United States of America et al v. Turner-Penick Joint Venture et al
Filing
153
ORDER: (1) Denying 124 Motion for Partial Summary Judgment by Turner-Penick Joint Venture and Sureties; (2) Denying 139 Motion to Strike Declaration of David Holland; (3) Granting 141 Joint Motion for Leave to File Extended Reply Brief. The hearing currently set for March 28, 2014, is VACATED. Signed by Judge Gonzalo P. Curiel on 3/27/2014. (srm)
1
2
3
4
5
6
7
8
UNITED STATES DISTRICT COURT
9
SOUTHERN DISTRICT OF CALIFORNIA
10
UNITED STATES OF AMERICA, for
the Use and Benefit of Collins
12 Plumbing, Inc., a California
Corporation; COLLINS PLUMBING,
13 INC.,
11
14
15
16
17
18
19
20
21
22
)
)
)
)
)
)
Plaintiffs,
)
v.
)
)
TURNER-PENICK JOINT VENTURE )
et al.,
)
)
Defendants.
)
)
)
)
)
AND RELATED COUNTER)
CLAIMS AND CROSS-CLAIMS
)
)
)
Civil No. 3:11-cv-2834-GPC-MDD
ORDER:
(1) DENYING MOTION FOR
PARTIAL SUMMARY
JUDGMENT BY TURNERPENICK JOINT VENTURE AND
SURETIES, (ECF NO. 124);
(2) DENYING MOTION TO
STRIKE DECLARATION OF
DAVID HOLLAND, (ECF NO.
139);
(3) GRANTING JOINT MOTION
FOR LEAVE TO FILE
EXTENDED REPLY BRIEF, (ECF
NO. 141)
INTRODUCTION
23
Before the Court in this construction-defect case is the Motion for Partial
24
Summary Judgment filed by Turner-Penick Joint Venture (“Turner-Penick”) and its
25
sureties SafeCo Insurance Company of America, Liberty Mutual Insurance Company,
26
Zurich American Insurance Company, Fidelity and Deposit Company of Maryland, and
27
Federal Insurance Company (all five collectively, “Sureties”). (ECF No. 124.) Turner-
28
Penick and the Sureties’ move for partial summary judgment against California
3:11-cv-2834-GPC-MDD
1
Comfort Systems USA, Inc. (“Comfort Systems”) on Comfort Systems’ counterclaims
2
against Turner-Penick and the Sureties for breach of contract, recovery under Miller
3
Act payment bond, and quantum meruit. Comfort Systems has filed an opposition to
4
Turner-Penick and the Sureties’ Motion for Partial Summary Judgment, (ECF No. 128),
5
and Turner-Penick and the Sureties have filed a reply, (ECF No. 137).1 The Court finds
6
Turner-Penick and the Sureties’ Motion for Partial Summary Judgment suitable for
7
disposition without oral argument. See CivLR 7.1.d.1. Having considered the parties’
8
submissions and the applicable law, and for the reasons that follow, the Court will
9
DENY the Motion for Partial Summary Judgment.
BACKGROUND
10
11
I.
Facts
12
While the parties disagree as to the materiality of certain facts and/or the
13
admissibility of certain evidence, the underlying facts of this controversy are largely
14
undisputed. This case involves a dispute over the design and construction of an
15
expansion to Camp Pendleton, a U.S. Marine Corps base in San Diego County,
16
California. The Naval Facilities Engineering Command (“NAVFAC”) administered,
17
and is considered the “owner,” of the expansion project.
18
The specific components of the expansion project at issue here are known as
19
“Package 4” and “Package 7” (together, “Projects”). Each of the Projects consists of
20
designing and building four, dormitory-style buildings known as “Bachelor Enlisted
21
Quarters” (“BEQ”) on Camp Pendleton. The Projects are thus sometimes referred to
22
as “BEQ 4” and “BEQ 7.” Combined, the Projects entail the designing and building
23
of eight BEQs.
24
In the fall of 2008, NAVFAC solicited bids from general contractors who would
25
both design and build the Projects. As is the case with design-build contracts,
26
NAVFAC set forth the requirements for each of the Projects in a “Request for
27
28
1
The Court GRANTS the parties’ Joint Motion for Leave to File Extended Reply Brief, (ECF
No. 141).
2
3:11-cv-2834-GPC-MDD
1
Proposal” (“RFP”). NAVFAC issued an RFP for BEQ 4 and an RFP for BEQ 7.2
2
In mid to late 2009, Turner-Penick was awarded the general contracts for both
3
BEQ 4 and BEQ 7. As was required to accept the award, Turner-Penick secured the
4
proper performance and payment bonds through the Sureties. Turner-Penick also set
5
about hiring the various architects, engineers, and other subcontractors needed to
6
design and build the Projects. Among those with whom Turner-Penick contracted, was
7
Comfort Systems.
8
In October and December of 2009, Comfort Systems entered into subcontracts
9
with Turner-Penick for the design and construction of the heating, ventilation, and air
10
conditioning (“HVAC”) systems for BEQ 4 and BEQ 7 (“Subcontracts”). There are
11
generally two types of HVAC systems: (1) a “through-wall” system, which provides
12
conditioned air via small mechanical units that pass through an exterior wall of each
13
room or unit in a building; and (2) a “central-air” system, which provides conditioned
14
air from one large mechanical unit that is pumped through ducting to each room or unit
15
in a building.
16
The core issue for purposes of this Motion for Partial Summary Judgment is
17
whether Comfort Systems is entitled to additional payment for having to redesign the
18
HVAC systems for BEQ 4 and BEQ 7. Comfort Systems initially designed a through-
19
wall system but was later required to change its design to include a central, make-up
20
air system. Comfort Systems claims it is entitled to additional compensation for having
21
to redesign the HVAC systems. Comfort Systems contends the Project requirements
22
were ambiguous with regard to whether a central-air system was required. Comfort
23
Systems bases its ambiguity argument on the following undisputed facts.
24
First, prior to Turner-Penick being awarded the BEQ 4 and BEQ 7 general
25
contracts, Turner-Penick representatives were required to participate in a mandatory
26
“job walk.” During this job walk, Turner-Penick representatives were shown BEQ 1,
27
28
2
An RFP was first issued for BEQ 7 in January 2009, and an amended RFP was issued in July
2009. See n.5, infra.
3
3:11-cv-2834-GPC-MDD
1
told BEQ 1 was a “Best of Breed Winner,” and encouraged to use BEQ 1 as a starting
2
point for any response to the RFPs for BEQ 4 and BEQ 7. BEQ 1 has a through-wall
3
HVAC system.
4
Second, Holland—the Turner-Penick project director for both BEQ 4 and BEQ
5
7—has stated that, at the time Turner-Penick and Comfort Systems were entering into
6
the BEQ 4 Subcontract, everyone agreed that Comfort Systems’ proposed through-wall
7
HVAC system should satisfy the RFP requirements for BEQ 4. Turner-Penick agreed
8
the RFP requirements for BEQ 4 did not clearly communicate a requirement to provide
9
a central-air system. And Holland later testified that, indeed, Comfort Systems had a
10
“very compelling case” for why its through-wall system would satisfy the RFP
11
requirements.
12
Third, Eugene Walsh of Walsh Engineering, Inc. believed Comfort Systems’
13
proposed through-wall system would satisfy the RFP requirements. Walsh, who had
14
been involved in nine federal projects similar to the Projects here, was asked by
15
Turner-Penick to consult on whether Comfort Systems’ initial HVAC design satisfied
16
the RFP requirements.
17
Fourth, Jonathan Lundstrom (Comfort Systems’ own mechanical engineer)
18
reviewed the RFP requirements and concluded Comfort Systems’ proposed through-
19
wall system would satisfy the RFP requirements.
20
Fifth, when the NAVFAC issued its RFP for BEQ 8, NAVFAC made clear that
21
a central-air HVAC system was required. This clarity distinguished the BEQ 8 RFP
22
from the BEQ 4 and BEQ 7 RFPs.
23
Sixth, prior to NAVFAC’s award of the BEQ 4 and BEQ 7 general contracts,
24
other general contractors had requested information from NAVFAC regarding the
25
required HVAC systems. Holland agreed that NAVFAC’s response to these pre-bid
26
requests for information were “[n]ot as clear as we would have liked.”
27
Seventh, while drafting the BEQ 4 Subcontract, Comfort Systems crossed out
28
requirements that were pertinent to central-air systems. The initial draft of the BEQ 7
4
3:11-cv-2834-GPC-MDD
1
Subcontract contained none of the requirements pertinent to central-air systems that
2
Comfort Systems had crossed out in the BEQ 4 Subcontract. The final version of both
3
Subcontracts, however, incorporated the requirements of their respective RFPs.
4
Eighth, shortly after the Subcontracts were executed, Turner-Penick sent
5
NAVFAC a letter requesting that the BEQ 4 general contract be modified to permit
6
Comfort Systems’ to install its initially designed through-wall HVAC system.3 This
7
letter was based on: (1) NAVFAC’s representations about BEQ 1 on the mandatory job
8
walk, (2) Walsh’s belief that Comfort Systems’ initial design complied with the RFP,
9
(3) Lundstrom’s belief that Comfort Systems’ initial design complied with the RFP, (4)
10
the additional clarification NAVFAC provided in the BEQ 8 RFP as compared to the
11
BEQ 4 and BEQ 7 RFPs, and (5) the deficient responses to the other general
12
conrtractors’ pre-bid requests for information. NAVFAC denied Turner-Penick’s
13
request.4
14
Turner-Penick and the Sureties now contend the contract documents were clear
15
all along and that Comfort Systems is not entitled to any additional payment for its
16
redesign of the HVAC systems for BEQ 4 and BEQ 7. Turner-Penick and the Sureties
17
base their position on the contract documents themselves.
18
The Subcontracts each contain an “Attachment ‘B,’” which in turn requires the
19
HVAC systems for each of the Projects to be designed and built in accordance with,
20
among other things, the RFPs for each of the Projects.5
21
22
23
24
3
Turner-Penick and the Sureties object to the admissibility of this letter on authentication and
hearsay grounds. The objections are OVERRULED. The letter is properly authenticated as an exhibit
to Holland’s deposition, and it is excluded from the definition of hearsay as an opposing party’s
statement.
4
25
26
27
Comfort Systems’ objection that the NAVFAC denial letter is inadmissible hearsay is
SUSTAINED. The Court will not, therefore, consider the stated reasons for NAVFAC’s denial.
Holland, however, provides his own declaration that NAVFAC rejected Turner-Penick’s request for
a modification. (ECF No. 149, Holland Decl. ISO Reply ¶ 22.) The Court finds this undisputed
evidence is sufficient to establish the fact that NAVFAC rejected Comfort Systems’ initial design.
5
28
The Subcontract for BEQ 7 was based on the January 2009 RFP—not the July 2009 RFP.
Turner-Penick, however, was awarded the BEQ 7 general contract based on the July 2009 RFP. Thus,
Turner-Penick and the Sureties provided only the July 2009 RFP in support of their Motion for Partial
5
3:11-cv-2834-GPC-MDD
1
The RFPs for BEQ 4 and BEQ 7 each contain “General Requirements.” Section
2
01 33 10.05 20 of the General Requirements contains “Design Submittal Procedures.”
3
The Design Submittal Procedures incorporate, and require compliance with, the U.S.
4
Department of Defense United Facilities Criteria (“UFC”) for Mechanical Engineering,
5
which is designated as UFC 3-400-10N.
6
In addition to the General Requirements, the RFPs each contain “Project
7
Program Requirements.” Like the Design Submittal Procedures, the Project Program
8
Requirements also require compliance with UFC 3-400-10N.
9
10
11
12
13
14
Section 2-5 of UFC 3-400-10N pertains to “TERMINAL & PACKAGE
UNITS.”6 Section 2-5.1 states:
Do not provide room fan coil units or packaged terminal units, such as
individual through-wall heat pumps, for facilities such as office buildings
and Bachelor Quarters or for any facility larger than 465 square meters
(5000 square feet), unless conditioned make-up air is provided to each
space through a central, continuously operating, dedicated make-up air
system. Conditioned make-up air shall be ducted to each room or to the
return side of each fan coil or terminal unit.
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Summary Judgment. Comfort Systems argues in opposition that the failure to provide the January
2009 RFP is a sufficient basis to deny Turner-Penick and the Sureties’ Motion for Partial Summary
Judgment, given that the BEQ 7 Subcontract incorporated the January 2009 RFP—not the July 2009
RFP. In reply, Turner-Penick and the Sureties offer undisputed evidence, in the form of Holland’s
Declaration, that the relevant provisions of the January 2009 RFP were unaltered in the July 2009 RFP.
(ECF No. 149, Holland Decl. ISO Reply ¶¶ 6-13, 16.)
The Court DENIES Comfort Systems’ Motion to Strike this Holland Declaration because the
Declaration and the exhibits attached thereto are a reasonably foreseeable response to Comfort
Systems’ arguments in opposition to the Motion for Partial Summary Judgment. Further, the Court
OVERRULES Comfort Systems’ objection to this Holland Declaration on authentication/personal
knowledge grounds because the Court finds Holland—as the Turner-Penick project director for BEQ
7 who has reviewed the January 2009 and July 2009 RFPs—has sufficient knowledge of the January
2009 and July 2009 RFPs to testify to their contents.
6
The Court DENIES Turner-Penick and the Sureties’ request that the Court take judicial
notice of Section 2-5 of UFC 3-400-10N because UFC 3-400-10N itself states: “UFC are living
documents and will be periodically reviewed, updated, and made available to users . . . .” (ECF No.
125-3 at 39.) Given the evolving nature of the UFC, the Court finds their provisions may be subject
to reasonable dispute. And contrary to Turner-Penick and the Sureties’ position, the UFC are not
published in the Code of Federal Regulations but are instead “distributed only in electronic media from
the . . . Whole Building Guide Design web site.” (Id.) This makes judicial notice of the UFC
inappropriate. See Fed. R. Evid. 201. Nevertheless, the Court finds the UFC attached to Holland’s
Declaration, along with Holland’s undisputed statement that the attached UFC is a true and correct
copy, to be sufficient evidence of the UFC 3-400-10N’s provisions.
6
3:11-cv-2834-GPC-MDD
1
(ECF No. 125-4 at 124.7) Thus, both the General Requirements (through the Design
2
Submittal Procedures) and the Project Program Requirements require compliance with
3
UFC 3-400-10N.8
4
Turning to provisions of the Subcontracts themselves, Article I of the
5
Subcontracts provides that Comfort Systems “shall perform and furnish all the work,
6
labor, services, materials, . . . and other things necessary for . . . the Work . . . at . . .
7
BEQ Package 4 . . . in strict accordance with the Additional Provisions and contract
8
documents as listed Page 2, Attachment B, Additional Provisions, annexed hereto and
9
made a part hereof.” (ECF Nos. 125-1 at 10, 111 (emphasis added).)
10
Article II of the Subcontracts provides that Comfort Systems
11
represents and agrees that it has carefully examined and understands this
Agreement and the other Contract Documents, has investigated the nature,
locality and site of the Work and the conditions and difficulties under
which it is to be performed and that it enters into this Agreement on the
basis of its own examination, investigation and evaluation of all such
matters and not in reliance upon any opinions or representations of
Turner-Penick, or of the Owner [i.e., NAVFAC], or of any of their
respective officers, agents, servants, or employees.
12
13
14
15
16
(Id. (emphasis added).) Article II further provides that Comfort Systems “agrees to be
17
bound to Turner-Penick by each and all of the terms and provisions of the General
18
Contract and the other Contract Documents, and to assume toward Turner-Penick all
19
of the duties, obligations and responsibilities that Turner-Penick by those Contract
20
Documents assumes toward the Owner . . . .” (Id.) Article II finally provides:
21
22
23
7
When the Court cites to a page of a pleading or document filed with the Court, the Court
refers to the CM/ECF page number.
8
24
25
26
27
28
The Design Submittal Procedures for each of the RFPs also set forth an order of precedence
to be applied if a conflict or inconsistency between the RFPs’ various provisions arises. (ECF No.
125-3 at 15-16.) The provision, entitled “THE CONTRACT AND ORDER OF PRECEDENCE,”
provides: “The contract consists of the solicitation, the approved proposal, and the final design.” The
provision continues, “In the event of conflict or inconsistency between any of the below described
portions of the conformed contract, precedence shall be given in the following order . . . .” (Id. at 16
(emphasis added).) Because the Order of Precedence applies only to the “conformed contract”—and
because the “contract” is defined as including only the solicitation, the approved proposal, and the final
design—it is clear that the Order of Precedence has no bearing on requirements contained in
documents other than the “conformed contract.” The Subcontracts are documents other than the
“conformed contract.” Thus, the Order of Precedence has no bearing on the Subcontracts.
7
3:11-cv-2834-GPC-MDD
This Subcontract Agreement, the provisions of the General Contract and
the other Contract Documents are intended to supplement and
complement each other and shall, where possible, be thus interpreted. If,
however, any provision of this Subcontract Agreement irreconcilably
conflicts with a provision of the General Contract and the other Contract
Documents, the provision imposing the greater duty or obligation on the
Subcontractor shall govern.
1
2
3
4
5
(Id. (emphasis added).)
6
Article XXVIII of the Subcontracts provides:
7
The Subcontractor hereby guarantees the Work to the full extent provided
in the Plans, Specifications, General Conditions, Special Conditions and
other Contract Documents.
8
The Subcontractor shall expeditiously remove, replace and/or repair at its
own expense and at the convenience of the Owner any faulty, defective
or improper Work, materials or equipment existing or discovered within
one (1) year from the date of the acceptance of the Project as a whole by
the Architect and the Owner or for such longer period as may be provided
....
9
10
11
12
Without limiting the generality of the foregoing, the Subcontractor
warrants to the Owner, the Architect and Turner-Penick, and each of
them, . . . that the Work performed pursuant to this Agreement will be free
from defects and that the Work will strictly conform with the
requirements of the Contract Documents. Work not conforming to such
requirements, including substitutions not properly approved and
authorized, shall be considered defective.
13
14
15
16
17
(ECF No. 125-1 at 19, 120 (emphasis added).)
18
II.
Procedural History
19
Plaintiff Collins Plumbing, Inc. (“Collins”) commenced this action when it filed
20
its Complaint on December 5, 2011, against Turner-Penick and the Sureties. (ECF No.
21
1.) The next day, Collins filed its First Amended Complaint. (ECF No. 2.) And, on
22
February 12, 2012, Collins filed its Second Amended Complaint. (ECF No. 14.)
23
On May 22, 2012, Turner-Penick and the Sureties filed their Answer to Collins’
24
SAC, along with a counterclaim complaint against Collins and a third-party complaint
25
against Comfort Systems and Walsh Engineering, Inc. (ECF No. 26.)
26
On July 19, 2012, Comfort Systems filed its Answer to Turner-Penick and the
27
Sureties’ Third-Party Complaint, along with a counterclaim complaint against Turner-
28
Penick and the Sureties. (ECF No. 35.) On October 1, 2012, Comfort Systems filed
8
3:11-cv-2834-GPC-MDD
1
its currently operative First Amended Counterclaim Complaint against Turner-Penick
2
and the Sureties for: (1) breach of BEQ 4 Subcontract against Turner-Penick, (2)
3
recovery under Miller Act payment bond for BEQ Package 4 against the Sureties, (3)
4
quantum meruit for BEQ Package 4 against Turner-Penick, (4) negligence in
5
connection with BEQ Package 4 against Turner-Penick, (5) breach of BEQ 7
6
Subcontract against Turner-Penick, (6) recovery under Miller Act payment bond for
7
BEQ Package 7 against the Sureties, (7) quantum meruit for BEQ Package 7 against
8
Turner-Penick, (8) negligence in connection with BEQ Package 7 against Turner-
9
Penick, (9) implied indemnity against Turner-Penick, (10) contribution against Turner-
10
Penick. (ECF No. 62.)
11
On January 15, 2013, Turner-Penick filed its Answer to Comfort Systems’ First
12
Amended Counterclaim Complaint. (ECF No. 76.) On February 8, 2013, the Sureties
13
filed their Answer to Comfort Systems’ Counterclaim Complaint. (ECF No. 81.)
14
Turner-Penick and the Sureties now move for partial summary judgment on the
15
discrete issue of whether Comfort Systems is entitled to additional compensation for
16
its redesign of the BEQ 4 and BEQ 7 HVAC systems. If not, then Comfort Systems’
17
redesign of the HVAC systems cannot serve as a basis for Comfort Systems’ first,
18
second, third, fifth, sixth, or seventh counterclaims against Turner-Penick and the
19
Sureties. Though, because Comfort Systems bases these causes of action on alleged
20
costs other than those incurred for the HVAC system redesign (e.g., the costs of
21
repairing duct work that was damaged by other trades and the cost of applying anti-
22
corrosion paint to all condensers), Turner-Penick and the Sureties’ Motion will not
23
fully dispose of any of Comfort Systems’ counterclaims. The costs associated with the
24
HVAC system redesign, however, represent the majority of damages claimed by
25
Comfort Systems in its First Amended Counterclaim Complaint against Turner-Penick
26
and the Sureties.
27
28
LEGAL STANDARD
Summary judgment is appropriate where the moving party demonstrates the
9
3:11-cv-2834-GPC-MDD
1
absence of a genuine issue of material fact and entitlement to judgment as a matter of
2
law. Fed. R. Civ. P. 56(c); Celotex Corp. v. Catrett, 477 U.S. 317, 322 (1986). A fact
3
is material when, under the governing substantive law, it could affect the outcome of
4
the case. See Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248 (1986); Freeman v.
5
Arpaio, 125 F.3d 732, 735 (9th Cir. 1997). A dispute about a material fact is genuine
6
if “the evidence is such that a reasonable jury could return a verdict for the nonmoving
7
party.” Anderson, 477 U.S. at 248.
8
A party seeking summary judgment always bears the initial burden of
9
establishing the absence of a genuine issue of material fact. See Celotex, 477 U.S. at
10
323. The moving party may satisfy this burden in two ways: (1) by presenting evidence
11
that negates an essential element of the nonmoving party’s case or (2) by demonstrating
12
that the nonmoving party failed to make a showing sufficient to establish an element
13
essential to that party’s case on which that party will bear the burden of proof at trial.
14
Id. at 322-23.
15
Where the party moving for summary judgment does not bear the burden of
16
proof at trial, it may show that no genuine issue of material fact exists by demonstrating
17
“there is an absence of evidence to support the non-moving party’s case.” Id. at 325.
18
The moving party is not required to produce evidence showing the absence of a
19
genuine issue of material fact, nor is it required to offer evidence negating the moving
20
party’s claim. Lujan v. National Wildlife Fed’n, 497 U.S. 871, 885 (1990); United
21
Steelworkers v. Phelps Dodge Corp., 865 F.2d 1539, 1542 (9th Cir. 1989). “Rather,
22
the motion may, and should, be granted so long as whatever is before the District Court
23
demonstrates that the standard for the entry of judgment, as set forth in Rule 56(c), is
24
satisfied.” Lujan, 497 U.S. at 885 (quoting Celotex, 477 U.S. at 323). If the moving
25
party fails to discharge this initial burden, summary judgment must be denied and the
26
court need not consider the nonmoving party’s evidence. See Adickes v. S.H. Kress &
27
Co., 398 U.S. 144, 159-60 (1970).
28
If the moving party meets the initial burden, the nonmoving party cannot defeat
10
3:11-cv-2834-GPC-MDD
1
summary judgment merely by demonstrating “that there is some metaphysical doubt
2
as to the material facts.” Matsushita Elec. Indus. Co., Ltd. v. Zenith Radio Corp., 475
3
U.S. 574, 586 (1986); see also Anderson, 477 U.S. at 252 (“The mere existence of a
4
scintilla of evidence in support of the nonmoving party’s position is not sufficient.”).
5
Rather, the nonmoving party must “go beyond the pleadings and by her own affidavits,
6
or by the depositions, answers to interrogatories, and admissions on file, designate
7
specific facts showing that there is a genuine issue for trial.” Celotex, 477 U.S. at 324
8
(quoting Fed. R. Civ. P. 56(e)) (internal quotations omitted).
9
“Disputes over irrelevant or unnecessary facts will not preclude a grant of
10
summary judgment.” T.W. Elec. Serv., Inc. v. Pacific Elec. Contractors Ass’n, 809 F.2d
11
626, 630 (9th Cir. 1987). “The district court may limit its review to the documents
12
submitted for purpose of summary judgment and those parts of the record specifically
13
referenced therein.” Carmen v. San Francisco Unified Sch. Dist., 237 F.3d 1026, 1030
14
(9th Cir. 2001). Therefore, the court need not “scour the record in search of a genuine
15
issue of triable fact.” Keenan v. Allen, 91 F.3d 1275, 1279 (9th Cir. 1996) (citing
16
Richards v. Combined Ins. Co., 55 F.3d 247, 251 (7th Cir. 1995)).
17
The court may not make credibility determinations, and inferences to be drawn
18
from the facts must be viewed in the light most favorable to the party opposing the
19
motion. Masson v. New Yorker Magazine, 501 U.S. 496, 520 (1991); see Anderson,
20
477 U.S. at 255; Matsushita, 475 U.S. at 587.
DISCUSSION
21
22
Turner-Penick and the Sureties argue they are entitled to partial summary
23
judgment on the issue of whether Comfort Systems is entitled to additional
24
compensation for its redesign of the HVAC systems for BEQ 4 and BEQ 7 because the
25
Subcontracts unambiguously required Comfort Systems to design and build a central-
26
air system. In other words, Turner-Penick and the Sureties argue Comfort Systems is
27
not entitled to additional compensation for complying with what the Subcontracts
28
already required.
More specifically, Turner-Penick and the Sureties argue the
11
3:11-cv-2834-GPC-MDD
1
Subcontracts’ terms require strict compliance with the RFPs, that the RFPs incorporate
2
the UFC, the UFC require installation of a central-air system, and that—because the
3
Subcontracts are integrated documents—the parol evidence rule bars consideration of
4
any extrinsic evidence to vary or add to the Subcontracts’ written terms.
5
In response, Comfort Systems does not take issue with Turner-Penick and the
6
Sureties’ explanation of the Subcontracts, RFPs, and UFC. Instead, Comfort Systems
7
argues the “relevant provisions” of the RFPs are ambiguous as to whether a central-air
8
system was required for BEQ 4 and BEQ 7. Comfort Systems also argues NAVFAC
9
breached the implied warranty of correctness as to the required HVAC system, which
10
in turn allows Comfort Systems to sue Turner-Penick for breach of contract. Comfort
11
Systems further argues that, under the rule of practical construction, the Court should
12
interpret Comfort Systems’ obligations under the Subcontracts in accordance with the
13
parties’ conduct. Finally, Comfort Systems argues that, even if there were no
14
ambiguity as to the required HVAC system, Comfort Systems entered the Subcontracts
15
based upon a mistake of fact and that the Court should therefore reform the
16
Subcontracts to reflect Comfort Systems’ understanding of the required HVAC system.
17
I.
18
19
20
21
22
23
Ambiguity & Parol Evidence
“[P]arol evidence is properly admitted to construe a written instrument when its
language is ambiguous.” Winet v. Price, 4 Cal. App. 4th 1159, 1165 (1992).
The decision whether to admit parol evidence involves a two-step process.
First, the court provisionally receives (without actually admitting) all
credible evidence concerning the parties’ intentions to determine
“ambiguity,” i.e. whether the language is “reasonably susceptible” to the
interpretation urged by a party. If in light of the extrinsic evidence the
court decides th language is “reasonably susceptible” to the interpretation
urged, the extrinsic evidence is then admitted to aid in the second
step—interpreting the contract.
24
25
Id. The threshold determination of ambiguity is a question of law, while any conflict
26
amongst competent parol evidence is an issue of fact. Id. at 1165-66. The Court thus
27
proceeds to determining whether, as Comfort Systems contends, the “relevant terms”
28
of the RFPs are ambiguous. (ECF No. 128 at 17.)
12
3:11-cv-2834-GPC-MDD
1
Comfort Systems relies on the following facts in support of its argument that the
2
RFPs are ambiguous as to the required HVAC system: (1) Holland’s deposition
3
testimony that the RFPs did not clearly communicate a requirement for a central-air
4
system and that Comfort Systems had a “very compelling case” for why its initial
5
design complied with the RFPs, (2) Turner-Penick’s agreement that Comfort Systems’
6
initial design should meet the RFP requirements, (3) Walsh’s and Lundstroms’ belief
7
that Comfort Systems’ initial design met the RFP requirements, (4) NAVFAC’s
8
subsequent clarification in the BEQ 8 RFP that a central-air system was required, and
9
(5) Comfort Systems insistence that the Subcontracts not contain provisions related to
10
a central-air system.
11
Notwithstanding the foregoing facts, Comfort Systems fails to identify any
12
language in the Subcontracts, RFPs, or UFC that is ambiguous. Comfort Systems
13
states only that the “relevant terms” of the RFPs are ambiguous. It is therefore
14
impossible for the Court to determine whether the language of the RFPs is susceptible
15
to Comfort Systems’ interpretation.
16
17
Assuming Comfort Systems is arguing that Section 2-5.1 of UFC 3-400-10N is
ambiguous, the Court disagrees. Section 2-5.1 states:
21
Do not provide room fan coil units or packaged terminal units, such as
individual through-wall heat pumps, for facilities such as office buildings
and Bachelor Quarters or for any facility larger than 465 square meters
(5000 square feet), unless conditioned make-up air is provided to each
space through a central, continuously operating, dedicated make-up air
system. Conditioned make-up air shall be ducted to each room or to the
return side of each fan coil or terminal unit.
22
The plain language of Section 2-5.1 thus conditions the use of a through-wall system
23
on providing a central make-up air system. Comfort System would nonetheless have
24
the Court interpret this language as not requiring a central-air system where a through-
25
wall system is used. In other words, Comfort Systems does not argue this language is
26
ambiguous, as much as it argues the Court should ignore the provision entirely. Yet
27
none of the extrinsic facts Comfort Systems relies on to create an ambiguity in this
28
provision make this provision “reasonably susceptible” to Comfort Systems’
18
19
20
13
3:11-cv-2834-GPC-MDD
1
interpretation. This is because Comfort Systems’ interpretation expressly contradicts
2
the language of the provision. See Cont’l Baking Co. v. Katz, 68 Cal. 2d 512, 522
3
(1968) (“[E]xtrinsic evidence is not admissible in order to give the terms of a written
4
instrument a meaning of which they are not reasonably susceptible.”). Accordingly,
5
the Court concludes Comfort Systems has not established an ambiguity in the
6
Subcontracts, RFPs, or UFC.
7
II.
Implied Warranty of Correctness
8
In the context of government contracts, the Supreme Court has recognized that,
9
“[w]here one agrees to do, for a fixed sum, a thing possible to be performed, he will not
10
be excused or become entitled to additional compensation, because unforseen
11
difficulties are encountered.” United States v. Spearin, 248 U.S. 132, 136 (1918). “But
12
if [a] contractor is bound to build according to plans and specifications prepared by the
13
owner, the contractor will not be responsible for the consequences of defects in the
14
plans and specifications.” Id. This is the so-called Spearin doctrine, which the
15
California Supreme Court articulated as follows:
16
17
18
A contractor of public works who, acting reasonably, is misled by
incorrect plans and specifications issued by the public authorities as the
basis for bids and who, as a result, submits a bid which is lower than he
would have otherwise made may recover in a contract action for extra
work or expenses necessitated by the conditions being other than as
represented.
19
20
Souza & McCue Constr. Co. v. Super. Ct. San Benito Cnty., 57 Cal. 2d 508, 510 (1962)
21
(citing, e.g., Spearin, 248 U.S. at 136-37). “This rule is mainly based on the theory that
22
the furnishing of misleading plans and specifications by the public body constitutes a
23
breach of an implied warranty of their correctness.” Souza, 57 Cal. 2d at 510-11. “In
24
order to recover on such an action, the contractor must prove that the agency
25
affirmatively misrepresented, or actively concealed, material facts which rendered the
26
bid documents misleading, and that the contractor reasonably relied on such
27
misrepresentations in preparing its bid.” Thompson Pac. Constr., Inc. v. City of
28
Sunnyvale, 155 Cal. App. 4th 525, 551 (2007) (citing Jasper Constr., Inc. v. Foothill
14
3:11-cv-2834-GPC-MDD
1
Junior College Dist., 91 Cal. App. 3d 1, 10 (1979)).
2
As set forth above, Comfort Systems has not demonstrated that an ambiguity
3
exists in the Subcontracts, RFPs, or UFC. And Comfort Systems has offered no
4
evidence that NAVFAC or Turner-Penick (to the extent that a subcontractor may
5
recover against a general contractor for breach of the implied warranty of correctness)
6
affirmatively misrepresented or actively concealed material facts.
7
Comfort Systems may not base its breach-of-contract claims against Turner-Penick on
8
a breach of the implied warranty of correctness.
9
III.
Accordingly,
Practical Construction
10
“[W]hen a contract is ambiguous, a construction given to it by the acts and
11
conduct of the parties with knowledge of its terms, before any controversy has arisen
12
as to its meaning, is entitled to great weight, and will, when reasonable, be adopted and
13
enforced by the court.” Crestview Cemetery Ass’n v. Dieden, 54 Cal. 2d 744, 753
14
(quoting Universal Sales Corp. v. California etc. Mfg. Co., 20 Cal. 2d 751, 761 (1942)).
15
In other words, a “practical construction” may be “placed upon the contract by the
16
parties themselves, which renders it immaterial to consider what might be the literal
17
construction of its terms.” Crestview, 54 Cal. 2d at 754 (quoting Mitau v. Roddan, 149
18
Cal. 1, 14 (1906)). In such cases, the “ambiguity” arises from the parties’ actions.
19
Crestview, 54 Cal. 2d at 754.
20
While Comfort Systems has offered evidence demonstrating that it and Turner-
21
Penick initially agreed that the RFPs did not clearly require a central-air system and
22
that Turner-Penick sent NAVFAC a letter to that effect, Comfort Systems has offered
23
no evidence demonstrating that—once NAVFAC rejected Comfort Systems’ initial
24
design shortly after Comfort Systems and Turner-Penick entered the Subcontracts—the
25
parties’ performance of the Subcontracts created any ambiguity in the contract
26
documents. To the contrary, when Comfort Systems proceeded to install the HVAC
27
systems in BEQ 4 and BEQ 7, it installed the required central-air system. In other
28
words, Comfort Systems’ performance ultimately complied with the plain language of
15
3:11-cv-2834-GPC-MDD
1
the contract documents. The Court thus concludes that Comfort Systems has failed to
2
offer evidence demonstrating that the parties’ performed the Subcontracts in a way that
3
created an ambiguity in the Subcontracts’ terms.
4
IV.
Mistake of Fact
5
Comfort Systems argues it is entitled to have the Subcontracts reformed to reflect
6
Comfort Systems’ interpretation of the HVAC system requirements. Comfort Systems
7
argues that Turner-Penick and the Sureties should be estopped from taking a position
8
that contradicts Turner-Penick’s initial agreement that the RFPs did not clearly require
9
a central-air system.
10
California Civil Code Section 3399 provides:
11
When, through fraud or a mutual mistake of the parties, or a mistake of
one party, which the other party at the time knew or suspected, a written
contract does not truly express the intention of the parties, it may be
revised on the application of a party aggrieved, so as to express that
intention, so far as it can be done without prejudice to rights acquired by
third persons, in good faith and for value.
12
13
14
15
“[T]he mistake of one party is a sufficient basis for reformation only when the mistake
16
is known or suspected by the other party and, as a result, the writing does not truly
17
express the intention of the parties.” La Mancha Dev. Corp. v. Sheegog, 78 Cal. App.
18
3d 9, 16 (1978). “In the absence of actual knowledge or suspicion or, at the very least,
19
actual knowledge or suspicion of a duly authorized agent imputed to the other party,
20
there is no inequitable conduct on which to predicate an estoppel.” Id. at 17. “[T]he
21
knowledge necessary to constitute an estoppel must be actual knowlege [as opposed
22
to constructive knowledge].” Id. (emphasis added).
23
Comfort Systems has offered no evidence that Turner-Penick had actual
24
knowledge that Comfort Systems’ initial design would not comply with the RFPs.
25
Rather, the undisputed evidence demonstrates Turner-Penick was itself initially wrong
26
about the required HVAC design. It was not until the Subcontracts were executed that
27
NAVFAC rejected Comfort Systems’ initial design. Thus, it cannot be said that
28
Turner-Penick induced Comfort Systems into entering the Subcontracts, knowing
16
3:11-cv-2834-GPC-MDD
1
Comfort Systems’ initial design was mistaken.
2
While there is no evidence of Turner-Penick inducing a unilateral mistake by
3
Comfort Systems, there is evidence demonstrating Comfort Systems and Turner-Penick
4
were mutually mistaken as to the required HVAC design at the time they entered the
5
Subcontracts, such that the Subcontracts “do[] not truly reflect the intention of the
6
parties.” See Cal. Civ. Code § 3399. Turner-Penick’s letter, outlining the parties’
7
reasons for why Comfort Systems’ initial design complied with the BEQ 4 RFP, is the
8
most notable evidence demonstrating the parties were mutually mistaken as to the
9
HVAC requirements. Thus, it may be appropriate to reform the Subcontracts to reflect
10
the parties’ apparent understanding of the HVAC requirements at the time they entered
11
the Subcontracts. This conclusion is a sufficient basis on which to deny Turner-Penick
12
and the Sureties’ Motion for Partial Summary Judgment on the issue of whether
13
Comfort Systems is entitled to additional compensation for having to redesign the
14
HVAC systems for BEQ 4 and BEQ 7.
CONCLUSION & ORDER
15
16
Based on the foregoing, IT IS HEREBY ORDERED that:
17
1.
(ECF No. 124), is DENIED;
18
19
2.
3.
24
The parties’ Joint Motion for Leave to File Extended Reply, (ECF No.
141), is GRANTED;
22
23
Comfort Systems’ Motion to Strike Declaration of David Holland, (ECF
No. 139), is DENIED;
20
21
Turner-Penick and the Sureties’ Motion for Partial Summary Judgment,
4.
The hearing currently set for March 28, 2014, is VACATED.
DATED: March 27, 2014
25
26
HON. GONZALO P. CURIEL
United States District Judge
27
28
17
3:11-cv-2834-GPC-MDD
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.
Why Is My Information Online?