Falconpoint Unlimited, LLC v. Senn et al

Filing 65

ORDER by Judge Nathanael Cousins granting in part and denying in part 26 Motion for Partial Summary Judgment (sp, COURT STAFF) (Filed on 9/4/2015)

Download PDF
1 2 3 4 5 6 7 UNITED STATES DISTRICT COURT 8 NORTHERN DISTRICT OF CALIFORNIA 9 10 FALCONPOINT UNLIMITED, LLC, Plaintiff, United States District Court Northern District of California 11 12 13 14 15 16 v. KEVIN J. SENN, SENN LAW, RANDOLPH MCCONVILLE, and MONA MCCONVILLE, Case No. 14-cv-02342 NC ORDER GRANTING IN PART AND DENYING IN PART MOTION FOR PARTIAL SUMMARY JUDGMENT Re: Dkt. No. 26 Defendants. The Court considers Falconpoint’s motion for partial summary judgment on its 17 breach of contract claims for repayment of a pre-settlement funding loan. Falconpoint’s 18 predecessor entered into a contract with the McConvilles, Senn, and Senn Law to provide 19 an advance of $136,820, with a $53,217 administrative fee, to fund litigation in a separate 20 case. Repayment on the advance was contingent upon the McConvilles recovering money 21 in the lawsuit, which they did. However, Falconpoint was never repaid the advance or any 22 of the 4% monthly compounded interest. Because the Court finds that there is no material 23 dispute of fact that the contract was breached, the Court GRANTS summary judgment 24 against all defendants in the value of the advance. However, the defendants have 25 presented a dispute of fact as to whether the interest on the advance is usurious in violation 26 of California law. Therefore, the Court DENIES summary judgment as to the damages of 27 the breach of contract claims above $136,820. 28 Case No. 14-cv-02342 NC 1 2 I. BACKGROUND A. Undisputed Facts 3 On April 26, 2013, Randy and Mona McConville, Kevin Senn, and Senn Law 4 entered into a pre-settlement funding contract with Woodbridge Baric Pre-Settlement 5 Investments, LLC (“Woodbridge”). Dkt. No. 28, Salvato Decl. at Exh. A. The contract 6 provided that the McConvilles received a $136,820.00 advance from Woodbridge in 7 connection with a lawsuit between the McConvilles and a third party. Id. In addition, the 8 McConvilles paid an administrative fee of $53,217.00. Id. at ¶ 2. In exchange, if the 9 McConvilles recovered money in the underlying lawsuit, the defendants were required to repay Woodbridge the advance plus interest. Id. at ¶ 2. The contract provided that interest 11 United States District Court Northern District of California 10 accrues at 4% monthly compound interest rate, on both the advance and administrative fee. 12 Id. at ¶ 4. In the event that the McConvilles did not receive monetary recovery in the 13 underlying suit, they were not obligated to repay Woodbridge for the advance. Id. at ¶ 3. 14 Kevin Senn and his law firm, Senn Law, represented the McConvilles in the underlying 15 case and signed onto the pre-settlement funding contract. Id. at 15-16. Specifically, Senn 16 agreed that he would pay Woodbridge the amount owed by the McConvilles before 17 making any distribution of funds to his client. Id. at 15 (Acknowledgement by Kevin Senn 18 of Senn Law). 19 The McConvilles were successful in their underlying lawsuit, recovering $865,000 20 in a settlement on October 8, 2013. Dkt. No. 31-1, Senn Decl. ¶ 6. Woodbridge Baric did 21 not receive any of the settlement money from the defendants. Dkt. No. 28, Salvato Decl. ¶ 22 4. On April 28, 2014, Woodbridge Baric assigned its rights under the contract, and right to 23 repayment from defendants, to Falconpoint Unlimited, LLC. Dkt. No. 28, Salvato Decl. at 24 Exh. B. 25 B. 26 Procedural History Falconpoint Unlimited, LLC sued the McConvilles, Senn, and Senn Law, on May 27 20, 2014, for fraud and breach of contract. Dkt. No. 1. Falconpoint’s second cause of 28 action is for breach of contract as to the McConvilles, while its third cause of action is for Case No. 14-cv-02342 NC 2 1 breach of contract as to Senn and Senn Law.1 Id. Falconpoint seeks to recover the value 2 of the advance, administrative fee, and the 4% monthly compounded interest. Id. On 3 October 3, 2014, Falconpoint moved for partial summary judgment on the breach of 4 contract claims, and on Senn’s defense of usury. Dkt. No. 26. Senn filed an opposition to 5 the summary judgment motion on behalf of himself, Senn Law, and the McConvilles. Dkt. 6 No. 31. Prior to the hearing, the Court issued an order to show cause why Senn should not 7 be disqualified from representing the McConvilles in this action. Dkt. No. 42. In 8 response, Senn requested a stay of the proceedings while the McConvilles considered 9 alternate counsel, which the Court granted. Dkt. Nos. 42, 44. Once the McConvilles obtained alternate counsel, the Court lifted the stay, and 10 United States District Court Northern District of California 11 postponed the summary judgment briefing until after further fact and expert discovery. 12 Dkt. No. 51. The Court then permitted the McConvilles and Senn each an opportunity to 13 oppose the motion for summary judgment anew. Dkt. No. 51. The McConvilles opposed 14 the motion separately, Dkt. No. 53, but Senn did not. The Court gave Senn a further 15 opportunity to respond, and at that time, Senn filed an opposition. Dkt. Nos. 57, 58. On 16 August 5, 2015, the Court held a hearing on the partial summary judgment motion. 17 Falconpoint and the McConvilles’ counsel were present, but Senn was not. Dkt. No. 59. 18 At the hearing, the McConvilles requested leave to file a cross-claim, which the Court 19 granted. Id. The Court separately set forth a briefing schedule to consider the cross-claim, 20 Dkt. No. 64. 21 II. LEGAL STANDARD 22 Summary judgment may be granted only when, drawing all inferences and 23 resolving all doubts in favor of the nonmoving party, there is no genuine dispute as to any 24 material fact. Fed. R. Civ. P. 56(a); Tolan v. Cotton, 134 S. Ct. 1861, 1863 (2014); 25 Celotex Corp. v. Catrett, 477 U.S. 317, 322 (1986). A fact is material when, under 26 27 28 1 Senn is representing both himself and his law firm with the same briefing and defenses, so both entities will be collectively referred to as “Senn” in this order. Case No. 14-cv-02342 NC 3 1 governing substantive law, it could affect the outcome of the case. Anderson v. Liberty 2 Lobby, Inc., 477 U.S. 242, 248 (1986). A dispute about a material fact is genuine if “the 3 evidence is such that a reasonable jury could return a verdict for the nonmoving party.” Id. 4 Bald assertions that genuine issues of material fact exist are insufficient. Galen v. Cnty. of 5 L.A., 477 F.3d 652, 658 (9th Cir. 2007). 6 The moving party bears the burden of identifying those portions of the pleadings, 7 discovery, and affidavits that demonstrate the absence of a genuine issue of material fact. 8 Celotex, 477 U.S. at 323. Once the moving party meets its initial burden, the nonmoving 9 party must go beyond the pleadings, and, by its own affidavits or discovery, set forth specific facts showing that a genuine issue of fact exists for trial. Fed. R. Civ. P. 56(c); 11 United States District Court Northern District of California 10 Barthelemy v. Air Lines Pilots Ass’n, 897 F.2d 999, 1004 (9th Cir. 1990) (citing Steckl v. 12 Motorola, Inc., 703 F.2d 392, 393 (9th Cir. 1983)). All justifiable inferences, however, 13 must be drawn in the light most favorable to the nonmoving party. Tolan, 134 S. Ct. at 14 1863 (citing Liberty Lobby, 477 U.S. at 255). 15 III. DISCUSSION 16 17 A. Breach of Contract As this is a diversity action, the Court first considers which law applies to the 18 breach of contract claims. “It is well-settled that in diversity cases federal courts must 19 apply the choice-of-law rules of the forum state.” Estate of Darulis v. Garate, 401 F.3d 20 1060, 1062 (9th Cir. 2005). Under California’s choice-of-law rule, California law applies 21 unless a party objects. Hurtado v. Superior Court, 11 Cal. 3d 574, 581 (1974); PlasPro 22 GMBH v. Gens, No. 09-cv-04302 PSG, 2011 WL 1000755, at *3 (N.D. Cal. Mar. 21, 23 2011). Additionally, the law of the place of contracting determines the enforcement and 24 validity of the contract. Restatement (First) of Conflict of Laws § 332 (1934). Here, all 25 parties assume that California law applies to the contract. Dkt. Nos. 26, 53, 58. 26 Additionally, the complaint asserts that the transactions at issue took place in substantial 27 part in California. Dkt. No. 1 at ¶ 14. Therefore, the Court applies California law to the 28 contract. Case No. 14-cv-02342 NC 4 1 Under California law, a breach of contract claim requires plaintiff to prove “the 2 existence of contract, plaintiff’s performance of that contract or excuse for failure to 3 perform, defendant’s breach, and damage to plaintiff resulting therefrom.” McKell v. 4 Washington Mut., Inc., 142 Cal. App. 4th 1457, 1489 (2006) (citing 4 Witkin, Cal. 5 Procedure (4th ed. 1997) Pleading, § 476 at 570). 6 First, no party disputes the existence of a contract. Dkt. No. 28, Exh. A; Dkt. No. 7 55, McConville Decl. ¶ 2; Dkt No. 58-1, Senn Decl. ¶ 2. Plaintiff has provided the 8 contract entered into between Woodridge Baric on the one hand and Randolph 9 McConville, Mona McConville, Kevin Senn, and Senn Law, on the other hand. Dkt. No. 10 United States District Court Northern District of California 11 28 at Exh. A. Second, no party disputes that plaintiff performed under the contract by providing 12 the $136,820.00 advance to the McConvilles. Dkt. No. 55, McConville Decl. ¶ 2; Dkt. No. 13 58-1, Senn Decl. ¶ 2. 14 Third, no party disputes that the McConvilles recovered money in their prior 15 lawsuit, and thus, owed Woodridge repayment. Dkt. No. 55, McConville Decl. ¶ 6; Dkt. 16 No. 58-1, Senn Decl. ¶ 3. Additionally, no party disputes that the money was not received 17 by Woodridge. Dkt. No. 28, Salvato Decl. ¶ 4. Therefore, there was a breach by the 18 defendants. 19 20 21 Fourth, no party disputes that Woodridge was damaged in at least the amount of the advance because it did not receive the money owed under the contract. Dkt. Nos. 53, 58. Therefore, the Court GRANTS summary judgment on the breach of contract claims 22 against all defendants for the value of the advance. See Blue Growth Holdings Ltd. v. 23 Mainstreet Ltd. Ventures, LLC, No. 13-cv-1452 CRB, 2013 WL 4758009, at *2 (N.D. Cal. 24 Sept. 4, 2013) (finding summary judgment appropriate on a breach of contract claim 25 because plaintiff had not been repaid the loan amount, and determining that “the usury 26 defense concerns the amount and not the existence of damages.”); see also Strike v. Trans- 27 West Discount Corp., 92 Cal. App. 3d 735, 744 (1979) (finding a contract usurious, but 28 still subject to a breach of contract claim and an award of the legal interest rate). Case No. 14-cv-02342 NC 5 1 B. McConvilles’ Defense 2 The McConvilles defend that they should not be held liable for breaching the 3 contract because they assigned their rights to Senn and Senn Law to perform the transfer of 4 funds to plaintiff. Dkt. No. 53. The McConvilles point to their authorization directing 5 Senn to remove the advance funds from the award before providing the McConvilles with 6 the remaining balance. Dkt. No. 28 at 13. According to the McConvilles, they believed 7 that Senn removed his attorneys’ fees and the advance value before providing them the 8 remaining settlement money. Dkt. No. 55, McConville Decl. ¶ 6. It is unclear whether the 9 McConvilles actually received the funds owed to Falconpoint from Senn, or whether Senn kept the funds. Regardless, the contract provides that all defendants are party to the 11 United States District Court Northern District of California 10 contract’s terms, which requires defendants to repay Falconpoint for the advance, interest, 12 and administrative fee. Dkt. No 28, Exh. A. The McConvilles accepted the advance, and 13 signed all pages of the contract with their initials. Dkt. No. 28, Exh. A. Additionally, 14 paragraph 4 of the contract states that the McConvilles “will not receive any money from 15 the proceeds of the Lawsuit/Claim until Woodbridge Baric has been paid in full.” Dkt. No. 16 28, Exh. A. Therefore, the Court concludes that the McConvilles’ obligation under the 17 contract was to repay Woodbridge the value of the advance and administration fee, plus 18 interest, if they recovered money in the underlying lawsuit. Under California law, “[w]here all the parties who unite in a promise receive some 19 20 benefit from the consideration, whether past or present, their promise is presumed to be 21 joint and several.” Cal. Civ. Code §1659. Additionally, California Civil Code § 1660 22 states, “A promise, made in the singular number, but executed by several persons, is 23 presumed to be joint and several.” See also, DKN Holdings LLC v. Faerber, 61 Cal. 4th 24 813, 820 (2015), reh’g denied (Aug. 12, 2015) (finding that parties jointly and severally 25 liable for a contract are liable for the entire loss and can be sued separately for the entire 26 loss). 27 Therefore, the Court concludes that the McConvilles are jointly and severally liable 28 for the advance repayment value of $136,820. The McConvilles have requested leave to Case No. 14-cv-02342 NC 6 1 file a cross-claim, and the Court finds that this is the appropriate avenue to evaluate their 2 defense to liability. The Court has already set forth a schedule for briefing on the motion 3 for cross-claim. Dkt. No. 64. 4 5 C. Senn’s Usury Defense Senn and Senn Law do not dispute that the value of the advance is owed to plaintiff. 6 Dkt. No. 58. However, Senn argues that the interest rate provided for in the original 7 contract is unlawful under California law. Dkt. No. 58. Falconpoint moves for summary 8 judgment on this defense as well. Dkt. No. 26. Senn argues that the contract is usurious, 9 and therefore, interest at the rate provided for in the contract is invalid. Additionally, Senn argues that the intent element of the usury defense is a question of fact and should be left 11 United States District Court Northern District of California 10 to a jury. Dkt. No. 59. 12 The California Constitution provides for a maximum annual interest rate of seven 13 percent on loans and forbearances, but allows parties to set up to a ten percent interest rate 14 on loans involving real property by written contract. Cal. Const. art. XV § 1. A loan that 15 violates the constitutional maximums is considered usurious. WRI Opportunity Loans II 16 LLC v. Cooper, 65 Cal. App. 4th 205, 212 (2007). “California’s usury law imposes 17 virtually strict liability on lenders.” In re Dominguez, 995 F.2d 883, 886 (9th Cir. 1993), 18 as amended on denial of reh’g (July 8, 1993). 19 Under California law, “[t]he essential elements of . . . usury are: (1) The transaction 20 must be a loan or forbearance; (2) the interest to be paid must exceed the statutory 21 maximum; (3) the loan and interest must be absolutely repayable by the borrower; and (4) 22 the lender must have a willful intent to enter into a usurious transaction.” WRI 23 Opportunity Loans, 65 Cal. App. 4th at 212. Intent, in the context of usury, is satisfied by 24 the intent to accept payment in excess of the legal rate; a conscious intent to evade the law 25 is not required. Id. Intent in regard to usury is a question of fact. Id. If a loan is found to 26 be usurious, the lender may not collect interest. Strike, 92 Cal. App. 3d at 744 . 27 28 Here, no party disputes that the 4% monthly compounded interest exceeds the statutory maximum. Dkt. No. 26. According to the repayment chart in the contract, the Case No. 14-cv-02342 NC 7 1 effective APR after the first year of the advance is 62.43%. Dkt. No. 28 at 20. 2 Additionally, the Court agrees that the intent element of usury presents a question of fact, 3 counseling against summary judgment in favor of the plaintiff. However, Falconpoint 4 argues that the contract is an interest contingent contract because the advance was not 5 absolutely repayable, so it is not usurious. Dkt. No. 26 at 5. 6 7 a. Interest Contingency Rule One exception to the usury law is the “interest contingency rule” which provides that “interest that exceeds the legal maximum is not usurious when its payment is ‘subject 9 to a contingency so that the lender’s profit is wholly or partially put in hazard,’ provided 10 ‘the parties are contracting in good faith and without the intent to avoid the statute against 11 United States District Court Northern District of California 8 usury.’” WRI Opportunity Loans, 154 Cal. App. 4th at 212 (quoting Lamb v. Herndon, 97 12 Cal. App. 193, 301 (1929)). 13 The risk required must be “something over and above the risk which exists with all 14 loans . . . that the borrower will be unable to pay.” Thomassen v. Carr, 250 Cal. App. 2d 15 341, 346-49 (1967). To assess the risk, courts look beyond the face of the agreement and 16 consider the substance of the transaction. Id. at 347; Teichner v. Klassman, 240 Cal. App. 17 2d 514, 516-18 (1966). 18 Here, the contract provides that the defendants would only repay the advance if they 19 recovered money in their litigation. Dkt. No. 26, Exh. A, Salvato Decl. ¶ 2. According to 20 Falconpoint, this is sufficient to demonstrate the defense of usury does not apply. Senn 21 argues that (1) the interest contingency rule does not apply because parts of the contract 22 were absolutely repayable; and (2) Woodbridge Baric did not assume the requisite risk to 23 assert the income contingency exception. Dkt. No. 58. 24 First, the Court finds that the interest contingency rule is not a bar to Senn’s usury 25 defense. The contract provides that only the repayment of the advance is contingent upon 26 the McConvilles’ monetary recovery. Dkt. No. 28 at ¶ 3. However, the contingency does 27 not apply to (1) the $53,217.00 administrative fee, or (2) the interest on the advance and 28 administrative fee. Dkt. No. 28 at ¶ 3. The contract specifically defines the “advance” as Case No. 14-cv-02342 NC 8 1 only the $136,820.00 provided to the McConvilles. Dkt. No. 28 at ¶ 1. This term does not 2 include the interest or administrative fee, which are referred to separately in all parts of the 3 contract. Dkt. No. 28 at ¶¶ 2, 4. Thus, plaintiff’s argument that the contract fits within the 4 interest contingent exception to usury does not succeed as a matter of law. See Strike, 92 5 Cal. App. 3d at 744 (finding that interest rates can be usurious on only part of a loan or 6 contract, while lawful on another part). Second, drawing all inferences in favor of the defendants, the Court finds that there 7 remains a material issue of fact as to the degree of risk Woodbridge assumed in entering 9 the pre-settlement loan contract. In support of his argument, Senn points to Woodbridge’s 10 extensive investigation into the strengths and weaknesses of the McConvilles’ case. Dkt. 11 United States District Court Northern District of California 8 No. 58 at Senn. Decl. Senn declares that Woodbridge investigated the case file materials, 12 inquired into the financial status of the defendants, viewed the defendants’ expert reports, 13 and received all of plaintiff’s medical files regarding the injuries in question. Senn. Decl. 14 ¶¶ 4-7. Senn argues that Woodbridge was able to determine, based on its extensive 15 investigation, that the McConvilles were nearly certain to be successful in their underlying 16 case. Dkt. No. 58. According to Senn, Woodbridge, and now Falconpoint, did not take 17 the risk necessary to avail itself of the income contingency exception to usury. 18 In summary, the Court agrees that taking all inferences in favor of the defendants, 19 there remains a material issue of fact as to whether the contract is usurious and whether the 20 interest contingency rule applies. Thus, the Court concludes that summary judgment 21 cannot be granted in favor of the plaintiff as to damages for the breach of contract above 22 the $136,820.00 advance, or on the usury defense. See Blue Growth Holdings Ltd. v. 23 Mainstreet Ltd. Ventures, LLC, No. 13-cv-1452 CRB, 2013 WL 4758009, at *2 (N.D. Cal. 24 Sept. 4, 2013). 25 //// 26 27 28 Case No. 14-cv-02342 NC 9 1 2 IV. CONCLUSION The Court GRANTS summary judgment as to the breach of contract claims for the 3 value of the advance, $136,820.00 jointly and severally against all defendants, but 4 DENIES summary judgment on the usury defense and the amount of damages beyond the 5 advance value. Therefore, the remaining issues for trial are: 6 7 8 9 10 United States District Court Northern District of California 11 1. First Cause of Action- Fraud against all defendants 2. Second Cause of Action- Breach of contract against the McConvilles, for the value of damages beyond $136,820. 3. Third Cause of Action- Breach of contract against Senn and Senn law, for the value of damages beyond $136,820. 12 The Court notes that no trial is presently scheduled in this case. Federal Rule of 13 Civil Procedure 1 requires the “just, speedy, and inexpensive” determination of all civil 14 actions and proceedings. The Court is sensitive that this case was filed over one year ago, 15 and that interest on the underlying advance may continue to accrue while this action is 16 pending. Therefore, on October 7 at 1:00 p.m., the Court will hold a case management 17 conference to set a further case schedule in the San Francisco Courthouse, Courtroom D. 18 The parties must meet and confer and submit a joint case management statement by 19 September 30 with proposed dates through trial. The Court suggests a January 11, 2016, 20 trial date. The parties should agree to this date, or explain why the case cannot be ready 21 for trial by January 2016. 22 23 IT IS SO ORDERED. Dated: September 4, 2015 24 _____________________________________ NATHANAEL M. COUSINS United States Magistrate Judge 25 26 27 28 Case No. 14-cv-02342 NC 10

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?