Robin Berman et al v. Microchip Technology Incorporated et al

Filing 95

ORDER by Judge Haywood S. Gilliam, Jr. GRANTING 54 MOTION FOR PARTIAL SUMMARY JUDGMENT; DENYING RULE 56(D) MOTION. Status Report due by 4/19/2019 and Further Case Management Conference set for 4/30/2019 02:00 PM in Oakland, Courtroom 2, 4th Floor. (ndrS, COURT STAFF) (Filed on 3/22/2019)

Download PDF
1 2 3 4 UNITED STATES DISTRICT COURT 5 NORTHERN DISTRICT OF CALIFORNIA 6 7 ROBIN BERMAN, et al., Plaintiffs, 8 v. 9 10 MICROCHIP TECHNOLOGY INCORPORATED, et al., 11 Case No. 17-cv-01864-HSG ORDER GRANTING MOTION FOR PARTIAL SUMMARY JUDGMENT; DENYING RULE 56(D) MOTION Re: Dkt. Nos. 54, 74 United States District Court Northern District of California Defendants. 12 Plaintiffs Robin Berman, Bo Kang, Khashayar Mirfakhraei, Thang Van Vu, Donna Viera- 13 14 Castillo, Girish Ramesh, Patrick Hanley, Ilana Shternshain, and Mandy Schwarz brought this 15 action under the Employee Retirement Income Security Act of 1974, 29 U.S.C. §§ 1001 et seq. 16 (“ERISA”). Dkt. No. 1 (“Complaint” or “Compl.”) ¶ 13. Plaintiffs are former employees of 17 Microchip Technology, Inc. (“Microchip”) and Atmel Corp. (“Atmel”) as well as participants in 18 the Atmel U.S. Severance Guarantee Benefit Program (“the Atmel Plan” or “the Plan”). See id.1 Pending before the Court is Plaintiffs’ motion for partial summary judgment. See Dkt. No. 19 20 54 (“Mot.”). Also pending before the Court is Defendants’ motion under Federal Rule of Civil 21 Procedure 56(d) to deny Plaintiffs’ motion as premature or defer considering it pending further 22 discovery. See Dkt. No. 74. For the following reasons, the Court GRANTS Plaintiffs’ motion for 23 partial summary judgment and DENIES Defendants’ Rule 56(d) motion. 24 I. BACKGROUND 25 A. 26 Prior to April 2016, Atmel was a publicly traded corporation with its principal place of The Atmel Plan 27 28 1 The Court will refer to Microchip, Atmel, and the Plan collectively as “Defendants.” 1 business in San Jose, California. See Compl. ¶ 15. Atmel was a supplier of “general purpose 2 microcontrollers, which are self-contained computers on a single chip used in a variety of 3 industrial and consumer products.” Id. ¶ 17. It employed approximately 1,800 people in the 4 United States. Id. ¶ 18. On July 9, 2015, Atmel sent a letter to its employees to acknowledge the “significant 5 6 market speculation regarding possible transactions involving the company.” AT 4117.2 Atmel 7 understood that “such rumors can be distracting and unsettling.” Id. However, Atmel was 8 “pleased to share” that it had established the Atmel Plan, which was “intended to ease the 9 concerns among [its] employees.” Id. Under the Plan, employees would receive severance benefits if they were terminated without cause following a change of control. See id. Details 11 United States District Court Northern District of California 10 varied based on an employee’s job category, but employees were generally entitled to cash 12 payments of between 25% and 50% of their annual base salary, paid health insurance premiums 13 for three to six months, and potentially a prorated bonus. See AT 4117–19. Precise terms of the 14 Atmel Plan were set out in an addendum to the letter: 15 Term of the Severance Guarantee Benefit Program: The U.S. Severance Guarantee Benefit Program is effective from July 1, 2015 and will terminate on November 1, 2015 unless an Initial Triggering Event (as described below) has occurred prior to November 1, 2015, in which event the U.S. Severance Guarantee Benefit Program will remain in effect for 18 (eighteen) months following that Initial Triggering Event. 16 17 18 19 Eligibility: Eligibility is limited to U.S.-based employees of Atmel Corporation as of the date a Change of Control is consummated. 20 Initial Triggering Event: Benefits under the U.S. Severance Guarantee Benefit Program will become available to eligible employees only if the Company enters into a definitive agreement (a “Definitive Agreement”), on or before November 1, 2015, that will result in a Change of Control of the Company. If a Definitive Agreement is not entered into on or before that date, the U.S. Severance Guarantee Benefit Program described in the letter and this 21 22 23 24 25 26 27 28 2 The full Administrative Record is composed of over 6,900 pages and is available at Dkt. Nos. 59–67. See Mot. at 2 n.2; Dkt. No. 58. The Administrative Record consists of three sets of documents, which are Bates stamped as follows: 0001–2756, ATMEL PLAN/BERMAN 0001– 4119, and BER 001–034. See Mot. at 2 n.2. In this order, the Court will preface the Bates number with “AR,” “AT,” or “BER,” respectively. In addition, Plaintiffs prepared an Appendix with key excerpts of the Administrative Record, which is filed at Dkt. No. 56 and contains most of the documents cited in this order. See Mot. at 2 n.2. 2 Addendum will automatically expire, unless expressly extended by the Company’s Board of Directors. 1 2 Benefits Conditions: After an Initial Triggering Event occurs that makes available to eligible employees the U.S. Severance Guarantee Benefit Program, participants will then be entitled to receive cash payments and COBRA benefits if, but only if: 3 4 (A) A Change of Control actually occurs; and 5 (B) Their employment is terminated without “Cause” by the Company (or its successor) at any time within 18 months of the execution date of the Definitive Agreement. 6 7 For purposes of this U.S. Severance Guarantee Benefit Program, the definition of “Change of Control” and “Cause” will be the same as that contained in the Company’s Senior Executive Change of Control and Severance Plan. 8 9 AT 4115. Atmel’s successor would “assume the obligations” of the Plan. AT 4116. The Plan 11 United States District Court Northern District of California 10 would “be administered and interpreted by” Atmel, with differing standards of review depending 12 on whether an interpretation occurred prior to or following a change of control. Id. Prior to a 13 16 change of control, Atmel’s interpretations were entitled to maximal deference: Any decision made or other action taken by the Company prior to a Change of Control with respect to the Program, and any interpretation by the Company prior to a Change of Control of any term or condition of the Program, or any related document, will be conclusive and binding on all persons and be given the maximum possible deference allowed by law. 17 Id. But after a change of control, interpretations of the Plan would be subject to a different 18 22 standard of review: Following a Change of Control, any decision made or other action taken by the Company, and any interpretation by the Company of any term or condition of the Program, or any related document that (i) does not affect the benefits payable under the Program shall not be subject to review unless found to be arbitrary and capricious or (ii) does affect the benefits payable under the Program shall not be subject to review unless found to be unreasonable or not to have been made in good faith. 23 Id. 14 15 19 20 21 24 B. 25 On September 19, 2015, UK-based Dialog Semiconductor plc (“Dialog”) agreed to Atmel Is Acquired 26 purchase Atmel for $4.6 billion in cash and stock. AR 2203. That day, Atmel filed a Form 8-K 27 with the Securities and Exchange Commission, announcing its “Entry into a Material Definitive 28 Agreement” with Dialog. AR 2213–25. The Form 8-K explained that “the acquisition of Atmel 3 1 will be accomplished through a merger.” AR 2214. The following day, Dialog and Atmel issued 2 a press release announcing the acquisition, which they expected would close in the first quarter of 3 2016. AR 2203–2211. But the agreement between Dialog and Atmel never closed because Microchip made a 4 5 better offer. See AR 2184; AT 410. Consequently, Atmel terminated the agreement with Dialog. 6 See AR 2250. Instead, Atmel entered into a new merger agreement on January 19, 2016, in which 7 Microchip agreed to acquire Atmel. See id. Microchip’s acquisition of Atmel closed on April 4, 8 2016. AR 2185. 9 C. Plaintiffs Reject New Severance Offers Robin Berman was a creative director at Atmel. AT 210. On April 6, 2016, Berman 11 United States District Court Northern District of California 10 received a letter saying that she had been terminated, effective immediately. Id. Microchip 12 offered to pay Berman five weeks of salary as severance. Id.; see also AT 217–20 (severance 13 agreement and release). On April 11, Berman received a letter from Microchip outlining a more 14 generous severance agreement. AT 210. Under the terms of this plan, Berman would receive 15 severance benefits worth one-half of those offered under the Atmel Plan, in exchange for releasing 16 any claims she may have had against Defendants. Id.; AT 225–30. The other eight Plaintiffs were terminated between April 4 and July 12 and sent similar 17 18 severance offers. See AR 1969–70, 1983–90 (Bo Kang); AR 1992–93, 2006–12 (Thong Van Vu); 19 AR 2019–20, 2035–41 (Donna Viera-Castillo); AR 2048–49, 2062–68 (Khashayar Mirfakhraei); 20 AR 2077–78 (Girish Ramesh); AR 2099–100 (Patrick Hanley); AR 2121–23 (Ilana Shternshain); 21 AR 2184–85 (Mandy Schwarz). 22 All nine Plaintiffs refused to sign the new severance agreements. See Compl. at 8–9.3 23 D. 24 Between May 20, 2016 and October 5, 2016, each Plaintiff submitted a claim for benefits 25 under the Atmel Plan. See, e.g., AR 1904–13 (claim letter from Plaintiff Schwarz). Microchip’s 26 Plan Administrator denied each claim, finding that Plaintiffs were “not eligible for benefits” under Microchip Denies Plaintiffs’ Claims for Benefits 27 28 3 By contrast, the plaintiffs representing the putative class in a related action, Schuman v. Microchip et al., Case No. 16-cv-05544-HSG, signed the release agreements. See Compl. at 1 n.1. 4 1 the Atmel Plan. AR 238–39. The Plan Administrator wrote that under her interpretation of the 2 Atmel Plan, employees were eligible for severance benefits only if the following conditions were 3 met: (1) Atmel entered into an agreement qualifying as an “Initial Triggering Event” (discussed below) that would result in a “Change of Control” (discussed further below) on or after July 1, 2015, but before November 1, 2015; (2) The agreement qualifying as an “Initial Triggering Event” ultimately resulted in a “Change of Control”; and (3) You were terminated within 18 months of the execution date of the agreement qualifying as an “Initial Triggering Event” and resulting in a “Change of Control.” 4 5 6 7 8 9 AR 238. First, the Administrator explained that because the agreement with Dialog did not actually result in a Change of Control, it did not make Plaintiffs eligible for severance benefits. 11 United States District Court Northern District of California 10 See AR 238–39. Second, the Administrator explained that because the Atmel Plan “automatically 12 expired on November 1, 2015,” any agreements entered into after that date could not qualify as an 13 Initial Triggering Event. AR 239. Thus, Plaintiffs were “not eligible for benefits” under the 14 Atmel Plan. AR 238. 15 Plaintiffs appealed the benefits denials in January 2017. See, e.g., AT 165–76 (Berman’s 16 appeal letter). In March 2017, the Plan Administrator denied Plaintiffs’ appeals, citing the same 17 bases on which she had denied their initial claims. See, e.g., BER 1–3 (Berman’s appeal denial). 18 E. 19 Following the denial of their appeals, Plaintiffs filed suit on April 4, 2017. See Compl. Plaintiffs Bring Suit 20 Plaintiffs asserted three causes of action: (1) breach of fiduciary duties under ERISA Section 21 502(a)(3), entitling them to the remedies of equitable relief, equitable estoppel, and surcharge, 22 Compl. ¶¶ 72–87; (2) a claim for plan benefits under ERISA Section 502(a)(1)(B), Compl. ¶¶ 88– 23 90; (3) and interference with the exercise of ERISA rights under ERISA Section 510, Compl. ¶¶ 24 91–101. 25 On February 6, 2018, the Court granted in part and denied in part Defendants’ motion to 26 dismiss the action. See Dkt. No. 35. First, the Court dismissed the Atmel Plan as a defendant 27 from the first cause of action because a plan “cannot be sued for breach of fiduciary duty.” See id. 28 at 9 (quoting Acosta v. Pac. Enters., 950 F.2d 611, 618 (9th Cir. 1991)). Second, the Court 5 1 dismissed Plaintiffs’ requests for declaratory and injunctive relief (other than their claim for an 2 injunction against Defendants “continuing to delay the processing of any Plan member’s claim for 3 ERISA benefits”) under Section 502(a)(3) as duplicative of relief available under other provisions 4 of ERISA. See Dkt. No. 35 at 18–20. Third, the Court dismissed Plaintiffs’ cause of action for 5 ERISA interference. See id. at 24–25. The Court allowed Plaintiffs’ remaining claims to proceed. 6 See id. at 26. Plaintiffs filed their motion for partial summary judgment on July 2, 2018. See Mot. On 7 July 30, Defendants responded in opposition and moved under Federal Rule of Civil Procedure 9 56(d) to deny the motion as premature or delay consideration pending additional discovery. See 10 Dkt. No. 74 (“Opp.”). Plaintiffs replied and opposed the Rule 56(d) motion on August 13. See 11 United States District Court Northern District of California 8 Dkt. No. 76 (“Reply”). On August 20, Defendants objected to new evidence included in 12 Plaintiffs’ Reply, Dkt. No. 77, and replied to Plaintiffs’ opposition, Dkt. No. 78. 13 14 II. LEGAL STANDARD Summary judgment is proper when a “movant shows that there is no genuine dispute as to 15 any material fact and the movant is entitled to judgment as a matter of law.” Fed. R. Civ. P. 56(a). 16 A fact is “material” if it “might affect the outcome of the suit under the governing law.” Anderson 17 v. Liberty Lobby, Inc., 477 U.S. 242, 248 (1986). And a dispute is “genuine” if there is evidence 18 in the record sufficient for a reasonable trier of fact to decide in favor of the nonmoving party. Id. 19 But in deciding if a dispute is genuine, the court must view the inferences reasonably drawn from 20 the materials in the record in the light most favorable to the nonmoving party, Matsushita Elec. 21 Indus. Co. v. Zenith Radio Corp., 475 U.S. 574, 587–88 (1986), and “may not weigh the evidence 22 or make credibility determinations,” Freeman v. Arpaio, 125 F.3d 732, 735 (9th Cir. 1997), 23 overruled on other grounds by Shakur v. Schriro, 514 F.3d 878, 884–85 (9th Cir. 2008). If a court 24 finds that there is no genuine dispute of material fact as to only a single claim or defense or as to 25 part of a claim or defense, it may enter partial summary judgment. Fed. R. Civ. P. 56(a). 26 With respect to summary judgment procedure, the moving party always bears both the 27 ultimate burden of persuasion and the initial burden of producing those portions of the pleadings, 28 discovery, and affidavits that show the absence of a genuine issue of material fact. Celotex Corp. 6 v. Catrett, 477 U.S. 317, 323 (1986). Where the moving party will not bear the burden of proof on 2 an issue at trial, it “must either produce evidence negating an essential element of the nonmoving 3 party’s claim or defense or show that the nonmoving party does not have enough evidence of an 4 essential element to carry its ultimate burden of persuasion at trial.” Nissan Fire & Marine Ins. 5 Co. v. Fritz Cos., 210 F.3d 1099, 1102 (9th Cir. 2000). Where the moving party will bear the 6 burden of proof on an issue at trial, it must also show that no reasonable trier of fact could not find 7 in its favor. Celotex, 477 U.S. at 325. In either case, the movant “may not require the nonmoving 8 party to produce evidence supporting its claim or defense simply by saying that the nonmoving 9 party has no such evidence.” Nissan Fire, 210 F.3d at 1105. “If a moving party fails to carry its 10 initial burden of production, the nonmoving party has no obligation to produce anything, even if 11 United States District Court Northern District of California 1 the nonmoving party would have the ultimate burden of persuasion at trial.” Id. at 1102–03. “If, however, a moving party carries its burden of production, the nonmoving party must 12 13 produce evidence to support its claim or defense.” Id. at 1103. In doing so, the nonmoving party 14 “must do more than simply show that there is some metaphysical doubt as to the material facts.” 15 Matsushita Elec., 475 U.S. at 586. A nonmoving party must also “identify with reasonable 16 particularity the evidence that precludes summary judgment,” because the duty of the courts is not 17 to “scour the record in search of a genuine issue of triable fact.” Keenan v. Allan, 91 F.3d 1275, 18 1279 (9th Cir. 1996). If a nonmoving party fails to produce evidence that supports its claim or 19 defense, courts must enter summary judgment in favor of the movant. Celotex, 477 U.S. at 323. If there is a genuine dispute of material fact in an ERISA case, summary judgment is 20 21 precluded, Tremain v. Bell Indus., Inc., 196 F.3d 970, 978 (9th Cir. 1999), and the district court 22 must conduct a bench trial, Kearney v. Standard Ins. Co., 175 F.3d 1084, 1094–95 (9th Cir. 23 1999) (en banc). 24 III. 25 DISCUSSION Plaintiffs moved for partial summary judgment on their claim for benefits under ERISA 26 Section 502(a)(1)(B) and for a finding of liability on their claim for equitable relief under ERISA 27 Section 502(a)(3). See Mot. at i, 24; Reply at 2. In response, Defendants moved to deny 28 Plaintiffs’ motion as premature or defer considering it pending further discovery. See Dkt. No. 74. 7 1 2 3 The Court will discuss each motion in turn. A. Plaintiffs’ Claim for Severance Benefits Under ERISA Section 502(a)(1)(B), a plan participant may bring a civil lawsuit “to recover 4 benefits due to him under the terms of his plan” or “to enforce his rights under the terms of the 5 plan.” 29 U.S.C. § 1132(a)(1)(B). Plaintiffs contend that by denying their claim for benefits, the 6 Plan Administrator “improperly deprived” them of benefits to which they were contractually 7 entitled “by adding an extra-contractual eligibility condition that is nowhere found in the Plan’s 8 language.” Mot. at 15. The Court agrees and GRANTS summary judgment on this claim. 9 10 United States District Court Northern District of California 11 12 i. Standard of Review As a preliminary matter, the parties dispute the standard of review the Court should apply when reviewing the Plan Administrator’s interpretation of the Atmel Plan. “To assess the applicable standard of review, the starting point is the wording of the plan.” 13 Abatie v. Alta Health & Life Ins. Co., 458 F.3d 955, 962–63 (9th Cir. 2006). A denial of ERISA 14 benefits “is to be reviewed under a de novo standard unless the benefit plan gives the administrator 15 or fiduciary discretionary authority to determine eligibility for benefits or to construe the terms of 16 the plan.” Firestone Tire & Rubber Co. v. Bruch, 489 U.S. 101, 115 (1989); see also Stephan v. 17 Unum Life Ins. Co. of Am., 697 F.3d 917, 923 (9th Cir. 2012) (“ERISA benefit determinations are 18 reviewed de novo, unless the benefit plan provides otherwise.”). “If de novo review applies” then 19 the court “proceeds to evaluate whether the plan administrator correctly or incorrectly denied 20 benefits, without reference to whether the administrator operated under a conflict of interest.” 21 Abatie, 458 F.3d at 963. However, “if the plan does confer discretionary authority as a matter of 22 contractual agreement, then the standard of review shifts to abuse of discretion.” Id. (citing 23 Firestone, 489 U.S. at 115). For the lower standard of review to apply, the plan must confer 24 discretion “unambiguously.” Kearney, 175 F.3d at 1090. Moreover, a conflict of interest 25 (including “the inherent conflict when a plan administrator is also the fiduciary”) must be 26 “weigh[ed] . . . as a factor in abuse of discretion review.” Abatie, 458 F.3d at 968–69. 27 28 A court is usually confined to the administrative record when reviewing an ERISA claim for abuse of discretion but may consider outside evidence if engaging in de novo review. See 8 1 Abatie, 458 F.3d at 969–70. In addition, the court “may, in its discretion, consider evidence 2 outside the administrative record to decide the nature, extent, and effect on the decision-making 3 process of any conflict of interest.” Id. at 970. 4 Plaintiffs contend that the denial of benefits is “subject to de novo review because the Plan 5 does not unambiguously grant . . . discretion to construe the Plan language post-merger.” Mot. at 6 13. Defendants respond that arbitrary and capricious review is required because the Plan’s use of 7 the phrase “unreasonable or not to have been made in good faith,” AT 4116, “incorporates 8 virtually verbatim the arbitrary and capricious review standard.” Opp. at 14. 9 Ultimately, the Court need not resolve the question of whether the Plan unambiguously grants discretion or whether the Plan’s phrasing incorporates the arbitrary and capricious standard. 11 United States District Court Northern District of California 10 The Plan Administrator’s interpretation of the Atmel Plan was so plainly incorrect as to violate 12 any potentially applicable standard of review, whether it be de novo, arbitrary and capricious, or 13 unreasonable and not in good faith. Cf. Brown v. S. Cal. IBEW-NECA Tr. Funds, 588 F.3d 1000, 14 1003 (9th Cir. 2009) (declining to determine standard of review because “result would be the same 15 under either standard of review”). Moreover, the Court need not—and did not—rely on any 16 evidence outside of the Administrative Record to reach this determination. 17 18 ii. Plaintiffs Are Entitled to Severance Benefits Regardless of the Standard of Review The Court need not look further than the plain language of the Atmel Plan to conclude that 19 Plaintiffs were entitled to severance benefits. Plaintiffs and Defendants agree that the Atmel 20 Plan’s language is clear and compels the result—but they have diametrically opposed views as to 21 what that unambiguous result is. See Mot. at 15; Opp. at 15. Plaintiffs argue that the text of the 22 23 24 25 26 27 Plan does not require that the “ultimate merger partner must be the same entity as the one whose preliminary agreement with Atmel constituted an ‘Initial Triggering Event.’” Mot. at 15. Defendants respond that the “unambiguous terms” of the Plan require that a definitive agreement that “resulted in a change of control” must be entered into prior to November 1, 2015 for the Plan to take effect—and that there was “no pre-November 1, 2015 definitive agreement with anyone that resulted in a change of control.” Opp. at 15. In essence, their disagreement boils down to one 28 9 1 question: must the agreement that constitutes the Initial Triggering Event be the agreement that 2 ultimately results in a Change of Control? See Mot. at 16; Opp. at 15. The Court finds that the 3 language of the Atmel Plan clearly and unequivocally dictates that the answer to this question is 4 no. Thus, Plaintiffs are entitled to severance benefits and the Plan Administrator’s denial of 5 benefits must be reversed regardless of what standard of review is applied. 6 7 8 9 10 United States District Court Northern District of California 11 12 13 14 15 The key portions of the Atmel Plan read as follows: Term of the Severance Guarantee Benefit Program: The U.S. Severance Guarantee Benefit Program is effective from July 1, 2015 and will terminate on November 1, 2015 unless an Initial Triggering Event (as described below) has occurred prior to November 1, 2015, in which event the U.S. Severance Guarantee Benefit Program will remain in effect for 18 (eighteen) months following that Initial Triggering Event. . . . Initial Triggering Event: Benefits under the U.S. Severance Guarantee Benefit Program will become available to eligible employees only if the Company enters into a definitive agreement (a “Definitive Agreement”), on or before November 1, 2015, that will result in a Change of Control of the Company. . . . Benefits Conditions: After an Initial Triggering Event occurs that makes available to eligible employees the U.S. Severance Guarantee Benefit Program, participants will then be entitled to receive cash payments and COBRA benefits if, but only if: 16 (A) A Change of Control actually occurs; and 17 (B) Their employment is terminated without “Cause” by the Company (or its successor) at any time within 18 months of the execution date of the Definitive Agreement. 18 19 AT 4115. In sum, the plain language of the Atmel Plan created three conditions precedent to 20 Plaintiffs’ entitlement to severance benefits: (1) an Initial Triggering Event occurred before 21 November 1, 2015; (2) a Change of Control transpired; and (3) Plaintiffs were terminated without 22 cause. No one disputes that the second and third conditions were satisfied: Atmel was acquired by 23 Microchip and Plaintiffs were terminated without cause. Thus, all that remains in contention is the 24 first condition and, more specifically, whether the Definitive Agreement that served as the Initial 25 Triggering Event must be the definitive agreement that resulted in the Change of Control. 26 According to the Plan Administrator, the “agreement qualifying as an ‘Initial Triggering 27 Event’” must be the one that “ultimately resulted in a ‘Change of Control.’” AR 238. Defendants 28 read the Plan similarly. See Opp. at 15. But that is not what the Atmel Plan says. 10 The Plan provides that benefits “will become available to eligible employees only if the 1 2 Company enters into a definitive agreement . . . , on or before November 1, 2015, that will result 3 in a Change of Control of the Company.” AT 4115. This would be the Initial Triggering Event. 4 Id. When Dialog agreed on September 19, 2015 to acquire Atmel, see AR 2203, that was the 5 Initial Triggering Event because it was a pre-November 1 definitive agreement that would result in 6 a Change of Control. And “the U.S. Severance Guarantee Benefit Program will remain in effect 7 for 18 (eighteen) months following that Initial Triggering Event.” AT 4115. Thus, because of the 8 Dialog agreement, the Atmel Plan would remain in effect until approximately March 19, 2017. Once the Initial Triggering Event transpired, Atmel Plan participants were entitled to 9 severance benefits “only if: (A) A Change of Control actually occur[ed]; and (B) Their 11 United States District Court Northern District of California 10 employment [was] terminated without ‘Cause’ by the Company (or its successor) at any time 12 within 18 months of the execution date of the Definitive Agreement.” AT 4115. Both events 13 occurred. The Atmel Plan did not say that the Change of Control contemplated by the Definitive 14 Agreement which constituted the Initial Triggering Event must be the same Change of Control 15 that “actually occurs.” It used the terms “will result” and “a” Change of Control rather than “does 16 result” and “the” Change of Control. These terms (and the Court’s interpretation) accord with the 17 Atmel Plan’s expressed purpose: “to ease the concerns among [Atmel] employees” given the 18 “significant market speculation regarding possible transactions involving the company.” AT 19 4117. 20 Were the Court to adopt the Plan Administrator’s or Defendants’ interpretation of the Plan 21 (which is foreclosed by the plain language), the Plan’s stated purpose would not be served. 22 Employees would be entitled to benefits only if the Definitive Agreement that served as the Initial 23 Triggering Event was the same one that resulted in the actual Change of Control. See Opp. at 17. 24 But, as Plaintiffs point out, that would mean that employees would not receive severance benefits 25 if, for example, the agreement was re-negotiated with the same merger partner. See Mot. at 16 26 n.11. Nor would employees receive severance benefits if (as actually happened) Atmel received 27 and accepted a better offer. This interpretation of the Plan would do nothing to ease concerns 28 among Atmel employees, because it would offer minimal assurances that they would receive 11 1 severance benefits following an acquisition. 2 Defendants assert that Plaintiffs’ (and thus the Court’s) interpretation of the Atmel Plan is 3 “irrational and unreasonable.” Opp. at 17. Defendants seem to think that this “reading eliminates 4 the November 1, 2015 definitive agreement deadline,” and assumes that “nothing that happened 5 prior to November 1, 2015 was even relevant.” See id. Not so. November 1 was the deadline for 6 the Initial Triggering Event: if no Definitive Agreement was reached by that day, the Plan would 7 have expired. Of course, because Atmel entered into a Definitive Agreement with Dialog prior to 8 the November 1 deadline, the Plan’s terms called for it to be extended for an additional 18 months. Because the Court finds that the plain language of the Atmel Plan entitles Plaintiffs to 9 severance benefits, the Plan Administrator’s denial of benefits is incorrect under any applicable 11 United States District Court Northern District of California 10 standard of review. Moreover, because the text of the Plan compels the result, the Court need not 12 (and did not) consider any evidence of the Plan Administrator’s potential conflict of interest or any 13 evidence outside of the Administrative Record. In sum, the Court GRANTS Plaintiffs’ motion for 14 summary judgment on their claim for severance benefits under ERISA Section 502(a)(1)(B). Plaintiffs’ Claim for Breach of Fiduciary Duty 15 B. 16 Plaintiffs also moved for summary judgment solely as to liability on their claim for 17 equitable relief under ERISA Section 502(a)(3) based on Defendants’ breaches of fiduciary duty. 18 See Mot. at i, 23–24; Reply at 2. Plaintiffs “intend to pursue [equitable] remedies later.” Mot. at 19 24. 20 Under ERISA Section 502(a)(3), a plan participant or beneficiary may bring a civil action 21 “(A) to enjoin any act or practice which violates any provision of this subchapter or the terms of 22 the plan, or (B) to obtain other appropriate equitable relief (i) to redress such violations or (ii) to 23 enforce any provisions of this subchapter or the terms of the plan.” 29 U.S.C. § 1132(a)(3). 24 Appropriate equitable relief under ERISA may include reformation of the terms of the plan, 25 equitable estoppel, or surcharge. See Gabriel v. Alaska Elec. Pension Fund, 773 F.3d 945, 955–58 26 (9th Cir. 2014). Plaintiffs may pursue simultaneous claims under Sections 502(a)(1)(B) and 27 502(a)(3), but they may not obtain double recovery. See Moyle v. Liberty Mut. Ret. Ben. Plan, 823 28 F.3d 948, 961 (9th Cir. 2016). 12 1 ERISA requires plan administrators to “discharge [their] duties with respect to a plan 2 solely in the interest of the participants and beneficiaries.” 29 U.S.C. § 1104(a)(1). They “breach 3 their duties if they mislead plan participants or misrepresent the terms or administration of a plan.” 4 King v. Blue Cross & Blue Shield of Ill., 871 F.3d 730, 744 (9th Cir. 2017) (internal quotation 5 omitted). Given that Plaintiffs were entitled to severance benefits based on the undisputed 6 evidence in the Administrative Record and the plain text of the Atmel Plan, the Plan Administrator 7 breached her duties when she misrepresented the terms of the Plan by denying Plaintiffs’ claim for 8 benefits. Thus, the Court GRANTS Plaintiffs’ motion for summary judgment as to liability for 9 breach of fiduciary duty under Section 502(a)(3). Defendants’ Rule 56(d) Motion and Objection to New Evidence C. 11 United States District Court Northern District of California 10 In their Opposition to Plaintiffs’ motion for partial summary judgment, Defendants moved 12 under Federal Rule of Civil Procedure 56(d) to deny Plaintiffs’ motion as premature or to defer 13 considering it pending additional discovery. See Opp. at 7. Defendants also objected to Plaintiffs’ 14 submission of new evidence in their Reply. See Dkt. No. 77. 15 Rule 56(d) of the Federal Rules of Civil Procedure allows a party to avoid summary 16 judgment if there has not been an opportunity to discover affirmative evidence necessary to 17 oppose the motion. See Garrett v. City & Cty. of San Francisco, 818 F.2d 1515, 1518 (9th Cir. 18 1987). To succeed on a Rule 56(d) motion, the moving party must show “(1) that they have set 19 forth in affidavit form the specific facts that they hope to elicit from further discovery, (2) that the 20 facts sought exist, and (3) that these sought-after facts are ‘essential’ to resist the summary 21 judgment motion.” State of Cal. v. Campbell, 138 F.3d 772, 779 (9th Cir. 1998). 22 Defendants’ Rule 56(d) motion fails because they cannot possibly establish the third prong 23 of the test. Defendants contend that summary judgment must be delayed because, for example, 24 they need additional discovery “to test the alleged verbal statements identified in Plaintiffs’ 25 declarations.” See Opp. at 11–12. But the Court did not rely upon or consider any such verbal 26 statements. Rather, this summary judgment order considered only the Administrative Record in 27 holding that the plain text of the Atmel Plan required granting summary judgment for Plaintiffs. 28 Thus, there is no reason to defer consideration of the motion for partial summary judgment 13 1 because there is no discovery that could be essential (or even relevant) to resisting the motion. Likewise, the Court did not consider the deposition testimony to which Defendants object 2 3 because it was not contained in the Administrative Record. See Dkt. No. 77. 4 IV. 5 CONCLUSION Based on the Administrative Record and the plain text of the Atmel Plan, the Court finds 6 that Plaintiffs were entitled to severance benefits. The Plan Administrator’s rejection of their 7 claim for benefits was erroneous under any standard of review; thus, she violated her fiduciary 8 duty to not misrepresent the terms of the Plan. Accordingly, the Court GRANTS Plaintiffs’ 9 motion for partial summary judgment on their claim for benefits under ERISA Section 502(a)(1)(B) and for liability on their claim for equitable relief under ERISA Section 502(a)(3). 11 United States District Court Northern District of California 10 Because the Court relied upon only the Administrative Record, the Court DENIES Defendants’ 12 Rule 56(d) motion. 13 The parties are ORDERED to meet and confer regarding the amounts of pre-judgment 14 interest, attorneys’ fees, and costs that may be owed as a result of this ruling. See Mot. at 18 n.12. 15 The parties shall file a short statement by April 19, 2019, informing the Court whether they were 16 able to reach a stipulation as to how much is owed. If the parties do not report on or before April 17 19 that an agreement has been reached, they shall appear for a case management conference on 18 April 30 at 2:00 p.m. in Oakland, Courtroom 2, 4th Floor to discuss a plan and schedule for 19 promptly resolving any remaining issues. 20 21 22 23 IT IS SO ORDERED. Dated: 3/22/2019 ______________________________________ HAYWOOD S. GILLIAM, JR. United States District Judge 24 25 26 27 28 14

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?