ORDER Granting 46 Plaintiff's Early Motion for partial Summary Judgment Regarding Corporate Successor Liability. ORDERED by Judge William J. Martinez on 4/18/2018. (angar, )
IN THE UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF COLORADO
Judge William J. Martínez
Civil Action No. 17-cv-0168-WJM-NYW
UNITED STATES OF AMERICA,
Plaintiff,
v.
PIONEER NATURAL RESOURCES COMPANY, and
PIONEER NATURAL RESOURCES USA, INC.,
Defendants.
ORDER GRANTING PLAINTIFF’S EARLY MOTION FOR PARTIAL SUMMARY
JUDGMENT REGARDING CORPORATE SUCCESSOR LIABILITY
In this action brought under the Comprehensive Environmental Response,
Compensation, and Liability Act (“CERCLA”), 42 U.S.C. §§ 9601 et seq., the United
States, as Plaintiff, seeks to recover from Defendants, Pioneer Natural Resources
Company (“Pioneer Natural Resources”), and Pioneer Natural Resources, USA, Inc.
(“Pioneer-USA”), certain costs incurred in response to the release (or threatened
release) of hazardous waste at the Nelson Tunnel/Commodore Waste Rock Pile
Superfund Site, located in Mineral County, Colorado.
Now before the Court is the United States’ Early Motion for Partial Summary
Judgment on Defendants’ Corporate Successor Liability (ECF No. 46), in which the
United States seeks a ruling as a matter of law that Defendants “are liable for the
CERCLA liabilities, to be determined at a later date” of certain predecessor entities,
namely, that (1) Defendant Pioneer Natural Resources is a successor to the CERCLA
liabilities of Pioneer Nuclear, Incorporated (here, “PNI”) and (2) that Def endant PioneerUSA is a successor to the CERCLA liabilities of Mesa Operating Limited Partnership
(here, “MOLP”) (id. at 53). For the reasons explained below, the Motion is granted.
I. SUMMARY JUDGMENT STANDARD
Summary judgment is appropriate only if there is no genuine issue of material
fact and the moving party is entitled to judgment as a matter of law. Fed. R. Civ. P.
56(c); Celotex Corp. v. Catrett, 477 U.S. 317, 322 (1986); Henderson v. Inter-Chem
Coal Co., Inc., 41 F.3d 567, 569 (10th Cir. 1994). W hether there is a genuine dispute
as to a material fact depends upon whether the evidence presents a sufficient
disagreement to require submission to a jury or conversely, is so one-sided that one
party must prevail as a matter of law. Anderson v. Liberty Lobby, 477 U.S. 242, 248–49
(1986); Stone v. Autoliv ASP, Inc., 210 F.3d 1132 (10th Cir. 2000). A fact is “material” if
it pertains to an element of a claim or defense; a factual dispute is “genuine” if the
evidence is so contradictory that if the matter went to trial, a reasonable jury could
return a verdict for either party. Anderson, 477 U.S. at 248.
In ruling on summary judgment, the Court must resolve factual ambiguities
against the moving party, thus favoring the right to a trial. Houston v. Nat’l Gen. Ins.
Co., 817 F.2d 83, 85 (10th Cir. 1987). “[T]he moving party carries the burden of
showing beyond a reasonable doubt that it is entitled to sum mary judgment.” Pelt v.
Utah, 539 F.3d 1271, 1280 (10th Cir. 2008). W here, as here, the moving party would
have the burden of proof at trial, the movant “must establish, as a matter of law, all
essential elements of the issue before the nonmoving party can be obligated to bring
2
forward any specific facts alleged to rebut the movant’s case.” Id. However, “[a]lthough
the burden of showing the absence of a genuine issue of material fact is upon the
movant, the nonmovant must do more than simply show that there is some
metaphysical doubt as to the material facts.” Champagne Metals v. Ken-Mac Metals,
Inc., 458 F.3d 1073, 1084 (10th Cir. 2006) (internal quotation marks omitted; alterations
incorporated).1
II. FACTUAL BACKGROUND
A.
The Site & Alleged Liability of PNI and MOLP
The Nelson Tunnel/Commodore Waste Rock Pile Superfund Site (the “Site”) is
located in the San Juan Mountains, just north of the town of Creede, Colorado, in an
area with a long history of silver mining. (See ECF No. 1 ¶ 7; id. at 18.) As alleged by
the United States, mining activity commenced there by the 1890s and continued at
least through the 1980s. (Id. ¶¶ 9–10.) The Environmental Protection Agency (“EPA”)
has designated two operating units within the Site; relevant here is “OU1,” which is the
Commodore Waste Rock Pile (the “Rockpile”). (Id. ¶ 6.)
In general terms, the United States alleges that over the course of many years,
waste rock from mining excavations “was cast down the mountainside into the West
Willow Creek drainage,” creating the Rockpile; and that “[l]ayers of cribbing to contain
1
The United States’ Motion seeks partial summary judgment, without addressing all the
elements of any claim or defense. Rule 56 permits such a motion for summary judgment “as to
a claim, defense, or part of a claim or defense.” Fed. R. Civ. P. 56, Advisory Comm. Notes to
2010 Amendment (emphasis added); see also 11-56 Jeffrey W. Stempel & Steven S. Gensler,
Moore’s Federal Practice—Civil § 56.122[2] (Matthew Bender ed. 2018) (“The freedom to use
summary judgment procedure to address issues or elements of a claim is an important feature
of Rule 56, making it a much more useful case management device.”).
3
waste rock” and “makeshift hydraulic structures to convey West Willow Creek over and
under the [Rockpile] . . . were installed over many years by several mining companies,”
including certain wooden flume structures and “a steel pipe . . . pieced together from
parts of railroad tank cars.” (Id. ¶¶ 11–12.)2
In this CERCLA case, the United States alleges that PNI and MOLP, as well as
another related entity, Mesa Limited Partnership (“MLP”),3 conducted mining operations
at the Site between 1983 and 1989 (see id. ¶¶ 16, 22–26), using the Rockpile “as the
hub of their mining operations,” and taking certain actions to alter or maintain the
“deteriorating cribbing and water conveyance system” (id. ¶ 13).4 Further, the United
States alleges that in 1988 Mesa retained an engineering firm which recommended that
certain actions be taken to address the “failing cribbing and water conveyance” and the
unstable Rockpile, but that Mesa did not complete those actions, thus failing to prevent
a subsequent collapse of the water conveyance system and resulting “washout” that
“released mine waste contaminated with heavy metals . . . into West Willow Creek” and
in turn into the Rio Grande River. (Id. ¶¶ 13, 36.)5
2
Defendants mostly do not dispute this factual summary, but dispute that waste rock
was cast down by PNI or Mesa from 1982 to 1989 and deny the characterization of the
hydraulic structures as “makeshift” or “pieced together.” (ECF Nos. 61 & 62 ¶¶ 11–12.)
3
The Court uses the term “Mesa” when referring to MOLP and MLP together, but more
often refers to these two entities separately, as is required by the analysis below.
4
Specifically, the United States claims that PNI “was a past owner and operator” of the
Site within the meaning of Section 101(2) of CERCLA, 42 U.S.C. § 9601(9), “from on or about
June 1, 1983 through June 26, 1986,” and that both MLP and MOLP “were past owners and
operators” of the OU1 Site . . . from “on or about July 1, 1986 through October 6, 1989.” (ECF
No. 46 at 3–4, ¶¶ 2–3.)
5
Defendants deny a number of the United States’ factual allegations regarding the
conduct and alleged liability of PNI and Mesa, including denying that Mesa conducted
4
The Site was placed on the National Priorities List (“NPL”) by the EPA on
September 3, 2008, as provided under Section 105 of CERCLA, 42 U.S.C. § 9605. (Id.
¶ 5; 73 Fed. Reg. 51368 (Sept. 3, 2008).) According to the United States, the EPA
completed certain removal and stabilization work in 2008 and 2009. (ECF No. 1 ¶ 39.)
B.
Corporate Entity History
The present Motion retells a lengthy corporate history somewhat in the fashion of
an Old Testament genealogy, with one company begetting another, and another,
through a series incorporations, name changes, sales, and mergers, dating from 1906
through 1997, when the transactions creating the present Defendants, Pioneer Natural
Resources and Pionner-USA were completed. (See generally ECF No. 46 at 5–35,
¶¶ 9–146.) However, the facts relevant to the presently disputed issues focus only on a
few months in 1986, when PNI’s parent, Pioneer Corporation, through a series of
corporate actions, first merged a number of its subsidiaries into itself, and then
transferred its assets and liabilities to Mesa. (See generally ECF No. 46 at 6–10,
¶¶ 13–34; ECF Nos. 46-7, 46-9, 46-11, 46-12.) T he Court details each of the corporate
actions and documents relevant to the present dispute in turn. The following facts are
undisputed unless attributed otherwise.
1.
March 5, 1986 Conveyance Agreement
As memorialized in an “Agreement of Sale and Purchase,” dated March 5, 1986
(the “March 5, 1986 Agreement” (ECF No. 46-7)), Pioneer Corporation, MLP, and
operations at the Site between 1986 and 1989. (See ECF Nos. 61 & 62 ¶ 13.) The Court does
not resolve these factual disputes here, and includes the United States’ factual allegations only
for general context.
5
MOLP entered into an agreement for Pioneer Corporation to sell its assets to MLP,
which would, “[i]mmediately upon the acquisition of the assets,” “convey, transfer, and
contribute the same to the MOLP,” together with “Assumed Liabilities,” as defined by
the March 5, 1986 Agreement. Several provisions of this document are relevant to the
disputed issues here.
An initial recital states that the agreement was entered because Pioneer
Corporation “desire[d] to contribute to the Buyers . . . all of the assets, properties,
goodwill and business” of Pioneer Corporation, “as a going concern.” (Id. at 2.) The
subsequent “Conveyance, Contribution and Transfer of Assets” clause states that “at
the Closing,” Pioneer “will convey, transfer and contribute to the MLP the Seller’s [i.e.,
Pioneer Corporation’s] Assets . . . as provided in Section 3.9” of the Agreement. (Id. at
2–3, § 1.1.)
Section 3.9 of the March 5, 1986 Agreement in turn provides that on or before
closing, Pioneer Corporation
and each of its subsidiaries shall have taken all necessary
action, including all necessary corporate action, to convey
and transfer to the Seller [i.e., Pioneer Corporation] all of the
assets, properties and business and to cause the Seller to
assume all liabilities and obligations, whether accrued,
absolute, contingent or otherwise, of each direct or indirect
subsidiary of the Seller as shall be selected by the Buyers
and specified to the Seller . . . . Such conveyances shall
have been effective to vest in Seller all of the right, title and
interest in such assets held by the Seller’s subsidiaries
immediately prior to such conveyances and to obligate the
Seller to pay, perform or discharge all such liabilities . . . .
6
(Id. at 39–40, § 3.9.) 6
Further, Section 1.2 of the March 5, 1986 Agreement defines the “consideration”
to be exchanged for the asset purchase, defining Mesa’s obligations and agreement
that Pioneer Corporation’s assets would be delivered to MLP “in exchange for” a
specified stock transfer, and “MLP’s assumption of and agreement to pay, perform or
discharge the Assumed Liabilities,” which were broadly defined to include “all debts,
liabilities, obligations, taxes and contracts of the Seller [i.e., Pioneer Corporation] of any
kind, character or description, whether accrued, absolute, contingent or otherwise, no
matter whether arising before or after the Closing Date.” (Id. at 2–3, § 1.2.)
2.
June 26–27, 1986 Articles of Merger and Certificate of Merger
On June 26, 1986, Pioneer Corporation executed an “Articles and Plan of
Merger,” reciting that Pioneer Corporation “desire[d] to . . . succeed to the debts,
liabilities and duties of” certain of its wholly-owned subsidiaries, which Pioneer had
agreed to convey to MLP. (ECF No. 46-9 at 3 (the “Articles”).) The Articles also recited
that “Pioneer . . . adopts the following Articles . . . for the purpose of merging . . . .
Pioneer Nuclear Inc. [i.e., PNI, together with other subsidiaries] with and into Pioneer
[Corporation], with Pioneer [Corporation] being the surviving corporation.” (ECF No. 469 at 3.)
Significantly, the Articles listed PNI among the listed subsidiaries which, on the
effective date of the merger, would “be merged with and into Pioneer Corporation,” with
6
All citations to exhibits docketed in support of the United States’ Motion are to the page
number used in the CM/ECF header, which frequently differs from the documents’ internal
pagination.
7
the effect that “the separate existence of each Subsidiary shall cease,” and Pioneer
Corporation would thereafter “have all the rights, privileges, immunities and powers and
shall be subject to all the duties and liabilities of each Subsidiary” (ECF No. 46-9 at
4–5, Arts. I, IV.A., IV.D.) 7
7
The text of the Articles in relevant parts reads as follows:
Article I.
The name of the parent corporation is Pioneer Corporation, a
Texas corporation (“Pioneer”). The names of the subsidiary
corporations are Amarillo Oil Company, Pinaga, Inc., Pioneer
Gas Products Company, Pioneer Nuclear, Inc. and Pioneer
Production Corporation (each of which is hereinafter referred to as
a “Subsidiary” and all of which are collectively hereinafter referred
to as the “Subsidiaries”).
***
Article IV.
***
D. Corporate Existence, Powers and Liabilities of the
Subsidiaries. On the Effective Date, the separate existence of
each Subsidiary shall cease. Each Subsidiary shall be merged
with and into Pioneer in accordance with the provisions of these
Articles and Plan of Merger. Thereafter, Pioneer shall have all
the rights, privileges, immunities, and powers and shall be
subject to all the duties and liabilities of each Subsidiary.
Pioneer shall thereupon and thereafter possess all the rights,
privileges, immunities, and franchises, as well of a public as of a
private nature, of each Subsidiary; and all property, real, personal,
and mixed, and all debts due on whatever account, of or
belonging to or due to each Subsidiary, shall be taken and
deemed to be transferred to and vested in Pioneer without further
act or deed. Pioneer shall thenceforth be responsible and
liable for all liabilities and obligations of each Subsidiary; and
any claim existing or action or proceeding pending by or against
any Subsidiary may be prosecuted as if the Merger had not taken
place, or Pioneer may be substituted in such Subsidiary’s place.
(ECF No. 46-9 at 4–5 (emphasis added).)
8
On June 27, 1986, these Articles were filed with the Texas Secretary of State,
which the same day issued a “Certificate of Merger of Domestic Corporations into
Pioneer Corporation” (the “Certificate of Merger”), identifying PNI among the
subsidiaries merged into Pioneer Corporation, and certifying that the Articles of Merger
had been received by the Secretary of State and “found to conform to law.” (Id. at 2.)
3.
June 30, 1986 Conveyance and Closing
A “Closing Memorandum” recording the closing of the asset sale documents
states that “[t]he Closing was held . . . on June 30, 1986,” outlines the steps of the
transaction leading up to the closing, and also the steps taken as part of closing. (ECF
No. 46-11 at 9.)
On the closing date of June 30, 1986, MLP, MOLP, and Pioneer Corporation
executed a “Conveyance From Pioneer Corporation to Mesa Limited Partnership and
from Mesa Limited Partnership to Mesa Operating Limited Partnership.” (ECF No.
46-12 (the “Conveyance”).)
The Conveyance includes the following recital:
WHEREAS, Pioneer [Corporation] is the successor in
interest by merger to title to all of the assets of Amarillo Oil
Company, Pinaga, Inc., Pioneer Gas Products Company
and Pioneer Production Corporation;
(ECF No. 46-12 at 3.) Notably, this paragraph names all of the subsidiaries that
Pioneer Corporation had merged into itself except for PNI. (Compare ECF No. 46-9 at
3 with ECF No. 46-12 at 3.) As addressed below, Defendants rely on this omission to
argue the United States has failed to prove PNI’s assets passed to Mesa, while the
United States argues this omission was evidently an error, and “does not change the
9
operative outcome of the final transaction between Pioneer [Corporation] and MLP.”
(ECF No. 60 at 18.)
Later clauses of the June 30, 1986 Conveyance refer back to the March 5, 1986
Agreement of Sale and Purchase (ECF No. 46-12 at 1), and def ine the “Assumed
Liabilities” being conveyed to Mesa as including “all liabilities and obligations of
Pioneer, fixed or contingent . . . other than any obligation to pay the Cash Distribution
Amount,” which was a liquidating cash distribution to be paid by Pioneer to its
shareholders (id. at 6, Art. 1.1(m)).
Consistent with the statements in the March 5, 1986 Agreement, the
Conveyance transferred the assets of Pioneer Corporation to MLP (id. at 7, § 2.1), and
reflects that MLP “assume[d] and agree[d] to pay, perform and discharge when due the
Assumed Liabilities” of Pioneer Corporation (id. at 8, § 2.4). MLP in turn transferred the
assets and liabilities it had just received from Pioneer Corporation to MOLP (id., § 3.1),
and MOLP “assume[d] and agree[d] to pay, perform and discharge when due the
Assumed Liabilities” (id. at 9, § 3.4). 8
Furthermore, the June 30, 1986 Closing Memorandum summarized that on June
27, 1986, PNI (and other named subsidiaries of Pioneer Corporation) had been
“merged into Pioneer.” (ECF No. 46-11 at 7, ¶ J.)
The day after the Conveyance, Pioneer Corporation filed Articles of Dissolution.
(ECF No. 46-10.)
8
In addition the Conveyance included an “unconditional” and “absolute” guaranty by
MLP, “guarantee[ing] the obligations of [MOLP] to pay the Assumed Liabilities pursuant to [the
March 5, 1986 Agreement], if and to the extent [MOLP] fails to timely make such payments.”
(Id. at 9, § 3.5.) See also infra, note 12.
10
4.
Actions After 1986
As detailed in the United States’ Motion (and docum ented in supporting exhibits),
after the actions detailed above, MLP was converted into Mesa, Inc., at the end of
1991. (See ECF No. 46 at 12–15, 17–18 ¶¶ 47–59, 67–71; ECF No. 46-17.) Mesa,
Inc. was in turn merged with and into Defendant Pioneer Natural Resources in 1997.
(ECF No. 46 at 19–22, ¶¶ 73–86; ECF No. 46-22.) Def endants do not contest that
these actions occurred, nor dispute that they made Pioneer Natural Resources the
successor of MLP.9
III. ANALYSIS
A.
Legal Background
1.
CERCLA Generally
“In 1980, CERCLA was enacted in response to the serious environmental and
health risks posed by industrial pollution. As its name implies, CERCLA is a
comprehensive statute that grants . . . broad power to command government agencies
and private parties to clean up hazardous waste sites.” United States v. Bestfoods, 524
U.S. 51, 55 (1998) (internal quotation marks omitted). “Congress enacted CERCLA to
facilitate the expeditious cleanup of environmental contamination caused by hazardous
waste releases, and to establish a financing mechanism to abate and control the vast
problems associated with abandoned and inactive hazardous waste disposal sites.”
9
Because Defendants do not contest the United States’ factual contentions regarding
these post-1986 transactions, nor their legal consequences for present purposes, the Court
does not describe them in detail, nor include here a recitation of the transactions related to the
undisputed claim that Defendant Pioneer-USA is the corporate successor to MOLP. See Part
III.B.1. infra.
11
Young v. United States, 394 F.3d 858, 862 (10th Cir. 2005) (internal quotation marks
and citations omitted; alterations incorporated). “Thus, the twin aims of CERCLA are to
clean up hazardous waste sites and impose the costs of such cleanup on parties
responsible for the contamination.” Id.
As part of CERCLA’s statutory framework, “the United States may . . . use the
‘Hazardous Substance Superfund’ to finance cleanup efforts, which it may then
replenish by suits brought under § 107 of the Act against, among others, ‘any person
who at the time of disposal of any hazardous substance owned or operated any
facility.’” Bestfoods, 524 U.S. at 55 (quoting 42 U.S.C. § 9607(a)(2); citations
omitted).10
This case is such a suit, in which the United States seeks to recover response
costs from Defendants. (See ECF No. 1 ¶ 1; id. at 18.) In particular, the United States
seeks a judgment against Defendants for “all unreimbursed response costs EPA has
incurred” at the Site, as well as a declaratory judgment as to Defendants’ liability for
response costs under Section 113(g)(2), which would “be binding on any subsequent
action or actions to recover further response costs or damages.” 42 U.S.C.
§ 9613(g)(2). (ECF No. 1 ¶ 1; id. at 18, ¶¶ A. & B.)
10
“Section 107(a) of CERCLA establishes four broad categories of [Potentially
Responsible Parties (‘PRPs’)] that may be liable for the costs incurred in responding to a
release or threatened release of a hazardous substance from a facility that causes the
incurrence of response costs: [1] Current owners and operators of the facility; [2] Owners and
operators at the time of disposal at the facility; [3] Persons who arranged for disposal or
treatment, or arranged with a transporter for disposal or treatment, at the facility (‘generators’);
and [4] Persons who accepted any hazardous substance for transport to the facility selected by
that person (‘transporters’).” 5 Environmental Law Practice Guide § 31.01 (2018) (Michael B.
Gerrard, ed., Matthew Bender); 42 U.S.C. § 9607(a)(1)–(4). The term “person” includes
corporations and other business organizations. Bestfoods, 524 U.S. at 55; 42 U.S.C.
§ 9601(21). Only the alleged owner/operator liability of PNI, MLP, and MOLP is at issue here.
12
2.
Corporate Successor Liability
Since the United States seeks to recover from Defendants as successors to the
alleged CERCLA liability of past owners or operators, the present dispute is focused on
whether Defendants may be held liable as corporate successors to those entities.
“CERCLA failed to address . . . corporate successor liability.” Smith Land &
Improvement Corp. v. Celotex Corp., 851 F.2d 86, 91 (3d Cir. 1988). However, “[t]he
courts of appeals that have addressed the issue are unanimous in recognizing
successor liability under CERCLA.” United States v. Gen. Battery Corp., 423 F.3d 294,
298 n.3 (3d Cir. 2005) (“General Battery”) (collecting cases); New York v. Nat'l Serv.
Indus., Inc., 460 F.3d 201, 206 (2d Cir. 2006) (“NSI ” ) (“CERCLA encompasses
successor liability”).
“[I]t is now settled that CERCLA incorporates common law principles of indirect
corporate liability, including successor liability.” General Battery, 423 F.3d at 298. 11
There are several common law rules which apply to determine whether a CERCLA
defendant may be liable as a corporate successor to a past owner or operator. See
generally A. Rumsey & M. Daneker, Superfund Deskbook at 13–14 (2d ed. 2014).
a.
Successor Liability Following a Merger
As a general rule, following a corporate merger, the surviving corporation takes
11
“There is significant disagreement among courts and commentators over whether, in
enforcing CERCLA’s indirect liability, courts should borrow state law, or instead apply a federal
common law.” Bestfoods, 524 U.S. at 64 (as to corporate veil-piercing). Here, the Defendants
argue the Court must apply Texas law, and the United States does not argue otherwise. (See
ECF No. 55 at 11; ECF No. 60.) Since the parties do not dispute the issue, and since it does
not appear to make any difference to the present outcome, the Court proceeds for present
purposes assuming that Texas law controls the successor liability issues raised here. Accord
United States v. Friedland, 173 F. Supp. 2d 1077, 1090 n.3 (D. Colo. 2001).
13
on the liabilities of predecessor entities merged into it. See, e.g., Anspec Co. v.
Johnson Controls, Inc., 922 F.2d 1240, 1245 (6th Cir. 1991) (“For purposes of liability,
the surviving corporation and the merged corporation are one and the same.” (applying
Michigan law)); Smith Land, 851 F.2d at 91 (“In general, when two corporations merge
pursuant to statutory provisions, liabilities become the responsibility of the surviving
company.”); 15 Fletcher Cyc. Corp. § 7121 (Sept. 2017 update) (“Fletcher”) (“[I]n all
jurisdictions today, the surviving corporation in a statutory merger has the statutory
obligation to assume the duties and liabilities of a constituent corporation.”).
b.
Successor Liability Following an Asset Sale
By contrast, in an asset sale, the “general rule . . . is that where one company
sells or otherwise transfers all its assets to another company, the latter is not liable for
the debts and liabilities of the transferor.” Fletcher § 7122 (emphasis added); NSI, 460
F.3d at 209 (in CERCLA case, observing that “[u]nder both New York law and
traditional common law, a corporation that purchases the assets of another corporation
is generally not liable for the seller’s liabilities”); accord Commerce Pub. Corp. v. U.S.
Postal Serv., 579 F. Supp. 1402, 1406 (N.D. Tex. 1984) (“Under Texas law, the
purchasing corporation does not, merely by a purchase of assets, become liable for the
debts of the selling corporation.” (collecting cases)).
However, there are a number of exceptions to this general rule. Typically, “a
buyer of a corporation’s assets will be liable as its successor if: (1) it expressly or
impliedly assumed the predecessor’s tort liability, (2) there was a consolidation or
merger of seller and purchaser, (3) the purchasing corporation was a mere continuation
14
of the selling corporation, or (4) the transaction is entered into f raudulently to escape
such obligations.” NSI, 460 F.3d at 209; accord General Battery, 423 F.3d at 305; see
also Fletcher § 7122 (recognizing the same exceptions, noting they “are generally
recognized by most courts”).
B.
Defendants’ Successor Liability
The United States seeks summary judgment on two specific issues; although
only one is disputed, the Court addresses each in turn.
1.
Pioneer-USA’s Successor Liability for MOLP
First, the United States seeks summary judgment on the successor liability of
Defendant Pioneer-USA “for the activities of [MOLP],” equivalent to a holding that
Pioneer-USA “is the corporate successor of MOLP.” (ECF No. 46 at 1, 50.)
Defendants do not dispute this claim, conceding that Pioneer-USA “has not denied that
it is a ‘successor’ to [MOLP],” and that the Court “can grant” the United States’ Motion
on this issue. (ECF No. 55 at 1; see also ECF No. 62 ¶ 13 (“PNR-USA admits that
PNR-USA is the corporate successor to MLP”).)
The Court therefore grants the United States’ Motion on this undisputed issue,
having reviewed the factual record and arguments included in the United States’
Motion, and concluding that the United States is entitled to partial sum mary judgment
under Rule 56(a) as a matter of law.
2.
Pioneer Natural Resources’s Successor Liability for PNI
Second, the United States seeks summary judgment on the successor liability of
Defendant Pioneer Natural Resources for PNI, that is, a summary judgment holding
15
that Pioneer Natural Resources “is the corporate successor of PNI.” (ECF No. 46 at 1,
50.)
Defendants dispute this contention, arguing the United States “has not come
forward with sufficient evidence” to prove this claim as a matter of law, and that for
summary judgment purposes, “[g]enuine issues of material fact exist as to the issue of
[Pioneer Natural Resources’] corporate successor liability.” (See ECF No. 55 at 1,
10–11.) However, the Court finds Defendants have not raised any genuine dispute that
Pioneer Natural Resources succeeded to the liabilities of PNI.
The transactions which occurred in 1986, detailed in Parts II.B.1.–3., supra,
effectively transferred all of PNI’s liabilities first to Pioneer Corporation, via merger, and
then to MLP and MOLP, via an asset sale including express assumption of liabilities.
First, the June 26, 1986 Articles of Merger and the June 27, 1986 Certificate of
Merger effectively transferred all of PNI’s liabilities to Pioneer Corporation. This transfer
of liabilities is reflected in the explicit terms of the Articles (see ECF No. 46- 9at 3, 4–5),
was plainly effected by the Texas statutes (id. at 2; ECF No. 46-42 at 5–6; 32 Tex. Bus.
Orgs. Code. § 1396-5.06A(5) (1986)), and is consistent with the general rule that in a
merger all liabilities are transferred to the surviving corporation, see Smith Land, 851
F.2d at 9; Fletcher § 7121.
Defendants’ arguments suggesting that PNI’s liabilities were somehow not
transferred to Pioneer Corporation are unavailing. Defendants focus on the “selection”
and “specification” provisions of § 3.9 of the March 5, 1986 Agreement, see Part II.B.1.,
supra, arguing that Agreement did not require the transfer of all of Pioneer
16
Corporation’s subsidiaries to Mesa, but only those “specified” by Mesa, and that there is
“no evidence” that either MLP or MOLP “‘specified to’ Pioneer Corporation that they had
selected to receive [PNI’s] assets and liabilities.” (ECF No. 55 at 12–13.)
But whatever uncertainty was left open by the March 5, 1986 Agreement is
foreclosed by the June 27, 1986 Articles, which unequivocally merged PNI into Pioneer
corporation, explicitly making Pioneer Corporation “responsible and liable for all
liabilities and obligations of [PNI].” (ECF No. 46-9 at 5.) Moreover, both the terms of
the Articles and Texas statutes establish that “the separate existence” of PNI ceased as
of the effective date of the Articles, which by statute was the date of “the issuance of
the certificate of merger,” or June 27, 1986. (See id. at 2; ECF No. 46-42 at 5.) Thus,
the “separate existence” of PNI (and the other subsidiaries merged into Pioneer
Corporation) ended on June 27, 1986, and only Pioneer Corporation survived
thereafter, becoming “responsible and liable for all liabilities and obligations” of PNI,
and of the other merged subsidiaries. See 32 Tex. Bus. Orgs. Code. § 1396-5.06A(2)
& (5) (statute docketed at ECF No. 46-42 at 6).
Given the unequivocal nature of the merger, Defendants’ focus on the omission
of PNI from the list of merged subsidiaries in the Conveyance document executed three
days later is irrelevant. By that date, PNI no longer existed. So whether or not the
recitals of the June 30, 1986 Conveyance mentioned PNI’s prior existence, all of PNI’s
liabilities had already been transferred into Pioneer Corporation. And Defendants do
not, and cannot, dispute that Pioneer Corporation’s liabilities w ere then expressly
assumed by MLP and MOLP.
While Defendants argue that the United States has provided “no evidence that
17
[Mesa] ‘selected’ to receive the . . . liabilities of [PNI],” and “no evidence that [Mesa]
‘specified to’ Pioneer Corporation that they had selected to receive [PNI’s] assets and
liabilities,” the Court disagrees, finding the United States has provided exactly such
evidence, and that it is conclusive. Namely, the June 26, 1986 Articles and the June
27, 1986 Certificate of Merger reflect that PNI was merged into Pioneer Corporation
before June 30, 1986. As was expressly anticipated by the March 5, 1986 Agreement,
this merger was then effected by way of the June 26–27, 1986 Articles and Certificate
of Merger, and also explicitly confirmed in the June 30, 1986 Closing Memorandum.
These documents, read together, are undisputed and dispositive evidence that the
transfer of PNI’s liabilities to MLP and MOLP was completed with Mesa’s knowledge,
and as contemplated in the March 5, 1986 Agreement.
Given the clarity of the record detailed above, the absence of some additional
documentation or communications showing exactly how or when Mesa “selected” or
“specified” that PNI was included in the merger and asset sale hardly reflects that it did
not occur. The only arguably contrary evidence is the omission of PNI from a single
“whereas” recital in the June 30, 1986 Conveyance. But, given the preceding merger,
and under the terms of the same document, that omission could have any effect only if
it were the case that sometime after June 27, 1986 (when PNI ceased to exist) but
before June 30, 1986 (when the asset sale closed), Pioneer Corporation had divested
itself of the exact liabilities that it had just acquired from PNI. But not even Defendants
suggest that such an improbable and completely undocumented transfer occurred, and
there is no reason to believe that it did. Thus, to the extent there is any factual dispute
18
regarding the merger of PNI’s liabilities into Pioneer Corporation and their subsequent
conveyance to Mesa, the Court finds no reasonable jury could find for Defendants on
this issue. At most, Defendants have raised a “metaphysical doubt,” regarding the
transfer of PNI’s liabilities to Mesa, but one that does reflect a genuine factual dispute
under Rule 56 requiring a trial to resolve. See Champagne Metals, 458 F.3d at 1084.
Accordingly, the Court grants the United States’ Motion on this issue, finding that
Pioneer Corporation took on the liabilities of PNI via merger, and that by way of the
June 30, 1986 Conveyance, MLP explicitly assumed those same liabilities. At least for
present purposes, there is no genuine dispute that Pioneer Natural Resources is the
corporate successor of PNI.12
12
Although the June 30, 1986 Conveyance also purported to immediately transfer from
MLP to MOLP the very same assets and liabilities which MLP had just received from Pioneer
Corporation (see ECF No. 46-12 at 8–9 §§ 3.1, 3.2, 3.4; see also ECF No. 46-8 § 1.2(b)), the
Conveyance also includes MLP’s “unconditional” and “absolute” guaranty for “the obligations of
[MOLP] to pay the Assumed Liabilities” (ECF No. 46-12 at 9, § 3.5). This guaranty also refers
back to § 1.2 of the March 5, 1986 Agreement, which expressed “MLP’s assumption of and
agreement to pay, perform, or discharge the Assumed Liabilities” (which are broadly defined),
and § 1.8 of the March 5, 1986 Agreement further repeated that “MLP . . . guarantees the
obligations of the MOLP to pay the Assumed Liabilities, if and to the extent the MOLP fails to
timely make such payment,” and that this amounts to “an absolute guaranty of payment and
performance of all of the Assumed Liabilities.” (ECF No. 46-7 at 3, 7.) The net effect of these
terms appears to make MLP fully liable for the liabilities received from Pioneer Corporation,
notwithstanding their nominal transfer to MOLP. Put another way, these guaranty provisions
may be viewed as an express assumption of PNI’s liabilities by MLP.
The parties’ arguments do not address these provisions, and in any event Defendants
do not argue that these terms defeat the conclusion that MLP (as opposed to MOLP) became
the corporate successor to PNI, and to its liabilities. Defendants argue only that “[b]ecause
[MLP] did not select . . . [PNI’s] . . . liabilities, [MLP] could not have carried those . . . liabilities
into its conversion into Mesa, Inc.,” and thence into Defendant Pioneer Natural Resources, and
that “it is unclear” whether PNI’s assets and liabilities were conveyed “to any entity” in 1986.
(ECF No. 55 at 14.) Having rejected these arguments, it follows that the liabilities which MLP
took on and guaranteed in the June 30, 1986 Conveyance later flowed to MLP’s successors.
19
IV. CONCLUSION
For the reasons explained above, the United States’ Early Motion for Partial
Summary Judgment on Defendants’ Corporate Successor Liability (ECF No. 46) is
GRANTED.
The parties are DIRECTED to contact the Chambers of U.S. Magistrate Judge
Nina Y. Wang no later than April 23, 2018 to arrange for a status conference or other
proceeding deemed appropriate by Judge Wang to address the consequences of this
ruling for the remainder of this litigation.
Dated this 18th day of April, 2018.
BY THE COURT:
__________________________
William J. Martínez
United States District Judge
20
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.
Why Is My Information Online?