Granite Rock Company v. Teamsters Union Local No.890 et al

Filing 26

ORDER by Judge Maria-Elena James granting 15 Motion to Dismiss (cdnS, COURT STAFF) (Filed on 11/20/2012)

Download PDF
1 2 3 4 5 6 UNITED STATES DISTRICT COURT 7 Northern District of California 8 9 GRANITE ROCK COMPANY, No. C 12-02974 MEJ Plaintiff, 10 v. 12 For the Northern District of California UNITED STATES DISTRICT COURT 11 TEAMSTERS UNION LOCAL NO. 890 AND TEAMSTERS UNION LOCAL NO. 912, ORDER GRANTING DEFENDANTS’ MOTION TO DISMISS (DKT. NO. 15) 13 14 Defendant(s). _____________________________________/ 15 INTRODUCTION 16 On July 23, 2012, Plaintiff Granite Rock Company filed its First Amended Complaint 17 (“FAC”) seeking an order to compel Defendants, Teamsters Union Local No. 890 and Teamsters 18 Union Local No. 912, to arbitrate certain grievances under Section 301 of the Labor Management 19 Relations Act (“LMRA”).1 Dkt. No. 12, FAC at ¶¶8, 26. Specifically, Plaintiff seeks an arbitrated 20 resolution to its allegation that Defendants violated the “no-strike provision” in the parties’ 2003- 21 2007 collective bargaining agreement.2 Id. at ¶26. Now before the Court is Defendants’ Motion to 22 Dismiss Plaintiff’s FAC on the grounds that it fails to state a claim. Having considered the relevant 23 legal authority and the parties’ arguments, the Court hereby GRANTS Defendants’ Motion for the 24 reasons explained below. 25 26 27 28 1 Plaintiff initiated this action to compel arbitration on June 8, 2012. Dkt. No. 1. Defendants moved to dismiss the Complaint on July 9, 2012; this Motion was denied as moot when Plaintiff voluntarily amended its pleading and filed its FAC. Dkt. Nos. 7 and 14. 2 The parties’ 2003-2007 collective bargaining agreement will subsequently be referenced as CBA 1. Dkt. No. 2, Declaration of Bruce Woolpert (“Woolpert Decl.”), Ex. B. 1 BACKGROUND 2 Plaintiff is a California corporation engaged in interstate commerce and an “employer” 3 within the meaning of Sections 2(6), 2(7), and 301 of the LMRA. FAC at ¶1. It produces and 4 supplies concrete and other building materials to construction contractors throughout the San 5 Francisco and Monterey Bay Areas. Id. Defendants are local labor unions covering employee 6 warehousemen and drivers at Plaintiff’s concrete and building material facilities in Monterey and 7 Santa Cruz Counties. Id. at ¶¶2, 3. Plaintiff and Defendants have been parties to a series of 8 collective bargaining agreements governing their employment relationship. Id. at ¶5; CBA 1; 9 Woolpert Decl., Ex. A (the 2007-2012 collective bargaining agreement).3 employment relationship from June 1, 2003 to May 31, 2007. CBA 1 at §29. CBA 1 contains two 12 For the Northern District of California In June 2003, Plaintiff and Defendants entered into CBA 1, which governed their 11 UNITED STATES DISTRICT COURT 10 sections relevant to this dispute. First, Section 7 (titled as Strikes and Lockouts) states in relevant 13 part that “[t]here will be no strikes, including unfair labor practices strikes, sympathy strikes, 14 slowdowns, stoppage of work or picketing by the Union or employees . . . during the term of this 15 agreement[.]” (the “no-strike clause”). Id. at §7. Second, Section 25 (titled as Board of 16 Adjustment), which discusses the grievance procedure, provides generally that if the parties are 17 unable to resolve the dispute themselves, or with the board of adjustment, the dispute will be 18 submitted to arbitration upon request of either party. Id. at §25. In June 2004, another local union (“Local 287"), went on strike after a series of failed 19 20 negotiations with Plaintiff to renew their collective bargaining agreement. FAC at ¶8. Local 287 21 established picket lines at Plaintiff’s Watsonville, Santa Cruz, Seaside, and Salinas facilities. Id. at 22 ¶9. Plaintiff notified Defendants that their unions’ participation in the strike would constitute a 23 violation of CBA 1, and any refusal to resume work would be a direct breach of their responsibilities 24 under the parties’ agreement. Woolpert Decl., Exhibit C at 1. Defendants refused to comply with 25 Plaintiff’s instructions and their members joined Local 287 in the strike. Id. at 2; FAC at ¶9. As a 26 27 28 3 The parties’ 2007-2012 collective bargaining agreement will subsequently be referenced as CBA 2. 2 1 result, Plaintiff filed grievances against Defendants charging them with violating the no-strike clause 2 of the then-in-effect CBA 1. FAC at ¶9. 3 In 2006, Plaintiff initiated a lawsuit against Local 287 for strike-related damages, but did 4 not file a complaint against Defendants at that time. Id. at ¶¶3, 12. Plaintiff alleges that it and 5 Defendants agreed to hold Plaintiff’s 2004 grievances against Defendants “in abeyance” while 6 litigation against Local 287 — which dealt with similar issues — was pursued in federal court. Id. 7 at ¶12. The action against Local 287 lasted several years and included the United States Supreme 8 Court granting certiori. Id. at ¶12. 9 Meanwhile, Plaintiff and Defendants entered into a subsequent collective bargaining 2007 to May 31, 2012. CBA 2 at §29. Recently, the parties further agreed to a one-year extension 12 For the Northern District of California agreement. Id. at ¶16. CBA 2 was executed in June 2011 and applied retroactively from June 7, 11 UNITED STATES DISTRICT COURT 10 for CBA 2. FAC at ¶5. 13 CBA 2 contains a no-strike clause, an integration clause, and a procedure for grievances 14 filed on behalf of either party. CBA 2 at §§7, 24, 25. The CBA 2 no-strike clause is identical to the 15 no-strike clause in CBA 1. Id. at §7. The integration clause provides: 16 17 18 19 20 21 22 23 24 25 26 27 It is agreed and understood between the parties hereto that this Agreement contains all the covenants, stipulations, and provisions agreed upon by the parties hereto, that no agent, or representative of either party has authority to make, and that said parties shall not be bound by nor liable for any statement, representation, promise, inducement, or agreement, not set forth herein; any provision in the working rules of any Union, a party hereto, with reference to the relations between Employer and its employees not expressly reaffirmed in this Agreement, shall be deemed to be waived, and any such rules or regulations which may be hereafter adopted by any Union shall have no application to work hereunder. Id. at §24. The grievance procedure provides in relevant part: Any alleged violations of the specific terms of this Agreement which cannot be settled informally shall be referred to representatives of the Employer and the Union for settlement. Every effort shall be made to resolve differences at this level. Any other dispute between the parties shall be subject to this grievance procedure only by unequivocal written agreement between the parties. Id. at §25. Plaintiff’s FAC to compel arbitration alleges that it sought and bargained for terms reflecting the active status of the 2004 no-strike grievances against Defendants to be included in 28 3 1 CBA 2. FAC at ¶16. Plaintiff cites to extrinsic evidence and negotiation history in support of its 2 allegations, including several letters from Plaintiff’s company officials. Id. at ¶¶16-23. 3 On August 23, 2012, Defendants moved to dismiss Plaintiff’s FAC. Dkt. No. 15, Motion. 4 Defendants argue that Plaintiff’s FAC lacks a cognizable legal theory because CBA 1, under which 5 Plaintiff seeks arbitration, has expired. And CBA 2 does not provide for arbitration of Plaintiff’s 6 specific grievances because they arose under CBA 1, which was voided by CBA 2, a fully integrated 7 collective bargaining agreement. According to Defendants, a fully integrated agreement supersedes 8 any prior agreements, the CBA 2 is a fully integrated contract, and there is no ambiguity as to the 9 contract to permit the court to look at extrinsic evidence. 10 On September 13, 2012, Plaintiff opposed Defendants’ Motion, arguing that its right to arbitrate the 2004 grievances survives CBA 1’s expiration. Dkt. No. 23, Opp. In the alternative, 12 For the Northern District of California UNITED STATES DISTRICT COURT 11 Plaintiff argues that it is equally entitled to arbitrate the 2004 grievances under CBA 2 since such 13 grievances fall within that agreement’s arbitration clause. On September 20, 2012, Defendants 14 replied to Plaintiff’s Opposition, reiterating that Plaintiff is not entitled to arbitration under either 15 CBA 1 or CBA 2. Dkt. No. 24, Reply. This is the issue consequently before the Court: whether 16 Plaintiff is entitled to compel Defendants to arbitrate its 2004 no-strike grievances under either of 17 the parties’ collective bargaining agreements. 18 19 ANALYSIS The Court begins its analysis by setting out the governing principles of arbitration disputes 20 such as the one presented here. Arbitration “is a matter of contract,” and a party cannot be required 21 to submit a dispute to arbitration unless it has agreed to do so. AT&T Techs. Inc. v. Commc’ns 22 Workers of America, 475 U.S. 643, 648-49 (1986) (“This axiom recognizes the fact that arbitrators 23 derive their authority to resolve disputes only because the parties have agreed in advance to submit 24 such grievances to arbitration.”). The question of whether the parties have agreed to arbitrate is to 25 be decided by the court and not the arbitrator, unless the parties have clearly and unmistakably 26 provided otherwise. Id. If a contract between the parties contains an arbitration clause, the court 27 should enforce that clause “unless it may be said with positive assurance that the arbitration clause is 28 4 1 not susceptible of an interpretation that covers the asserted dispute.” Id. at 650. Any “[d]oubts 2 should be resolved in favor of coverage.” Id. 3 With these principles in mind, the Court turns to Plaintiff’s arguments in support of its warrant much discussion. First, Plaintiff contends that Defendants’ Motion asserts procedural 6 objections to arbitration and that such objections should be decided by the actual arbitrator. Opp. at 7 9 (“Because the subject matter of the parties’ dispute, strikes, is covered by the Arbitration clause of 8 their collective bargaining agreement, any other procedural issues “which grow out of the dispute 9 and bear on its final disposition should be left to the arbitrator.”) (internal quotations and citations 10 omitted). This argument is misplaced. As mentioned in the paragraph above, “[w]hether or not a 11 company is bound to arbitrate, as well as what issues it must arbitrate, is a matter to be determined 12 For the Northern District of California position that it is entitled to arbitrate the 2004 no-strike grievances. Two of these arguments do not 5 UNITED STATES DISTRICT COURT 4 by the court, and a party cannot be forced to ‘arbitrate the arbitrability question.’” Litton Fin. 13 Printing Div. v. N.L.R.B., 501 U.S. 190, 208 (citing AT&T, 475 U.S. at 651) (emphasis added); 14 Howsam v. Dean Witter Reynolds, Inc., 537 U.S. 79, 84 (2002) (“Thus, a gateway dispute about 15 whether the parties are bound by a given arbitration clause raises a ‘question of arbitrability’ for a 16 court to decide.”). Here, Defendants’ objections are not affirmative defenses or procedural 17 arguments that grow out of the dispute; rather, they go to the preliminary issue of whether the parties 18 agreed to arbitrate this issue. It is therefore up to this Court — not an arbitrator — to decide 19 whether Plaintiff is entitled to arbitration. 20 Second, Plaintiff contends that CBA 2 is ambiguous, and the Court must therefore review the 21 extrinsic evidence submitted by Plaintiff (which would essentially require the Court to ignore the 22 integration clause in CBA 2). Opp. at 13-16. The Court cannot do so. CBA 2’s Section 24 — 23 which is entitled “Entire Agreement” — explicitly sets forth that CBA 2 encompasses the parties’ 24 entire contract with each other, and they will “not be bound by nor liable for any statement, 25 representation, promise, inducement, or agreement” not contained in CBA 2. CBA 2 at §24. The 26 27 28 5 1 Court finds that this is an express and unambiguous integration clause.4 Accordingly, “because the 2 parties have agreed that the written instrument is the exclusive and final embodiment of their 3 contract, antecedent understandings and parol evidence are not admissible to alter its terms.” 4 Golden Gate Acceptance Corp. v. Gen. Motors Corp., 597 F.2d 676, 680 (9th Cir. 1979); Computer 5 Place, Inc. v. Hewlett-Packard Co., 607 F.Supp. 822, 834-35 (N.D. Cal. 1984). For this reason, the 6 Court does not consider any of the extrinsic evidence submitted by Plaintiff.5 7 The Court moves on to the crux of this dispute between the parties and first evaluates With respect to CBA 1, Plaintiff argues that this agreement’s expiration did not automatically 10 terminate the arbitration provision. Opp. at 7 (“For like reasons, the right to arbitrate a dispute 11 arising under an expired agreement does not automatically terminate when the parties subsequently 12 For the Northern District of California whether Plaintiff is entitled to arbitrate the 2004 grievances under CBA 1 and then under CBA 2. 9 UNITED STATES DISTRICT COURT 8 enter a new agreement.”). Defendants, however, do not contend that Plaintiff’s rights under CBA 1 13 were automatically terminated just because a new agreement was signed at a later time. Instead, 14 Defendants correctly point out the black letter law on this issue: when there is a dispute over an 15 16 4 17 18 19 20 21 22 23 24 25 26 27 28 In support of its ambiguity argument, Plaintiff points out that CBA 2’s Section 25 provides that an arbitrator may interpret the express written terms of the agreement by utilizing “past arbitration awards, bargaining history, prior grievances and their resolutions, and past practices.” Opp. at 13. This, according to Plaintiff, creates ambiguity because it is in direct contradiction to the integration clause, which prohibits any reference to prior agreements. The Court disagrees. Section 25 does not change the scope of which agreements are contained within CBA 2 and which disputes should be arbitrated. Rather, Section 25 only provides that once there is a dispute that falls within the scope of CBA 2’s arbitration clause, past history can be used to help interpret express terms of the agreement. This creates no ambiguity and does not change that CBA 2 contains an express integration clause. 5 See also Grey v. American Mgmt. Servs., 204 Cal.App.4th 803, 807 (2012) (“The court determines whether the parties intended the contract to be a final and complete expression of their agreement. The crucial issue in determining whether there has been an integration is whether the parties intended their writing to serve as the exclusive embodiment of their agreement. The instrument itself may help to resolve that issue. The existence of an integration clause is a key factor in divining that intent. This type of clause has been held conclusive on the issue of integration, so that parol evidence to show that the parties did not intend the writing to constitute the sole agreement will be excluded.”) (internal quotations and citations omitted). 6 1 arbitration clause from an expired agreement, presumptions in favor of arbitrability remain unless 2 they are negated expressly or by clear implication. Nolde Bros., Inc. v. Bakery Workers, 430 U.S. 3 243, 255 (1977) (emphasis added); United Parcel Serv. v. Union De Tronquistas De Puerto Rico 4 (“UPS”), 426 F.3d 470, 472 (2005) (“In Litton, the Supreme Court confirmed that a presumption 5 exists in favor of postexpiration arbitration of matters unless negated expressly or by clear 6 implication in the collective bargaining agreement.”) (internal quotations and citations omitted). 7 Citing to Nolde and Litton, Defendants argue that the parties expressly negated Plaintiff’s right to 8 arbitrate the 2004 grievances under CBA 1 when they executed CBA 2, which contained an explicit 9 integration clause that provided CBA 2 constituted the parties’ entire agreement and CBA 1 was no 10 longer valid. The Court agrees with Defendants’ position. CBA 2’s integration clause, as discussed 12 For the Northern District of California UNITED STATES DISTRICT COURT 11 previously, specifically provides that the parties will not be bound by any previous contracts, and 13 that CBA 2 constitutes the entire agreement of the parties. CBA 2 at §24. The Court finds that this 14 direct language in Section 24 extinguishes Plaintiff’s arbitration rights under CBA 1, as such 15 expiration of rights was contemplated by Nolde and Litton. Based on this, Plaintiff cannot base its 16 request to compel arbitration on CBA 1, an agreement that this Court finds was superseded by CBA 17 2. 18 This view is supported by case law. In GCIU Employer Retirement Fund v. Chicago Tribune 19 Company — a case that was discussed in Defendants’ Motion but never mentioned by Plaintiff in its 20 Opposition — the Seventh Circuit held that an employer was no longer required to make pension 21 payments pursuant to an obligation under the parties’ 1979 agreement since it was superseded by the 22 parties’ 1980 collective bargaining agreement, which contained an integration clause. 66 F.3d 862, 23 865 (1995) (“We conclude that since the CBA is a later contract which specifically terminated the 24 earlier agreement, there can be no additional duty to contribute pursuant to that earlier contribution 25 agreement.”); see also id. at 867 (“The 1980 CBA between the Union and the Tribune contained an 26 integration clause which provided in clear and unambiguous terms that the 1980 CBA constituted 27 the entire agreement between the parties. The 1980 CBA thereby superseded the 1979 Subscription 28 7 1 Agreement.”). In the same manner, CBA 2’s express integration clause here terminated CBA 1 and 2 resulted in its arbitration clause no longer being available to Plaintiff. 3 In Grey, a California Appellate Court analyzed a similar question when it examined whether 4 an arbitration provision in an employment contract that contained an integration clause superseded a 5 previous agreement’s arbitration provision that was signed by the employee when he submitted his 6 application. 204 Cal.App.4th at 805-06. The Grey court held that the later contract did supercede 7 the previous agreement, explaining that because “the [employment] contract says it is the entire 8 agreement, common sense dictates that it supersedes other prior agreements related to Grey’s 9 employment.” Id. at 807. Plaintiff attempts to distinguish Grey by arguing that the case did not deal stronger than here since it specifically stated that all prior agreements were “superseded.” Opp. at 12 For the Northern District of California with collective bargaining issues, and the integration clause in that employment contract was much 11 UNITED STATES DISTRICT COURT 10 16. 13 Plaintiff is correct regarding both of these slight differences. But this still does not persuade 14 the Court to apply Grey’s rationale to this matter. First, as both parties acknowledged at oral 15 argument, not many courts have directly addressed the specific issues presented here. This therefore 16 requires the Court to look outside of collective bargaining cases for guidance, and the question 17 examined in Grey is analogous to some of the issues in this case. Second, the Court agrees that it 18 would have been more clear if Defendants specifically wrote in the integration clause that CBA 2 19 supersedes CBA 1. However, that does not mean that CBA 2’s integration clause is rendered 20 meaningless and should be completely ignored. As both Plaintiff and Defendants argue in their 21 briefs, they are sophisticated parties that have negotiated collective bargaining agreements on many 22 prior occasions. Having such experience, the Court cannot find that the parties did not understand 23 that Section 24 of CBA 2 — the “Entire Agreement” clause — was not intended to supersede other 24 agreements when it specifically stated that CBA 2 would be the only contract between the parties, 25 and they would not be bound by any prior or contemporaneous agreements not contained in CBA 2 26 (i.e., as Defendants state in their briefs, the integration clause was “wiping the slate clean” between 27 the parties). See Motion at 5. 28 8 1 Moreover, many of the decisions relied on by Plaintiff in its Opposition are distinguishable integration clause as CBA 2 did here. For instance, Plaintiff argues that the Court should follow the 4 rationale in UPS, which it claims is analogous. Opp. at 11-12. In UPS, the court first concluded that 5 the employees’ dispute regarding vacation time had arisen under an earlier collective bargaining 6 agreement. 426 F.3d at 474. It then noted that the dispute must therefore go to the arbitrator as 7 contemplated in the parties’ agreement, “unless the agreement negates the presumption of 8 arbitrability expressly or by clear implication.” Id. UPS held as follows: “We find no evidence in 9 these provisions — clear or otherwise — that the parties agreed to depart from the presumption that 10 matters arising under a particular collective bargaining agreement will remain arbitrable even after 11 the contract has terminated.” Id. This holding, however, has no application to this dispute. Here, 12 For the Northern District of California because in those cases the subsequent agreement between the parties did not have an express 3 UNITED STATES DISTRICT COURT 2 CBA 2 contains an integration clause — which was not present in UPS — that expressly provides 13 that CBA 2, and not CBA 1, is the agreement that governs the parties’ employment relationship. Id.; 14 CBA 2 at § 24. Thus, UPS is not analogous and Plaintiff cannot rely on it nor CBA 1 for its request 15 to compel arbitration. 16 With respect to CBA 2, the Court’s analysis turns directly to that agreement’s Section 25, 17 which outlines the grievance procedure for the parties. Section 25 provides that any “alleged 18 violation of the specific terms of this Agreement which cannot be settled informally shall be referred 19 to representatives of the Employer and the Union for settlement.” CBA 2 at §25 (emphasis added). 20 Because Plaintiff’s 2004 grievances did not arise under CBA 2 — which was not even signed until 21 seven years later in 2011 — this Court cannot find that such grievances arise under “this 22 Agreement” (i.e., CBA 2). See, e.g., Rosenblum v. Travelbyus.com Ltd., 299 F.3d 657, 663-64 (7th 23 Cir. 2002) (holding that the terms of the arbitration clause in an employment agreement did not 24 apply to another agreement between the parties since the clause specifically stated that it only 25 applied to “any matter in dispute under or relating to this Agreement”). 26 27 Section 25 goes on to provide that “[a]ny other dispute between the parties shall be subject to this grievance procedure [i.e., arbitration] only by unequivocal written agreement between the 28 9 1 parties.” CBA 2 at §25 (emphasis added). To the extent that Plaintiff argues that CBA 1 constitutes 2 such an “unequivocal written agreement” entitling it to arbitrate the 2004 grievances, this argument 3 is denied. As the Court explained above, CBA 1 was superseded by CBA 2 and is therefore not 4 applicable. Plaintiff’s allegation that the 2004 grievances were held by the parties “in abeyance” is 5 also not persuasive. Plaintiff has never pointed to nor alleged that there is an unequivocal written 6 contract reflecting that such an “abeyance” agreement was ever reached between the parties. 7 Without this written contract, Plaintiff cannot invoke the arbitration procedure of CBA 2. For these 8 reasons, CBA 2 also does not help Plaintiff in its quest to arbitrate the 2004 no-strike grievances. 9 CONCLUSION CBA 1 or CBA 2. Defendants’ Motion is therefore GRANTED, and Plaintiff’s FAC to compel 12 For the Northern District of California Based on the above, Plaintiff is not entitled to arbitrate the 2004 grievances under either 11 UNITED STATES DISTRICT COURT 10 arbitration is DISMISSED WITH PREJUDICE since amendment would be futile. 13 IT IS SO ORDERED. 14 15 Dated: November 20, 2012 _______________________________ Maria-Elena James Chief United States Magistrate Judge 16 17 18 19 20 21 22 23 24 25 26 27 28 10

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?