ORDER DENYING DEFENDANTS’
MOTION TO DISMISS
Plaintiffs,
10
v.
SHAMROCK MATERIALS, INC., et al.,
12
For the Northern District of California
UNITED STATES DISTRICT COURT
11
(Docket No. 18)
Defendants.
_____________________________________/
13
14
15
I. INTRODUCTION
Plaintiffs California Sportfishing Protection Alliance and Petaluma River Council
16
(collectively, “Plaintiffs”) bring this action under the citizen suit enforcement provisions of the
17
Federal Water Pollution Control Act, 33 U.S.C. §§ 1251-1376 (“the Clean Water Act” or “the Act”).
18
Defendants Shamrock Materials, Inc., Corto Meno Sand and Gravel, LLC, and Corto Meno Sand
19
and Gravel II, LLC (collectively, “Defendants”) have now moved to dismiss Plaintiffs’ Complaint
20
for lack of subject matter jurisdiction pursuant to Federal Rule of Civil Procedure (“Rule”) 12(b)(1)
21
and for failure to state a claim pursuant to Rule 12(b)(6). Dkt. No. 18. Because the Court finds this
22
matter suitable for resolution based on the parties’ written submissions, the Court VACATES the
23
hearing set for November 3, 2011. See Civil L.R. 7-1(b). After careful consideration of the parties’
24
arguments, the Court DENIES Defendants’ motion for the reasons set forth below.
25
II. BACKGROUND
26
Plaintiff California Sportfishing Protection Alliance is a 501(c)(3) non-profit public benefit
27
corporation dedicated to the preservation, protection, and defense of the environment, wildlife, and
28
natural resources of the San Francisco Bay and other California waters, including the Petaluma
1
River. Compl. at 3, Dkt. No. 1. Plaintiff Petaluma River Council is an unincorporated organization
2
of citizens who reside in and around Petaluma and are committed to protecting and improving the
3
health and character of the Petaluma River and the San Francisco Bay. Id.
4
Defendants operate a facility located at 210-222 Landing Way, Petaluma, California (“the
sand at the Facility. Id. at 4. Sand, gravel, and aggregate materials at the Facility are unloaded from
7
barges along the Petaluma River and subsequently stored in large, uncovered piles in two areas, and
8
then loaded and distributed via diesel-fueled trucks. Id. The sand, gravel, and aggregate materials
9
are transported from the Facility and delivered off-site to several ready mix concrete plants operated
10
by Defendants throughout the areas of Petaluma, Novato, Napa, and San Rafael, California. Id. at 6.
11
The Facility primarily provides support services to these ready-mix concrete plants. Id. at 6-7.
12
For the Northern District of California
Facility”), and are engaged in off-loading, storage, distribution, and transportation of gravel and
6
UNITED STATES DISTRICT COURT
5
A.
13
Statutory Background
The Clean Water Act is intended to “restore and maintain the chemical, physical, and
14
biological integrity of the Nation’s waters.” 33 U.S.C. § 1251(a). In pursuit of this goal, section
15
301(a) of the Act prohibits the “discharge of any pollutant” into navigable waters from any “point
16
source” without a permit. 33 U.S.C. § 1311(a) (except as otherwise provided in the Act, the
17
discharge of any pollutant by any person shall by unlawful). “Discharge of a pollutant” is defined
18
broadly to include “any addition of any pollutant to navigable waters from any point source.” Id. §
19
1362(12)(A); Rapanos v. United States, 547 U.S. 715, 723 (2006). And “navigable waters” means
20
“Waters of the United States.” 33 U.S.C. § 1362(7). “The phrase ‘the waters of the United States’
21
includes only those relatively permanent, standing or continuously flowing bodies of water ‘forming
22
geographic features’ that are described in ordinary parlance as ‘streams[,] . . . oceans, rivers, [and]
23
lakes.’” Rapanos, 547 U.S. at 739.
24
Under the Act, the United States Environmental Protection Agency (“EPA”) is required to
25
regulate storm water discharges “to protect water quality.” 33 U.S.C. § 1342(p)(6). The
26
Administrator of the EPA has promulgated regulations defining the term “storm water discharge
27
associated with industrial activity,” which includes “the discharge from any conveyance which is
28
2
1
used for collecting and conveying storm water and which is directly related to manufacturing,
2
processing or raw materials storage areas at an industrial plant.” 40 C.F.R. § 122.26(b)(14).
3
Section 402 of the Act provides for the issuance of a permit under the National Pollutant
4
Discharge Elimination System (“NPDES”). 33 U.S.C § 1342(a). A NPDES permit allows the
5
holder to discharge pollutants notwithstanding the general prohibition imposed by § 301(a). Id. The
6
NPDES permitting program is the “centerpiece” of the CWA and the primary method for enforcing
7
the effluent and water-quality standards established by the EPA and state governments. Natural
8
Res. Def. Council, Inc. v. Cnty. of Los Angeles, 636 F.3d 1235, 1245 (9th Cir. 2011) (citations
9
omitted). NPDES permits may be issued by the EPA or by state agencies that have been duly
by the State Water Resources Control Board (“the State Board”). Cal. Water Code § 13267(b)(1);
12
For the Northern District of California
authorized by the EPA. 33 U.S.C. § 1342(a)-(b). In California, the NPDES program is administered
11
UNITED STATES DISTRICT COURT
10
Pl.’s Req. for Judicial Notice (“Pl.’s RJN”) Ex. B, Dkt. No. 20.
13
In 1991, the State Board elected to issue a statewide General Permit for industrial discharges,
14
which was subsequently modified in 1992 and reissued in 1997. Compl. at 5; Pl.’s RJN, Ex. C. In
15
order to discharge storm water lawfully in California, industrial discharges must comply with the
16
terms of the General Permit or have obtained and complied with an individual NPDES permit. 33
17
U.S.C. § 1311(a).
18
Sections 505(a)(1) and 505(f) of the Act provide for citizen enforcement actions against any
19
“person,” including individuals, corporations, or partnerships, for violations of the NPDES permit
20
requirements and for un-permitted discharges of pollutants. 33 U.S.C. §§ 1365(a)(1) & (f), §
21
1362(5). As membership organizations, Plaintiffs have standing to bring suit on behalf of their
22
members when they “would otherwise have standing to sue in their own right, the interests at stake
23
are germane to the organization’s purpose, and neither the claim asserted nor the relief requested
24
requires the participation of individual members in the lawsuit.” Friends of the Earth v. Laidlaw
25
Envtl. Serv. (TOC), Inc., 528 U.S. 167, 181 (2000) (citing Hunt v. Washington State Apple Adver.
26
Comm’n, 432 U.S. 333, 343 (1977)). Defendants have not contested Plaintiffs’ general standing to
27
bring suit on behalf of their members.
28
3
1
B.
Plaintiffs’ Allegations
2
In their Complaint, Plaintiffs allege that storm water falling on the Facility percolates
3
through and flows over the sand, gravel, and aggregate materials and runs freely over the surfaces of
4
the sand and gravel storage and processing areas. Compl. at 7. Plaintiffs allege that the storm water
5
picks up sediments, oil and grease, fine materials, and other pollutants, and has its pH, specific
6
conductivity, and clarity altered by the materials with which it comes into contact at the Facility. Id.
7
Plaintiffs further allege that numerous activities at the Facility take place outside and are exposed to
8
rainfall, including the storage and movement of aggregate materials, vehicles and other machines,
9
maintenance and repair work on vehicles and machines, and vehicle fueling. Id. Plaintiffs allege
freeze, and hydraulic fluids which are exposed to storm water flows. Id. Plaintiffs maintain that the
12
For the Northern District of California
that the machinery and other equipment leak contaminants such as oil, grease, diesel fuel, anti-
11
UNITED STATES DISTRICT COURT
10
management practices at the Facility are wholly inadequate to prevent these sources of
13
contamination from causing the discharge of pollutants to waters of the United States. Id at 8. As
14
the Facility is located adjacent to the Petaluma River, Plaintiffs allege that storm water from the
15
Facility is discharged from the site into channels or other conveyances and subsequently discharged
16
into the Petaluma River. Id.
17
Based on these allegations, Plaintiffs bring one cause of action - Discharges of Pollutants or
18
Storm Water Associated with Industrial Activity Without a NPDES Permit in violation of 33 U.S.C.
19
§ 1311(a). Id. at 9-10. Specifically, Plaintiffs allege that Defendants discharge storm water
20
associated with industrial activity from one or more point sources at the Facility to the Petaluma
21
River, that Defendants have not obtained a NPDES permit for these discharges, and that the
22
discharges from the Facility are therefore unlawful discharges of pollutants or storm water
23
associated with industrial activity from point sources into waters of the United States. Id. Plaintiffs
24
request that the Court declare Defendants to have violated and to be in violation of the Act, enjoin
25
Defendants from discharging pollutants from the Facility, order Defendants to take appropriate
26
actions to restore the quality of navigable waters impaired by their activities, and to award civil
27
penalties, attorney’s fees and costs as authorized under the Act. Id. at 10.
28
4
On October 10, 2011, Defendants filed the present Motion to Dismiss. Dkt. No. 18.
1
2
Defendants seeks dismissal for lack of jurisdiction pursuant to Rule 12(b)(1) and for failure to state a
3
claim pursuant to Rule 12(b)(6). Id.
4
III. DISCUSSION
5
In their motion, Defendants argue that subject matter jurisdiction is absent because the Clean
6
Water Act does not include facilities with the Standard Industrial Classification code of the type they
7
operate. Defs.’ Mot. at 2, Dkt. No. 18. Defendants further argue that Plaintiffs’ cause of action for
8
violations of 33 U.S.C. § 1311(a) fails to state a claim for relief because the Act does not require a
9
permit for the alleged storm water discharges. Id. at 2.
10
A.
Requests for Judicial Notice
As a preliminary matter, both parties have filed Requests for Judicial Notice. Dkt. Nos. 18-1
12
For the Northern District of California
UNITED STATES DISTRICT COURT
11
(Defs.’s RJN); Dkt. No. 20 (Pl.’s RJN). Defendants request that the Court take judicial notice of the
13
following documents: (1) United States Department of Labor, Occupational Safety & Health
14
Administration (“OSHA”) Standard Industrial Codes (“SIC”) Division D: Manufacturing, Industry
15
Group 3273 - Ready Mix Concrete; and (2) United States Department of Labor, OSHA SIC Division
16
F: Wholesale Trade, Industry Group 5032 Brick, Stone and Related Construction Materials. Defs.’
17
RJN, Exs. A-B.
18
Plaintiffs request that the Court take judicial notice of the following documents: (1)
19
selections from the Standard Industrial Classification Manual, produced by the Office of
20
Management and Budget, 1987, published by JIST Works, Inc.; (2) 71 Federal Register, ¶.
21
32464-32478, from June 6, 2006; (3) selections from the State Water Resources Control Board
22
Water Quality Order No. 97-03-DWQ NPDES General Permit No. CAS000001; (4) a Memorandum
23
dated October 18, 1994, prepared by the EPA’s Office of Wastewater Management and Office of
24
Regulatory Enforcement entitled “Policy for End of Moratorium for Storm Water Permitting –
25
October 1, 1994”; and (5) 60 Federal Register, ¶. 40230-40235, from August 7, 1995. Pl.’s RJN,
26
Exs. A-E.
27
Federal Rule of Evidence (“FRE”) 201(b) provides the criteria for judicially noticed facts:
28
5
1
“A judicially noticed fact must be one not subject to reasonable dispute in that it is either (1)
2
generally known within the territorial jurisdiction of the trial court or (2) capable of accurate and
3
ready determination by resort to sources whose accuracy cannot reasonably be questioned.” It is
4
well established that records, reports, and other documents on file with administrative agencies –
5
such as the State Water Resources Control Board – are judicially noticeable. Lee v. City of Los
6
Angeles, 250 F.3d 668, 689-90 (9th Cir. 2001); see also al-Kidd v. Ashcroft, 580 F.3d 949, 954 fn. 6
7
(9th Cir. 2009); Marsh v. San Diego Cnty., 432 F. Supp. 2d 1035, 1043-45 (S.D. Cal. 2006). City
8
ordinances are also proper subjects for judicial notice. Santa Monica Food Not Bombs v. City of
9
Santa Monica, 450 F.3d 1022, 1025 fn. 2 (9th Cir. 2006).
10
As neither party has raised any objections to the requests for judicial notice, and the requests
are not subject to reasonable dispute in that they are capable of accurate and ready determination, the
12
For the Northern District of California
UNITED STATES DISTRICT COURT
11
Court GRANTS the parties requests for judicial notice.
13
B.
14
Rule 12(b)(1)
In their motion, Defendants argue that subject matter jurisdiction is absent because the Clean
15
Water Act does not include facilities with the SIC code of the type they operate. Defs.’ Mot. at 2.
16
Specifically, Defendants argue that the Facility is not an industrial facility under the Act; rather, it is
17
a distribution facility that simply stockpiles processed materials for a short period of time until they
18
can be distributed to various Shamrock concrete batch plants or sold to a third party. Id. at 9-10.
19
Thus, because the materials arrive on the site already processed, Defendants argue that citizen-suit
20
jurisdiction under 33 U.S.C. § 1365(a) is improper because none of the stored materials are raw
21
material subject to industrial storm water permitting under the Act. Id. at 10.
22
In their Opposition, Plaintiffs respond that the Complaint properly alleges that Defendants
23
are discharging storm water associated with industrial activity, and that the Facility falls within the
24
EPA’s definition of a facility that conducts industrial activity. Pls.’s Opp’n at 1, Dkt. No. 19.
25
Plaintiffs argue that, even if the storm water discharged from the Facility is associated with non-
26
industrial activity, the Act does not exempt these discharges. Id.
27
28
6
1
1.
Legal Standard
2
Federal courts are courts of limited jurisdiction, possessing only that power authorized by
Bender v. Williamsport Area Sch. Dist., 475 U.S. 534, 541 (1986). Thus, federal courts have no
5
power to consider claims for which they lack subject matter jurisdiction. Chen–Cheng Wang ex rel.
6
United States v. FMC Corp., 975 F.2d 1412, 1415 (9th Cir. 1992). The Court is under a continuing
7
duty to dismiss an action whenever it appears that it lacks jurisdiction. Id.; see also Spencer Enters.,
8
Inc. v. United States, 345 F.3d 683, 687 (9th Cir. 2003). The burden of establishing that a cause lies
9
within this limited jurisdiction rests upon the party asserting jurisdiction. Kokkonen v. Guardian
10
Life Ins. Co. of America, 511 U.S. 375, 377 (1994). Thus, in the present action, Plaintiffs bear the
11
burden of demonstrating that subject matter jurisdiction exists over their Complaint. Tosco Corp. v.
12
For the Northern District of California
Article III of the United States Constitution and statutes enacted by Congress pursuant thereto.
4
UNITED STATES DISTRICT COURT
3
Communities for a Better Env’t, 236 F.3d 495, 499 (9th Cir. 2001).
13
On a motion to dismiss pursuant to Rule 12(b)(1), the applicable standard turns on the nature
14
of the jurisdictional challenge. A Rule 12(b)(1) jurisdictional attack may be “facial” or “factual.”
15
White v. Lee, 227 F.3d 1214, 1242 (9th Cir. 2000) (citation omitted). In evaluating a facial attack on
16
jurisdiction, the Court must accept the factual allegations in Plaintiffs’ complaint as true and draw
17
all reasonable inferences in their favor. Doe v. Holy See, 557 F.3d 1066, 1073 (9th Cir. 2009). As
18
part of its ruling on such a motion, the Court may also consider additional facts that “are contained
19
in materials of which the court may take judicial notice.” McCarthy v. United States, 850 F.2d 558,
20
560 (9th Cir. 1988).
21
By contrast, in a factual attack, the challenger disputes the truth of the allegations that, by
22
themselves, would otherwise invoke federal jurisdiction. Safe Air for Everyone v. Meyer, 373 F.3d
23
1035, 1039 (9th Cir. 2004). In such a case, “[n]o presumptive truthfulness attaches to plaintiff’s
24
allegations, and the existence of disputed material facts will not preclude the trial court from
25
evaluating for itself the merits of jurisdictional claims.” Thornhill Publ’g v. Gen. Tel. & Elec.
26
Corp., 594 F.2d 730, 733 (9th Cir. 1979). “In resolving a factual attack on jurisdiction, the district
27
court may review evidence beyond the complaint without converting the motion to dismiss into a
28
7
jurisdictional finding of genuinely disputed facts is inappropriate when the jurisdictional issue and
3
substantive issues are so intertwined that the question of jurisdiction is dependent on the resolution
4
of factual issues going to the merits of the action.” Id. “The question of jurisdiction and the merits
5
of an action are intertwined where ‘a statute provides the basis for both the subject matter
6
jurisdiction of the federal court and the plaintiff’s substantive claim for relief.’” Id. “Dismissal is
7
then appropriate ‘where it appears beyond doubt that the plaintiff can prove no set of facts in support
8
of his claim which would entitle him to relief.’” Roberts v. Corrothers, 812 F.2d 1173, 1177 (9th
9
Cir. 1987) (quoting Conley v. Gibson, 355 U.S. 41, 45-46 (1957)). “This standard, often cited in
10
Rule 12(b)(6) motions, . . . is equally applicable in motions challenging subject matter jurisdiction
11
when such jurisdiction may be contingent upon factual matters in dispute.” Id. (internal quotations
12
For the Northern District of California
motion for summary judgment.” Safe Air, 373 F.3d at 1039 (citation omitted). However, “[a]
2
UNITED STATES DISTRICT COURT
1
and citation omitted). “The Ninth Circuit has held that, where the jurisdictional issue is intertwined
13
with the merits, a court cannot determine the jurisdictional issue until the merits of the case are
14
appropriately resolved.” Chie v. Reed Elsevier, Inc., 2011 WL 3879495, at *3 (N.D. Cal. Sep. 02,
15
2011) (citing Roberts, 812 F.2d at 1177).
16
2.
17
Here, because the Clean Water Act provides the basis for both the Court’s subject matter
Application to the Case at Bar
18
jurisdiction and Plaintiffs’ substantive claim for relief, the question of jurisdiction and the merits of
19
this action are intertwined. 33 U.S.C. §§ 1365(a) & (f) (providing for any citizen to bring a civil
20
action against any person alleged to be in violation of an effluent standard or limitation, including
21
any unlawful act under 33 U.S.C. § 1311(a)); 33 U.S.C. § 1311(a) (“Except in compliance with . . .
22
section[] . . . 1342 . . . of this title, the discharge of any pollutant by any person shall be unlawful.”).
23
Thus, dismissal is only appropriate if it appears beyond doubt that Plaintiffs can prove no set of facts
24
in support of their claim which would entitle them to relief. Roberts, 812 F.2d at 1177.
25
Accordingly, the Court’s analysis shall focus on Defendants’ Rule 12(b)(6) argument.
26
C.
27
Rule 12(b)(6)
Defendants next argue that Plaintiffs’ cause of action for violations of 33 U.S.C. § 1311(a)
28
8
1
fails to state a claim for relief because the Act does not require a permit for the alleged storm water
2
discharges. Defs.’ Mot. at 2. Specifically, Defendants argue that Plaintiffs cannot allege any facts
3
showing that Defendants, as a matter of law, are subject to the Act and the NPDES program because
4
the activities at the Facility are not directly related to the manufacturing, processing, or storage of
5
raw material. Id. at 15-16.
6
1.
7
A motion to dismiss a complaint under Rule 12(b)(6) tests the legal sufficiency of the claims
Legal Standard
8
asserted in the complaint. Navarro v. Black, 250 F.3d 729, 732 (9th Cir. 2001). Rule 8(a)(2)
9
requires that a pleading stating a claim for relief contain “a short and plain statement of the claim
the defendant fair notice of what the . . . claim is and the grounds upon which it rests.” Bell Atl.
12
For the Northern District of California
showing that the pleader is entitled to relief.” The function of this pleading requirement is to “give
11
UNITED STATES DISTRICT COURT
10
Corp. v. Twombly, 550 U.S. 544, 555 (2007). “While a complaint attacked by a Rule 12(b)(6)
13
motion to dismiss does not need detailed factual allegations, a plaintiff’s obligation to provide the
14
‘grounds’ of his ‘entitle[ment] to relief’ requires more than labels and conclusions, and a formulaic
15
recitation of the elements of a cause of action will not do. Factual allegations must be enough to
16
raise a right to relief above the speculative level.” Id. at 555 (internal citations and parentheticals
17
omitted). In considering a 12(b)(6) motion, “[a]ll allegations of material fact are taken as true and
18
construed in the light most favorable to plaintiff. “However, conclusory allegations of law and
19
unwarranted inferences are insufficient to defeat a motion to dismiss for failure to state a claim.”
20
Epstein v. Wash. Energy Co., 83 F.3d 1136, 1140 (9th Cir. 1996); see also Twombly, 550 U.S. at
21
555. The court “may generally consider only allegations contained in the pleadings, exhibits
22
attached to the complaint, and matters properly subject to judicial notice.” Williston Basin Interstate
23
Pipeline Co. v. An Exclusive Gas Storage Leasehold and Easement in the Cloverly Subterranean,
24
Geological Formation, 524 F.3d 1090, 1096 (9th Cir. 2008) (citation omitted); United States v.
25
Ritchie, 342 F.3d 903, 908 (9th Cir. 2003).
26
27
If the court dismisses the complaint, it should grant leave to amend even if no request to
amend is made “unless it determines that the pleading could not possibly be cured by the allegation
28
9
1
of other facts.” Lopez v. Smith, 203 F.3d 1122, 1127 (9th Cir. 2000) (quoting Cook, Perkiss and
2
Liehe, Inc. v. N. Cal. Collection Serv. Inc., 911 F.2d 242, 247 (9th Cir. 1990)).
3
2.
Application to the Case at Bar
4
Here, there is no dispute that any “discharge associated with industrial activity” is required to
5
have a NPDES permit. 33 U.S.C. § 1342(p)(2)(B). However, Defendants argue that there are no
6
allegations of a discharge of storm water associated with any industrial activity at their properties
7
and, therefore, they have no duty to obtain a permit. Defs.’ Mot. at 7.
8
9
Federal Regulations define “storm water discharge associated with industrial activity” to
mean: “The discharge from any conveyance that is used for collecting and conveying storm water
industrial plant.” 40 C.F.R. § 122.26(b)(14). The Ninth Circuit has observed that “[t]he language
12
For the Northern District of California
and that is directly related to manufacturing, processing or raw materials storage areas at an
11
UNITED STATES DISTRICT COURT
10
‘discharges associated with industrial activity’ is very broad.” NRDC v. EPA, 966 F.2d 1292, 1304
13
(9th Cir. 1992). “The operative word is ‘associated.’ It is not necessary that storm water be
14
contaminated or come into direct contact with pollutants; only association with any type of industrial
15
activity is necessary.” Id. Section 122.26 further provides that, “facilities are considered to be
16
engaging in ‘industrial activity’” if they are “classified as” any one of a number of specified SICs.
17
40 C.F.R. § 122.26(b)(14). Accordingly, the primary question here is whether Defendants’ Facility
18
is properly “classified as” any of the SICs listed in 40 C.F.R. § 122.26(b)(14).
19
In their Complaint, Plaintiffs allege that the Facility is an industrial facility. Compl. at 6.
20
The Complaint alleges the facility “is located in an area zoned by the County of Sonoma for heavy
21
industrial use as a M2 Heavy Industrial District.” Id. The Complaint alleges that “[i]ndustrial
22
operations at the site include the unloading of barges, conveying sand, gravel, and aggregate
23
materials to large, uncovered piles, loading of materials using electric-powered or diesel-powered
24
front-end loaders, queuing of trucks awaiting loading, and transporting materials from the site on
25
unpaved or gravel surfaces.” Id. The Complaint further alleges that the sand, gravel, and aggregate
26
materials are transported from the site via trucks owned by Defendant to concrete plants, and that
27
storm water discharged from the Facility includes storm water “that has come into contact with raw
28
10
1
materials that ultimately are used at these ready-mix concrete plants.” Id. In addition, the
2
Complaint alleges that the following activities also occur at the Facility: “the use and storage of
3
lubrication products, including hazardous substances, which are used to conduct repairs and
4
maintenance of equipment”; mobile fueling of loading equipment; and “[i]ndustrial machinery and
5
heavy equipment, including trucks, are operated and stored at the Facility in areas exposed to storm
6
water flows. Id. at 7-8
7
Beyond the Facility, Plaintiffs contend that Defendants’ numerous concrete manufacturing
8
facilities and the Facility at issue here constitute a single enterprise. Pls.’ Opp’n at 11. Plaintiffs
9
allege that the Facility is an auxiliary establishment, performing support services for Defendants’
10
12
For the Northern District of California
UNITED STATES DISTRICT COURT
11
13
concrete manufacturing facilities. Compl. at 6-7.
The SIC Manual (1987) is published by the Office of Management and Budget. Pl.’s RJN,
Ex. A. Its introduction explains that:
16
The [SIC] was developed for use in the classifications of
establishments by type of activity in which they are engaged; for
purposes of facilitating the collection, tabulation, presentation, and
analysis of data relating to establishments; and for promoting
uniformity and comparability in the presentation of statistical data
collected by various agencies of the United States Government, State
agencies, trade associations and private research organizations.
17
Id. at 11. The Manual defines “establishment” as “an economic unit, generally at a single physical
18
location, where business is conducted or where services are performed.” Id. at 12. The term
19
“establishment” is distinguished from “enterprise (company),” which “may consist of one or more
20
establishments.” Id. Each “establishment is assigned an industry code on the basis of its primary
21
activity, which is determined by its principal product or group of products produced or distributed,
22
or services rendered.” Id. at 15.
14
15
23
Here, Shamrock owns and operates several ready-mix concrete industrial establishments in
24
separate physical locations in Petaluma, Novato, Napa, Santa Rosa, and San Rafael, each of which is
25
categorized as SIC Code 3273 and subject to a NPDES permit which is in place. Compl. at 6-7;
26
Defs.’ Mot. at 12. SIC Code 3273 is defined as: “Establishments primarily engaged in
27
manufacturing portland cement concrete manufactured and delivered to a purchaser in a plastic and
28
11
1
unhardened state. This includes production and sale of central-mixed concrete, shrink mixed
2
concrete, and truck mixed concrete.” Defs.’ RJN, Ex. 1. SIC Code 3273 falls within the SIC Codes
3
listed by the EPA at 40 C.F.R. § 122.26(b)(14). Defendants’ plants perform cement concrete
4
manufacturing operations - concrete is made by mixing together water, cement, sand, and rock, and
5
then loaded into trucks and distributed to various job locations. Defs.’ Mot. at 12. Defendants
6
contend that it is this processing of aggregate material into ready-mix concrete outside the Facility
7
that subjects them to the Clean Water Act. Id.
8
9
The Manual further explains that “auxiliaries” are establishments that primarily provide
management or support services for other establishments that are part of the same enterprise.
establishment(s) served and are treated as separate establishments. Pl.s’ RJN, Ex. A at 13. Here,
12
For the Northern District of California
Auxiliaries that perform auxiliary functions and are located physically separate from the
11
UNITED STATES DISTRICT COURT
10
Defendants contend that the Facility is a distinct and separate establishment that is to be categorized
13
based upon its own operations. Mot. at 13. Defendants suggest that “it should be categorized under
14
SIC Code 5032.” Id. SIC Code 5032 is defined as: “Establishments primarily engaged in the
15
wholesale distribution of stone, cement, lime, construction sand, and gravel; brick (except
16
refractory); asphalt and concrete mixtures; and concrete, stone and structural clay products (other
17
than refractories).” Defs.’ RJN, Ex. 2.
18
Auxiliaries that are not treated as separate establishments are assigned SIC codes, “on the
19
basis of the primary activity of the operating establishments they serve.” Pl.s’ RJN, Ex. A at 16.
20
Although the Manual suggests that where an auxiliary is located physically separate from the
21
establishment or establishment served, it is to be treated as a separate establishment, elsewhere it
22
lists examples of auxiliary establishments such as warehouses, automotive repair and storage
23
facilities that likely are quite often located at a geographic distance from the establishments they
24
serve. Id. at 14-15. The Manual also provides for the sub-classification of auxiliaries by an
25
additional one-digit code that follows that of the primary establishment. Id. at 16-17. Accordingly,
26
as the SIC Code for Defendants’s establishments is 3273, Plaintiffs contend that the SIC Code for
27
the Facility is also 3273, and that the Facility should be sub-categorized as 3273-3. Pls.’s Opp’n at
28
12
1
12. Auxiliary Code Number 3 applies to “Storage yards” as “[a]uxiliary establishments primarily
2
engaged in storing raw materials, finished goods, and other products to be used or sold by other
3
establishments of the same enterprise.” Pl.s’ RJN, Ex. A at 17.
4
Based on the parties’ arguments and evidentiary support, the Court finds that it is unable to
5
determine at the Rule 12(b)(6) stage whether the Facility’s SIC Code establishes that it is or is not an
6
industrial facility. First, although there is no dispute that the Facility is geographically separate from
7
Defendants’ concrete-mixing establishments, “it is not entirely clear from the Manual when
8
geographically separate facilities that provide support services to other establishments within the
9
same enterprise should be classified according to the primary activities taking place at those
facilities and when they should not.” Ecol. Rights Found. v. PG&E, 2011 WL 445091, at *2 (N.D.
11
Cal. Feb. 4, 2011).
12
For the Northern District of California
UNITED STATES DISTRICT COURT
10
Second, “[t]he considerations relevant to deciding whether an auxiliary should be treated
13
separately or not would seem to be highly dependent on the purposes for which the classification is
14
being undertaken. The Manual presents the SIC as a system designed for statistical data collection
15
and analysis by governmental and private entities largely in the economic context[.] Id. at *2, fn.4.
16
“As such, even if the Manual set out the rules more clearly, they might not be well-suited for
17
determining whether or not a particular facility is engaged in ‘industrial activity’ for purposes of the
18
Clean Water Act.” Id. Given the parties’ opposing ideas of the proper SIC classification for the
19
Facility, this appears to be a fact-based determination, and the Court finds that such a determination
20
should be made after the opportunity to conduct discovery and further develop the record.
21
Third, at this juncture, neither party has definitively established that the Facility can be
22
properly classified only under one SIC Code. Furthermore, the implementing regulation, 40 C.F.R.
23
§ 122.26(b)(14), provides that plants or facilities “classified as” particular SIC codes are “considered
24
to be engaging in ‘industrial activity,’” but it nowhere sets out any rules governing when, if ever, a
25
particular plant or facility must be assigned the code of a larger entity rather than being given its
26
own. As discussed above, the SIC Manual itself expressly states that geographically separate sites
27
are to be treated as distinct establishments, although it also contains implications to the contrary.
28
13
1
Thus, even to the extent that the EPA’s governing regulations could be deemed to have incorporated
2
the rules in the SIC Manual by reference, neither Section 402(p) nor 40 C.F.R. § 122.26(b)(14),
3
plainly and unambiguously requires that the Facility at issue be classified under a particular SIC
4
Group. Ecol. Rights Found., 2011 WL 445091, at *3. For these reasons, the Court must deny
5
Defendants’ motion.
6
IV. CONCLUSION
7
For the reasons set forth above, the Court DENIES Defendants’ motion to dismiss.
8
IT IS SO ORDERED.
9
10
Dated: November 2, 2011
_______________________________
Maria-Elena James
Chief United States Magistrate Judge
12
For the Northern District of California
UNITED STATES DISTRICT COURT
11
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
14
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.
Why Is My Information Online?