Cooper et al v. Gieseking et al

Filing 69

ORDER (1) Granting in Part and Denying in Part Defendant's Motion to Dismiss, (2) Denying Defendant's Motion to Dismiss Under Forum Non Conveniens and International Comity, and (3) Granting Leave to Amend re 55 65 . The Court grants TEP CO's motion to dismiss Plaintiffs' strict liability for design defect and IIED claims with prejudice. Additionally, the Court grants TEPCO's motion to dismiss the SAC's claims on behalf of "Doe" plaintiffs. Plaintiffs&# 039; other claims survive. The Court denies TEPCO's Motion to Dismiss under the doctrines of forum non conveniens and international comity. The Court also grants Plaintiffs Motion to Amend their SAC. Plaintiffs shall take this Order into consideration and file any amended pleading by November 18, 2014. Signed by Judge Janis L. Sammartino on 10/28/2014. (jao)

Download PDF
1 2 3 4 5 6 7 8 UNITED STATES DISTRICT COURT 9 SOUTHERN DISTRICT OF CALIFORNIA 10 LINDSAY R. COOPER, et al., 11 Plaintiffs, 12 13 vs. 14 15 16 17 TOKYO ELECTRIC POWER COMPANY, INC., Defendant. CASE NO. 12-CV-3032 JLS (WMC) ORDER (1) GRANTING IN PART AND DENYING IN PART DEFENDANT’S MOTION TO DISMISS, (2) DENYING DEFENDANT’S MOTION TO DISMISS UNDER FORUM NON CONVENIENS AND INTERNATIONAL COMITY, AND (3) GRANTING LEAVE TO AMEND (ECF No. 55 & 65) 18 19 Presently before the Court is Defendant Tokyo Electric Power Company, Inc.’s 20 (“TEPCO”) Motion to Dismiss Second Amended Complaint for Lack of Subject Matter 21 Jurisdiction and Failure to State a Claim or, in the Alternative, to Dismiss under the 22 Doctrines of Forum Non Conveniens and International Comity. (Mot. to Dismiss, ECF 23 No. 55.) Also before the Court are Plaintiffs’ Response in Opposition (Plaintiff’s Resp. 24 in Opp’n, ECF No. 59.) and TEPCO’s Reply in Support (Reply ISO Mot. to Dismiss, 25 ECF No. 62.) of the Motion to Dismiss. 26 Additionally before the Court is Plaintiffs’ Motion to Amend Second Amended 27 Complaint to Add Doe Defendants and Doe Plaintiffs. (Mot. to File Am. Compl., ECF 28 No. 65.) The Court also considers TEPCO’s Response in Opposition, (TEPCO’s Resp. -1- 12cv3032 1 in Opp’n, ECF No. 67.), and Plaintiffs’ Reply in Support (Reply ISO Mot. to File Am. 2 Compl., ECF No. 68.) of the Motion to Amend. 3 The Court heard oral argument on August 25, 2014, and thereafter took both 4 matters under submission. Having carefully considered the parties’ arguments and the 5 law, the Court GRANTS IN PART and DENIES IN PART TEPCO’s Motion to 6 Dismiss and GRANTS Plaintiff’s request for leave to amend. 7 8 BACKGROUND This Order incorporates by reference the factual and procedural background set 9 forth in the Court’s Nov. 26, 2013 Order dismissing Plaintiffs’ First Amended 10 Complaint (“FAC”) without prejudice. (Order, Nov. 26, 2013, ECF No. 46.) This 11 section presents a brief summary of the most relevant facts in order to provide context 12 for the issues discussed below. 13 Plaintiffs are members of the U.S. military who allege that they were injured by 14 radiation exposure when they were deployed near the Fukushima-Daichi Nuclear 15 Power Plant (“FNPP”) in Japan in the aftermath of the disastrous earthquake and 16 tsunami that struck that country on March 11, 2011. Plaintiffs initiated this action 17 against TEPCO, which owns and operates the FNPP, on December 21, 2012, and 18 subsequently filed the FAC on June 4, 2013. Plaintiffs’ FAC alleged that TEPCO 19 “conspired and acted in concert with the Japanese Government . . . to create an illusory 20 impression that the extent of the radiation that had leaked from the site of the FNPP 21 was at levels that would not pose a threat” to human health and safety, and that TEPCO 22 “failed to alert public officials, including the U.S. Navy, the Plaintiffs, and the general 23 public, to the danger of coming too close to the FNPP.” (See FAC ¶¶ 70, 109, ECF No. 24 21.) 25 On November 26, 2013, the Court granted TEPCO’s motion to dismiss the FAC, 26 concluding that subject matter jurisdiction was lacking because Plaintiffs’ claims were 27 non-justiciable under the political question doctrine. (Order 9, Nov. 26, 2013, ECF No. 28 46.) The Court determined that adjudicating Plaintiffs’ claims would require -2- 12cv3032 1 impermissible scrutiny of the U.S. military’s discretionary judgments regarding 2 deployment of personnel and would also require evaluation of the Japanese 3 Government’s communications with the U.S. Government regarding the FNPP. (Id. 4 at 7–9.) The Court dismissed Plaintiffs’ claims with leave to amend and declined to 5 address TEPCO’s arguments for dismissal on the merits or its arguments urging 6 dismissal on the basis of forum non conveniens and international comity. 7 On February 5, 2014, Plaintiffs filed the operative Second Amended Complaint 8 (“SAC”), omitting claims grounded in TEPCO’s purported fraud and misrepresentation, 9 and instead relying on allegations that TEPCO was negligent in the siting, design, 10 construction, and operation of the FNPP. Plaintiffs maintain, inter alia, that TEPCO 11 failed to adhere to basic safety requirements in designing and operating the FNPP, 12 failed to take adequate measures to prevent and minimize nuclear accidents, and failed 13 to develop a suitable evacuation plan in case of emergency. (SAC ¶ 109, ECF No. 50.) 14 Plaintiffs further allege that TEPCO ignored warnings that the FNPP was at risk of 15 significant damage from a tsunami, failed to make necessary repairs to the plant’s 16 cooling system, and failed to carry out timely inspections of other critical equipment. 17 (Id. at ¶¶ 114, 118–19.) Plaintiffs contend that because they no longer rely on 18 TEPCO’s affirmative representations and fraud, the Court is not required to analyze 19 any decision made by the Executive Branch of the U.S. Government, thereby avoiding 20 the justiciability issue. 21 TEPCO moves to dismiss once again, arguing that Plaintiffs’ revised claims do 22 not remedy the deficiencies previously identified by the Court. (Mot. to Dismiss 1, 23 ECF No. 55.) According to TEPCO, the new theory of liability elaborated in Plaintiffs’ 24 SAC remains inadequate because it still relies on an account of causation of injury that 25 implicates the deployment decisions of the U.S. Navy and high-level communications 26 between the Japanese and U.S. Governments, thereby raising the same issues of 27 justiciability that warranted dismissal of the original pleading. (Id.) In addition, 28 TEPCO emphasizes that Plaintiffs’ claims fail on the merits and that this suit should -3- 12cv3032 1 be dismissed on the grounds of forum non conveniens and international comity to allow 2 for litigation to proceed in Japan. (Id. at 4–6.) 3 4 SUBJECT MATTER JURISDICTION TEPCO moves to dismiss Plaintiffs’ SAC for lack of subject matter jurisdiction, 5 arguing that the SAC raises nonjusticiable political questions. 6 1. Legal Standard 7 A motion to dismiss pursuant to Federal Rule of Civil Procedure 12(b)(1) 8 challenges a court’s subject matter jurisdiction. Federal district courts are courts of 9 limited jurisdiction that “may not grant relief absent a constitutional or valid statutory 10 grant of jurisdiction” and are “presumed to lack jurisdiction in a particular case unless 11 the contrary affirmatively appears.” A–Z Int’l v. Phillips, 323 F.3d 1141, 1145 (9th Cir. 12 2003) (internal quotations omitted). 13 “[D]isputes involving political questions lie outside of the Article III jurisdiction 14 of federal courts.” Corrie v. Caterpillar, Inc., 503 F.3d 974, 980 (9th Cir. 2007). The 15 political question doctrine forecloses judicial review of controversies which revolve 16 around policy choices constitutionally committed to Congress or the Executive branch. 17 Japan Whaling Ass’n v. Am. Cetacean Soc., 478 U.S. 221, 230 (1986). Like other 18 doctrines of justiciability, such as standing, mootness, and ripeness, the political 19 question doctrine is grounded in respect for the Constitution’s separation of powers. 20 See Baker v. Carr, 369 U.S. 186, 210 (1962) (“The nonjusticiability of a political 21 question is primarily a function of the separation of powers.”). 22 Under Baker v. Carr, a case may be dismissed on political question grounds if 23 one of the following characteristics is present: 24 25 26 27 28 [1] a textually demonstrable constitutional commitment of the issue to a coordinate political department; [2] a lack of judicially discoverable and manageable standards for resolving it; [3] the impossibility of deciding without an initial policy determination of a kind clearly for nonjudicial discretion; [4] the impossibility of a court’s undertaking independent resolution without expressing lack of the respect due coordinate branches of government; [5] an unusual need for unquestioning adherence to a political decision already made; or [6] the potentiality of embarrassment from multifarious pronouncements by various departments on one question. -4- 12cv3032 1 Id. 2 Determining whether a case involves a nonjusticiable political question requires 3 a “discriminating inquiry into the precise facts and posture of the particular case.” Id. 4 at 217. Courts must analyze “the particular question posed, in terms of the history of 5 its management by the political branches, of its susceptibility to judicial handling in 6 light of its nature and posture in the specific case, and of the possible consequences of 7 judicial action.” Id. at 211–12. While many cases involving foreign relations or the 8 military invoke the political question doctrine, “it is error to suppose that every case or 9 controversy which touches foreign relations lies beyond judicial cognizance.” Id. at 10 211. Courts must determine, in light of the Baker factors, “whether the military 11 judgment is the kind that warrants application of the political question doctrine.” 12 McMahon v. Presidential Airways, Inc., 502 F.3d 1331, 1358 (11th Cir. 2007). The 13 court “must analyze [a plaintiff’s] claim as it would be tried, to determine whether a 14 political question will emerge.” Carmichael v. Kellogg, Brown & Root Servs., Inc., 572 15 F.3d 1271, 1281 (11th Cir. 2009)(citing Occidental of Umm al Qaywayn, Inc. v. A. 16 Certain Cargo of Petroleum, 577 F.2d 1196 (5th Cir. 1978)). 17 2. Analysis 18 TEPCO argues that the first, second, third, and fourth Baker issues are implicated 19 in Plaintiffs’ theory of causation and that the Court therefore lacks subject matter 20 jurisdiction over Plaintiffs’ case. (Mot. to Dismiss 16–17, ECF No. 55.) 21 Plaintiffs maintain that they have “redirected the focus of their claims” away 22 from TEPCO’s alleged misrepresentations and fraud and toward TEPCO’s negligent 23 acts and omissions prior to, and during, the nuclear accident at the FNPP. (Plaintiffs’ 24 Resp. in Opp’n 6, ECF No. 59.) According to Plaintiffs, because the SAC no longer 25 rests on the theory that TEPCO’s misrepresentations influenced military judgments 26 regarding deployment of personnel and assets, the Court need not “stand in judgment 27 over any decision made by the Executive Branch of the U.S. Government.” (Id. at 1.) 28 Plaintiffs contend that their action as amended is now merely one for “ordinary -5- 12cv3032 1 negligence,” which can be resolved through the application of “traditional tort 2 standards” that do not raise political questions. (Id. at 10.) In particular, the SAC 3 seeks to impose liability for TEPCO’s “intentional and negligent oversight in 4 construction, design, regulatory compliance, maintenance, training, emergency 5 readiness, emergency responses, and decision making during the emergency.” (Id. at 6 11–12.) 7 TEPCO rejects this characterization of the SAC, however. Despite Plaintiffs’ 8 efforts to re-style their pleading by dropping their cause of action for fraud, TEPCO 9 contends that Plaintiffs are nonetheless required to “plead and prove that the chain of 10 causation [of injury] was not broken by the U.S. Navy’s independent decisionmaking 11 about where to locate the vessels and what protective measures to take.” (Reply ISO 12 Mot. to Dismiss 3, ECF No. 62.) Because the Navy’s contribution to causation remains 13 in issue, TEPCO argues that the Court cannot adjudicate Plaintiffs’ negligence claims 14 without implicating several of the Baker factors. TEPCO asserts that Plaintiffs 15 continue to rely on concealment by TEPCO and the Japanese government. 16 After reevaluating the chain of causation in this case, the Court agrees with 17 Plaintiffs that the SAC as amended no longer requires the Court to evaluate the 18 discretionary actions of the U.S. military or communications between the Japanese and 19 U.S. Governments. 20 A. Actual Causation 21 As alleged, TEPCO’s negligence was an actual cause of Plaintiff’s injuries. 22 Plaintiffs allege that TEPCO failed to adhere to basic safety requirements in designing 23 and operating the FNPP, failed to take adequate measures to prevent and minimize 24 nuclear accidents, failed to develop a suitable evacuation plan in case of emergency, 25 failed to make necessary repairs to the plant’s cooling system, failed to carry out timely 26 inspections of critical equipment, and ignored warnings that the FNPP was at risk of 27 significant damage from a tsunami. (Id. at ¶¶ 109, 114, 118–19.) These negligent acts, 28 -6- 12cv3032 1 in conjunction with the earthquake and tsunami, led to the FNPP’s ultimate failure 2 which caused Plaintiffs and many other people within the FNPP’s vicinity to fall ill. 3 The discretionary decision to deploy personnel and assets in support of 4 Operation Tomodachi is also undisputedly an actual cause of Plaintiff’s injuries. 5 Accepted as true, the SAC states that Plaintiffs were brought into the vicinity of the 6 FNPP by the U.S. Navy in response to the earthquake and tsunami in order to provide 7 humanitarian relief. 8 B. Proximate Causation 9 TEPCO contends that the military’s contribution to causation should limit its 10 liability in this case. 11 In certain situations where the defendant's conduct is an actual cause of the harm, 12 the defendant will nevertheless be absolved where there is an independent intervening 13 act that is not reasonably foreseeable. 6 Witkin, Summary 10th (2005) Torts, Cause in 14 Fact and Proximate Cause s. 1186, p. 553 (2012) (citing Mitchell v. Gonzales, 54 15 Cal.3d 1041 (1991)); See Akins v. Sonoma Cnty., 67 Cal. 2d 185, 199 (1967); Farr v. 16 NC Mach. Co., 186 F. 3d 1165, 1169 (9th Cir. 1999). However, “any harm which is 17 in itself foreseeable, as to which the actor has created or increased the recognizable 18 risk, is always ‘proximate,’ no matter how it is brought about, except where there is 19 such intentionally tortious or criminal intervention, and it is not within the scope of the 20 risk created by the original negligent conduct.” RESTATEMENT (SECOND) OF TORTS § 21 442B cmt.b (1965). 22 TEPCO thinks the Navy’s independent decision to send the U.S.S. Reagan to 23 Japan qualifies as a supervening cause of Plaintiffs’ harm, thereby limiting TEPCO’s 24 liability by breaking the necessary chain of proximate causation. To determine whether 25 the Navy’s decision was a supervening cause, TEPCO argues that the Court would be 26 required to evaluate the discretionary decisions of military commanders, which would 27 invoke a political question and therefore deprive the Court of subject matter 28 -7- 12cv3032 1 jurisdiction. If the Navy’s decision was unforeseeable, intentionally tortious, or 2 criminal it could qualify as a supervening cause. 3 TEPCO does not persuade the Court that the military’s decision-making could 4 plausibly constitute a supervening cause of injury. Aside from the military’s decision 5 to enter the area, the military had no role in the chain of causation for Plaintiff’s 6 injuries as alleged in the SAC. As discussed above, Plaintiffs sufficiently allege that 7 TEPCO’s negligence was an actual cause of Plaintiffs’ injuries. It is foreseeable that 8 as a result of an improperly designed and maintained nuclear plant, people present in 9 the vicinity would be adversely affected by radiation. Likewise, the Navy’s presence 10 in this scenario was foreseeable. In the aftermath of a natural disaster, it is foreseeable 11 that foreign military and aid-workers would be among those in the vicinity. As alleged, 12 TEPCO created the very risk of harm that actually occurred. 13 Because the alleged harm to Plaintiffs was foreseeable and within the scope of 14 risk created by TEPCO, the relevant issue becomes whether the Navy’s conduct was 15 intentionally tortious or criminal. At most, based on the initial evidence presented, 16 TEPCO could allege negligence on the part of the Navy. However, the United States 17 is not a party, Plaintiffs allege no negligence on the part of the U.S. military, and the 18 SAC establishes the reasonableness of the military’s actions. Plaintiffs contend that 19 once the U.S.S. Reagan detected unsafe levels of radiation, the ship withdrew from the 20 area. Further, Defendants present no facts supporting that the U.S. military’s 21 precautions were inadequate or unreasonable, let alone intentionally tortious or 22 criminal. TEPCO only discusses that the Navy is a sophisticated entity with the 23 independent capability of knowing the risks incident to a natural disaster. (Mot. to 24 Dismiss 25, ECF No. 55.) 25 Further, the Court finds that the SAC alleviates any potential separation of 26 powers concerns. The crux of the case is not whether the decision to deploy or the 27 actions taken during the deployment were reasonable. Plaintiffs are not challenging 28 the executive decision to offer aid to Japan or questioning U.S. foreign relations -8- 12cv3032 1 decisions. While deployment decisions regarding military personnel operating in a 2 disaster zone are essentially professional military judgments, and therefore could 3 implicate a political question, here no military judgments need be reviewed. The 4 choices by the U.S. military only incidentally come into play as a potential affirmative 5 defense to Plaintiffs’ theory of negligence, and as discussed above, this theory is not 6 viable. Unlike the other cases presented before the court where the circumstances were 7 thoroughly pervaded by military judgments and decisions, here the allegedly negligent 8 conduct is easily separated from the actions of the U.S. Navy both temporally and 9 factually. Cf. Carmichael, 572 F.3d at 1282–83 (Suit against military contractor related 10 to driver’s negligence in an Iraqi convoy accident nonjusticiable because convoy 11 controlled by U.S. military); Corrie, 503 F.3d at 980 (Palestine nationals suing private 12 corporation for selling bulldozers to Israel where bulldozers approved and paid for by 13 U.S.); Taylor v. Kellogg Brown & Root Servs., Inc., 658 F.3d 402 (4th Cir. 2011) 14 (political question barred negligence claim against military contractor working in 15 combat zone when unauthorized military personnel interfered with repair of electrical 16 box). TEPCO is not a military contractor or otherwise under the control or direction 17 of the United States and in resolving this case, the Court will rely on well-established 18 tort standards. Accordingly, the Court finds that Plaintiffs’ amended theory of 19 causation does not implicate any of the Baker factors and that the military judgment in 20 this instance is not the kind that warrants application of the political question doctrine. 21 Because the Court finds that TEPCO has not set forth a tenable scenario where 22 the Navy’s actions could be considered a supervening cause, the Court need not delve 23 into the discretionary decisions of the executive branch, and jurisdiction is no longer 24 barred by the political question doctrine.1 25 26 27 28 1 Plaintiffs’ FAC relied on the Japanese Government and TEPCO’s deception regarding the condition of the FNPP. Plaintiffs’ alleged a chain of causation involving TEPCO’s communications with the Navy and the Navy’s reliance on those misrepresentations. This necessarily included the issue of whether the Navy justifiably relied on TEPCO’s misrepresentations and whether the Navy made an informed decision in deploying personnel near the FNPP. See Corrie, 503. F.3d at 983 (“Whether to grant military or other aid to a foreign nation is a political decision inherently entangled with the -9- 12cv3032 1 FAILURE TO STATE A CLAIM 2 1. Legal Standard 3 Federal Rule of Civil Procedure 12(b)(6) permits a party to raise by motion the 4 defense that the complaint “fail[s] to state a claim upon which relief can be granted.” 5 The Court evaluates whether a complaint states a cognizable legal theory and sufficient 6 facts in light of Federal Rule of Civil Procedure 8(a), which requires a “short and plain 7 statement of the claim showing that the pleader is entitled to relief.” Although Rule 8 8 “does not require ‘detailed factual allegations,’ . . . it [does] demand[] more than an 9 unadorned, the-defendant-unlawfully-harmed-me accusation.” Ashcroft v. Iqbal, 556 10 U.S. 662, 129 S. Ct. 1937, 1949 (2009) (quoting Bell Atl. Corp. v. Twombly, 550 U.S. 11 544, 555 (2007)). In other words, “a plaintiff’s obligation to provide the ‘grounds’ of 12 his ‘entitle[ment] to relief’ requires more than labels and conclusions, and a formulaic 13 recitation of the elements of a cause of action will not do.” Twombly, 550 U.S. at 555 14 (citing Papasan v. Allain, 478 U.S. 265, 286 (1986)). “Nor does a complaint suffice 15 if it tenders ‘naked assertion[s]’ devoid of ‘further factual enhancement.’” Iqbal, 129 16 S. Ct. at 1949 (citing Twombly, 550 U.S. at 557). 17 “To survive a motion to dismiss, a complaint must contain sufficient factual 18 matter, accepted as true, to ‘state a claim to relief that is plausible on its face.’” Id. 19 (quoting Twombly, 550 U.S. at 570); see also Fed. R. Civ. P. 12(b)(6). A claim is 20 21 22 23 24 25 26 27 28 conduct of foreign relations.”). Accordingly, the Court dismissed the FAC as nonjusticiable. However, the SAC omits these allegations. The SAC no longer alleges that had it not been for TEPCO’s distribution of false information regarding radiation levels at the FNPP, military commanders would have adopted a different course of action. Similarly, the SAC no longer alleges that “but for TEPCO’s allegedly wrongful conduct, the military would not have deployed personnel near the FNPP or would have taken additional measures to protect service members from radiation exposure.” (Order 7, Nov. 26, 2013, ECF No. 46.) Moreover, Plaintiffs no longer specifically allege that the Japanese Government was TEPCO’s ‘co-conspirator’ in providing misleading information to the Navy, (Mot. to Dismiss 18, ECF No. 55.), and, the Court therefore need not examine the Japanese Government’s disclosures to the U.S. military. (See Reply in Supp. 7–9, ECF No. 62.) The “residual factual allegations asserting (1) TEPCO’s affirmative misrepresentations that the conditions at the reactor complex were within safe limits, and (2) that the radioactive release was far more dangerous than TEPCO communicated, are not the basis of Plaintiff’s claims in the SAC.” (Resp. in Opp’n 11, ECF No. 59.) TEPCO argues throughout its motion to dismiss that these statements continue to support its political question defense. However, these allegations, “although included in the SAC,” are not the basis for Plaintiffs current claims as is evident from the briefing and oral argument. - 10 - 12cv3032 1 facially plausible when the facts pled “allow[] the court to draw the reasonable 2 inference that the defendant is liable for the misconduct alleged.” Id. (citing Twombly, 3 550 U.S. at 556). That is not to say that the claim must be probable, but there must be 4 “more than a sheer possibility that a defendant has acted unlawfully.” Id. Facts 5 “‘merely consistent with’ a defendant’s liability” fall short of a plausible entitlement 6 to relief. Id. (quoting Twombly, 550 U.S. at 557). Further, the Court need not accept 7 as true “legal conclusions” contained in the complaint. Id. This review requires 8 context-specific analysis involving the Court’s “judicial experience and common 9 sense.” Id. at 1950 (citation omitted). “[W]here the well-pleaded facts do not permit 10 the court to infer more than the mere possibility of misconduct, the complaint has 11 alleged—but it has not ‘show[n]’—‘that the pleader is entitled to relief.’” Id. 12 Moreover, “[f]or a complaint to be dismissed because the allegations give rise to an 13 affirmative defense[,] the defense clearly must appear on the face of the pleading.” 14 McCalden v. Ca. Library Ass’n, 955 F.2d 1214, 1219 (9th Cir. 1990) (internal 15 quotation marks omitted). 16 Where a motion to dismiss is granted, “leave to amend should be granted ‘unless 17 the court determines that the allegation of other facts consistent with the challenged 18 pleading could not possibly cure the deficiency.’” DeSoto v. Yellow Freight Sys., Inc., 19 957 F.2d 655, 658 (9th Cir. 1992) (quoting Schreiber Distrib. Co. v. Serv-Well 20 Furniture Co., 806 F.2d 1393, 1401 (9th Cir. 1986)). In other words, where leave to 21 amend would be futile, the Court may deny leave to amend. See Desoto, 957 F.2d at 22 658; Schreiber, 806 F.2d at 1401. 23 2. Analysis 24 TEPCO moves to dismiss each of Plaintiffs’ asserted causes of action for failure 25 to state a claim for which relief could be granted. The Court considers each of 26 TEPCO’s arguments in turn. 27 28 - 11 - 12cv3032 1 A. Proximate Causation 2 TEPCO contends that Plaintiffs fail to satisfy the crucial element of proximate 3 causation, such that all nine of their claims must be dismissed because there is no 4 plausible connection between TEPCO’s allegedly wrongful conduct and Plaintiffs’ 5 injuries. TEPCO relies on the same argument discussed above regarding the U.S. 6 military’s role in causation and unlikely reliance on TEPCO’s representations. (Mot. 7 to Dismiss 21, ECF No. 55). As discussed above, the Court finds that Plaintiffs have 8 sufficiently pled proximate causation because, as alleged, Plaintiff’s harms were 9 directly caused by TEPCO’s negligence and Plaintiffs no longer contend that the 10 military based its decision to deploy on TEPCO’s representations. 11 Additionally, the Court finds TEPCO’s reliance on the First Circuit’s decision 12 in Jacob v. Curt, 898 F.2d 838 (1st Cir. 1990), and the Ninth Circuit’s decision in 13 Galen v. Cnty. of L.A., 477 F.3d 652 (9th Cir. 2007), to be misplaced. TEPCO contends 14 that “when the decisionmaking of a government body is an essential step in the chain 15 of causation of injury, a plaintiff’s burden to plead and prove proximate causation 16 requires a showing that the government’s decisionmaking was not the result of its own 17 independent judgment.” (Mot. to Dismiss 21, ECF No. 55.) In both cases, plaintiffs 18 sued individuals who had made statements leading to a later independent government 19 decision. In Galen, the court held that judicial officers have exclusive authority to set 20 bail and that a deputy’s statements to the judicial officer could not subject that deputy 21 to liability. 477 F.3d at 663. In Jacob, the court held that a U.S. researcher could not 22 be found liable for a foreign government’s decision to close a health clinic because of 23 a the researcher’s article criticizing the clinic. 898 F.2d at 839. The courts in both 24 cases held that the independent government decisions were superseding causes that 25 broke the chain of causation. Here, the Navy’s conduct did not exclusively and 26 independently result in the harm to Plaintiffs. As discussed above, TEPCO’s 27 negligence was a proximate cause of Plaintiffs’ injuries and the Navy’s actions do not 28 constitute a supervening cause releasing TEPCO from liability. - 12 - 12cv3032 1 Accordingly, the Court agrees with Plaintiffs that the complaint sufficiently 2 pleads proximate cause as amended and the Court DENIES TEPCO’s motion to 3 dismiss on this basis. 4 B. Firefighter’s Rule 5 TEPCO contends that Plaintiffs’ recovery is barred under the “firefighter’s rule,” 6 because as professional rescuers, they cannot recover for injuries caused by a hazard 7 incident to the situation to which they responded.” (Mot. to Dismiss 22, ECF No. 55). 8 TEPCO maintains that Plaintiffs, as members of the U.S. Armed Forces participating 9 in Operation Tomodachi, were acting as professional rescuers and are therefore covered 10 by the “firefighter’s rule.” (Id. at 23.) (citing Maltman v. Sauer, 530 P.2d 254, 257–58 11 (Wash. 1975)). 12 Plaintiffs contend that the firefighter’s rule does not apply to them because a 13 nuclear meltdown is not a “risk inherent in offering humanitarian assistance.” See 14 Solgaard v.Guy F. Atkinson Co., 6 Cal.3d 361, 369 (1971). The firefighter’s rule does 15 not bar recovery for independent acts of misconduct which were not the cause of the 16 plaintiff’s presence on the scene. Donahue v. S.F. Hous. Auth., 16 Cal.App.4th 658, 17 663 (1993). 18 The Court agrees with Plaintiffs that their Complaint is not barred by the 19 firefighter’s rule. As alleged, the nuclear accident was independent of the earthquake 20 that summoned the U.S. Navy. Although the FNPP meltdown occurred in part due to 21 the earthquake and tsunami, Plaintiffs allege the ultimate failure of the FNPP was a 22 result of TEPCO’s inadequate preparation for a foreseeable natural disaster and 23 negligence in designing and maintaining the FNPP. Plaintiffs contend that the Navy 24 responded to the earthquake and tsunami in order to provide humanitarian assistance, 25 including: providing food, water, and emergency shelter. Nuclear failure and radiation 26 exposure—due to a private corporation’s negligence—are not risks inherent in 27 responding to an earthquake and tsunami, and thus the Firefighter’s Rule does not bar 28 Plaintiffs claims as a matter of law. The Court has reservations in using the - 13 - 12cv3032 1 Firefighter’s Rule as a liability shield for a foreign corporation where the connection 2 between the harm and the rescue operation is not obvious. Defendants cite no authority 3 extending the Firefighter’s Rule to this type of circumstance2 and the Court will not 4 dismiss Plaintiffs’ SAC for this reason. Accordingly, the Court DENIES TEPCO’s 5 motion to dismiss Plaintiffs’ claims on this basis. 6 C. TEPCO’s Duty of Care with Respect to Plaintiffs’ Claims of Negligence, 7 Negligence Per Se, Res Ipsa Loquitur, Failure to Warn, and Nuisance 8 TEPCO argues that Plaintiffs’ claims for negligence, failure to warn, and 9 nuisance must be dismissed because TEPCO owed no duty of care to Plaintiffs. 10 TEPCO relies on two arguments in support of it’s contention. First, there was no need 11 to warn the U.S. military about potential radiation because “it would be inappropriate, 12 as a matter of substantive tort law, for the court to recognize an innovative judge-made 13 duty of foreign sovereigns and foreign entities to provide disclosures to other 14 sovereigns in the context of a large-scale humanitarian crisis.” (Mot. to Dismiss 25, 15 ECF No. 55). Second, TEPCO contends that it had no duty to warn a sophisticated 16 entity such as the Navy regarding known risks of operating in a disaster zone especially 17 as the U.S.S. Reagan had nuclear detection capabilities. (Id.) Both of these arguments 18 appear to be only related to TEPCO’s duty to warn the U.S. military in the context of 19 negligence. TEPCO does not address any independent duty owed to Plaintiffs as 20 individuals in the area. (Reply ISO Mot. to Dismiss 14, ECF No. 6.) Further, TEPCO 21 does not address the merits of Plaintiffs’ Strict Products Liability Failure to Warn or 22 Nuisance claims.3 23 24 25 26 27 28 2 TEPCO cites to Maltman v. Sauer, to support the proposition that “Army servicemembers responding to accidents” are barred by the Firefighter’s Rule. 530 P.2d 254, 257–58 (Wash. 1975). Not only is this not authoritative, but the Court finds this broad statement to be misleading. In Maltman, an army helicopter was dispatched to a car accident scene as part of the Military Assistance to Safety and Traffic rescue program. (Id. at 256.) Subsequently the helicopter crashed en route to the accident. (Id.) Here, the relationship between the Plaintiffs and TEPCO is far less clear, and in any case, Plaintiffs were not responding directly to the nuclear disaster. 3 The Court has serious concerns that Plaintiffs claims for Strict Liability Failure to Warn and Nuisance cannot stand as a matter of law. - 14 - 12cv3032 1 Plaintiffs respond by arguing that TEPCO owed an absolute duty to all persons 2 within the vicinity of the FNPP. (Plaintiff’s Resp. in Opp’n 18, ECF No. 59.) As 3 discussed above, the SAC alleges a chain of causation independent from the decisions 4 made by the Navy. Thus, TEPCO owed Plaintiffs the same duty of care it owed to 5 those in the vicinity of the FNPP in reasonably operating the FNPP. TEPCO’s two 6 arguments have no bearing on whether it owed a duty to the individual 7 servicemembers. In light of the Court’s decision regarding causation and the Parties’ 8 arguments, the Court DENIES TEPCO’s motion to dismiss Plaintiffs’ claims on this 9 basis. 10 D. Actual and Justifiable Reliance 11 TEPCO moves to dismiss Plaintiffs’ negligence claim arguing that the claim is 12 based in large part on negligent misrepresentation and argues that Plaintiff did not 13 demonstrate actual and justifiable reliance. (Mot. To Dismiss 26, ECF No. 55.) 14 Plaintiffs contend that this issue is irrelevant because they are not asserting a negligent 15 misrepresentation claim. (Plaintiff’s Resp. in Opp. 24, ECF No. 59.) Because 16 Plaintiffs are pursuing no such claim, the Court DENIES as moot TEPCO’s motion 17 to dismiss Plaintiffs’ negligence claim on this basis. 18 E. Strict Liability for Design Defect 19 A strict liability for design defect claim has four elements: (1) the product is 20 placed on the market, (2) there is knowledge that it will be used without inspection for 21 defect, (3) the product is defective, and (4) the defect causes injury. Nelson v. Sup. Ct., 22 50 Cal. Rptr. 3d 684, 688 (Cal. Ct. App. 2006). 23 TEPCO moves to dismiss Plaintiffs’ strict liability design defect claim, arguing 24 that Plaintiffs fail to allege facts supporting the claim that the FNPP is a product 25 “placed on the market.” (Mot. to Dismiss 28, ECF No. 55.) Because the FNPP is a 26 nuclear power facility that was owned by TEPCO at all times and was never transferred 27 to a different “user,” TEPCO argues that Plaintiffs’ design defect claim must fail. (Id. 28 at 28–29.) Plaintiffs argue that Defendants placed the electricity from the FNPP on the - 15 - 12cv3032 1 market which was stored and manufactured in the FNPP and that this should lead to 2 strict liability for design defect. (Plaintiff’s Resp. in Opp’n 31, ECF No. 59.) 3 Plaintiff’s design defect claim lacks merit. Plaintiffs may not ignore elements 4 of the design defect cause of action simply because it would make sense to apply 5 liability in light of the potential for injury to the public. Plaintiffs do not persuasively 6 explain how a design defect claim is viable in light of these facts. The product, 7 electricity, was not defectively designed and did not cause Plaintiff’s injuries. The 8 FNPP was evidently not a product “placed on the market.” The alleged defects in 9 storage and design do not support a defective design claim. Accordingly, the Court 10 GRANTS TEPCO’s motion to dismiss Plaintiffs’ design defect claim WITH 11 PREJUDICE because Plaintiffs can not cure the defects in this claim by alleging 12 additional facts consistent with their pleading. 13 F. Intentional Infliction of Emotional Distress (“IIED”) 14 A claim for IIED requires (1) extreme and outrageous conduct by the defendant 15 with the intention of causing emotional distress, (2) the plaintiff’s suffering severe 16 emotional distress, and (3) actual and proximate causation of the emotional distress. 17 Potter v. Firestone Tire & Rubber Co., 863 P.2d 795, 819 (Cal. 1993). Thus, “it is not 18 enough that the conduct be intentional and outrageous. It must be conduct directed 19 at the Plaintiff.” Id. This distinguishes IIED from negligent infliction of emotional 20 distress. Id. at 820. 21 TEPCO contends that Plaintiffs’ claim for IIED fails for two reasons: (1) the 22 federal statutory scheme for compensating victims of nuclear incidents, known as the 23 Price-Anderson Act, prohibits claims for emotional distress in the absence of physical 24 injury, suggesting that common law liability should not provide recovery in such cases 25 either; and, (2) Plaintiffs do not allege facts establishing that TEPCO engaged in 26 “extreme and outrageous conduct” or that any such conduct was “directed at” Plaintiffs, 27 two necessary elements of the IIED cause of action. (Mot. to Dismiss 29–30, ECF No. 28 55). Plaintiffs maintain that the Price-Anderson Act does not apply to foreign - 16 - 12cv3032 1 producers of nuclear power. (Resp. in Opp’n 24–25, ECF No. 59). Plaintiffs also 2 contend that TEPCO’s degree of negligence rises to the level of extreme and 3 outrageous. (Id. at 25.) Plaintiffs make no effort to respond to TEPCO’s argument that 4 no conduct was “directed at” Plaintiffs, a prerequisite for imposing liability for IIED. 5 Plaintiffs’ IIED claim lacks merit. Plaintiffs attempt to cast TEPCO’s alleged 6 negligence as the same extreme and outrageous conduct. However, negligence is 7 insufficient to state a claim for IIED. Plaintiff must establish intentional conduct or 8 reckless disregard. Potter, 863 P.2d 795 at 819. Plaintiffs also fail to allege facts 9 sufficient to establish that TEPCO engaged in any conduct specifically “directed at” 10 them. Because IIED imposes liability for ambiguous injuries that are easily feigned, 11 Plaintiffs may not recover in the absence of facts indicating that the defendant’s 12 conduct specifically targeted them and sought to cause them harm. There is no 13 plausible way to claim that TEPCO engaged in any conduct directed at the U.S. 14 servicemembers. Much of the alleged negligence occurred years before the Plaintiffs 15 were deployed and they never had any contact with TEPCO other than suffering from 16 the radiation. 17 Accordingly, the Court GRANTS TEPCO’s motion to dismiss Plaintiffs’ IIED 18 claim WITH PREJUDICE. 19 G. Strict Liability for Ultrahazardous Activities 20 TEPCO also moves to dismiss Plaintiffs’ claim for strict liability for injuries 21 resulting from an inherently dangerous activity. TEPCO makes a similar argument as 22 with the IIED claim that the Price-Anderson Act prohibits strict liability claims for 23 releases of radiation below federal limits, and suggests that common law liability 24 should not provide recovery absent pleading that their exposure to radiation exceeded 25 federal limits. (Mot. to Dismiss 32–33, ECF No. 55.) Second, TEPCO argues that the 26 Convention on Supplementary Compensation for Nuclear Damage (“CSCND”) 27 specifies that all claims concerning nuclear accidents should be resolved in the country 28 where the accident occurred. (Id. at 33–34.) TEPCO apparently concedes that - 17 - 12cv3032 1 operation of a nuclear power facility is an inherently dangerous or “ultrahazardous” 2 activity. (Reply ISO Mot. to Dismiss 18 n. 7, ECF No. 62 (TEPCO’s Motion assumed 3 arguendo that the operation of a nuclear power plant qualifies as an ultrahazardous 4 activity).) Plaintiffs again argue that the Price-Anderson Act does not apply to a 5 foreign nuclear operator and that the CSCND is not yet in force and has not been 6 ratified by Japan. (Plaintiff’s Resp. in Opp. 24–25, 29–30, ECF No. 59.) Also, 7 Plaintiffs argue that TEPCO’s activities meet the criteria of abnormally dangerous. (Id. 8 at 27–29.) 9 The Court finds TEPCO’s arguments unpersuasive. TEPCO offers no legal 10 support for applying the Price-Anderson Act by analogy to a foreign corporation and 11 the Court declines to do so. Also, the Court will not dismiss a claim that is sufficiently 12 pled because of the pending CSCND. Accordingly, the Court DENIES TEPCO’s 13 motion to dismiss the strict liability for ultra-hazardous activity claim. 14 H. Loss of Consortium 15 TEPCO moves to dismiss Plaintiffs’ loss of consortium claim arguing that since 16 Plaintiffs’ tort claims fail there is no valid loss of consortium cause of action. (Mot. 17 to Dismiss 34, ECF No. 55.) Plaintiffs clarify that a tort claim and a spouse’s loss of 18 consortium claim are separate claims. (Plaintiff’s Resp. in Opp’n 31–32, ECF No. 59.) 19 Because the Court finds that Plaintiffs have stated a claim for which relief may be 20 granted for several tort claims, the loss of consortium claim survives. 21 22 MOTION TO DISMISS CLAIMS ON BEHALF OF DOE PLAINTIFFS Finally, TEPCO moves to dismiss the claims purportedly brought by Plaintiffs 23 on behalf of “John & Jane Does 1-70,000.” (Mot. to Dismiss 34, ECF No. 55.) TEPCO 24 argues that this is an impermissible attempt by Plaintiffs’ counsel to bring claims on 25 behalf of “placeholder plaintiffs” so as to buy time while they try to drum up 70,000 26 future clients. (Id. at 34–35.) Additionally, TEPCO states that this designation is 27 inappropriate in the context of a class action because absent class members are not 28 formal parties which could be designated as Doe parties. (Reply ISO Mot. to Dismiss - 18 - 12cv3032 1 18–19, ECF No. 62.) Plaintiffs insist that they are seeking to certify a class action and 2 that Defendant’s motion to dismiss the John and Jane Does is premature. (Plaintiff’s 3 Resp. in Opp’n 32–33, ECF No. 59.) 4 The continued use of “placeholder plaintiffs” is likely unjustified and 5 inappropriate at this point as Plaintiffs have had over two years to name additional 6 parties. Absent class members are not formal parties which can be designated as 7 pseudonymous Doe plaintiffs. Accordingly, the Court GRANTS TEPCO’s motion to 8 dismiss the claims on behalf of the “DOE” plaintiffs. 9 FORUM NON CONVENIENS 10 1. Legal Standard 11 “A federal court has discretion to decline to exercise jurisdiction in a case where 12 litigation in a foreign forum would be more convenient for the parties.” Lueck v. 13 Sundstrand Corp., 236 F.3d 1137, 1142 (9th Cir. 2001) (citing Gulf Oil Corp. v. 14 Gilbert, 330 U.S. 501, 504 (1947)). “The doctrine of forum non conveniens is a drastic 15 exercise of the court's ‘inherent power’ because, unlike a mere transfer of venue, it 16 results in the dismissal of a plaintiff's case.” Carijano v. Occidental Petroleum Corp., 17 643 F.3d 1216, 1224 (9th Cir. 2011). TEPCO bears the burden of proving the 18 Plaintiffs’ choice of forum results in “‘oppressiveness and vexation . . . out of all 19 proportion’” to Plaintiffs’ convenience. Id. at 1227 (quoting Piper Aircraft Co. v. 20 Reyno, 454 U.S. 235, 241 (1981). Where the plaintiff is a U.S. citizen, a court should 21 afford more deference to the plaintiff’s choice of a U.S. forum and should assume the 22 forum is convenient. Id. “While a U.S. citizen has no absolute right to sue in a U.S. 23 court, great deference is due plaintiffs because a showing of convenience by a party 24 who has sued in his home forum will usually outweigh the inconvenience the defendant 25 may have shown.” Contact Lumber Co. v. P.T. Moges Shipping Co., 918 F.2d 1446, 26 1449 (9th Cir. 1990). 27 To dismiss on the ground of forum non conveniens, a court must examine: “(1) 28 whether an adequate alternative forum exists, and (2) whether the balance of private - 19 - 12cv3032 1 and public interest factors favors dismissal.” Id. (citations omitted). An adequate 2 alternative forum is available to the plaintiff when (1) the defendant is amenable to 3 service of process in the foreign forum and (2) the foreign forum provides the plaintiff 4 with a satisfactory remedy. Id. at 1225. Only where the remedy provided is “clearly 5 unsatisfactory” is this second requirement not met. Id. (citing Lueck, 236 F.3d at 6 1144.). 7 Courts must consider the following private interest factors: “(1) the residence of 8 the parties and witnesses; (2) the forum’s convenience to the litigants; (3) access to the 9 physical evidence and other sources of proof; (4) whether unwilling witnesses can be 10 compelled to testify; (5) the cost of bringing witnesses to trial; (6) the enforceability 11 of the judgment; and (7) all other practical issues that make trial of a case easy, 12 expeditious, and inexpensive.” Id. at 1229. Courts also must consider the following 13 public interest factors: (1) local interest of the lawsuit; (2) the court’s familiarity with 14 governing law; (3) the burden on local courts and juries; (4) congestion in the court; 15 and, (5) the costs of resolving a dispute unrelated to this forum. Id. at 1232. 16 2. Analysis 17 TEPCO moves to dismiss on the basis of forum non conveniens, arguing that this 18 case should be heard in a Japanese court. TEPCO provides documentation in support 19 of its request, detailing the customs and practices of the Japanese legal system and 20 examining the factors that would complicate trial of this action in a U.S. court. 21 (A) Adequate Alternative Forum 22 To begin with, TEPCO maintains that Japan’s court system is an adequate 23 alternative forum because TEPCO is unquestionably subject to jurisdiction and 24 amenable to process in Japan, and because Plaintiffs would be able to recover for their 25 injuries under Japanese tort law, assuming their claims are meritorious.4 According to 26 TEPCO, “[t]he Japanese judicial system is held in high regard and has consistently 27 4 TEPCO that file a special statutory cause 28 that provides foremphasizesfrom Plaintiffs could also for injuries resulting from aof action recovery a nuclear operator nuclear incident. - 20 - 12cv3032 1 been found to be adequate for forum non conveniens purposes.” (Mot. to Dismiss. 38, 2 ECF No. 55.) 3 Plaintiffs deny that Japan is an adequate alternative forum, arguing that they 4 “will be denied a fair and impartial proceeding, due to the highly sensitive and 5 politicized circumstances surrounding TEPCO.” (Plaintiff’s Resp. in Opp’n 36, ECF 6 No. 59). Additionally, Plaintiffs contend that they will be unable to receive a fair trial 7 because of the lack of discovery and jury trials available to Plaintiffs in Japan. (Id.) 8 Plaintiffs rely on the declaration of two Japanese attorneys and discuss a Japanese case 9 rejecting an appeal to evacuate school children suffering from radiation illness. (Id. at 10 34–35.) 11 The Court agrees with TEPCO that Japan is an adequate alternative forum. 12 There is no doubt that TEPCO is amenable to service in Japan. Further, Japanese 13 courts are well-respected and independent of government control and Plaintiffs provide 14 no evidence to the contrary. Courts in this Circuit have not previously rendered Japan 15 an inadequate forum, despite the country’s more limited discovery system and lack of 16 jury trials. Lockman Found v. Evangelical Alliance Mission, 930 F.2d 764, 768 (9th 17 Cir. 1991); Philippine Packing Corp. v. Maritime Co. of Philippines, 519 F.2d 811, 812 18 (9th Cir. 1975) (per curiam); Creager v. Yoshimoto, No. 05-1985, 2006 WL 680555, 19 at *2 (N.D. Cal. Mar. 14, 2006). Further, Plaintiffs’ concerns about the secrecy law are 20 unpersuasive in light of the Japanese Government’s statements indicating it would be 21 inapplicable to a case like this. (Reply ISO Mot. to Dismiss 20, ECF No. 62 (“the 22 Japanese government has specifically stated that the [privacy] Act does not apply to . 23 . . information concerning nuclear power plant accidents.”).) Because the Court finds 24 that Japan is an adequate alternative forum, the Court must next balance various private 25 and public factors and dismiss the case if the Japanese forum would be more 26 convenient for the Parties. 27 28 - 21 - 12cv3032 1 (B) Balancing of Private Interests 2 TEPCO argues that the relevant private interest factors all indicate that Japan is 3 the appropriate forum for this action. Plaintiffs disagree. The Court considers each 4 private interest factor in turn. 5 (i) Residence of the Parties and Witnesses 6 TEPCO argues that Japan is where the overwhelming majority of the witnesses 7 reside. (Mot. to Dismiss. 40, ECF No. 55.) TEPCO maintains that Japan is the more 8 convenient forum for the litigants because all current and former TEPCO officers and 9 employees that they expect to testify are located in Japan, as are nearly all of the 10 Japanese Government officials and private citizens that were involved in the response 11 to the FNPP meltdown. (Id.) TEPCO emphasizes that, not only will it be difficult or 12 impossible to produce many non-party witnesses for trial, but it will also be extremely 13 challenging to obtain even pre-trial deposition testimony from them in light of Japan’s 14 restrictions on taking depositions for use in foreign litigation. Further, TEPCO argues 15 that although Plaintiffs are all located in the U.S., Plaintiffs’ testimony is unnecessary 16 at the liability stage, such that there is no need for them to travel to the forum at this 17 time. If it eventually becomes necessary for Plaintiffs to provide testimony regarding 18 their injuries, TEPCO indicates that Japanese courts have established procedures for 19 procuring testimony from parties located overseas who cannot travel to Japan. 20 Plaintiffs insist that this factor favors a U.S. forum. Plaintiffs argue that all of 21 the service members named as plaintiffs in this action are located in the U.S. and that 22 TEPCO even has a Washington, D.C. office. (Plaintiff’s Resp. in Opp’n 37, ECF No. 23 59). Plaintiffs downplay the inconvenience of seeking deposition or trial testimony 24 from witnesses residing in Japan, arguing that these procedural obstacles will primarily 25 affect Plaintiffs, not TEPCO. 26 The presence of numerous non-party witnesses in Japan weighs in favor of 27 dismissal. The difficulty of accessing these witnesses will affect both parties and, in 28 any case, the principal consideration is the convenience of the witnesses. Plaintiffs’ - 22 - 12cv3032 1 residence in the U.S. and distance from Japan favors retaining the case. However, 2 plaintiff’s testimony will likely play a minimal role in the initial, critical stages of the 3 proceeding and would be more important during the damages portion of trial. Overall, 4 the Court finds that this factor is neutral. Plaintiffs all reside in the U.S. and TEPCO’s 5 witness mostly reside in Japan. Each side has established that it would be inconvenient 6 for them to conduct proceedings in the opposite country. However, the Court dos not 7 find it this factor to clearly weigh in favor of one side or the other. 8 (ii) Forum’s Convenience to the Litigants 9 TEPCO does not separately address this factor in its motion to dismiss. Plaintiffs 10 maintain that their choice of forum is entitled to substantial deference. (Plaintiff’s 11 Resp. in Opp’n 39, ECF No. 59). Plaintiffs argue that it would be “simply impossible” 12 for them to pursue their cases in Japan. (Id. at 40.) They attach numerous declarations 13 to their opposition detailing their “radiation related injuries,” which they claim would 14 prevent them from traveling to Japan at all. (Id. at 40–44.) On the other hand, 15 Plaintiffs argue, TEPCO has a long history of doing business in the U.S. and would not 16 be inconvenienced by litigating in a U.S. forum. 17 This factor strongly favors retaining jurisdiction in this forum. Plaintiffs would 18 be comparatively disadvantaged if they were required to file suit in Japan and likely 19 would not proceed with their claims. The comparative hardship for Plaintiffs is much 20 greater than it would be for TEPCO given the alleged medical conditions and ability 21 to travel. On the other hand, TEPCO could necessarily defend itself in this forum, albeit 22 at a significant cost. 23 (iii) Access to the Physical Evidence and Other Sources of Proof 24 TEPCO contends that the critical documents that will be needed in this suit are 25 nearly all located in Japan. (Mot. to Dismiss. 44, ECF No. 55.) Although TEPCO 26 concedes that the U.S. Navy may have some important documents, TEPCO argues that 27 the Navy is unlikely to disclose those documents in either forum. (Id. at 45.) 28 Additionally, TEPCO argues that information from the Japanese government may be - 23 - 12cv3032 1 necessary to adjudicate Plaintiffs’ claims and that the Japanese government may refuse 2 to disclose this information or make witnesses available in a U.S. court. (Id. at 46–47.) 3 TEPCO contends that with respect to documents outside of TEPCO’s possession and 4 located in Japan, a U.S. forum could not obtain them, even by letters rogatory, since 5 Japanese judges have no authority to compel document production for foreign 6 litigation. 7 Plaintiffs insist that the key inquiry is which forum will facilitate access to 8 documents, rather than where the documents themselves are located. (Plaintiff’s Resp. 9 in Opp’n 45, ECF No. 59). Plaintiffs argue that TEPCO will be required to produce 10 documents in its possession and control if this suit proceeds in this Court, such that 11 access to documents does not favor a Japanese forum. (Id.) This is especially true 12 given the prevalence of electronic documents and current technology. (Id. at 45–46.) 13 Moreover, Plaintiffs claim that there is no evidence indicating that TEPCO will have 14 difficulty obtaining documents held by the Japanese Government or by other non15 parties. (Id. at 46.) And, “Plaintiffs have no intention to compel documents from the 16 Japanese government.” (Id.) Plaintiffs maintain that TEPCO cannot meet its high 17 burden of proving that the current forum is inadequate by relying on mere speculation. 18 The Court finds that this factor is neutral. While this suit arises from a nuclear 19 incident at the FNPP and most of the operative facts took place in Japan, many of the 20 obstacles TEPCO identifies would be present no matter where the litigation takes place. 21 It is true that because TEPCO is subject to personal jurisdiction in the Southern 22 District, it would be required to turn over all of the documents in its possession. These 23 documents would undoubtedly be the most important source of information in this 24 litigation and would be available in the District Court. Although the majority of the 25 relevant documents and physical proof remain in Japan, TEPCO has not satisfied its 26 burden of proving that litigation in California would be oppressive or vexing. 27 28 - 24 - 12cv3032 1 (iv) Whether Unwilling Witnesses Can Be Compelled to Testify 2 TEPCO argues that U.S. courts have no ability to compel testimony from 3 unwilling non-party witnesses located in Japan, such as Japanese Government officials, 4 former TEPCO officers, and other potential witnesses. TEPCO’s argument is that 5 many witnesses, which might be willing to testify in a Japanese court, would not do so 6 in a U.S. court. Further, what little could be done by way of letters rogatory would be 7 burdensome and expensive compared to the summary procedures available in Japan. 8 According to TEPCO, this means that critical witnesses will be unavailable in the U.S. 9 forum, indicating that a Japanese forum is highly preferable to a fair and unbiased 10 determination of this action. Plaintiffs argue that there is nothing to suggest that 11 Japanese Government officials or former TEPCO directors and employees would be 12 unwilling to testify or to cooperate with this litigation. 13 The Court agrees with TEPCO that the difficulties in obtaining testimony from 14 non-party witnesses located in Japan, and outside of TEPCO’s control, weigh in favor 15 of a Japanese forum. Plaintiffs err in continuing to argue that these challenges are not 16 relevant to TEPCO’s ability to present a defense. As these witnesses can be 17 conveniently accessed in a Japanese forum, but can be accessed only with difficulty, 18 if at all, in this Court, this factor favors dismissal. 19 (v) The Cost of Bringing Witnesses to Trial 20 TEPCO contends that the presence of witnesses and evidence in Japan would 21 make a trial in this Court very costly, requiring significant travel expenses for TEPCO 22 employees to attend trial and for TEPCO’s U.S. counsel to conduct depositions of non23 party witnesses at the U.S. Embassy in Japan. Accordingly, TEPCO argues that this 24 factor favors dismissal. 25 Plaintiffs maintain, on the other hand, that they would incur several hundred 26 thousand dollars in travel expenses in order to try this case in Japan. Plaintiffs claim 27 that they would have to fly all 80 individual named plaintiffs, at least 40 treating 28 physicians, and many expert damages witnesses to Japan, far outweighing any expenses - 25 - 12cv3032 1 that TEPCO might incur to fly a few officers or employees to the U.S. (Plaintiffs’ 2 Resp. in Opp’n 48, ECF No. 59). Travel to Japan would take a “physical and 3 psychological toll” on Plaintiffs, as well as a financial one, whereas Plaintiffs claim 4 that TEPCO is a “multi-billion dollar company” that can easily afford the costs of 5 defending itself in this forum. (Id.) 6 Because of the nature of international litigation, each side would incur expenses 7 related to traveling and procuring witnesses in either forum. Although Plaintiffs might 8 incur additional expenses to retain counsel in Japan, it is not at all clear that they would 9 be required to travel to Japan to testify if it is inconvenient for them to do so, especially 10 in the initial stages of litigation. (see Supp. Decl. of Prof. Yasuhei Taniguchi ¶¶ 6, 11 13–17, ECF No. 43-1) (detailing procedures for procuring testimony from willing 12 witnesses overseas who cannot travel to Japan). However, any willing witnesses in 13 Japan would almost certainly have to travel to the U.S. for trial or provide pre-trial 14 depositions through the expensive and cumbersome process specified by Japanese law. 15 However, the Japanese deposition process is feasible and is not a bar for litigating in 16 the District Court. It is also unlikely that Plaintiffs would be required to procure the 17 number of witnesses and experts they detail in their Opposition. Therefore, the Court 18 finds this factor to weigh only slightly in favor of dismissing the case. 19 (vi) Enforceability of the Judgment 20 TEPCO is headquartered in Tokyo, Japan and also has significant assets in the 21 U.S. Accordingly, any judgment rendered against TEPCO either in Japan or in the U.S. 22 would be enforceable. This factor is therefore neutral. 23 (vii) Other Practical Problems 24 TEPCO argues that translation costs would be high if this case is tried in the 25 U.S., as most of the witnesses associated with TEPCO or with the Japanese 26 Government would have to testify in Japanese and most of the relevant documents will 27 also be in Japanese. (Mot. to Dismiss. 51, ECF No. 55.) Plaintiffs respond that 28 translation to English would be necessary in a Japanese forum in order to “apprise and - 26 - 12cv3032 1 include” Plaintiffs, and that testimony from U.S. military witnesses would also have to 2 be translated into Japanese. (Plaintiffs’ Resp. in Opp’n 50, ECF No. 59). Plaintiffs 3 insist that translation costs are “an expected cost of litigating in a global world.” (Id.) 4 This factor is neutral. The available documents and testimony pertaining to 5 liability are all likely to be in Japanese, while Plaintiffs will have English-language 6 materials and witnesses as well. The translation costs may be higher in this forum, 7 however the Court does not find this to be a decisive factor in light of the necessary 8 costs of translation in either forum. 9 (C) 10 Balancing of Public Interests TEPCO contends that the relevant public interest factors also favor dismissal. 11 The Court considers each in turn. 12 (i) Local Interest in the Lawsuit 13 TEPCO argues that Japan has the strongest interest in this dispute because the 14 Japanese Government has enacted several measures to provide compensation to those 15 harmed by the FNPP incident. (Mot. to Dismiss. 52–53, ECF No. 55.) Moreover, 16 TEPCO observes that the Japanese Government, through its instrumentality, the 17 Nuclear Damage Liability Facilitation Fund, is now TEPCO’s principal shareholder 18 and has committed billions of dollars in aid to TEPCO to ensure that it is able to pay 19 out compensation to those affected by the FNPP incident. (Id. at 53–54.) TEPCO 20 emphasizes that the Japanese Government has been “heavily involved in the overall 21 response to the earthquake, the tsunami, and the FNPP accident,” such that no interest 22 in this forum can “compare to the singular importance of the FNPP accident to Japan 23 and its Government.” (Id. at 54–55.) 24 Plaintiffs maintain that the U.S. has a strong interest in seeing that its service 25 members are compensated for their injuries. (Plaintiffs’ Resp. in Opp’n 52, ECF No. 26 59). In particular, because many of the Plaintiffs reside in the Southern District, this 27 Court in particular has a strong interest in providing resolution for them. Plaintiffs 28 point to the myriad institutions dedicated to caring for military veterans as evidence - 27 - 12cv3032 1 that the U.S. is interested in ensuring that “those who have served . . . receive benefits 2 for [their] service.” (Id.) Plaintiffs deny that Japan’s efforts to centralize compensation 3 for victims of the tsunami support dismissal because the allegations of negligence 4 distinguish Plaintiffs from other Japanese citizens who were merely harmed by a 5 natural catastrophe. (Id.) 6 Japan has an interest in adjudicating claims arising from the March 11, 2011 7 earthquake and tsunami that devastated large swaths of the country as evidenced by 8 Japan’s large investment in responding to the disaster. The U.S. also has a strong 9 interest in seeing that members of the Armed Forces are compensated for their service. 10 Especially as it is the V.A. system and the U.S. taxpayers who will ultimately pay for 11 the injuries to Plaintiffs. The Court thinks that both countries have a strong interest in 12 this litigation. This factor slightly favors retaining jurisdiction because of the strong 13 interest in providing compensation for servicemembers and the ultimate costs of 14 medical treatment lying with U.S. taxpayers. 15 (ii) Court’s Familiarity with the Governing Law 16 The parties do not address this factor. Although TEPCO does not concede the 17 applicability of California law, TEPCO does not suggest at any point that Japanese law 18 would govern the dispute if the Court retained jurisdiction. In all likelihood, the Court 19 would be applying some version of U.S. law, be it maritime law, federal common law, 20 or California state law. Accordingly, this factor weighs against dismissal. 21 22 23 (iii) Remaining Public Interest Factors: Burden on Local Courts and Juries, Congestion in the Court, Costs of Resolving a Dispute The parties hardly touch upon the remaining public interest factors, suggesting 24 that these issues need not substantially affect the Court’s inquiry. Although litigating 25 this case in this forum would add to an already busy docket and would require time and 26 resources to be dedicated to the matter, these factors alone do not justify dismissal. 27 Moreover, litigating in Japan would impose significant costs on the Japanese judicial 28 system. Accordingly, these factors are neutral. - 28 - 12cv3032 1 (D) Summary and Conclusion 2 In sum, although Japan is an adequate alternative forum, the balance of the 3 private and public interest factors suggests that it would be more convenient for the 4 parties to litigate in a U.S. court. Accordingly, the Court DENIES TEPCO’s motion 5 to dismiss on this basis. 6 7 INTERNATIONAL COMITY Lastly, TEPCO argues that the doctrine of international comity warrants 8 dismissal of this action in favor of a Japanese forum. 9 1. 10 Legal Standard International comity is an abstention doctrine that permits federal courts to defer 11 to the judgment of an alternative forum where the issues to be resolved are “entangled 12 in international relations.” Ungaro-Benages v. Dresdner Bank AG, 379 F.3d 1227, 13 1237 (11th Cir. 2004) (quoting In re Maxwell Comm’n Corp., 93 F.3d 1036, 1047 (2d 14 Cir. 1996)). Courts must evaluate several factors, including “the strength of the United 15 States’ interest in using a foreign forum, the strength of the foreign governments’ 16 interests, and the adequacy of the alternative forum.” Id. (citing cases). 17 2. Analysis 18 TEPCO contends that the interests of the U.S., Japan, and the international 19 community support consolidating Plaintiffs’ claims in Japan in light of the Japanese 20 Government’s comprehensive scheme for providing relief to individuals harmed by the 21 FNPP incident. The Court considers each of the three key interests in turn. 22 (A) Strength of the United States’ Interest in Using a Japanese Forum 23 TEPCO argues that the U.S.’s ratification of the Convention on Supplementary 24 Compensation for Nuclear Damage (“CSCND”) reflects a long-expressed policy that 25 “all claims arising from a nuclear incident are handled in a comprehensive and 26 coordinated fashion by centralizing all such claims in the courts of the country where 27 the nuclear incident occurred.” (Mot. to Dismiss 57–58, ECF No. 55). The CSCND, 28 which was ratified by the U.S. on August 3, 2006, provides that “jurisdiction over - 29 - 12cv3032 1 actions concerning nuclear damage from a nuclear incident shall lie only with the 2 courts of the Contracting Party within which the nuclear incident occurs.” (Id. at 58.) 3 According to TEPCO, both the CSCND and the comments of Executive officials 4 regarding the Convention make clear that the U.S. has a strong interest in seeing that 5 claims for damages from a nuclear incident are consolidated in the country where the 6 incident occurred, even if that means that U.S citizens are diverted to a foreign court 7 system. (Id. at 58–59) 8 Plaintiffs discussed previously that the Convention has not yet entered into effect 9 and thus does not have the force of law. Moreover, Plaintiffs distinguish the primary 10 case upon which TEPCO relies, Ungaro-Benages v. Dresdner Bank AG because, in that 11 case, the court dismissed out of deference to an alternative forum that had been 12 established jointly by the American and German governments to address precisely the 13 types of claims brought by the plaintiffs. 379 F.3d at 1237. Here, the alternative forum 14 would be a Japanese court, over which the U.S. has no authority. Finally, Plaintiffs 15 argue that the interests of the U.S. would not be served by adjudicating Plaintiffs’ 16 claims in a Japanese forum. 17 Although the U.S. has articulated its preference that all claims, including those 18 brought by U.S. citizens, be centralized in the jurisdiction where the nuclear incident 19 took place – the CSCND has not yet been ratified. Additionally, other factors evidence 20 the U.S.’s strong interest including the residence of the injured servicemembers and the 21 financial responsibility of U.S. taxpayers. Thus, the Court finds that the United States 22 has an extremely strong interest in resolving this matter in the Southern District. 23 TEPCO’s evidence on this matter does not persuade the Court that the U.S. lacks a 24 serious interest in resolving this case. 25 (B) Strength of Japan’s Interest in Using a Japanese Forum 26 TEPCO cites the measures that Japan has taken to set up an effective system for 27 compensating individuals harmed by the FNPP incident and points to these steps as 28 evidence of Japan’s significant interest in having Plaintiffs’ claims adjudicated in the - 30 - 12cv3032 1 Japanese court system. (Mot. to Dismiss 58–59, ECF No. 55). Plaintiffs do not 2 dispute Japan’s interest, but claim the United States’ interests are stronger and that 3 TEPCO has not been forthcoming about the FNPP meltdown, such that dismissal in 4 deference to Japan’s interests would be improper. As discussed above, the Court 5 agrees that Japan has a strong interest in litigating the case in Japan. However, while 6 consolidating liability may be an enticing prospect to Japan, the potential liability in 7 this case lies with TEPCO and the Court is not persuaded that Japan has a strong 8 interest in compensating foreign plaintiffs arising out of TEPCO’s negligence. 9 (C) 10 Adequacy of the Japanese Forum The standards for evaluating the adequacy of a forum are the same under the 11 international comity doctrine as they are under forum non conveniens analysis. See 12 Jota v. Texaco Co., 157 F.3d 153, 160 (2d Cir. 1998). Neither party adds any argument 13 regarding this factor. As discussed above, the Court finds Japan to be an adequate 14 alternative forum. 15 (D) Summary and Conclusion 16 For the same reasons articulated in the forum non conveniens analysis above, the 17 Court finds that both the U.S. and Japan have a strong interest in having this suit heard 18 within their forum. The Court finds that the United States has a slightly stronger 19 interest and declines to exercise its discretion in dismissing this case under the doctrine 20 of international comity. 21 22 PLAINTIFFS’ MOTION TO AMEND Plaintiffs seek leave to amend the SAC to add four Doe Defendants: General 23 Electric, EBASCO, Toshiba, and Hitachi. Plaintiffs also wish to add additional 24 servicemember plaintiffs. Plaintiffs assert that they only recently “discovered the 25 nature and extent of conduct of the Doe Defendants giving rise to liability and 26 causation of Plaintiffs’ harms, damages, injuries and losses.” (Mot. to File Am. Compl. 27 3, ECF No. 65.) Plaintiffs allege that each of the four Doe Defendants was responsible 28 - 31 - 12cv3032 1 in part for the design, procurement, maintenance, management, or servicing of the 2 FNPP. (Id.) 3 1. Legal Standard 4 Leave to amend should be freely given “when justice so requires.” Fed. R. Civ. 5 P. 15(a)(2). But while the rule should be interpreted extremely liberally, leave should 6 not be granted automatically. Jackson v. Bank of Haw., 902 F.2d 1385, 1387 (9th Cir. 7 1990). The opposing party bears the burden of demonstrating why denial is necessary. 8 A trial court may deny a motion for leave to amend based on various factors, including 9 bad faith, undue delay, prejudice to the opposing party, futility of amendment, and 10 whether the party has previously amended. Foman v. Davis, 371 U.S. 178 (1962). 11 2. Analysis 12 TEPCO argues that the Court should deny Plaintiffs’ Motion to Amend SAC as 13 futile because of the previously discussed justiciability issue. However, as the Court 14 finds that the SAC is not barred by the political question doctrine, this argument is not 15 persuasive. TEPCO does not address the other Foman factors. The burden fell on 16 TEPCO to demonstrate that leave to amend would be inappropriate. Because TEPCO 17 failed to meet that burden and did not establish the presence of any of the five Foman 18 factors, the Court finds no reason to deny leave to amend. However, the Court does not 19 admit the third amended complaint, attached as Exhibit A. Rather, Plaintiffs shall 20 amend in light of the Court’s rulings in this Order. 21 22 CONCLUSION For the reasons stated above, the Court GRANTS TEPCO’s motion to dismiss 23 Plaintiffs’ strict liability for design defect and IIED claims WITH PREJUDICE. 24 Additionally, the Court GRANTS TEPCO’s motion to dismiss the SAC’s claims on 25 behalf of “Doe” plaintiffs. Plaintiffs’ other claims survive. 26 The Court DENIES TEPCO’s Motion to Dismiss under the doctrines of forum 27 non conveniens and international comity. 28 - 32 - 12cv3032 1 The Court also GRANTS Plaintiffs Motion to Amend their SAC. Plaintiffs shall 2 take this Order into consideration and file any amended pleading by November 18, 3 2014. 4 IT IS SO ORDERED. 5 6 DATED: October 28, 2014 7 8 Honorable Janis L. Sammartino United States District Judge 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 - 33 - 12cv3032

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?