Global Commodities Trading Group, Inc. et al v. Beneficio De Arroz Choloma, S.A. et al
Filing
168
ORDER and FINDINGS and RECOMMENDATIONS signed by Magistrate Judge Carolyn K. Delaney on 5/6/22 ORDERING that plaintiffs serve an electronic copy of this order and findings and recommendations on defendants forthwith to their last known ema il addresses, and thereafter plaintiffs shall file a notice of such service within 10 days. RECOMMENDING that Plaintiffs' motion for default judgment 164 be granted as set forth herein. Judgment be entered in plaintiffs' favor and against Bachosa and Reyes on counts one and two, against Reyes and Dox on count three, and against Bachosa on count four. Default judgment be entered against defendants in the amount of $13,661,790.29 USD, plus interest of $1 ,797.47 per day from January 18, 2022, through entry of judgment, with postjudgment interest at the statutory rate of 28 U.S.C. § 1961. F&R referred to District Judge Troy L. Nunley. Objections to F&R due within thirty (30) days. (Kaminski, H)
1
2
3
4
5
6
7
8
UNITED STATES DISTRICT COURT
9
FOR THE EASTERN DISTRICT OF CALIFORNIA
10
11
12
GLOBAL COMMODITIES TRADING
GROUP, INC., et al. ,
Plaintiffs,
13
14
15
v.
BENEFICIO DE ARROZ CHOLOMA,
S.A., et al.,
16
No. 2:16-cv-1045-TLN-CKD
FINDINGS AND RECOMMENDATIONS
AND ORDER
(ECF No. 164)
Defendants.
17
18
Plaintiffs, Global Commodities Trading Group, Inc. (“Global”) and The Insurance
19
Company of the State of Pennsylvania, Philadelphia (“Insurance Company”), move the court for
20
default judgment against defendants Beneficio de Arroz Choloma, S.A. (“Bachosa”), Sady Farid
21
Andonie Reyes (“Reyes”), and Joyce Mary Jarufe Dox (“Dox”). (ECF No. 164.) This action
22
arises from an alleged breach of contract for the shipment of rice and corn from the United States
23
to Honduras. Plaintiffs allege Bachosa breached the terms of an agreement for repayment, after
24
which Bachosa and Reyes failed to pay amounts due on a subsequent promissory note guaranteed
25
by Reyes and Dox. By this motion, plaintiffs seek a default judgment against defendants in the
26
amount of $13,661,790.29, plus interest of $1,797.47 per day from January 18, 2022, through
27
entry of and following judgment.
28
////
1
1
Defendants have appeared in this action but have not answered the complaint and have not
2
opposed the motion for default judgment. For the reasons that follow, the undersigned
3
recommends the court grant the motion as it pertains to the breach of contract claims in counts
4
one and two against Bachosa and in count three against Reyes and Dox. The undersigned also
5
recommends the court grant the motion as it pertains to the alternative common count pleaded
6
against Bachosa in count four, as set forth herein. 1
I. BACKGROUND
7
8
A. Procedural Background
9
Plaintiffs initiated this action in the California Superior Court, County of Placer, on
10
September 25, 2014. Defendants removed the action on May 17, 2016. (ECF No. 1.)
11
On August 17, 2017, the court granted defendants’ motion to dismiss for lack of personal
12
jurisdiction and denied as moot the defendants’ motion to dismiss for forum non conveniens and
13
other pending motions. (ECF No. 108.) Following plaintiffs appeal, on September 17, 2020, the
14
Ninth Circuit reversed the order of dismissal and remanded with instructions to deny the forum
15
non conveniens motion on the merits. (ECF Nos. 128, 130.)
16
On September 24, 2020, plaintiffs moved to amend the complaint. (ECF No. 131.)
17
On October 16, 2020, defendants’ counsel moved to withdraw as counsel, stating
18
defendants had violated their retainer agreement by failing to make timely payment of attorney
19
fees and costs. (ECF No. 135.)
20
On October 26, 2020, plaintiffs requested the entry of default. (ECF No. 141.) The Clerk
21
of the Court declined to enter default at that time due to a pending motion to amend the
22
complaint. (ECF No. 147.) Plaintiffs withdrew that motion on November 3, 2020. (ECF No. 148.)
23
On November 6, 2020, pursuant to the Ninth Circuit’s mandate, the court denied defendants’
24
motion to dismiss. (ECF No. 153.)
25
/////
26
1
27
28
Plaintiffs no longer seek default judgment against Reyes and Dox on count four. (See ECF No.
167 at 2 (“Plaintiffs stipulate to dismiss their fourth claim for relief as to Defendants Reyes and
Dox, without prejudice.”)).
2
1
On June 25, 2021, the court granted the motion to withdraw by defendants’ counsel,
2
leaving defendants pro se. 2 (ECF No. 157.) The court ordered defendants to file a status report or
3
retain new counsel within 30 days and to answer to the complaint within 90 days. (Id.) On
4
September 2, 2021, no communication from defendants having been received, the court ordered
5
defendants to file a status report or substitution of counsel within 60 days and indicated the court
6
would entertain a motion for default judgment if defendants failed to timely comply with the
7
order. (ECF No. 158.)
8
9
Defendants’ former counsel provided defendants’ contact information in a status report
filed on October 14, 2021. (ECF No. 159.) The status report stated former counsel were informed
10
and believed Bachosa was in the process of acquiring legal counsel but might not have the
11
resources to do so. (Id. at 2.)
Pursuant to plaintiffs’ further request, the Clerk of the Court entered a default on January
12
13
11, 2022. (ECF No. 163.) The present motion for default judgment was filed on January 25, 2022.
14
(ECF No. 164.) Plaintiffs served the motion for default judgment to defendants by electronic
15
transmission to the email addresses provided by defendants’ former counsel. (ECF No. 164-4 at
16
2.) Plaintiffs filed a supplemental brief pertaining to the motion for default judgment on April 5,
17
2022. (ECF No. 167.) Defendants have not filed an answer, opposed the motion for default
18
judgment, or otherwise responded to the court’s order of September 2, 2021.
19
B. Factual Background
20
Plaintiffs are two California corporations. (ECF No. 1-2 at ¶¶ 1-2.) Defendant Bachosa is
21
alleged to be a company duly organized under the laws of the Country of Honduras. (Id. at ¶ 3.)
22
Defendants Reyes and Dox are alleged to be individuals residing in Honduras, and Reyes is
23
alleged to be a principal, owner and officer of Bachosa. (Id.)
24
Under the allegations in the complaint, plaintiffs and Bachosa entered into two separate
25
contracts on December 17, 2011, providing for the sale and delivery of approximately 14,500
26
metric tons of U.S. No. 2 or better long grain rough rice (the “rice contract”) and approximately
27
28
2
As the court noted then, pursuant to Local Rule 183(a), defendant Bachosa, a corporation, may
not appear pro se.
3
1
5,000 metric tons of U.S. No. 2 or better white corn (the “corn contract”). (ECF No. 1-2 at ¶ 6.)
2
When the corn and rice arrived at the Honduran port, Bachosa’s importation permits were invalid,
3
causing delay and additional demurrage charges. (Id. at ¶ 12.) Payment was due under the Rice
4
Contract and the Corn Contract no later than August 30, 2021, but Bachosa did not pay. (Id.)
5
Global and Bachosa agreed to additional terms for repayment as memorialized in an
6
October of 2021 Act of Understanding (the “Memorandum”). (ECF No. 1-2 at ¶ 14.) The
7
Memorandum acknowledged Bachosa owed $7,073,648 for the goods and $644,897.92 for the
8
demurrage charges. (Id.) The Memorandum provided an additional 180 days for Bachosa to pay
9
the amounts owed. (Id.)
10
Contemporaneously with the execution of the Memorandum, Bachosa and Reyes executed
11
a promissory note in favor of Global for an amount of $11,000,000 (the “Note”) providing for
12
payment of Bachosa’s obligations with accruing interest. (ECF No. 1-2 at 15.) The Note
13
contained a personal guarantee of the debt signed by Reyes and Dox (the “Guaranty”), which
14
became due immediately upon the failure of Bachosa to pay the Note. (Id. at 16.)
15
Plaintiff alleges all defendants have defaulted on their payment obligations under the
16
Memorandum, the Note, and the Guaranty. (ECF No. 1-2 at ¶ 18.) Although interest payments of
17
an irregular nature have been made, the last payment was made in August of 2014. (Id.)
18
The holder of Global’s policy of insurance (“Insurance Company”) paid Global
19
$4,968,750 related to the Bachosa transactions. (ECF No. 1-2 at ¶ 17.) Global assigned to
20
Insurance Company the claim for the amount paid plus expenses and collection. (Id.)
21
22
II. LEGAL STANDARDS
Pursuant to Federal Rule of Civil Procedure 55, default may be entered against a party for
23
affirmative relief if that party fails to plead or otherwise defend against the action. See Fed. R.
24
Civ. P. 55(a). The decision to grant or deny an application for default judgment lies within the
25
sound discretion of the district court. Aldabe v. Aldabe, 616 F.2d 1089, 1092 (9th Cir. 1980).
26
Once default is entered, as a general rule, well-pleaded factual allegations in the operative
27
complaint are taken as true except for the allegations relating to damages. TeleVideo Sys., Inc. v.
28
Heidenthal, 826 F.2d 915, 917-18 (9th Cir. 1987) (per curiam) (citing Geddes v. United Fin.
4
1
Group, 559 F.2d 557, 560 (9th Cir. 1977) (per curiam)); accord Fair Housing of Marin v. Combs,
2
285 F.3d 899, 906 (9th Cir. 2002). “[N]ecessary facts not contained in the pleadings, and claims
3
which are legally insufficient, are not established by default.” Cripps v. Life Ins. Co. of N. Am.,
4
980 F.2d 1261, 1267 (9th Cir. 1992). Where the pleadings are insufficient, the court may require
5
the moving party to produce evidence in support of the emotion for default judgment. See
6
TeleVideo Sys., Inc., 826 F.2d at 917-18.
7
Default judgments are ordinarily disfavored. Eitel v. McCool, 782 F.2d 1470, 1472 (9th
8
Cir. 1986). In making the determination whether to grant a motion for default judgment, the court
9
considers the following factors:
10
11
12
13
14
15
16
17
18
(1) the possibility of prejudice to the plaintiff, (2) the merits of
plaintiff’s substantive claim, (3) the sufficiency of the complaint, (4)
the sum of money at stake in the action; (5) the possibility of a dispute
concerning material facts; (6) whether the default was due to
excusable neglect, and (7) the strong policy underlying the Federal
Rules of Civil Procedure favoring decisions on the merits.
Eitel,782 F.2d at 1471-72.
III. DISCUSSION
A. Eitel Factors
1. Possibility of Prejudice to Plaintiffs
Plaintiffs initiated this litigation in the Placer County Superior Court on September 25,
19
2014. Defendants removed the case to this court but have failed to answer the complaint or
20
otherwise participate in the case following remand from the Ninth Circuit on September 17, 2020.
21
The present litigation cannot move forward, leaving no other recourse than to seek a default
22
judgment. Thus, the possibility of prejudice to plaintiffs if default judgment is not entered weighs
23
in favor of granting a default judgment. See PepsiCo, Inc., v. California Security Cans, 238 F.
24
Supp. 2d 1172, 1177 (C.D. Cal. 2002).
25
26
2. Merits of the Claims and the Sufficiency of the Complaint
The court considers the merits of plaintiffs’ substantive claims and the sufficiency of the
27
complaint together due to the relatedness of the inquiries. See Danning v. Lavine, 572 F.2d 1386,
28
1388 (9th Cir. 1978); PepsiCo, Inc., 238 F. Supp. 2d at 1175.
5
i. Breach of Contract Claims (Counts One, Two, and Three)
1
2
Plaintiffs seek recovery for breach of contract pertaining to the Memorandum (Count One,
3
against Bachosa and Reyes), the Note (Count Two, against Bachosa and Reyes), and the Guaranty
4
(Count Three, against Reyes and Dox). (ECF No. 164-1 at 8-9.) Sitting in diversity, the court
5
applies California law. See Allstate Ins. Co. v. Hughes, 358 F.3d 1089, 1094 (9th Cir. 2003). The
6
elements of a breach of contract claim under California law are “(1) the contract, (2) plaintiff's
7
performance or excuse for nonperformance, (3) defendant’s breach, and (4) damage to plaintiff
8
therefrom.” See Wall St. Network, Ltd. V. New York Times Co., 164 Cal.App.4th 1171 (2008).
9
Taking the well-pleaded allegations as true, see Fair Housing of Marin, 285 F.3d at 906, plaintiff
10
has adequately pleaded breach of contract claims.
11
As to Count One, Global and Bachosa entered into a contract, (the Memorandum). (ECF
12
No. 1-2 at ¶ 14; ECF No. 164-3 at ¶¶ 7-8 & Ex. A.) Global performed all, or substantially all, of
13
the significant promises, conditions and covenants required on its part to be performed under the
14
Memorandum, in that Global gave Bachosa an additional 180 days to pay the amounts owed
15
under the Rice and Corn Contracts, but Bachosa breached the Memorandum by failing to pay
16
what was owed, thereby causing harm to Global. (ECF No. 1-2 at ¶¶ 14, 23-24.)
As to Count Two, Global, Bachosa, and Reyes entered into a contract (the Note). (ECF
17
18
No. 1-2 at ¶ 15; ECF No. 164-3 at ¶¶ 9-11 & Ex. B.) Global performed all, or substantially all, of
19
the significant promises, conditions and covenants required on its part to be performed under the
20
Note, but Bachosa and Reyes breached the contract by failing to pay the full amount due under
21
the Note, thereby causing harm to Global. (ECF No. 1-2 at ¶¶ 15, 27, 29-30.)
As to Count Three, Reyes and Dox signed the Note, which contained a contract between
22
23
Global and Reyes and Dox (the Guaranty). (ECF No. 1-2 at 15, 35; ECF No. 164-3 at ¶¶ 10-11 &
24
Ex. B.) Global performed all, or substantially all, of the significant promises, conditions and
25
covenants required on its part to be performed under the Guaranty, but Reyes and Dox breached
26
the Guaranty by failing to pay the full amount due under the Guaranty, thereby causing harm to
27
Global. (ECF No. 1-2 at 15, 35-36.)
28
////
6
ii. Common Count for Goods Sold and Delivered (Count 4)
1
2
3
4
Count Four pleads a common count for goods and services rendered. Plaintiffs seek
default judgment only against Bachosa on this count. (See ECF No. 167 at 2.)
“A common count is… a simplified form of pleading normally used to aver the existence
5
of various forms of monetary indebtedness…” and may be “used as an alternative way of seeking
6
the same recovery demanded in a specific cause of action.” McBride v. Boughton, 123
7
Cal.App.4th 379, 394 (2004) (citations omitted). The essential allegations of a common count are
8
“(1) the statement of indebtedness in a certain sum, (2) the consideration, i.e., goods sold, work
9
done, etc., and (3) nonpayment.” Farmers Ins. Exch. v. Zerin, 53 Cal. App. 4th 445, 460 (1997).
10
A plaintiff must prove four elements to recover on a claim for goods delivered: (1)
11
defendant requested, by words or conduct, that plaintiff deliver goods for defendant’s benefit; (2)
12
plaintiff delivered the goods as requested; (3) defendant has not paid plaintiff for the goods; and
13
(4) the reasonable value of the goods that were provided. Judicial Council of Cal. Civ. Jury
14
Instruction (“CACI”) No. 371 (2022); see also United States ex rel. Hajoca Corp. v. Aeroplate
15
Corp., No. 1: 12-cv-1287-AWI-BAM, 2013 WL 3729692, *3 (E.D. Cal. July 12, 2013) (“For a
16
goods sold and delivered claim, it is sufficient to allege that the defendant was indebted to the
17
plaintiff at a specific time in a stated sum on an account for goods sold and delivered by the
18
plaintiff to the defendant at the defendant’s request, and no part of the debt was paid.”) (citing
19
Abadie v. Carrillo, 32 Cal. 172, 175 (1867)).
20
Here, the complaint alleges Global and Bachosa entered into a written contract for the
21
delivery of rice and corn; those goods were delivered, but Bachosa has not paid. (ECF No. 1-2 at
22
¶¶ 11, 38.) The complaint states a common count against Bachosa as an alternative means of
23
recovery.
24
25
3. The Sum of Money at Stake
Under the fourth factor cited in Eitel, “the court must consider the amount of money at
26
stake in relation to the seriousness of defendant’s conduct.” PepsiCo, Inc., 238 F. Supp. 2d at
27
1176-77; see also Philip Morris USA, Inc. v. Castworld Prods., Inc., 219 F.R.D. 494, 500 (C.D.
28
Cal. 2003). This factor requires the court to assess whether recovery sought is proportional to the
7
1
harm caused by defendants’ conduct. See Vogel v. Rite Aid Corp., 992 F. Supp. 2d 998, 1012
2
(C.D. Cal. 2014) (“Default judgment is disfavored where the sum of money at stake is too large
3
or unreasonable in relation to defendant’s conduct”).
4
Here, plaintiffs seek $13,661,790.29, plus interest of $1,797.47 per day from January 18,
5
2022. (ECF 164-1 at 4.) Clearly, this a significant sum. The amount sought represents the entire
6
principle of the Note, the amount of unpaid interest, and pre-judgment interest from January 18,
7
2022. (ECF 164-1 at 4.)
8
9
“Courts have consistently granted default judgment in excess of a million dollars for
breach of contract cases.” SAC Invs., LLC v. Perez, No. SACV14-582-JLS-JPR-X, 2015 WL
10
13283059, at *4 (C.D. Cal. Feb. 24, 2015) (citing Richmark Corp. v. Timber Falling Consultants,
11
Inc., 937 F.2d 1444, 1446 (9th Cir. 1991) and Oracle USA, Inc. v. Qtrax, Inc., No. C09–3334
12
SBA BZ, 2011 WL 4853436, at *2 (N.D. Cal. Sept. 27, 2011)). In doing so, courts balance the
13
amount of damages against the other Eitel factors. See Craigslist, Inc. v. Naturemarket, Inc., 694
14
F. Supp. 2d 1039, 1060 (N.D. Cal. 2010) (holding that the damages in the range of one to five
15
million dollars did not defeat entry of default judgment where the defendant had engaged in
16
willful trademark infringement and refused to respond to allegations in the lawsuit). “Courts have
17
found that this factor ‘presents no barrier to default judgment’ even when millions of dollars were
18
at stake, as long as the potential damages were ‘proportional to the harm alleged.’” Johnson v.
19
Advanced Air Sols. Inc., No. 19-CV-00613-LHK, 2020 WL 2084898, at *8 (N.D. Cal. Apr. 30,
20
2020) (finding request of $7,189.03 was justified) (citing Liu Hongwei v. Velocity V Ltd., No.
21
2:15-cv-05061-ODW-E, 2018 WL 3414053, at *8 (C.D. Cal. July 11, 2018)).
22
Here, plaintiffs have demonstrated the amount sought is based on set amounts due
23
according to contract terms incorporated onto the face of the complaint (ECF No. 1-2 at ¶ 14;
24
ECF No. 163-4 at 6) and an 8.5 percent accrued annual interest rate found in the terms of the
25
contract and incorporated onto the face of the complaint (ECF No. 163-4 at 10). Thus, “the sum
26
of money at stake… is for a sum certain” and represents the damages incurred. Desert Trailer
27
Sys., Inc. v. Twenty6 Letters Corp., No. SACV17-0412-AGD-FMX, 2017 WL 8117693, at *2
28
////
8
1
(C.D. Cal. Aug. 4, 2017). Thus, although the award sought is substantial, this factor does not, by
2
itself, preclude granting default judgment.
4. The Possibility of a Dispute Concerning Material Facts
3
4
The court assumes the truth of well-pleaded facts in the complaint following the clerk’s
5
entry of default. See, e.g., Elektra Entm’t Group Inc. v. Crawford, 226 F.R.D. 388, 393 (C.D. Cal.
6
2005) (“Because all allegations in a well-pleaded complaint are taken as true after the court clerk
7
enters default judgment, there is no likelihood that any genuine issue of material fact exists”);
8
accord Philip Morris USA, Inc., 219 F.R.D. at 500; PepsiCo, Inc., 238 F. Supp. 2d at 1177.
9
Because there is no indication that material facts are in dispute, this factor weighs in favor of
10
granting default judgment.
5. Whether the Default Was Due to Excusable Neglect
11
Due process requires that interested parties be given notice of the pendency of the action
12
13
and be afforded an opportunity to present their objections before a final judgment is rendered.
14
Mullane v. Central Hanover Bank & Trust Co., 339 U.S. 306, 314 (1950). While there is always a
15
possibility that a defendant might appear and claim excusable neglect, where the defendants
16
“were properly served with the Complaint, the notice of entry of default, as well as the papers in
17
support of the instant motion,” this factor favors entry of default judgment. Shanghai Automation
18
Instrument Co. Ltd. v. Kuei, 194 F. Supp. 2d 995, 1005 (N.D. Cal. 2001).
19
Here, defendants were actively involved with this case in that they removed it to this court
20
and litigated a motion to dismiss. Subsequent to the Ninth Circuit’s remand, however, defendants
21
have failed to file an answer and failed to respond to court orders. (ECF Nos. 157, 158). Despite
22
the court’s clear orders to retain new counsel, to file status reports, and to answer the complaint,
23
defendants are no longer participating in this case or communicating with the court. Plaintiffs
24
served the motion for default judgment to defendants by electronic transmission to the email
25
addresses provided by defendants’ former counsel. (ECF No. 164-4 at 2.) Under these
26
circumstances, the record contains no indication defendants’ default was due to excusable
27
neglect.
28
////
9
1
2
3
6. The Strong Policy Underlying the Federal Rules of Civil Procedure
Favoring Decisions on the Merits
“Cases should be decided upon their merits whenever reasonably possible.” Eitel, 782
4
F.2d at 1472. But the mere existence of Rule 55(b) “indicates that this preference, standing alone,
5
is not dispositive.” PepsiCo, Inc., 238 F. Supp. 2d at 1177 (citation omitted); see also Craigslist,
6
Inc., 694 F. Supp. 2d at 1061. Rule 55 allows a court to decide a case before the merits are heard
7
if defendant fails to appear and defend. See PepsiCo, Inc., 238 F. Supp. 2d at 1177. Thus,
8
although the court is cognizant of the policy in favor of decisions on the merits, that policy does
9
not, by itself, preclude the entry of default judgment.
10
7. Eitel Recommendation
11
Taken together, the Eitel factors support granting the request for default judgment even
12
though plaintiffs request a significant sum of damages. It will therefore recommended default
13
judgment be entered.
14
B. Terms of the Judgment to be Entered
15
The court determines the “amount and character” of the relief to be awarded upon default
16
judgment. Landstar Ranger, Inc. v. Parth Enterprises, Inc., 725 F.Supp.2d 916, 920 (C.D. Cal.
17
2010)). A plaintiff “must “prove up” the damages. Id. at 923 (citations omitted). The damages
18
sought cannot “differ in kind from, or exceed in amount, what is demanded in the pleadings.”
19
Fed. R. Civ. P. 54(c). Default judgment may be entered without a hearing where the plaintiff
20
submits documentary evidence showing that the amount sought in damages is based on a definite
21
figure capable of mathematic computation. Davis v. Fendler, 650 F.2d 1154, 1161 (9th Cir. 1981)
22
(quoting United Artists Corp. v. Freeman, 605 F.2d 854, 857 (5th Cir. 1979)).
23
Here, plaintiffs may recover the sum of damages under the express contractual provisions.
24
See Newbery Corp. v. Fireman’s Fund Ins. Co., 95 F.3d 1392, 1405 (9th Cir. 1996). Plaintiffs
25
have provided affidavits and documentation adequately establishing these monetary damages.
26
The amount sought is based on set amounts due according to contract terms incorporated onto the
27
face of the complaint (ECF No. 1-2 at ¶ 14; ECF No. 164-3 at ¶¶ 7-8 & Ex. A) and an interest rate
28
found in the terms of a contract incorporated onto the face of the complaint (ECF No. 1-2 at ¶ 15;
10
1
ECF No. 164-3 at ¶¶ 9, 11 & Ex. B). Plaintiffs have submitted documentation demonstrating the
2
amount of contract damages at $13,661,790.29, plus interest of $1,797.47 per day from January
3
18, 2022, through entry of judgment. Accordingly, the undersigned recommends damages be
4
awarded in that amount.
5
Plaintiffs also request postjudgment interest based on the contracted interest rate. (ECF
6
No. 167 at 3.) Postjudgment interest in this case is governed by 28 U.S.C. § 1961 unless the
7
parties contracted to waive its application. See Citicorp Real Estate, Inc. v. Smith, 155 F.3d 1097,
8
1107-08 (9th Cir. 1998) (“state law determines the rate of prejudgment interest, and postjudgment
9
interest is governed by [28 U.S.C. § 1961]”); Fid. Fed. Bank, FSB v. Durga Ma Corp., 387 F.3d
10
1021, 1023 (9th Cir. 2004) (“Durga Ma”) (“An exception to § 1961 exists when the parties
11
contractually agree to waive its application.”).
12
In order to contract around the otherwise mandatory provisions of 28 U.S.C. § 1961, there
13
must be a “specific agreement” “on this “specific issue.” Durga Ma, 387 F.3d at 1023. In
14
Citicorp, the parties had agreed upon an interest rate in the case of default, and the promissory
15
notes additionally provided interest would accrue at the rate specified after judgment and until
16
collection. See Citicorp Real Estate, Inc. v. Smith, 155 F.3d at 1108. The Ninth Circuit found
17
those terms sufficiently waived application of the otherwise mandatory application of § 1961. Id.
18
In contrast, in Durga Ma, 387 F.3d at 1023, the Ninth Circuit held that a choice-of-law clause
19
with no reference to interest rates evinced no agreement between the parties.
20
Here, plaintiffs argue the parties contracted to waive 28 U.S.C. § 1961 when they agreed
21
the entire amount was to be paid “plus interest set out in this note, in the form, term and due dates
22
indicated herein. This promissory accrued annual interest rate is 8.5%.” (ECF No. 167 at 2.)
23
Plaintiffs note the agreement to pay interest “was from the date of the Note; it was not an
24
agreement to only pay interest in the event of future late payments under the Note.” (Id. at 3.)
25
Although the parties agreed to an interest rate for repayment of the entire sum which was
26
already past due, there was no “specific agreement” as to the specific issue of post-judgment
27
interest sufficient to manifest an intent to override 28 U.S.C. § 1961. See Durga Ma, 387 F.3d at
28
1023; Oreo Corp. v. Winnerman, 642 F. App’x 751, 755 (9th Cir. 2016) (district court abused its
11
1
discretion in not applying the statutory rate where “none of the contract provisions cited… allude
2
to post-judgment interest”). Unlike in Citicorp, where the parties expressly agreed the contractual
3
rate applied “after judgment until collection,” 155 F.3d at 1108, in this case, the contract
4
provision cited by plaintiffs is not a specific agreement on the issue of post-judgment interest.
5
Accordingly, the statutory rate of 28 U.S.C. § 1961 should be applied.
6
IV. CONCLUSION
7
In accordance with the above, it is HEREBY RECOMMENDED:
8
1.
Plaintiffs’ motion for default judgment (ECF No. 164) be granted as set forth herein.
9
2.
Judgment be entered in plaintiffs’ favor and against Bachosa and Reyes on counts one
10
11
and two, against Reyes and Dox on count three, and against Bachosa on count four.
3.
Default judgment be entered against defendants in the amount of $13,661,790.29
12
USD, plus interest of $1,797.47 per day from January 18, 2022, through entry of
13
judgment, with postjudgment interest at the statutory rate of 28 U.S.C. § 1961.
14
IT IS ALSO HEREBY ORDERED that plaintiffs serve an electronic copy of this order
15
and findings and recommendations on defendants forthwith to their last known email addresses,
16
and thereafter plaintiffs shall file a notice of such service within 10 days.
17
These findings and recommendations are submitted to the United States District Judge
18
assigned to the case, pursuant to the provisions of 28 U.S.C. § 636(b)(l). Within thirty (30) days
19
after being served with these findings and recommendations, any party may file written
20
objections with the court and serve a copy on all parties. Such a document should be captioned
21
“Objections to Magistrate Judge’s Findings and Recommendations.” Any reply to the objections
22
shall be served on all parties and filed with the court within 14 days after service of the
23
objections. The parties are advised that failure to file objections within the specified time may
24
waive the right to appeal the District Court’s order. Turner v. Duncan, 158 F.3d 449, 455 (9th Cir.
25
1998); Martinez v. Ylst, 951 F.2d 1153, 1156-57 (9th Cir. 1991).
26
Dated: May 6, 2022
27
28
8.glob16cv1045.mdj
_____________________________________
CAROLYN K. DELANEY
UNITED STATES MAGISTRATE JUDGE