Synopsys, Inc. v. Avatar Integrated Systems, Inc.

Filing 153

ORDER GRANTING 129 MOTION TO STAY PENDING ARBITRATION by Judge William H. Orrick. (jmdS, COURT STAFF) (Filed on 9/9/2021)

Download PDF
Case 3:20-cv-04151-WHO Document 153 Filed 09/09/21 Page 1 of 10 1 2 3 4 UNITED STATES DISTRICT COURT 5 NORTHERN DISTRICT OF CALIFORNIA 6 SYNOPSYS, INC., 7 Plaintiff, 8 ORDER GRANTING MOTION TO STAY PENDING ARBITRATION v. 9 SIEMENS INDUSTRY SOFTWARE INC., 10 Re: Dkt. Nos. 129, 136, 141 Defendant. 11 United States District Court Northern District of California Case No. 20-cv-04151-WHO 12 13 Defendant Siemens Industry Software Inc.’s (“Siemens”) moves to stay the entire action 14 under the Federal Arbitration Act (“FAA”) because of the arbitration agreement contained in the 15 parties’ Patent Licensing and Settlement Agreement (“PLSA”). The parties have agreed to an 16 arbitration schedule requiring a final award by February 16, 2022. Plaintiff Synopsys, Inc. 17 (“Synopsys”) opposes, arguing that the FAA does not mandate a stay of the entire action because 18 there are non-arbitrable issues—e.g., the infringement of all versions of the accused products that 19 predate Siemens’s acquisition of Avatar Integrated Systems, Inc. (“Avatar”). Synopsys also 20 argues that a complete stay would harm it and would not be judicially efficient. While it is not 21 apparent that the FAA mandates a stay of the entire action, the conservation of judicial resources 22 from a discretionary stay of the entire action for roughly five months outweighs any potential 23 harm to Synopsys. Accordingly, Siemens’s motion to stay the entire action is GRANTED.1 The 24 parties’ motions to seal are also GRANTED. BACKGROUND 25 In June 2018, Synopsys, Siemens AG, the parent company of defendant Siemens, and 26 27 28 1 I will, however, issue an order resolving the Claim Construction terms in dispute in the near future. Case 3:20-cv-04151-WHO Document 153 Filed 09/09/21 Page 2 of 10 1 Mentor Graphics, an indirect subsidiary of Siemens AG, entered the PLSA to resolve 22 separate 2 actions between the corporate families. See Dkt. No. 68-9 (“PLSA”) § 4.1, 5.1. The PLSA grants 3 a license to “Siemens Subsidiaries” under “Synopsys Patents” to use “Siemens Licensed 4 Products.” Id. § 1.17, 1.23. The parties agreed to arbitrate any disputes concerning 5 post-acquisition versions of products subject to the license. Id. §§ 1.15, 10.4.1, 10.4.2, 10.4.3. 6 On June 23, 2020, Synopsys filed the present action against Avatar, alleging that Avatar’s Aprisa and Apogee (collectively, “Aprisa”) products (“Accused Products”) infringed several of 8 Synopsys’s patents. See Dkt. No. 1; Dkt. No. 147 (“Opp.”) at 2 n.1. Each count in Synopsys’s 9 complaint alleges infringement under one of Synopsys’s patents. See Dkt. No. 9 (“Corrected 10 Compl.”) at 6, 16, 21, 26, 37, 43. Four counts remain in this case, each asserting infringement 11 United States District Court Northern District of California 7 under one of the following patents (“Asserted Patents”): U.S. Patent No. 7,546,567 (“the ’567 12 Patent”); U.S. Patent No. 7,853,915 (“the ’915 Patent”); U.S. Patent No. 8,234,614 (“the ’614 13 Patent”); and U.S. Patent No. 8,407,655 (“the ’655 Patent”). Dkt. No. 61-1 (“Synopsys 14 Infringement Contentions”). After this action was filed, Avatar merged into Siemens and ceased 15 to exist as a stand-alone entity on December 1, 2020. See Dkt. No. 51. The parties subsequently 16 stipulated to substitute Siemens as the defendant for Avatar. See Dkt. Nos. 58, 59. 17 On December 15, 2020, Siemens released a new version of its newly acquired Aprisa 18 product, version 20.1.rel.1.0. See Dkt. No. 68-8. On January 7, 2021, Siemens notified Synopsys 19 of its position that the new 20.1.rel.1.0 release, and any future release, was covered by the parties’ 20 PLSA and therefore licensed as a “Siemens Licensed Product” under Synopsys’s Asserted Patents. 21 Dkt. No. 129 (“Mot.”) at 3. On February 12, 2021, Siemens filed its original motion to stay this 22 action pending arbitration. Dkt. No. 69. On March 8, 2021, Siemens released Aprisa 20.1.rel.2.0. 23 and contends that this product is also licensed under the PLSA. Mot. at 3. On April 2, 2021, I 24 denied Siemens’s motion to stay pending arbitration without prejudice because the parties had not 25 yet completed the PLSA’s pre-arbitration dispute resolution (“ADR”) procedures. Dkt. No. 95 26 (“Order”) at 5. 27 28 Since my Order, the parties have completed the PLSA’s pre-ADR procedures. The parties completed pre-ADR negotiations about whether the PLSA provides a license to its Accused 2 Case 3:20-cv-04151-WHO Document 153 Filed 09/09/21 Page 3 of 10 1 Products, including Aprisa 20.1.rel.1.0, Aprisa 20.1.rel.2.0, and future versions. See, e.g., Dkt. 2 No. 130 (“Nuzzi Decl.”) ¶ 3. Between January 7, 2021 and May 17, 20201, Siemens permitted 3 Synopsys to review Aprisa’s source code 17 times. See Dkt. No. 131-1. The parties conducted 4 mediation sessions on May 26, 2021 and July 7, 2021, but did not reach settlement. Nuzzi Decl. 5 ¶¶ 4–5; Dkt. No. 132-1 (“Pellikaan Decl., Ex. 1”). In July 2021, Siemens filed petitions for inter 6 partes review, challenging the validity of all asserted claims of the ’567, ’655, and ’614 Patents. 7 Mot. at 4. On July 30, 2021, Siemens filed the present motion to stay the entire case pending 8 arbitration. Mot. at 1. 9 On August 12, 2021, Siemens filed a Request for Arbitration with the International Chamber of Commerce’s Internal Court of Arbitration to determine among other things whether 11 United States District Court Northern District of California 10 Siemens has a license from Synopsys under its Asserted Patents for certain Accused Products. 12 Dkt. No. 142-1 (“Cleveland Decl.”) ¶ 3. The parties agreed to an arbitration schedule that 13 included a final hearing to be held around January 17–19, 2022 and a final award to be issued by 14 February 16, 2022. Id. ¶ 4; Opp. at 12 n.5. LEGAL STANDARD 15 16 The FAA governs motions to compel arbitration. 9 U.S.C. §§ 1 et seq. Under the FAA, in 17 assessing a motion to compel a district court determines (1) whether a valid agreement to arbitrate 18 exists and, if it does, (2) whether the agreement encompasses the dispute at issue. Lifescan, Inc. v. 19 Premier Diabetic Servs., Inc., 363 F.3d 1010, 1012 (9th Cir. 2004). To decide whether the parties 20 entered a contract containing an arbitration agreement, “federal courts should apply ordinary 21 state-law principles that govern the formation of contracts.” Ingle v. Circuit City Stores, Inc., 328 22 F.3d 1165, 1170 (9th Cir. 2003) (internal quotation marks omitted). If the court is “satisfied that 23 the making of the arbitration agreement or the failure to comply with the agreement is not in issue, 24 the court shall make an order directing the parties to proceed to arbitration in accordance with the 25 terms of the agreement.” 9 U.S.C. § 4. “[A]ny doubts concerning the scope of arbitrable issues 26 should be resolved in favor of arbitration[.]” Moses H. Cone Mem'l Hosp. v. Mercury Constr. 27 Corp., 460 U.S. 1, 24–25 (1983). 28 3 Case 3:20-cv-04151-WHO Document 153 Filed 09/09/21 Page 4 of 10 DISCUSSION 1 2 3 I. WHETHER THE ENTIRE ACTION SHOULD BE STAYED The parties do not dispute that the PLSA is a valid arbitration agreement, which 4 encompasses the dispute as to the scope of the license for the 20.1.rel.1.0, 20.1.rel.2.0, and future 5 versions of Aprisa. Order at 5; Mot. at 5–6; Opp. at 1. There is no disagreement that the versions 6 of the Accused Products that predate Siemens’s acquisition of Avatar are not licensed under the 7 PLSA. Mot. at 5–6; Opp. at 2. The parties also do not dispute that Siemens has satisfied the 8 PLSA’s requirements for commencing arbitration. Mot. at 6; Opp. at 1. The only dispute is 9 whether I should stay the action in its entirety, including Synopsys’s non-arbitrable claims against 10 pre-acquisition versions of the Accused Products, or stay only the arbitrable claims. Id. United States District Court Northern District of California 11 A. 12 The parties dispute whether the FAA mandates a stay of the entire action. The Ninth Whether the FAA Mandates a Stay of the Entire Action 13 Circuit has held that a district court has discretion to stay only the arbitrable claims. See, e.g., 14 Leyva v. Certified Grocers of California, Ltd., 593 F.2d 857, 863 (9th Cir. 1979) (determining that 15 “the Fair Labor Standards Act claim in count I of the complaint is not arbitrable” and therefore 16 “the defendant was not entitled to a stay pursuant to section 3 of the Arbitration Act”); Blair v. 17 Rent-A-Ctr., Inc., 928 F.3d 819, 832 (9th Cir. 2019) (holding that “[o]nly the usury claim was 18 ‘referable to arbitration,’ so Rent-A-Center was not entitled to a stay under § 3 for any of the other 19 claims.”). 20 Siemens asserts that the present case is distinguishable from Levya and Blair because in 21 those cases there were distinct non-arbitrable counts but here, the non-arbitrable and arbitrable 22 issues are found in each count. Mot. at 7. Under the remaining four counts, Synopsys accuses all 23 versions of Aprisa of infringing the ’567, ’915, ’614, and ’655 Patents. See Synopsys 24 Infringement Contentions at 3, 6. Siemens points to the plain language of the FAA and asserts 25 that the FAA mandates a stay of the entire action because there are arbitrable issues: 26 “[i]f any suit or proceeding be brought . . . upon any issue referable to arbitration under an agreement in writing for such arbitration, the court in which such suit is pending, upon being satisfied that the issue involved in such suit or proceeding is referable to arbitration under such an agreement, shall on application of one of the parties stay the 27 28 4 Case 3:20-cv-04151-WHO Document 153 Filed 09/09/21 Page 5 of 10 1 trial of the action . . . .” 9 U.S.C. § 3. Siemens also asserts that the recent trend of courts in this district is to hold that the 2 FAA mandates a stay of the entire action where there are arbitrable claims. 3 Most of the cases that Siemens relies upon are distinguishable and do not support its 4 argument that the FAA mandates a stay of the entire action when there are both arbitrable and 5 non-arbitrable issues in each count. Its cases concern situations where the court had already 6 stayed the entirety of the action and the court thereafter denied the plaintiff’s attempts to 7 voluntarily withdraw its arbitrable claims in hopes of proceeding with the non-arbitrable claims. 8 See, e.g., Lovig v. Best Buy Stores LP, No. 18-CV-02807-PJH, 2019 WL 2568851, at *3 (N.D. 9 Cal. June 21, 2019) (denying plaintiff’s motion to voluntarily dismiss his six arbitrable non-PAGA 10 claims to proceed with his non-arbitrable PAGA claim after the court had ordered a stay of the United States District Court Northern District of California 11 12 13 entire action because the FAA dictates that “a court must continue to stay the entire action—and cannot dismiss fewer than all of the claims—until the contracted-for ‘arbitration has been had in accordance with the terms of the agreement[.]’”), appeal dismissed sub nom. Lovig v. Best Buy 14 Stores LP, 2019 WL 7494405 (9th Cir. Nov. 22, 2019); see also Marron v. Healthsource Glob. 15 Staffing, Inc., No. 19-CV-01534-KAW, 2020 WL 4284818, at *2 (N.D. Cal. July 27, 2020) 16 (denying plaintiff’s motion to dismiss his arbitrable claims because the “FAA does not give the 17 court discretion to lift the stay to dismiss some of the claims, particularly now that arbitration has 18 19 20 21 22 23 been initiated.”); Murphy v. Finish Line, Inc., No. 20-CV-05663-WHO, 2021 WL 2166875, at *2 (N.D. Cal. May 27, 2021) (denying plaintiff’s motion to dismiss his arbitrable claims to avoid arbitration because “[o]nce an issue in an action is referred to arbitration . . . the FAA dictates that [the court] ‘shall’ stay the action ‘until such arbitration has been had in accordance with the terms of the agreement.’”). Siemens’s other case is more factually analogous but is not persuasive. In Mohebbi v. 24 Khazen, No. 13-CV-03044-BLF, 2014 WL 6845477 (N.D. Cal. Dec. 4, 2014), the court decided to 25 stay the entire action despite there being non-arbitrable claims because “[p]ursuant to the Federal 26 Arbitration Act, when a court determines that some claims are arbitrable while some are not, the 27 claims that are not arbitrable must be stayed pending the completion of arbitration.” Mohebbi, 28 5 Case 3:20-cv-04151-WHO Document 153 Filed 09/09/21 Page 6 of 10 1 2014 WL 6845477, at *7, *12. But Mohebbi contradicts the Ninth Circuit decisions in Levya and 2 Blair, which hold that the FAA does not mandate a stay for non-arbitrable claims. Levya, 593 3 F.2d at 863; Blair, 928 F.3d at 832. Moreover, even if Mohebbi was reconcilable with the Ninth 4 Circuit precedent, it does not support Siemens’s argument that the FAA mandates a complete stay 5 when there are arbitrable and non-arbitrable issues in the same claims because Mohebbi only 6 addressed distinct arbitrable and non-arbitrable claims. Mohebbi, 2014 WL 6845477, at *12. Synopsys contends that none of Siemens’s cases “support its position that claims against 7 8 arbitrable and non-arbitrable issues cannot be separated.” Opp. at 6. It relies on three cases: 9 Summer Rain v. Donning Co./Publishers, Inc., 964 F.2d 1455, 1461 (4th Cir. 1992), as amended (June 23, 1992) (holding that the FAA “requires the separation of arbitrable ‘issues’ from 11 United States District Court Northern District of California 10 non-arbitrable ones” and that “arbitrability is to be determined on an issue-by-issue basis, without 12 regard to the way that the issues are grouped into claims.”); Glenn v. Wells Fargo Bank, N.A., 13 2017 WL 371956, at *11 (D. Md. Jan. 26, 2017) (same); Ferguson v. Corinthian Colls., Inc., 823 14 F.Supp.2d 1025, 1036 (C.D. Cal. Oct. 6, 2011), rev’d on other grounds, 733 F.3d 928 (9th Cir. 15 2013) (declining to stay the non-arbitrable public injunctive relief issues under three counts).2 But 16 as Siemens asserts, none of these cases are “controlling authority for bifurcating a count by staying 17 some arbitrable issues in a count but proceeding with others.” Dkt. No. 142 (“Reply”) at 4. In other words, neither party has cited a persuasive case in support of its argument. But the 18 19 Ninth Circuit is clear—non-arbitrable claims are not subject to a stay under the FAA. Levya, 593 20 F.2d at 863; Blair, 928 F.3d at 832. Further, the Ninth Circuit has noted “a preference for 21 proceeding with the non-arbitrable claims when feasible,” approving a district court’s reasoning 22 that “[e]xpanding the stay, so as to encompass all of the nonarbitrable claims in the case, is [only] 23 appropriate where the arbitrable claims predominate, or where the outcome of the nonarbitrable 24 claims will depend on the arbitrator’s decision.” United Communs. Hub, Inc. v. Qwest Communs., 25 Inc., 46 F. Appx. 412, 415 (9th Cir. 2002). Accordingly, it is not apparent that the FAA mandates 26 27 28 2 For separate reasons, both Summer Rain, under the discretion of the court, and Ferguson, after it was reversed on appeal, resulted in complete stays of the actions pending arbitration. Summer Rain, 964 F.2d at 1461; Ferguson, 733 F.3d at 930–31. 6 Case 3:20-cv-04151-WHO Document 153 Filed 09/09/21 Page 7 of 10 1 a stay of the entire action where there are independent non-arbitrable and arbitrable issues in the 2 same counts. 3 B. 4 That said, it is well-established and undisputed that courts have discretion to stay Whether There Should Be A Discretionary Stay of the Entire Action 5 non-arbitrable issues. See Levya, 593 F.2d at 863 (explaining that “sound reasons may exist . . . to 6 support the district court's determination to stay the action under the powers to control its own 7 docket and to provide for the prompt and efficient determination of the cases pending before it” 8 even though the FAA does not mandate a stay for non-arbitrable claims); see also Summer Rain, 9 964 F.2d at 1461 (“The decision whether to stay the litigation of the non-arbitrable issues is a matter largely within the district court’s discretion to control its docket.”). When considering a 11 United States District Court Northern District of California 10 motion to stay, a court must weigh “competing interests” such as “the possible damage which may 12 result from the granting of a stay, the hardship or inequity which a party may suffer in being 13 required to go forward, and the orderly course of justice measured in terms of the simplifying or 14 complicating of issues, proof, and questions of law which could be expected to result from a stay.” 15 CMAX, Inc. v. Hall, 300 F.2d 265, 268 (9th Cir. 1962). 16 The parties dispute whether staying the entire case will promote judicial efficiency. In 17 particular, the parties dispute a provision in the PLSA, specifically whether “the “Siemens 18 Licensed Products” under the PLSA include all post-acquisition versions of the Aprisa products or 19 only the versions that are modifications of pre-acquisition versions. Opp. at 3; Reply at 7. 20 Siemens argues the former and asserts that if the arbitrators find that the current Aprisa products 21 are licensed then that will substantially narrow the litigation because none of the post-acquisition 22 versions will be at issue. Mot. at 9. Synopsys opposes and contends that because “the arbitration 23 cannot result in a finding that all post-acquisition versions are licensed, some or all of the 24 post-acquisition versions will return for adjudication.” Opp. at 4. 25 I cannot decide the scope of the “Siemens Licensed Products” under the PLSA. But even 26 if the PLSA does not cover all post-acquisition versions of the Aprisa products, it will be judicially 27 efficient to stay the entire action. If the arbitrators determine that any post-acquisition version is 28 licensed then that will narrow the non-arbitrable issues, such as “intent for indirect infringement, 7 Case 3:20-cv-04151-WHO Document 153 Filed 09/09/21 Page 8 of 10 1 willful infringement, lost profits, reasonable royalty, failure to mitigate damages, and possibly, 2 patent misuse.” Reply at 7. For example, a licensed product “becomes a non-infringing 3 alternative to the accused product as of approximately the date of acquisition,” which “would 4 cabin both the lost profits and the reasonable royalty amounts Synopsys can seek.” Id. A 5 conclusion of licensed products would also help undermine any allegations of Siemens’s “intent” 6 to infringe for indirect infringement or alleged willful infringement. Id. And a finding that 7 “Synopsys breached the license agreement in part by repudiating the license that the agreement 8 expressly grants” would be “another defense to patent misuse.” Id. at 7–8. 9 In addition, if the arbitrators find that none of the post-acquisition versions are licensed, then a stay of the entire action will avoid duplication of effort, e.g., taking fact witness 11 United States District Court Northern District of California 10 depositions, serving expert reports, taking expert depositions, and engaging in motion practice for 12 post-acquisition versions after doing so for pre-acquisition versions. Mot. at 9. Synopsys argues 13 that if the arbitrators find that none of the post-acquisition versions are licensed, then it will be 14 because these versions are premised on pre-acquisition versions. Opp. at 13. As a result, any 15 effort made for litigating the infringement of pre-acquisition versions would be applicable to 16 post-acquisition versions. Id. But as Siemens points out, if the entire action is stayed under this 17 scenario, the parties “would be able to consider all applicable versions of software together instead 18 of risking the need to redepose numerous witnesses on post-acquisition products.” Reply at 6–7. I 19 agree that staying the entire action is more judicially efficient because of the possibility of 20 substantially simplifying the issues and the risk of wasting judicial resources if the entire action is 21 not stayed. See United Commc'ns Hub, 46 F. App'x at 415 (a complete stay is appropriate where 22 the arbitrable issues predominate the non-arbitrable issues). 23 Synopsys argues that Siemens will not suffer any hardship or inequity by continuing to 24 litigate the case because Siemens will have to eventually defend the alleged infringement of the 25 pre-acquisition versions of Aprisa notwithstanding the outcome of the arbitration. Opp. at 1. The 26 delay will allegedly harm Synopsys, however, because Siemens has filed an inter partes review 27 (“IPR”) on the invalidity of all asserted claims of the ’567 Patent, the ’655 Patent, and the ’614 28 Patent in July 2021. Opp. at 1, 3. According to Synopsys, staying the entire action will allow 8 Case 3:20-cv-04151-WHO Document 153 Filed 09/09/21 Page 9 of 10 1 Siemens to pursue its defenses “while Synopsys is forced to pause and face competitive harm in 2 the market resulting from Siemens’ continued patent infringement.” Id. It also argues that it 3 would be harmed by a delayed injunction against older versions of Aprisa. Opp. at 11. It asserts 4 that injunctive relief for the pre-acquisition versions remains at issue in the case because Siemens 5 provides no evidence that the “pre-acquisition versions are no longer in the market, no longer 6 being used by customers, or no longer being supported by Siemens.” Opp. at 11. 7 Siemens responds that Synopsys will not be harmed because “it can still be made whole for 8 any alleged injury [of past versions of Aprisa] through a damages award” and any injunctive relief 9 of old versions of Aprisa is speculative. Mot. at 9; Reply at 9. It also points out that Synopsys waited seven years to file the case, which asserts infringement under patents issued between 2006 11 United States District Court Northern District of California 10 and 2013, which undercuts the prejudice claim. Mot. at 9. The parties dispute who has the burden 12 to provide evidence that Synopsys either did or did not have sufficient knowledge to assert 13 infringement against Avatar at an earlier date. Opp. at 10–11; Reply at 8. Importantly, however, the parties have agreed to a final hearing for arbitration in about five 14 15 months and have the final award be issued by February 16, 2022. Dkt. No. 142-1 (“Cleveland 16 Decl.”) ¶ 4; Opp. at 12 n.5. The potential harm, if any, from staying the case for five months does 17 not outweigh the judicial efficiencies from staying the entire case. 18 II. MOTIONS TO SEAL 19 The parties have filed two motions to seal. Dkt. Nos. 136, 145. Under Ninth Circuit law a 20 party must demonstrate “compelling reasons” to seal any motion-related filings where “the motion 21 at issue is more than tangentially related to the underlying cause of action.” Ctr. for Auto Safety v. 22 Chrysler Grp., 809 F.3d 1092, 1096–99 (9th Cir. 2016). The parties’ submissions regarding 23 Siemens’s motion to stay are subject to this “compelling reasons” standard because the motion 24 relates to Siemens’s affirmative defense that all post-acquisition versions of Aprisa are licensed 25 under the PLSA. What constitutes a compelling reason is “left to the sound discretion of the trial 26 court.” Nixon v. Warner Commnc’ns, Inc., 435 U.S. 589, 598 (1978). The Ninth Circuit, 27 however, has highlighted that “[e]xamples include when a court record might be used to gratify 28 private spite or promote public scandal, to circulate libelous statements, or as sources of business 9 Case 3:20-cv-04151-WHO Document 153 Filed 09/09/21 Page 10 of 10 1 information that might harm a litigant’s competitive standing.” Ctr. for Auto Safety, 809 F.3d at 2 1097. 3 The first administrative motion to file under seal certain information in Synopsys’s opposition is GRANTED. Dkt. No. 136. The portions that Synopsys seeks to file under seal 5 contain confidential information including trade secrets and commercially sensitive business 6 information, such as information from the PLSA. I have previously considered and granted 7 motions to seal references and quotations from the PLSA although I rejected the sealing of basic 8 facts regarding the PLSA, e.g., the existence, name, and date of the PLSA as well as the parties to 9 the agreement and language from Section 10.4 about the dispute resolution procedures. See Dkt. 10 No. 95 at 9–10. The proposed sealable language here reference portions of the PLSA other than 11 United States District Court Northern District of California 4 the basic facts or Section 10.4 and therefore the motion is GRANTED. Dkt. No. 136. For the 12 same reasons, the second administrative motion to file under seal certain information in Siemens’s 13 reply is also GRANTED. Dkt. Nos. 141, 149. CONCLUSION 14 15 16 For the reasons explained above, Siemens’s motion to stay the entire action is GRANTED. The parties’ administrative motions to file under seal are also GRANTED. 17 18 19 IT IS SO ORDERED. Dated: September 9, 2021 20 21 William H. Orrick United States District Judge 22 23 24 25 26 27 28 10

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?