San Francisco Baykeeper v. City Of San Jose et al

Filing 51

ORDER APPROVING 50 CONSENT DECREE. Signed by Judge Beth Labson Freeman on 8/11/2016. (blflc3S, COURT STAFF) (Filed on 8/11/2016)

Download PDF
RICHARD DOYLE, City Attorney (88625) NORA FRIMANN, Assistant City Attorney (93249) 2 LEAH S. GOLDBERG, Senior Deputy City Attorney (157278) Office of the City Attorney 200 East Santa Clara Street, 16th Floor 3 San Jose, California 95113-1905 Telephone Number: (408) 535-1900 4 Facsimile Number: (408) 998-3131 E-Mail Address: cao.main@sanjoseca.gov 1 5 6 7 8 9 10 11 Attorneys for Defendant CITY OF SAN JOS£ Daniel Cooper (Bar No. 153576) Drevet Hunt (Bar No. 240487) LAWYERS FOR CLEAN WATER, INC. 1004-A O'Reilly Avenue San Francisco, California 94129 Telephone: (415) 440-6520 Facsimile: (415) 440-4155 Email: daniel@lawyersforcleanwater.com Email: drev@lawyersforcleanwater.com , 12 13 14 15 16 17 George Torgun (Bar No. 222085) Erica Maharg (Bar No. 279396) SAN FRANCISCO BAYKEEPER 1736 Franklin Street, Suite 800 Oakland, California 94612 Telephone: (510) 735-9700 Facsimile: (510) 735-9160 Email: george@baykeeper.org Email: erica@baykeeper.org 18 Attorneys for Plaintiff SAN FRANCISCO BAYKEEPER 19 20 UNITED STATES DISTRICT COURT 21 NORTHERN DISTRICT OF CALIFORNIA 22 23 SAN FRANCISCO BAYKEEPER, a California non-profit corporation, Civil Case No.: 15-CV-00642-BLF [PROPOSED] CONSENT DECREE 24 25 Plaintiff, v. 26 CITY OF SAN JOSE, a municipality, et al., 27 28 Defendants. 1 CONSENT DECREE 2 The following Consent Decree is entered into by and between Plaintiff San 3 Francisco Baykeeper ("Plaintiff" or "Baykeeper") and Defendant City of San Jose, a 4 municipal corporation ("Defendant," "City," or "San Jose"). The entities entering into this 5 6 7 8 9 10 11 Consent Decree are each an individual "Party" and collectively the "Parties." WHEREAS, Baykeeper is a 501(c)(3) non-profit public benefit corporation dedicated to, among other things, the protection and enhancement of the water quality of the San Francisco Bay; WHEREAS, the City of San Jose is a municipal corporation established by California state law, with Departments of Transportation, Public Works, and Environmental Services; WHEREAS, the City of San Jose is an owner and operator of a Municipal 12 Separate Storm Sewer System that serves the City of San Jose ("San Jose MS4"); 13 WHEREAS, the City of San Jose is an owner and operator of a separate sewage 14 collection system that serves the City of San Jose that is not a part of the San Jose MS4 15 ("San Jose Collection System"); 16 17 18 19 WHEREAS, the San Jose MS4 is regulated by the Federal Water Pollution Control Act, 33 U.S.C. § 1251 et seq. ("Clean Water Act" or "CWA"), and is permitted under Municipal Regional Stormwater NPDES Permit, NPDES Permit No. CAS612008, Order No. R2-2015-0049, California Regional Water Quality Control Board, San 20 Francisco Bay Region ("MS4 Permit," "MRP," or "Permit"); 21 22 23 WHEREAS, the approach to demonstrating compliance with trash reduction requirements is outlined in the MRP; WHEREAS, on November 24, 2014, Baykeeper issued a sixty (60) day notice 24 letter ("Notice Letter") to Defendant. The Notice Letter informed Defendant of 25 Baykeeper's intent to file suit against it for alleged Clean Water Act violations of the MS4 26 Permit, including alleged unlawful discharges of pollutants from the San Jose MS4 and 27 28 alleged sewage discharges to the San Jose MS4 from the San Jose Collection System; 1 WHEREAS, on February 11, 2015, Baykeeper filed its complaint against San 2 Jose in the United States District Court for the Northern District of California, Civil Case 3 No. 15-CV-00642-BLF (hereinafter, "Complaint"); 4 WHEREAS, Defendant denies Baykeeper's allegations in the Complaint; 5 WHEREAS, the Parties, through their authorized representatives and without 6 either adjudication of the Complaint's claims or admission by San Jose of any alleged 7 8 9 10 11 violation or other wrongdoing, have chosen to resolve this action through settlement to avoid the costs and uncertainties of further litigation; WHEREAS, the Parties intend for this Consent Decree be consistent with regulatory requirements; and WHEREAS, all actions taken by San Jose pursuant to this Consent Decree will be made in compliance with all applicable federal, state and local rules and regulations. 12 NOW THEREFORE IT IS HEREBY STIPULATED BETWEEN THE PARTIES 13 AND ADJUDGED, ORDERED, AND DECREED BY THE COURT AS FOLLOWS: 14 1. The Court has jurisdiction over the subject matter of this Action pursuant to 15 Section 505(a)(1)(A) of the Clean Water Act, 33 U.S.C. § 1365(a)(1)(A). 16 2. Venue is appropriate in the Northern District pursuant to Section 505(c)(1) 17 of the Clean Water Act, 33 U.S.C. § 1365(c)(1). 18 19 20 21 3. The Complaint states claims upon which relief may be granted pursuant to Section 505 of the Clean Water Act, 33 U.S.C. § 1365. 4. Plaintiff has standing to bring this action. 5. The Court will retain jurisdiction over this matter for purposes of enforcing 22 the terms of this Consent Decree for the life of the Consent Decree, or as long thereafter 23 as is necessary for the Court to resolve any motion to enforce this Consent Decree. 24 25 I. 6. DEFINITIONS Unless otherwise expressly defined herein, terms used in this Consent 26 Decree that are defined in the Clean Water Act or in regulations, or in rules promulgated 27 under the Clean Water Act, have the meaning assigned to them in the applicable 28 1 statutes, regulations, or rules. Whenever terms listed below are used in this Consent 2 Decree, the following definitions apply: 3 a. "Annual Report" means a consolidated report containing reporting 4 obligations in the MRP and this Consent Decree and will be submitted to Baykeeper on 5 6 7 8 9 10 or before October 30,h of any Year this Consent Decree is in effect. b. "CCTV" means closed-circuit television. c. "Consent Decree" means this Consent Decree, and any exhibits and appendices incorporated by reference to this Consent Decree. d. "Critical Bacteria Storm" means the 90th percentile 24-hour wet weather day when bacteria receiving water limits apply. For San Jose, the Critical Bacteria Storm equates to a 24-hour storm event of 0.46 inches. 11 12 e. "Day" means a calendar day. In computing any period of time under this Consent Decree, where the last day of such period is a Saturday, Sunday, or 13 Federal, State, or City Holiday, the period runs until the close of business on the next 14 day that is not a Saturday, Sunday, or Federal, State, or City Holiday. 15 f. 16 17 18 19 "Dry Season" means the season from May 1 to September 30 of the same calendar Year. g. "FIB" means Fecal Indicator Bacteria. h. "Full Trash Capture System" means any single device or series of devices that traps all particles retained by a five millimeter mesh screen and has a 20 design treatment capacity of not less than the peak flow rate resulting from a one-Year, 21 one-hour storm in the sub-drainage area, which also includes a trash reservoir large 22 enough to contain a reasonable amount of trash safely without overflowing trash into the 23 24 25 26 overflow outlet between maintenance events. i. "Gravity Sewer" means pipes within San Jose's Collection System that convey wastewater by gravity flow. j. . "Infeasible" means cannot be accomplished due to soil type, 27 groundwater contamination, physical limitations, or engineering impossibility. Infeasible 28 1 shall not mean lack of funding. 2 3 k. "Low Impact Development" means a Treatment Control that uses or mimics natural processes that result in the infiltration, evapotranspiration, biotreatment or 4 use of stormwater in order to protect water quality and associated habitat. 5 I. "MS4" means "a conveyance or system of conveyances (including 6 roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, 7 8 9 10 11 man-made channels, or storm drains)" owned or operated by a State, city, or town that is "designed or used for collecting or conveying storm water" and "that discharges to waters of the United States." See 40 C.F.R. § 122.26(b)(8); see also id. § 122.26(b)(18). m. "Multi-Benefit Project" means a Treatment Control project designed to achieve any of the benefits set forth in section 10562, subdivision (d) of the Water Code. Examples include projects designed to infiltrate, recharge, biotreat, or store 12 Stormwater; develop or enhance habitat and open space through Stormwater and non- 13 Stormwater management; and/or reduce Stormwater and non-Stormwater runoff volume. 14 n. "San Jose Collection System" is comprised of the City of San Jose's 15 sanitary sewer collection system, including the sewer pipes and lines, manholes or 16 17 18 19 maintenance holes, and all appurtenances thereto owned by San Jose that are used to convey wastewater generated by residential, commercial, and industrial sources to the Water Pollution Control Plant. o. "Sanitary Sewer Overflow" or "SSO" means any overflow, spill, 20 release, discharge, or diversion of untreated or partially treated wastewater from the San 21 Jose Collection System. SSOs include: (1) overflows or releases of untreated or 22 partially treated wastewater that reach waters of the United States; (2) overflows or 23 releases of untreated or partially treated wastewater that do not reach waters of the 24 United States; and (3) wastewater backups into buildings and on private property that 25 are caused by blockages or flow conditions within the publicly owned portion of the San 26 Jose Collection System. 27 28 p. "Sewer Line Segment" means any section of publicly owned sewer 1 line or pipe located between: (1) two manholes/maintenance holes; (2) a pump station 2 and a manhole/maintenance hole; (3) a pump station or a manhole/maintenance hole 3 and a headworks structure; or (4) a sewer line or pipe otherwise identifiable as a discrete 4 section. 5 q. "Stormwater" has the meaning set forth in 40 C.F.R. § 6 122.26(b)(13). 7 8 9 10 11 r. "Trash" consists of litter and particles of litter. Litter means all improperly discarded waste material, including, but not limited to, convenience food, beverage, and other product packages or containers constructed of steel, aluminum, glass, paper, plastic, and other natural and synthetic materials, thrown or deposited on the lands and waters of the State, but not including the properly discarded waste of the primary processing of agriculture, mining, logging, sawmilling, or manufacturing. 12 s. "Trash Hot Spots" means locations of high trash density along 13 receiving water bodies, selected pursuant to Provision C.10.c of the MS4 Permit. 14 t. 15 16 17 18 19 "Treatment Controls" means best management practices to either: (1) remove or biotreat pollutants and/or solids from Stormwater runoff, wastewater, or effluent; or (2) capture, infiltrate, reuse, or biotreat Stormwater runoff, wastewater, or effluent. Treatment Controls include Full Trash Capture Systems, Low Impact Development Controls and Multi-Benefit Projects. u. "Very High, High, or Moderate Trash Generation Areas" are areas 20 that are considered to generate more than five (5) gallons of trash per acre per Year and 21 has the meaning set forth in the MS4 Permit. 22 23 24 25 26 27 28 v. "Waters of the United States" has the meaning as set forth in 40 C.F.R. § 122.2 and as interpreted in applicable case law. w. "Wet Weather" means a time period within 48 hours after a storm event in excess of 0.2 inches in depth. x. "Year" means calendar year, unless otherwise specified. II. 1 2 3 7. EFFECT OF CONSENT DECREE Notwithstanding the general objectives of this Consent Decree, Baykeeper does not, by its consent to this Consent Decree, warrant or aver in any manner that San 4 Jose's compliance with this Consent Decree will constitute or result in compliance with 5 any federal, state, or local law or regulation. This Consent Decree is neither a permit nor 6 a modification of existing permits under any federal, state, or local law and in no way 7 8 9 10 relieves San Jose of its responsibilities to comply with all applicable federal, state, and local laws and regulations. 8. The Parties enter into this Consent Decree for the purpose of avoiding costly litigation. Nothing in this Consent Decree will be construed as an admission by San Jose, and San Jose does not intend to imply any admission as to any fact, finding, 11 issue of law, or violation of law, nor will compliance with this Consent Decree be 12 construed as an admission by San Jose of any fact, finding, conclusion, issue of law, or 13 violation of law. 14 III. APPLICABILITY 15 9. 16 17 18 19 The provisions of this Consent Decree apply to and bind the Parties, including any successors or assigns. The Parties certify that their undersigned representatives are fully authorized to enter into this Consent Decree, to execute it on behalf of the Parties, and to legally bind the Parties to its terms. 10. The Parties agree to be bound by this Consent Decree and not to contest 20 its validity in any subsequent proceeding to implement or enforce its terms. 21 11. No change in ownership or corporate or other legal status of San Jose or 22 any transfer of San Jose's assets or liabilities will in any way alter the responsibilities of 23 24 25 San Jose, or any of its successors or assigns, under this Consent Decree. 12. In any action to enforce this Consent Decree, San Jose will not raise as a defense the failure by any of its agents, servants, contractors, employees, and 26 successors or assigns to take actions necessary to comply with this Consent Decree. 27 28 IV. 1 13. 2 3 The Effective Date of this Consent Decree will be the date that the Court enters the final Consent Decree. 14. 4 5 AGENCY REVIEW, EFFECTIVE DATE AND TERMINATION DATE Plaintiff shall: (a) submit this Consent Decree by certified mail to the United States Department of Justice and the Environmental Protection Agency 6 (collectively, "Federal Agencies") within three (3) business days of the Parties' execution 7 8 9 10 11 of this Consent Decree for agency review consistent with 40 C.F.R. § 135.5; and (b) lodge this (proposed) Consent Decree with the District Court. In the event the Federal Agencies comment negatively on the provisions of this Consent Decree, the Parties agree to meet and confer to resolve the issues raised by the Federal Agencies. After the Federal Agencies have either completed their review of this Consent Decree without objection or the 45-day agency review period has expired, whichever is earlier, Plaintiff 12 shall promptly request that the District Court enter this Consent Decree, and within five 13 (5) days of entry of the Consent Decree, move to dismiss the Complaint and all claims 14 therein with prejudice pursuant to Federal Rule of Civil Procedure 41(a)(2). 15 16 15. This Consent Decree will terminate ten (10) Years from the Effective Date ("Termination Date"). 17 18 V. TRASH REDUCTION PROGRAM A. 19 20 Trash Reduction Requirements 16. waters in accordance with the following schedule: 21 a. 70% by July 1,2017; and 22 23 24 25 26 27 28 San Jose shall reduce trash discharges from 2009 levels to receiving b. 80% by July 1, 2019. B. . Compliance with the MS4 Permit 17. San Jose is required to comply with the requirements of Section C.10 of the MS4 Permit. 18. If San Jose revises its Long-Term Trash Reduction Plan at any time during the term of this Consent Decree, San Jose will provide the revised Long-Term Trash 1 Reduction Plan to Baykeeper no later than thirty (30) days after submission of the 2 revision. 3 4 5 C. Receiving Water Monitoring Program 19. San Jose shall develop and implement a receiving water monitoring program designed to answer the following questions: a. 6 Have trash control actions effectively prevented trash within San 7 Jose's jurisdiction from discharging into receiving water(s)? b. 8 Is trash present in receiving water(s), including transport from one 9 receiving water to another, e.g., from a creek to a San Francisco Bay segment, at levels 10 that may cause adverse water quality impacts? c. 11 12 MS4 pathways and non-MS4 pathways? d. What is the characterization of trash types in these receiving e. 13 14 What proportions of trash found in these receiving waters are from Has the amount of trash discharged from the San Jose MS4 waters? 15 decreased from the previous year and over time? If so, by how much? If not, why? 16 f. Has the amount of trash at the Trash Hot Spots decreased from the 17 previous year? 18 20. 19 20 21 22 23 24 25 The receiving water monitoring program shall include direct measurements or observations of trash in receiving water(s), or in scenarios where direct measurements or observations are not feasible, surrogates for trash in receiving water(s), such as measurement of trash on stream banks or shorelines. 21. San Jose will develop the Receiving Water Monitoring Program which includes criteria for designating which types of trash are associated with non-MS4 pathways, including criteria based on: (a) trash size (i.e., too large for discharge through an MS4 system), (b) location (i.e., proximity to homeless encampment or illegal dumping 26 site), and (c) type of material. San Jos6 shall provide the Receiving Water Monitoring 27 Program to Baykeeper for comment within sixty (60) days of the Effective Date. 28 1 Baykeeper will submit comments, if any, on the Receiving Water Monitoring Program 2 within thirty (30) days of receipt. San Jose will consider Baykeeper's comments in good 3 faith within thirty (30) days of receipt, and will either incorporate those comments into the 4 criteria or explain in writing why those comments were not accepted. Disputes as to the 5 adequacy of the Receiving Water Monitoring Program shall be resolved through the 6 Dispute Resolution provisions in Section XII below. 22. 7 8 9 Receiving water monitoring will be conducted once annually during the Dry Season at the six (6) Trash Hot Spots identified in Table 1. Receiving water monitoring shall begin during the 2017 Dry Season. Table 1. Receiving Water Monitoring Locations at Designated Trash Hot Spots 10 Trash Hot Spot 1) 12 SJC02 Coyote Creek at 101 (Watson Park) 2) 11 SJC08 Coyote Creek at Roosevelt Park 3) 13 SJC25a Coyote Creek at Singleton Rd. 4) SJC23 Confluence of Guadalupe River at W. Santa Clara St. 5) SJC27 Guadalupe River upstream of Woz Way to Interstate 280 14 6) SJC31 Guadalupe River at Alma 15 23. San Jose shall collect and record the following data for each monitoring 16 event: 17 a. Tons and estimated volume of trash removed; 18 b. Types of trash removed (trash characterization); and 19 c. Estimated proportion of trash from MS4 and non-MS4 sources. 20 24. San Jose shall sort and characterize trash removed from each of the seven 21 (7) monitoring sites. Information will be collected using the most current Santa Clara 22 Valley Urban Runoff Pollution Prevention Program ("SCVURPPP") "Trash Hot Spot 23 24 25 26 27 Cleanup Data Collection Form." 25. Based on this monitoring data, San Jose shall annually conduct an analysis to answer the questions set out in Paragraph 19 above. This analysis will be included in the Annual Report. 26. San Jose shall retain documentation of the Receiving Water Monitoring Program, including the trash condition before and after the cleanup of the entire Trash 28 1 Hot Spot using photo documentation with a minimum of one (1) photo per hundred feet 2 of Trash Hot Spot length. Photo documentation will be completed in accordance with the 3 most current SCVURPPP "Photograph Documentation Protocol for Creek and Shoreline 4 Trash Hot Spots" protocol. 5 D. 27. 6 7 8 9 San Jose shall, in addition to the 1,328 acres currently in place, install and maintain Full Trash Capture Systems sufficient to treat runoff from 3,000 acres of Very High, High, or Moderate Trash Generation Areas. The Full Trash Capture Systems shall be fully installed and operational by October 1, 2017. 28. 10 11 Full Capture Systems San Jose will maintain the Full Trash Capture Systems in accordance with Section C.IO.b.i of the MS4 Permit. If San Jose reduces the frequency of inspections, San Jose shall report such reduction in that Year's Annual Report and provide 12 supporting documentation to Baykeeper. Disputes shall be resolved through the Dispute 13 Resolution provisions in Section XII below. 14 29. 15 16 17 18 19 Maintenance shall include visual inspection and removal of all accumulated trash when the device is plugged or is greater than fifty (50) percent full of accumulated trash. If a Full Trash Capture System requires removal of accumulated trash, San Jose will inspect the device again within thirty (30) days after the accumulated trash was removed. If the device is plugged or is greater than fifty (50) percent full of accumulated trash at that time, San Jose will remove the accumulated trash from Full Trash Capture 20 System again and develop a device-specific inspection and maintenance plan to ensure 21 the device is neither plugged nor more than half full of trash at the next maintenance 22 event. 23 24 25 E. Trash Hot Spots 30. San Jose will clean Trash Hot Spots to a level of "no visual impact" at least one time per Year. This entails removal of all trash, debris, and historic derelict material 26 (e.g., tires, barrels and shopping carts) in excess of two (2) inches in diameter. Trash 27 Hot Spots must be at least 100 yards of creek length or 200 yards of shoreline length. 28 1 2 3 San Jose agrees to maintain a total number of thirty-two (32) Trash Hot Spots. 31. With the exception of the following modifications, San Jose will maintain the existing Trash Hot Spots, as identified by the SCVURPPP in Trash Hot Spot 4 Selection: Final Report, submitted to the California Regional Water Quality Control 5 Board, San Francisco Bay Region ("Regional Water Board") on June 29, 2010, and: a. 9 10 11 32. Add Coyote Creek downstream of East Capital Expressway; d. 8 Add Coyote Creek at Berryessa Road; c. 7 Discontinue SJC01, SJC17, and SJC20; b. 6 Add Coyote Creek at Story and Senter Road. San Jose will modify the existing Trash Hot Spots to include the Trash Hot Spots identified in Paragraph 31 within ninety (90) days of the Effective Date of this Consent Decree. 12 33. San Jose will annually assess Trash Hot Spot locations and may select 13 new Trash Hot Spot locations if, based on cleaning and reporting as required in this 14 Section, existing Trash Hot Spot locations are no longer Trash Hot Spots or if other 15 locations may better align with trash management areas. San Jose will consult with 16 17 18 19 20 21 22 23 24 25 26 27 28 Baykeeper on sites proposed for addition to or removal from the Trash Hot Spot list. F. Trash Program Reporting and Action Plan 34. San Jose shall provide the information required by the MS4 Permit, sections C.IO.b.i.b, C.10.c.iii, and C.10.f, to Baykeeper as part of its Annual Report pursuant to this Consent Decree, except that each Annual Report shall include an updated trash generation area map or maps, which include trash management areas, including the locations and associated drainage areas of full trash capture systems and other trash control actions, and the locations of Trash Hot Spots, with highlights or other indication of any revisions or changes from the previous year map(s). 35. In the event that San Jose is obligated to prepare a Trash Action Plan under Section C.IO.f.v of the MS4 Permit, San Jose will provide a copy of the Trash Action Plan to Baykeeper prior to submission. Baykeeper will review the Trash Action 1 Plan and must submit comments, if any, on the Trash Action Plan within fifteen (15) days 2 of receipt. San Jose will consider Baykeeper's comments in good faith within thirty (30) 3 days from receipt of Baykeeper's comments. San Jose will either incorporate those 4 comments into the Trash Action Plan or explain in writing why those comments were not 5 accepted. Disputes as to the adequacy of a Trash Action Plan shall be resolved through 6 the Dispute Resolution provisions in Section XII below. 7 36. For any trash control action that involves public education, including trash 8 reduction marketing campaigns, San Jose will employ its best efforts to positively credit 9 the partnership between Baykeeper and San Jose and offer Baykeeper the opportunity 10 to co-brand any media and marketing materials, if appropriate. VI. 11 12 37. FECAL INDICATOR BACTERIA ASSESSMENT PROGRAM Within 120 days of the Effective Date, San Jose shall develop and submit 13 to Baykeeper a monitoring plan to characterize Wet Weather concentrations and source 14 types of fecal indicator bacteria ("FIB") from designated sites ("FIB Monitoring Plan"). 15 Data produced pursuant to the FIB Monitoring Plan shall not be utilized to determine 16 compliance with FIB load reduction requirements. 17 38. The purpose of the FIB Monitoring Plan is to address the following 18 questions: a. 19 What are the wet weather in-stream FIB concentrations upstream of 20 the San Jose MS4? b. 21 What are the wet weather in-stream FIB concentrations within 22 reaches influenced by the San Jose MS4? 23 39. To address Paragraph 38.a above, the City will collect samples from 24 receiving waters during fifteen (15) wet weather events within the first five (5) Years after 25 the Effective Date from two (2) in-stream monitoring locations located immediately 26 upstream of the influence of the San Jose MS4: one (1) location within Coyote Creek, at 27 Metcalf Park (37.23514N, -121.76194W); and one (1) location in Los Gatos Creek at 28 1 Hamilton Avenue (37.29444N, -121.93312W). Samples will be analyzed for, at a 2 minimum, E.coli and Enterococci. 3 40. To address Paragraph 38.b above, the City will collect samples from 4 receiving waters during fifteen (15) wet weather events within the first five (5) Years after 5 the Effective Date from six (6) in-stream monitoring locations located in reaches 6 influenced by the San Jose MS4: two (2) locations within Coyote Creek, two (2) locations 7 within the Guadalupe River, one (1) location within Los Gatos Creek, and one (1) 8 location within Penitencia Creek. Sampling locations will be identified in the FIB 9 Monitoring Plan and will be located such that they represent well-mixed areas 10 downstream of MS4 outfalls draining urban areas. Samples will be analyzed for, at a 11 12 13 minimum, E.coli and Enterococci. 41. The FIB Monitoring Plan shall include a section on quality assurance protocols to ensure validity and quality of the data collected, in general accordance with 14 EPA Guidance for Quality Assurance Project Plans (EPA QA/G-5), December 2002, 15 EPA/240/R-02/009. This section shall also identify the laboratory or laboratories to 16 conduct the analyses and describe the methods for sample preparation and shipping. 17 18 42. Baykeeper will review the FIB Monitoring Plan and submit comments, if any, within thirty (30) days of receipt. San Jose shall consider Baykeeper's comments in 19 good faith, and shall have thirty (30) days from receipt of Baykeeper's comments to 20 either incorporate those comments into the FIB Monitoring Plan or explain in writing why 21 those comments were not accepted. Disputes as to the adequacy of the FIB Monitoring 22 Plan are to be resolved via Dispute Resolution as set out in Section XII below. 23 43. All monitoring results generated for the prior Year shall be summarized, 24 with corresponding original lab results, and submitted to Baykeeper by October 30th of 25 26 27 28 each of the five (5) sampling years. VII. 1 2 A. FIB Load Reduction Standard 44. 3 FIB Load Reduction and Comprehensive Load Reduction Plan The FIB load reduction standard shall be achieved through reductions in 4 flow from each sub-watershed of the San Jose MS4 to receiving waters, equivalent to full 5 retention of the Critical Bacteria Storm ("FIB Load Reduction Standard"). The Critical 6 Bacteria Storm shall be based upon a 22% exceedance rate. Following the methods 7 utilized in the Enhanced Watershed Management Program forBallona Creek Watershed 8 and Appendix I of the Total Maximum Daily Loads for Indicator Bacteria, Project I 9 Twenty Beaches and Creeks in the San Diego Region (Including Tecolote Creek): 10 Methodology for Calculating TMDLs for Impaired Beaches and Creeks and Allocating to 11 Sources, a 22% exceedance rate correlates to a Critical Bacteria Storm of 0.46 inches, 12 based on historic precipitation data for San Jose (NOAA National Climactic Data Center 13 http://www.ncdc.noaa.gov/cdo-web/precipation data record for the San Jose, CA station 14 GHCND: USC0047821, January 1, 1950 to September 30, 2007), which is approximately 15 16 17 equivalent to the 82nd percentile 24-hour storm. B. Reasonable Assurance Analysis and Comprehensive Load Reduction Plan 45. San Jose shall develop and implement a Comprehensive Load Reduction 18 Plan ("CLRP") to meet the FIB Load Reduction Standard, as defined in Paragraph 44 by 19 October 1, 2050. The CLRP shall be developed in a manner consistent with the 20 Guidelines for Conducting Reasonable Assurance Analysis in a Watershed 21 Management Program, Including an Enhanced Watershed Management Program, 22 developed pursuant to the Los Angeles County MS4 Permit, Order No. R4-2012-0175 23 ("eWMP Guidance"). 24 46. The CLRP shall include a Reasonable Assurance Analysis ("RAA") and 25 shall be supported by a process-based Best Management Practice ("BMP") 26 Performance Model referenced in Table 1 of the eWMP Guidance, to demonstrate that 27 implementation of prescribed structural and non-structural BMPs shall, with a 28 1 reasonable level of assurance, achieve the FIB Load Reduction Standard by October 1, 2 2050. 3 47. The CLRP shall include a Maintenance and Monitoring Plan ("MMP"), to 4 assure maintenance of BMPs and implementation of a monitoring program sufficient to 5 determine compliance with the FIB Load Reduction Standard. The monitoring program 6 shall not be required to include end of pipe monitoring. 7 48. The CLRP shall include detailed description of each regional Multi-Benefit 8 Project, consistent with Section D.l.a of the eWMP Guidance. Description of other 9 Treatment Controls deemed necessary to achieve the FIB Load Reduction Standard 10 shall be described consistent with Sections D.l.a or D.l.b of the eWMP Guidance. For 11 the purposes of modeling pollutant load and flow reductions, data on performance of 12 regional Multi-Benefit Projects and other Treatment Controls shall be drawn only from 13 peer-reviewed sources, including but not limited to sources such as the International 14 Stormwater BMP Database (available at http://www.bmpdatabase.org/). 15 49. The CLRP will prioritize site selection of Multi-Benefit Projects and Low 16 Impact Development installations to achieve applicable water quality-based effluent 17 limitations, waste load allocations, and receiving water limitations associated with trash, 18 polychlorinated biphenyls ("PCBs"), mercury, and other pollutants, to the extent 19 appropriate. For the purposes of RAA modeling, FIB shall serve as the "limiting 20 pollutant," pursuant to the eWMP Guidance. 21 50. The CLRP shall include a schedule and estimated budget of 22 implementation designed to achieve compliance with the schedule for implementation, 23 established in Paragraph 53 of this Consent Decree. The budget and schedule shall be 24 sufficiently robust to support a financial analysis to evaluate funding needs. 25 51. Baykeeper shall review the draft CLRP and submit comments, if any, within 26 thirty (30) days of receipt, consistent with the schedule established in Paragraph 53 of 27 this Consent Decree. San Jose shall consider Baykeeper's comments in good faith, and 28 1 shall have thirty (30) days from receipt of Baykeeper's comments to either incorporate 2 those comments into the CLRP or explain in writing why those comments were not 3 accepted. Disputes as to the acceptance of Baykeeper's comments on the CLRP are to 4 be resolved via Dispute Resolution as set out in Section XII below. 52. 5 Upon completion of the final CLRP, San Jose must perform assessments 6 of their best management practices every two (2) Years. Reported outcomes must be 7 expressly compared to the FIB Reduction Standard of this Consent Decree. 8 Performance assessment reporting must include: a. The status of completion of proposed structural treatment control 11 b. The status of implementation of nonstructural BMPs; 12 c. Information related to the validity of the RAA performed in support of 9 10 BMPs; 13 the CLRP and any underlying assumptions and risks; and d. 14 15 16 implementation of the CLRP on receiving water quality. C. 19 20 Subject to, and contingent upon, the City receiving sufficient new revenue sources as set forth in Section D, Paragraphs 54-56 below, implementation of milestones and compliance with the FIB Load Reduction Standard and implementation of the CLRP shall be completed on the following schedule: a. 21 22 Implementation Schedule 53. 17 18 The results of any monitoring undertaken to evaluate the impact of San Jose shall contract with a qualified consultant to develop the CLRP and RAA by June 30, 2017. b. 23 The framework for the CLRP that meets the requirements of Section C.3.j.i(1) of the MS4 Permit will be completed by June 30, 2017. 24 c. A draft CLRP shall be submitted to Baykeeper by February 28, d. A final CLRP shall be submitted to Baykeeper by July 31, 2020. e. The Parties shall meet and confer to discuss the CLRP and identify 25 2020. 26 27 28 1 the highest priority projects identified in the final CLRP for implementation during the life 2 of this Consent Decree by November 20, 2020. If unforeseen delays occur in meeting 3 the implementation schedule, including but not limited to permitting or a legal challenge, 4 despite all good faith efforts of San Jose, the Parties shall meet and confer regarding 5 the implementation schedule. 6 7 8 9 10 11 f. San Jose shall appropriate a total of at least one hundred million dollars ($100,000,000) over a 10-year period to implement the CLRP, including but not limited to the acquisition of land, environmental review, design, construction, operation, and maintenance of projects identified in the final CLRP. g. San Jose shall procure consultant services on or before September 1, 2021, for the purposes of implementing projects identified in the final CLRP totaling at least one hundred million dollars ($100,000,000) over a 10-year period. 12 h. On or before September 1, 2024, San Jose shall complete the 13 design, environmental, and geotechnical analysis of projects identified in the final CLRP 14 representing at least twenty-five million dollars ($25,000,000) in total project costs. 15 i. 16 17 18 19 20 21 On or before September 1, 2025, San Jose shall award contracts for projects identified in the CLRP totaling at least twenty-five million dollars ($25,000,000). j. On or before September 1, 2025, San Jose shall complete the design, environmental, and geotechnical analysis of projects identified in the final CLRP representing at least thirty-five million dollars ($35,000,000), inclusive of sub-paragraph h above, in total project costs. k. On or before the Termination Date, San Jose shall award contracts 22 for projects identified in the CLRP totaling at least thirty-five million dollars 23 ($35,000,000), inclusive of sub-paragraph i above, in total project costs. 24 I. On or before the Termination Date, San Jose shall complete the 25 design, environmental, and geotechnical analysis of projects identified in the final CLRP 26 representing at least fifty million dollars ($50,000,000), inclusive of sub-paragraphs h 27 and j above, in total project costs. 28 m. 1 At least ninety (90) days prior to the Termination Date, San Jose 2 shall provide to Baykeeper a final implementation letter. The final implementation letter 3 shall provide sufficient information and detail to demonstrate that San Jose has 4 undertaken and will have completed sufficient activities to fully comply with the 5 implementation schedule in this Paragraph by the Termination Date. The final 6 implementation letter shall be subject to review, comment, and the Dispute Resolution 7 8 9 10 11 12 provisions in Section XII below. D. Funding 54. The Parties recognize that the City will need additional revenue sources to implement the projects included in the CLRP. City staff will identify potential funding sources, including state and federal sources, and make all best efforts to submit timely and complete applications for the following grants, at a minimum and as available: a. Prop 84 Grants 13 b. Proposition 1 Planning Grants 14 c. Proposition 1 Implementation Grants 15 16 17 18 19 20 21 22 23 24 25 26 27 28 55. The City shall bring additional possible revenue measures intended to seek. funding to implement the CLRP, to the City Council for consideration by December 31, 2017. Nothing in this paragraph obligates the City Council to take a particular legislative action. Revenue measures may include: a. Stormwater sewer fee b. Stormwater sewer tax c. Bond 56. If San Jose is unable to obtain funding by December 31, 2020 sufficient to implement the CLRP and meet the FIB Load Reduction Standard, the Parties shall meet and confer to discuss what measures San Jose will take to ensure funding is acquired. If San Jose has not obtained funding sufficient to implement the CLRP by December 31, 2020, Baykeeper may, in its discretion, terminate this Consent Decree. If Baykeeper 1 chooses not to terminate this Consent Decree, the Parties will work together to identify 2 other sources of funding available for San Jose to implement the CLRP and meet the 3 FIB Load Reduction Standard. 57. In any public communications related to fee or tax increase(s) related to this 4 5 Consent Decree, San Jose will not negatively cite Baykeeper or this Consent Decree as 6 the reason for such fee or tax increase(s), and will allow Baykeeper, to the extent 7 practicable, to review any media or marketing materials in advance of their release to the 8 public. VIII. 9 10 11 A. COLLECTION SYSTEM IMPROVEMENT PROGRAM Exfiltration Abatement Program 58. San Jose shall develop and implement an Exfiltration Abatement Program. 12 The goal of this program is to identify and prioritize for pipe rehabilitation, replacement or 13 repair the Gravity Sewer lines that have a high risk of leaking wastewater from the San 14 Jose Collection System to the San Jose MS4. 15 16 59. As part of this Program, San Jose shall identify Sewer Line Segments meeting all of the following criteria: (1) Sewer Line Segments that are constructed of 17 vitrified clay or reinforced concrete; (2) Sewer Line Segments that cross above MS4 18 pipes or are above and within ten (10) feet horizontally of MS4 pipes; (3) Sewer Line 19 Segments fifty Years or older, with a condition assessment that identifies that the Sewer 20 Line Segment has a medium to severe crack, offset joint, or some other structural defect 21 of Grade 4 or higher according to PACP standards; and (4) Sewer Line Segments that 22 are above the water table ("High Risk Pipes"). All Sewer Line Segments in the San Jose 23 Collection System for which San Jose already possesses necessary information to 24 evaluate using criteria (1)-(4) of this Paragraph shall be evaluated and designated as 25 High Risk Pipes, as appropriate, by December 31, 2016. All other Sewer Line Segments 26 in the San Jose Collection System meeting requirements (1), (2) and (4) of this 27 Paragraph shall be inspected using CCTV, ranked according to PACP standards, and 28 1 designated High Risk Pipes, as appropriate, by December 31, 2019. 60. 2 3 San Jose shall repair, rehabilitate, or replace all discovered High Risk Pipes totaling on average at least six and a half (6.5) miles of High Risk Pipes each Year 4 (equal to at least sixty-five (65) miles over the term of the Consent Decree). 61. 5 If San Jose completes repair, rehabilitation and replacement of all the High 6 Risk Pipes and that total is less than sixty-five (65) miles, San Jose shall continue to 7 repair, rehabilitate, or replace Sewer Line Segments totaling on average at least six and 8 a half (6.5) miles per Year (at least sixty-five (65) miles over the term of the Consent 9 Decree) based on the following criteria: (1) Sewer Line Segments that cross above MS4 10 pipes or are above and within ten (10) feet horizontally of MS4 pipes; and (2) a condition 1 1 assessment identifies that the Sewer Line Segment has a medium to severe crack, offset 12 joint, or some other structural defect of Grade 4 or higher according to PACP standards. 62. 13 By December 31, 2016, and thereafter by October 30 of each Year this 14 Consent Decree remains in effect, San Jos6 shall submit an Annual Exfiltration 15 Abatement Program Plan to Baykeeper. The Annual Exfiltration Abatement Program 16 Plan shall be designed to eliminate the threat to water quality from High Risk Pipes and 17 shall: 18 a. Describe the Exfiltration Abatement Program activities for the 19 preceding fiscal year; 20 b. Identify all San Jose MS4 pipes and Sewer Line Segments San 21 Jose considered to determine which Sewer Line Segments are High Risk Pipes; which 22 High Risk Pipes San Jose considered for repair, rehabilitation, and replacement; and 23 24 25 26 27 28 which of those San Jose intends to repair, rehabilitate, or replace during that fiscal year; c. Include an ESRI GIS Shapefile for the pipes identified in sub­ paragraph b above that contains the pipe ID number, upstream manhole identifier, downstream manhole identifier, upstream and downstream invert elevations, pipe age (for Sewer Line Segmentsonly), pipe material (for Sewer Line Segments only), pipe diameter, and whether the specific Sewer Line Segment was selected for repair, 1 rehabilitation, or replacement; and d. 2 3 prioritize the Sewer Line Segments selected for repair, rehabilitation, or replacement. 63. 4 5 Describe how the factors listed in Paragraph 59 were used to Baykeeper will review the Annual Exfiltration Abatement Program Plan and submit comments, if any, on the Annual Exfiltration Abatement Program Plan within thirty 6 (30) days of receipt. San Jose shall consider Baykeeper comments in good faith, and 7 shall have fifteen (15) days from receipt of Baykeeper's comments to either incorporate 8 those comments into the Annual Exfiltration Abatement Program Plan or explain in 9 10 writing why those comments were not accepted. Disputes as to the adequacy of the Annual Exfiltration Abatement Program Plan shall be resolved via the Dispute Resolution 11 provisions in Section XII below. 12 B. CAPACITY ASSURANCE 64. 13 On or before December 21, 2017, San Jos6 shall review San Jose's 2013 14 Trunk System Master Plan, the capacity assessment associated with that Master Plan, 15 and any other appropriate documents, to generate a Capacity Assurance Program for 16 the trunk system. The Capacity Assurance Program shall evaluate whether San Jose 17 has adequate capacity to prevent capacity related SSOs from the trunk system during 18 rain events up to and including a 10-Year 24-Hour Storm, recommend capacity 19 improvement, where appropriate, and prioritize and plan identified capacity projects 20 sufficient to ensure adequate capacity to prevent spills up to the 10-Year 24-Hour Storm. 21 22 23 C. ANNUAL COLLECTION SYSTEM REPORT 65. Beginning in 2017, San Jose shall submit an Annual Collection System Report to Baykeeper, along with its Annual Report. The Annual Collection System 24 Report shall provide details relevant to San Jose's implementation of, and compliance 25 with, this Section VIII during the preceding Year, including: 26 a. Any program modifications or delays during the preceding Year; 27 b. CCTV inspection schedules in the upcoming Year for inspection of 28 1 Gravity Sewers. c. 2 A statement of: i. The miles of Sewer Line Segments that were assessed in the ii. 3 The miles of Sewer Line Segments assessed receiving each 4 preceding Year; 5 6 grade in the PACP grading system; iii. 7 8 Segments repaired, rehabilitated, and/or replaced during the preceding Year; and iv. 9 10 11 12 13 14 15 16 17 66. 20 21 22 23 24 25 26 27 28 A map of the Sewer Line Segments cleaned. Baykeeper will submit comments, if any, on the Annual Collection System Report within thirty (30) days of receipt. Unless provided otherwise, San Jose shall consider Baykeeper's comments in good faith and shall have twenty (20) days from receipt of Baykeeper's comments to either incorporate those comments into the Annual Collection System Report or explain in writing why those comments were not accepted. Disputes as to the adequacy of the Annual Collection System Report shall be resolved via Dispute Resolution as set out in Section XII of the Consent Decree. IX. ENVIRONMENTAL MITITGATION PROJECT, LITIGATION COSTS, AND COMPLIANCE MONITORING 18 19 A summary of the mileage and identification of Sewer Line 67. Environmental Mitigation Project: In lieu of civil penalties and to mitigate past environmental harms allegedly resulting from the allegations in the Complaint, San Jose agrees to fund and implement one or more environmental mitigation project(s) for the five (5) Years following enactment of this Consent Decree in the amount of two hundred thousand dollars ($200,000) per Year to be paid to San Jose Parks Foundation, to give grants for projects that mitigate the impacts of municipal stormwater pollution and/or trash on Coyote Creek and the Guadalupe River. Within forty-five (45) days of the Effective Date and July 1 of each Year thereafter for the first five (5) Years of the term of the Consent Decree, San Jose will submit payment of two hundred thousand dollars ($200,000) to "San Jose Parks Foundation" addressed to: P.O. Box 53841, San 1 Jose, California 95153. 2 a. Projects must be based on the following criteria: i. 3 Projects that mitigate the impacts of trash and bacteria 4 discharges in Coyote Creek or the Guadalupe River; ii. 5 Projects that otherwise improve water quality in Coyote Creek 6 or the Guadalupe River; or iii. 7 Projects that include habitat restoration on Coyote Creek or 8 the Guadalupe River. b. 9 Where projects meeting any of the criteria set out in sub-paragraph 10 67a with a cumulative total of one million dollars ($1,000,000) are not identified by the 11 San Jose Parks Foundation within six (6) years after the Effective Date, the San Jose 12 Parks Foundation may provide funding for projects to mitigate the impacts of urban 13 stormwater in the Guadalupe River or Coyote Creek watersheds. c. 14 Within thirty (30) days of execution of this Consent Decree, the San 15 Jose Parks Foundation will provide a letter to the United States Department of Justice 16 and the Parties confirming its commitment to grant the environmental mitigation funds 17 consistent with the requirements of the Consent Decree. The San Jose Parks 18 Foundation will also provide a letter to U.S. Department of Justice and the Parties 19 summarizing each Year's grants, again confirming consistency with Consent Decree 20 requirements, on or before January 30th each Year during the term of the Consent 21 Decree. 22 d. Past or present City representatives or employees must recuse 23 themselves from any part of the grant allocation process for the projects described in 24 this Paragraph. The environmental mitigation funds granted pursuant to this Paragraph 25 shall not replace funding from the City for any current or planned projects. 26 68. Baykeeper's Litigation Fees and Costs. San Jose agrees to pay 27 Baykeeper the sum of four hundred twenty-five thousand dollars ($425,000), which 28 1 covers attorneys' fees and costs for services performed by and on behalf of Baykeeper 2 by its attorneys and consultants. San Jose will submit payment within forty-five (45) 3 days of the Effective Date to "San Francisco Baykeeper" addressed to: 1736 Franklin 4 Street, Suite 800, Oakland, California 94612. 69. 5 Compliance Monitoring. To defray Baykeeper's time and costs monitoring 6 San Jose's compliance with this Consent Decree over the next ten (10) Years, San Jose 7 agrees to pay Baykeeper the sum of ten thousand dollars ($10,000) per Year for the 8 term of this Consent Decree. Payment shall be made by June 30 of each Year 9 commencing June 30, 2017, and shall be made payable to "San Francisco Baykeeper" 10 addressed to: 1736 Franklin Street, Suite 800, Oakland, California 94612. In the final 11 Year of this Consent Decree, San Jose shall remit the final compliance monitoring 12 payment of ten thousand dollars ($10,000) to Baykeeper by the Termination Date. If this 13 Consent Decree terminates early pursuant to Paragraph 56, San Jose shall remit the 14 final compliance monitoring payment prorated for the time the Consent Decree was in 15 effect during the fiscal year to Baykeeper within forty-five (45) days of the Termination 16 Date. 17 18 X. 70. STIPULATED PENALTIES San Jose agrees to pay the following stipulated payments in the event that 19 it misses a deadline required by this Consent Decree, other than a missed deadline 20 because of a Force Majeure event as defined in Paragraph 101: a. 21 For any report more than ten (10) days late, San Jose shall pay fifty 22 dollars ($50) per day, up to thirty (30) days late for a total of one thousand dollars 23 24 25 26 ($1,000.00). b. For any report more than thirty (30) days late, San Jose shall pay an additional one thousand dollars ($1,000). c. For any report more than ninety (90) days late, San Jose shall pay 27 an additional three thousand dollars ($3,000). 28 d. 1 The above penalties are cumulative, as applicable, to a maximum 2 penalty of seven thousand dollars ($7,000) per report. 3 71. Any disagreement as to the amount of a stipulated payment is subject to 4 the Dispute Resolution provisions in Section XII below. San Jose agrees to pay any 5 stipulated payments due pursuant to this Consent Decree within forty-five (45) days after 6 the City receives written notice of the stipulated payment liability, or within forty-five (45) 7 days after resolution of a dispute in favor of Baykeeper if Dispute Resolution has been 8 invoked. 9 10 11 72. All payments of stipulated penalties described above must be paid by San Jose to Baykeeper at the address in Paragraph 91. 73. The payment of stipulated penalties under this Consent Decree will not be 12 deemed an admission of or a violation of any law, regulation, or any of San Jose's 13 NPDES Permits. XI. 14 15 16 74. REGULATORY AGENCY ACTION In entering into this Consent Decree, the Parties intend that San Jose comply with the MS4 Permit requirements. The Parties further recognize that the 17 Regional Water Board has the primary obligation to issue and oversee compliance with 18 the MS4 Permit. The Parties intend that the Consent Decree be consistent with 19 regulatory requirements. In the event that the State Water Resources Control Board 20 ("State Water Board"), Regional Water Board, or staff thereof issues written 21 requirements, guidance, or directives that are inconsistent with the requirements of the 22 Consent Decree, the Parties shall meet and confer pursuant to the Dispute Resolution 23 provisions in Section XII below. In the event the Regional Water Board or the State 24 Water Board modifies the MS4 Permit, or modifies applicable Water Quality Objectives 25 or Total Maximum Daily Loads ("TMDLs") and incorporates those into the Basin Plan, the 26 Parties shall meet and confer pursuant to the Dispute Resolution provisions and 27 negotiate in good faith to modify the terms of this Consent Decree to be consistent with 28 1 the modified requirements. Nothing in this Consent Decree prohibits either Party from 2 challenging the Regional Water Board's or State Water Board's actions or inactions. XII. 3 75. 4 5 DISPUTE RESOLUTION This Court will retain jurisdiction over this matter for the term of this Consent Decree for the purposes of enforcing the terms and conditions of this Consent 6 Decree, and adjudicating any disputes between the Parties that may arise under the 7 provisions of this Consent Decree. The Court has and will maintain the power to enforce 8 this Consent Decree with all available legal and equitable remedies. 76. 9 In resolving disputes concerning implementation or interpretation of any 10 provision of this Consent Decree, the Parties agree that any action or proceeding to 1 1 enforce or interpret the terms of this Consent Decree or how regulatory mandates impact 12 this Consent Decree, cannot be heard by the Court unless the Parties have first utilized 13 Informal Dispute Resolution in Paragraph 78, and the mediation process in Paragraph 14 79. 15 77. Either Party to this Consent Decree may invoke the dispute resolution 16 procedures of this Section by notifying the other Party in writing and clearly stating the 17 matter(s) in dispute and of the Party's proposal to resolve the dispute under this Section. 18 78. The Parties will meet and confer (either by telephone or in person) in a 19 good faith attempt to resolve the dispute informally ("Informal Dispute Resolution") within 20 thirty (30) days from the date of the notice. By mutual consent, the Parties may extend 21 22 the time to meet and confer. 79. If Informal Dispute Resolution is not successful in resolving the dispute, 23 either Party may request mediation in the Federal District Court with Magistrate Judge 24 Cousins serving as the mediator, or if unavailable, another Federal Magistrate assigned 25 to this matter. 26 80. The Party initiating the mediation must serve a written notice of its 27 intention to seek mediation ("Mediation Notice"). The Mediation Notice may be no longer 28 1 than 15 pages in length and must set forth with particularity all of the Party's claims and 2 the factual foundation for such claims. Within fourteen (14) days of receipt of the 3 Mediation Notice, the other Party must serve a written response of no more than fifteen 4 (15) pages setting forth with particularity its position with regard to the claims contained 5 in the Mediation Notice ("Response"). The Mediation Notice and the Response will be 6 provided concurrently to Magistrate Judge Cousins or another Magistrate as appropriate. 7 The Parties and the Magistrate may hold a pre-mediation conference for the purpose of 8 setting the schedule and procedures for the mediation. Each Party shall pay its own fees 9 and costs for the mediation. 81. 10 If the Parties cannot resolve a dispute through Informal Dispute Resolution 11 or the mediation process, then either Party may invoke formal dispute resolution 12 ("Formal Dispute Resolution"). To invoke Formal Dispute Resolution, a Party must file a 13 motion before the District Court to interpret this Consent Decree; reconcile provisions of 14 this Consent Decree with regulatory changes, guidance or directives; or determine 15 whether either Party is in breach of this Consent Decree and if so, to require the 16 breaching Party to correct the breach identified by the Court within a reasonable period 17 of time. The filing Party may request an expedited hearing schedule on the motion. 82. 18 When resolving disputes, in addition to contract interpretation principles 19 and Clean Water Act precedent, the Parties and the District Court Judge shall consider: 20 a. Changes in any re-issued Permit; 21 b. Written guidance or permit interpretation from Regional Water Board c. The Bay Area Stormwater Management Agencies Association or 22 staff; 23 24 SCVURPPP regional program, such as the Trash Receiving Water Monitoring Plan, 25 26 once completed and approved by the Regional Water Board; and d. Changes to Water Quality Objectives in the San Francisco Bay 27 Basin Water Quality Control Plan, including the establishment of a TMDL. 28 1 83. To help limit fees and costs potentially incurred in dispute resolution, the 2 Parties agree to waive the right to appeal any decision of the District Court. 3 84. Except as otherwise provided in this Consent Decree, litigation costs and 4 fees incurred in addressing and/or resolving any dispute shall be awarded in accordance 5 with the standard established by section 505 of the Clean Water Act, 33 U.S.C. § 1365, 6 and case law interpreting that standard, provided that San Jose will not be obligated to 7 pay more than two hundred thousand dollars ($200,000) during the term of this Consent 8 Decree. 9 10 85. Notwithstanding that a particular issue is in the Dispute Resolution process outlined in this Section XII, San Jose must comply with any provisions of the Consent 1 1 Decree that are not in dispute. The timeline for implementation of any issues that are in 12 the Dispute Resolution process will be tolled pending the outcome of the Dispute 13 Resolution. XIII. 14 15 86. MUTUAL RELEASE OF LIABILITY Baykeeper's Release. Upon the Effective Date of this Consent Decree and 16 through the Termination Date, Baykeeper, on its own behalf and on behalf of its current 17 and former officers, directors, employees, and each of their successors and assigns, and 18 its agents, attorneys, and other representatives, hereby releases and covenants not to 19 sue San Jose (and each of its current, former, and future City Council members, officers, 20 directors and employees, and each of their predecessors, successors and assigns, and 21 each of their agents, attorneys, consultants, and other representatives) of and from, and 22 waives CWA claims, known and unknown, that Baykeeper alleged, or could have alleged 23 in its Notice Letter or Complaint and for alleged violations of the MS4 Permit occurring 24 during the term of this Consent Decree, including all claims for injunctive relief, penalties, 25 fees (including fees of attorneys, experts, and others), costs, expenses or any other sum 26 incurred or claimed. Baykeeper's release does not apply to claims for San Jose's failure 27 to comply with this Consent Decree. 28 1 87. San Jose's Release. Upon the Effective Date of this Consent Decree, San 2 Jose, on its own behalf and on behalf of its current and former City Council members 3 and employees, and each of their successors and assigns, and their agents, attorneys, 4 and other representatives, hereby releases Baykeeper (and its current and former 5 officers, directors, and employees, and each of their successors and assigns, and its 6 agents, attorneys, and other representatives) of and from, and waives all claims which 7 arise from or pertain to this action, including all claims for fees (including fees of 8 attorneys, experts, and others), costs, expenses or any other sum incurred or claimed for 9 matters related to, or which could have been asserted in response to, Baykeeper's 10 Complaint up to the Termination Date. San Jose's release does not apply to claims for 1 1 Baykeeper's failure to comply with this Consent Decree. 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 88. California Civil Code Waiver. The Parties acknowledge that they are familiar with section 1542 of the California Civil Code, which provides: A general release does not extend to claims which the creditor does not know or suspect to exist in his favor at the time of the executing the release, which if known by him must have materially affected his settlement with the debtor. The Parties hereby waive and relinquish any rights or benefits they may have under California Civil Code section 1542 with respect to any other claims against each other arising from, or related to, the allegations and claims as set forth in the Notice Letter, the Complaint, or the MS4 Permit during the term of this Consent Decree. 89. Nothing in this Consent Decree limits or otherwise affects the Parties' right to address or take any position that they deem necessary or appropriate in any formal or informal proceeding before the Regional Water Board, the State Water Board, the U.S. Environmental Protection Agency, or any other judicial or administrative body on any matter relating to the MS4 Permit or any reissued or subsequent version of the MS4 Permit, or any issue relevant to this action. Unless otherwise expressly waived in this Consent Decree, the City further reserves all defenses, whether legal or equitable, with respect to any future enforcement action that may be brought against it, whether by 1 Plaintiff, the United States, the State of California or any other person or entity. San 2 Jose further expressly reserves all rights and remedies otherwise available to it with 3 4 5 respect to the MS4 Permit. 90. During the term of this Consent Decree, Baykeeper, and its employees acting on behalf of Baykeeper, will not provide data, financial support or personnel time 6 for the purpose of supporting lawsuits brought by other groups or individuals against the 7 City for the violations alleged in the Notice Letter or Complaint or for any alleged 8 violations of the MS4 Permit. XIV. 9 10 91. NOTICES AND SUBMISSIONS Any notifications, submissions, or communications to Baykeeper or to San 11 Jose pursuant to this Consent Decree will be, to the extent feasible, sent via electronic 12 mail transmission to the e-mail addresses listed below (electronic return receipt 13 requested) or, if electronic transmission is not feasible, via U.S. Mail or hand delivery to 14 the following addresses. Any change in the individuals or addresses designated by any 15 Party must be made in writing to all Parties, but the Parties stipulate and agree that the 16 Parties need not amend this Consent Decree to effectuate a change in the notice 17 recipients. 18 If to Baykeeper: 19 Daniel Cooper Lawyers for Clean Water, Inc. 1004-A O'Reilly Avenue San Francisco, California 94129 Email: daniel@lawyersforcleanwater.com 20 21 22 23 24 25 26 27 28 With copies to: Nicole Sasaki San Francisco Baykeeper 1736 Franklin Street, Suite 800 Oakland, California 94612 Email: nicole@baykeeper.org 1 2 3 4 5 6 If to San Jose: City of San Jose Attn: City Attorney 200 E. Santa Clara St., 16,h Floor San Jose, CA 95113 Telephone: (408) 535-1900 Facsimile: (408) 998-3131 Email: nora.frimann@sanjoseca.gov With copies to: 7 8 9 10 11 City of San Jose Attn: Directors of Environmental Services, Public Works and Transportation 200 East Santa Clara Street San Jose, CA 95113 Telephone: (408) 535-1900 Facsimile: (408) 998-3131 Email: cao.main@sanjoseca.gov 12 13 92. Notices submitted electronically in accordance with this Section will be 14 deemed submitted upon transmission, but a notice is not effective if the sending Party 15 learns that it did not reach the Party to be notified. Notwithstanding the sender's receipt 16 of a successful delivery notification, a recipient that fails to receive the submission may 17 request delivery by other means. Such a request does not affect the timeliness of the 18 original submission. Notices sent by U.S. Mail will be deemed submitted on the date 19 20 21 they are postmarked. 93. San Jose agrees to provide to Baykeeper any new or existing final technical reports or documents within San Jose's custody or control that are reasonably 22 necessary to confirm San Jose's compliance with this Consent Decree within thirty (30) 23 24 25 days of written request by Baykeeper. 94. During the term of this Consent Decree, San Jose agrees to provide Baykeeper with a copy of all final documents required to be submitted to the Regional 26 Water Board or the State Water Board concerning the City's compliance with the current 27 or any subsequent MS4 Permit. Such documents will be transmitted to Baykeeper via 28 1 electronic mail at the time, or within twenty-four (24) hours, that the documents are 2 submitted to the Regional Water Board or State Water Board, with the exception of the 3 Annual Report. The Parties agree that San Jose is under no obligation to provide 4 Baykeeper any documents, data or reports that are not in final form. 5 95. During the term of this Consent Decree, San Jose will use its best efforts to 6 provide Baykeeper with a copy of all public communications and education materials 7 related to the matters covered under this Consent Decree, including but not limited to 8 trash reduction marketing campaigns. 9 10 96. Failure to provide copies to Baykeeper of reports to the Regional Water Board or the State Water Board or public communications as required in Paragraphs 94­ 11 95 will not subject the City to stipulated penalties under Section X of this Consent 12 13 Decree. 97. During the life of this Consent Decree, San Jose will preserve at least one 14 legible copy of all records and documents, including computer-stored information, which 15 memorializes performance of its obligations under this Consent Decree. XV. 16 17 18 98. GENERAL PROVISIONS Construction. The language in all parts of this Consent Decree will be construed according to its plain and ordinary meaning, except as to those terms 19 specifically defined within the Consent Decree or the MS4 Permit. If a term is defined 20 differently in this Consent Decree and the MS4 Permit, the definition in the Consent 21 Decree shall control. 22 23 99. Choice of Law. The laws of the United States will govern this Consent Decree, and to the extent State law applies, the laws of the State of California will 24 govern. 25 100. Counterparts. This Consent Decree may be executed in any number of 26 counterparts, all of which together will constitute one original document. Telecopy, 27 scanned copies (i.e., pdf) and/or facsimile copies of original signature will be deemed to 28 1 2 3 be originally executed counterparts of this Consent Decree. 101. Force Majeure. Neither Party will be considered to be in default in the performance of any obligations under this Consent Decree precluded by an event of 4 Force Majeure. Force Majeure is any act of God, war, fire, earthquake, natural 5 catastrophe, sabotage or terrorism, city-wide civil unrest, or restraint by court order. 6 Force Majeure does not include normal inclement weather, economic hardship, or failure 7 to allocate funds to comply with this Consent Decree during San Jose's annual budget 8 process, except where these conditions are due to a Force Majeure event. Any Party 9 seeking to rely upon this Section to excuse or postpone performance shall have the 10 burden of establishing that it could not reasonably have avoided the Force Majeure event 11 and that through the exercise of due diligence it has been unable to overcome the failure 12 of performance. The Parties shall exercise due diligence to resolve and remove any 13 Force Majeure event. For any delay in performance caused by a Force Majeure event, 14 the Parties agree to modify this Consent Decree to provide additional time for 15 performance of the particular requirement and, as applicable, any subsequent 16 requirement affected by the Force Majeure. Delay in compliance with a particular 17 requirement due to a Force Majeure event shall not excuse or delay compliance with any 18 and all other unrelated and unaffected obligations required under this Consent Decree. 19 If the Parties are unable to agree that a delay has been caused by a Force Majeure 20 event, or if the Parties are unable to agree on a modification to the schedule for the 21 particular requirement(s) delayed due to Force Majeure, the Parties will invoke Dispute 22 Resolution provisions in Section XII. 23 102. Modification of the Consent Decree. This Consent Decree, and any 24 provisions herein, may not be changed, waived, discharged, or terminated unless by a 25 written instrument, signed by the Parties. The Parties agree to modify the Consent 26 Decree to incorporate any changes to the Consent Decree as a result of the Dispute 27 Resolution process, if any. 28 1 103. Full Settlement. This Consent Decree constitutes a full and final 2 satisfaction of this matter, including without limitation, anything in Plaintiff's Notice Letter 3 4 5 or Complaint. 104. Severability. Except as otherwise expressly provided in this Consent Decree, in the event that any provision, paragraph, Section, subsection, or sentence of 6 this Consent Decree is held by the Court to be unenforceable, the validity of the 7 enforceable provisions will remain in full force and effect providing that the intent of the 8 Parties when entering into this Consent Decree can still be achieved. 9 10 105. Integration Clause. This is an integrated Consent Decree. This Consent Decree is intended to be a full and complete statement of the terms of the agreement 1 1 between the Parties and expressly supersedes any and all prior oral or written 12 agreements, covenants, representations, and warranties (express or implied) concerning 13 the subject matter of this Consent Decree. 14 15 16 106. No Third Party Beneficiaries. This Consent Decree does not confer upon any person other than the Parties any rights or remedies hereunder. 107. Authority. The undersigned representatives for Baykeeper and San Jose 17 each certify that he/she is fully authorized by the Party whom he/she represents to enter 18 into the terms and conditions of this Consent Decree, to execute it on behalf of the 19 20 21 22 23 24 25 26 27 28 Parties, and to legally bind the Parties to its terms. The Parties hereby enter into this Consent Decree. 1 APPROVED AS TO FORM: 2 3 Date: .. \A b ' l6 • hp By: Nora Frirhann Assistant City Attorney 4 5 6 7 SAN FRANCISCO BAYKEEPER: 8 9 10 A Date: June 1. 2016 x By: SejarChoksi-Chugh Executive Director 11 12 13 APPROVED AS TO FORM: 14 15 16 C Date: 27 May 2016 By: Daniel Cooper Lawyers for Clean Water, Inc. Counsel for Baykeeper 17 18 19 X IT IS SO ORDERED 20 21 22 23 24 25 26 27 28 Date: August 11, 2016 Honorable Beth Labson Freeman District Judge of the United States District Court for the Northern District of California

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?