ORDER: The good faith settlement motion (Doc. 487 ) is granted as follows: (1) The Court finds the Settlement Agreement was entered into in good faith, and is fair, reasonable, and consistent with the purposes of CERCLA and the UCFA. (2) The Moving Parties shall file the revised proposed bar order within ten (10) days from the date this Order is filed. Any objections shall be filed within ten (10) days from the date the proposed bar order is filed. Signed by Judge William Q. Hayes on 4/21/2015. (All non-registered users served via U.S. Mail Service.) (mdc)
1
2
3
4
5
6
7
UNITED STATES DISTRICT COURT
8
SOUTHERN DISTRICT OF CALIFORNIA
9
10
CITY OF SAN DIEGO,
11
13
Plaintiff,
vs.
NATIONAL STEEL &
SHIPBUILDING COMPANY; et al.,
14
Defendants.
12
CASE NO. 09cv2275 WQH
(BGS)
ORDER
AND RELATED CROSS-ACTIONS
AND COUNTERCLAIMS
16 HAYES, Judge:
17
The matter before the Court is the Joint Motion of National Steel and
18 Shipbuilding Company and City of San Diego for Determination of Good Faith
15
19 Settlement filed by Plaintiff City of San Diego (the “City”) and Defendant National
20 Steel & Shipbuilding Corporation (“NASSCO”). (ECF No. 487).
21
22
BACKGROUND
The Shipyard Sediment Site (“the Site”) is an area of bottom marine sediment
23 located along the eastern shore of the central San Diego Bay. (ECF No. 367-3 at 7624 78). The Site consists generally of two leaseholds presently occupied by BAE Systems
25 San Diego Ship Repair (“BAE Systems”) and NASSCO. Id. The “North Yard”
26 consists of the BAE Systems leasehold and certain surrounding tidelands, and the
27 “South Yard” consists of the NASSCO leasehold and certain surrounding tidelands. Id.
28
BAE Systems and its predecessors, including Southwest Marine, Inc. (“Southwest
-1-
09cv2275 WQH (BGS)
1 Marine”), have operated at the North Yard for nearly one hundred years. (ECF No.
2 354-2 at 4). NASSCO has operated at the South Yard since at least the 1960’s. Id.
3
In or about 1991, the California Regional Water Quality Control Board
4 (“Regional Board”) commenced an initial investigation of impacts to marine sediment
5 at the Site. Id. at 5. Initially, the Regional Board’s investigation focused on BAE
6 Systems and NASSCO. Id. The Regional Board directed BAE Systems and NASSCO
7 to address sediment contamination directly adjacent to their facilities. Id.
8
In February 2001, the Regional Board commenced administrative proceedings
9 in connection with historical discharges at the Site. (ECF No. 368-3 at 2). The
10 Regional Board compelled NASSCO, BAE Systems, and other parties to undertake
11 studies and submit information concerning the nature and extent of contamination
12 resulting from the historical discharges. Id. The result of this fact-gathering process
13 was an extensive Administrative Record compiled from over a decade of submissions
14 and studies related to the historical discharges at the Site. Id.
15
On April 29, 2005, the Regional Board issued a Tentative Cleanup and
16 Abatement Order (“tentative CAO”), that identified NASSCO, BAE Systems, the City,
17 Campbell Industries (“Campbell”), San Diego Gas & Electric (“SDG&E”), and the U.S.
18 Navy (the “Navy”) as the “Dischargers” or “Persons Responsible” for the contamination
19 at the Site, and set forth proposed cleanup requirements for the Site. (ECF No. 1 at 5020 77). On August 24, 2007, April 4, 2008, December 22, 2009, and September 15, 2010,
21 the Regional Board issued revised versions of the Tentative Cleanup and Abatement
22 Order. (ECF No. 354-2 at 5-6).
23
In June 2008, the “Dischargers,” each represented by experienced counsel,
24 entered into arm’s-length mediation regarding cleanup, liability, and allocation issues
25 before environmental litigation mediator Timothy Gallagher. (ECF No. 354-2 at 6).
26 Since that time, the “Dischargers” have been engaged in regular settlement discussions.
27 (ECF No. 370-2 at 4-5).
28
On October 14, 2009, the City initiated this action by filing a Complaint for
-2-
09cv2275 WQH (BGS)
1 Environmental Cost Recovery and Contribution, Injunctive Relief, Declaratory Relief
2 and Damages against BAE Systems, NASSCO, SDG&E, Campbell, the Navy, the San
3 Diego Unified Port District (the “Port District”), San Diego Marine Construction
4 Company, San Diego Marine Construction Corporation, Martinolich Shipbuilding
5 Company, National Iron Works, National Steel & Shipbuilding Corporation, Southwest
6 Marine, Inc., Star and Crescent Boat Company (“Star and Crescent”), Star and Crescent
7 Ferry Company, Star and Crescent Investment Company, and Does 1-100, inclusive
8 (“the parties”). (ECF No. 1). The City alleged contribution and cost recovery claims
9 under both state and federal law. Id. The City also alleged contractual and express
10 indemnity claims against NASSCO, and intentional tort claims for nuisance and
11 trespass against all Defendants except the Navy. (ECF No. 1 ¶¶ 101, 202-218). The
12 subject matter of the Complaint relates to, and derives from the underlying
13 administrative Regional Board proceedings and the tentative cleanup and abatement
14 orders. All of the parties named in the tentative cleanup and abatement orders as
15 “Dischargers” or “Responsible Parties” are parties to this action.
16
Defendants filed contribution and cost-recovery counterclaims against the City,
17 and contribution and cost-recovery cross-claims and supplemental cross-claims against
18 each other, under both state and federal law. (ECF Nos. 13, 14, 16-18, 20, 21, 29, 49,
19 63, 90, 210, 223, 300, 302, 307, 308).
20
On July 15, 2010, the Magistrate Judge issued an order adopting a phased
21 discovery plan proposed by the parties. (ECF No. 125). Phase I discovery was limited
22 to certain categories of information, and was divided into three segments:
23
C
Phase I(a), a seven-month phase during which each party served limited
24
initial disclosures and was permitted to issue “Interrogatories, Requests for
25
Admission, Requests for Production of Documents and Things.”
26
C
Phase I(b), fact depositions limited to the topics addressed in Phase I.
27
C
Phase I(c), court-ordered mediation during which no discovery would take
28
-3-
09cv2275 WQH (BGS)
1
place.
2 Id. at 3-6. Phase I(c) mediation with Timothy Gallagher began in May 2011, and
3 continued through June 2013.
4
In November 2011, the parties participated in a three-day evidentiary hearing as
5 part of the Regional Board’s administrative proceedings. (ECF No. 354-2 at 6).
6
On March 14, 2012, the Regional Board issued its final Cleanup and Abatement
7 Order (No. R9-2012-0024) (“the Final CAO”), along with a Technical Report, in which
8 it (1) found various parties to be “Dischargers” or “Persons Responsible” for
9 environmental contamination at the Shipyard Sediment Site, (2) concluded that the
10 sediments at the Site posed a risk to aquatic and human receptors, and (3) mandated an
11 extensive cleanup. (ECF No. 367-3 at 7-44).
12
Specifically, the Regional Board found that “[e]levated levels of pollutants above
13 San Diego Bay background conditions exist in the San Diego Bay bottom marine
14 sediment” along the Shipyard Sediment Site. Id. at 7. The Regional Board found
15 NASSCO, BAE Systems, the City, San Diego Marine Construction Company,1
16 Campbell, SDG&E, the Navy, and the Port District:
17
[H]ave each caused or permitted the discharge of waste to the Shipyard
Sediment Site resulting in the accumulation of waste in the marine
sediment. The contaminated marine sediment has caused conditions of
pollution, contamination or nuisance in the San Diego Bay that adversely
affect aquatic life, aquatic-dependent wildlife, and human health San
Diego Bay beneficial uses.
18
19
20
21
22
23
24
Id.
The Final CAO identifies the following “Dischargers” or “Persons Responsible”
finding that each caused or permitted wastes to be discharged or deposited into the San
Diego Bay and created or threatened to create a condition of pollution or nuisance.
25
26
1
San Diego Marine Construction Company is not identified in the CAO as a
27 discharger with responsibility for compliance because “San Diego Marine Construction
Company no longer exists and no corporate successor with legal responsibility for San
28 Diego Marine Construction Company’s liabilities has been identified.” Id. at 7 n.1.
-4-
09cv2275 WQH (BGS)
1 Persons Responsible
2
1.
3
NASSCO owns and operates a full service ship construction,
modification, repair, and maintenance facility on 126 acres of tidelands
property leased from the Port District on the eastern waterfront of central
San Diego Bay at 2798 Harbor Drive in San Diego [the “South Yard”].
Shipyard operations have been conducted at this site by NASSCO over
San Diego Bay waters or very close to the waterfront since at least 1960.
Shipyard facilities operated by NASSCO over the years at the site have
included concrete platens used for steel fabrication, a graving dock,
shipbuilding ways, and berths on piers or land to accommodate the
berthing of ships. An assortment of waste is generated at the facility
including spent abrasive, paint, rust, petroleum products, marine growth,
sanitary waste, and general refuse.
4
5
6
7
8
9
10
11
12
13
14
15
16
17
NASSCO
Id. at 7-8.
2.
BAE Systems
From 1979 to the present, Southwest Marine, Inc. and its successor
BAE Systems have owned and operated a ship repair, alteration, and
overhaul facility on approximately 39.6 acres of tidelands property on the
eastern waterfront of central San Diego Bay. The facility, currently
referred to as BAE Systems San Diego Ship Repair, is located on land
leased from the Port District at 2205 East Belt Street, foot of Sampson
Street in San Diego, San Diego County, California [the “North Yard”].
Shipyard facilities operated by BAE Systems over the years have included
concrete platens used for steel fabrication, two floating dry docks, five
piers, and two marine railways. An assortment of waste has been
generated by the facility including spent abrasive, paint, rust, petroleum
products, marine growth, sanitary waste, and general refuse.
18
Id. at 8.
19
3.
20
From the early 1900s through February 1963, when the relevant
tideland areas were transferred from the City of San Diego to the Port
District, the City was the trustee of and leased to various operators, all
relevant portions of the Shipyard Sediment Site. The ... City of San Diego
caused or permitted [waste] to be discharged, or to be deposited where
they were discharged into the San Diego Bay through its ownership of the
Shipyard Sediment Site....
21
22
23
24
25
26
27
28
City of San Diego
The City of San Diego also owns and operates a municipal separate
storm sewer system (MS4) through which it discharges waste commonly
found in urban runoff to San Diego Bay subject to the terms and
conditions of a National Pollutant Discharge Elimination System (NPDES)
Storm Water Permit. The [Regional Board] finds that the City of San
Diego has discharged urban storm water containing waste directly to San
Diego Bay at the Shipyard Sediment Site.
[The Regional Board] finds that the City of San Diego has also
discharged urban storm water containing waste through its MS4 to Chollas
-5-
09cv2275 WQH (BGS)
1
2
3
4
5
6
7
8
9
10
11
12
13
Creek resulting in the exceedances of chronic and acute California Toxics
Rule copper, lead, and zinc criteria for the protection of aquatic life.
Studies indicate that during storm events, storm water plumes toxic to
marine life emanate from Chollas Creek up to 1.2 kilometers into San
Diego Bay, and contribute to pollutant levels at the Shipyard Sediment
Site. The urban storm water containing waste that has discharged from the
on-site and off-site MS4 has contributed to the accumulation of pollutants
in the marine sediments at the Shipyard Sediment Site to levels, that cause,
and threaten to cause, conditions of pollution, contamination, and nuisance
by exceeding applicable water quality objectives for toxic pollutants in
San Diego Bay.
Id. at 8-9.
4.
Campbell
From July 1972 through 1979, Campbell’s wholly owned subsidiaries
MCCSD and later San Diego Marine Construction Corporation operated
a ship repair, alteration, and overhaul facility on what is now the BAE
Systems leasehold at the foot of Sampson Street in San Diego. Shipyard
operations were conducted at this site by Campbell over San Diego Bay
waters or very close to the waterfront. An assortment of waste was
generated at the facility including spent abrasive blast waste, paint, rust,
petroleum products, marine growth, sanitary waste, and general refuse.
14
Id. at 10.
15
5.
16
SDG&E owned and operated the Silver Gate Power Plant along the
north side of the BAE Systems leasehold from approximately 1943 to the
1990s. SDG&E utilized an easement to San Diego Bay along BAE
Systems’ north property boundary for the intake and discharge of cooling
water via concrete tunnels at flows ranging from 120 to 180 million
gallons per day. SDG&E operations included discharging waste to
holding ponds above the tunnels near the Shipyard Sediment Site.
17
18
19
SDG&E
20
Id. at 11.
21
6.
22
The U.S. Navy owns and operates a municipal separate storm sewer
system (MS4) at the Naval Base San Diego (NBSD), formerly Naval
Station San Diego or NAVSTA, through which it caused or permitted the
discharge of waste commonly found in urban runoff to Chollas Creek and
San Diego Bay...Technical reports by the U.S. Navy and others indicate
that Chollas Creek outflows during storm events convey elevated sediment
and urban runoff chemical pollutant loading and its associated toxicity up
to 1.2 kilometers into San Diego Bay over an area included in the Shipyard
Sediment Site.
23
24
25
26
27
28
U.S. Navy
[The Regional Board] finds that the U.S. Navy has caused or permitted
marine sediment and associated waste to be resuspended into the water
column as a result of shear forces generated by the thrust of propellers
during ship movements at NBSD. The resuspended sediment and
-6-
09cv2275 WQH (BGS)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
pollutants can be transported by tidal currents and deposited in other parts
of San Diego Bay, including the Shipyard Sediment Site. The above
discharges have contributed to the accumulation of pollutants in marine
sediment at the Shipyard Sediment Site to levels that cause, and threaten
to cause, conditions of pollution, contamination, and nuisance by
exceeding applicable water quality objectives for toxic pollutants in San
Diego Bay.
Also, from 1921 to the present, the U.S. Navy has provided shore
support and pier-side berthing services to U.S. Pacific fleet vessels at
NBSD located at 3445 Surface Navy Boulevard in the City of San Diego.
NBSD currently occupies 1,029 acres of land and 326 water acres adjacent
to San Diego Bay to the west, and Chollas Creek to the north near Pier 1.
Between 1938 and 1956, the NBSD leasehold included a parcel of land
within the Shipyard Settlement Site referred to as the 28th Street Shore
Boat Landing Station, located at the south end of the present day
NASSCO leasehold at the foot of 28th Street and including the 28th Street
Pier. [The Regional Board] finds that the U.S. Navy caused or permitted
wastes to be deposited where they were discharged into San Diego Bay
and created, or threatened to create, a condition of pollution or nuisance
at this location when it conducted operations similar in scope to a small
boatyard, including solvent cleaning and degreasing vessel parts and
surfaces, abrasive blasting and scraping for paint removal and surface
preparations, metal plating, and surface finishing and painting. Prevailing
industry-wide boatyard operational practices employed during the 1930s
through the 1980s were often not sufficient to adequately control or
prevent pollutant discharges, and often led to excessive discharges of
pollutants in marine sediment in San Diego Bay. The types of pollutants
found in elevated concentrations at the Shipyard Sediment Site ... are
associated with the characteristics of the waste the U.S. Navy operations
generated at the 28th Street Shore Boat Landing Station site.
Id. at 11-12.
18
7.
19
The Port District is a special government entity, created in 1962 by the
San Diego Unified Port District Act, California Harbors and Navigation
Code Appendix I, in order to manage San Diego Harbor, and administer
certain public lands along San Diego Bay. The Port District holds and
manages as trust property on behalf of the People of the State of California
the land occupied by NASSCO, BAE Systems, and the cooling water
tunnels for SDG&E’s former Silver Gate Power Plant. The Port District
is also the trustee of the land formerly occupied by the San Diego Marine
Construction Company and by Campbell at all times since 1963 during
which they conducted shipbuilding and repair activities. The Port
District’s own ordinances, which date back to 1963, prohibit deposit or
discharge of any chemicals or waste to the tidelands or San Diego Bay and
make it unlawful to discharge pollutants in non-storm water directly or
indirectly into the storm water conveyance system.
20
21
22
23
24
25
26
27
28
Port District
Id. at 12.
The Regional Board stated that it has discretion to name the Port District in its
capacity as the State’s trustee as a “Discharger,” and does so in the Final CAO. (ECF
-7-
09cv2275 WQH (BGS)
1 No. 367-3 at 12). The Regional Board did not accord the Port District secondary
2 liability status, finding:
3
4
5
6
7
8
9
10
The Port District also owns and operates a municipal separate storm sewer
system (MS4) through which it discharges waste commonly found in
urban runoff to San Diego Bay subject to the terms and conditions of an
NPDES [National Pollutant Discharge Elimination System] Storm Water
Permit. [The Regional Board] finds that the Port District has discharged
urban storm water containing waste directly or indirectly to San Diego
Bay at the Shipyard Sediment Site.
....
The urban storm water containing waste that has discharged from the onsite and off-site MS4 has contributed to the accumulation of pollutants in
the marine sediments at the Shipyard Sediment Site to levels, that cause,
and threaten to cause, conditions of pollution, contamination, and nuisance
by exceeding applicable water quality objectives for toxic pollutants in
San Diego Bay.
11 Id. at 13.
12 Waste Discharge/Use Impairments
13
The Final CAO identified the types of waste discharge, as well as the use
14 impairments caused by the contamination. The San Diego Bay shoreline occupied by
15 the Shipyard Sediment Site is “listed on the Clean Water Act section 303(d) list of
16 Water Quality Limited Segments for elevated levels of copper, mercury, zinc, PAHs,
17 and PCBs in the marine sediment.” (ECF No. 367-3 at 13). The Regional Board found
18 that “[t]hese pollutants are impairing the aquatic life, aquatic-dependent wildlife, and
19 the human health beneficial uses designated for San Diego Bay and are causing the
20 Bay’s narrative water quality objective for toxicity not to be attained.” Id. The
21 Regional Board based its findings and conclusions in the Final CAO on “data and other
22 technical information contained in the Shipyard Report prepared by NASSCO’s and
23 BAE’s consultant, Exponent,” after a detailed sediment investigation at the Shipyard
24 Sediment Site within and adjacent to the NASSCO and BAE Systems leaseholds. Id.
25
The Final CAO identified constituents of primary concern (“primary COCs”) for
26 the Shipyard Sediment Site to be copper, mercury, HPAHs, PCBs, and TBT, “which are
27 associated with the greatest exceedance of background and highest magnitude of
28 potential risk at the Shipyard Sediment Site.” Id. at 19. Secondary COCs are arsenic,
-8-
09cv2275 WQH (BGS)
1 cadmium, lead, and zinc. Id. The Regional Board determined that “[a]lthough there are
2 complexities and difficulties that would need to be addressed and overcome ... it is
3 technologically feasible to cleanup to the background sediment quality levels utilizing
4 one or more remedial and disposal techniques.” (ECF No. 367-3 at 20).
5
The Final CAO “evaluated a number of criteria to determine risks, costs, and
6 benefits associated with no action, cleanups to background sediment chemistry levels,
7 and alternative cleanup levels greater than background concentrations.” Id.
8
The criteria included factors such as total cost, volume of sediment
dredged, exposure pathways of receptors to contaminants, short- and longterm effects on beneficial uses (as they fall into the broader categories of
aquatic life, aquatic-dependent wildlife, and human health). The
[Regional Board] then compared these cost criteria against the benefits
gained by diminishing exposure to the primary COCs to estimate the
incremental benefit gained from reducing exposure based on the
incremental costs of doing so.
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Id.
Based on the above considerations, the Regional Board concluded that “cleaning
up to background sediment chemistry levels is not economically feasible.” Id. The
Regional Board prescribed alternative, less stringent, cleanup levels in compliance with
State Water Board Resolution No. 92-49, Policies and Procedures for Investigation and
Cleanup and Abatement of Discharges under Water Code Section 13304. Id. at 21.
The alternative cleanup levels will result in significant contaminant
mass removal and therefore risk reduction from San Diego Bay.
Remediated areas will approach reference area sediment concentrations for
most contaminants. Compared to cleaning up to background cleanup
levels, cleaning up to the alternative cleanup levels will cause less diesel
emission, less greenhouse gas emission, less noise, less truck traffic, have
a lower potential for accidents, and less disruption to the local community.
Achieving the alternative cleanup levels also requires less barge and crane
movement on San Diego Bay, has a lower risk of re-suspension of
contaminated sediments, and reduces the amount of landfill capacity
required to dispose of sediment wastes. The alternative cleanup levels
properly balance reasonable protections of San Diego Bay beneficial uses
with the significant economic and service activities provided by the City
of San Diego, the NASSCO and BAE Systems Shipyards and the U.S.
Navy.
ECF No. 367-3 at 22.
The Regional Board set out a “Remedial Monitoring Program” which provides
for monitoring during remediation activities, as well as post-remediation monitoring.
-9-
09cv2275 WQH (BGS)
1 Id. at 23.
2
3
4
5
The Dischargers have proposed a remedial action implementation
schedule and a description of specific remedial actions they intend to
undertake to comply with this CAO. The remedial action implementation
schedule will begin with the adoption of this CAO and will end with the
submission of final reports documenting that the alternative sediment
cleanup levels have been met. From start to finish, remedial action
implementation is expected to take approximately 5 years to complete.
6 Id. at 24.
7 Order Directives
8
The Final CAO ordered all Dischargers to comply with several directives,
9 including the following:
10
1.
11
Dischargers shall terminate all illicit discharges, if any, to the Shipyard
Sediment Site in violation of waste discharge requirements or other order
or prohibition issued by the [Regional Board].... The Dischargers shall
take all corrective actions necessary to remediate the contaminated marine
bay sediment at the Shipyard Sediment Site....
12
13
Cleanup and Abate
14 Id. at 27. The Final CAO set forth a detailed corrective action design ordering
15 Dischargers to dredge remedial areas to attain specific “post remedial surface-area
16 weighted average concentrations (‘SWACs’).” (ECF No. 367-3 at 27-28).
17
In addition, with respect to the municipal separate storm sewer system (“MS4”),
18 the Regional Board ordered that after the adoption of the Final CAO:
19
20
21
22
23
24
[T]he City of San Diego and the San Diego Unified Port District within the
tideland area shall take interim remedial actions, as necessary, to abate or
correct the actual or potential effects of the releases from the MS4 system
that drains to outfall SW4....
The City of San Diego and the San Diego Unified Port District within the
tideland area shall prepare and submit a municipal separate storm system
(MS4) Investigation and Mitigation Plan (Plan) within 90 days after
adoption of the CAO. The plan shall be designed to identify, characterize,
and mitigate pollutants and pollutant sources in the watershed that drains
to the MS4 outfall SW-4 at the Shipyard Sediment Site....
25 ECF No. 367-3 at 28-29. The Final CAO identified required components of the MS4
26 Investigation and Mitigation Plan, as well as an Activity Completion Schedule. See id.
27 at 29-30.
28
2.
Remedial Action Plan and Implementation
- 10 -
09cv2275 WQH (BGS)
1
The Regional Board ordered that “[a]ll Dischargers shall prepare and submit a
2 Remedial Action Plan (RAP) to the [Regional Board] no later than 90 days after
3 adoption of the CAO.” Id. at 30. The Regional Board required specific components in
4 the RAP including an introduction, a description of the selected remedies, a health and
5 safety plan, a community relations plan, a quality assurance project plan, a sampling and
6 analysis plan, a description of wastes generated, results of pilot testing, a design criteria
7 report, an equipment, services and utilities list, regulatory permits and approvals, a
8 remediation monitoring plan, a site map, contingencies, and a remediation schedule.
9 Id. at 30-32.
10
3.
11
The Dischargers shall submit a final Cleanup and Abatement
Completion Report verifying completion of the RAP activities for the
Shipyard Sediment Site within 90 days of completion of remediation. The
report shall provide a demonstration, based on sound technical analysis,
that sediment quality cleanup levels in Directive A.2 have been achieved.
12
13
Cleanup and Abatement Completion Verification
14 Id. at 32.
15
4.
16
The Regional Board ordered that no later than 90 days after the adoption of the
Post Remedial Monitoring
17 CAO, “[t]he Dischargers shall prepare and submit a Post Remedial Monitoring Plan to
18 the [Regional Board].... The Post Remedial Monitoring Plan shall be designed to verify
19 that the remaining pollutant concentrations in the sediments will not unreasonably affect
20 San Diego Bay beneficial uses.” (ECF No. 367-3 at 32). The Final CAO provided
21 several specific elements that are required to be included in the Post Remedial
22 Monitoring Plan, including a quality assurance project plan, a sampling and analysis
23 plan, sediment chemistry, bioaccumulation testing, sediment chemistry for benthic
24 exposure, sediment toxicity, a benthic community assessment, and a schedule detailing
25 the sequence of sampling events and the time frame for each activity. Id. at 32-35. The
26 Regional Board further ordered that the Dischargers submit “Post Remedial Monitoring
27 Reports” containing specified information, including an analysis of whether or not
28 remedial goals have been attained at Year 2, Year 5, and Year 10. Id. at 35-36.
- 11 -
09cv2275 WQH (BGS)
1
5.
Quarterly Progress Reports
2
The Regional Board ordered that by the 15th day of March, June, September, and
3 December of each year after the Final CAO goes into effect, the Dischargers shall
4 submit “written quarterly progress reports.” Id. at 37-38. The Regional Board ordered
5 that these reports continue until the submission of the final Cleanup and Abatement
6 Completion Report verifying completion of the Remedial Action Plan for the Shipyard
7 Sediment Site.
8
6.
9
The Regional Board ordered that upon its approval of the Final Cleanup and
No Further Action
10 Abatement Order and the Post Remedial Monitoring Reports, “remedial actions and
11 monitoring will be complete and compliance with this CAO will be achieved.” Id. at
12 38.
13 Earlier Settlements
14
On June 24, 25, and 26, 2013, the parties attended a Mandatory Settlement
15 Conference with the Magistrate Judge. (ECF No. 279). A settlement was not reached.
16
On July 19, 2013, the Magistrate Judge issued a Case Management Conference Order
17 regulating Phase I(b) and Phase II of discovery.2 (ECF No. 290).
18
In or around October and November, 2013, three settlement agreements were
19 reached between various parties. SDG&E and BAE Systems settled their respective
20 claims for response costs at the North Yard. The Navy, BAE Systems, and NASSCO
21 settled their respective claims with respect to response costs at both the North and South
22 Yards. NASSCO and the Port District settled their respective claims with respect to
23 response costs at the South Yard.3
The settling parties filed motions seeking
24
2
On
Amended Case
25 ManagementNovember 7, 2013, the Magistrate Judge issued anexpert discovery,
Conference Order extending the deadlines for fact and
for increased numbers of Interrogatories, Requests for
26 and allowing Production of Documents and Things. (ECF No. 376). Admission, and
Requests for
27
3
In December 2012, NASSCO established the San Diego Bay Environmental
Restoration Fund - South (“South Trust”), for which it serves as trustee, for the purpose
28 of providing for payment of work required under the Final CAO. (ECF No. 370-3 at
21, 23-24).
- 12 -
09cv2275 WQH (BGS)
1 determinations that the settlement agreements were reached in good faith, and approval
2 of requested bars to future claims. (ECF Nos. 354, 366, 367, 368, 370).
3
On July 10, 2014, the Court issued an order granting the motions, concluding that
4 “all three settlement agreements were entered into in good faith,” and were “fair,
5 reasonable, and consistent with the purposes of CERCLA and the [Uniform
6 Contributory Fault Act].” (ECF No. 423 at 48). Following approval of the settlements,
7 the City was the only remaining “Discharger” or “Person[] Responsible” identified in
8 the Final CAO that had yet to settle with NASSCO.
9 The Pending Settlement
10
On February 11, 2015, NASSCO and the City filed the joint motion for
11 determination of good faith settlement, indicating that a settlement agreement had been
12 entered into regarding response costs of the “South Yard” portion of the Shipyard
13 Sediment Site. (ECF No. 487-1). The pending motion requests approval of the
14 Settlement Agreement and an order dismissing and barring all claims against the City
15 and NASSCO in this action “with regard to ‘Covered Matters’ under the Agreement,
16 as more particularly set forth in the Settling South Parties’ moving papers, except as
17 expressly reserved or excluded in the Agreement.” (ECF No. 487 at 2). The motion is
18 accompanied by the Declaration of Kelly Richardson (“Richardson Decl.”), the
19 settlement agreement entered into between NASSCO and the City (the “Settlement
20 Agreement”), a proposed order barring and dismissing claims against NASSCO and the
21 City (“proposed bar order”), and a request for judicial notice of the Final CAO and
22 Technical Report. (ECF Nos. 487-2 through 487-6).
23
NASSCO and the City assert that their settlement, in addition to the earlier
24 settlements, “resolves all claims in this action relating to the remediation of the South
25 Site.” Id. at 8. NASSCO and the City assert that the terms of their settlement
26 agreement (the “Settlement Agreement”) are the “result of arms’ length negotiations
27 over several years of privately-mediated and judicially-supervised settlement
28 discussions among all parties to this action, and are without collusion, fraud, or any
- 13 -
09cv2275 WQH (BGS)
1 tortious conduct aimed to injure the interests of non-settling parties.” Id. at 9. Kelly
2 Richardson states that the Regional Board estimates the total cost of cleanup of the
3 South Yard to be $24 million.
4
Under the terms of the Settlement Agreement, NASSCO agrees to “be solely
5 responsible to perform the work required by the CAO in the South Yard and for the
6 implementation and completion of the Remedial Action in the South Yard” and to pay
7 $580,724.21 for “unpaid Past State Oversight Costs related to the South Yard.” (ECF
8 No. 487-2 at 14-15). The City agrees to pay 24% of “Past South Trust Costs” of which
9 it has paid $4,154,581.36 to date. Id. at 15. The City agrees to pay $1,070,204.02 to
10 NASSCO for “Past Response Costs.” Id. The City agrees to pay $301,046.18 for “Past
11 Unpaid State Oversight Costs.” Id. The City agrees to pay 24% of “Future Response
12 Costs.” Id.
13
On March 2, 2015, counsel for the City emailed the Court’s chambers a “revised”
14 proposed order dismissing and barring claims against the settling South Yard parties.
15 Counsel states that “[t]his revised order is a product of negotiations between the moving
16 parties and the Port District.” The docket reflects that the revised proposed order has
17 not been filed. On March 2, 2015, the Port District filed a “Conditional Non18 Opposition” to the pending motion, “expressly conditioned upon the modifications to
19 the proposed ‘Order Confirming Good Faith Settlement Between National Steel and
20 Shipbuilding Company and City of San Diego and Barring and Dismissing Claims
21 Against the City,’ as reflected in the revised proposed Order submitted to the Court this
22 afternoon....” (ECF No. 493 at 3).
23
On March 2, 2015, the Port District filed objections to NASSCO and the City’s
24 request for judicial notice. (ECF No. 494). On March 9, 2015, NASSCO filed a
25 response to the Port District’s objections. (ECF No. 496).
26
APPLICABLE LAW
27 I.
CERCLA Liability
28
CERCLA imposes “strict liability for environmental contamination” upon four
- 14 -
09cv2275 WQH (BGS)
1 classes of potentially responsible parties. Burlington N. & Santa Fe Ry. Co. v. United
2 States, 556 U.S. 599, 608 (2009). Enacted as a part of the Superfund Amendments and
3 Reauthorization Act of 1986, § 113(f) authorizes one potentially responsible party to
4 sue another for contribution in certain circumstances. 42 U.S.C. § 9613(f). CERCLA
5 liability is joint and several, meaning that a responsible party may be held liable for the
6 entire cost of cleanup even where other parties contributed to the contamination.
7 Fireman’s Fund Ins. Co. v. City of Lodi, 302 F.3d 928, 945 (9th Cir. 2002). Parties
8 required to pay cleanup costs may, in turn, sue other potentially responsible parties for
9 contribution. Id.
10 II.
CERCLA Favors Settlement and Allows Contribution Bars
11
CERCLA encourages responsible parties to remediate hazardous sites without
12 delay. Burlington N. & Santa Fe Ry. Co., 556 U.S. at 602; Fireman’s Fund Ins. Co.,
13 302 F.3d at 947 (“A fundamental purpose and objective of CERCLA is to encourage
14 the timely cleanup of hazardous waste sites.”). The Courts have recognized a strong
15 federal interest in promoting settlement of complex CERCLA actions. See e.g., Cal.
16 Dep’t of Toxic Substances Control v. Hearthside Residential Corp., 613 F.3d 910, 915
17 (9th Cir. 2010) (“Another important purpose of CERCLA is to encourage early
18 settlement between potentially responsible parties and environmental regulators.”);
19 Fireman’s Fund Ins. Co., 302 F.3d at 948 (finding “early settlement[s]” under
20 CERCLA allow “energy and resources to be directed at site cleanup rather than
21 protracted litigation.”); Carson Harbor Vill. Ltd. v. Unocal Corp., 270 F.3d 863, 880,
22 884 (9th Cir. 2001) (en banc) (discussing CERCLA’s policies of “encouraging early
23 settlement” and promoting the “expeditious and efficient cleanup of hazardous waste
24 sites.”).
25
“To facilitate settlement in multi-party litigation, a court may review settlements
26 and issue bar orders that discharge all claims of contribution by nonsettling defendants
27 against settling defendants.” Adobe Lumber, Inc. v. Hellman, No. CIV 05-1510 WBS
28 EFB, 2009 WL 256553, at *2 (E.D. Cal. Feb. 3, 2009); see also AmeriPride Servs., Inc.
- 15 -
09cv2275 WQH (BGS)
1 v. Valley Indus. Servs., Inc., No. CIV. S-00-113-LKK JFM, 2007 WL 1946635, at *2
2 (E.D. Cal. July 6, 2007) (“Within the Ninth Circuit, a court’s authority to review and
3 approve settlements and to enter bar orders has been expressly recognized.”). The
4 Court can bar related state law claims in a federal action. See In Re Heritage Bond
5 Litig., 546 F.3d 667, 670-71 (9th Cir. 2008) (court can enter bar order under California
6 Code of Civil Procedure section 877.6 that addresses related state law claims for
7 “contribution and indemnity or disguised claims for such relief”); see also Fed. Sav.
8 and Loan Ins. Corp. v. Butler, 904 F.2d 505, 511 (9th Cir. 1990).
9 III.
10
Fairness, Adequacy, and Reasonableness of the Settlement
“‘The initial decision to approve or reject a settlement proposal is committed to
11 the sound discretion of the trial judge.’” S.E.C. v. Randolph, 736 F.2d 525, 529 (9th
12 Cir. 1984) (quoting Officers for Justice v. Civil Serv. Comm’n, 688 F.2d 615, 625 (9th
13 Cir. 1982)). “In deciding whether to approve a proposed settlement in a CERCLA case,
14 a district court must weigh the ‘fairness, adequacy and reasonableness’ of the proposed
15 settlement.” Stearns & Foster Bedding Co. v. Franklin Holding Corp., 947 F. Supp.
16 790, 813 (D.N.J. 1996) (quoting United States v. Rohm & Haas Co., 721 F. Supp. 666,
17 685 (D.N.J. 1989)). The Court of Appeals for the Ninth Circuit has indicated that “[a]
18 settlement should be approved if it is fundamentally fair, adequate, and reasonable.”
19 Torrisi v. Tucson Elec. Power Co., 8 F.3d 1370, 1375 (9th Cir. 1993). When evaluating
20 a settlement, the Court does not conduct a trial on the merits, nor should the proposed
21 settlement “be judged against a hypothetical or speculative measure of what might have
22 been achieved by the negotiators.” Officers for Justice, 688 F.2d at 625. Instead, a
23 presumption of fairness arises where: (1) counsel is experienced in similar litigation;
24 (2) settlement was reached through arm’s-length negotiations; and (3) investigation and
25 discovery are sufficient to allow counsel and the court to act intelligently. Linney v.
26 Alaska Cellular P’ship, No. C-96-3008 DLJ, 1997 WL 450064, at *5 (N.D. Cal. Jul. 18,
27 1997), aff’d 151 F.3d 1234 (9th Cir. 1998); Ellis v. Naval Air Rework Facility, 87
28 F.R.D. 15, 18 (N.D. Cal. 1980), aff’d, 661 F.3d 939 (9th Cir. 1981).
- 16 -
09cv2275 WQH (BGS)
1
However, the “fairness or reasonableness of a ... settlement simply cannot be
2 measured” in “an informational vaccum.” United States v. Montrose Chem. Corp. of
3 Cal., 50 F.3d 741, 747 (1995). “‘Fair’ and ‘reasonable’ are comparative terms.”
4 Arizona v. City of Tucson, 761 F.3d 1005, 1012 (9th Cir. 2014) (citing Montrose, 50
5 F.3d at 748). “[I]n order to approve a CERCLA consent decree, a district court must
6 find that the agreement is ‘based upon, and roughly correlated with, some acceptable
7 measure of comparative fault, apportioning liability among the settling parties according
8 to rational (if necessarily imprecise) estimates of how much harm each [potentially
9 responsible party] has done.’” Id. (quoting United States v. Charter Int’l Oil Co., 83
10 F.3d 510, 521 (1st Cir.1996)). The district court has an “obligation to independently
11 ‘scrutinize’ the terms of a settlement.” Montrose, 50 F.3d at 747. The district court
12 “should determine the proportional relationship between the [settlement amount] and
13 [estimates of] total potential damages. The court should evaluate the fairness of that
14 proportional relationship in light of the degree of liability attributable to the settling
15 defendants.” Id. The court should also take into account “the nature of the liability of
16 the various defendants” and any “reasonable discounts for litigation risks, time savings,
17 and the like that may be justified.” Id.
18 IV.
Appropriate Method for Allocation of Response Costs
19
CERCLA section 113(f)(2) instructs courts to “allocate response costs among
20 liable parties using such equitable factors as the court determines are appropriate.” 42
21 U.S.C. § 9613(f)(1).
“[C]ourts have adopted two main alternative methods:
22 proportionate share and pro tanto (dollar-for-dollar).” Id.; see generally McDermott,
23 Inc. v. AmClyde, 511 U.S. 202, 211 (1994) (defining the proportionate share and pro
24 tanto methods). The pro tanto approach, embodied in the Uniform Contribution Among
25 Tortfeasors Act (UCATA), provides for the reduction of nonsettling defendants’
26 liability by the dollar amount of the settlement. UCATA § 4, 12 U.L.A. 194 (1996).
27 Alternatively, the proportionate share approach contained in the Uniform Comparative
28 Fault Act (UCFA) reduces the liability of the nonsettling defendants by the equitable
- 17 -
09cv2275 WQH (BGS)
1 share of the settling parties’ obligations. UCFA § 6, 12 U.L.A. 126 (1996).
2
CERCLA does not specify which method of apportionment courts should apply
3 in evaluating settlements, and the Ninth Circuit Court of Appeals has not issued a
4 guiding decision on the issue. See 42 U.S.C. § 9613(f); Adobe Lumber, 2009 WL
5 256553, at *3 (noting that the Ninth Circuit “has never addressed the question of proper
6 credit method for settlements”). District courts in the Ninth Circuit, however, have
7 uniformly employed the proportionate share method of the UCFA. See, e.g., Tyco
8 Thermal Controls LLC v. Redwood Indus., No. C 06-07164 JF (PVT), 2010 WL
9 3211926, at *5 (N.D. Cal. Aug. 12, 2010); Adobe Lumber, 2009 WL 256553, at *7;
10 Acme Fill Corp. v. Althin CD Med., Inc., No. C 91-4268-MMC, 1995 WL 822663, at
11 *1 (N.D. Cal. Nov. 8, 1995); United States v. W. Processing Co., 756 F.Supp. 1424,
12 1432 (W.D. Wash. 1990). District courts nationwide have similarly adopted the
13 proportionate share method. See, e.g., Tosco Corp. v. Koch Indust., 216 F.3d 886, 897
14 (10th Cir. 2000) (“[T]he majority of courts deciding contribution suits between private
15 parties ... have applied the [UCFA] to reduce a nonsettling party’s liability by the
16 amount of the settling parties’ liability, not the settlement amount.”); State v. Solvent
17 Chem. Co., Inc., 984 F.Supp. 160, 168 (W.D.N.Y. 1997); United States v. SCA Serv.,
18 Inc., 827 F. Supp. 526, 535 (N.D. Ind. 1993).
19
Under the proportionate share method, Section 6 of the UCFA provides:
20
A release, covenant not to sue, or similar agreement entered into between
a claimant and a person liable discharges that person from all liability for
contribution, but it does not discharge any other person liable upon the
same claim unless it so provides. However, the claim of the releasing
person against other persons is reduced by the amount of the released
person’s equitable share of the obligation....
21
22
23
24
25
26
27
28
UCFA § 6, 12 U.L.A. 44, 56 (Supp. 1992).
Section 2 of the UCFA provides that the court will make findings as to “the
percentage of the total fault that is allocated to each claimant, defendant, third-party
defendant, and person who has been released from liability under Section 6.” UCFA
§ 2(a)(2). The contribution provision of the UCFA “aims to avoid a variety of scenarios
by which a comparatively innocent [party] might be on the hook for the entirety of a
- 18 -
09cv2275 WQH (BGS)
1 large cleanup bill.” Carson, 270 F.3d at 871. The proportionate share approach
2 furthers the underlying policy of the contribution provision by “ensuring ... that
3 damages are apportioned equitably among the liable parties.” American Cyanamid Co.
4 v. Capuano, 381 F.3d 6, 20 (1st Cir. 2004).
5
In this case, there is no dispute among the parties that the proportionate share
6 approach of the UCFA is the most equitable method of apportioning liability. The
7 Court finds that the UCFA’s proportionate share approach is consistent with the
8 underlying goals of section 113(f)(1) and provides the most equitable method of
9 apportioning fault.
10 V.
State Law Claims
11
Where a settlement agreement involves the resolution of state law claims, federal
12 courts may apply the criteria set forth by the California Supreme Court in Tech-Bilt, Inc.
13 v. Woodward-Clyde Assoc., 38 Cal. 3d 488 (1985) to determine whether a particular
14 settlement was made in good faith, and thus extinguishes any equitable right of
15 contribution or indemnity from nonsettling parties. Heritage Bond, 546 F.3d at 68016 681; see also Shawmut Bank N.V. v. Kress Assoc., 33 F.3d 1477, 1504 (9th Cir. 1994).
17
District courts have the discretion to enter a bar order that applies the UCFA
18 contribution bar to state law claims in a CERCLA action. See, e.g., Acme Fill Corp.,
19 1995 WL 822664, at *8. In Acme Fill, nonsettling defendants challenged the settling
20 parties’ proposed order applying the UCFA contribution bar to all state law claims
21 asserted in the case. The district court explained:
22
23
24
25
26
27
28
The rationale for dismissal of all claims is that unless the related state
claims that arise out of the same set of facts and involve identical subject
matter are also dismissed, the finality of the settlement gained by applying
UCFA becomes meaningless. As a result, ‘[federal district] courts have
held that the contribution protection accorded to defendants settling their
liability under CERCLA discharges related claims made under state law.’
A settling defendant freed from federal contribution claims, but not from
state law claims, would gain little from the settlement payment. The
incentive to reach settlement in CERCLA actions would likely disappear
under a policy that allowed related state law claims to survive imposition
of a contribution bar. The CERCLA policy that encourages early
settlement would be circumvented by lingering state law claims.
Id. (quoting Hillsborough Cnty. v. A&E Road Oiling Svc., Inc., 853 F. Supp. 1402, 1408
- 19 -
09cv2275 WQH (BGS)
1 (M.D. Fla. 1994)).
2
DISCUSSION
3 I. Request for Judicial Notice
4
NASSCO and the City request judicial notice of the Final CAO and Technical
5 Report. The Port District objects to judicial notice of these documents “to the extent
6 they relate to the Port District’s alleged liability for contamination of the Shipyard
7 Sediment Site and for the municipal separate storm sewer system (‘MS4’) owned and
8 operated by the City of San Diego.” (ECF No. 494 at 3). The Port District contends
9 that NASSCO and the City have failed to identify the particular facts within the Final
10 CAO and Technical Report that are the subject of their request for judicial notice. The
11 Port District contends that findings contained in the Final CAO and Technical Report
12 are disputed by the parties. NASSCO asserts that it does not seek judicial notice of the
13 Final CAO and Technical Report for the truth of the matters asserted therein, “but to
14 provide contextual background upon which the Mediator, NASSCO and the City each
15 evaluated ... the basis for and reasonableness of their settlement.” (ECF No. 496 at 3).
16
The Court takes judicial notice of the fact that the Regional Board issued the
17 Final CAO and Technical Report and that these documents contain certain statements.
18 II.
Good Faith, Fairness, Adequacy, and Reasonableness of the Settlement
19
In this case, the parties have been engaged in administrative proceedings before
20 the Regional Board since 2005. (ECF No. 487-2 at 3). The parties began arm’s-length
21 mediation sessions with an experienced environmental mediator in June 2008. Id. The
22 parties have also participated in settlement discussions before the Magistrate Judge. Id.
23 NASSCO and the City have continued to negotiate in good faith as the final two
24 nonsettling parties identified as “Persons Responsible” for contamination of the South
25 Yard. The Court finds that the parties entered into the Settlement Agreement in good
26 faith.
27
The Court further finds that the Settlement Agreement furthers the goals of
28 CERCLA to remediate contamination and to ensure that the costs are borne by the
- 20 -
09cv2275 WQH (BGS)
1 potentially responsible parties. The settlement will avoid significant delays and
2 transaction costs associated with protracted litigation and preserve resources for
3 remediation. This settlement concludes negotiations for cleanup costs with respect to
4 the South Yard.
5
The Court further finds that the terms of the Settlement Agreement are
6 procedurally fair, adequate, and reasonable.
All parties identified as “Persons
7 Responsible” for South Yard contamination in the Final CAO are parties to this case,
8 participated in lengthy administrative proceedings, participated in settlement
9 conferences before the Magistrate Judge, participated in nearly seven years of mediation
10 with an experienced mediator, and had the opportunity to oppose this noticed motion.
11
Finally, the Court finds that the allocations of responsibility in the Settlement
12 Agreement are substantively fair, adequate, and reasonable in light of the total estimated
13 cost of cleanup of the South Yard. Kelly Richardson states that the Regional Board
14 estimates the total cost of cleanup of the South Yard to be $24 million. (ECF No. 487-2
15 at 3). The Port District agreed to pay a total of $1.4 million, which included past
16 oversight costs, past response costs, and future response costs. (ECF No. 370-3 at 23).
17 The Navy agreed to pay $966,398.84 for combined past response costs and past
18 oversight costs. (ECF No. 366-2 at 11). The Navy agreed to pay $6,765,000 for future
19 response costs, and in the event that future response costs total more than $20,500,000,
20 33% of future response costs beyond that amount. Id.
21
In the Settlement Agreement, the City agrees to pay $1,070,204.02 in past
22 response costs, $301,046.18 in past oversight costs, 24% share of “Past South Trust
23 Costs,” and 24% of future response costs. (ECF No. 487-2 at 15-16). In the Settlement
24 Agreement, NASSCO agrees to pay $580,724 in past oversight costs and “shall be
25 solely responsible to perform the work required by the CAO in the South Yard and for
26 the implementation and completion of the Remedial Action in the South Yard required
27 under the CAO....” Id. at 487-2 at 14-15. In the joint motion, NASSCO represents that
28 its fair share of the clean-up costs does not exceed 37%.
- 21 -
09cv2275 WQH (BGS)
1
The Court finds that these allocations of responsibility are not inconsistent with
2 any findings of the Final CAO and are fair and reasonable. As the final two “Persons
3 Responsible” for contamination of the South Yard site, NASSCO and the City are in the
4 best position to allocate the remaining responsibility between themselves. There are no
5 remaining nonsettling parties who may be left with an “inequitable distribution of
6 costs,” yet barred from seeking contributions from the settling parties. See Atl.
7 Research Corp. v. United States, 551 U.S. 128, 140 (2007) (noting that CERCLA
8 contribution counterclaims “blunt any inequitable distribution of costs”).
9 III. Proposed Order
10
The docket reflects that a revised proposed bar order, to which the Port District
11 does not object, has not been filed. The moving parties shall file the revised proposed
12 bar order on the docket within ten days from the date this Order is filed. Any objections
13 shall be filed within ten days from the date the proposed order is filed.
14
15
CONCLUSION
IT IS HEREBY ORDERED that the good faith settlement motion (ECF No. 487)
16 is GRANTED as follows:
17
1.
The Court finds the Settlement Agreement was entered into in good faith,
18
and is fair, reasonable, and consistent with the purposes of CERCLA and
19
the UCFA.
20
2.
The Moving Parties shall file the revised proposed bar order within ten
21
(10) days from the date this Order is filed. Any objections shall be filed
22
within ten (10) days from the date the proposed bar order is filed.
23 DATED: April 21, 2015
24
25
WILLIAM Q. HAYES
United States District Judge
26
27
28
- 22 -
09cv2275 WQH (BGS)
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.