Thrash et al v. Cirrus Enterprises, LLC et al
Filing
64
ORDER DENYING MOTION TO REMAND FOR LACK OF SUBJECT MATTER JURISDICTION by Judge Jon S. Tigar denying 26 Motion to Remand. (wsn, COURT STAFF) (Filed on 6/20/2017)
1
2
3
4
UNITED STATES DISTRICT COURT
5
NORTHERN DISTRICT OF CALIFORNIA
6
7
JOSEPH THRASH, ET AL.,
Plaintiffs,
8
v.
9
10
CIRRUS ENTERPRISES, LLC, et al.,
Defendants.
11
United States District Court
Northern District of California
Case No. 17-cv-01501-JST
ORDER DENYING MOTION TO
REMAND FOR LACK OF SUBJECT
MATTER JURISDICTION
Re: ECF No. 26
Before the Court is Plaintiffs’ Motion to Remand for Lack of Subject Matter Jurisdiction.
12
13
ECF No. 26. The Court will deny the motion.
14
I.
15
BACKGROUND
Plaintiff Joseph Thrash alleges he was diagnosed with mesothelioma in September 2016,
16
and was exposed to asbestos while he worked on B-52, C-141, and C-5 airplanes in the United
17
States Air Force from 1975 through the 1980’s and while doing automotive work at various
18
locations. ECF No. 1-1 at 5, 7.
19
Plaintiffs allege that “Defendants placed their names, logos, and trademarks on asbestos
20
products as well as put out as their own asbestos products manufactured by others so as to be an
21
apparent manufacturer and liable as the manufacturer.” ECF No. 1-1 at 5. Thrash “handled or
22
was otherwise exposed to asbestos, asbestos containing products and/or products designed to be
23
used in association with asbestos products.” ECF No. 1-1 at 5. Plaintiffs allege that Defendants
24
“specified and required the use of such original and replacement asbestos containing parts and
25
components that were integral to their respective asbestos containing products’ normal use and
26
operation and that by design such normal use and operation directly created, generated, released
27
and exposed [Plaintiffs] to asbestos-containing dust, debris, fiber and particulate” from those
28
products and components, and that “as a direct and proximate result,” he was exposed to the
1
asbestos, “which increased his risk of developing the mesothelioma and asbestos disease(s) from
2
which he now suffers.” ECF No. 1-1 at 7.
Plaintiffs originally filed this case in Alameda County Superior Court on February 21,
3
4
2017, bringing claims for negligence, breach of express and implied warranties, strict liability in
5
tort, premises owner/contractor liability, and loss of consortium. ECF No. 1 at 2; ECF No. 1-1.
6
On March 20, 2017, Defendant The Boeing Company (“Boeing”) removed the case to federal
7
court. ECF No. 1. Shortly thereafter, Defendants United Technology Corporation (“UTC”),
8
Lockheed Martin Corporation (“Lockheed”), and The Goodyear Tire & Rubber Company
9
(“Goodyear”) filed notices of joinder in Boeing’s removal notice. ECF Nos. 13, 16, 17. On April
4, 2017, Plaintiff filed a Motion to Remand for Lack of Subject Matter Jurisdiction, which the
11
United States District Court
Northern District of California
10
Court now considers. ECF No. 26.
12
II.
13
LEGAL STANDARD
A defendant may remove a civil action filed in state court to federal court so long as the
14
district court could have exercised original jurisdiction over the matter. 28 U.S.C. § 1441(a).
15
“Federal jurisdiction must be rejected if there is any doubt as to the right of removal in the first
16
instance.” Gaus v. Miles, Inc., 980 F.2d 564, 566 (9th Cir. 1992). Generally, the removal statute
17
is strictly construed against removal and any doubt as to the right of removal should be resolved in
18
favor of remand. Id. at 566.
19
However, the opposite is true where, as here, defendants seek removal under the federal
20
officer removal statute, 28 U.S.C. § 1442(a). See Leite v. Crane Co., 749 F.3d 1117, 1122 (9th
21
Cir. 2014) (“We recognize that defendants enjoy much broader removal rights under the federal
22
officer removal statute than they do under the general removal statute[.]”); Durham v. Lockheed
23
Martin Corp., 445 F.3d 1247, 1252 (9th Cir. 2006) (noting that, because it is important to the
24
federal government to protect federal officers, removal rights under 28 U.S.C. section 1442 are
25
much broader than those under section 1441). Under Section 1442 “[t]he United States or any
26
agency thereof or any officer (or any person acting under that officer) of the United States or of
27
any agency thereof, sued in an official or individual capacity for any act under color of such
28
office” may remove the case to federal court. The Ninth Circuit has recognized “a clear command
2
1
from both Congress and the Supreme Court that when federal officers and their agents are seeking
2
a federal forum, [courts] are to interpret section 1442 broadly in favor of removal.” Id. The
3
reason for this is important and pragmatic: “If the federal government can’t guarantee its agents
4
access to a federal forum if they are sued or prosecuted, it may have difficulty finding anyone
5
willing to act on its behalf.” Id.
“[A] defendant seeking to remove an action may not offer mere legal conclusions; it must
6
allege the underlying facts supporting each of the requirements for removal jurisdiction.” Leite,
8
749 F.3d at 1122. A motion to remand challenging the existence of removal jurisdiction is the
9
“functional equivalent of a defendant’s motion to dismiss for lack of subject-matter jurisdiction
10
under Rule 12(b)(1),” and, like such motions, “may raise either a facial attack or a factual attack
11
United States District Court
Northern District of California
7
on the defendant’s jurisdictional allegations . . . .” Id. A facial attack on subject-matter
12
jurisdiction asserts that the jurisdictional allegations, even if true, “are insufficient on their face to
13
invoke federal jurisdiction.” Id. at 1121 (quoting Safe Air for Everyone v. Meyer, 373 F.3d 1035,
14
1039 (9th Cir. 2004)). “The district court resolves a facial attack as it would a motion to dismiss
15
under Rule 12(b)(6): Accepting the [defendant’s jurisdictional] allegations as true and drawing all
16
reasonable inferences in the [removing defendant’s] favor . . . .” Id. at 1121. “A ‘factual’ attack,
17
by contrast, contests the truth of the plaintiff’s factual allegations, usually by introducing evidence
18
outside the pleadings.” Id. A party responding to a factual attack must support its jurisdictional
19
allegations with “competent proof,” with the evidence evaluated “under the same evidentiary
20
standard that governs in the summary judgment context.” Id. However, to defeat a motion for
21
remand, a federal officer “doesn’t have to prove that its government contractor defense is in fact
22
meritorious”—it only needs to show that the defense is “colorable.” Leite, 749 F.3d at 1124.
23
III.
24
DISCUSSION
The Court first addresses the proper standard to apply, which turns on whether Plaintiffs
25
have mounted a facial or factual challenge to Defendants’ jurisdictional allegations. Plaintiffs in
26
their motion cite the standard for a “factual attack” on removal jurisdiction. See ECF No. 26 at 9.
27
The motion focuses on what Plaintiffs believe to be a lack of evidentiary support in Defendants’
28
3
1
removal notices.1 See e.g., ECF No. 26 at 6 (“As shown below, Defendants have not produced
2
any evidence to support either basis for federal question jurisdiction.”), 7 (“The lack of evidentiary
3
support cited in Defendants’ Notice of Removal and Joinders shows that removal was improper.”).
4
Though Plaintiffs do not submit evidence outside the pleadings in support of their Motion to
5
Remand, as would typically be required for a factual attack, they do generally “contest the truth of
6
[Defendants’] factual allegations.” Leite, 749 F.3d at 1122. Since Defendants have submitted
7
evidence supporting removal jurisdiction in response to Plaintiffs’ jurisdictional challenge, the
8
Court need not limit its review to the pleadings, and will interpret Plaintiffs’ motion as a factual
9
attack on removal jurisdiction.
A defendant seeking removal under Section 1442 must establish (a) that it is a “person”
10
United States District Court
Northern District of California
11
within the meaning of the statute; (b) that there is a causal nexus between its actions, taken
12
pursuant to a federal officer’s directions, and plaintiff’s claims; and (c) that it can assert a
13
“colorable federal defense.” Durham, 445 F.3d at 1251. Plaintiffs concede that Defendants are
14
“persons” under Section 1442. ECF No. 26 at 9. However, Plaintiffs contend that Defendants
15
have not sufficiently alleged facts to establish the other two requirements for federal officer
16
removal jurisdiction, namely (i) that the acts complained of in Plaintiffs’ complaint were taken at
17
the direction of a federal officer and there is a causal nexus between the actions taken by
18
Defendants and Plaintiffs’ claims; and (ii) that Defendants can assert a colorable federal defense.
19
28 U.S.C. § 1442(a). The Court addresses each of these requirements in turn.
20
A.
21
To establish that they were acting under the direction of a federal officer, Defendants must
22
Acting Under the Direction of a Federal Officer and Causal Nexus
show that a federal officer had “direct and detailed control” over them. Fung v. Abex Corp., 816
23
24
25
26
27
28
1
Plaintiffs argue that Defendants must attach evidence to their notice of removal to establish a
“colorable” defense. ECF No. 26 at 8 (“These facts, however, must be supported by evidence.”)
(emphasis in original). However, none of the cases they cite address the pleading requirements for
a notice of removal. In view of Ninth Circuit law analogizing challenges to removal jurisdiction
to Rule 12 motions, the Court agrees with Defendants that the notices need not attach evidence so
long as they allege facts sufficient to render the jurisdictional allegations plausible. See Leite, 749
F.3d at 1123 (challenges to removal jurisdiction evaluated according to same standard as Rule 12
motions); Bell Atlantic Corp. v. Twombly, 550 U.S. 544, 570 (2007) (complaint must allege “only
enough facts to state a claim to relief that is plausible on its face”).
4
1
2
F.Supp. 569, 572 (N.D. Cal. 1992).
Defendant Boeing alleges that “[i]n designing, manufacturing, supplying, testing, and
3
repairing aircraft for the United States military, Boeing acted as a government contractor under the
4
detailed and ongoing direction and control of one or more federal officers.” ECF No. 1 at 4. It
5
further alleges that as part of its contracts with the United States government, the government
6
maintained “exclusive control over the design and development of the aircraft and required
7
adherence to detailed specifications approved by the government.” Id. Defendants UTC,
8
Lockheed, and Goodyear make substantially similar allegations. ECF No. 13 at 3; ECF No. 16 at
9
4; ECF No. 17 at 6.
10
Boeing relies on the affidavit of Nolan H. Leatherman, who has “over 30 years of
United States District Court
Northern District of California
11
experience reviewing, negotiating and dealing with government contracts for military aircraft
12
procurement . . . .” ECF No. 37-2 (“Leatherman Decl.”) at ¶ 8. Mr. Leatherman, upon review of
13
the relevant Boeing government contracts, states that Boeing was required to comply with detailed
14
military specifications, including “material, item and installation specifications and standards
15
pertaining to each and every part and component to be used in and/or procured for the aircraft.”
16
Id. at ¶ 15. Defendants UTC, Lockheed, and Goodyear each provide affidavits from similarly
17
qualified witnesses detailing the exacting specifications each defendant had to follow in designing
18
and manufacturing components for military aircraft. ECF No. 32-2 (“Sumner Decl.”) at ¶ 7
19
(describing “oversight and approval process . . . through contract documents, design and
20
construction drawings, written specifications, and personal oversight of Pratt & Whitney’s work
21
by military engineers, military inspectors, and military specialists who were resident on-site at
22
Pratt & Whitney”); ECF No. 33-3 (“McCaffery Decl.”) at ¶ 2 (“In the case of military aircraft,
23
aircraft engines and aircraft components such as wheel/brake assemblies and consumable
24
materials such as gaskets and hoses, the Armed Forces provided extensive and detailed
25
specifications which provided the design requirements, operating characteristics, performance
26
requirements, detailed configuration definitions, construction standards, materials, mandatory
27
qualification and acceptance testing procedures, and documentation requirements.”); ECF No. 35-
28
1 (“Jimenez Decl.”) at ¶ 11 (“Each Military aircraft procurement contract and all Military5
1
mandated specifications for the manufacture of Military aircraft are both fully inclusive and fully
2
exclusive. This means that, unless the Government approves otherwise, Lockheed Martin is, and
3
always was, required to do everything called for in the contract and Military-mandated
4
specifications and is, and always was prohibited from doing anything not contained within the
5
contract and Military-mandated specifications.”).
In view of the uncontroverted evidence provided by Defendants, the Court finds that
7
Defendants have established that the United States military exerted direct and detailed control over
8
their work as it relates to Plaintiffs’ allegations. See e.g. Brantley v. Borg-Warner Morse Tec,
9
Inc., No. 12-cv-540, 2012 WL 1571129, *4 (S.D. Cal. May 3, 2012) (crediting expert declarations
10
describing detailed specifications and inability of defendants to deviate from those specifications,
11
United States District Court
Northern District of California
6
finding that “[t]o demand more evidence than these declarations would ‘frustrate the purpose of
12
section 1442(a)(1).’”) (quoting Ballenger v. AGCO Corp., No. C 06-2271, 2007 WL 1813821 at
13
*3 (C.D. Cal. June 22, 2007); Fung, 816 F.Supp. at 572-73 (detailed specifications and contractual
14
provisions for testing and monitoring established direct and detailed control).
15
Because Plaintiffs contend that Mr. Thrash was exposed to asbestos through the use of
16
asbestos-containing products and/or components designed or manufactured by Defendants, and
17
because Defendants have established that the United States government exerted direct and detailed
18
control over their design and manufacture of these products, the Court further finds that
19
Defendants have established a causal nexus between Plaintiffs’ claims and the acts performed by
20
Defendants under the direction of the United States government. Leite, 749 F.3d at 1124 (“In
21
assessing whether a causal nexus exists, we credit the defendant’s theory of the case. . . . Such a
22
nexus exists here because the very act that forms the basis of plaintiffs’ claims . . . is an act that
23
[the contractor] contends it performed under the direction of the [Government] . . . .”).
24
B.
25
Plaintiffs next contend that Defendants have not established a colorable government
26
contractor defense under Section 1442(a). To successfully assert a government contractor defense,
27
Defendants must show: “(1) the United States approved reasonably precise specifications; (2) the
28
equipment [Defendants supplied] conformed to those specifications; and (3) [Defendants] warned
Colorable Defense
6
1
the United States about the dangers in the use of the equipment that were known to the
2
[Defendants] but not to the United States.” Boyle, 487 U.S. at 512. The Court finds that
3
Defendants have alleged sufficient facts, supported by affidavits and documentary evidence, to
4
establish a colorable government contractor defense under Boyle.
5
With respect to the first prong of the Boyle test, Defendant Boeing alleges, in somewhat
6
conclusory fashion, that it “designed, manufactured, and supplied the aircraft at issue, as well as
7
markings and manuals to accompany them, in accordance with ‘reasonably precise specifications’
8
promulgated or adopted by the United States government” and that the equipment it provided
9
conformed to those specifications. ECF No. 1 at 5. Defendants Lockheed, Goodyear, and UTC
make similarly high-level allegations. ECF No. 13 at 3; ECF No. 16 at 4-6; ECF No. 17 at 8.
11
United States District Court
Northern District of California
10
However, Defendants have submitted ample evidence of the detailed specifications and
12
contractual requirements they were subject to in designing and manufacturing the aircraft and
13
components thereof that Thrash alleges contained asbestos and caused his exposure.2 See, e.g.,
14
Leatherman Decl. at ¶¶ 15, 35-36; Jimenez Decl. at ¶¶ 11-15; McCaffery Decl. at ¶ 2; Sumner
15
Decl. at ¶¶ 7-8. Plaintiffs contend that the evidence submitted by Defendants “amounts to nothing
16
more than a claim that the government imposed exacting performance standards and required
17
Defendants to meet them.” ECF No. 46 at 4. The Court disagrees. For example, Defendant
18
Boeing submitted evidence that the government-approved specifications for the B-52 aircraft
19
required it to use components separately procured by the Air Force and Navy, and that Boeing had
20
no ability to purchase or manufacture these components on its own or to add or modify warnings
21
on these components. Leatherman Decl. ¶ 21. The other removing Defendants provide similar
22
evidence of contractual requirements that specify certain components, not just performance
23
standards. See e.g. McCaffery Decl. ¶ 3; Sumner Decl. ¶¶ 8-9; Jimenez Decl. ¶ 14. The Court
24
25
26
27
28
2
Plaintiffs, citing Willis v. Buffalo Pumps Inc., 34 F.Supp.3d 1117, 1125 (S.D. Cal. 2014),
contend that Defendants do not meet the first element of the government contractor defense
because they do not identify particular specifications requiring the use of parts containing
asbestos. ECF No. 26 at 13-14. But the Willis court was considering a manufacturer’s summary
judgment motion. To survive a motion to remand and establish removal jurisdiction, Defendants
need only establish a colorable defense to Plaintiffs’ claims. They need not prove their defense at
this stage in the case. Leite, 749 F.3d at 1124.
7
1
therefore finds that Defendants have at this stage provided sufficient evidence that the United
2
States military established reasonably precise specifications for their equipment under the first
3
prong of the Boyle test.
4
With respect to the second prong of the Boyle test, since Defendants have provided
5
evidence that they supplied aircraft and equipment to the United States military subject to
6
reasonably precise specifications, the Court finds that Defendants have sufficiently established at
7
this point that the equipment conformed to government specifications. See Miller v. Diamond
8
Shamrock Co., 275 F.3d 414, 420 (5th Cir. 2001) (The government’s “[a]cceptance and use of an
9
item following its production can establish that the item conformed to its specifications.”).
10
With respect to the third prong of the Boyle test, Defendants submit evidence that the
United States District Court
Northern District of California
11
United States military directly controlled the technical manuals and warning labels on the
12
equipment at issue, and that Defendants could not have provided a warning without the military’s
13
prior approval. See e.g., Leatherman Decl. at ¶ 52 (“The Military controlled the markings and
14
warnings that could be placed on B-52 aircraft.”); Sumner Decl. at ¶ 13 (“Any written materials,
15
such as warnings or product manuals, that accompanied the engines built by Pratt & Whitney for
16
the U.S. Air Force were similarly controlled and approved by U.S. military representatives. . . .
17
The U.S. military reviewed and considered what warnings should be provided with the aircraft
18
engines.”); Jimenez Decl. at ¶ 18 (“The Government also controlled the inclusion (as well as the
19
type, placement, and content) of any warnings regarding Military aircraft.”); McCaffery Decl. at ¶
20
3 (“Thus, any ‘Note’, ‘Caution’ or ‘Warning’ in any technical manual, book, parts breakdown or
21
list was subject to specific approval by the Armed Forces based on their determination of the need
22
for such a ‘Note’, ‘Caution’ or ‘Warning.’”). Defendant UTC submits an affidavit from William
23
P. Ringo, who purports to be knowledgeable regarding the “potential hazards associated with the
24
use of asbestos-containing products,” stating that “the United States government was aware of
25
potential health hazards of working with or around asbestos-containing materials dating back to
26
the 1930s,” and that the government had “state of the art knowledge” regarding this risk. ECF No.
27
32-3 (“Ringo Decl.”) at ¶¶ 9. Defendant Goodyear’s expert Mr. McCaffery offers similar
28
8
1
testimony.3 McCaffery Decl. ¶¶ 5, 12.
Based on this evidence, the Court finds that Defendants have provided sufficient evidence
2
3
at this stage to show that they did not have any information regarding the danger of asbestos
4
exposure that the United States military did not already have. See Getz v. Boeing Co., 654 F.3d
5
852, 866 (9th Cir. 2011) (“Boyle does not require government contractors to warn of dangers that
6
were already known to the United States.”); see also Blackman v. Asbestos Defendants (BHC),
7
No. C-97-3066, 1997 WL 703773, at *3 (N.D. Cal. Nov. 3, 1997) (“Finally, although Thiokol’s
8
papers do not allege that they warned the USAF of asbestos hazards, Thiokol satisfies the third
9
prong of the Boyle test. Thiokol is not an asbestos manufacturer; rather, Thiokol manufactures
solid rocket motors for military missiles. Thiokol had no greater opportunity to know of the
11
United States District Court
Northern District of California
10
dangers of asbestos in the 1970’s than did the USAF, and therefore, did not owe a duty to warn the
12
USAF of the asbestos hazards.”). The Court therefore concludes that Defendants have adequately
13
alleged and provided sufficient evidence at this stage in the case to assert at least a colorable
14
government contractor defense.
Similarly, with respect to failure to warn claims, Defendants “will ultimately have to prove
15
16
that (1) the [government] exercised its discretion and approved certain warnings for [their]
17
products, (2) [Defendants] provided the warnings required by the [government], and (3)
18
[Defendants] warned the [government] about any asbestos hazards that were known to
19
[Defendants] but not to the [government].” Leite, 749 F.3d at 1123. As discussed above,
20
Defendants have established that the United States military was directly involved in the
21
preparation of technical manuals and warning labels, the military may have rejected any attempt
22
by Defendants to include additional asbestos-related warnings, and that the military knew at least
23
as much about the dangers of asbestos exposure as Defendants. The Ninth Circuit has found this
24
25
26
27
28
3
At least one other district court has found that the United States government had extensive
knowledge regarding the dangers of asbestos exposure as early as the 1940’s, decades before
Plaintiff Thrash’s alleged exposure to asbestos. Niemann v. McDonnell Douglas Corp., 721 F.
Supp. 1019, 1028 (S.D. Ill. 1989) (granting summary judgment on government contractor defense,
finding “at the time of the construction of these aircraft [as early as 1946], the government was
aware of the risks of the use of asbestos, and chose to continue to use asbestos in spite of this
knowledge.”).
9
1
showing sufficient to establish a colorable government contractor defense to a failure to warn
2
claim. Leite, 749 F.3d at 1123-24. In Leite, the defendant Crane, like Defendants here, submitted
3
expert affidavits tending to show that the United States Navy mandated warnings on equipment
4
provided by manufacturers, that the Navy might have rejected any additional warnings proposed
5
by the manufacturers, and that the Navy at all times knew at least as much about asbestos hazards
6
as the manufacturers. Id. There, as here, the plaintiffs contended that “counterfactual opinion
7
testimony” that the government would not have allowed additional asbestos warnings, in the
8
absence of actual evidence that the defendants proposed such warnings, could not support a
9
colorable government contractor defense to a failure to warn claim. Id. at 1123. The Ninth Circuit
found that this was an evidentiary objection that need not be resolved, as “[i]t’s enough . . . that
11
United States District Court
Northern District of California
10
the Navy exercised its discretion by prescribing certain warnings and prohibiting others without its
12
express approval.” Id. The evidence submitted by Defendants here is no different than that found
13
to be sufficient by the Ninth Circuit in Leite. The Court therefore the Court finds that Defendants
14
have established at least a colorable federal contractor defense with respect to Plaintiffs’ failure to
15
warn claim.
Defendants Boeing, Lockheed, and Goodyear each additionally assert the defense of
16
17
derivative sovereign immunity. Since the Court has found that Defendants have each raised a
18
colorable federal contractor defense, the Court need not address the parties’ arguments regarding
19
the derivative sovereign immunity defense.4
20
///
21
///
22
///
23
4
24
25
26
27
28
Under this defense, a party acting on behalf of the United States government pursuant to a
contract is immune from liability so long as that party has not exceeded its authority under the
contract and the contract was validly conferred. See Yearsley v. W.A. Ross Const. Co., 309 U.S.
18, 21 (1940). Plaintiffs contend that Defendants have not established a colorable derivative
sovereign immunity defense for the same reason that they have failed to establish a colorable
government contractor defense—namely, that Defendants purportedly did not provide evidence
that “the particular actions they undertook which caused Thrash’s harm were taken pursuant to a
federal officer’s direction . . . .” ECF No. 26 at 16. Since neither Plaintiffs nor the defendants
asserting the defense have provided much more than a cursory discussion of this defense in their
papers, the Court declines to substantively address it here.
10
CONCLUSION
1
2
Plaintiff’s Motion to Remand is denied.
3
IT IS SO ORDERED.
4
Dated: June 20, 2017
5
6
7
______________________________________
JON S. TIGAR
United States District Judge
8
9
10
United States District Court
Northern District of California
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
11