of facts that merely 15 creates a suspicion [of] a legally cognizable right of action.”)). 16 Furthermore, “Rule 8(a)(2) . . . requires a showing, rather than a blanket 17 assertion, of entitlement to relief.” Twombly, 550 U.S. at 556 n.3 (internal citations and 18 quotations omitted). Thus, “[w]ithout some factual allegation in the complaint, it is hard 19 to see how a claimant could satisfy the requirements of providing not only ‘fair notice’ of 20 the nature of the claim, but also ‘grounds’ on which the claim rests.” Id. (citing 5 Charles 21 Alan Wright & Arthur R. Miller, supra, at § 1202). A pleading must contain “only enough 22 facts to state a claim to relief that is plausible on its face.” Id. at 570. If the “plaintiffs . . . 23 have not nudged their claims across the line from conceivable to plausible, their 24 complaint must be dismissed.” Id. However, “[a] well-pleaded complaint may proceed 25 even if it strikes a savvy judge that actual proof of those facts is improbable, and ‘that a 26 recovery is very remote and unlikely.’” Id. at 556 (quoting Scheuer v. Rhodes, 416 U.S. 27 232, 236 (1974)). 28 /// 5 1 A court granting a motion to dismiss a complaint must then decide whether to 2 grant leave to amend. Leave to amend should be “freely given” where there is no 3 “undue delay, bad faith or dilatory motive on the part of the movant, . . . undue prejudice 4 to the opposing party by virtue of allowance of the amendment, [or] futility of the 5 amendment . . . .” Foman v. Davis, 371 U.S. 178, 182 (1962); Eminence Capital, LLC v. 6 Aspeon, Inc., 316 F.3d 1048, 1052 (9th Cir. 2003) (listing the Foman factors as those to 7 be considered when deciding whether to grant leave to amend). Not all of these factors 8 merit equal weight. Rather, “the consideration of prejudice to the opposing party . . . 9 carries the greatest weight.” Id. (citing DCD Programs, Ltd. v. Leighton, 833 F.2d 183, 10 185 (9th Cir. 1987)). Dismissal without leave to amend is proper only if it is clear that 11 “the complaint could not be saved by any amendment.” Intri-Plex Techs. v. Crest Group, 12 Inc., 499 F.3d 1048, 1056 (9th Cir. 2007) (citing In re Daou Sys., Inc., 411 F.3d 1006, 13 1013 (9th Cir. 2005); Ascon Props., Inc. v. Mobil Oil Co., 866 F.2d 1149, 1160 (9th Cir. 14 1989) (“Leave need not be granted where the amendment of the complaint . . . 15 constitutes an exercise in futility . . . .”)). 16 17 ANALYSIS 18 19 A. Breach of the Implied Covenant 20 “Every contract imposes on each party a duty of good faith and fair dealing in 21 each performance and its enforcement.” Diaz v. Federal Express Corp., 373 F. Supp. 2d 22 1034, 1066 (C.D. Cal. 2005). CH2M Hill nonetheless argues that no breach of an 23 implied covenant claim lies where the claimed breaches lie squarely within the express 24 terms of the contract. See Guz v. Bechtel Nat., Inc., 24 Cal. 4th 317, 352 (2000) (”a 25 claim that merely realleges [a contractual] breach as a violation of the covenant is 26 superfluous.”); see also Bionghi v. Metropolitan Water Dist. of Southern California, 27 70 Cal. App. 4th 1358, 1370 (1999) (affirming dismissal of breach of an implied covenant 28 claim on grounds that “the cause of action for breach of the implied covenant is 6 1 duplicative of the cause of action for breach of contract, and may be disregarded.”); 2 Careau & Cal. v. Security Pac. Bus. Credit, Inc., 222 Cal. App. 3d 1371, 1395 (1990) (“If 3 the allegations do not go beyond the statement of a mere contract breach and, relying 4 on the same alleged facts, simply seek the same damages or other relief already 5 claimed in a companion contract cause of action, they may be disregarded as 6 superfluous as no additional claim is actually stated.”). 7 Applying this authority to the present case, CH2M Hill argues that because the 8 Complaint alleges no facts suggesting anything other than a straight breach of contract, 9 any implied covenant claim necessarily fails. As Plaintiff points out, however, Federal 10 Rule of Civil Procedure 8(d)(2) permits claims to be pled alternatively. Regardless, 11 examination of the Complaint belies CH2M Hill’s contention. Plaintiff’s breach of 12 contract claim identifies express provisions of the Subcontract and alleges that CH2M 13 Hill has failed to abide by those provisions. Compl., ¶ 219, 221. In setting forth its 14 breach of the covenant claim, however, Plaintiff points to “an implicit obligation to make 15 adjustments to the Subcontract price based on reasonable expenditures…” Id. at 226.3 16 Plaintiff, then, argues that CH2M Hill’s obligations were both express and implied, and its 17 claim for an alternative implied breach claim is hardly surprising given the Subcontract’s 18 use of a “reasonable expenditures and savings” benchmark for determining price 19 adjustments. That term, while included in the express terms of the Subcontract, by its 20 definition implicates equitable considerations going beyond the purview of a 21 straightforward contractual breach. In addition, Plaintiff alleges that some $245,618.16 22 was withheld despite the agreed upon terms of the Subcontract (thereby suggesting 23 simple breach of contract) despite the fact that overall at least $3,150,264.27 in costs 24 that should have been reimbursed were not paid. See id. at 202, 207. Again, this 25 suggests different measures of damages that could fall within both express and implied 26 classifications. 27 3 28 As indicated above, pleading the express and implied claims alternatively is especially critical given CH2M Hill’s denial that it breached the express terms of the Subcontract in any way. 7 1 Significantly, too, examination of the Complaint as a whole reveals factual 2 allegations that CH2M Hill has used “slow pay” tactics in processing Plaintiff’s invoices, 3 allowing them to sit for weeks, if not months, and resulting in damage to Plaintiff’s 4 business reputation and supplier relationships. Id. at 244. Although these particular 5 factual allegations are included within the allegations made in support of Plaintiff’s 6 related claim for unfair business practices under California Business and Professions 7 Code section 17200, et seq. (as discussed below), they appear to apply with equal force 8 to Plaintiff’s cause of action for breach of the implied covenant of good faith and fair 9 dealing. See, e.g., Guz v. Bechtel Nat’l, Inc., 24 Cal. 4th at 349 (implied covenant 10 protects one contracting party from unfairly frustrating the other party’s right to receive 11 the benefits of the agreement). The fact that the “slow play” allegations are not 12 specifically within the factual averments pertaining to the implied covenant is not 13 dispositive, since all reasonable inferences from the facts alleged must be drawn in 14 Plaintiff’s favor in determining whether the complaint states a valid claim. See Braden v. 15 Wal-Mart Stores, Inc., 588 F.3d 585, 595 (8th Cir. 2009). 16 Moreover, and in any event, as Plaintiff correctly points out, whether or not a 17 breach of the implied covenant is duplicative of a contract is more appropriately 18 addressed at summary judgment as opposed to the more liberal pleading standard 19 applicable to the present motion to dismissal. See Hause v. The Salvation Army, 2007 20 WL 4219450 at *9 (C. D. Cal. 2007); (evaluation of the nature of a plaintiff’s factual 21 allegations, and how evidence might bear on such claims as the case progresses, 22 cannot be made in the early stages of litigation before discovery has commenced, with 23 such arguments more properly raised on summary judgment). For all these reasons 24 CH2M’s Hill Motion to Dismiss, insofar as it pertains to Plaintiff’s Third Cause of Action, 25 for breach of the implied covenant of good faith and fair dealing, fails. 26 B. Unfair/Unlawful Business Practices 27 In attacking Plaintiff’s Sixth Cause of Action, for unfair and unlawful business 28 practices in violation of California Business and Professions Code section 17200, 8 1 et seq., CH2M Hill first argues that section 17200 should be narrowly defined to conduct 2 that harms or threatens competition. Then, presupposing the Court’s acceptance of its 3 argument against the viability of the implied covenant claim (which the Court has in fact 4 rejected as set forth above), CH2M contends that a straight breach of contract claim 5 cannot suffice as the legal predicate for a section 17200 cause of action. Third and 6 finally, Plaintiff also contends that Plaintiff has not identified any legally cognizable basis 7 for granting relief on its section 17200 claim in any event. Under the circumstances 8 present here, CH2M Hill’s arguments fail. 9 Turning initially to CH2M Hill’s narrow interpretation of the scope of the statute, 10 California courts interpreting section 17200 have held that the statute “is not confined to 11 anticompetitive business practices, but is also directed toward the public’s right to 12 protection from fraud, deceit and unlawful conduct.” Hewlett v. Squaw Valley Ski Corp. 13 54 Cal. App. 4th 499, 519 (1997). Therefore, contrary to CH2M Hill’s assertion herein, 14 “California courts have consistently interpreted the language of section 17200 broadly.” 15 Id. If a business practice violates any law it may also violate section 17200 and be 16 redressable under that section. See People v. E.W.A.P., Inc.,106 Cal. App. 3d 315, 319 17 (1980). 18 Second, as already discussed above, in finding that a breach of the implied 19 covenant claim has been adequately pled on the basis of allegations going beyond 20 simple breach of contract, the Court has already recognized that Plaintiff has taken the 21 allegations here beyond any garden-variety breach of contract. CH2M Hill consequently 22 cannot attack the viability of Plaintiff’s claim under that rationale. 23 Additionally, while CH2M Hill may be correct that a breach of contract in and of 24 itself may not run afoul of section 17200, section 17200’s proscription against “unlawful” 25 practices may include an unlawful provision in a contract. See, e.g., People v. McKale, 26 25 Cal.3d 626, 635 (1975) (requiring consumers to agree to rules and regulations which 27 one “is prohibited by law from enforcing” can constitute an unfair business practice). 28 Here, paragraph 243 of Plaintiff’s Complaint specifically avers that “by including ‘pay if 9 1 paid’ provisions in the Subcontract, CH2M violated well-established California public 2 policy against such provisions in construction contracts.” To the extent the Subcontract 3 does include “pay if paid” clauses as Plaintiff alleges, the provisions do not comport with 4 the law. See U.S. for Use and Benefit of Walton Tech, Inc. v. Westar Eng. Inc., 290 F.3d 5 1199, 1202, 1208 (9th Cir. 2002) (where subcontract provided that the subcontractor 6 would only be paid when and if the general contractor was paid by the government, such 7 provision constituted an unenforceable “pay if paid” clause); Wm. R. Clarke Corp. v. 8 Safeco Ins. Co., 15 Cal. 4th 882, 886 (1997); (under California law, here receipt of funds 9 by contractor is deemed a condition precedent to contractor’s obligation to pay, such 10 provisions are “contrary to the public policy of this state and [are] therefore 11 unenforceable”). Plaintiff can therefore state a cognizable section 17200 claim on that 12 basis. 13 Finally, with regard to available remedies for unfair and unlawful competition in 14 violation of section 17200, CH2M Hill admits that injunctive relief may be sought under 15 California Business and Professions Code section 17203. The prayer to Plaintiff’s 16 Complaint specifically requests an injunction with respect to its claim for violation of 17 section 17200. Pl.’s Compl., 42:12. CH2M Hill nonetheless argues that the Complaint is 18 devoid of any facts from which such injunctive relief can be fashioned. Plaintiff 19 maintains, however, that it seeks “an injunction ordering CH2M to no longer rely on 20 [unenforceable ‘pay-if-paid’ provisions] as a basis for withholding payments from it, or 21 any other subcontractors, suppliers, or materialmen going forward.” Pl.’s Opp’n, 13:10- 22 13. Such relief is permitted under California law. See Barquis v. Merchants Collection 23 Ass’n, 7 Cal. 3d 94, 111 (1972) (recognizing that the Legislature “intended. . . to permit 24 courts to enjoin ongoing wrongful business conduct in whatever context such activity 25 might occur”). Consequently, at least at the pleadings stage, Plaintiff has requested 26 relief available under section 17200. 27 /// 28 /// 10 1 CONCLUSION 2 3 In sum, for all the foregoing reasons, Defendants’ Motion to Dismiss (ECF No. 23) 4 is granted in part and denied in part. Defendant Berkley Regional Insurance Company’s 5 request that the Seventh Cause of Action, for unfair insurance practices, be dismissed is 6 conceded by Plaintiff and is therefore GRANTED. Defendant CH2M Hill’s request, 7 however, that the Third and Sixth Causes of Action against it be dismissed for failure to 8 state a viable claim, is DENIED. 9 IT IS SO ORDERED. 10 Dated: November 18, 2014 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 11

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?