Alexander et al v. FedEx Ground Package System, Inc. et al

Filing 175

ORDER by Judge Edward M. Chen Denying 135 Zohrabians's Motion to Intervene and for Appointment; and Granting 172 Zohrabians's Motion for Leave to File Reply. (emcsec, COURT STAFF) (Filed on 9/29/2015)

Download PDF
1 2 3 4 UNITED STATES DISTRICT COURT 5 NORTHERN DISTRICT OF CALIFORNIA 6 7 DEAN ALEXANDER, et al., Case No. 05-cv-00038-EMC Plaintiffs, 8 v. 9 10 FEDEX GROUND PACKAGE SYSTEM, INC., et al., 11 Defendants. ORDER DENYING ZOHRABIANS’S MOTION TO INTERVENE AND FOR APPOINTMENT; AND GRANTING ZOHRABIANS’S MOTION FOR LEAVE TO FILE REPLY United States District Court Northern District of California Re: Docket Nos. 135, 172 12 13 14 Currently pending before the Court is Henrik Zohrabians‟s motion to intervene and for 15 appointment of subclass counsel and subclass representative. The Court held a hearing on inter 16 alia, Mr. Zohrabians‟s motion on September 3, 2015. At the hearing, the Court asked the parties 17 to provide supplemental briefing. The parties did so, after which Mr. Zohrabians‟s asked for leave 18 to file another brief. Having considered the parties‟ submissions, the Court hereby GRANTS Mr. 19 Zohrabians‟s motion for leave to file a second supplemental brief but DENIES his motion to 20 intervene and for appointment. 21 22 I. FACTUAL & PROCEDURAL BACKGROUND This litigation has a lengthy history. It was initiated in 2004, put into MDL proceedings, 23 appealed to the Ninth Circuit, remanded to this Court, and so forth. For purposes of this opinion, 24 the Court focuses only on those events that are directly relevant to the pending motion. 25 Plaintiffs filed a class action against Defendant FedEx Ground Package System, Inc. 26 (“FXG”), asserting, in essence, wage-and-hour claims. While in MDL proceedings, the MDL 27 court granted in part and denied in part Plaintiffs‟ motion for class certification as to certain 28 claims. See MDL Docket No. 1119 (order, filed on March 25, 2008). The MDL court 1 subsequently granted FXG‟s motion for summary judgment. See Docket No. 2097 (order, filed on 2 August 11, 2010). Plaintiffs appealed to the Ninth Circuit and prevailed. See generally Alexander 3 v. FedEx Ground Package Sys., 765 F.3d 981 (9th Cir. 2014). 4 After the appeal, FXG filed several motions to limit liability and/or damages before this 5 Court (as the case had been remanded). See Docket Nos. 108, 111, 113 (motions, filed on May 6 21, 2015). The parties then engaged in settlement discussions. Those negotiations were 7 successful, and Plaintiffs thus filed a motion for preliminary approval of the settlement. See 8 Docket No. 119 (motion, filed on July 2, 2015). The Court held a hearing on the motion on 9 August 6, 2015. At the hearing, the Court expressed concern about the settlement because of the 10 resolution of the meal-and-rest-break (“MRB”) claim. As represented by the parties, the MRB claim – though pled in the operative complaint – United States District Court Northern District of California 11 12 was not presented to the MDL court for certification and thus was never certified.1 See, e.g., 13 Docket No. 126 (Joint Supp. Br. at 10) (noting that Plaintiffs made a strategic decision not to seek 14 certification of the MRB claim because of the then-existing law). The named Plaintiffs, however, 15 still pursued their individual MRB claims and, under the settlement, they would receive $1 million 16 to release those individual claims. What troubled the Court was that, under the settlement, the 17 other class members were also releasing their MRB claims but were not getting any compensation 18 for that release. See Docket No. 128 (Order at 1-2). Accordingly, the Court ordered supplemental 19 briefing from the parties and set a further hearing on the motion for September 3, 2015. See 20 Docket No. 131 (civil minutes). 21 On August 21, 2015, the day after the parties provided their supplemental brief, Mr. 22 Zohrabians filed the currently pending motion to intervene and for appointment. Not surprisingly, 23 Mr. Zohrabians‟s motion cited the Court‟s concerns about the MBR claim, as articulated at the 24 August 6 hearing. The Court issued an order allowing Mr. Zohrabians to appear at the September 25 3 hearing. See Docket No. 136 (order). At the September 3 hearing, the parties explained that they had agreed to a modified 26 27 1 28 As discussed below, the parties now have a dispute as to whether a MRB claim was in fact certified by the MDL Court. 2 1 settlement to address the Court‟s concerns about the MBR claim. Under the settlement, the class 2 would now get compensation for the MBR claim, but only for the period starting August 2011. 3 Because the settlement did not cover any MBR claim that predated August 2011, there would be 4 no release of that specific claim. See Docket No. 144 (Tr. at 5). The settlement did not include a 5 pre-August 2011 MBR claim because of a potential statute-of-limitations problem. See, e.g., 6 Aguilera v. Pirelli Armstrong Tire Corp., 223 F.3d 1010, 1018-19 (9th Cir. 2000) (in considering 7 whether the statute of limitations was tolled during the pendency of a class action (named 8 Anderson), concluding that there was tolling but, “whatever tolling applied, it ceased once the 9 deadline for seeking class certification [in Anderson] passed on October 15, 1996”; the Anderson 10 plaintiffs never moved for class certification). Because there was no release of the pre-August 2011 MBR claim, the Court pressed Mr. United States District Court Northern District of California 11 12 Zohrabians as to why intervention was necessary in this case. He could object in this case to any 13 resolution of the August 2011-and-on MBR claim, and, if he wanted to proceed with a pre-August 14 2011 MBR claim, he could file a new action – with the court presiding over that action addressing 15 any statute-of-limitations issues, including tolling under American Pipe & Construction v. Utah, 16 414 U.S. 538 (1974),2 and equitable tolling. See, e.g., Docket No. 144 (Tr. at 30-33) (Court, 17 stating “You have the right to raise everything that happens in this case in this new case[;] [t]hat‟s 18 why I‟m saying why do you need intervention in this case”; also asking, “How are you 19 prejudiced? How are your barred from raising the argument – the exact argument you just raised 20 in the next case?”). As to prejudice, Mr. Zohrabians claimed that American Pipe tolling and 21 equitable tolling arguments would be precluded if he were to file a separate action. See Docket 22 No. 144 (Tr. at 35). The Court then asked the Mr. Zohrabians and the parties to provide 23 supplemental briefing on “[w]hat prejudice is there in terms of preserving all of these rights – 24 America[n] Pipe, equitable tolling, whatever rights you have, the right to class certification – in 25 the second action as opposed to the current action?” Docket No. 144 (Tr. at 45). 26 27 28 2 In American Pipe, the Supreme Court noted that “the commencement of a class action suspends the applicable statute of limitations as to all asserted members of the class who would have been parties had the suit been permitted to continue as a class action.” American Pipe, 414 U.S. at 554. 3 Mr. Zohrabians and the parties have now provided their supplemental briefing, including a 1 second supplemental brief from Mr. Zohrabians which the Court shall permit. In his papers, Mr. 3 Zohrabians no longer claims – as he did at the hearing – that he could not raise American Pipe 4 tolling or equitable tolling in a second action. Instead, Mr. Zohrabians has adopted a completely 5 new position that he never articulated either in his previous papers or at the September 3 hearing – 6 i.e., that, contrary to what the parties have represented to this Court, the MDL court did in fact 7 certify the MBR claim. According to Mr. Zohrabians, that being the case, Plaintiffs should not 8 have abandoned the pre-August 2011 MBR claim, and the fact that Plaintiffs did so shows that 9 they cannot fairly represent class members who have a MBR claim that predates August 2011 – 10 thus necessitating Mr. Zohrabians‟s intervention. Mr. Zohrabians also argues that, because the 11 United States District Court Northern District of California 2 MBR claim was in fact certified, he would be prejudiced by having to bring a new action for pre- 12 August 2011 conduct because he may be forced to make a tolling argument that he should not 13 have to make at all. 14 15 16 II. A. DISCUSSION Legal Standard Federal Rule of Civil Procedure 24 governs intervention, both intervention as of right and 17 permissive intervention. A person or entity has the right to intervene (assuming a timely motion to 18 do so) if, e.g., it “claims an interest relating to the property or transaction that is the subject of the 19 action, and is so situated that disposing of the action may as a practical matter impair or impede 20 the movant‟s ability to protect its interest, unless existing parties adequately represent that 21 interest.” Fed. R. Civ. P. 24(a)(2). A person or entity may be permitted to intervene (again, 22 assuming a timely motion to do so) if, e.g., it “has a claim or defense that shares with the main 23 action a common question of law or fact,” although a “court must consider whether the 24 intervention will unduly delay or prejudice the adjudication of the original parties‟ rights.” Fed. 25 R. Civ. P. 24(b)(1)(B). 26 As the Court noted at the September 3 hearing, in deciding the issue of intervention, the 27 critical question for the Court is whether Mr. Zohrabians‟s ability to protect his interests would be 28 compromised absent intervention. 4 1 2 B. Alleged Certification of MBR Claim As noted above, Mr. Zohrabians‟s argument that intervention is necessary is predicated on 3 his contention that the MBR claim was in fact certified by the MDL Court (and has now 4 effectively been abandoned in the proposed settlement). 5 As background, the current operative complaint (i.e., the third amended complaint 6 (“TAC”)) asserts a MBR violation in two causes of action: (1) directly through the fourth cause of 7 action, titled “Failure to Provide Meal and Break Periods In Violation of California Labor Codes 8 §§ 510, 226.7 and IWC 9,” and (2) indirectly through the eighth cause of action, titled “Unfair 9 Business Practices in Violation of California Business and Professions Code §§ 17200.” MDL Docket No. 899 (TAC). Notably, the § 17200 claim is based not only on a MBR violation but also 11 United States District Court Northern District of California 10 on, e.g., other California Labor Code violations, which are implicated in the other causes of action 12 asserted by Plaintiffs. As Plaintiffs allege in ¶ 81 of the TAC: 13 By all of the foregoing alleged conduct of failing to indemnify Plaintiffs and class members for work-related expenses, by failing to notify Plaintiffs and class members of their rights under the FMLA, by interfering with, restraining or denying FMLA rights to plaintiffs and class members, by failing and refusing to provide plaintiffs and class members with workers compensation insurance and unemployment insurance benefits, by failing to pay overtime compensation to Plaintiffs and plaintiff class members who operate trucks with a gross vehicle weight rating of less than 10,001 pounds, by failing and refusing to provide meal and/or rest periods, by unlawfully deducting money from wages and coercing Plaintiffs and plaintiff class members to patronize Defendant and allied companies, by intentionally, reckless and/or negligently misrepresenting to Plaintiffs and plaintiff class members the true nature of their employment status, and by engaging in the other acts and conduct alleged above, FEG and FHD have committed, and are continuing to commit, ongoing unlawful, unfair and fraudulent business practices within the meaning of Cal. Bus. & Professions Code §17200 et seq. 14 15 16 17 18 19 20 21 22 23 TAC ¶ 81. 24 The Court has reviewed the papers submitted by the parties and Mr. Zohrabians, as well as 25 other evidence of record in this case, including the MDL proceedings, and finds, conclusively, that 26 the MBR claim was not certified, either through the fourth cause of action or the eighth. The 27 Court takes note of the following: 28 When Plaintiffs filed their motion for class certification before the MDL Court, they did 5 1 not ask for certification of the fourth cause of action, nor did they invoke California Labor Code § 2 226.7 or § 512. See Ross Decl., Ex. A (Mot. at 2) (asking the MDL Court to “[a]llow[] this action 3 to proceed as a state-wide class action as to Plaintiffs[‟] Second, Fifth, Sixth, Eighth, Ninth and 4 Tenth Causes of Action for damages, rescission, restitution, declaratory and injunctive relief 5 arising under California Labor Code Sections 201, 221, 223, 224, 450, 2699 and 2802, California 6 7 8 9 10 Business and Professions Code Sections 17200 and 17203 . . . .”). While, in the memorandum supporting the class certification memorandum, Plaintiffs did reference California Labor Code §§ 226.7 and 512, see Ross Decl., Ex. B (Memo. at 11) (arguing that “[t]he claims under Labor Code §§ 221, 223, 224, 226.7, 450, 512, 2699, and 2802 . . . raise common questions beyond the threshold question of employee status”), this was clearly an error, as nowhere was a MBR violation substantively addressed in the memorandum. This stands in 11 United States District Court Northern District of California sharp contrast to the substantive discussion of other claimed Labor Code violations. See, e.g., 12 Ross Decl., Ex. B (Memo. at 10-13) (discussing California Labor Code §§ 2802, 221, 2699, and 13 14 510); Ross Decl., Ex. D (Reply Memo. at 12-16) (same). Furthermore, FXG specifically asserted, in its opposition memorandum, that, even though Plaintiffs had referenced Labor Code §§ 226.7 15 and 512 in their papers, Plaintiffs had “not moved to certify their claim regarding meal and break 16 periods.” Ross Decl., Ex. C (Opp‟n Memo. at 19 n.26) (emphasis added). Plaintiffs never 17 disputed this assertion in their reply memorandum, which confirms that certification of the MBR 18 claim was in fact not sought. 19 Further confirmation to that effect is reflected in the parties‟ Joint Proposed Pretrial Order, 20 filed with the MDL Court on January 24, 2011, which stated, inter alia: “Plaintiffs did not move 21 to certify their claims for meal and break period violation (Fourth Cause of Action) or for fraud 22 (Seventh Cause of Action).” MDL Docket No. 2450 (Prop. Pretrial Order at 10). 23 24 As Plaintiffs did not move for certification of the fourth cause of action, the MDL Court could not have certified a class based on the fourth cause of action. 25 While Plaintiffs did move for certification of their § 17200 claim, see Ross Decl., Ex. A 26 (Mot. at 2), and the MDL Court certified that claim, Plaintiffs did not ask for certification of the 27 28 6 1 entirety of the § 17200 claim.3 Rather, Plaintiffs were seeking only certification of the § 17200 2 claim so that it would be coextensive with the underlying predicate claims on which certification 3 was sought. This was made clear in the certification papers submitted by Plaintiffs to the MDL 4 Court. For example:  5 “The UCL claim arises out of the same practices by which FXG deprive class members of 6 their rightfully-earned wages in violation of the California Labor Code.” Ross Decl., Ex. 7 B (Memo. at 14) (emphasis added).  8 “Common questions of fact predominate with regard to Plaintiffs‟ claims under the California Labor Code for reimbursement of necessary expenses (§ 2802), illegal wage 9 deductions (§§ 221 & 223), coercion in the purchase of goods and services (§ 450), unpaid 11 United States District Court Northern District of California 10 overtime wages (§§ 510 & 1194 et seq.), and penalties (§ 2699), and the associated claim 12 under California Business & Professions Code § 17200.”). Ross Decl., Ex. D (Memo. at 13 12) (emphasis added).  14 “The UCL challenges the same practices at issue in Plaintiffs’ other Labor Code claims, as 15 discussed in Section III(B)(1)-(3) above [none of which discussed a MBR violation].” 16 Ross Decl., Ex. D (Memo. at 16) (emphasis added). 17 This was also made clear in the parties‟ Joint Proposed Pretrial Order filed with the MDL 18 Court: “As to the Eighth and Ninth Causes of Action, Plaintiffs‟ claims have been adjudicated in 19 FXG‟s favor to the extent that they were based on the certified employment claims under the 20 California Labor Code which were adjudicated in FedEx‟s favor.” MDL Docket No. 2450 (Prop. 21 Order at 16) (emphasis added). The fact that the notice sent to the class, see MDL Docket No. 1271-3 (class notice); MDL 22 23 Docket No. 1288 (order approving class notice), and the letter sent to the class from Plaintiffs‟ 24 counsel following the Ninth Circuit victory, see Docket No. 145-1 (Burton Decl., Ex. 3 (letter, 25 26 27 28 3 According to Mr. Zohrabians, it was reasonable for Plaintiffs to have (purportedly) asked for certification of the MBR claim through § 17200 because § 17200 has a long (four-year) statute of limitations. See Docket No. 145 (Supp. Brief at 2-3 n.1). But if, in fact, Plaintiffs were intent on proceeding with a MBR claim, it would have made little sense to invoke only the eighth cause of action (§ 17200) and not both the eighth and fourth causes of action. 7 1 dated September 11, 2014), referenced the MBR violation is immaterial. That fact may inform an 2 equitable tolling argument. But as both Plaintiffs and FXG point out, “it does not somehow 3 retroactively alter the MDL Court‟s Class Certification Order into one that certified causes of 4 action that Plaintiffs did not previously seek to litigate on a class-wide basis.” Docket No. 168 5 (Supp. Br. at 4). 6 To the extent Mr. Zohrabians has asked the Court to defer ruling on the issue of whether 7 the MBR claim was certified, either directly or indirectly, see Docket No. 172-1 (2d Supp. Br. at 8 7), the Court denies that request. Mr. Zohrabians suggests that fuller briefing is needed but the 9 matter has already been sufficiently briefed. As for Mr. Zohrabians‟s suggestion that discovery is needed, the Court disagrees. The question of what claims were certified is informed objectively 11 United States District Court Northern District of California 10 by the court records, not by, e.g., the subjective intent of counsel, and the record is more than 12 sufficiently developed on the issue. It is unclear exactly what discovery Mr. Zohrabians believes 13 is necessary – e.g., would he be deposing Judge Miller (the MDL judge) to ascertain his 14 understanding of the motion for class certification? Or would he be deposing Plaintiffs‟ and 15 FXG‟s litigation counsel? What relevant evidence could be obtained which is not already in the 16 court records? The Court refuses to go down that route. 17 Furthermore, the Court emphasizes that nothing supports the chicanery suggested by Mr. 18 Zohrabians – i.e., that a MBR claim in some form was certified and that the parties have falsely 19 represented to this Court that it was not. While the Court has had concerns about the settlement, it 20 is clear that this has been a hard-fought case, and the settlement provides for substantial recovery 21 to the class. The Court also takes this opportunity to advise Mr. Zohrabians that, now that he has 22 entered the fray, he and his counsel also have Rule 11 obligations, and it seems odd, to say the 23 least, that he has leveled serious charges against the parties while at the same time praising them. 24 See, e.g., Docket No. 144 (Tr. at 18, 20-21) (counsel for Mr. Zohrabians stating “my firm is not 25 going to sit here and demand somehow that these people are not good counsel” and “[w]e have 26 nothing against class – they have done a great job in this case. . . . Remarkable job, they really 27 have[;] I can‟t say anything bad about them, but I am concerned.”); Docket No. 170 (Supp. Br. at 28 6) (giving “due respect to the work undertaken by these same counsel to date”). The Court is also 8 1 troubled by shifting theories asserted by Mr. Zohrabians; this raises concerns about Mr. 2 Zohrabians‟s real goal. Finally, the Court notes that, to the extent Mr. Zohrabians contends that Plaintiffs should 3 4 have moved for certification of the MBR claim, and the failure to do so raises questions about the 5 adequacy of Plaintiffs and their counsel, see Docket No. 145 (Supp. Br. at 6), the Court disagrees. 6 As the Court noted at the September 3 hearing, counsel made a “good faith . . . judgment . . . that 7 meal-and-rest-break claims are hard to certify, particularly under . . . the pre-Brinker law as it 8 existed then.” Docket No. 144 (Tr. at 17). Moreover, even post-Brinker, certification on a MBR 9 claim is not an easy task, as evidenced by the Ninth Circuit‟s recent decision in Alcantar v. Hobart Service, No. 13-55400, 2015 U.S. LEXIS 15687 (9th Cir. Sept. 3, 2015). Furthermore, the case 11 United States District Court Northern District of California 10 cited by Mr. Zohrabians is distinguishable as it involved res judicata concerns, see Pearl v. Allied 12 Corp., 102 F.R.D. 921, 924 (E.D. Pa. 1984) (discussing splitting of a single cause of action and res 13 judicata), and those concerns are not implicated here where the pre-August 2011 conduct is 14 distinct from the post-August 2011 conduct and where the parties have made clear that pre-August 15 2011 claims are not being released. 16 C. 17 Prejudice Because the Court concludes that no MBR claim was ever certified, either directly through 18 the fourth cause of action or indirectly through the eighth cause of action, the Court turns back to 19 the question that it initially asked the parties to brief through a supplemental filing: What prejudice 20 is there to Mr. Zohrabians if he were not allowed to intervene and instead had to pursue a pre- 21 August 2011 MBR claim in a new action? At best, Mr. Zohrabians has articulated two arguments: 22 (1) that it will be harder for him to argue for tolling in a new action given what Plaintiffs have 23 asserted here; and (2) that it will be costly for him to litigate a second action. See Docket No. 145 24 (Supp. Br. at 5); Docket No. 172-1 (2d Supp. Br. at 6). 25 Neither of these arguments is persuasive. First, even if Mr. Zohrabians were allowed to 26 intervene, he would have to confront potential time bar for the pre-August 2011 MBR claim and 27 the challenges in obtaining class certification. Second, Mr. Zohrabians has failed to identify any 28 significant costs that he would have to pay to litigate a second action as opposed to continuing to 9 1 litigate in this action. 2 D. Permissive Intervention Finally, as to permissive intervention, the Court notes that “[t]he degree of the 3 4 „commonality‟ of law or fact required may depend in part on the nature of the requested 5 intervention.” 6-24 Moore‟s Fed. Prac. – Civ. § 24.11. Here, an argument could be made that 6 there is not a common question of law or fact in light of the carve-out of the pre-August 2011 7 MBR claim from the action. See also id. (noting that, “[i]n assessing whether the common- 8 question requisite is satisfied, courts will use their discretion to assess the potential gains or 9 prejudice that would result if intervention is granted”). But even assuming commonality is satisfied here, the Court must consider whether 10 United States District Court Northern District of California 11 intervention will unduly delay or prejudice the adjudication of the rights of the original parties. 12 See Fed. R. Civ. P. 24(b). Moreover, the Court may still consider whether Mr. Zohrabians‟s 13 interests are adequately represented in the instant case, as well as the availability of a remedy 14 through a separate suit. See 6-24 Moore‟s Fed. Prac. – Civ. § 24.10[2][c]-[d]. These 15 considerations weigh against permissive intervention in the instant case. Mr. Zohrabians‟s actions 16 threaten to derail the settlement, which has been achieved after more than ten years of ongoing 17 litigation, and he has the ability to represent his own interests as an objector in this case or through 18 filing a separate action for the pre-August 2011 MBR claim. Cf. Allen v. Bedolla, 787 F.3d 1218 19 (9th Cir. 2015) (upholding denial of intervention motion because it was not timely made – 20 “motion was filed after four years of ongoing litigation, on the eve of settlement and threatened to 21 prejudice settling parties by potentially derailing settlement talks”; adding that “objectors‟ 22 concerns could largely be addressed through normal objection process”). 23 /// 24 /// 25 /// 26 /// 27 /// 28 /// 10 1 2 3 III. CONCLUSION For the foregoing reasons, the Court denies Mr. Zohrabians‟s motion to intervene. 4 Because the intervention motion is being denied, the motion for appointment is also denied. 5 Moreover, the Court notes that a motion for appointment is premature given that no MBR class 6 has ever been certified. Mr. Zohrabians, of course, is free to participate as an objector in this case 7 and/or initiate a new action to assert a pre-August 2011 MBR claim. 8 This order disposes of Docket Nos. 135 and 172. 9 10 IT IS SO ORDERED. United States District Court Northern District of California 11 12 Dated: September 29, 2015 13 ________________________ EDWARD M. CHEN United States District Judge 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 11

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?