Smith -v- Overland Contracting, Inc.

Filing 55

ORDER by Judge Maria-Elena James denying 37 Motion for Summary Judgment (cdnS, COURT STAFF) (Filed on 10/4/2013)

Download PDF
1 2 3 4 UNITED STATES DISTRICT COURT 5 Northern District of California 6 7 MITCHELL SMITH, No. C 12-2642 MEJ Plaintiff, 8 ORDER RE: DEFENDANT’S MOTION FOR SUMMARY JUDGMENT v. 9 OVERLAND CONTRACTING, INC., (Docket No. 37) 10 12 For the Northern District of California UNITED STATES DISTRICT COURT 11 Defendant. _____________________________________/ 13 INTRODUCTION 14 Plaintiff Mitchell Smith brings this action for damages related to his employment as a 15 construction manager at Defendant Overland Contracting, Inc. (“OCI” or “Defendant”). Not. of 16 Rem., Ex. B (Compl.), Dkt. No. 1. Defendant now moves for an order granting summary judgment 17 in its favor. Dkt. No. 37. Plaintiff has filed an Opposition (Dkt. No. 44), to which Defendant has 18 filed a Reply (Dkt. No. 45). The Court finds this matter suitable for disposition without oral 19 argument and hereby VACATES the October 3, 2013 hearing. Civ. L.R. 7-1(b). After carefully 20 considering the parties’ briefs and the controlling legal authorities, the Court DENIES Defendant’s 21 Motion for the reasons set forth below. 22 23 BACKGROUND Defendant provides construction management for telecommunications projects. Dkt. No. 37, 24 Declaration of Charles H. Kline (“Kline Decl.”) ¶ 5. With such construction projects, Defendant 25 uses multiple levels of management. A regional construction manager (“RCM”) has overall 26 responsibility for construction in a given region. Id. The RCM supervises a number of lead 27 construction managers (“LCM”), who supervise field construction managers (“FCM”), who in turn 28 supervise the subcontractors who do the physical construction. Id. According to the job description, 1 LCMs are responsible for managing the overall project execution performance, including scope, 2 cost, safety, quality, schedule, implementation, and customer satisfaction. Kline Decl., Ex. C. 3 Defendant hired Plaintiff in early February 2011 as an LCM to work on its Sprint Network 4 Vision Project (“Project). Joint Statement of Fact (“JSUF”) ¶ 1; Kline Decl. ¶ 6. The Project is a 5 nationwide upgrade of Sprint’s wireless network infrastructure, and Samsung provides the 6 equipment for this upgrade in the San Francisco Bay Area Region. Kline Decl. ¶¶ 7, 8. OCI1 then 7 provides construction management for Samsung’s upgrade in the Bay Area. Id. ¶ 8. First, OCI 8 plans the installation of equipment on Sprint’s cell sites, then it hires, coordinates, and supervises the 9 subcontractors who do the physical installation. Id. OCI was responsible for 1,200 cell sites in the 10 When OCI hired Plaintiff, the Project was just getting started in the Bay Area. Kline Decl. ¶ 12 For the Northern District of California UNITED STATES DISTRICT COURT 11 San Francisco Bay Area. JSUF ¶ 3. 14. At the time, the only personnel were Jim Amato, B&V’s regional director, and Amato’s 13 assistant. Id. Plaintiff was the first construction manager OCI hired and was assigned 243 cell sites. 14 Id. ¶¶ 14; 23. Smith had more than 15 years of experience in the telecommunications construction 15 industry, including five years of experience as a construction manager. JSUF ¶ 2. Defendant states 16 that it hired Plaintiff “because he had the experience and knowledge necessary to make independent 17 judgment calls when planning and managing the upgrade of a sophisticated cellular network.” Kline 18 Decl. ¶ 14. Defendant paid Smith a salary of $95,000 annually (a monthly salary of $7,307.70), and 19 his employment was at will. Id., Exs. D, E; JSUF ¶ 5. About a month after Smith started working 20 on the Project, OCI hired another LCM and an RCM, Art Cunningham. Kline Decl. ¶ 14. Smith 21 reported to his RCM, Cunningham. Id. 22 23 While working for OCI, Plaintiff only had one of the sites he was assigned built to completion. Dkt. No. 44, Declaration of Brad Stuckey (“Stuckey Decl.”), Ex. A (Smith Dep.)2 24 25 26 27 28 1 Samsung chose Black & Veatch Corporation (“B&V”) to manage the upgrade, and OCI is a wholly owned subsidiary of B&V. Kline Decl. ¶ 8. 2 As Exhibit A, Mr. Stuckey attached two of Plaintiff’s depositions taken on different days: February 22, 2013 and May 8, 2013. To avoid confusion, the Court will refer to both of these 2 1 119:7-12; JSUF ¶ 1; Kline Decl. ¶ 36. Smith stated that the whole time he was working at OCI he 2 was doing “up-front work,” and only a handful of his sites went into construction. Dkt. No. 44 3 (Smith Dep.) 119:7-12. According to Defendant, the first of Smith’s cell sites was beginning actual 4 construction at the time of Smith’s termination on January 11, 2012. Kline Decl. ¶ 36. 5 A. 6 Microwave Analysis Surveys One of Smith’s first activities on the Project was coordinating surveys by a firm that skill to do this analysis, and OCI contracted the surveys to contractors. Dkt. No. 44 (Smith Dep.) 9 48:4-7. Defendant states that Plaintiff was OCI’s contact with the firm conducting the analysis, and 10 Plaintiff scheduled the surveys and then verified the quality of those surveys. Kline Decl. ¶ 15. To 11 make this verification, Defendant states that Smith consulted with the database Siterra,3 as well as 12 For the Northern District of California specialized in site-to-site microwave analysis. Id. ¶ 15. Plaintiff testified that he did not have the 8 UNITED STATES DISTRICT COURT 7 photographs, topographical maps, and antenna height; he had to anticipate obstacles to the signal, 13 such as planned buildings and growing trees. Id.; Dkt. No. 44 (Smith Dep.) 52:12-24. Defendant 14 states that each evaluation required Plaintiff to exercise independent judgment. Kline Decl. ¶ 15. 15 Plaintiff describes his activities as verifying that the survey firms “weren’t just copying, pasting the 16 information that already exists, but they were actually confirming.” Dkt. No. 44 (Smith Dep.) 17 53:10-17. He explained that he had to verify that “their information is close to what we already 18 knew was there and not just shooting from the hip and making up bologna surveys.” Id. Smith 19 checked their quality and if the work did not pass, he stated that his RCM, Art Cunningham, would 20 ask the contractors to redo the work via Smith. Dkt. No. 44 (Smith Dep.) 49:8-16. 21 Plaintiff worked on the microwave phase for six to eight weeks. Id. at 54:5-7. During that 22 time he spent five or more hours a day reviewing these submissions and resubmissions. Id. at 53:25- 23 54:3; 8:16. Plaintiff testified that “for the most part” he was the person who would find the errors 24 25 26 27 28 depositions as “Dkt. No. 44 (Smith Dep.).” 3 Siterra is a nationwide data base of cell towers that Sprint leases. Siterra contains the histories of cell sites, including leases, photographs, and construction drawings for previous equipment installations. Kline Decl. ¶ 16. 3 1 and request resubmissions. Id. at 54:19-21. He agreed that this was a necessary step if the 2 microwave project went forward for the construction to begin. Id. at 54:22-25. But the microwave 3 phase of the project did not go forward. Id. at 49:19-22. The project changed and Sprint decided to 4 stop the microwave surveys. Id. 5 B. 6 Research and Information Gathering While Plaintiff was working on the microwave phase, he was also engaged in research and 7 information gathering. Dkt. No. 44 (Smith Dep.) 55:4-56:4. Plaintiff testified that he received a 8 constant barrage of emails from Cunningham addressing other things they needed to address. Id. at 9 55:9-21. He explained that there was a lot of research done in Siterra and information gathering doing this research and information gathering. Id. Smith agreed that it would be fair to describe this 12 For the Northern District of California composed and delivered to Cunningham. Id. at 55:22-24. Smith stated that Cunningham was also 11 UNITED STATES DISTRICT COURT 10 activity as part of the planning for the upcoming construction. Id. at 56:5-8. He describes this 13 activity as “trying to pull as much information that we could out of Siterra that may be helpful in 14 developing a plan.” Id. at 56:22-24. Smith testified that he was “just gathering the information so 15 that an electrical engineer who is licensed can make these determinations if it will work.” Id. at 16 58:1-10. They addressed these issues throughout the project. Id. at 56:17-23; Dkt. No. 37, 17 Declaration of Julia Azrael (“Azrael Decl.”), Ex. A (Smith Dep.)4 63:13-15. 18 1. 19 Defendant describes scoping as determining what needed to be done to complete the upgrade Scoping 20 on a given cell site. Kline Decl. ¶ 17. Plaintiff describes scoping as “more or less taking the 21 information that is existing and seeing if we can implement the Samsung/Sprint concept.” Dkt. No. 22 44 (Smith Dep.) 76:10-12. Smith, Cunningham, and another LCM, Mike Foster, scoped the 23 approximately 1,200 cell sites in the Bay Area Region. Kline Decl. ¶ 17. Plaintiff testified that they 24 were “lucky to scope four sites a day, and we had 1200, so, you know, it took months. It took 25 26 27 28 4 Like Mr. Stuckey, Ms. Azrael included Plaintiff’s depositions from February 22, 2013 and May 8, 2012 in one exhibit, Exhibit A. Although Ms. Azrael separates the depositions into two different volumes, for consistency, the Court will refer to the two depositions transcripts provided by Defendant as “Dkt. No. 37 (Smith Dep.).” 4 1 months.” Dkt. No. 37 (Smith Dep.) 77:22-25. Plaintiff never visited any of the sites during the 2 scoping phase. Dkt. No. 37 (Smith Dep.) 214:20-22. 3 The scoping phase required Smith to sit in on meetings with a site acquisition (“SA”) 4 manager, a radio frequency (“RF”) engineer, and a representative from architecture and engineering 5 (“A&E”). Kline Decl. ¶ 18; Dkt. No. 44 (Smith Dep.) 71:5-11. These meetings were conversations 6 about specific sites, one site at a time. Dkt. No. 44 (Smith Dep.) 71:16-17. Plaintiff testified that the 7 idea behind the meetings “was to address all problems to the best of our ability at that time.” Id. at 8 71:17-18. Plaintiff described these meetings as follows: “RF would say this is what we want. Site 9 acquisition would say then that’s what I need to try and get the lease for. And construction would issue from a construction perspective. Id. at 210:1-2. He testified that he “just . . . identif[ied] issues 12 For the Northern District of California say that looks doable, or not.” Id. at 209:2-6. Plaintiff’s role was to identify things that could be an 11 UNITED STATES DISTRICT COURT 10 that site acq and RF may have to also consider in their design.” Id. at 210:5-7. 13 To be able to identify these issues, Plaintiff consulted with Siterra and other resources, at 14 times from home to prepare for the next day’s scoping meeting. Dkt. No. 44 (Smith Dep.) 210:8- 15 211:118. Plaintiff provided an example of a type of issue he would identify, such as “guarantee[ing] 16 the accuracy of . . . the hybrid cable lengths for the fiber and DC power to the RAUs.” Id. at 211:8- 17 14. At the scoping meetings, Plaintiff would identify the potential problems in the development of 18 the Sprint upgrade, based on his experience and the information they had at the time. Id. at 69:7-11. 19 Defendant states that together, RF, SA, and Smith would create a scoping document, which an 20 architecture and engineering firm would use to create zoning drawings and construction drawings. 21 Kline Decl. ¶ 22. Plaintiff testified that the scoping document was a document provided by 22 Samsung. Dkt. No. 44 (Smith Dep.) 81:8-9. He explained his role was “more to assist the RF and 23 the site acquisition people to determine what they needed to lease for and submit permits and 24 ultimately constructability.” Id. at 212:6-9. When asked whether the information Plaintiff provided 25 to site acquisition was important, Plaintiff responded: “[a] construction manager thinks it’s 26 important, but the site acquisition team doesn’t necessarily think it’s important,” explaining “we 27 encounter the problems that they don’t care about.” Dkt. No. 37 (Smith Dep.) 69:12-16; 23-24. In 28 5 1 this phase, Plaintiff stated he was “put into scoping for eight hours a day.” Id. at 79:17-18. 2 2. Tracker 3 During that same time, Plaintiff stated that he had to continue to update the trackers, a 4 wholly different entity than the scoping document. Dkt. No. 37 (Smith Dep.) 79:17-22. According 5 to Defendant, the tracker was an extremely complex Excel spreadsheet that lists critical information 6 for each of the 1,200 cell sites. Kline Decl. ¶ 30. Defendant describes Plaintiff as using a tracker 7 “to manage everything that happened in the construction process, from planning to execution.” Id. 8 When Plaintiff was asked how he used the tracker, he stated that he used “a tool that was an 9 extraction of the tracker.” Dkt. No. 44 (Smith Dep.) 81:11-22. He testified that Cunningham it would be easy for me to provide that information that Art [Cunningham] has requested, send it 12 For the Northern District of California provided him a list of priorities, and he used a “filtered down tracker showing the priorities, so then 11 UNITED STATES DISTRICT COURT 10 back to him for him to extract it and put it into the tracker.” Id. at 81:11-82:22. Later he described 13 that he was “given a list of priorities on a tracker that had a bunch of blank spots in it and the black 14 spots need to be filled in with information.” Id. at 170:9-11. Plaintiff explained that he and the 15 FCMs would then gather information so that Russell Mix, an RCM, could then accurately 16 communicate with the client.” Id. at 170:11-15. 17 Plaintiff gathered this information by using Siterra. Dkt. No. 37 (Smith Dep.) 82:2-4. He 18 agreed that in using Siterra he brought his experience from his field construction management 19 background. Id. at 73:3-9. Then when asked why a person with a construction manager background 20 would be identifying and providing information from Siterra, Plaintiff responded: “Just because 21 there wasn’t anyone else hired on. I mean, anybody could have done it. It wasn’t rocket science. It 22 didn’t take any management skill to go into Siterra.” Dkt. No. 44 (Smith Dep.) 82:5:12. 23 Cunningham, Plaintiff’s RCM, instructed Smith to confirm all information on Siterra with three 24 separate references. Dkt. No. 37 (Smith Dep.) 211:8-18. 25 When asked how the use of the tracker fit into the construction management of the program, 26 Plaintiff responded: “As I understand it, the information in the tracker was provided to Samsung 27 who then extracted information from the tracker and utilized it in their own separate tool, and I don’t 28 6 1 know what that tool was.” Dkt. No. 37 (Smith Dep.) 82:13-18. Defendant describes the tracker as 2 very important to OCI because it is the interface through which OCI coordinates the construction 3 process. Kline Decl. ¶ 34. OCI made the tracker available to Sprint and Samsung so they could 4 monitor progress, analyze construction issues, and know when the sites were ready for “integration.” 5 Id. ¶ 35. The tracker also allowed Samsung to evaluate OCI’s performance. Id. Plaintiff agreed 6 that the tracker was an important tool for reporting to Samsung. Dkt. No. 37 (Smith Dep.) 88:6-8. 7 The tracker evolved over time, growing from 65 columns to 203. Dkt. No. 37 (Smith Dep.) 8 82:24-83:2. According to Plaintiff, each column had pertinent information that needed to be 9 provided and a site list of priorities. Id. at 83:2-4. Plaintiff agreed that the tracker was partly a inputting information in the tracker that would be used to schedule the entire construction of any 12 For the Northern District of California scheduling and calendar tool. Id. at 83:4-6. But he testified that he had no accountability for 11 UNITED STATES DISTRICT COURT 10 given site, and that he had no responsibility over the accuracy of the dates for a given site as input 13 into the tracker. Dkt. No. 44 (Smith Dep.) at 85:4-16, 86:7-10. Plaintiff testified that the site 14 acquisition management team entered the construction start dates, and from those dates Defendant 15 tried to formulate the master tracker with a logical sequence of time frames from construction start 16 to construction finish, and all the milestones in between. Id. at 231:9-18. According to Smith, it 17 was Russell Mix’s responsibility to put in the forecast dates for the various downstream phases. Id. 18 at 86:19-21. And Mix got the forecast dates from a formula placed in the tracker that would project 19 out from the construction date to the construction complete date. Id. at 87:1-6. 20 The only dates Smith testified that he was expected to provide before construction began 21 were bid walks and other dates that he said he provided to the project coordinator who put that 22 information into the master tracker. Dkt. No. 44 (Smith Dep.) 231:19-24. Smith testified that he did 23 not have a project coordinator or facilitator helping him with his workload. Id. at 156:13-14. But he 24 explained that the five LCMs funneled information to a project coordinator, who was tasked with 25 taking their updates and status changes. Id. at 87:23-24; Dkt. No. 37 (Smith Dep.) 88:2-5. Smith 26 testified that he would review material off Siterra, then provide that information to others who 27 would put it into the tracker. Dkt. No. 44 (Smith Dep.) 180:25-181-8. According to Plaintiff, he had 28 7 1 no control over the timing or phase his sites were in. Dkt. No. 37 (Smith Dep.) 83:19-84:6. When 2 asked, Plaintiff agreed that his information gathering task felt like “just doing clerical work,” 3 although he states that he knew there was actual construction benefit to extracting that clerical 4 information. Id. at 63:19-24. Plaintiff also testified that the information he provided was necessary 5 for the construction management to proceed. Dkt. No. 44 (Smith Dep.) 181:9-11. Later, when asked 6 again if he believed he was doing “just clerical work, data entry-type work,” Smith responded, “[f]or 7 the most part, yeah.” Dkt. No. 37 (Smith Dep.) 161:10-12. 8 C. 9 Redlining According to Defendant, another critical part of Smith’s job was redlining. Kline Decl. ¶ 24. drawings (“ZDs”) (for zoning approval by local government) and construction drawings (“CDs”) 12 For the Northern District of California Defendant states that the purpose of redlining was quality control. Id. A&E created zoning 11 UNITED STATES DISTRICT COURT 10 (more detailed drawings also used by subcontractors). Id. ¶¶ 22, 25, 26. Then Smith would review 13 the drawings and, if necessary, indicate changes needed to be made and send them back to A&E to 14 be corrected. Id. ¶¶ 22, 24. SA then used the completed zoning drawings to obtain zoning permits. 15 Id. ¶ 22. And subcontractors used the completed construction drawings as blueprints for the 16 physical construction of the upgrade. Id. ¶ 24. According to Defendant, Plaintiff’s redlining was the 17 final review of construction drawings for sites under his management. Id. ¶ 16. 18 Smith received the drawings when they were called 90% ZDs or CDs. Kline Decl. ¶¶ 22, 24. 19 Later, they would become 100% ZDs or CDs. Id. For the 90% ZDs, Smith explained that the site 20 acquisition management team was expected to review the drawing, and the lead CM was also 21 expected to review and sign off before it could go on to a 100% ZD. Dkt. No. 44 (Smith Dep.) 22 92:24-93:3. Plaintiff testified that most of the time he did not review the 90% ZD for accuracy, but 23 instead stated that “We just stamped it. Even though a name may be associated with it, it wasn’t 24 reviewed. There wasn’t time enough to review every 90 percent ZD.” Id. at 93:4-12. He testifies 25 that “somebody had to stamp off on them, whether they made any changes or not. In order for them 26 to go into the permitting process somebody had to stamp off on them, whether they were reviewed 27 or not.” Dkt. No. 37 (Smith Dep.) 99:7-10. 28 8 But Plaintiff did redline construction drawings, which he said was more pertinent to “us as 1 2 construction.” Dkt. No. 44 (Smith Dep.) 93:13-20; 94:2-4. Plaintiff testified he engaged the FCMs 3 in doing the redlines, but that was “short-lived.” Dkt. No. 37 (Smith Dep.) 94:5-10. But he also 4 testified that he had other resources around him so that he “was able to keep up on other tasks by 5 having redlines done by others.” Id. at 94:11-13. When asked what knowledge he had that enabled 6 him to redline documents, Plaintiff responded, “Just field experience.” Id. at 96:12-14. The 7 redlining started “maybe in April,” and they were doing redlines for “months and months,” some 8 days for eight hours a day. Id. at 97:1-20. When asked if redlining was a significant part of his day 9 before October when construction began, Plaintiff replied, “Some days, yes.” Id. at 97:21-24. From 10 October to January, Plaintiff estimated that he spent 35-40% of his time redlining. Id. at 135:3-7. Plaintiff described two schools of thought on redlining: “capture every detail” or “push it 12 For the Northern District of California UNITED STATES DISTRICT COURT 11 through.” Dkt. No. 37 (Smith Dep.) 94:17-20; 95:8-10. Plaintiff testified that he had the resources 13 to give him “as much detail as they knew or they had the ability to see, either through a field visit or 14 Siterra.” Id. at 95:12-14. Smith also explained that some of the redlines were based on 15 hypotheticals, because “nobody, even Samsung didn’t know how to put their own equipment 16 together.” Id. at 98:25-99:3. He stated that his school of thought was “always more is better, the 17 more detail you knew, the better off you would be with your hundred CDs.” Id. at 95:14-17. He 18 explained that “there were those that wanted us to put that much detail into a redline for the A and E 19 to go back and redraw it so that when the hundred CDs came back there were as accurate as 20 possible.” Id. at 95:1-5. 21 D. Bid and Site Walks, Purchase Order Requests, and Change Order Requests 22 1. 23 Based on the construction drawings, Plaintiff would “call out” a project to a contractor who 24 would then give him a bid. Dkt. No. 44 (Smith Dep.) 118:2-9. Defendant describes this process as 25 Smith presenting the scope of work to a subcontractor, who would in turn submit to Smith a bid for 26 labor and materials. Kline Decl. ¶ 27. Smith explained that the bids were not competitive. Dkt. No. 27 44 (Smith Dep.) 118:6-7. He did not have a role in selecting the general contractor that came to bid. Bid and Site Walks 28 9 1 Dkt. No. 44 (Smith Dep.) 118:21-23. He testified that he was “more or less given, Here is who is 2 building this site.” Id. at 119:3-4. 3 Plaintiff would prepare the “scope of work” by going out beforehand and putting together contractor so that he could put a bid together.” Dkt. No. 44 (Smith Dep.) 119:14-21. He described 6 this preparation as taking photos, looking at the site, and comparing it with construction drawings. 7 Id. at 119:23-25. At the scope of work site visit, Plaintiff explained that “with the understanding I 8 had at any given moment from Samsung and what they wanted to accomplish, I would go out to 9 those priority sites that were going to be a construction start date, the soonest I would go out to those 10 sites, visit them, take photos, see what’s existing, and plan for a final configuration and put together 11 a scope of work.” Id. at 128:4-15. This included determining whether the scope of work included a 12 For the Northern District of California “the understanding of what I needed to communicate or what needed to be communicated to the 5 UNITED STATES DISTRICT COURT 4 power upgrade, adding additional boom for more antennas, how the fiber would be routed, and 13 more. Id. At the scope of work walks, Plaintiff testified he was alone with only his drawings, 14 camera, and experience. Id. at 128:18-24. When asked what percentage of time he spent on these 15 walks, Plaintiff responded, “[n]ot a lot.” Dkt. No. 37 (Smith Dep.) 120:11-14. 16 Plaintiff explained that the purpose of the bid walks was to “identify the scope of work, 17 communicate clearly and accurately to the best of my ability to the contractor what Samsung wanted 18 to do if it didn’t change before we actually did it.” Dkt. No. 37 (Smith Dep.) 121:21-24. When 19 asked it he believed he was successful in being able to present and identify the scope of the work to 20 the general contractors, Plaintiff replied “With the – the knowledge and understanding I had of what 21 Samsung wanted to accomplish, yes; if it changed after a bid walk was completed, no.” Id. at 22 122:10-15. But Plaintiff testified that Samsung “changed its direction” on “a hundred percent” of 23 the jobs. Id. at 123:3-5. After these changes, Plaintiff testified he would have to get a proposal from 24 a contractor “as to how this would affect the cost of the project.” Id. at 124:1-6. After receiving that 25 information, Plaintiff would “feed it upstream to Art Cunningham at that time.” Id. at 124:7-8. 26 27 Asked whether he would make recommendations as to solutions for these changes, Plaintiff testified that he has “always been the kind of CM that requested solutions provided by my 28 10 1 contractor.” Dkt. No. 37 (Smith Dep.) 124:15-20. But he also testified that “when it came down to 2 the rubber meeting the road, I tried to reduce my liability by saying, This is how you are going to do 3 it. I always wanted other opinions and solutions. I wanted to weigh options and present solutions to 4 those above me and get their feedback and then as a team make a decision.” Id. at 124:20-125:1. 5 He stated that “as a team, my regional, myself and other lead CMS, we were able to determine what 6 would be best, if it was cost effects, if it maintained our margin.” Id. at 125:8-11. When asked if 7 problem-solving was part of his job as an LCM, presenting the best solution, alternative solutions, 8 making recommendations, and weighing them, Plaintiff responded “[y]es, presenting alternative 9 solutions definitely was.” Id. at 125:12-17. Smith explained that a “contractor can make ultimately, they would come to an agreement that Smith would follow up with an e-mail “that that is 12 For the Northern District of California suggestions that may eliminate certain scopes of work that I’ve identified as necessary,” and that 11 UNITED STATES DISTRICT COURT 10 the direction we would go.” Id. at 127:5-12. 13 2. 14 Prior to construction, Smith was also involved with purchase order requests (“POR”). Dkt. Purchase Order Requests 15 No. 37 (Smith Dep.) 138:9-11. When OCI awarded a site to a contractor, a POR needed to be 16 submitted by Plaintiff, which he attached to an email that would be “forwarded upstream.” Id. at 17 138:12-20. The bid originated from the contractor, which was reviewed by Plaintiff, then 18 reformatted onto the POR by OCI. Id. at 138:21-139:1. Smith reviewed the POR to check that it 19 matched the scope of the work that was communicated to the contractor. Id. at 139:6-9. He testified 20 that his review could take minutes, or it could take days if the POR did not include all that was 21 identified as a scope of work. Id. at 139:10-14. In that case, the contractors would have to go back 22 and submit a new proposal, then Plaintiff would review it again. Id. at 139:14-16. Plaintiff testified 23 that there were numerous back-and-forths on PORs because “designs change, constructability 24 changes, what we thought we could do we couldn’t do.” Id. at 120:3-5. The RCM would develop a 25 POR for processing. Kline Decl. ¶ 27. 26 27 Smith began reviewing PORs in September of 2011. Dkt. No. 37 (Smith Dep.) 139:21-22. Although reviewing PORs was not a substantial part of his day, he testified that cumulatively it 28 11 1 amounted to a substantial amount of time. Id. at 139:23-25; 140:4-6. He explained that this was due 2 to the “back and forth, the lead time, the delay in getting to POR revised, received back, reviewed 3 again . . . the feedback, you know the other – the regional having his input reminded me of did you 4 get this, did you get this, is this covered, is this covered, you know so it wasn’t just me involved in 5 the POR, it was also the regional.” Id. at 140:5-16. But Smith also testified that “I look at things 6 now and PORs didn’t take up a lot of my time.” Id. at 143:2-3. When asked what ultimately 7 happened to a POR, Plaintiff said, “I don’t know. I don’t have visibility to those things that are 8 really above me, whatever the regional CM is responsible for, other than him providing me a tracker 9 that shows priorities and what’s – what are my next sites to build and bid walk and what not. I don’t 10 have a whole lot of visibility to what they do with the paperwork.” Id. at 143:12-20. 3. 12 For the Northern District of California UNITED STATES DISTRICT COURT 11 If the scope of work for a site changed after the POR had been approved, the subcontractor Change Order Requests 13 would submit a change order request (“COR”). Kline Decl. ¶ 28; Dkt. No. 37 (Smith Dep.) 146:2-6. 14 Smith testified that he was involved with CORs. Dkt. No. 44 (Smith Dep.) 145:13-15. According to 15 Defendant, Smith was responsible for ensuring that any CORs were appropriate and accurate. Kline 16 Decl. ¶ 28. General contractors would sometimes present Smith with CORs, which could have come 17 through field managers as well. Dkt. No. 44 (Smith Dep.) 147:1-10. Plaintiff testified that his duty 18 with CORs was “[j]ust feed it up the food chain.” Id. at 147:11-13. When asked if he had the ability 19 to approve a COR, Smith stated “I don’t think I ever took the authority even if I had it . . . because 20 others wanted visibility beforehand, so I was more or less a conduit for additional information.” Id. 21 at 147:14-18. According to Smith, “they wanted control of the finances, so they didn’t want lead 22 CMs approving things.” Id. at 147:21-22. Smith testified he spent “approximately very little” time 23 reviewing CORs. Id. at 147:11-13. 24 E. Relationships with Other Employees 25 1. 26 OCI began hiring FCMs around October 2011. Dkt. No. 44 (Smith Dep.) 147:14-16; 166:9- 27 Field Construction Managers (FCMs) 19. Smith had Jeff Long and Joe Mertz as his FCMs, but he said he played no role in their hiring. 28 12 1 Id. at 147:17-20. Other lead construction managers also used the FCMs when needed. Dkt. No. 37 2 (Smith Dep.) 269:24-270:3. passing along orders from above. Dkt. No. 37 (Smith Dep.) 173:8-12. According to Plaintiff, even 5 though Mertz “fell under my wing, I had no authority over him. He was directed by others from day 6 one.” Id. at 167:16-20. Smith explained that Long and Mertz both reported to him on various 7 projects, but those projects came from RCM Russell Mix or Jim Amoto. Id. at 169:14-25. 8 According to Plaintiff, those projects were first handed to Plaintiff by Mix via the tracker, the 9 Monday morning meeting, or the conversation of priorities, and then Plaintiff would “hand off [the 10 project] to Joe or Jeff.” Id. These projects would include tasks like measuring a length of a cable or 11 the amperage of the service. Id. Smith explained that “more so than not I was given a list of 12 For the Northern District of California Smith also explained that he felt he was not managing Mertz and Long because he was only 4 UNITED STATES DISTRICT COURT 3 priorities on a tracker that had a bunch of blank spots in it and the blank spots needed to be filled in 13 with information. I could help Joe and Jeff understand what information we needed to gather so that 14 Russell could, then, communicate to the client accurately and they would go out and get that 15 information.” Id. at 170:8-15. 16 Plaintiff agreed that he helped give Mertz and Long assistance, training, and direction. Dkt. 17 No. 37 (Smith Dep.) 170:19-21. He explained that he helped them figure out where and how to get 18 the information that he requested from them. Id. at 170:22-171:9. He would also “assist them in 19 how to come to the conclusions that the client was expecting to see there, and that was based on the 20 training that I received from people educating me on what the client wanted to see.” Id. at 171:5-9. 21 As Smith’s sites were prioritized by construction start dates, he split the sites up between Mertz and 22 Long. Id. at 171:24-25. Jeff Long was the FCM on Smith’s cell site that went into construction. Id. 23 at 288:19-21. 24 2. 25 Plaintiff never had any direct interaction with Sprint. Dkt. No. 44 (Smith Dep.) 158:18-19. Upper Management, Samsung, and Sprint 26 He also testified that his RCMs and Jim Amoto instructed him not to contact or have interactions 27 with OCI’s client, Samsung. Id. at 158:20-159:4. Smith never attended any regular meetings with 28 13 1 Samsung. Id. at 159:18-20. Outside of the interaction with his RCMs, Plaintiff testified that he 2 rarely interacted with upper management. Id. at 163:2-13. 3 Plaintiff testified that he had a “good understanding” with his supervisor Russell Mix. Dkt. 4 No. 37 (Smith Dep.) 110:10-14. Plaintiff explained that they “didn’t always see eye to eye, but 5 [Mix] expressed on numerous occasions that he respected my opinion. And ultimately he was in 6 charge, and he would take my advice or my suggestions and take it to heart, but the ultimate 7 decision was his.” Id. at 110:17-23. Later, Plaintiff testified he felt there was “too much hands-on 8 by [Mix], that he needed to let go of control and let us manage, but he never let go.” Id. at 173:13- 9 18. 10 Mix ran weekly Monday morning meetings, attended by all the LCMs and FCMs. Dkt. No. 44 (Smith Dep.) 148:23-149:6. According to Plaintiff, “those Monday morning meetings were 12 For the Northern District of California UNITED STATES DISTRICT COURT 11 Russell Mix’s. He was the keynote speaker.” Id. at 149:18-19. At these meetings they would 13 discuss the “importance of the tracker updates, the forecast dates for all the sites that were assigned 14 to a particular lead CM, the training of how we should utilize our field CMs, and meeting -- the 15 deadlines, the milestones.” Id. at 149:7-16. Plaintiff explained that Mix was under a lot of pressure 16 and pushed to meet dates, and he in turn pushed the lead and field CMs. Dkt. No. 37 (Smith Dep.) 17 149:18-24. According to Smith, “[u]ltimately everything rolled downhill to myself and the field 18 guys, but everything was always initiated from several layers above us.” Id. at 149:22-24. Russell 19 Mix was RCM when Plaintiff was terminated in January 2012. Id. at 173:23-25. 20 F. 21 Procedural Background On April 20, 2012, Plaintiff filed a Complaint against Defendant in Contra Costa County 22 Superior Court. Not. of Rem., Ex. B (Compl.), Dkt. No. 1. Defendant removed the case to this 23 Court on May 22, 2012. Dkt. No. 1. In his Complaint, Plaintiff brings the following causes of 24 action: (1) failure to pay overtime under California Labor Code section 510; (2) failure to pay 25 minimum wage under Labor Code section 1194; (3) failure to pay wages under Labor Code section 26 204; (4) failure to comply with employment wage statement and record provisions under Labor 27 Code section 226(a); (5) statutory waiting time penalties under Labor Code section 202; (6) 28 14 1 unlawful business practices; (7) wrongful discharge in violation of public policy; and (8) retaliation. 2 Compl. at 4-12. On January 17, 2013, the Court granted the parties’ stipulation to dismiss the 3 seventh and eighth causes of action. Dkt. No. 25. 4 On July 3, 2013, Defendant filed the present Motion for Summary Judgment, arguing that it 5 properly classified Plaintiff as exempt from the overtime provisions of the California Labor Code, 6 and that all of his remaining claims must therefore fail. Mot. at 1-2. In response, Plaintiff argues 7 that he was not properly classified as exempt because he had little if any discretion in his job duties, 8 and the bulk of his job performance included research and data gathering. Opp’n at 2. 9 10 LEGAL STANDARD Summary judgment is appropriate only when there is no genuine dispute of material fact and the moving party is entitled to judgment as a matter of law. Fed. R. Civ. P. 56(a); Celotex Corp. v. 12 For the Northern District of California UNITED STATES DISTRICT COURT 11 Catrett, 477 U.S. 317, 322 (1986). The moving party bears both the initial burden of production as 13 well as the ultimate burden of persuasion to demonstrate that no genuine dispute of material fact 14 remains. Nissan Fire & Marine Ins. Co., Ltd. v. Fritz Cos., Inc., 210 F.3d 1099, 1102 (9th Cir. 15 2000). A dispute is genuine “if the evidence is such that a reasonable jury could return a verdict for 16 the nonmoving party.” Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248 (1986). 17 Once the moving party meets its initial burden, the nonmoving party is required “to go 18 beyond the pleadings and by [its] own affidavits, or by the depositions, answers to interrogatories, 19 and admissions on file, designate specific facts showing that there is a genuine issue for trial.” 20 Celotex, 477 U.S. at 324 (internal quotations and citations omitted). The non-moving party may not 21 rely on the pleadings alone, but must present specific facts creating a genuine issue of material fact 22 through affidavits, depositions, or answers to interrogatories. Fed. R. Civ. P. 56(c); Celotex, 477 23 U.S. at 324 24 The Court must view the evidence in the light most favorable to the nonmoving party. 25 Matsushita Elec. Indus. Co., Ltd. v. Zenith Radio Corp., 475 U.S. 574, 587 (1986). If a reasonable 26 jury could return a verdict in favor of the nonmoving party, summary judgment is inappropriate. 27 Anderson, 477 U.S. at 248. However, unsupported conjecture or conclusory statements are 28 15 1 insufficient to defeat summary judgment. Surrell v. Cal. Water Serv. Co., 518 F.3d 1097, 1103 (9th 2 Cir. 2008). Moreover, the court is not required “to scour the record in search of a genuine issue of 3 triable fact,” Keenan v. Allan, 91 F.3d 1275, 1279 (9th Cir. 1996) (citations omitted), but rather 4 “may limit its review to the documents submitted for purposes of summary judgment and those parts 5 of the record specifically referenced therein.” Carmen v. San Francisco Unified Sch. Dist., 237 F.3d 6 1026, 1030 (9th Cir. 2001). 7 8 9 DISCUSSION A. Overtime In his first cause of action, Plaintiff alleges Defendant failed to compensate him for overtime week. Compl. ¶¶ 19-20. Plaintiff alleges Defendant followed a policy and practice of classifying 12 For the Northern District of California hours worked, despite working shifts of more than eight hours per day and more than 40 hours per 11 UNITED STATES DISTRICT COURT 10 and treating him as an exempt employee, despite the fact that it failed to employ him in an 13 administrative, executive, or professional capacity as defined by applicable law. Id. ¶ 18. 14 In its Motion, Defendant argues that Plaintiff was properly classified as an exempt employee 15 because: (1) his duties involved non-manual work directly related to the management or general 16 business operations of Defendant and its client; (2) he regularly exercised discretion and 17 independent judgment with regard to matters of significance; (3) he performed, under general 18 supervision only, specialized or technical work that requires special training, experience, or 19 knowledge; (4) he performed administrative duties more than half of the time; and (5) it paid him a 20 salary well over minimum wage. Mot. at 13-22. 21 In response, Plaintiff argues that he did not participate in, or even influence policy-making 22 for Defendant, nor did he personally effect its general business operations. Opp’n at 11. Instead, 23 Plaintiff argues that he was simply producing a commodity/service for Defendant at a basic level. 24 Id. Plaintiff also contends that he did not have the ability to practice discretion and independent 25 judgment free from immediate supervision and with matters of significance, but instead was 26 controlled by upper management and closely supervised. Id. at 14. 27 Under California Labor Code section 510, employers must generally pay mandatory 28 16 1 overtime to any employee who works more than eight hours a day or forty hours a week. Cal. Lab. 2 Code § 510(a). However, the Industrial Welfare Commission (“IWC”), a California state agency, 3 may promulgate exemptions from mandatory overtime. Id. § 515(a). The IWC promulgates these 4 exemptions in “wage orders,” state regulations enforced by the California Division of Labor 5 Standards and Enforcement (“DLSE”). The current IWC wage order is Wage Order No. 4-2001, 6 codified at California Code of Regulations title 8, section 11040. The 2001 Wage Order establishes 7 three overtime exemptions: the professional exemption, the executive exemption, and the 8 administrative exemption. 8 Cal. Code Regs. § 11040(1)(A)(1)-(3). 9 Here, Defendant argues that Plaintiff was exempt under the administrative exception. Mot. at 1, 13. To exempt an employee under the administrative exemption, an employer must establish 11 five elements: 12 For the Northern District of California UNITED STATES DISTRICT COURT 10 1. The employee performs work “directly related to management policies or general business operations” of either the employer or the employer’s clients; 2. The employee “customarily and regularly exercises discretion and independent judgment”; 3. The employee works “under only general supervision” while either: (1) performing work along specialized or technical lines requiring special training, experience, or knowledge, or (2) executing special assignments and tasks; 4. The employee is “primarily engaged” in exempt work meeting the above requirements; and 5. The employee meets a minimum salary requirement. 13 14 15 16 17 18 19 20 Campbell v. PricewaterhouseCoopers, LLP, 642 F.3d 820, 830-31 (9th Cir. 2011); 8 Cal. Code 21 Regs. § 11040(1)(A)(2). Further, the administrative exemption extends to “all work that is directly 22 and closely related to exempt work and work which is properly viewed as a means for carrying out 23 exempt functions.” 8 Cal. Code Regs. § 11040.1(A)(2)(f). 24 Wage Order 4-2001 expressly incorporates certain FLSA regulations effective as of the date 25 that wage order was issued. “The activities constituting exempt work and non-exempt work shall be 26 construed in the same manner as such terms are construed in the following regulations under the Fair 27 Labor Standards Act effective as of the date of this order: 29 C.F.R. Sections 541.201-05, 28 17 1 541.207-08, 541.210, and 541.215.” Campbell, 642 F.3d at 831. In other words, in applying Wage 2 Order 4-2001, “just as the [labor] statute is understood in light of the wage order, the wage order is 3 construed in light of the incorporated federal regulations.” Harris v. Superior Court, 53 Cal. 4th 4 170, 178-79 (2011). Thus, the question is whether Plaintiff’s work as a construction manager is 5 encompassed by the administrative exemption as construed in accordance with the relevant statute, 6 wage orders, and federal regulations. Id. at 179. 7 The question of whether Plaintiff is an administrative employee exempt from overtime 794 (1999). The issue of what Plaintiff did as an employee for Defendant is a question of fact, while 10 the precise scope of the exemptions is a question of law. Id. Exemptions from statutory mandatory 11 overtime provisions are to be narrowly construed, and Defendant bears the burden of proving the 12 For the Northern District of California coverage is a mixed question of law and fact. Ramirez v. Yosemite Water Co., Inc., 20 Cal. 4th 785, 9 UNITED STATES DISTRICT COURT 8 exemption is proper. Id. at 794-95. Finally, “in resolving whether work qualifies as administrative, 13 courts must consider the particular facts before them and apply the language of the statutes and wage 14 orders at issue.” Harris, 53 Cal. 4th at 190. 15 1. 16 Under the first element of the administrative exemption, Plaintiff’s work must “directly Work Directly Related to Management Policies or General Business Operations 17 relate[ ] to management policies or general business operations” of either Defendant or Defendant’s 18 clients. 8 Cal. Code Regs. § 11040(1)(A)(2)(a)(I). In the applicable Federal Regulations, part 19 541.205(a) defines the “directly related” phrase as “those types of activities relating to the 20 administrative operations of a business as distinguished from ‘production’ or, in a retail or service 21 establishment, ‘sales’ work.” 29 C.F.R. § 541.205(a) (2000).5 The phrase also limits the exemption 22 to persons who perform work of “substantial importance” to the management or operation of the 23 business of his employer or his employer’s customers. Id. 24 25 In the past, some courts have limited their inquiry about whether an employee’s work is “directly related” to the administrative operations of a defendant’s business by using the 26 27 28 5 All further undesignated section (regulation) references are to title 29 of the Code of Federal Regulations in effect and as incorporated by Wage Order 4-2001. 18 1 “administrative/production dichotomy” test. This test was used to “distinguish[] between[] 2 administrative employees who are primarily engaged in ‘administering the business affairs of the 3 enterprise’ and production-level employees whose ‘primary duty is producing the commodity or 4 commodities, whether goods or services, that the enterprise exists to produce and market.’” Harris, 5 53 Cal. 4th at 183 (discussing how the court below had only focused its inquiry on Federal 6 Regulations former part 541.205(a), which differentiates between administrative and production 7 duties). However, in Harris, the California Supreme Court held that in determining whether an 8 employee does work “directly related” to the defendant’s administrative operations, courts must do 9 more than simply consider this administrative/production dichotomy. Id. at 188. Harris held that must all be read together in order to apply the “directly related” test and properly determine whether 12 For the Northern District of California under Wage Order 4-2001, the incorporated Federal Regulations former part 541.205(a), (b), and (c) 11 UNITED STATES DISTRICT COURT 10 the work at issue satisfies the administrative exemption. Id. at 188. 13 Under these incorporated Federal Regulations, “work qualifies as ‘directly related’ if it 14 satisfies two components. First, it must be qualitatively administrative.” Id. at 181. Second, 15 quantitatively, it must be of substantial importance to the management or operations of the business. 16 Id. Both components must be satisfied before work can be considered ‘directly related’ to 17 management policies or general business operations in order to meet the test of the exemption.” Id. 18 Federal Regulations former part 541.205(b) discusses the qualitative requirement that the 19 work must be administrative in nature. Id. at 182. It explains that administrative operations includes 20 work done by “white collar” employees engaged in “servicing” a business, including advising 21 management, planning, negotiating, and representing the company. 29 C.F.R. § 541.205(b). 22 Administrative work may also include “purchasing, promoting sales, and business research and 23 control.” Id. 24 The quantitative prong then explains that an administrative employee’s duties are “directly 25 related” to management policies or general business operations only if they are of “substantial 26 importance to the management or operation of the business of his employer or his employer’s 27 customers.” 29 C.F.R. § 541.205(a); Harris, 53 Cal. 4th at 182. Federal Regulations former part 28 19 1 541.205(c) relates to the quantitative component that tests whether work is of “substantial 2 importance.” Harris, 53 Cal. 4th at 182. To satisfy the “substantial importance” test, an employee 3 need not “participate in the formulation of management policies or in the operation of the business 4 as a whole.” 29 C.F.R. § 541.205(c). Rather, employees whose work is “of substantial importance” 5 to the management or operations of a business includes those whose “work affects policy or whose 6 responsibility it is to execute or carry it out. The phrase also includes a wide variety of persons who 7 either carry out major assignments in conducting the operations of the business, or whose work 8 affects business operations to a substantial degree, even though their assignments are tasks related to 9 the operation of a particular segment of the business.” Id. 10 Plaintiff’s job title as LCM is not determinative; rather, the Court must look to the nature of his day-to-day activities. Miller v. Farmers’ Ins. Exch., 481 F.3d 1119, 1125 (9th Cir. 2007) 12 For the Northern District of California UNITED STATES DISTRICT COURT 11 (holding that insurance adjusters were exempt administrative employees, despite the fact that they 13 comprised approximately fifty percent of their employer’s workforce and did not supervise other 14 employees); see also 29 C.F.R. § 541.201 (“A [job] title alone is of little or no assistance in 15 determining . . . [an employee’s status] as exempt or non exempt . . . . Titles can be had cheaply and 16 are of no determinative value.”). 17 Neither party cites any case law on the direct-relationship test, and the record contains 18 evidence that could support contrary findings regarding the nature of Smith’s work. On one hand, 19 Defendant presents evidence that (1) Plaintiff performed white collar, non-manual work managing 20 the construction of a significant number of OCI’s cell sites; (2) Plaintiff helped plan and advise 21 management on important aspects of preparing cell sites for construction; and (3) his various tasks 22 of researching on Siterra, providing information for the tracker, redlining, bid-walks, and purchase 23 order and change order requests all related to business research, control, and representing OCI and 24 their client. See 29 C.F.R. §§ 541.205(a-c). Such findings could support the conclusion that Smith’s 25 work directly related to management policies and general business operations. 26 There is no question that Smith spent the majority of his time performing non-manual, white 27 collar work, and Smith agrees that he engaged in “research and data gathering.” Compl. ¶ 8. But he 28 20 1 also presents evidence that could support a finding that he performed primarily clerical duties, with 2 only limited opportunities to plan, advise management, negotiate, or represent OCI or Samsung. 3 Plaintiff testified that “[f]or the most part” he was doing “just clerical work, data entry-type work.” 4 Dkt. No. 37 (Smith Dep.) 63:19-24; 161:10-12. Although Plaintiff stated that he knew there was 5 actual construction benefit to extracting that clerical information (id. at 63:19-24), Federal 6 Regulations former part 541.205(c)(2) states “[a]n employee performing routine clerical duties 7 obviously is not performing work of substantial importance to the management or operation of the 8 business even though he may exercise some measure of discretion and judgment as to the manner in 9 which he performs his clerical tasks.” 29 C.F.R. § 541.205(c)(2). Smith testified that he was “given filled in with information.” Dkt. No. 44 (Smith Dep.) 170:9-11. Plaintiff explained that he and the 12 For the Northern District of California a list of priorities on a tracker that had a bunch of blank spots in it and the blank spots need to be 11 UNITED STATES DISTRICT COURT 10 FCMs would then gather information so that RCM Russell Mix could then accurately communicate 13 with the client. Id. at 170:11-15. This testimony indicates that Plaintiff performed primarily clerical 14 work, while others performed work more related to servicing OCI and its client. 15 Defendant argues that “[a]ll of Smith’s ‘research and data gathering’ was business research” 16 within the meaning of the Federal Regulations former part 541.205(b), “because it was integral to 17 every state of planning and executing the upgrade.” Mot. at 15. But Federal Regulations former 18 part 541.205(c)(3) explains that “[i]f all such a person does, in effect, is to tabulate data, he is clearly 19 not exempt.” 29 C.F.R. § 541.205(c)(3). But “if such an employee makes analyses of data and 20 draws conclusions which are important to the determination of, or which, in fact, determine 21 financial, merchandising, or other policy, clearly he is doing work directly related to management 22 policies or general business operations.” Id. It is not clear which of these categories Smith’s duties 23 fell under. 24 Plaintiff describes some of his activities as relating to planning. For instance, he describes 25 his research and data gathering activities as “trying to pull as much information that we could out of 26 Siterra that may be helpful in developing a plan.” Dkt. No. 44 (Smith Dep.) 56:22-24. During the 27 scoping phase, Plaintiff used the information he had gathered to identify construction problems at 28 21 1 the scoping meeting, where together with site acquisition and a radio frequency engineer, he would 2 help create a scoping document, which an architecture and engineering firm would use to create the 3 drawings for construction and zoning for the actual site. Kline Decl. ¶ 22. Then, at the scope-of- 4 work type of site visits, Plaintiff explained he “would go out to those [priority] sites, visit them, take 5 photos, see what’s existing, and plan for a final configuration and put together a scope of work.” 6 Dkt. No. 44 (Smith Dep.) 128:4-15. These are planning activities involving business research and, 7 to some degree, representation of OCI and its client. 8 Although Defendant has presented persuasive evidence that Smith was at times involved in 9 qualitatively administrative work, Plaintiff’s description of his duties provides enough evidence to business and whether his activities were of substantial importance to management policies. In 12 For the Northern District of California create a genuine issue of a material fact as to the degree he engaged in servicing Defendant’s 11 UNITED STATES DISTRICT COURT 10 addition to the duties Plaintiff portrays as clerical, he also presented evidence that even the work he 13 did in identifying construction issues during the scoping phase may not have been particularly 14 important, let alone of “substantial importance,” in the design implemented by the site acquisition 15 team and radio frequency engineer. When asked whether the information Plaintiff provided to site 16 acquisition was important, Plaintiff responded: “[a] construction manager thinks it’s important, but 17 the site acquisition team doesn’t necessarily think it’s important,” explaining “we encounter the 18 problems that they don’t care about.” Dkt. No. 37 (Smith Dep.) 69:12-16; 23-24. It is not enough 19 that an employee attempts to make “analyses of data and draw[] conclusions,” but that those 20 analyses and conclusions must also be “important to the determination of, or which, in fact, 21 determine financial, merchandising, or other policy.” 29 C.F.R. § 521.205(c)(3). There remains a 22 dispute of material fact as to whether Plaintiff’s work was important to the determination of OCI’s 23 policy. 24 There is also a genuine dispute remaining as to Plaintiff’s duties involving the tracker and 25 forecast dates. Defendant contends that Plaintiff engaged in business control every time he updated 26 the tracker or forecasted a completion date. Mot. at 14. But Plaintiff’s testimony disputes both of 27 these contentions. Smith testified that he had no control or input into the scheduling of 28 22 1 construction-related activities on the tracker, nor was he responsible for the accuracy of the 2 scheduling dates in the tracker. Dkt. No. 37 (Smith Dep.) 85:4-16, 86:7-10. He testified that others 3 were responsible for forecasting and scheduling. Dkt. No. 44 (Smith Dep.) 86:19-21; 231:9-18. 4 When it came to the tracker, Plaintiff testified that he used “a tool that was an extraction of the 5 tracker.” Id. at 81:11-22. He testified that his RCM had a list of priorities, and he used a “filtered 6 down tracker showing the priorities, so then it would be easy for me to provide that information that 7 Art [Cunningham] has requested, send it back to him for him to extract it and put it into the tracker.” 8 Id. at 81:11-82:22. It is not clear how Plaintiff used the tracker, or a filtered down tracker, or an 9 extraction of the tracker–or whatever it was–to actually help him “manage everything in the sites, Plaintiff testified that he had no control over which contractors built his sites or the timing or 12 For the Northern District of California construction process” as Defendant claims. Mot. at 11. Instead, when it came to control over his 11 UNITED STATES DISTRICT COURT 10 phase his sites were in. Dkt. No. 44 (Smith Dep.) 119:3-4; Dkt. No. 37 (Smith Dep.) 83:19-84:6. 13 All of this evidence undermines Defendant’s argument that Smith was involved in planning, 14 business control, and business research that was important to the determination of business policy. 15 It is a close issue, but Plaintiff has ultimately produced enough evidence to show that there remains 16 a genuine issue of material fact under this first prong of the analysis. 17 Although not binding, the Court finds the comparisons to the following cases helpful. In 18 Combs v. Skyriver Commc’ns, Inc., 159 Cal. App. 4th 1242 (2008), the plaintiff sought unpaid 19 overtime compensation from Skyriver, a broadband internet service provider, alleging that he was 20 misclassified as an exempt employee. Id. at 1247. Combs was the “director of network operations” 21 responsible for project management, budgeting, vendor management, purchasing, forecasting, 22 employee management, management of “overseas deployment of wireless data network,” 23 management of “the integration and standardization of three networks into the Skyriver 24 architecture,” and the overseeing of “day to day Network Operations.” Id. The court held that 25 Combs was properly classified as exempt because his duties were directly related to the management 26 or general business operations as “‘they directly related to assisting with the running or servicing of 27 the business’ . . . and his work included ‘budgeting,’ ‘purchasing,’ ‘procurement,’ and ‘computer 28 23 1 network, internet and database administration.’” Id. at 1264-65 (citation omitted). The court noted 2 that Combs was responsible for maintaining, developing and improving Skyriver’s network, and his 3 duties involved high-level problem solving, preparing reports for Skyriver’s board of directors, 4 capacity and expansion planning, planning for the integration of acquired networks into Skyriver’s 5 network, lease negotiations, and equipment sourcing and purchasing. Id. at 1264. In contrast, the 6 evidence here is questionable as to whether Plaintiff had anywhere near the same sort of 7 responsibility relating to servicing the company or performing work of such substantial importance. 8 9 In McCullough v. Lennar Corp., 2011 WL 1585017, at *17 (S.D. Cal. Apr. 26, 2011), the court found that summary judgment on the issue of exemption was inappropriate where the plaintiff, evidence that his “primary duties involved tasks as a production employee out in the field 12 For the Northern District of California an area manager for a company in the business of residential new home construction, presented 11 UNITED STATES DISTRICT COURT 10 implementing the schedule or duties that were given to him by the corporate office.” The defendant 13 presented evidence that the plaintiff managed all the subcontractors who were building a reservoir, 14 coordinated with outside teams (including archaeologists, biologists, and city officials), worked with 15 project management, and saved the defendant $5 million by coming up with a design that the 16 defendant used as part of the construction. Id. at 16. Part of the plaintiff’s job as area manager was 17 determining the order and priority of the horizontal construction activities, leading weekly meetings 18 with subcontractors and project managers, reviewing the budget, interacting and meeting with city 19 officials related to obtaining necessary inspection approvals, approving subcontractors invoices for 20 payment, and reviewing change orders. Id. In opposition, the plaintiff argued that he was a 21 production employee and that every week he would attend a meeting where the schedule was 22 readjusted, and the following week he would implement the new schedule. Id. at 17. 23 The McCullough court found that, based on the defendant’s version of the facts, it could be 24 said that the plaintiff’s primary duty was the performance of work directly related to the 25 management or general business operations; however, the court ultimately found that because 26 plaintiff presented evidence that his primary tasks were simply implementing the schedule or duties 27 that were given to him by the corporate office, there remained a genuine issue of material fact 28 24 1 precluding summary judgment. McCullough v. Lennar Corp., 2011 WL 1585017, at *17. The court 2 found that even if the plaintiff was well qualified as an area manager and the defendant appeared to 3 utilize and follow his recommendations on key business operations, it was not clear whether 4 plaintiff’s primary work duties involved work directly related to the management or general business 5 operations of the defendant. Id. The same is true here, where it is not clear that Plaintiff’s primary 6 work consisted of the types of activities relating to the administrative operations of Defendant’s 7 business. 8 Likewise, in Gottlieb v. Const. Srvs. & Consultants, Inc., 2006 WL 5503644, at *6 (S.D. Fla. of constructing shells for houses, was not an exempt employee. The business used subcontractors 11 for every phase, and the project supervisors’ job was to schedule the subcontractors, order supplies, 12 For the Northern District of California July 24, 2006), the court held that the plaintiff, as project supervisor for a company in the business 10 UNITED STATES DISTRICT COURT 9 bill on his construction site, be the company’s representative on the construction site, and inspect the 13 work of the subcontractors. Id. at 1-2. However, the plaintiff was not responsible for hiring or 14 interviewing subcontractors, and the area manager was generally present on the construction site 15 each a time a new model was built and made any changes to the quantity of supplies needed. Id. at 16 2. If the area manager was not present, the plaintiff was expected to make these changes. Id. The 17 plaintiff was also responsible for safety on the construction site. Id. at 3. The court explained that 18 the “[p]laintiff’s work involved producing the product CSCI existed to market rather than servicing 19 CSCI itself.” Id. at 6. As such, the court found that plaintiff’s primary work was not directly related 20 to the management or general business operations of the employer or the employer’s customers. Id. 21 Similarly, in Cotten v. HFS–USA, Inc., 620 F. Supp. 2d 1342, 1353 (M.D. Fla. 2009), the 22 court found that the defendant had not met its burden of establishing that the plaintiff was an 23 administrative employee. The plaintiff was a field supervisor for the defendant, a provider of home 24 finishing services such as installation of tile and hardwood flooring, carpet, decorative trim and 25 molding, and exterior stone and pavers to residential builders. Id. at 1344. Although the plaintiff 26 managed certain assigned installation sites, his duties were to ensure “the installers received their 27 work orders, retrieved the correct materials from the warehouse, and completed the installation job 28 25 1 as specified in the contract and the work order and in compliance with specified standards.” Id. at 2 1348. The plaintiff was not responsible for negotiating or executing contracts, creating work orders 3 or developing the applicable standards; did not perform duties related to financing, budgeting, 4 accounting, auditing, research, employee benefits, taxes, insurance, advertising or computer 5 technology; and was not involved in formulating business policies or procedure. Id. Thus, the court 6 concluded that the plaintiff’s primary duties were not directly related to the management or general 7 business operations of the defendant. Id. at 1350. 8 9 Given the similar facts present in this case, the Court finds that a genuine dispute remains as to whether the work Plaintiff performed qualified as administrative duties directly related to 11040(1)(A)(2)(a)(1). Likewise, it is not clear whether Plaintiff’s work was of substantial 12 For the Northern District of California Defendant’s management policies or general business operations. See 8 Cal. Code Regs § 11 UNITED STATES DISTRICT COURT 10 importance to Defendant’s business operations. Accordingly, the Court cannot find as a matter of 13 law that Plaintiff’s duties qualify as qualitatively and quantitatively administrative, and summary 14 judgment is therefore inappropriate. 15 2. 16 Even if the Court found that Defendant met its burden as to the first prong of the analysis, the Discretion and Independent Judgment 17 Court finds that a genuine issue of material fact remains as to whether Plaintiff customarily and 18 regularly exercised discretion and independent judgment. As part of a smaller crew of people 19 identifying construction issues during the scoping phase of the 1,200 sites, and later as a LCM with 20 responsibility for 243 sites, Defendant argues that Plaintiff “made thousands of discretionary 21 decisions and judgment calls, all of which affected the cost, quality, and schedule of the Project.” 22 Mot. at 16. Defendant argues that because the Samsung equipment was entirely new, Smith had to 23 solve problems with no ready-made solutions. Id. In response, Plaintiff argues that Defendant’s 24 upper management kept him on a “short leash,” with no ability to practice discretion and 25 independent judgement free from immediate supervision. Opp’n at 13-14. 26 27 The “exercise of discretion and independent judgment involves the comparison and the evaluation of possible courses of conduct and acting or making a decision after the various 28 26 1 possibilities have been considered.” 29 C.F.R. § 541.207(a). The phrase “implies that the person 2 has the authority or power to make an independent choice, free from immediate direction or 3 supervision and with respect to matters of significance.” Id. Subpart (b) explains that the “phrase 4 must be applied in the light of all the facts involved in the particular employment situation in which 5 the question arises.” 29 C.F.R. § 541.207(b). The Regulations warn that the phrase is “most 6 frequently misunderstood and misapplied by employers and employees in cases involving the 7 following: (1) Confusion between the exercise of discretion and independent judgment, and the use 8 of skill in applying techniques, procedures, or specific standards; and (2) misapplication of the term 9 to employees making decisions relating to matters of little consequence.” Id. judgment exercised must be real and substantial, that is, they must be exercised with respect to 12 For the Northern District of California Subpart (d) of the same regulation further explains that “the discretion and independent 11 UNITED STATES DISTRICT COURT 10 matters of consequence.” 29 C.F.R. § 541.207(a). But this requirement does not necessarily 13 imply that the employee’s decisions must have a finality that goes with unlimited authority and a 14 complete absence of review. 29 C.F.R. § 541.207(e). Instead, the employee’s exercise of discretion 15 and independent judgment may consist of recommendations for action rather than the actual taking 16 of action. Id. Finally, an exempt administrative employee must exercise discretion and independent 17 judgment “customarily and regularly,” a requirement that is met by the employee who “normally 18 and recurrently” is called upon to exercise discretion and independent judgment in the day-to-day 19 performance of his duties. 29 C.F.R. § 541.207(g). 20 In support of its argument that Plaintiff regularly exercised discretion and independent 21 judgment, Defendant cites to Kennedy v. Commonwealth Edison, 410 F.3d 365 (7th Cir. 2005). In 22 Kennedy, the Seventh Circuit upheld summary judgment in favor of the employer, a nuclear power 23 plant. The plaintiffs were “work planners” who were “problem solvers” that devised solutions for 24 electrical, mechanical, and instrumentation problems at the plant. Id. at 368. The work planner 25 would study a given problem and then decide what kind of labor, materials, and equipment would be 26 needed for the project. Id. The work planners claimed that they did not exercise discretion and 27 independent judgment, because their work place was procedure driven and strictly controlled. Id. at 28 27 1 374. The Court of Appeal disagreed, stating, “Certainly no one would contend that a tax lawyer 2 does not exercise discretion or independent judgment just because the Internal Revenue Code 3 contains a highly regimented set of rules.” Id. at 374-75. The Court found that all the Plaintiffs had 4 exercised independent judgment and discretion within the meaning of 29 C.F.R. § 541.207 by 5 comparing and evaluating several possible courses of action. Id. at 375. 6 Here Defendant argues that “Smith solved complex problems regularly.” Mot. at 16. 7 Smith’s testimony indicates that at least when it came to his scope-of-work activities, he “wanted to 8 weigh options and present solutions to those above me and get their feedback and then as a team 9 make a decision.” Dkt. No. 37 (Smith Dep.) 124:20-125:1. He testified that “as a team, my effective, if it maintained our margin.” Dkt. No. 37 (Smith Dep.) 125:8-11. When asked if problem- 12 For the Northern District of California regional, myself and other lead CMS, we were able to determine what would be best, if it was cost 11 UNITED STATES DISTRICT COURT 10 solving, presenting the best solution, alternative solutions, making recommendations, and weighing 13 them was part of his job as an LCM, Plaintiff responded “[y]es, presenting alternative solutions 14 definitely was.” Dkt. No. 37 (Smith Dep.) 125:12-17. 15 While this evidence supports a conclusion that Smith exercised discretion and independent 16 judgment, Defendant has not met its burden to show that Plaintiff “customarily” and “regularly” 17 exercised discretion and independent judgment. See 29 C.F.R. § 541.207(g). Although Plaintiff 18 testified that he “wanted” to weigh options and present solutions, and that he was part of a “team” 19 that was able to determine what was best for his sites, it is not clear from the evidence how often or 20 how much Plaintiff was really engaged in exercising discretion and independent judgement. And in 21 any case, this requirement is met not when the employee occasionally exercises discretion and 22 independent judge, but only where the employee is “normally and recurrently” called upon to 23 exercise discretion and independent judgment in the day-to-day performance of his duties. Id. 24 While Smith arguably admits that he exercised some discretion and independent judgment, it is not 25 clear that this exercise was normal and recurrent. 26 27 Defendant essentially argues that Plaintiff exercised discretion and independent judgement in all of his activities, including researching site histories on Siterra, identifying construction issues 28 28 communicating with subcontractors, deciding what information to enter into the tracker, and 3 supervising the FCMs. Mot. at 17-20. With Smith’s research on Siterra, Defendant argues that “he 4 used his experience to make choices in what to research, how to interpret that research, and how to 5 use the research he found to implement and oversee a complex construction plan.” Mot. at 17 6 (citing Dkt. No. 37 (Smith Dep.) 161:13-24). In that portion of his deposition, Smith admits that he 7 utilized his construction experience in extracting information from Siterra, but he does not say that 8 he personally used the information to implement and oversee a complex construction plan. Instead, 9 Plaintiff’s testimony consistently indicates that he thought he was providing information to upper 10 management that would be helpful in developing a plan, but not that he had authority or power to 11 make an independent choice, free from immediate direction or supervision and with respect to 12 For the Northern District of California during the scoping phase, reviewing and redlining the zoning and construction drawings, 2 UNITED STATES DISTRICT COURT 1 matters of significance. See Dkt. No. 44 (Smith Dep.) 56:22-24; 58:1-10 (describing that he was 13 “trying to pull as much information that we could out of Siterra that may be helpful in developing a 14 plan,” but that he was “just gathering the information so that an electrical engineer who is licensed 15 can make these determinations if it will work”); 170:9-15 (explaining that he used the tracker to fill 16 in the blank spots showing the priorities for his sites so that an RCM could then communicate with 17 the client); 210:1-7; Dkt. No. 37 (Smith Dep.) 69:12-16; 23-24 (describing his role in the scoping 18 phase as identifying things that could be an issue from a construction perspective, but explaining 19 that he “just . . . identif[ied] issues that site acq and RF may have to also consider in their design,” 20 and that the site acquisition team did not “care about” the problems he encountered or find the 21 information he provided important). Defendant also argues that Plaintiff’s experience “allowed him 22 to redline,” to provide directions to subcontractors, and identify construction issues in the scoping 23 phase. Mot. at 17-19. Plaintiff does not deny that his experience played a role in these duties. 24 “Perhaps the most frequent cause of misapplication of the term ‘discretion and independent 25 judgment’ is the failure to distinguish it from the use of skill in various respects.” 29 C.F.R. § 26 541.207(c)(1); see also Bothell v. Phase Metrics, Inc., 299 F.3d 1120, 1129 (9th Cir. 2002) (warning 27 against “ignor[ing] the regulations’ distinction between the use of discretion and the application of 28 29 1 skill.”). In Phase Metrics, Bothell worked as a field service engineer, installing, troubleshooting, 2 and maintaining Phase Metrics’ products. Id. at 1122-23. Phase Metrics argued that, as a field 3 inspector operating away from his supervisor in a remote location, Bothell necessarily exercised 4 discretion and independent judgment. Id. at 1129. The Court, however, found that there were 5 genuine issues of fact regarding the extent to which the plaintiff was permitted to make decisions 6 and the importance of the decisions over which he had control. Id. Even though Bothell’s work 7 required specialized knowledge, the Court held that skill is not determinative, and noted that all but 8 the smallest decisions were made by the plaintiff’s supervisor. Id. application of skill with discretion and independent judgment: “A typical example of the application 11 of skills and procedures is ordinary inspection work . . . . [I]nspectors rely on techniques and skills 12 For the Northern District of California Both the Phase Metrics holding and the related regulations caution against confusing 10 UNITED STATES DISTRICT COURT 9 acquired by special training or experience. They may have some leeway in the performance of their 13 work but only within closely prescribed limits.” 29 C.F.R. § 541.207(c)(2). The regulations 14 acknowledge that “[e]mployees of this type may make recommendations on the basis of the 15 information they develop in the course of their inspections (as for example, to accept or reject an 16 insurance risk or a product manufactured to specifications), but these recommendations are based on 17 the development of the facts as to whether there is conformity with the prescribed standards.” Id. 18 As a result, “a decision to depart from the prescribed standards or the permitted tolerance is typically 19 made by the inspector’s superior.” Id. In such cases, the inspector is engaged in exercising skill 20 rather than discretion and independent judgment. Id. 21 As in Phase Metrics, genuine issues of material fact remain here concerning the significance, 22 discretion, and independence of the decisions Plaintiff used in his various tasks, as opposed to 23 merely applying his skill or experience. Like the inspector in the Federal Regulations, Defendant 24 describes the confines under which Smith and his FCMs had to work, explaining that “[t]he cell site 25 had to work, according to the standards set by the engineers. It also had to be built within a budget, 26 according to the requirements of the lease, landlord, and jurisdiction.” Mot. at 20; see also Dkt. No. 27 37 (Smith Dep.) 288:6-16 (explaining that construction management had to “play within the 28 30 1 perimeters of the jurisdiction, the landlord, the lease agreement, and all these other things.”). While 2 the evidence suggests that this Project was novel at least in some respects, it is not clear that Plaintiff 3 was normally and recurrently involved in the high level problem solving. Although it is a close 4 issue, the Court finds that whether Plaintiff “customarily and regularly exercised discretion and 5 independent judgment cannot be ascertained from the existing record” at this phase in the 6 proceedings. Phase Metrics, 299 F.3d at 1129; see also 29 C.F.R. § 541.207(g). Accordingly, the 7 Court cannot find as a matter of law that Defendant has satisfied its burden as to this prong of the 8 analysis. 9 3. General Supervision As to the third element, Defendant must establish that Plaintiff worked “under only general 10 supervision” while either: (1) performing work along specialized or technical lines requiring special 12 For the Northern District of California UNITED STATES DISTRICT COURT 11 training, experience, or knowledge, or (2) executing special assignments and tasks. 8 Cal. Code 13 Regs. § 11040(1)(A)(2). Defendant maintains its argument that Smith performed work requiring 14 and utilizing his experience. Mot. at 20-21. It also contends that during the scoping phase, Smith 15 had only minimal supervision, during the redlining phase he “made his own decisions,” during his 16 interactions with subcontractors he had “no supervision,” and likewise, “[n]o one supervised him 17 when he updated the tracker.” Mot. at 21. Plaintiff responds that he was “controlled by upper 18 management and closely supervised.” Opp’n at 14. He argues that all his research assignments 19 originated from upper management, who were also responsible for determining the scope of the 20 tracker, the scheduling of the Project, and even the specific cell sites assigned to Smith. Opp’n at 21 14. 22 Where there are numerous factual disputes in the record, courts should be cautious in 23 disposing of the general supervision issue at summary judgment. See, e.g., Campbell, 642 F.3d at 24 831-32. In Campbell, the Ninth Circuit held that it could not “conclude as a matter of law that all 25 unlicensed accountants are necessarily subject to more than general supervision.” Id. at 832. The 26 Court noted that both parties had introduced substantial evidence about the nature and scope of the 27 defendant’s supervision over plaintiffs, and given the “highly contested” issues of fact, the court 28 31 1 ultimately determined that “a jury should evaluate credibility and weigh this extensive conflicting 2 evidence.” Id.; see also Ho v. Ernst & Young LLP, 2009 WL 111729, at *5 (N.D. Cal. Jan. 15, 3 2009) (finding that the conflicting evidence in plaintiff’s deposition testimony and declarations 4 created a triable issue of material fact as to the amount of supervision given her and the degree of 5 independent judgment plaintiff exercised). 6 Here, too, as discussed above, the Court finds that material factual disputes exist in the 7 record. Plaintiff testimony depicts a situation in which he was closely supervised, explaining that he 8 felt there was “too much hands-on by [RCM Russell Mix], that he needed to let go of control and let 9 us manage, but he never let go.” Dkt. No. 37 (Smith Dep.) 173:13-18. And although Defendant testimony indicates otherwise. With the PORs, Plaintiff describes receiving “feedback, you know 12 For the Northern District of California claims that Plaintiff had no supervision while communicating with subcontractors, Plaintiff’s 11 UNITED STATES DISTRICT COURT 10 the other – the regional having his input reminded me of did you get this, did you get this, is this 13 covered, is this covered, you know so it wasn’t just me involved in the POR, it was also the 14 regional.” Dkt. No. 37 (Smith Dep.) 140:5-16. Similarly, with the research done in Siterra and 15 other data-gathering, Smith testified that it was his RCMs who determined what they needed to 16 address and what information Smith would have to gather. Dkt. No. 44 (Smith Dep.) 55:9-21; 17 81:11-82:22; 170:9-11. Given the numerous factual disputes in the existing record, the Court finds 18 that the determination of whether Plaintiff worked under only general supervision is premature. 19 4. 20 Under the fourth element, Plaintiff must be “primarily” engaged in duties that qualify under Primarily Engaged in Exempt Work 21 the regulations. 8 Cal. Code Regs. § 11040(1)(A)(2). The term “‘primarily’ means more than 22 one-half of the employee’s worktime.” Cal. Lab. Code § 515(e). Thus, “state regulation takes a 23 purely quantitative approach” as to whether an employee is exempt or non-exempt. Ramirez, 20 24 Cal. 4th at 797 (1999). Pursuant to 8 Cal. Code. Regs. § 11040(1)(A)(2)(f), exempt work includes 25 “all work that is directly and closely related to exempt work and work which is properly viewed as a 26 means for carrying out exempt functions.” Id. “The work actually performed by the employee 27 during the course of the workweek must, first and foremost, be examined and the amount of time the 28 32 1 employee spends on such work, together with the employer’s realistic expectations and the realistic 2 requirements of the job, shall be considered in determining whether the employee satisfies this 3 requirement.” Id. 4 Despite Defendant’s contention that 100% of Plaintiff’s activities were administrative (Mot. 5 at 22, 24), as discussed above, the Court finds that genuine issues of material fact exist as to whether 6 Plaintiff’s activities are all properly classified as administrative. Even if the Court had found that 7 some of Plaintiff’s activities were administrative in nature, Defendant has not met its burden to show 8 that these activities amounted to more than 50% of Plaintiff’s workweek. See Marlo v. United 9 Parcel Serv., Inc., 639 F.3d 942, 948 (9th Cir. 2011) (finding that the district court did not err in numbers of hours Smith worked on a particular project without context related to the total number of 12 For the Northern District of California requiring a week-by-week determination of exempt status). Defendant’s statements about the 11 UNITED STATES DISTRICT COURT 10 hours worked is not evidence that can be used towards meeting its burden. Likewise, its 13 descriptions of percentage of time worked without providing the number of days, weeks or months 14 on a particular project cannot be used to meet its burden. The only statement made by Defendant 15 that goes towards this prong of the analysis is that from October 2011 until January 2012, Smith 16 spent 35-40% of his time redlining. This does not establish that more than 50% of Plaintiff’s 17 workweek consisted of work that qualifies under the administrative exception. Accordingly, the 18 Court finds that triable issues exist as to this prong that preclude the entry of summary judgment. 19 5. 20 Finally, an administrative employee must “earn a monthly salary equivalent to no less than Salary Requirement 21 two (2) times the state minimum wage for full-time employment. 8 Cal. Code Regs. § 22 11040(1)(A)(2)(g). Full-time employment is defined in Labor Code section 515(c) as 40 hours per 23 week. Id. The parties agree in their Joint Statement of Undisputed Facts that Plaintiff’s monthly 24 salary was $7,307.07. JSUF ¶ 4. This total, according to the Court’s informal calculations, is more 25 than five times the monthly salary of an individual earning California’s applicable minimum wage 26 27 28 33 1 rate of $8.00 per hour.6 While the Court agrees that Plaintiff was paid a salary commensurate with 2 that of an administrative employee, it also notes that Plaintiff’s wage statements and offer letter 3 reflect a higher monthly salary of $7,916.67, and an annual salary of $95,000 per year. See Dkt. No. 4 37, Exs. D, E. 5 6. Summary 6 Based on the analysis above, the Court finds that Defendant has failed to meet its burden to 7 establish as a matter of law that Plaintiff was properly classified as an exempt employee, and that 8 issues of material fact exist on this issue. Accordingly, the Court DENIES Defendant’s Motion as to 9 Plaintiff’s first cause of action for overtime under California Labor Code section 510(a). 10 B. In his second cause of action, Plaintiff alleges that Defendant failed to pay him the legal 11 12 For the Northern District of California UNITED STATES DISTRICT COURT Failure to Pay Minimum Wage minimum wage for all hours he worked in violation of Labor Code section 1194. Compl. ¶¶ 22-27. 13 Plaintiff also seeks liquidated damages pursuant to section 1194.2. Compl. ¶ 23. Defendant argues 14 that this claim must fail because Plaintiff was not entitled to overtime compensation. Mot. at 22. 15 However, as discussed above, the Court is unable to determine at this stage in the proceedings 16 whether Plaintiff was properly classified as an exempt employee. Accordingly, the Court DENIES 17 Defendant’s Motion as to this cause of action. 18 C. 19 Failure to Pay Wages In his third cause of action, Plaintiff alleges that Defendant failed to pay him for all hours 20 worked in violation of Labor Code section 204. Compl. ¶¶ 29-33. Section 204 governs when 21 employees are to be paid their wages and requires that all wages “earned by any person in any 22 employment are due and payable twice during each calendar month, on days designated in advance 23 by the employer as the regular paydays.” Cal. Lab. Code § 204(a). Here, Plaintiff’s pay statements 24 show Defendant consistently paid his salary according to the statutory timetable. Azrael Decl., Ex. 25 E. However, they do not show that Defendant paid Plaintiff for all overtime hours he claims to have 26 27 28 6 Since January 1, 2008, the state minimum wage has been $8.00 per hour. Cal. Lab. Code § 1182.12. 34 1 worked. Defendant again argues that this claim must fail because Plaintiff was not entitled to 2 overtime compensation. Mot. at 23. However, as discussed above, the Court is unable to determine 3 at this stage whether Plaintiff was properly classified as an exempt employee. Accordingly, the 4 Court DENIES Defendant’s Motion as to this cause of action. 5 D. 6 Failure to Comply with Employment Wage Statement and Record Provisions In his fourth cause of action, Plaintiff alleges that Defendant failed to provide proper pay 7 statements, in violation of Labor Code section 226(a), by failing to itemize the total number of hours 8 Plaintiff worked. Compl. ¶ 35. Plaintiff also alleges that Defendant failed to maintain proper 9 payroll records, pursuant to Labor Code section 1174. Id. ¶ 36. Defendant argues that this claim Court is unable to determine at this stage in the proceedings whether Plaintiff was properly classified 12 For the Northern District of California must fail because it kept the appropriate records. Mot. at 23-24. However, as discussed above, the 11 UNITED STATES DISTRICT COURT 10 as an exempt employee, and therefore cannot determine whether Defendant properly itemized 13 Plaintiff’s hours and maintained proper payroll records. Accordingly, the Court DENIES 14 Defendant’s Motion as to this cause of action. 15 E. 16 Statutory Waiting Time Penalties In his fifth cause of action, Plaintiff alleges that Defendant failed to pay him within 72 hours 17 of resignation, as required by Labor Code section 202. Compl. ¶ 39. Plaintiff contends that this 18 claim is premised on Defendant’s failure to pay him overtime. Opp’n at 15. Defendant argues that 19 Plaintiff was not entitled to overtime, and thus this claim must fail. Mot. at 24. As discussed above, 20 the Court is unable to determine at this stage in the proceedings whether Plaintiff was properly 21 classified as an exempt employee. Accordingly, the Court DENIES Defendant’s Motion as to this 22 cause of action. 23 F. Unlawful Business Practices 24 Plaintiff’s sixth and final cause of action alleges that Defendant’s conduct constitutes unfair 25 and unlawful business practices within the meaning of California Business and Professions Code §§ 26 17200 et seq. Compl. ¶¶ 39-42. The Unfair Competition Law or “UCL,” section 17200 prohibits 27 the following five different types of wrongful conduct: (1) an “unlawful . . . business act or 28 35 1 practice;” (2) an “unfair . . . business act or practice;” (3) a “fraudulent business act or practice;” (4) 2 “unfair, deceptive, or untrue or misleading advertising;” and (5) “any act prohibited by [Bus. & Prof. 3 Code §§ 17500-17577.5].” Cal. Bus. & Prof. Code § 17200. The “unlawful” prong of the UCL 4 proscribes “anything that can properly be called a business practice and that at the same time is 5 forbidden by law.” Smith v. State Farm Mut. Auto. Ins. Co., 93 Cal. App. 4th 700, 717-18 (2001) 6 (internal quotations omitted). The “unlawful” practices prohibited by the UCL “are any practices 7 forbidden by law, be it civil or criminal, federal, state, or municipal, statutory, regulatory or 8 court-made.” Saunders v. Superior Court, 27 Cal. App. 4th 832, 838-39 (1994). Here, Plaintiff 9 alleges that Defendant violated the UCL based on its conduct alleged in his other causes of action. 10 Compl. ¶ 44. In its Motion, Defendant argues that this claim must fail because all of the other causes of 12 For the Northern District of California UNITED STATES DISTRICT COURT 11 action fail. Mot. at 24. However, in his Opposition, Plaintiff states that “[b]y mis-classifying the 13 Plaintiff and failing to pay him overtime and minimum wage, Defendant has violated the California 14 IWC Wage Orders and the Labor code.” Opp’n at 16. As discussed above, there remains a genuine 15 question of material fact as to whether Defendant misclassified Plaintiff as exempt. Accordingly, 16 the Court DENIES Defendant’s Motion as to Plaintiff’s unlawful business practices cause of action. 17 CONCLUSION 18 For the foregoing reasons, Defendant’s Motion for Summary Judgment is DENIED. 19 IT IS SO ORDERED. 20 21 Dated: October 4, 2013 _______________________________ Maria-Elena James United States Magistrate Judge 22 23 24 25 26 27 28 36

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?