ORDER granting Petitioner LG Electronics Mobilecomm U.S.A., Inc.'s 1 Petition to Confirm Arbitration Award; granting Petitioner's 6 Motion for Entry of Order to Confirm Arbitration Award. Court grants LG's petition for a confirmati on of the Award in the amount of $9,986,124.14, plus interest set at the contractual rate of 1.5% per month from the due date for each unpaid invoice. The Court directs the Clerk to enter judgment in favor of LG. LG may file a properly supported motion for attorney's fees and costs by 6/1/2018. Signed by Judge Cynthia Bashant on 5/3/2018. (All non-registered users served via U.S. Mail Service) (jah)
1
2
3
4
5
6
7
8
UNITED STATES DISTRICT COURT
9
SOUTHERN DISTRICT OF CALIFORNIA
10
LG ELECTRONICS
MOBILECOMM U.S.A., INC.,
11
12
Case No. 18-cv-0250-BAS-RBB
ORDER GRANTING PETITION
FOR CONFIRMATION OF
ARBITRATION AWARD
Plaintiff,
13
v.
14
15
16
[ECF Nos. 1, 6]
RELIANCE COMMUNICATIONS,
LLC,
Defendant.
17
18
Plaintiff LG Electronics MobileComm U.S.A., Inc. (“LG”) has filed a petition
19
(the “Petition”) pursuant to the Federal Arbitration Act (“FAA”), 9 U.S.C. §9, for a
20
court order confirming an arbitration award in its favor and against Defendant
21
Reliance Communications, LLC (“Reliance”). (ECF Nos. 1, 6.) For the reasons
22
herein, the Court grants LG’s Petition.
23
I.
BACKGROUND
24
LG is a California corporation and wholly owned subsidiary of LG Electronics
25
U.S.A., with its corporate offices located in San Diego, California. (Pet. ¶2.)
26
Reliance is a New Jersey-based limited liability company with offices in Hauppauge,
27
New York. (Id. ¶3.) It is comprised of four members, who are citizens of New York.
28
(Id.)
–1–
18cv250
1
The parties entered into a Master Purchase Agreement (“MPA”), by which
2
LG agreed to supply LG-branded accessories to Reliance for distribution. (ECF No.
3
1-4 Ex. A, MPA.) The MPA included a mandatory arbitration provision to resolve
4
disputes between the parties related to the agreement, with any arbitration
5
proceedings occurring in San Diego, California. (Id. ¶14.1) The underlying dispute
6
arose due to Reliance’s failure and refusal to pay invoices for LG products that it
7
ordered and received from LG, in breach of the MPA’s terms. The unpaid invoices
8
totaled $9,986,124.14, not including accrued interest. (Pet. ¶7.)
9
Pursuant to the arbitration provision, LG initiated an arbitration with Reliance
10
before the Honorable J. Richard Haden (Retired) with the Judicial Arbitration and
11
Mediation Service in San Diego, California on September 3, 2016. (Id. ¶8; ECF No.
12
1-5 Ex. B.) The parties entered into a settlement agreement which stayed arbitration
13
and held in abeyance a stipulated judgment signed by both parties to be entered by
14
the Arbitrator if Reliance defaulted on its settlement payment obligations. (Pet. ¶9.)
15
Reliance defaulted and, after LG provided written notice to the Arbitrator and
16
Reliance, the Arbitrator executed and entered the stipulated judgment (the “Award”)
17
in favor of LG on January 17, 2018. (Id. ¶10; ECF No. 1-8 Ex. E.) Under the Award,
18
LG is entitled to: (1) $9,986,124.14, less any payments previously made by Reliance
19
on or after January 15, 2017; (2) monthly interest set at the contractual rate of 1.5%
20
for each unpaid invoice; and, according to proof, (3) attorneys’ fees and (4) costs.
21
(Award at 2.)
22
After the issuance of the Award, LG filed the Petition on February 2, 2018.
23
(ECF No. 6.) Reliance was subsequently served with the Petition on February 12,
24
2018, by delivery through a private process server of the Petition and Summons on
25
its statutorily authorized agent for service of process in New Jersey. (ECF No. 4.)
26
After several weeks with no response to the Petition, LG filed a notice on March 27,
27
2018 regarding Reliance’s failure to respond. (ECF No. 5.) LG subsequently filed
28
a request for entry of an order granting its unopposed Petition. (ECF No. 6.)
–2–
18cv250
1
II.
DISCUSSION
2
A.
3
The Court first addresses whether it has personal jurisdiction over Reliance to
4
enter a confirmation of the arbitration award against it. Personal jurisdiction over a
5
defendant in a conformation proceeding may arise upon service of a petition for
6
confirmation of an arbitration award under Section 9 of the FAA. See Reed &
7
Martin, Inc. v. Westinghouse Elec. Corp., 439 F.2d 1268, 1277 (2d Cir. 1971) (“The
8
Arbitration Act provides for a specific means of obtaining personal jurisdiction in
9
the district agreed to by the parties . . .”); see also Weststar Assoc., Inc. v. Tin Metals
10
Co., 752 F.2d 5, 7 (1st Cir. 1985) (“[Section] 9 was precisely meant to enable the
11
district court for the district within which the award was made to exercise personal
12
jurisdiction over the parties to the award.”).
The Court Possesses Personal Jurisdiction Over Reliance
13
Section 9 provides that “[n]otice of the application shall be served upon the
14
adverse party, and thereupon the court shall have jurisdiction of such party as
15
though he had appeared generally in the proceeding.” 9 U.S.C. §9 (emphasis
16
added). Section 9 establishes two methods of providing notice depending on
17
whether the “adverse party” is a resident of the district in which the award was made.
18
“If the adverse party is a resident of the district, . . . service shall be made upon the
19
adverse party or his attorney as prescribed by law for service of notice of motion in
20
an action in the same court.” 9 U.S.C. §9. However, “[i]f the adverse party shall be
21
a nonresident, then the notice of the application shall be served by the marshal of
22
any district within which the adverse party may be found in like manner as other
23
process of the court.” Id.
24
Notice here is only proper under Section 9’s nonresident method because
25
Reliance is not a resident of the Southern District of California, the judicial district
26
in which the arbitration award was made. LG served the Petition and summons by
27
delivering a copy of both to Reliance’s statutorily authorized agent in New Jersey.
28
(ECF No. 4.) This method of service comports with Federal Rule of Civil Procedure
–3–
18cv250
1
4(h), which provides that a limited liability corporation may be served in any judicial
2
district in the United States by delivering through a private service provider a copy
3
of the complaint and summons to an agent authorized by appointment or by law.
4
FED. R. CIV. P. 4(h)(1); see also Amalgamated Leasing & Trading, Inc. v. Sumber
5
Mas, LLC, No. CV 15-05128 TJH (FFMx), 2016 WL 8252921, at *2 (C.D. Cal. Feb.
6
8, 2016). The question is whether this service, which was not service by a U.S.
7
Marshal, comports with Section 9’s notice requirement and, thus, provides this Court
8
with jurisdiction over Reliance.
9
“[T]here is scant case law interpreting the FAA’s §9 service requirement,”
10
Hancor, Inc. v. R & R Eng’g Prods., Inc., 381 F. Supp. 2d 12, 15 (D.P.R. 2005). “A
11
review of the existing case law reveals that district courts around the country are
12
applying [it] inconsistently.” Logan & Kanawha Coal Co. v. Detherage Coal Sales,
13
LLC, 789 F. Supp. 2d 716, 718 (S.D.W. Va. 2011), rev’d and remanded on other
14
grounds, 514 Fed. App’x 365 (4th Cir. 2013). Some courts have found service must
15
be effectuated by a U.S. Marshal to satisfy Section 9’s notice requirement for
16
nonresidents. See, e.g., Logan, 789 F. Supp. 2d at 722; Dobco, Inc. v. Mery Gates,
17
Inc., No. 06-0699(HAA), 2006 WL 2056799, at *2 (D. N.J. July 21, 2006). But a
18
number of other courts have found that service under Rule 4 satisfies Section 9’s
19
notice requirement.
20
anachronism not only because it cannot account for the internationalization of
21
arbitration law subsequent to its enactment, but also because it cannot account for
22
the subsequent abandonment of the United States marshals as routine process
23
servers.”); see also United Cmty. Bank v. Campbell, No. 1:10-cv-79, 2011 WL
24
815684, at *2 (W.D.N.C Mar. 1, 2011) (“Section [9] cannot be taken as the proper
25
standard for service of process. Recourse must be had to the Federal Rules of Civil
26
Procedure.”) (service by certified mail, return receipt and by individual service in
27
accordance with Rule 4(e) was proper) (citation omitted); Own Capital, LLC v.
28
David Smith Autoland, Inc., No. 10-mc-51002, 2010 WL 3623173, at *2 (E.D. Mich.
See Hancor, 381 F. Supp. 2d at 15 (“Section [9] is an
–4–
18cv250
1
Sept. 15, 2010) (“[T]he phrase ‘in like manner as other process of court’ requires the
2
party applying for confirmation of an arbitration award under [S]ection 9 to follow
3
Fed. R. Civ. P. 4 in providing notice to adversarial parties.”).
4
Much like district courts elsewhere, district courts in the Ninth Circuit have
5
taken varying approaches. Two courts have issued conflicting opinions about
6
Section 9’s notice requirement for nonresidents. Compare Amazon.com, Inc. v.
7
Arobo Trade, Inc., No. C17-0804JLR, 2017 WL 3424976, at *4 (W.D. Wash. Aug.
8
9, 2017) (“[T]he court concludes that serving a nonresident respondent via process
9
server, in accordance with Rule 4, satisfies Section 9 of the FAA”) with Kirby
10
Morgan Dive Sys. v. Hydrospace Ltd., No. CV 09-4934 PSG (FFMx), 2010 WL
11
234791, at *4 (C.D. Cal. Jan. 13, 2010), rev’d and remanded on other grounds, 478
12
Fed. App’x 382 (9th Cir. 2012) (“[A]s service was not made by a marshal in a
13
judicial district in the United States, such service does not give the Court personal
14
jurisdiction over Smith under §9.”). A few courts have addressed service of a
15
petition for confirmation of an arbitration award with reference only to Rule 4. See
16
Wells Fargo Advisors, LLC v. Braver, No: 3:11-cv-06685-JSC, 2012 WL 2990779,
17
at *2 (N.D. Cal. July 9, 2012) (service of petition and summons on petition was
18
proper when it was effectuated in accordance under California state law pursuant to
19
Federal Rule of Civil Procedure Rule 4(e)); Gladstone Wood v. Hampton-Porter Inv.
20
Bankers, No. C-02-5367 MMC, 2004 WL 546888, at *2 (N.D. Cal. Mar. 11, 2004)
21
(finding service of petition and summons on petition proper under Rule 4(h)).
22
Another court has determined that non-compliance with Section 9’s literal
23
requirement of service by a U.S. marshal “is of no consequence” when the “parties
24
agreed to waive formal service” including “for any court actions in connection with
25
the arbitration.” Collins v. D.R. Horton, Inc., 361 F. Supp. 2d 1085, 1092 (D. Ariz.
26
2005).
27
This Court finds persuasive and appropriate the approach taken by courts
28
which find that service under Rule 4 satisfies Section 9’s notice requirement. As
–5–
18cv250
1
these courts have recognized, Section 9’s use of the phrase “in like manner as other
2
process of the court” provides a textual basis for linking Section 9’s service
3
requirement with service under Rule 4. Indeed, multiple courts have relied on this
4
phrase as a textual basis for finding service under Rule 4 proper for the purposes of
5
the FAA’s notice provisions. See Ventureforth Holdings LLC v. Joseph, 80 F. Supp.
6
3d 147, 148–149 (D.D.C. 2015); Technologists, Inc. v. Mir’s Ltd., 725 F. Supp. 2d
7
120, 127 (D.D.C. 2010). Moreover, significant changes in who serves process have
8
occurred since the FAA was enacted, “tak[ing] the marshals out of summons service
9
almost entirely.” Matter of the Arbitration Between InterCarbon Bermuda, Ltd. &
10
Caltex Trading & Transport Corporation, 146 F.R.D. 64, 67 n.3 (S.D.N.Y. 1993);
11
see also Technologists, Inc, 725 F. Supp. 2d at 126 (interpreting similarly worded
12
provision in Section 12 of the FAA and observing that “requirement that
13
nonresidents be served by the marshal is an artifact of the era in which United States
14
marshals were the default servers of process in federal courts, an era that ended in
15
the early 1980s when the Federal Rules of Civil Procedure[] were amended so as to
16
allow for service by any nonparty over the age of 18.”). Application of a strict
17
interpretation of Section 9 “cannot be taken as the proper standard for service of
18
process” given those changes. Matter of the Arbitration, 146 F.R.D. at 67 n.3; see
19
also Hancor, 381 F. Supp. 2d at 16.
20
In view of the FAA’s purposes, there are also important policy considerations
21
underlying the conclusion that service under Rule 4 satisfies Section 9’s notice
22
requirement for nonresidents. “Requiring an FAA petitioner to effect service on
23
nonresident respondents via United States Marshal—rather than by utilizing the
24
menu of otherwise satisfactory options under [Rule] 4—would ‘frustrate[] the
25
[FAA’s] policy of rapid and unobstructed enforcement of arbitration agreements.’”
26
Amazon.com, Inc., 2017 WL 3424976, at *4 (quoting Moses H. Cone, 460 U.S. at
27
23). Here, unnecessary delay in the confirmation of LG’s Award would result
28
merely as a matter of compliance with an interpretation of Section 9 that is no longer
–6–
18cv250
1
viable. This cannot be the right result in light of the fact that Reliance already
2
consented to arbitration in this district, of which Section 9 takes account in its
3
personal jurisdiction-enabling language. See Weststar Assoc., Inc., 752 F.2d at 7.
4
Accordingly, the Court concludes that Reliance properly received notice in
5
accordance with Section 9 of the FAA and, thus, the Court has personal jurisdiction
6
over Reliance for this Petition.
7
B.
8
The Court must also confirm that subject matter jurisdiction exists over a
9
petition for confirmation of an arbitration award. Although the FAA permits a party
10
to move for an order confirming an arbitration award, see 9 U.S.C. §9, the FAA
11
“does not create any independent federal-question jurisdiction under 28 U.S.C.
12
§1331 or otherwise.” Southland Corp. v. Keating, 465 U.S. 1, 16 n.9 (1984) (citing
13
Mohes H. Cone Mem’l Hosp. v. Mercury Constr. Corp., 460 U.S. 1, 25 n.32 (1983));
14
General Atomic Co. v. United Nuclear Corp., 655 F.2d 968, 970–71 (9th Cir. 1981)
15
(determining that Section 9 does not create a basis for federal jurisdiction and
16
therefore a party must allege an “independent ground[] to justify an exercise of
17
federal jurisdiction . . ., that is, diversity of citizenship or a federal question. . .”);
18
New United Motor Mfg. v. UAW Local 2244, 617 F. Supp. 2d 948, 955 n.7 (N.D.
19
Cal. 2008). A court considering a petition to confirm an arbitration award must
20
therefore determine whether there is either diversity jurisdiction or some other
21
independent basis for federal question jurisdiction. See General Atomic Co., 655
22
F.2d at 971; Hansen Bev. Co. v. DSD Distribs., No. 08-cv-0619-LAB (RBB), 2008
23
WL 5233180, at *4 (S.D. Cal. Dec. 12, 2008).
Subject Matter Jurisdiction Exists Over the Petition
24
LG invokes this Court’s diversity jurisdiction under 28 U.S.C. §1332(a). (Pet.
25
¶4.) A federal court possesses diversity jurisdiction when the “matter in controversy
26
exceeds the sum or value of $75,000, exclusive of interests and costs” and, in
27
relevant part, “is between . . . citizens of different states.” 28 U.S.C. §1332(a). As
28
LG is the party asserting jurisdiction, it has the burden of showing jurisdiction exists.
–7–
18cv250
1
Kokkonen v. Guardian Life Ins. Co. of Am., 511 U.S. 375, 377 (1994). The Court
2
finds that LG has met its burden.
3
First, for the purposes of Section 1332(a), the amount in controversy here is
4
the amount of the arbitration award LG seeks to confirm. When a petitioner seeks
5
confirmation of an arbitration award, without seeking remand for further arbitration
6
proceedings, the amount in controversy is the value of the award itself to the
7
petitioner. 1 See Anessa’s Transp. Inc. v. XPO Last Mile Inc., No. 18-cv-00709-SK,
8
2018 U.S. Dist. LEXIS 70655, at *6 (N.D. Cal. April 26, 2018); Pac. Metro, LLC v.
9
Le Investments, Inc., No. C13-02216 HRL, 2013 WL 12304551, *2 (N.D. Cal. Aug.
10
27, 2013); Hansen Bev. Co., 2008 WL 5233180 at *5; Wise v. Marriott Int’l, Inc.,
11
No. 06 Civ. 11439 (LAP), 2007 WL 2200704, at *4 (S.D.N.Y. July 30, 2007). The
12
$9,986,124.14 Award amount in favor of LG easily satisfies the amount in
13
controversy requirement.2
14
Second, there exists the requisite complete diversity of citizenship. See
15
16
17
18
19
20
21
22
23
24
25
26
27
28
1
In contrast, when a party seeks to re-open arbitration proceedings, the
amount in controversy for the purposes of diversity jurisdiction, is the amount at
stake in the underlying litigation. See Theis Research, Inc. v. Brown & Bain, 400
F.3d 659, 664–65 (9th Cir. 2005). There would be no practical difference if this
standard applied here because the Award is equal to the amount in controversy in
the underlying dispute between LG and Reliance. The $9,986,124.14 reflects the
amount of unpaid invoices for which LG sought payment. (Pet. ¶7; Spjute Decl. ¶5.)
The fact that the Award is for an amount “less any payments made by
Reliance on or after January 15, 2017” (ECF No. 1-8 Ex. E ¶2) is inconsequential to
diversity jurisdiction. “The mere fact” that Reliance may or could have “satisfied a
portion of its obligation under the arbitration award does not divest the court of
authority to confirm that portion of the award—satisfaction and confirmation are
separate issues.” Collins v. D.R. Horton, Inc., 361 F. Supp. 2d 1085, 1093 (D. Ariz.
2005); see also Dist. Council No. 9 v. APC Painting, Inc., 272 F. Supp. 2d 229,239
(S.D.N.Y. 2003) (holding that the fact that the defendant had satisfied the arbitration
awards at issue was irrelevant to whether the court should confirm the awards under
9 U.S.C. § 9).
2
–8–
18cv250
1
Strawbridge v. Curtiss, 7 U.S. 267 (1806) (complete diversity of citizenship is
2
required); see also Caterpillar, Inc. v. Lewis, 519 U.S. 61, 68 n. 3 (1996) (same).
3
LG is incorporated in the state of California. (Pet. ¶2; Spjute Decl. ¶2.) Because
4
Reliance is a limited liability company, it “‘is a citizen of every state of which its
5
owners/members are citizens,’ not the state in which it was formed or does business.”
6
NewGen, LLC v. Safe Cig, LLC, 840 F.3d 606, 612 (9th Cir. 2016) (quoting Johnson
7
v. Columbia Props. Anchorage, LP, 437 F.3d 894, 899 (9th Cir. 2006)). Each of
8
Reliance’s members is a citizen of New York.
9
Accordingly, the Court finds that it has subject matter jurisdiction over the Petition.
(Pet. ¶3; Spjute Decl. ¶3.)
10
C.
11
Having confirmed the existence of personal and subject matter jurisdiction,
Merits of the Petition to Confirm the Award
12
the Court turns to the requirements for confirmation of the Award.
13
requirements include that: (1) the Petition is timely sought in the proper court and
14
contains all filings statutorily required under the FAA, and (2) confirmation of the
15
Award is otherwise proper. LG satisfies each of these.
16
1.
These
Timely Application to Proper Court and Requisite Filings
17
Under Section 9, “[i]f the parties in their agreement have agreed that a
18
judgment of the court shall be entered upon the award made pursuant to the
19
arbitration, and shall specify the court, then at any time within one year after the
20
award is made any party to the arbitration may apply to the court so specified for an
21
order confirming the award, and . . . the court must grant such an order unless the
22
award is vacated, modified, or corrected . . .” 9 U.S.C. §9. If the parties’ agreement
23
does not specify a particular court, the petition “may be made to the United States
24
court in and for the district within which such award was made.” Id. Consistent
25
with this language, a court must ensure that the parties contemplated judicial
26
enforcement of an arbitration award in their agreement and that a petition to confirm
27
is timely sought.
28
Here, the parties’ agreement provides that an award will be “final, binding,
–9–
18cv250
1
and enforceable in a court of competent jurisdiction.” (MPA ¶14.1.) This language
2
confirms to this Court that the parties contemplated judicial enforcement. Qorvis
3
Commc'ns, LLC v. Wilson, 549 F.3d 303, 308 (4th Cir. 2008) (“[C]ourts must
4
undertake enforcement of arbitration awards ‘so long as the parties contemplated
5
judicial enforcement.’”) (quoting Hall St. Assocs., L.L.C. v. Mattel, Inc., 552 U.S.
6
576, 587 n.6 (2008) (emphasis added by Fourth Circuit)). Although the parties’
7
agreement does not specify a particular court in which a court judgment on the award
8
may be entered, LG has properly sought a judgment in this Court because the Award
9
was made in San Diego, California. See 9 U.S.C. §9. LG’s Petition is also timely
10
filed within the one-year requirement under Section 9 because LG filed the Petition
11
less than a month after the Award issued.
12
To obtain a court order confirming the Award, LG must also satisfy certain
13
filing requirements. Section 13 of the FAA requires that the party moving to confirm
14
an arbitration award file: (1) the arbitration agreement and the selection or
15
appointment of an arbitrator, (2) the award, and (3) “[e]ach notice, affidavit, or other
16
papers used upon an application to confirm, modify, or correct the award . . .” 9
17
U.S.C. §§13(a)–(c). LG has met each of these requirements, by providing a copy of
18
the MPA’s arbitration provisions, the notice of appointment of the Honorable J.
19
Richard Haden (Retired), the stipulated judgment which constitutes the Award, and
20
additional papers. (ECF No. 1-4 Ex. A; ECF No. 1-5 Ex. B; ECF No. 1-8 Ex. E.)
21
Thus, the Petition satisfies the FAA’s timing and filing requirements.
22
2.
Propriety of Confirming the Award
23
Once a court is satisfied that the Petition is timely and properly supported, the
24
court’s ultimate review of the Petition is “both limited and highly deferential.”
25
Coutee v. Barington Capital Group, L.P., 336 F.3d 1128, 1132 (9th Cir. 2003)
26
(citing Sheet Metal Workers’ Int’l Ass’n v. Madison Indus., Inc., 84 F.3d 1186, 1190
27
(9th Cir.1996)). Confirmation of an arbitration award typically “is a summary
28
proceeding that merely makes what is already a final arbitration award a judgment
– 10 –
18cv250
1
of the court.” Romero v. Citibank USA, Nat’l Ass’n, 551 F. Supp. 2d 1010, 1014
2
(E.D. Cal. 2008) (quoting Florasynth, Inc. v. Pickholz, 750 F.2d 171, 175–76 (2d
3
Cir. 1984)). This limited and summary review aims to honor the parties’ contractual
4
choices and further the FAA’s “national policy favoring arbitration and plac[ing]
5
arbitration agreements on equal footing with all other contracts . . . .”
6
Check Cashing, Inc. v. Cardegna, 546 U.S. 440, 443 (2006); see also Thompson v.
7
Tega-Rand Int’l, 740 F.2d 762, 763 (9th Cir. 1984) (“[w]here the parties have agreed
8
to arbitration, the court will not review the merits of the dispute.”).
Buckeye
9
Section 9 of the FAA mandates that “the court must grant such an order unless
10
the award is vacated, modified, or corrected as prescribed in sections 10 and 11.” 9
11
U.S.C. §9 (emphasis added). The grounds for not granting a confirmation are
12
“extremely limited” and only implicated when a party to the arbitration moves to
13
vacate the award based on certain circumstances that undermine the award’s validity
14
or its accuracy on material issues. See 9 U.S.C. §10(a) (enumerating grounds for
15
vacating an award, including that the award was procured by fraud, corruption or
16
undue means or the arbitrator was biased, engaged in misconduct, or exceeded his
17
powers); 9 U.S.C. §11 (court may modify or correct award for material
18
miscalculations or material mistakes, when the award addresses matters not
19
submitted to the arbitrator, or the award is “imperfect in form”); see also Kyocera
20
Corp. v. Prudential Bache Trade Servs., 341 F.3d 987, 998 (9th Cir. 2003) (“These
21
grounds afford an extremely limited review authority, a limitation that is designed
22
to preserve due process but not to permit unnecessary public intrusion into private
23
arbitration matters”); G.C. & K.B. Invs., Inc. v. Wilson, 326 F.3d 1096, 1105 (9th
24
Cir. 2003) (noting that courts “have interpreted sections 9 and 10 [of the FAA]
25
narrowly.”). Reliance has not moved to modify or correct the Award under either
26
Sections 10 or 11 of the FAA.3
27
28
3
Reliance is no longer able to bring any such challenges. Section 12 of the
– 11 –
18cv250
1
In the absence of a cognizable challenge to the Award, the Court must hew to
2
the FAA’s mandate to confirm it. See Jones v. Coastal Concrete Southeast II, LLC,
3
No. 3:15-cv-03020-JMC, 2016 U.S. Dist. LEXIS 6289, at *2 (D.S.C. Jan. 20, 2016)
4
(citing Apex Plumbing Supply, Inc. v. U.S. Supply Co., Inc., 142 F.3d 188, 193 (4th
5
Cir. 1998)); see also Goldman v. Gagnard, No. 11-CV-3028-LHK, 2011 WL
6
13177619, at *2 (N.D. Cal. Oct. 27, 2011) (no grounds for modification or correction
7
of award were alleged and thus court was required to confirm award); May Fin.
8
Corp. v. Granger Meadows, No. 3:02-CV-2482-L, 2003 U.S. Dist. LEXIS 1411, at
9
*7 (N.D. Tex. Jan. 30, 2003) (confirming arbitration award to which the parties
10
stipulated). Accordingly, the Court confirms the Award.
11
III.
CONCLUSION & ORDER
12
For the foregoing reasons, the Court GRANTS LG’s petition for a
13
confirmation of the Award in the amount of $9,986,124.14, plus interest set at the
14
contractual rate of 1.5% per month from the due date for each unpaid invoice. (ECF
15
Nos. 1, 6.) The Court DIRECTS the Clerk of the Court to enter judgment in favor
16
of LG.
17
LG has also requested attorneys’ fees and costs in the Petition, but has not
18
specified in what amount, nor supported the request with appropriate evidence. (Pet.
19
at 4, Prayer for Relief (3), (4).) Federal Rule of Civil Procedure 54(d) permits a
20
party to move for attorneys’ fees and costs. FED. R. CIV. P. 54(d). LG may file a
21
22
23
24
25
26
27
28
FAA requires that a “notice of a motion to vacate, modify, or correct an award must
be served upon the adverse party or his attorney within three months after the award
is filed or delivered.” 9 U.S.C. §12. The Award here was filed on January 17, 2018.
(ECF No. 1-8 Ex. E.) Thus, Reliance’s statutory time period to challenge the award
lapsed on April 17, 2018. Failure to timely move to vacate bars all defenses to
arbitration awards. Sheet Metal Workers Int’l Assn., Local v. Standard Sheet Metal,
Inc., 699 F.2d 481, 483 (9th Cir. 1983) (“Although this circuit has not ruled that
failure to move to vacate bars all defenses to arbitration awards, other circuits have
so held . . . We accept the rule in the Third and Seventh Circuits and hold that the
statute of limitations bars Standard’s defenses.”).
– 12 –
18cv250
1
2
properly supported motion for attorneys’ fees and costs no later than June 1, 2018.
IT IS SO ORDERED.
3
4
DATED: May 3, 2018
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
– 13 –
18cv250
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.
Why Is My Information Online?