Morrison v. Zangpo

Filing 50

ORDER by Judge Edward M. Chen Denying 40 Plaintiff's Motion for Relief from Stipulation. (emcsec, COURT STAFF) (Filed on 9/30/2008)

Download PDF
1 2 3 4 5 6 7 8 9 10 v. ULI ZANGPO, Defendant. ___________________________________/ MARK MORRISON, Plaintiff, No. C-08-1945 EMC ORDER DENYING PLAINTIFF'S MOTION FOR RELIEF FROM STIPULATION (Docket No. 40) UNITED STATES DISTRICT COURT NORTHERN DISTRICT OF CALIFORNIA United States District Court 11 For the Northern District of California 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Plaintiff Mark Morrison has filed suit against Defendant Uli Zangpo for, inter alia, breach of contract and other state law claims. Currently pending before the Court is Mr. Morrison's motion for relief from a stipulation for arbitration. In the motion, Mr. Morrison essentially asks that he be allowed to withdraw his statement of nonopposition to binding arbitration. Having considered the parties' briefs and accompanying submissions, as well as the oral argument of counsel and all other evidence of record, the Court hereby DENIES Mr. Morrison's motion. I. FACTUAL & PROCEDURAL BACKGROUND The claims asserted by Mr. Morrison in his complaint all concern the work that Mr. Zangpo performed on real property owned by Mr. Morrison. The work was governed by a contract between the parties entered into on June 21, 2006, see Compl., Ex. B [hereinafter Original Prospect Agreement], and subsequently revised on December 5, 2006. See Compl., Ex. F [hereinafter Revised Prospect Agreement]. This contract shall hereinafter be referred to as the Prospect Agreement. Neither the Original nor the Revised Prospect Agreement contained an arbitration clause. 1 2 3 4 5 6 7 8 9 10 Prior to the Prospect Agreement, Mr. Morrison and Mr. Zangpo -- as well as two others, Jennifer Baker (Mr. Zangpo's wife) and Jim Sciaroni -- entered into an agreement with respect to a different piece of real property. See Docket No. 12 (Bloomfield Decl., Ex. A) [hereinafter Manzanita Agreement]. This agreement shall hereinafter be referred to as the Manzanita Agreement. The Manzanita Agreement reflected that Mr. Zangpo and his wife owned and/or were in control of certain real property and that it was "[t]he intention of the Parties . . . to work together in creating four legal buildable parcels of real property so that [Mr. Zangpo and his wife, Mr. Sciaroni, Mr. Morrison, and Steven Finkbine] each have one parcel to build a single family residential home" and "to work together to create useable community space" for common areas. Manzanita Agreement ¶ 1. Unlike the Prospect Agreement, the Manzanita Agreement did contain an arbitration clause, which provided as follows: "Any dispute or proceeding concerning this Agreement, or any and all claims arising out of or in connection with this Agreement will be resolved by binding arbitration to be held in Marin County, California." Manzanita Agreement ¶ 27 (emphasis added). After Mr. Morrison initiated this lawsuit concerning the Prospect Agreement, Mr. Zangpo filed a motion to stay proceedings pending mandatory binding arbitration. See Docket No. 11. In the motion, Mr. Zangpo argued that mandatory binding arbitration was required because, even though the Prospect Agreement did not contain an arbitration clause, the Manzanita Agreement did, and the Prospect Agreement was "actually an addendum" to the Manzanita Agreement. Docket No. 11 (Mot. at 2). In response to the motion to stay, Mr. Morrison filed a statement of nonopposition. See Docket No. 20. In the statement, Mr. Morrison disputed that the Prospect Agreement was an addendum to the Manzanita Agreement, but he specifically agreed that "the dispute over the Prospect contract relates to, or arises from, the Manzanita property, and that any potential dispute regarding either property or contract should be decided by binding arbitration." Docket No. 20 (Opp'n at 2). The Court therefore issued an order stating that it would order mandatory arbitration so long as Mr. Zangpo's motion to dismiss for lack of subject matter jurisdiction was denied. See Docket United States District Court 11 For the Northern District of California 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 2 1 2 3 4 5 6 7 8 9 10 No. 27 (Order at 2). Subsequently, the Court denied the motion to dismiss, and, at a case management conference held thereafter, the Court discussed with the parties the issue of mandatory arbitration. The Court was concerned that, in spite of the parties' previous agreement to mandatory arbitration, it now appeared -- based on the parties' joint case management conference statement -that there was a dispute regarding such. Mr. Morrison confirmed that there was a dispute and eventually stated that he no longer agreed to arbitration. The Court therefore gave Mr. Morrison an opportunity to file a motion to reconsider with respect to its order in which it had conditionally ordered mandatory arbitration. See Docket No. 34 (Order at 5) (citing Civil Local Rule 7-9, which governs motions to reconsider). The Court noted: "If [Mr. Morrison] files such a motion, [he] must, of necessity, establish that he is entitled to withdraw his statement [of] nonopposition . . . . He would also have to prevail on the merits and demonstrate that the instant dispute is not subject to the arbitration clause in the Manzanita agreement." Docket No. 34 (Order at 5). Mr. Morrison thereafter filed the currently pending motion. II. A. Civil Local Rule 7-9 As a preliminary matter, the Court must address Mr. Zangpo's contention that the motion should be denied in its entirety based on Mr. Morrison's failure to comply with Civil Local Rule 7-9. The Court shall not deny the motion on this basis. Civil Local Rule 7-9 requires that a party moving for reconsideration must first seek leave to file a motion to reconsider. See Civ. L.R. 7-9(a). To obtain leave to file a motion to reconsider, a party must make a specific showing -- e.g., that there are new material facts or a change of law occurring after the time of the order at issue. See Civ. L.R. 7-9(b). In the instant case, the Court already gave leave to Mr. Morrison to file a motion to reconsider. See Docket No. 34 (Order at 5). Thus, arguably, Mr. Morrison did not have to meet the specific showing as detailed in Civil Local Rule 7-9(b). The Court therefore turns to the merits of Mr. Morrison's motion. B. Relief from Stipulation The issue for the Court to consider is whether Mr. Morrison should be allowed to withdraw his statement of nonopposition to binding arbitration. Mr. Morrison argues that his statement of DISCUSSION United States District Court 11 For the Northern District of California 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 3 1 2 3 4 5 6 7 8 9 10 nonopposition was essentially a stipulation to binding arbitration, that relief from a stipulation is possible under certain circumstances, and that he is entitled to such relief because his stipulation was the result of "mistake, excusable neglect or improvidence." Mot. at 11. He later elaborates: Plaintiff's non-opposition was a mistaken legal tactic to include and finalize any and all legal relationships with Defendant. Plaintiff wanted to assure the Court of his intention to arbitrate all Prospect Agreement issues. It was a mistake, excusable neglect and improvident for Plaintiff to make this statement as his basis for stipulating to binding arbitration. His belief at the time was that the case could be efficiently, effectively and fairly adjudicated by stipulating to binding arbitration. Due to Plaintiff's misunderstanding, he believed that the Court would order binding arbitration per its own rules. Plaintiff would not have filed the non-opposition had he known he would be exposed to Defendant's attorney's fees, limited to JAMS in choosing an arbitrator or unable to conduct discovery in this case. Mot. at 11-12 (emphasis added). Some courts have held that relief from a stipulation may be given where a party enters a stipulation due to mistake, inadvertence, or excusable neglect, see, e.g., Action Alliance of Senior Citizens of Greater Philadelphia v. Elan Corp. PLC, No. 02-CV-2095, 2003 U.S. Dist. LEXIS 18089, at *4 (E.D. Pa. Sept. 5, 2003) ("`A court may allow a party to withdraw from a stipulation if the moving party can prove that he relied to his detriment on representations that were untrue, or that the stipulation stemmed from fraud, accident, mistake, inadvertence, surprise, or excusable neglect, or that some other reason justifies relief.'"), but the Ninth Circuit does not appear to have held such - at least, no Ninth Circuit authority is cited by Mr. Morrison. Even if the Ninth Circuit were to adopt that position, the mistake committed by Mr. Morrison is not a sufficient basis for relief. Although the case law does not provide much guidance as to what kind of a mistake is typically recognized, courts have analogized a stipulation to a contract, see Patterson v. Newspaper & Mail Deliverers' Union of N.Y. & Vicinity, Nos. 73 Civ. 3058 (WCC), 73 Civ. 4278 (WCC), 2005 U.S. Dist. LEXIS 37538, at *21 (S.D.N.Y. July 13, 2005) ("A stipulation and order is a binding agreement between parties to a dispute that is enforceable as a contract. . . . [R]elief from a stipulation will be granted only upon a showing of good cause sufficient to invalidate a contract, such as fraud, overreaching, duress or mistake.") (internal quotation marks omitted), and, United States District Court 11 For the Northern District of California 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 4 1 2 3 4 5 6 7 8 9 10 under California law, a unilateral mistake of fact is not a basis to rescind a contract unless the other party had reason to know of the mistake or caused the mistake or unless the effect of the mistake is such that enforcement of the contract would be unconscionable. See Donovan v. RRL Corp., 26 Cal. 4th 261, 280-82 (2001). Here, there is no evidence that Mr. Zangpo had reason to know of or caused Mr. Morrison's mistake, and it would be hard to characterize enforcement of the stipulation unconscionable when Mr. Morrison -- an attorney himself and represented by counsel in this action -- should have known about the attorney fee provision and the JAMS provision since they were specifically provided for in the Manzanita Agreement in the section on dispute resolution. See Manzanita Agreement ¶ 27. Moreover, it appears undisputed that Mr. Morrison was actually the drafter of the Manzanita Agreement, and therefore he knew of its provisions. Even if Mr. Morrison would not be entitled to relief from the stipulation based on his mistake, under Ninth Circuit law, a stipulation may still be withdrawn to prevent a manifest injustice. See Waggoner v. Dallaire, 767 F.2d 589, 593 (9th Cir. 1985) (stating that the trial court could not permit the defendant to withdraw the stipulation unless the defendant presented evidence to the court showing that withdrawal of the stipulation was necessary to prevent manifest injustice). [A] district court may disregard a stipulation if to accept it would be "manifestly unjust or if the evidence contrary to the stipulation [is] substantial. In determining what constitutes manifest injustice, courts may consider (1) the effect of the stipulation on the party seeking to withdraw the stipulation; (2) the effect on the other parties to the litigation; (3) the occurrence of intervening events since the parties agreed to the stipulation; and (4) whether the evidence contrary to the [stipulation] is substantial. State Farm Fire & Cas. v. McDevitt, No. C-00-2240 EDL, 2001 U.S. Dist. LEXIS 7529, at *22 (N.D. Cal. May 21, 2001). In the instant case, the effect on Mr. Morrison of the stipulation would be to deny him of venue in this court and his right to a jury trial therein. However, that right is waivable and the arbitration process established in the Manzanita Agreement is well established. There is no indication that the arbitration process would not be fair. Mr. Zangpo, on the other hand, would obtain the benefit of the bargain which affords him arbitration, which typically is intended as a speedier and cost effective process. As noted above, there have been no interviewing events since United States District Court 11 For the Northern District of California 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 5 1 2 3 4 5 6 7 8 9 10 the stipulation other than Mr. Morrison's realization that he may have made a tactical error. Given Mr. Morrison is an attorney and is the one who drafted both the Prospect and Manzanita Agreement, such a belated realization does not render enforcement of the stipulation a manifest injustice. Thus, Mr. Morrison fails to establish sufficient grounds for relief from the stipulation. Even if grounds for withdrawal had been established, the Court further finds Mr. Morrison's position on arbitrability without merit. C. Arbitrability As a preliminary matter, the Court must determine what arbitration law it should look to in deciding whether the dispute regarding the Prospect Agreement is covered by the arbitration clause in the Manzanita Agreement. In his motion to stay proceedings pending mandatory binding arbitration, Mr. Zangpo argued that the governing arbitration law is the Federal Arbitration Act ("FAA"). The FAA states that [a] written provision in any maritime transaction or a contract evidencing a transaction involving commerce to settle by arbitration a controversy thereafter arising out of such contract or transaction . . . shall be valid, irrevocable, and enforceable, save upon such grounds as exist at law or in equity for the revocation of any contract. 9 U.S.C. § 2. The instant case clearly does not involve a maritime transaction. Thus, the only question remaining is whether the Manzanita Agreement was a "contract evidencing a transaction involving commerce." Significantly, courts have interpreted "commerce" to mean interstate commerce. See Collins v. D.R. Horton, Inc., 505 F.3d 874, 877 n.3 (9th Cir. 2007). There is little to no evidence indicating that the Manzanita Agreement itself would involve interstate commerce or that, in the aggregate, the economic activity at issue with the Manzanita Agreement represents a general practice subject to federal control. Compare Del E. Webb Constr. v. Richardson Hosp. Auth., 823 F.2d 145, 147 (5th Cir. 1987) (concluding that FAA was applicable to owner-contractor agreement to supervise expansion and renovation of medical center, where contract involved persons from different states, employees of contractor traveled interstate, interstate mails were used to facilitate work of contractor's employees, and materials used in construction of medical center were manufactured and moved in interstate commerce), overruled on other grounds by Pedcor Mgmt. Co. Welfare Ben. Plan v. Nations Pers. of Tex., Inc., 343 F3d 355 (5th Cir. 2003); First Family Fin. United States District Court 11 For the Northern District of California 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 6 1 2 3 4 5 6 7 8 9 10 Servs. v. Fairley, 173 F. Supp. 2d 565, 573 (S.D. Miss. 2001) (concluding that borrower's claim against lender for violation of loan agreement had sufficient nexus to interstate commerce to permit lender to enforce arbitration clause under FAA in federal court, where borrower was nonresident corporation and financing transaction was required to comply with federal laws and regulations); American Gen. Fin. Servs. v. Griffin, 327 F Supp 2d 678, 681 (N.D. Miss. 2004) (holding that application of FAA was not defeated simply because individual transactions, taken alone, did not have substantial effect on interstate commerce; noting that general practice in the aggregate, commercial lending, effected interstate commerce). Therefore, the Court does not agree with Mr. Zangpo's contention that the FAA provides the governing arbitration law. That leaves the Court with state arbitration law. Under California law, "there is no policy compelling persons to accept arbitration of controversies which they have not agreed to arbitrate." RN Soln., Inc. v. Catholic Healthcare West, 165 Cal. App. 4th 1511, 1523 (2008). Still, California "law favors contracts for arbitration of disputes between parties," id., and so, not surprisingly, it is the burden of the party opposing arbitration "to show that the arbitration clause cannot be interpreted to cover the claims [at issue]." EFund Capital Partners v. Pless, 150 Cal. App. 4th 1311, 1321 (2007). In fact, because of California's "strong public policy in favor of arbitration," if there is "any doubt" as to whether a plaintiff's claims come within an arbitration clause, that doubt must be resolved in favor of arbitration. Id. at 1320-21. That is, the general rule is that arbitration will be ordered "unless it can be shown with assurance that the arbitration clause is not susceptible of an interpretation that covers the asserted dispute." Pacific Invest. Co. v. Townsend, 58 Cal. App. 3d 1, 9 (1976). "In determining the scope of an arbitration clause, [t]he court should attempt to give effect to the parties' intentions, in light of the usual and ordinary meaning of the contractual language and the circumstances under which the agreement was made." RN Soln., 165 Cal. App. 4th at 1523 (internal quotation marks omitted). Notably, the phrase "all disputes arising in connection with this United States District Court 11 For the Northern District of California 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 7 1 2 3 4 5 6 7 8 9 10 agreement" -- a phrase essentially the same as that used in the Manzanita Agreement1 -- "has been construed to include `every dispute between the parties having a significant relationship to the contract and all disputes having their origin or genesis in the contract.'" Id. at 1522-23 (citing Simula, Inc. v. Autoliv, Inc., 175 F.3d 716, 720-25 (9th Cir. 1999)). The Court finds the dispute regarding the Prospect Agreement has a significant relationship to the Manzanita Agreement. In so finding, the Court acknowledges that the two agreements were not executed at the same time and that breach of the Manzanita Agreement would not necessarily lead to breach of the Prospect Agreement. Also, the Prospect and Manzanita Agreements had different purposes, and the Prospect Agreement did not explicitly incorporate the Manzanita Agreement. See Marsch v. Williams, 23 Cal. App. 4th 250, 256 (1994) (rejecting defendant's argument that arbitration clause in one contract between the parties could be imposed on a different contractual relationship because, inter alia, the two agreements "were not closely connected in purpose, did not incorporate one another's terms, were not executed at the same time, and the breach of [one] agreement did not necessarily lead to the breach of the [other] agreement"). However, these facts are outweighed by others. First, there is evidence that Mr. Zangpo agreed to enter into the Prospect Agreement in order to enable Mr. Morrison to fund the Manzanita Agreement (i.e., Mr. Morrison would fund once construction on the Prospect property was completed and the property sold). Second, there is evidence that the Prospect Agreement was a means to compensate Mr. Zangpo for the injury he suffered as a result of Mr. Morrison's delayed funding of the Manzanita Agreement. See Zangpo Decl. ¶ 5(d) (claiming that, at numerous Manzanita partnership meetings, "[i]t was stated . . . repeatedly that the reason for my involvement in Prospect was to help Mark meet his delayed funding commitment to Manzanita . . . and in part later to offset the loss to me caused by that delay in Mark's meeting his financial commitment to me and to the Manzanita partnership"); see also Finkbine Decl. ¶ 3(d) (agreeing that "[t]he desirability of Zangpo having a primary role on the Prospect job was discussed in formal Manzanita meetings"). As noted above, the Manzanita Agreement's arbitration agreement states as follows: "Any dispute or proceeding concerning this Agreement, or any and all claims arising out of or in connection with this Agreement will be resolved by binding arbitration to be held in Marin County, California." Manzanita Agreement ¶ 27 (emphasis added). 1 United States District Court 11 For the Northern District of California 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 8 1 2 3 4 5 6 7 8 9 10 Finally, and most importantly, even though the Prospect Agreement did not explicitly incorporate the Manzanita Agreement's terms, the terms of the Manzanita Agreement was clearly referenced in the Prospect Agreement -- i.e., the $125,000 loan by Mr. Morrison required under the Manzanita Agreement would be offset in part if Mr. Zangpo did not perform the Prospect Agreement on time. Indeed, this provision in the Prospect Agreement reflected that the Prospect and Manzanita Agreements were tied to one another and therefore were not entirely "separate commercial risks." Marsch, 23 Cal. App. 4th at 256 (stating that two contracts involved "involve[d] separate enterprises and most importantly separate commercial risks"). Furthermore, there are related factual and legal issues with respect to the dispute involving the Prospect Agrement and the dispute involving the Manzanita Agreement. For example, in both disputes, whether Mr. Morrison had an attorney-client relationship with Mr. Zangpo and thus owed Mr. Zangpo certain duties is an issue.2 Also, the terms of the Prospect Agreement, as discussed above, create an overlap between the two disputes -- i.e., under the Prospect Agreement, Mr. Morrison would not have to pay part of the $125,000 loan he was supposed to make under the Manzanita Agreement if Mr. Zangpo did not perform the Prospect Agreement on time. Finally, the arbitration clause in the Manzanita Agreement extends not only to disputes "arising out of" the agreement, but also to those "in connection with" the agreement. The disjunctive between these two clauses implies the parties intended to have the scope of arbitrability sweep broadly to cover disputes which have any relationship to the Manzanita Agreement. It is hardly surprising that Mr. Morrison initially agreed that the dispute over the Prospect Agreement fell within the reach of the arbitration clause of the Manzanita Agreement. The courts have held that "any doubt" as to whether a plaintiff's claims come within an arbitration clause must be resolved in favor of arbitration. EFund, 150 Cal. App. 4th at 1320-21. The Court concludes, in light of the above discussion, that arbitration of the instant case is required per the terms of the Manzanita Agreement. The Court therefore orders that the case be referred to arbitration consistent with the terms of the Manzanita Agreement. In addition, as requested by the United States District Court 11 For the Northern District of California 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 2 At the hearing, Mr. Morrison admitted that this was an issue relevant to both disputes. 9 1 2 3 4 5 6 7 8 9 10 parties (at least prior to Mr. Morrison's change of heart regarding arbitration), the Court orders that these proceedings and discovery be stayed pending the outcome of arbitration. The Court, however, shall stay the enforcement of this order pending completion of ADR in order to give the parties an opportunity to resolve their disputes through the Court's alternative dispute resolution program. The Court has already referred this matter to Magistrate Judge Zimmerman for a settlement conference to be conducted within 90 days. Upon completion of the settlement conference, the parties shall report back to this Court whether settlement has been reached. III. CONCLUSION For the foregoing reasons, Mr. Morrison's motion is denied and the case is referred to arbitration. Enforcement of this order, however, is stayed pending ADR. This order disposes of Docket No. 40. United States District Court 11 For the Northern District of California 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 IT IS SO ORDERED. Dated: September 30, 2008 _________________________ EDWARD M. CHEN United States Magistrate Judge 10

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?