Alexander et al v. FedEx Ground Package System, Inc. et al
Filing
215
ORDER by Judge Edward M. Chen Conditionally Granting 204 Plaintiffs' Motion for Final Approval of Class Action Settlement; and Deferring Ruling on 185 Plaintiffs' Motion for Attorney Fees and Costs and Class Representative Service Payments. (emcsec, COURT STAFF) (Filed on 4/12/2016)
1
2
3
4
UNITED STATES DISTRICT COURT
5
NORTHERN DISTRICT OF CALIFORNIA
6
7
DEAN ALEXANDER, et al.,
Plaintiffs,
12
ORDER CONDITIONALLY
GRANTING PLAINTIFFS’ MOTION
FOR FINAL APPROVAL OF CLASS
ACTION SETTLEMENT; AND
DEFERRING RULING ON
PLAINTIFFS’ MOTION FOR
ATTORNEY FEES AND COSTS AND
CLASS REPRESENTATIVE SERVICE
PAYMENTS
13
Docket No. 185, 204
8
9
10
11
v.
FEDEX GROUND PACKAGE SYSTEM,
INC., et al.,
For the Northern District of California
Defendants.
United States District Court
Case No. 05-cv-00038-EMC
14
Previously, the Court granted preliminary approval to a proposed settlement in the above-
15
referenced class action. Currently pending before the Court is the motion for final approval as
16
well as the motion for fees, costs, and incentive awards. Having considered the parties‟ briefs and
17
accompanying submissions, the filings made by objectors, and the oral argument presented at the
18
hearing on the motions, the Court hereby CONDITIONALLY GRANTS the motion for final
19
approval and DEFERS ruling on the motion for fees, costs, and incentive awards.
20
21
I.
FACTUAL & PROCEDURAL BACKGROUND
This case has a lengthy history. In 2004, Plaintiffs initiated this class action against
22
Defendant FedEx Ground Package System, Inc. (“FXG”), asserting, in essence, wage-and-hour
23
claims. The case was put into MDL proceedings. While in MDL proceedings, the MDL court
24
granted in part and denied in part Plaintiffs‟ motion for class certification as to certain claims. The
25
MDL court subsequently granted FXG‟s motion for summary judgment. Plaintiffs appealed to the
26
Ninth Circuit and prevailed, with the court holding that the class members were employees of
27
FXG and not independent contractors.
28
The case was then remanded to this Court where FXG then filed several motions to limit
1
liability and/or damages.1
2
In the first motion, FXG asked for clarification of the class definition. The class as defined
3
covered those who drove or will drive on a “full-time” basis. FXG argued that the term
4
“full-time” needed to be fleshed out – more specifically, to be limited to those “who both
5
drove forty hours in any given week and who drove consistently for at least 11/12ths of the
6
relevant contract year (i.e., had no more than 20 work days of absences).” Docket No. 108
7
(Mot. at 1-2).
8
In the second motion, FXG moved to limit damages. More specifically, FXG argued that
damages should not accrue through then-2015, as advocated by Plaintiffs, but rather should
9
favor). FXG contended that this limitation was proper because it had made “changes
12
For the Northern District of California
accrue through 2010 only (i.e., when the MDL court issued summary judgment in FXG‟s
11
United States District Court
10
between mid-2007 and late 2010 to [its] business model, Operating Agreement, and
13
policies and procedures, as well as changes to contractor business structure and work
14
activities.” Docket No. 111 (Mot. at 1) (arguing that the changed circumstances “prevent
15
Plaintiffs from demonstrating that the facts underlying Alexander remain controlling”).
16
In the third motion, FXG moved to exclude “settlement deductions” from damages. The
17
term “settlement deductions” is somewhat misleading. FXG is referring to items that FXG
18
initially paid for (e.g., licenses, taxes) but then “charged back” to the drivers – i.e.,
19
deductions were made from the drivers‟ compensation to take into account the items
20
initially paid for by FXG. According to FXG, such charge backs were “authorized by the
21
federal motor carrier leasing regulations, and therefore were exempt from the California
22
Labor Code provisions that restrict employer deductions from employee wage payments.”
23
Docket No. 113 (Mot. at 1).
24
Thus, even though the class members were now deemed employees (per the Ninth
25
Circuit‟s decision), there were still some significant liability and damages issues to be resolved.
26
The parties thereafter engaged in settlement negotiations, which were ultimately
27
28
1
Those motions can be found at Docket Nos. 108, 111, and 113.
2
Court expressed concerns about the settlement and ordered supplemental briefing. One of the
3
Court‟s main concerns related to the meal-and-rest-break (“MRB”) claim. In particular, the
4
release extended to these claims, but there was no consideration expressly exchanged therefor.
5
The parties agreed to restructure the settlement to address this concern (i.e., the parties would ask
6
for certification of a settlement subclass for MRB claims that post-date August 2011 and provide
7
monetary relief therefor), and the Court continued the hearing.2 Promptly thereafter, Henry
8
Zohrabians moved to intervene and sought appointment as a subclass representative. Mr.
9
Zohrabians seized on the Court‟s concerns regarding the MRB claim to support his motions. The
10
Court ultimately denied Mr. Zohrabians‟s motions and granted preliminary approval. See Docket
11
No. 175 (order denying Mr. Zohrabians‟s motions); Docket No. 179 (order granting preliminary
12
For the Northern District of California
successful. Plaintiffs thus moved for preliminary approval. Prior to the hearing on the motion, the
2
United States District Court
1
approval).
Notice was then issued to the class, which is comprised of 2,016 people. Because of a
13
14
technical problem with the mailing list, notice was re-issued. Ultimately some form of notice was
15
given to all but three members of the class. See generally Myette Decl.; Supp. Myette Decl.
16
As of April 5, 2016, the settlement administrator had received 1,544 claim forms,3 which
17
translates to a response rate of approximately 77 percent (i.e., 1,544 ÷ 2,016).4 The claim forms
18
19
20
21
22
23
24
2
The settlement has, technically speaking, two components: (1) settlement of class action claims
that were certified by the MDL court and (2) settlement of the post-August 2011 MRB claims
which have never been certified. Plaintiffs did not seek certification of pre-August 2011 MRB
claims because of a likely statute-of-limitations problem. See Aguilera v. Pirelli Armstrong Tire
Corp., 223 F.3d 1010, 1018-19 (9th Cir. 2000) (in considering whether the statute of limitations
was tolled during the pendency of a class action (named Anderson), concluding that there was
tolling but, “whatever tolling applied, it ceased once the deadline for seeking class certification [in
Anderson] passed on October 15, 1996”; the Anderson plaintiffs never moved for class
certification). The settlement makes clear that the release does not cover any pre-August 2011
MRB claims.
3
25
26
“Of the 1544 claims received, one was submitted by an individual who opted out of the class in
2009 [and] was deemed invalid, and 41 were submitted by Estrada class members who were
ineligible to recover damages in the Alexander case.” Supp. Myette Decl. ¶ 14.
4
27
28
With respect to the claims made, the settlement administrator received from class members
approximately 61disputes regarding work history and/or estimated award. “Of the 61 disputes, 8
were sustained and 53 were overruled.” Supp. Myette Decl. ¶ 16.
3
1
represent claims for payment of approximately $149,394,731.79. See Supp. Myette Decl. ¶ 12.
2
The gross settlement fund is $226,500,000. The net settlement fund is approximately
3
$173,245,000.5 Based on this net figure, roughly 86% of the net settlement fund has been claimed
4
by responding members of the class. See Supp. Myette Decl. ¶ 12. Pursuant to the settlement
5
agreement, the remaining portion of the net settlement fund will be distributed to the claiming
6
class members on a pro rata basis. According to the settlement administrator, based on the above
7
figures, the average pay-out to claiming class members will be approximately $112,000, with “the
8
lowest award at $250 and the highest award [at] $440,670.10.” Supp. Myette Decl. ¶ 15.
The settlement administrator has received no requests for exclusion (with exclusion being
9
opportunity to opt out after the class was certified). See Myette Decl. ¶ 18. Only a handful of
12
For the Northern District of California
an option only for the MRB subclass as all other class members were previously given an
11
United States District Court
10
objections were made to the settlement. One of the objectors is Mr. Zohrabians.6
II.
13
DISCUSSION
Federal Rule of Civil Procedure 23(e) provides that “[t]he claims, issues, or defenses of a
14
15
certified class may be settled, voluntarily dismissed, or compromised only with the court‟s
16
approval.” Fed. R. Civ. P. 23(e). It further provides that, “[i]f the proposal would bind class
17
members, the court may approve it only after a hearing and on finding that it is fair, reasonable,
18
and adequate.” Fed. R. Civ. P. 23(e)(2). Where there is a proposed settlement class, a court must
19
also ensure that the requirements for certification under Federal Rule of Civil Procedure 23(a) and
20
(b) have been met.7
In assessing the fairness of a settlement, a court must consider the following factors:
21
22
5
23
24
25
26
27
It is not entirely clear how Plaintiffs arrived at the net figure. The following sums need to be
extracted from the gross figure to get to the net: (1) attorney‟s fees and costs ($49,830,000); (2)
incentive awards ($171,500); (3) settlement administration costs (approximately $30,000); (4)
PAGA penalties to the state (approximately $1.2 million); (5) a “reserve fund” ($2,000,000); and
(6) settlement of the named Plaintiffs‟ individual claims ($1 million). If these amounts are correct,
the Court calculates a net of approximately $172,268,500.
6
It is somewhat disingenuous for Mr. Zohrabians not to have aired many of the specific concerns
that he identifies now when he could have done so at preliminary approval.
7
28
The Court previously concluded, in its preliminary approval order, that the Rule 23(a) and (b)
requirements were met for the proposed MRB settlement subclass.
4
1
(1) the strength of the plaintiffs‟ case; (2) the risk, expense,
complexity, and likely duration of further litigation; (3) the risk of
maintaining class action status throughout the trial; (4) the amount
offered in settlement; (5) the extent of discovery completed and the
stage of the proceedings; (6) the experience and views of counsel;
(7) the presence of a governmental participant; and (8) the reaction
of the class members to the proposed settlement. In addition,
although “strong judicial policy . . . favors settlements,” the
settlement may not be the product of collusion among the
negotiating parties.
2
3
4
5
6
7
Churchill Vill., L.L.C. v. GE, 361 F.3d 566, 575-76 (9th Cir. 2004).
The Court previously considered these factors and concluded that they warranted a grant of
8
9
preliminary approval of the proposed settlement. For example, as to factors (1)-(3), although
were employees and that the class would not be decertified, FXG filed three-post remand motions
12
For the Northern District of California
Plaintiffs‟ case was significantly strengthened by the Ninth Circuit‟s ruling that class members
11
United States District Court
10
that raised substantial liability and damages issues. As to factor (4), the average recovery for a
13
class member is significant – more than $100,000. With respect to factor (5), Plaintiffs acquired a
14
substantial amount of discovery from FXG, and this case has been hotly contested for years.
15
Regarding (6), Plaintiffs‟ counsel is knowledgeable and experienced (even more so because of
16
their prior experience with the Estrada case), and they support the settlement.
The Court is now called upon to assess these factors again, particularly now that it has the
17
18
reaction of the class members to the proposed settlement. While, in the typical case, the Court
19
would address each of these factors in seriatim, in this case, because this Court has already
20
assessed the factors, it will address these factors as subsumed by the objections raised. For the
21
reasons discussed below, the Court concludes that the objections raised do not warrant denial of
22
final approval.8
23
A.
Mr. Marquez and Mr. Carrera have objected to not receiving overtime. However, the
24
25
Mr. Marquez and Mr. Carrera: Overtime
overtime class certified herein is defined as persons who operated vehicles weighing less than
26
8
27
28
The Court considers only objections that were made in writing. Objections raised for the first
time at the hearing (e.g., El-Hani‟s objection to the incentive awards) have been waived. The
Court gives some leeway, however, to objections raised by pro se class members because they are
not represented.
5
1
10,001 pounds. Mr. Marquez‟s own submission indicates that he drove vehicles weighing 80,000
2
pounds. See Docket No. 203 (letter). At the hearing, Mr. Carrera admitted that his vehicle
3
exceeded 10,001 pounds (albeit by only a few pounds).
Plaintiffs have a good basis for limiting the overtime class to those who operated vehicles
4
5
weighing less than 10,001 pounds. California overtime law contains a motor carrier exemption.
6
See IWC Wage Order 9-2011(L) (providing that “[t]he provisions of this section are not applicable
7
to employees whose hours of service are regulated by . . . [t]he United States Department of
8
Transportation Code of Federal Regulations, Title 49, Sections 395.1 to 395.13, Hours of Service
9
of Drivers”); see also 49 U.S.C. § 31502(b) (section in the Motor Carrier Act providing that the
carriers and motor private carriers). But drivers of vehicles with a gross vehicle weight rating of
12
For the Northern District of California
Secretary of Transportation may prescribe maximum hours of service of employees of motor
11
United States District Court
10
less than 10,001 pounds are outside the scope of the exemption – i.e., they (but not those who
13
drive heavier trucks) can get overtime under California law. See Dunkel v. Warrior Energy Servs.,
14
304 F.R.D. 193, 200 (W.D. Pa. 2014) (noting that federal law passed in 2005 amended the Motor
15
Carrier Act so as to define a “motor private carrier” as a person transporting property by a
16
commercial motor vehicle, and commercial motor vehicle was defined as one with a gross vehicle
17
weight rating of at least 10,001 pounds; while subsequent federal law (passed in 2008) dropped
18
the use of the term “commercial motor vehicle,” it still maintained the 10,001-pound benchmark
19
by now defining a “covered employee” as one whose work affected the safety of operation of
20
motor vehicles weighing 10,000 pounds or less”).
At the hearing, both Mr. Marquez and Mr. Carrera intimated that other persons are still
21
22
receiving overtime even though they drove vehicles exceeding 10,000 pounds. However, there is
23
no evidence before the Court to support this claim. In any event, Mr. Marquez and Mr. Carrera
24
are properly excluded from the class.
25
///
26
///
27
///
28
///
6
1
B.
El-Hani9: Release
2
El-Hani (i.e., Mr. El-Hani and an affiliated entity, El-Hani Services, Inc.) has objected to
3
the settlement on the ground that the settlement exposes El-Hani to liability.10 El-Hani explains
4
that, even though FXG hired it to service certain routes, El-Hani then hired drivers to service those
5
routes; El-Hani‟s concern is that it will now be sued by these “secondary drivers” for the same
6
claims. See, e.g., Docket No. 196 (Obj. at 4) (“Class members [like objectors] are now exposed to
7
the very claims they have brought against FedEx.”). El-Hani argues that the settlement is
8
unsatisfactory unless the secondary drivers are brought into the settlement and their claims against
9
class members released as well.
As a preliminary matter, the Court questions the timeliness of El-Hani‟s objection. El-
10
Hani is essentially arguing that the class definition should be expanded to include secondary
12
For the Northern District of California
United States District Court
11
drivers. But that argument should have been raised at class certification. Notably, even El-Hani
13
admitted at the hearing that it would have been preferable for the objection to have raised at the
14
certification stage.
Moreover, on the merits, El-Hani‟s argument is problematic. Plaintiffs had no obligation
15
16
to bring suit on anyone‟s behalf but their own and/or the behalf of others similarly situated, and
17
secondary drivers are not similarly situated because they, unlike the class members, never actually
18
contracted with FXG; thus, their claim an employment relationship with FXG is more difficult to
19
assert. Furthermore, the entire premise of El-Hani‟s objection is that class members and
20
secondary drivers have a conflict, and therefore the two groups cannot be similarly situated.
21
Including secondary drivers in the class could be problematic.
22
9
23
24
25
26
27
The Court uses the term “El-Hani” to refer to Mr. El-Hani and an affiliated entity, El-Hani
Services, Inc.
El-Hani is represented by John William Davis and Steven F. Helfand. At the hearing,
Plaintiffs indicated that counsel are serial objectors. Based on the Court‟s ECF review, Mr. Davis
appears as an attorney in 12 cases in this District. In 11 of these cases (including this one), Mr.
Davis represented an objector (in one case, himself). Mr. Helfand was co-counsel for the objector
in several of the cases and had Mr. Davis represent him as an objector in one case. Mr. Helfand
has also represented an objector, on his own, in at least one other case in this District.
10
28
At the hearing, Plaintiffs noted that El-Hani had neither opted out nor filed a claim, instead
simply filing an objection. El-Hani did not dispute this fact.
7
To the extent El-Hani is suggesting that there is a joinder problem pursuant to Federal Rule
1
2
of Civil Procedure 19, the Court does not agree. The absence of the secondary drivers does not
3
prevent the Court from “afford[ing] complete relief among the existing parties,” and the secondary
4
drivers are not “so situated that disposing of the action in [their] absence may . . . impair or impede
5
[their] ability to protect [their] interest” or leave class members like El-Hani “subject to a
6
substantial risk of incurring double, multiple, or otherwise inconsistent obligations because of the
7
interest.” Fed. R. Civ. P. 19(a) (addressing required joinder). El-Hani is not prevented from
8
defending a claim by secondary drivers.
9
C.
Mr. Zohrabians and El-Hani: Use of a Claim Form
Mr. Zohrabians and El-Hani have objected to the use of a claim form. They argue that,
10
although the response rate is high (approximately 77%), the response rate would be 100% or close
12
For the Northern District of California
United States District Court
11
thereto in the absence of a claim form as, in that scenario, checks would be issued directly to class
13
members.
The Court acknowledges that the use of a claim form can, in some circumstances, be
14
15
unnecessary and can present a needless barrier to relief. In some situations, class members may
16
well not undertake the effort of filling out and submitting a claim form, particularly where the
17
recovery per class member is small. Thus, requiring a claim form, in certain situations, can
18
depress the response rate.
19
That being said, the Court finds that this is not a case where use of a claim form is
20
unreasonable. Here, many class members are being offered substantial awards, and thus there is,
21
in the main, a strong incentive for class members to fill out and submit claim forms. Furthermore,
22
as Plaintiffs argue, given the age of this case (first initiated in 2004) and the size of the checks, a
23
claim process was reasonable to ensure that correct contact information was secured and to protect
24
against fraud. This is particularly true where nearly all class members have been or will be
25
contacted, if necessary, multiple times to ensure they are informed of their rights under the
26
settlement agreement.
27
D.
28
Mr. Brooks: Untimely Claim
Mr. Brooks has objected to the settlement on the ground that untimely claims should still
8
1
be deemed valid. While there may be an argument that Mr. Brooks‟s objection is untimely, the
2
Court need not address that issue because Mr. Brooks‟s objection raises an issue that the Court
3
considered independently prior to the filing of his objection.
While the 77% response rate is high, the Court has concerns over why the response rate is
4
5
not higher given the substantial recoveries for many class members.11 Implicitly, the parties in
6
this case shared the Court‟s concern, as indicated by their agreement to honor late-filed claims.
7
See Mot. at 9 n.6. At the hearing, Plaintiffs indicated that the parties had discussed giving the
8
class members additional time to submit claims, more specifically, after a further effort by
9
Plaintiffs to get in touch with those non-claiming class members. The Court agrees that additional
further contact all non-claiming class members (although previously notified of the settlement
12
For the Northern District of California
outreach should be undertaken. Accordingly, Plaintiffs shall undertake all reasonable efforts to
11
United States District Court
10
through the class notice). Plaintiffs shall immediately undertake such efforts as the Court is now
13
requiring all claims to be submitted no later than May 15, 2016. Moreover, all late filed claims
14
will be accepted up until said date.
15
E.
Mr. Evans: No Payment
16
Mr. Evans has objected to the settlement on the ground that the claim administrator
17
determined that he had no right to any payment. At the hearing, however, Plaintiffs explained that
18
Mr. Evans was not eligible for a settlement payment for the time period November 17, 2000,
19
through December 31, 2008 (as explained in the class notice) because he was a member of the
20
certified class in Estrada v. FedEx Ground Package System, Inc., No. BC210130 (L.A. Superior
21
Court) and his claims were dismissed with prejudice under the stipulated judgment entered in that
22
case on December 23, 2008.
23
F.
Mr. Zohrabians has objected to the settlement on the ground that communications with the
24
25
Mr. Zohrabians: Opt-Out
class, in particular the class notice containing the opt-out provision, have been confusing. The
26
11
27
28
The Court recognizes that there is no reverter to FXG in this case and any unclaimed funds
would be subject to a second distribution to the class. However, the Court still has an interest in
ensuring that each class member gets his or her due, particularly given that claims for relief are
being released.
9
1
Court does not agree. The Court carefully vetted the language of the class notice to ensure that it
2
was understandable, particularly for a lay person. Notably, the opt-out language that Mr.
3
Zohrabians claims is confusing does not come from the class notice; rather, it is language from the
4
settlement agreement.
argues that all class members should be given a second opportunity to opt out and that absent
7
such, their due process rights will be violated. This argument lacks merit. Rule 23(e) provides
8
that, “[i]f the class action was previously certified under Rule 23(b)(3), the court may refuse to
9
approve a settlement unless it affords a new opportunity to request exclusion to individual class
10
members who had an earlier opportunity to request exclusion but did not do so.” Fed. R. Civ. P.
11
23(e)(3) (emphasis added). The term “may” implies courts are not required to give a second opt-
12
For the Northern District of California
At the hearing, Mr. Zohrabians changed his opt-out argument.12 Mr. Zohrabians now
6
United States District Court
5
out opportunity after class certification. Mr. Zohrabians has cited no case which holds there is a
13
due process violation where a court declines to give a second opt-out opportunity. Moreover, Mr.
14
Zohrabians has not articulated why a second opt-out opportunity is warranted here. Certainly, “[a]
15
decision to remain in the class is likely to be more carefully considered and is better informed
16
when settlement terms are known.” Fed. R. Civ. P. 23(e)(3), 2003 advisory committee notes. But
17
Mr. Zohrabians has not pointed to, e.g., any “changes in the information available to class
18
members since expiration of the first opportunity to request exclusion” which might justify a
19
second opt-out opportunity.13 Fed. R. Civ. P. 23(e)(3), 2003 advisory committee notes. The Court
20
sees no need for a second opportunity to opt out given the positive response rate to the settlement
21
and the limited number of objections.
22
12
23
24
25
26
27
28
This is the second time that Mr. Zohrabians, when confronted with a meritorious counterargument, has changed his tune. More specifically, Mr. Zohrabians took the same tactic when the
Court asked him how he would be prejudiced if the Court were to deny intervention. Instead of
answering this question, Mr. Zohrabians came up with a completely new argument, asserting
(without merit) that the MDL court had certified the MRB claim. See Docket No. 175 (Order at 34).
13
At the hearing, Mr. Zohrabians suggested that there was a chance in circumstances because the
settlement release is broader than the class certification. However, the only broadening is the
settlement of the MRB claim. As to that claim, the settlement notice itself gave subclass members
an opportunity to opt out. Mr. Zohrabians fails to explain why, after the settlement notice, class
members should now be given yet another opportunity to opt out of the MRB subclass.
10
1
G.
Mr. Zohrabians: Maximum Exposure Analysis
Mr. Zohrabians has objected on the basis that Plaintiffs failed to conduct a sufficient
2
3
analysis as to the total maximum exposure FXG faced. This objection patently lacks merit. As
4
Plaintiffs explain in their motion, they acquired 15 years‟ worth of data for all class members and
5
hired a forensic accounting expert who spent dozens of hours reviewing the documents. Plaintiffs
6
calculated FXG‟s maximum potential exposure assuming, e.g., that they would prevail on every
7
aspect of their damages claims and that the Court would award the full measure of civil penalties
8
under PAGA and the California Labor Code. While Mr. Zohrabians suggests that Plaintiffs
9
“should have been able to come up with very specific damages information via questionnaires,
account that many of the class members likely would not have retained records for all of their
12
For the Northern District of California
receipts for expenses, and a host of other methods,” Zohrabians‟s Obj. at 14, he fails to take into
11
United States District Court
10
expenses, hours, and deliveries for the past 15 years. Moreover, as Plaintiffs note, Mr.
13
Zohrabians‟s approach “would have been extremely onerous, time consuming and
14
counterproductive” as a similar analysis took Plaintiffs‟ counsel “an entire year to calculate . . . for
15
only 200 people in Estrada” (i.e., compared to the 2,016 class members here). Mot. at 22.
16
H.
Mr. Zohrabians: Risk of Litigation
17
Mr. Zohrabians has objected to the settlement on the basis that the risk of litigation in this
18
case was minimal, i.e., because the class has already been certified and that, post-certification, the
19
Ninth Circuit determined that class members were employees. Once again, Mr. Zohrabians‟s
20
objection lacks merit. Mr. Zohrabians gives short shrift to the three post-remand motions brought
21
by FXG. Mr. Zohrabians has failed to give any analysis as to why these three motions were of no
22
real consequence or otherwise lacking in merit.
23
I.
24
Mr. Zohrabians: Conflict of Interest
Mr. Zohrabians has objected to the settlement, claiming that it is permeated with conflicts
25
of interest – e.g., between the named Plaintiffs and other class members, between the certified
26
class and the uncertified class, and between the class and counsel. None of these asserted conflicts
27
has any basis.
28
As to the first claimed conflict, this is territory that the Court already covered when it
11
1
denied Mr. Zohrabians‟s motions to intervene and for appointment as a subclass representative.
2
The bottom line is that the MRB subclass is settling only MRB claims from August 2011 and on.
3
The named Plaintiffs are giving up more and therefore are getting additional payment. More
4
specifically, the named Plaintiffs are also giving up their MRB claims that pre-date August 2011;
5
the MRB subclass is not releasing pre-August 2011 MRB claims. Notably, the named Plaintiffs
6
do not face a statute-of-limitations bar for their pre-August 2011 MRB claims but other class
7
members may well have a timeliness problem should they file such claims against FXG now.
8
Furthermore, it is significant that “[t]he MRB claims of [the] provisionally certified subclass [i.e.,
9
2011 and on] were valued and discounted for risk according to the identical assumptions used to
10
value and discount the Named Plaintiffs‟ individual MRB claims [pre-2011].” Mot. at 28.
As for the second claimed conflict, it makes no sense whatsoever. As Plaintiffs argue, they
12
For the Northern District of California
United States District Court
11
had no obligation to litigate claims held by FXG drivers who do not meet the class definition.
Finally, the Court gives no credit to the third alleged conflict. Plaintiffs‟ counsel has spent
13
14
more than ten years working on this case, and the litigation has been hard fought, with – as
15
Plaintiffs argued at the hearing – counsel ably seizing victory (i.e., the Ninth Circuit appeal) from
16
the jaws of defeat (i.e., the MDL court‟s grant of summary judgment to FXG). When faced with
17
significant post-remand motions, Plaintiffs‟ counsel still secured a settlement which will give class
18
members substantial relief, with an average pay-out of approximately $112,000 per class member.
19
See Supp. Myette Decl. ¶ 15. The bulk of Mr. Zohrabians‟s criticism arises from counsel‟s
20
resolution of the named Plaintiffs‟ MRB claims but the Court has already addressed those issues in
21
its prior orders, in particular, its order denying Mr. Zohrabians‟s motion to intervene and for
22
appointment.14
23
J.
Mr. Zohrabians and El-Hani: Clear-Sailing Clause
Both Mr. Zohrabians and El-Hani have objected to the settlement because it contains a
24
25
clear-sailing provision with respect to attorney‟s fees. This objection lacks merit. As Plaintiffs
26
note, in Rodriguez v. West Publishing Corp., 563 F.3d 948 (9th Cir. 2009), the Ninth Circuit
27
14
28
Notably, Mr. Zohrabians‟s counsel has not taken up representation of drivers who may have
pre-August 2011 MRB claims which were not released by the settlement herein.
12
1
rejected the objectors‟ contention that
2
the “clear sailing” provision by which West and Kaplan [defendants]
agreed not to contest attorney‟s fees or incentive awards of no more
than $ 25,000 evinces collusion. . . . [B]oth payments were to be
made from the settlement fund, capped at $49 million. This scenario
does not signal the possibility of collusion because, by agreeing to a
sum certain, West and Kaplan were acting consistently with their
own interests in minimizing liability. Cf. Weinberger v. Great N.
Nekoosa Corp., 925 F.2d 518, 524 (1st Cir. 1991) (inferring
collusion from a “clear sailing” provision when the attorney‟s fees
were to be paid on top of the settlement fund as this is
counterintuitive defense behavior).
3
4
5
6
7
8
2011) (identifying as a settlement arrangement that could indicate collusion “when the parties
11
negotiate a „clear sailing‟ arrangement providing for the payment of attorneys‟ fees separate and
12
For the Northern District of California
Id. at 961 n.5; see also In re Bluetooth Headset Prods. Liab. Litig., 654 F.3d 935, 947 (9th Cir.
10
United States District Court
9
apart from class funds”); Larsen v. Trader Joe’s Co., No. 11-cv-05188-WHO, 2014 U.S. Dist.
13
LEXIS 95538, at *26-27 (N.D. Cal. July 11, 2014) (noting that, even under Bluetooth, “clear
14
sailing provisions generally do not raise concerns where, as here, the fees are to come from the
15
settlement fund”). Here, attorneys‟ fees would be paid out of, not on top of, the settlement fund.
16
K.
17
El-Hani: Attorney‟s Fees and Costs
Finally, El-Hani has objected to the fee/cost award on the ground that it is excessive.
18
Plaintiffs are asking for 22% of the gross settlement fund for fees and costs. This amounts to an
19
award of $49,830,000 – i.e., almost $50 million. Plaintiffs calculate their lodestar as being
20
between $12-14 million. (Plaintiffs have provided a range for their lodestar because they have had
21
to extrapolate how much of the MDL work was reasonable and necessary to the Alexander case
22
specifically.) See Fee Mot. at 18-20. Thus, Plaintiffs are asking for a multiplier of 3.5 to 4 in
23
order to get to the $50 million fee request.
24
1.
Percentage Method
25
As noted above, Plaintiffs are asking for 22% of the gross settlement fund for fees and
26
expenses. This is less than the 25% benchmark identified by the Ninth Circuit. However, given
27
the size of the common fund, even a 22% award would be substantial – it would amount to an
28
award of almost $50 million.
13
1
El-Hani objects that a 22% award is too high because this is a megafund case. A
2
megafund case is simply a case that has a very large common fund recovery. This case is fairly
3
deemed a megafund case by virtue of the fact that the common fund recovery is approximately
4
$226 million. See Ramah Navajo Chapter v. Jewell, No. 90 CV 957 JAP/KBM, 2016 U.S. Dist.
5
LEXIS 27624, at *63 (D.N.M. Mar. 2, 2016) (noting that “a „mega fund‟ recovery [is] currently
6
defined as cases with common fund recovery of more than $100 million”).
is extraordinarily large, the application of a benchmark or standard percentage may result in a fee
9
that is unreasonably large for the benefits conferred.” In re Copley Pharm., Inc., 1 F. Supp. 2d
10
1407, 1413 (D. Wyo. 1998). “„[A]bsent unusual circumstances, the percentage will decrease as
11
the size of the fund increases‟[]. This sliding scale . . . is explained in part by economies of scale.
12
For the Northern District of California
In megafund cases, use of the percentage method can be tricky. “[W]hen a common fund
8
United States District Court
7
It is not one hundred fifty times more difficult to prepare, try, and settle a $150 million case than it
13
is to try a $1 million case.” Id. “„[I]n many instances the increase [in recovery] is merely a factor
14
of the size of the class and has no direct relationship to the efforts of counsel.‟”15 In re Prudential
15
Ins. Co. America Sales Practice Litig. Agent Actions, 148 F.3d 283, 339 (3d Cir. 1998).
16
Plaintiffs argue that, even if this is a megafund case, it is different from the typical
17
megafund case in that the size of the common fund is not really attributable to the size of the class
18
(2,016 members) but rather to the efforts of counsel and “the size of each class member‟s
19
recovery, many of whom will receive over $100,000.” Fee Mot. at 22. It is the efforts of counsel,
20
however, that is critical. See Bluetooth, 654 F.3d at 942 (stating that “where awarding 25% of a
21
„mega-fund‟ would yield windfall profits for class counsel in light of the hours spent on the case,
22
courts should adjust the [25%] bench-mark percentage or employ the lodestar method instead”).
23
Indeed, even Plaintiffs‟ own brief reflects that fees based on “the extent of the damages” often
24
15
25
26
27
28
Percentages actually awarded in megafund cases run the gamut – e.g., sometimes as low as 815% and sometimes as high as 30%. See Ramah Navajo, 2016 U.S. Dist. LEXIS 27624, at *63;
see also Vizcaino v. Microsft Corp., 290 F.3d 1043, 1052-53 (9th Cir. 2002) (table addressing
percentage-based fee awards in common fund cases of $50-200 million from 1996 to 2001;
percent awarded ranged from 2.8% to 40%); In re High-Tech Emple. Antitrust Litig., No. 11-CV02509-LHK, 2015 U.S. Dist. LEXIS 118052, at *50 (N.D. Cal. Sept. 2, 2015) (finding persuasive
evidence presented that “the median attorney‟s fees award in a sample of 68 „megafund‟ class
action settlements over a 16-year period was 10.2%”).
14
1
results in a windfall. See Fee Mot. at 22 (arguing that, in megafund cases, “which are usually
2
consumer or securities class actions, courts sometimes reduce the percentage award from a large
3
common fund to avoid a „windfall‟ to class counsel due to the likelihood that the multiplier over
4
counsel‟s lodestar is attributable only to the size of the class or the extent of the damages, rather
5
than to counsel‟s efforts”) (emphasis added).
Given that the issue is what were counsel‟s efforts, that makes the lodestar calculation even
6
7
more important. The lodestar calculation, plus the multiplier, are addressed below.
8
2.
Lodestar Calculation
9
Plaintiffs are represented by Leonard Carder (“LC”). LC spent time on the Alexander case
Other counsel in the MDL also worked on the Alexander case by virtue of the MDL. LC claims a
12
For the Northern District of California
both as representatives of Plaintiffs and as one of the co-lead counsel designated in the MDL.
11
United States District Court
10
lodestar (with no multiplier) of $12.4 to 14 million. See Fee Mot. at 18. The claimed lodestar is
13
based on the following:
14
(1)
LC has identified hours that it spent on the Alexander case before transfer to the MDL and
15
after remand to this court (2,997.75 hours translating to $1.7 million in fees). See Fee
16
Mot. at 17-18; Ross Decl., Ex. B.
17
(2)
LC has also identified hours that it spent during the MDL but that pertained to the
18
Alexander case specifically (3,594.5 hours translating to $1.9 million in fees). See Fee
19
Mot. at 18; Ross Decl., Ex. C.
20
(3)
Finally, LC has explained that, during the MDL, all MDL counsel spent time on “Omnibus
21
work” (i.e., work not specific to any state/case but rather applicable to all). LC argues that
22
it and other MDL counsel should be compensated in the Alexander case for “a reasonable
23
portion of the time devoted by the MDL Counsel to the Omnibus work” because “virtually
24
all of the underlying Omnibus fact and expert discovery work done in support of class
25
certification, summary adjudication and non-dispositive motion practice was necessary to
26
establish the California Drivers‟ employment status.” Fee Mot. at 18-19 (emphasis in
27
original). The total fees for all MDL counsel for Omnibus work is approximately $34.8
28
million. See Ross Decl., Ex. D. LC asks, on its behalf and the behalf of the other MDL
15
1
counsel, to be compensated for 25-30% of that amount – i.e., $8.7 to 10.4 million. See Fee
2
Mot. at 18; see also Fee Mot. at 19 (acknowledging that, “[b]ecause [a] singular record was
3
necessary to establish employment status – whether Alexander was litigated as a stand-
4
alone action or in the MDL docket – any effort to allocate an exact percentage of the total
5
MDL lodestar to Alexander is extremely difficult”). According to LC, $8.7 to 10.4 million
6
represents approximately 21,000-25,000 hours of work. See Fee Mot. at 18.
7
As expressed at the hearing, the Court is concerned with regard to (3) above. Plaintiffs
but more evidence is needed to demonstrate that the 25-30% figure was appropriately selected.
10
Plaintiffs shall provide a supplemental brief (which may be filed under seal) to support the 25-
11
30% figure. For example, in its supplemental brief, Plaintiffs could provide additional
12
For the Northern District of California
reasonably argue that a portion of the Omnibus work should, in effect, be chargeable to Alexander
9
United States District Court
8
information as to how much of the Omnibus work has been allocated to other cases (i.e., to ensure
13
that counsel will not get double recovery) and the size of the respective recoveries in the other
14
case which grew out of the MDL, including how much the proposed recovery in the Alexander
15
(i.e., California) case was compared to all other cases in the MDL. The supplemental brief shall
16
be filed within two (2) weeks from the date of this order.
The Court will reserve any further analysis, including the lodestar cross-check, pending
17
18
review of further briefing ordered herein.
19
III.
CONCLUSION
For the foregoing reasons, the Court finds that the objections lack sufficient merit to
20
21
warrant a denial of final approval. However, the Court at this juncture grants only conditional
22
approval so that (1) it can consider the response rate after Plaintiffs make additional outreach to
23
nonclaiming class members and (2) it can consider the supplemental brief related to fees. Because
24
of the latter issue, the Court also defers ruling on the fee motion.
25
///
26
///
27
///
28
///
16
1
As noted above, Plaintiffs‟ supplemental brief related to fees shall be filed within two (2)
2
weeks from the date of this order. In addition, by May 23, 2016, Plaintiffs shall file a
3
supplemental brief addressing whether additional claims were made on the common fund.
4
This order disposes of Docket No. 204.
5
6
IT IS SO ORDERED.
7
8
9
10
Dated: April 12, 2016
______________________________________
EDWARD M. CHEN
United States District Judge
12
For the Northern District of California
United States District Court
11
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
17
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.
Why Is My Information Online?