Areas USA SJC, LLC v. Mission San Jose Airport, LLC et al

Filing 61

ORDER by Magistrate Judge Howard R. Lloyd Granting in part and Denying in part 50 Motion to Dismiss Mission's Second Amended Counterclaims. Signed on 8/1/2012. (hrllc1, COURT STAFF) (Filed on 8/1/2012)

Download PDF
1 ** E-filed August 1, 2012 ** 2 3 4 5 6 IN THE UNITED STATES DISTRICT COURT 9 FOR THE NORTHERN DISTRICT OF CALIFORNIA 10 For the Northern District of California NOT FOR CITATION 8 United States District Court 7 SAN JOSE DIVISION 11 AREAS USA SJC, LLC, Plaintiff, 12 v. 13 14 MISSION SAN JOSE AIRPORT, LLC; ET AL., 15 Defendants. ____________________________________/ No. C11-04487 HRL ORDER GRANTING IN PART AND DENYING IN PART PLAINTIFF’S MOTION TO DISMISS COUNTERCLAIMS IN THE SECOND AMENDED ANSWER [Re: Docket No. 50] 16 17 Areas USA SJC, LLC (“Areas”) sued Mission San Jose Airport, LLC and Mission Yogurt, 18 Inc. (collectively “Mission”) alleging breach of a concession contract (“the subcontract”) for the 19 build-out and operation of concession space known as TA-21 (“the space” or “TA-21”) in the 20 Norman Y. Mineta San Jose International Airport (“Airport”). Dkt. No. 1 (“Complaint”). Mission 21 counterclaimed, alleging fraud in the inducement and breach of contract, contending that Areas 22 made material misrepresentations about the viability of building out TA-21 as a food concession and 23 failed to disclose material facts in contravention of an agreement to do so with the City of San Jose. 24 Areas moved to dismiss Mission’s counterclaims and to strike Mission’s affirmative 25 defenses. Dkt. No. 22. Mission then filed a First Amended Answer (“FAA”) as a matter of course 26 pursuant to Fed. R. Civ. P. 15(a). Dkt. No. 27. Areas moved to dismiss the counterclaims in the 27 FAA and to strike the affirmative defenses, followed by Mission filing a Second Amended Answer 28 (“SAA”). Dkt. Nos. 29, 30, 32. Areas then moved to strike the SAA. Dkt. No. 34. The court granted 1 Areas’s motion to strike the SAA, granted the motion to dismiss Mission’s counterclaims with leave 2 to amend, and granted in part and denied in part the motion to dismiss Mission’s affirmative 3 defenses with leave to amend. Dkt. No. 47. Mission timely filed a new SAA. Dkt. No. 49. Areas 4 now moves again to dismiss Mission’s counterclaims. Dkt. No. 50. Mission has opposed the motion. 5 Dkt. No. 53. All parties have expressly consented to magistrate jurisdiction pursuant to 28 U.S.C. § 6 636(c). Based on the moving papers, arguments presented at the hearing held on July 31, 2012, and 7 all applicable authority, the court rules as follows. 8 LEGAL STANDARD 9 On motion, a court may dismiss a complaint for failure to state a claim. FED. R. CIV. P. For the Northern District of California United States District Court 10 12(b)(6). The federal rules require that a complaint include a “short and plain statement” showing 11 the plaintiff is entitled to relief. FED. R. CIV. P. 8(a)(2). The statement must “raise a right to relief 12 above the speculative level.” Bell Atl. Corp. v. Twombly, 550 U.S. 544, 55 (2007). However, only 13 plausible claims for relief will survive a motion to dismiss. Ashcroft v. Iqbal, 556 U.S. 662, 129 14 S.Ct. 1937, 1950, 173 L.Ed.2d 868 (2009). A claim is plausible if its factual content “allows the 15 court to draw the reasonable inference that the defendant is liable for the misconduct alleged.” Id. at 16 1949. A plaintiff does not have to provide detailed facts, but the pleading must include “more than 17 an unadorned, the-defendant-unlawfully-harmed-me accusation.” Id. at 1950. 18 In deciding a motion to dismiss, the court is ordinarily limited to the face of the complaint. 19 Van Buskirk v. Cable News Network, Inc., 284 F.3d 977, 980 (9th Cir. 2002). The factual 20 allegations pled in the complaint must be taken as true and reasonable inferences drawn from them 21 must be construed in favor of the nonmoving party. Cahill v. Liberty Mutual Ins. Co., 80 F.3d 336, 22 337-38 (9th Cir. 1996); Mier v. Owens, 57 F.3d 747, 750 (9th Cir. 1995) (citing Usher v. City of 23 Los Angeles, 828 F.2d 556, 561 (9th Cir. 1987)). However, the court cannot assume that “the 24 [plaintiff] can prove facts which [he or she] has not alleged.” Associated General Contractors of 25 California, Inc. v. California State Council of Carpenters, 459 U.S. 519, 526 (1983). “Nor is the 26 court required to accept as true allegations that are merely conclusory, unwarranted deductions of 27 fact, or unreasonable inferences.” Sprewell v. Golden State Warriors, 266 F.3d 979, 988 (9th Cir. 28 2 1 2001) (citing Clegg v. Cult Awareness Network, 18 F.3d 752, 754-55 (9th Cir. 1994)), amended on 2 other grounds by 275 F.3d 1187 (9th Cir. 2001). 3 “A court should freely give leave [to amend] when justice so requires.” FED. R. CIV. P. 4 15(a)(2). “‘Four factors are commonly used to determine the propriety of a motion for leave to 5 amend. These are: bad faith, undue delay, prejudice to the opposing party, and futility of 6 amendment.’” Ditto v. McCurdy, 510 F.3d 1070, 1079 (9th Cir. 2007) (internal citations omitted). 7 “Futility of amendment can, by itself, justify the denial of a motion for leave to amend.” Bonin v. 8 Calderon, 59 F.3d 815, 845 (9th Cir. 1995). An amendment would be “futile” if there is no set of 9 facts can be proved which would constitute a valid claim or defense. See Miller v. Rykoff-Sexton, For the Northern District of California United States District Court 10 Inc., 845 F.2d 209, 214 (9th Cir. 1988). A complaint may be dismissed with prejudice when plaintiff 11 has “multiple opportunities to amend and [is] unable to cure the defects that required dismissal of [] 12 previous complaints.” Metzler Inv. GMBH v. Corinthian Colleges, Inc., 540 F.3d 1049, 1060 (9th 13 Cir. 2008). 14 DISCUSSION 15 Areas moves to dismiss Mission’s counterclaims for fraud in the inducement and breach of 16 contract, alleging that the counterclaims fail to state claims upon which relief can be granted. Dkt. 17 No. 50. Mission opposes the motion, arguing that it has provided ample factual support for its 18 claims sufficient to survive a motion to dismiss. 19 A. Fraud in the Inducement 20 Fed. R. Civ. P. 9(b) requires that in all claims for fraud, the circumstances constituting fraud 21 must be stated with particularity. Malice, intent, knowledge, and other conditions of a person's mind 22 may be alleged generally. “Averments of fraud must be accompanied by ‘the who, what, when, 23 where, and how’ of the misconduct charged.” Vess v. Ciba-Geigy Corp. USA, 317 F.3d 1097, 1106 24 (9th Cir. 2003). The elements of fraud are (a) a misrepresentation (false representation, 25 concealment, or nondisclosure); (b) scienter or knowledge of its falsity; (c) intent to induce reliance; 26 (d) justifiable reliance; and (e) resulting damage. Lazar v. Super. Ct., 12 Cal. 4th 631, 638, 49 Cal. 27 Rptr. 2d 377, 909 P.2d 981 (1996). “Fraud in the inducement is a subset of fraud. It ‘occurs when 28 the promisor knows what he is signing but his consent is induced by fraud.’” Parino v. Bidrack, Inc., 3 1 2011 U.S. Dist. LEXIS 109543, *10 (N.D. Cal. Sept. 26, 2011) (quoting Rosenthal v. Great W. Fin. 2 Sec. Corp., 14 Cal. 4th 394, 415, 58 Cal. Rptr. 2d 875, 926 P.2d 1061 (1996). In support of its claim for fraud in the inducement, Mission alleges that Guillermo Hidalgo, 3 (“Airport Program”), expressly informed Areas executive Kevin Reynolds and executives of 6 Legends Group, Inc. (“Legends”), the design firm Areas used for its concession spaces within the 7 airport, that no plumbing lines could be placed above the special security equipment 1 below TA-21, 8 and that “all plan documents [should] make reference” to those limitations. SAA ¶ 14-15. In 9 addition, Mission alleges that Bert Beattie, the City of San Jose’s Project Manager for the Airport 10 For the Northern District of California superintendent for the contractor managing the SJC Airport Terminal Area Improvement Program 5 United States District Court 4 Program, told Legends design director Gayle Dixon that whatever entity ultimately agreed to build 11 out TA-21 “need[ed] to be informed of” the special construction issues caused by the security 12 equipment below TA-21 “in the design proposal.” SAA ¶ 18. Mission further alleges that Areas 13 employees, Legends employees, and city employees discussed the construction issues and their 14 associated costs at length, and Areas ultimately agreed to inform any potential subconcessionaire of 15 the relevant construction limitations.2 SAA ¶¶ 18-24. Mission contends that its president, Rod Tafoya, conducted several visits to the airport to 16 17 consider the viability of building out the TA-21 space, but that every visit required special security 18 access and an Areas employee escort. SAA ¶ 30. Mission alleges that it was never given any access 19 to the area below TA-21, that that area was not publically accessible, and that Areas never gave 20 Mission any indication of what was below the TA-21 space. SAA ¶ 31. Mission alleges that at least 21 once, Tafoya specifically asked Pham, the Areas employee, “whether there were any abnormal or 22 unusual construction issues that he should know about with respect to the TA-21 space” and that 23 Pham told him there were not. SAA ¶ 32. According to the SAA, this statement by Pham was made 24 months after Areas, Legends, and City employees discussed the construction limitations at the TA- 25 1 26 27 28 Mission notes that while “it is common to have to work around baggage conveyor systems while building out airport concessions, having to work around CTX Machines [the machines located below TA-21] is unusual and not an expected part of build-out,” SAA ¶ 31. 2 Mission contends that Areas did inform the entity with which it first attempted to negotiate a subconcession contract for the build-out of TA-21, and that that entity pulled out of negotiations shortly after receiving the information about construction limitations and the associated costs. SAA ¶ 25. It also alleges that a second potential subconcessionaire backed out of negotiations, presumably after learning of these issues. SAA ¶ 26. 4 1 21 space. SAA ¶ 32; cf. SAA ¶ 18-22. Mission also alleges on information and belief that Areas 2 executives expressly informed Pham and Legends employees not to disclose the construction 3 restrictions to Mission, despite their earlier agreement with the City to make such disclosures, in an 4 attempt to secure a subconcessionaire for the TA-21 space. SAA ¶ 32. Finally, Mission alleges that 5 it had contracted with Areas for the build-out of another concession space in the airport, which had 6 no special construction limitations, and that Mission specifically relied on Areas’s repeated 7 assurances that the TA-21 space would require similar build-out costs and had no special restrictions 8 as compared to that earlier contract. SAA ¶ 35, 37. 9 Areas argues that these allegations fail to meet the particularity standard required by Fed. R. For the Northern District of California United States District Court 10 Civ. P. 9(b). Specifically, it argues that Mission has failed to allege sufficiently specific facts as to 11 the reasonableness of its reliance on assurances Areas made about the lack of special construction 12 issues. Dkt. No. 50, p. 5. Areas also argues that, to the extent that misrepresentations may have been 13 made, they are “foreclosed” by the contract, which expressly disclaims that any warranties were 14 made with respect to the condition of the premises. Id. at pp. 6-7. 15 1. Whether Mission Has Adequately Pled Elements of Fraud 16 Areas’s contention that Mission must plead with particularity facts supporting the 17 reasonableness of its reliance on Areas’s alleged misrepresentations is unavailing. Although fraud 18 must be pled “with particularity,” the goal of Fed. R. Civ. P. 9(b) is simply to give the opposing 19 party adequate notice of the claim so that it may prepare a response. See Cooper v. Pickett, 137 F.3d 20 616, 627 (9th Cir. 1998) (finding that a claim for fraud need only “‘identif[y] the circumstances of 21 the alleged fraud so that defendants can prepare an adequate answer.’” (quoting Warshaw v. Xoma 22 Corp., 74 F.3d 955, 960 (9th Cir. 1996)) (overruled as to pleading requirements under the Private 23 Securities Litigation Reform Act); In re Technical Equities Fed. Sec. Litig., 1989 U.S. Dist. LEXIS 24 18405, *7-8 (N.D. Cal. Aug. 22, 1989) (stating that the “central concern” of Rule 9(b) “is to ensure 25 that the Complaint alleges ‘the circumstances constituting fraud so that the defendant can prepare an 26 adequate answer from the allegations’ (quoting Lewis v. Sporck, 612 F. Supp. 1316, 1324-25 (N.D. 27 Cal. 1985)). Areas’s argument that Mission must state with particularity the grounds for its belief 28 5 1 that its reliance on representations made before the subcontract was executed was reasonable would 2 impose a pleading standard not recognized in this Circuit. 3 This court concludes that the SAA does adequately lay out the “who, what, when and where” City employees informed specific Areas employees, as well as specific Legends employees working 6 for Areas on the Airport Program, of the special construction restrictions in the TA-21 space (who). 7 Mission gives exact dates for these communications (when). Mission alleges that the City 8 employees expressly directed Areas to inform any potential subconcessionaire of the restrictions 9 “early on,” a direction that Legends employees repeated to Areas executives. Finally, Mission 10 For the Northern District of California of the alleged fraud so as to allow Areas to prepare a response. Mission has alleged that specific 5 United States District Court 4 alleges that its president, Rod Tafoya, asked Huy Pham, an Areas employee who was expressly 11 directed to inform subconcessionaires of these restrictions, at a site visit on June 2, 2010 whether 12 there were any special construction issues and that Pham told Tafoya that there were not (what, 13 when, and where). As for the reasonableness element with which Areas is so concerned, Mission 14 also alleged that it had already executed a separate subcontract with Areas for a different concession 15 space, and that Areas represented that TA-21 would involve substantially similar costs as the first 16 space. This does speak to the reasonableness of Mission’s belief that Areas was providing accurate 17 representations upon which Mission could reasonably rely. Accordingly, Areas’s argument that 18 Mission failed to adequately plead the elements of fraud fails, and does not provide a basis for 19 dismissing the claim. 20 2. Whether Mission’s Claim is Foreclosed by the Subcontract 21 Next, Areas argues that Mission cannot now claim fraud because the subcontract expressly 22 provides that Areas made no warranties as to “the quality of construction of any improvements 23 within the premises or as to the condition of the premises, either express or implied, and that the 24 concessionaire and city expressly disclaim any implied warranty that the premises are or will be 25 suitable for subconcessionaire’s intended purposes.” See Complaint, Exh. B ¶ 22. Areas contends 26 that when a contract makes an express provision covering a topic, such as the absence of warranties 27 regarding the condition of the premises in this case, the parties are foreclosed from asserting that 28 fraudulent representations were made about that topic. Dkt. No. 50, pp. 7-9. See Okura & Co. v. 6 1 Careau Group, 783 F. Supp. 482, 500 (C.D. Cal. 1991) (finding that defendant could not prevail on 2 a fraudulent misrepresentation claim using parol evidence of oral promises by plaintiff not to call in 3 loan payments owed when the subject contract clearly set forth the loan payment schedule). 4 However, in this case, Mission contends that the subcontract term Areas points to does not 5 address its allegations, because the subcontract only speaks of the “premises,” which does not 6 include the security zone filled with special equipment beneath TA-21. Dkt. No. 53, p. 10. The 7 subcontract defines the “premises” as “Location TA-21 in Terminal A at the Norman Y. Mineta San 8 Jose International Airport.” Complaint, Exh. B, Exh. B thereto. The court agrees that a plain reading 9 of this definition includes only the TA-21 space itself, not the area beneath. Thus, it is not at all For the Northern District of California United States District Court 10 obvious that the subcontract disclaims any warranties that may have been made about construction 11 restrictions resulting from the location of the CTX machines, and the contract term may not actually 12 address the allegedly fraudulent representations Missions alleges Areas made. The holdings in 13 Okura and California Bagel. Co. v. American Bagel Co., both cited by Areas, do not extend to a 14 case like this one, where it is unclear whether the contract disclaimer covers the topic at issue. See 15 Cal. Bagel Co., LLC v. Am. Bagel Co., 2000 U.S. Dist. LEXIS 22898, *3-4 (C.D. Cal. June 2, 16 2000) (holding that a party may not base a claim for fraudulent misrepresentation on statements of 17 expected profitability when the opposing party provided written notice before the contract was 18 executed that no warranties would be made about profitability). 19 Indeed, Mission argues persuasively that Areas may not be permitted to avoid liability for 20 fraud simply by pointing to a contract disclaimer if, as Mission asserts, it failed to disclose any 21 information about the space below “the premises” even though it knew that the space below TA-21 22 presented significant construction restrictions that would materially affect the agreement between 23 the parties. See Dkt. No. 53, p. 11. California law holds that no contract may exempt a party from 24 liability for its own fraud, and that parol evidence may be admitted on a fraud in the inducement 25 claim to contradict a contract stipulation that attempts such an exemption. Cal. Civ. Code § 1668; 26 Manderville v. PCG&S Group, Inc., 146 Cal. App. 4th 1486, 1499-1501 (Cal. App. 4th Dist. 2007) 27 (citing 1 Witkin, Summary of Cal. Law (10th ed. 2005) Contracts, § 304, pp. 330–331 (“[A] party to 28 a contract . . . guilty of fraud in its inducement cannot absolve himself . . . by any stipulation in the 7 1 contract, either that no representations have been made, or that any right that might be grounded 2 upon them is waived. Such a stipulation or waiver will be ignored, and parol evidence of 3 misrepresentations will be admitted, for the reason that fraud renders the whole agreement voidable, 4 including the waiver provision.”)). Areas’s argument that the contract term “forecloses” Mission’s 5 assertion must therefore fail. 6 Accordingly, the court is unable to conclude at this stage that Mission’s fraud claim is 7 foreclosed by the contract term regarding warranties made about the “premises” because (1) it is not 8 clear that the contract term addresses Mission’s specific allegations; and (2) it is contrary to 9 California law to find as a matter of law that no fraud has occurred based solely on a contract For the Northern District of California United States District Court 10 11 provision that might itself be the product of a fraud. Areas also argues that to the extent Mission alleges misrepresentations that are actually 12 statements of opinion rather than fact, such statements are not actionable under a claim for fraud. 13 Dkt. No. 50, p. 8. Areas appears to be focusing on Mission’s allegations that Huy Pham told Rod 14 Tafoya that the cost of building out TA-21 would be substantially similar to the cost of building out 15 the other concession space Areas had leased to Mission. See SAA ¶¶ 35-36. General statements of 16 valuation “are not misrepresentations, amounting to deceit, nor are they to be regarded as statements 17 of existing facts, upon which an action for deceit may be based, but rather as the expressions of 18 opinions or beliefs.” Lehigh Zinc & Iron Co. v. Bamford, 150 U.S. 665, 673 (U.S. 1893). Areas is 19 correct in its assertion, and the court agrees that Mission cannot base its fraud claim on Pham’s 20 alleged statements about the expect build-out costs, even if those costs were substantially higher 21 than the minimum capital improvement expenditure set forth in the subcontract. However, Mission 22 also alleges that “[d]espite his experience with [the previous potential subconcessionaire], and 23 Legends’ repeated warnings, Pham told Tafoya that there were no unusual construction issues with 24 the space.” SAA ¶ 33. This is not a statement of opinion, but one of material fact, and therefore a 25 valid basis for a claim of fraud. 26 27 In conclusion, Areas’s arguments in support of dismissing Mission’s claim for fraud in the inducement are unpersuasive. The claim is sufficiently pled. The motion to dismiss is DENIED. 28 8 1 B. Breach of Contract 2 Areas next argues that Mission’s counterclaim for breach of contract fails to state a claim 3 upon which relief can be granted. Dkt. No. 29, pp. 11-12. “A cause of action for damages for breach 4 of contract is comprised of the following elements: (1) the contract, (2) plaintiff's performance or 5 excuse for nonperformance, (3) defendant's breach, and (4) the resulting damages to plaintiff.” 6 Careau & Co. v. Sec. Pacific Bus. Credit, Inc., 222 Cal. App. 3d 1371, 1388 (1990). 7 Mission alleges that the subcontract between Areas and Mission obligated Areas to tell 8 Mission if it had any other agreements with the City (excluding, of course, the Prime Contract, 9 which was appended to the subcontract). In the subcontract, Areas expressly represented that it For the Northern District of California United States District Court 10 “ha[d] no other agreements with the City, other than the Prime Contract.” See Complaint, Exh. A 11 (“Subconcession Contract”). Mission alleges that there was a separate agreement resulting from 12 talks between City and Areas employees, in which the City instructed Areas to tell 13 subconcessionaires about the CTX machines below the space. SAA ¶ 24. Mission does not allege 14 that a written agreement was executed. 3 Mission contends that Areas’s misrepresentation about 15 other agreements it had with the City constituted a material breach of the subcontract that occurred 16 at the moment of execution, excusing Mission from any performance under the subcontract. SAA ¶ 17 57. 4 Mission’s vague allegations do not state a claim for breach of contract. There is no written 18 19 contract and no plausible allegation that the speakers intended to enter into a contract for the benefit 20 of Mission. There are no allegations of offer, acceptance, or consideration. The conversations 21 alleged do not create a contract. Rather, they further support Mission’s fraudulent inducement claim. As stated above, where a party has had multiple opportunities to amend and cannot state a 22 23 viable claim for relief, dismissal without leave to amend is appropriate. Metzler Inv. GMBH v. 24 Corinthian Colleges, Inc., 540 F.3d 1049, 1060 (9th Cir. 2008) (finding dismissal without leave to 25 3 26 27 28 In fact, at the July 31, 2012 hearing, counsel for Mission admitted that he did not believe any written contract resulted from the series of communications between Areas and City employees. 4 In its moving papers, Areas just misses the boat by arguing, incorrectly, that Mission claims that Areas breached a term in its original proposal to the City, which was incorporated into the Prime Contract. Areas also argues that the Prime Contract contains provisions that obligate Areas and Mission to comply with specific guidelines, rules, regulations, and the like that may be imposed by the City, but has not asserted that any specific guidelines addressing the CTX machines fall within the ambit of the Prime Contract’s provisions. 9 1 amend appropriate when a party has “multiple opportunities to amend and [is] unable to cure the 2 defects that required dismissal of [] previous complaints.”). See also Miller v. Rykoff-Sexton, Inc., 3 845 F.2d 209, 214 (9th Cir. 1988) (“An amendment would be ‘futile’ if there is no set of facts can 4 be proved which would constitute a valid claim or defense.”). Mission has now had four 5 opportunities to state a viable claim for breach of contract, without success. The court therefore 6 concludes that further amendments would be futile, and dismissal without leave to amend is 7 appropriate. Areas’s motion is GRANTED as to Mission’s breach of contract claim, without leave 8 to amend. 9 For the Northern District of California United States District Court 10 CONCLUSION Based on the foregoing, IT IS ORDERED THAT Areas’s motion to dismiss is GRANTED 11 IN PART AND DENIED IN PART. Mission’s fraud in the inducement claim is sufficiently pled. 12 Mission’s breach of contact claim fails to state a claim for relief and is now DISMISSED without 13 leave to amend. 14 Dated: August 1, 2012 15 HOWARD R. LLOYD UNITED STATES MAGISTRATE JUDGE 16 17 18 19 20 21 22 23 24 25 26 27 28 10 1 C11-04487 HRL Notice will be electronically mailed to: 2 Karin Bohmholdt Scott Bertzyk Denise Mayo Daniel Rockey Meryl Macklin 3 4 5 bohmholdtk@gtlaw.com bertzyks@gtlaw.com mayod@gtlaw.com daniel.rockey@hro.com meryl.macklin@bryancave.com Counsel are responsible for distributing copies of this document to co-counsel who have not registered for e-filing under the court’s CM/ECF program. 6 7 8 9 For the Northern District of California United States District Court 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 11

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?