REPORTED OPINION (re-issued for publication of 115 SEALED MEMORANDUM AND ORDER DENYING Plaintiff's Motion for Judgment on the Administrative Record (MJAR) 33 , Plaintiff's Supplemental MJAR 77 , and Plaintiff's Second Supplemental MJAR 103 , and GRANTING Defendant's Cross-Motion for Judgment on the Administrative Record (Cross-MJAR) 38 , Defendant's Supplemental Cross-MJAR 78 , Intervenor-Defendant's Cross-MJAR 39 , and Intervenor-Defendant's Supplemental Cross-MJAR 79 .) Signed by Judge Eleni M. Roumel. (rt16) Service on parties made.
In the United States Court of Federal Claims
INSIGHT PUBLIC SECTOR, INC.,
Plaintiff,
v.
THE UNITED STATES,
Defendant,
No. 21-cv-1755
Filed Under Seal: July 25, 2022
Publication: August 1, 2022 1
and
DELL MARKETING L.P.,
Intervenor-Defendant.
Kyle R. Jefcoat, Latham & Watkins LLP, Washington, District of Columbia for Plaintiff. With
him on the briefs are David R. Hazelton and Julia A.C. Lippman, Latham & Watkins LLP,
Washington, District of Columbia.
William P. Rayel, United States Department of Justice, Civil Division, Washington, District of
Columbia for Defendant. With him on the briefs are Brian M. Boynton, Principal Deputy Assistant
Attorney General, Civil Division; Patricia M. McCarthy, Director, Commercial Litigation; Martin
F. Hockey, Jr., Acting Director, Commercial Litigation; Douglas K. Mickle, Assistant Director,
Commercial Litigation; Tracey Ferguson, Naval Information Warfare Center Pacific; and Stephen
T. O’Neal, General Services Administration.
Craig A. Holman, Arnold & Porter Kaye Scholer LLP, Washington, District of Columbia for
Intervenor-Defendant. With him on the briefs are Amanda J. Sherwood and Aime JH Joo, Arnold
& Porter Kaye Scholer LLP, Washington, District of Columbia.
1
This Memorandum and Order was filed under seal in accordance with the Protective Order
entered in this case (ECF No. 10) and was publicly reissued after incorporating all redactions
proposed by the parties. (ECF No. 117.) The sealed and public versions of this Memorandum and
Order are otherwise identical, except for the publication date and this footnote.
MEMORANDUM AND ORDER
Modern enterprises annually invest significant funds on information technology. The
United States Government is no exception. Over the next 5 years, the U.S. Department of the
Navy (Navy) plans to spend more than $2.5 billion on the procurement of Microsoft products and
services alone. The Navy will obtain such products and services from a Microsoft reseller it
selected through a competitive bidding process. Initially, the Navy awarded this lucrative contract
to Insight Public Sector, Inc. (Insight), which offered a cheaper price than its competitor, Dell
Marketing L.P. (Dell Marketing). Shortly after making the award, however, the Navy learned that
Insight was only able to offer its lower price because it left several required items unpriced in its
proposal, while Dell Marketing had priced those same items. The Navy vacated its initial award
and equalized the competition by requiring Dell Marketing and Insight to submit revised proposals
with all required items priced. After evaluating the revised proposals, the Navy selected Dell
Marketing for the award based on Dell Marketing’s significantly lower price. Insight now protests
the Navy’s award of the contract to Dell Marketing.
In its post-award bid protest, Insight alleges that several aspects of the procurement
rendered the Navy’s award to Dell Marketing arbitrary, capricious, and contrary to law, and
accordingly urges this Court to vacate the award. Insight contends in its Complaint that (1) the
Navy failed to review or evaluate whether Dell Marketing had the requisite products on its federal
supply schedule; (2) Dell Marketing did not propose a valid Contractor Teaming Arrangement; (3)
the Navy failed to investigate an alleged violation of the Procurement Integrity Act; (4) the Navy
improperly evaluated past performance; (5) the Navy applied the wrong standard for its best value
decision; and (6) the Navy unlawfully favored Dell Marketing. See Plaintiff’s Complaint (ECF
No. 1) (Compl.) ¶¶ 117-18, 130-31, 138, 150. Following an initial round of motions for judgment
2
on the administrative record based on five of those allegations, 2 the Court remanded this action to
the Navy to conduct a Procurement Integrity Act (PIA) violation investigation and reserved ruling
on the remaining issues. See December 9, 2021 Memorandum and Order on Motions for Judgment
on the Administrative Record (ECF No. 56) (Remand Order). 3
In a supplemental round of motions for judgment on the administrative record, the parties
revived some arguments and raised new arguments in response to the Navy’s PIA violation
investigation. See Plaintiff’s First Supplemental Motion for Judgment on the Administrative
Record (ECF No. 77) (Pl.’s SMJAR); Defendant’s Supplemental Cross-Motion for Judgment on
the Administrative Record (ECF No. 78) (Def.’s Suppl. Cross-MJAR); Intervenor-Defendant’s
Supplemental Cross-Motion for Judgment on the Administrative Record (ECF No. 79) (Int.-Def.’s
Suppl. Cross-MJAR). After reviewing the record and supplemental motions, this Court held that
the Navy failed to fully investigate the alleged PIA allegation as directed by the Court; the Court
remanded this action again, directing the Navy to complete its investigation and fully comply with
this Court’s December 9, 2021 Memorandum and Order.
See April 25, 2022 Order on
Supplemental Motions for Judgment on the Administrative Record (ECF No. 96) (Second Remand
Order). After the Navy issued its Supplemental PIA Report, concluding no violation had occurred,
Insight filed a second supplemental motion for judgment on the administrative record. See
Addendum to Contracting Officer’s Assessment of Potential Procurement Integrity Act Violation,
2
While Insight’s Complaint alleged that the Navy applied the wrong standard for its best value
determination, it did not pursue this claim in its Motion for Judgment on the Administrative Record
(MJAR). See generally Plaintiff’s Memorandum in Support of its MJAR (ECF No. 34).
3
Prior to filing its MJAR, Plaintiff also filed a Motion to Complete the Administrative Record
(ECF No. 26), which this Court denied. See Order Denying Motion to Complete the
Administrative Record (ECF No. 32); Transcript of Oral Argument dated September 23, 2021
(ECF No. 55); see also December 9, 2021 Memorandum and Order on Motion to Complete the
Administrative Record (ECF No. 57); infra Background Section V.
3
and Impact under 48 CFR § 3.104-7, dated 21 January 2022 (ECF No. 98-1) (Supplemental PIA
Report); Plaintiff’s Second Supplemental Motion for Judgment on the Administrative Record
(ECF No. 103) (P1.’s Second SMJAR). Defendants responded in opposition and renewed their
cross-motions for judgment on the administrative record. See Defendant’s Response to Plaintiff’s
Second Supplemental Motion for Judgment on the Administrative Record (ECF No. 105) (Def.’s
Resp. to P1.’s Second SMJAR); Intervenor-Defendant’s Response to Plaintiff’s Second
Supplemental Motion for Judgment on the Administrative Record (ECF No. 104) (Int.-Def.’s
Resp. to P1.’s Second SMJAR).
Having considered the parties arguments advanced in over 360 pages of briefing and during
more than four hours of oral argument, this Court rules in favor of the Defendant and IntervenorDefendant. Accordingly, as reflected on the record and in this Court’s May 10, 2022 Order, 4 and
as more fully explained below, the remaining portions of Plaintiff’s MJAR, 5 Plaintiff’s SMJAR,
and Plaintiff’s Second SMJAR are DENIED. The remaining portions of Defendant’s CrossMJAR, Defendant’s Supplemental Cross-MJAR, Intervenor-Defendant’s Cross-MJAR, and
Intervenor-Defendant’s Supplemental Cross-MJAR are GRANTED. See May 10, 2022 Order
Denying Plaintiff’s Motion for Judgment on the Administrative Record (ECF No. 106) (May 10
4
The Navy explained that it required an expedited ruling and clarity regarding injunctive relief, as
it required Microsoft software licenses in place by June 1, 2022. See Defendant’s Response to
Plaintiff’s Motion for Opportunity to Brief (ECF No. 101) at 6. To accommodate that need, the
Court proposed providing the parties with an oral ruling on the record as soon as possible after all
briefing concluded. See Transcript of Oral Argument dated April 8, 2022 (ECF No. 95) (Apr. 8
Tr.) at 82:8-20. Additionally, the Court proposed entering judgment upon publishing a more
detailed, written Memorandum and Order on all pending issues. See id. at 82:8-83:2. All parties
consented to this procedure. Id. at 83:4-17.
5
On December 9, 2021, the Court denied as untimely Insight’s claim that the Navy violated the
PIA upon notifying Dell Marketing of an award suspension due to Insight’s failure to price four
promotional Contract Line Item Numbers (CLINs). Remand Order at 25-26.
4
Order) at 1; Transcript of Oral Argument dated May 10, 2022 (ECF No. 108) (May 10 Tr.) at 5:166:2. Further, as noted on the record and in this Court’s May 10, 2022 Order, Defendant United
States, which includes the Navy, is authorized to immediately proceed with its award to Dell
Marketing. See May 10 Order at 2; May 10 Tr. at 6:2-4.
BACKGROUND 6
I.
Original RFQ & Pre-Award Amendments
Navy Solicitation No. N66001-21-Q-0082 (RFQ or Solicitation) stands at the center of this
protest. Compl. ¶ 1. It provides for the award of a Blanket Purchase Agreement (BPA) for the
exclusive provision of Microsoft software licenses, software maintenance, and user-based
subscriptions for a one-year base ordering period with four one-year options. See Tab 3.1
(Excerpts from Original Request for Quotations (RFQ), dated March 17, 2021) at AR 8-9. The
BPA is awarded against an underlying General Services Administration (GSA) Federal Supply
Schedule (FSS) contract. Id. While the Navy will be the first Department of Defense (DoD) entity
to use the BPA, it is expected that other DoD entities will join the BPA as their respective
enterprise agreements for Microsoft products expire. Id. at AR 10 (“The Government estimates,
but does not guarantee, that the volume of purchases through this BPA will be $3.4 billion.”),
AR 31.
To be eligible for the BPA award, offerors, which the RFQ calls “Resellers,” were required
to “meet all [of] the Reseller criteria.” Id. at AR 31. Among other requirements, the RFQ mandates
that offerors (i) have a GSA FSS contract that will cover the BPA’s duration, (ii) “be a DoD ESI
6
This section reflects the Court’s findings of fact, derived from the Administrative Record (AR).
The AR is contained in ECF Nos. 25-2 – 25-5, 47-2 – 47-3, 68, 82-1, and 98-1 – 98-2. Documents
within the Administrative Record are divided into “Tabs.” An index of Tabs comprising the
Administrative Record may be found at ECF Nos. 25-1 and 68.
5
BPA Holder for Microsoft Products and Azure Services,” (iii) “have a Facility Clearance at the
Secret level,” (iv) have the Microsoft products on the Reseller’s GSA FSS contract, 7 and (v)
include pricing and/or discount percentages for each required product. Id. at AR 32. Notably, the
RFQ originally required the reseller, and not a teaming partner, to have an active GSA FSS contract
for the duration of the BPA. Id.
The day after the deadline for submitting questions to the Navy regarding the RFQ, Dell
Technologies Inc. — Dell Marketing’s parent company — submitted correspondence to the Navy
explaining that it would prefer to submit a quote through Dell Federal Systems L.P. (Dell Federal),
but that Dell Federal was not qualified for the competition. See Tab 3.6 (E-mail Chain regarding
Dell Teaming Request, dated March 26-31, 2021) at AR 132-33. Dell explained that it could not
submit a bid under the RFQ’s terms at that time because Dell Federal’s GSA FSS contract would
expire on September 19, 2024 — before the end of the BPA to be awarded in this procurement —
and “the Navy has not included GSA Federal Supply Schedule Succession language.” Id. at AR
132. Dell offered two possible solutions that would allow its entities to compete “in an already
limited field of Microsoft Licensing Solution Providers (LSP) capable of managing an agreement
of this size.” Id. First, it suggested adding succession language in the RFQ that would allow, in
the event a current GSA FSS contract is replaced with a new GSA FSS contract, the BPA to
transfer from the expired GSA FSS contract “to the new [GSA FSS] contract to the extent the new
schedule contract includes the same or substantially the same scope and items as the canceled or
7
The Microsoft products and services listed under the BPA are distributed across several hundred
CLINs. See Tab 3.1 at AR 37-42. While the value of each CLIN varies, approximately 19 highvalue CLINs each contribute $20 million or more to the BPA’s total value. See Tab 7.1 (Additional
E-mails between the Navy and Dell regarding Dell’s Quote, dated May 4-6, 2021) at AR 3352-54
(CLINs x100, x101, x102, x104, x105, x106, x120, x407, x 453, x497, x511, x729, x744, x746,
x761, x765, x768, x781, and x784).
6
expired GSA contract.” Id. Alternatively, Dell suggested that the Navy permit use of Contractor
Teaming Arrangement (CTA) to pair Dell Federal’s security clearance with Dell Marketing’s GSA
FSS contract, which does not expire until November 2035, and would extend throughout the
duration of the BPA. Id. at 133.
In response, the Navy indicated that it would amend the RFQ to permit CTAs and that it
would extend the deadline for submission of quotes. Id. at AR 137. This amendment was handled
outside of the official question-and-answer process, and the questions and answers that the Navy
published after the question-and-answer period ended did not reference either the communications
with Dell or teaming arrangements. See Tab 42 (Insight Comments on Agency Report, dated July
16, 2021) at AR 4806-07.
The amended RFQ included the following eligibility requirements:
a. Reseller must have a current General Services Administration (GSA) Federal
Supply Schedule (FSS) contract that covers the duration of the resultant Agreement.
...
c. Reseller/Teaming Partner must be a DoD ESI BPA Holder for Microsoft
Products and Azure Services.
...
e. Reseller/Teaming Partner must have a Facility Clearance at the Secret level. If
the Reseller/ Teaming Partner does not have a Facility Clearance at the Secret level,
they must obtain it within 120 days of contract award.
f. All Microsoft products listed under Attachment #2 – BPA Product and Price List
must be on the Reseller’s FSS contract. Resellers will not be precluded from award
in the event a product is not available on the respective GSA Schedule contract
provided an appropriate explanation is given in the ‘Vendors Comments’ column
of Attachment #2.
...
h. Reseller/Teaming Partner must submit 2 contract references of similar size and
scope that were performed within the past 5 years (see Section 5 below for
definition of similar size and scope). Please provide the POC/references
7
(Contracting Officer or Contracting Officer’s Representative) for each contract
reference. Our office will contact each reference and submit a questionnaire
regarding the Reseller/Teaming Partner’s performance. The questionnaire
responses will be evaluated in addition to the Vendor’s CPARS ratings.
Tab 3.4 (Amendment 3 to RFQ, dated April 1, 2021) at AR 102 (emphases added). While the
amendment permitted using a teaming partner to satisfy many of the eligibility criteria, the
Microsoft product list was required to “be on the Reseller’s FSS contract.” Id. (emphasis added).
Thus, Dell Marketing, as the offeror and proposed reseller under the BPA, was required to have
the requisite Microsoft products on its own GSA FSS contract – not Dell Federal’s GSA FSS
contract.
Specifically, the submission requirements stated that a quote shall include “[e]vidence of
product inclusion and pricing on GSA schedule (only provide Microsoft product listing and
pricing).” Id. at AR 104. Another section of the instructions stated that “Resellers shall submit
evidence of product inclusion on GSA schedule, i.e., a copy of your GSA approved Price List.”
Id. at AR 101. However, the RFQ did not require submission of the GSA FSS contract itself. See
id. at AR 101-04.
The RFQ also explained that offerors would “be evaluated based on providing the best
value to the Government.” Id. at AR 102. Those offerors who satisfied the eligibility requirements
would be evaluated based on price and past performance. Id. Although price would be considered
more important than past performance, past performance would increase in importance as the price
variance between offerors narrowed. Id. The RFQ explained that “[p]rice will be evaluated based
upon the vendor pricing provided on BPA Attachment 2- BPA Product and Price List at the
estimated quantities listed.” Id.
The past performance rating considered the recency and relevance of previous projects. Id.
at AR 103. The RFQ explained that “[r]ecency will be based on performance within the last 5
8
years,” and that “[r]elevance will be evaluated on the size and scope of the referenced award(s)
being evaluated in comparison to the size and scope of this solicitation’s requirement.” Id. In
describing “size” and “scope,” the RFQ indicated that “similar size would include Agreements
valued at approximately $50M or greater per year, and similar scope would include any award that
is agency/component-wide, multi-agency, or department–wide.” Id. The Navy would then
consider the previous project as part of the overall performance Confidence assessment rating if
the project was “both recent and at least somewhat relevant.” Id. The RFQ established the
following ratings for Relevance and Confidence:
Id. Under this rubric, the RFQ explained “Confidence means the Government’s expectation that
the vendor will successfully perform the required effort based on the vendor’s recent/relevant
performance record.” Id. Higher Relevance ratings “will . . . have more influence on the past
performance confidence assessment than past performance of a lesser relevance.” Id. The
Solicitation did not include specific definitions for Confidence or Relevance ratings. See id.
II.
Initial Award to Insight
Two vendors, Insight and Dell Marketing, submitted initial bids on April 6, 2021. See Tab
4 (Dell Initial Quote, dated April 6, 2021); Tab 5 (Insight Initial Quote, dated April 6, 2021).
While Insight was the lone contractor on its proposal, Dell Marketing proposed a CTA between
Dell Marketing and Dell Federal. See Tab 4 at AR 140, 173. Dell Marketing proposed acting as
the team lead under its GSA FSS contract number GS-35F-059DA and using Dell Federal’s GSA
FSS contract GS-35F-0884P “to fulfil [sic] any security requirements.” Id. at AR 140. This was
9
necessary under the CTA because, unlike Dell Federal, Dell Marketing does not have the requisite
security clearances for this procurement. See Transcript of Oral Argument dated November 17,
2021 (ECF No. 51) (Nov. 17 Tr.) at 96:18-97:6; see also Tab 3.6 at AR 132-33.
Both Insight and Dell Marketing submitted the required Attachment #2 – BPA Product and
Price List, which included their proposed pricing for products on the BPA. Tab 4 at AR 173-80;
Tab 5 at AR 917-27. Insight included “a Microsoft only GSA [multiple award schedule (MAS)]
pricelist” with its quotation. Tab 5 at AR 917, 929-3277. Dell Marketing similarly provided its
Microsoft price list in an Excel file identified as a “copy of the Microsoft Products on vendor’s
GSA MAS Contract and prices.” Tab 4 at AR 173, 182-785. Neither offeror submitted their full
GSA FSS contract, nor as noted, did the RFQ require offerors to do so. 8 See generally Tab 3.4 at
AR 101-04; Tabs 4-5. Compare Transcript of Oral Argument, dated September 23, 2021 (ECF
No. 36) (Sept. 23 Tr.) at 27:17-22 (asserting on behalf of Defendant that “unless Insight only sells
Microsoft products . . . it didn’t provide its entire GSA Schedule contract”), and id. at 38:6-8
(asserting on behalf of Intervenor-Defendant that Insight “didn’t provide [its] GSA Schedule
contract.”), with id. at 47:7-49:5 (Plaintiff failing to rebut Defendants’ contentions that Insight also
did not submit its GSA FSS contract to the Navy).
Insight does not contend, and the
Administrative Record does not support, that it ever made a pre-award objection to the Navy’s
process of using offerors’ self-provided Microsoft product and price list as opposed to requiring
submission of offerors’ full GSA FSS contracts.
8
The Navy had good reason for not requesting offerors’ full GSA FSS contracts: the contracts are
lengthy and contain lists of products irrelevant to this procurement. For example, the publicly
available version of Dell’s GSA price list contains several hundred thousand products. See
https://www.gsaadvantage.gov/ref_text/GS35F059DA/GS35F059DA_online.htm (last visited
June 8, 2022) at 3.
10
After reviewing the initial submissions, the Navy communicated with Insight and Dell to
obtain additional information and solicit proposal revisions. See Tab 6.1 (Additional E-mails
between the Navy and Dell regarding Dell’s Quote, dated April 7-8, 2021); Tab 6.2 (E-mails
between the Navy and Insight regarding Insight’s Quote, dated April 7, 2021). The Navy asked
both parties to make certain representations regarding FAR 52.204-24 (Representation Regarding
Certain Telecommunications and Video Surveillance Services or Equipment) and DFARS
252.239-7009 (Representation of Use of Cloud Computing), both of which were required by the
RFQ. See Tabs 6.1 at AR 3279; 6.2 at AR 3328; see also Tab 3.1 at AR 29-30 (incorporating FAR
52.204-24 and DFARS 252.239-7009 into the BPA by reference). The Navy further asked Dell
Marketing to provide details of its proposed teaming arrangement with Dell Federal. See Tab 6.1
at AR 3279-80. The Navy gave both parties until April 7, 2021 to provide the supplemental
information. Id. at AR 3289-306; Tab 6.2 at AR 3328.
Dell Marketing and Insight submitted the requested representations on April 7, 2021. See
Tabs 6.1 at AR 3285-306; 6.2 at AR 3333-39. The next day, the Navy called Dell to clarify Dell
Marketing’s representation regarding DFARS 252.239-7009. See Tab 44 (Navy Response to
Insight Supplemental Protest and Comments, dated July 20, 2021) at AR 4933. Dell indicated in
its April 7 representations that it “[did] not anticipate that cloud computing services will be used
in the performance of any contract or subcontract resulting from this solicitation.” Tab 6.1 at AR
3306. However, cloud computing services were among the products to be sold under the BPA.
See, e.g., Tab 3.1 at AR 31. The contracting officer who reached out to Dell concerning the
applicability of this DFARS clause had similarly clarified the issue with Insight and had recalled
doing so with many vendors on other, past solicitations. Tab 44 at AR 4933. On the same day on
which it spoke with the contracting officer, Dell Marketing updated its DFARS 252.239-7009
11
representations to reflect that cloud computing services were expected. Id.; Tab 6.1 at AR
3307, 3326.
In its April 7, 2021 submission, Dell Marketing also produced the Master GSA CTA
between Dell Marketing and Dell Federal. Tab 6.1 at AR 3290. It explained that “[a]ll pricing
submitted on RFQ N66001-21-Q-0082 was based upon Dell Marketing L.P.’s GSA schedule.” Id.
at AR 3292. It further explained that while “[a]ll software CLINs will be sold off of [Dell
Marketing’s] GSA schedule GS-35F-059DA,” Dell Federal would be “responsible for fulfilling
any secure order requirements.” Id. at AR 3293; see also infra p. 10.
After receiving these submissions, the Navy began an extensive process of evaluating the
offerors’ eligibility based on whether the products listed in Attachment #2 – BPA Product and
Price List were on the offerors’ GSA FSS contracts. See Tab 8.2 (Dell Price Verification
Evaluation); Tab 8.3 (Insight Price Verification Evaluation); Tab 40 (Navy Response to GAO
Request for Information, dated July 13, 2021) at AR 4739. The Navy relied on spreadsheets
generated by the parties to evaluate whether the offerors had the requisite products on their GSA
FSS contracts. See Tab 5 at AR 921; Tab 8.3 at AR 3395-402; Tab 40 (Navy Response to GAO
Request for Information, dated July 13, 2021) at AR 4740-41. For each offeror, the Navy created
a color-coded chart identifying whether the price listed on the offeror’s BPA Product and Price
List for a given product was above, below, or matched the price on the offeror’s evidence of
product inclusion on its GSA Schedule, or whether the offeror did not submit a GSA Schedule
price for that product. See Tab 8.2 (Dell Price Verification Evaluation); Tab 8.3 (Insight Price
Verification Evaluation); Tab 40 (Navy Response to GAO Request for Information, dated July 13,
2021) at AR 4739. Similarly, as noted, it is undisputed that neither party objected to the Navy’s
12
reliance on offerors’ self-reported pricing and product information as opposed to relying on, or
requiring production of, offerors’ respective GSA FSS contracts.
While most of the Contract Line Item Numbers (CLINs) listed on Insight’s and Dell
Marketing’s BPA Product and Price Lists were also listed in the offerors’ spreadsheets, submitted
as evidence of product inclusion and pricing on their GSA FSS contracts, the Navy identified
several CLINs that did not match the offerors’ GSA FSS contracts. See Tab 7.1 at AR 3340-47;
Tab 7.2 (Additional Emails between the Navy and Insight regarding Insight’s Quote, dated May
4-6, 2021) at AR 3357-66. The Navy asked Dell and Insight to address the mismatched CLINs,
reduce pricing for certain CLINs, confirm that certain products were discontinued, state whether
GSA pricing was available for certain CLINs, and submit their Best and Final Offers by May 6,
2021. See Tab 7.1 at AR 3340-47; Tab 7.2 at AR 3357-66.
Both offerors timely submitted their Best and Final Offers, which included the Navy’s
requested changes and explanations for each of the CLINs of concern. See Tab 7.1 at AR 334856; Tab 7.2 at AR 3367-78. The Navy determined that both Dell Marketing and Insight met the
RFQ’s eligibility criteria. See Tab 9 (Initial Business Clearance Memorandum, signed May 1516, 2021) at AR 3498. Both offerors received a “Relevant” Relevance rating and a “Satisfactory
Confidence” Confidence rating. Id. at AR 3498, 3511-13. Insight’s total evaluated price was
$2,555,033,130, while Dell Marketing’s total evaluated price was $2,582,354,460. Id. at AR 3511.
Given the offerors’ equivalent past performance ratings and that Insight’s “overall price was
$27,321,330 less than Dell Federal System’s [sic] submission,” the Navy selected Insight for
award of the BPA. Id. at AR 3498.
On May 21, 2021, the Navy notified Insight that it was the recipient of a BPA under
Solicitation No. N66001-21-Q-0082. Tab 10.1 (Notice of BPA Award to Insight, dated May 21,
13
2021). A public Department of Defense website announced the award that same day, publishing
an approximation of Insight’s total evaluated price (approximately $2.56 billion). See Tab 69
(DoD Website Notice of Contract Awards, May 21, 2021) at AR 6465. Three days later, on May
24, 2021, the Navy published Insight’s CLIN prices on an internal SharePoint website for Navy
customers to use for placing orders against Insight’s BPA.
See Tab 81 (PIA No Impact
Determination, dated January 21, 2022) at AR 7399. While 3,500-4,300 Navy personnel and
contractors had access to the SharePoint site from May 24 through May 28, 2021, site access was
restricted to individuals with a DoD Common Access Card (CAC). See Tab 73 (Navy Emails
Regarding SharePoint System, dated August 18 - September 1, 2021) at AR 6498-612; Tab 81 at
AR 7399 n.1. It is undisputed that neither Dell Marketing, nor any other Dell entity, had access to
the SharePoint site. See Transcript of Oral Argument, dated April 8, 2022 (ECF No. 95) (Apr. 8
Tr.) at 16:6-10 (Insight’s counsel acknowledgement that list of individuals with SharePoint site
access did not include any Dell personnel).
On May 26, 2021, two days after posting Insight’s pricing on the SharePoint site, the Navy
notified Dell Marketing of the award to Insight. See Tab 10.2 (Emails between Navy and Dell
regarding BPA Award to Insight, dated May 26-27, 2021). The notification to Dell Marketing
included only the following information regarding Insight’s quote:
Id. at AR 3522. The Administrative Record does not indicate that Dell Marketing (or any other
Dell entity) ever received or had access to Insight’s CLIN-level pricing. See id.
14
III.
Suspension and Reevaluation of the Award to Insight
A. May 27, 2021 Email from Dell Marketing to the Navy
Internal Dell emails reflect that on May 26, 2021, the day the Navy informed Dell
Marketing of the award to Insight, Dell personnel began surmising that Insight submitted a lower
price because it had failed to price two items (i.e., CLINs) required by the RFQ. See Tab 77 (Email
from Dell to Navy forwarding Dell email chain regarding PIA Investigation, dated January 6,
2022) at AR 7358-59. Accordingly, on May 26, 2021, Dell requested a formal debrief with the
Navy. See Tab 10.2 at AR 3520. Although the Navy denied that request, it permitted Dell
Marketing to submit any “specific questions” it had about the award. Id. at AR 3519-20.
Dell responded by email on May 27, 2021, raising its concern that “the pricing evaluation
may not be comparing apples to apples, leading to a disadvantage for Dell and a possible
misrepresentation of total price to the Government over the term of the agreement.” Id. at AR
3519. Dell further explained its theory that Insight may have incorrectly priced four promotional
CLINs: 9
Throughout the bidding process, Microsoft made multiple revisions to the pricing
for the Project & Visio bundle promotional CLINs – x728, x729, x764, x765.
Microsoft originally offered only 3 years of pricing for these bundles but, at last
minute, extended an offer for years 4 & 5 at a lesser discount. The lesser discount
on the bundle is still less expensive than procuring the underlying products on a
stand-alone basis. . . .
We are concerned that competitors’ proposals may have included no pricing for
these bundled CLINS in years 4 and 5 due to the late timing of Microsoft’s change
to the offering. If that were the case, then the Dell Total Evaluated Price would be
unfairly evaluated at more than $
higher than a competitor’s offer that shows
no pricing for these CLINS in Years and 4 and 5.
9
Two of the four promotional CLINs identified by Dell Marketing, x729 and x765, were among
the approximately 19 high-value CLINs discussed infra in footnote 7.
15
Id. Dell asked the Navy to “validate that all bidders provided complete pricing for all CLIN[s] in
all years.” Id.
B. Corrective Action and Further RFQ Revisions
In response to Dell’s May 27, 2021 email, the Navy reviewed the bidders’ BPA Product
and Price lists. See Tab 12.1 (Final Business Clearance Memorandum, signed June 3-7, 2021) at
AR 4374. It confirmed that Dell Marketing had priced years 4 and 5 of the promotional CLINs
while Insight had not. Id. The Navy further noted that “[t]he value of that difference was ~ $
,
which impacted the award.” Id.
Concerned that a protest by Dell Marketing would be successful, on May 27, 2021 — the
same day that Dell had raised its concerns to the Navy — the Navy issued a notice suspending the
award to Insight “in order to re-evaluate the pricing submitted in response to the subject RFQ.”
Tab 11.1 (Emails [R]egarding Suspension of Insight Award and Submission of Revised Price Lists,
dated May 27-28, 2021) at AR 3523, 3525. The Navy offered the following explanation:
A discrepancy was found in how the promotional CLINs/ SKUs x728, x729, x764
and x765 provided by Microsoft should be applied. One vendor submitted pricing
for years 4 and 5 of those CLINs/SKUs, while the other zeroed the pricing for those
CLINs/SKUs for years 4 and 5. The discrepancy is significant enough to impact the
award decision.
Id. At that time, the Navy did not disclose that Dell had brought this possible discrepancy,
including the four referenced promotional CLINs, to the Navy’s attention. See id. The Navy did,
however, provide Insight with the same information regarding the offerors’ total evaluated prices
that was previously provided to Dell Marketing. See id.
On May 28, 2021, Insight responded to the Navy’s notice by explaining that it did not
provide pricing for the Promo CLINs for BPA years 4 and 5 because “Microsoft did not provide a
16
bundled cost for these CLINs for option year 3 and option year 4.” 10 Tab 11.5 (Email from Navy
to Insight regarding Removal of Promotional SKUs, dated May 28, 2021) at AR 3555. Insight
also requested a conference call with the Navy to discuss, among other things, altering the
quantities of the four promotional CLINs “so the correct pricing can be provided for evaluation
purposes.” Id. at AR 3556. The Navy considered Insight’s request and “decided to remove the
promotional SKUs from the evaluation and put the quantities back in Project and Visio
respectively.” Id. at AR 3555. The Navy extended the original deadline for submitting revised
quotations from 5 p.m. Pacific Time on May 28, 2021, to 7 p.m. Pacific Time on that date. See id.
After the Navy issued its Notice of Suspension of the award and initiated corrective action
on the evening of May 27, 2021, Insight’s pricing data remained posted to the Navy’s internal
SharePoint site for less than a day. Tab 81 at AR 7399 n.1. Specifically, the Navy removed
Insight’s data from SharePoint on May 28, 2021. Id. Again, it is undisputed that neither Dell
Marketing nor any other Dell entity had access to the SharePoint site during the period of May 27
through May 28, 2021. See id.; Tab 73 at AR 6498-612; Apr. 8 Tr. at 16:6-10.
Meanwhile, Insight and Dell Marketing submitted revised pricing to the Navy on May 28,
2021, as requested. See Tab 11.7 (Email from Dell to Navy transmitting Revised Price Proposal
Version 2, dated May 28, 2021); Tab 11.9 (Email from Insight to Navy transmitting Revised Price
Proposal, dated May 28, 2021). Subsequently, the Navy requested both offerors provide additional
information and submit their Best and Final Offers by noon Pacific Time on May 30, 2021. Tab
11.11 (Email from Navy to Dell regarding Best and Final Offers, dated May 29, 2021) at AR 3598-
10
“[O]ption year 3 and option year 4” correspond to years 4 and 5, respectively, for a given CLIN.
See Tab 3.1 at AR 8-9 (indicating the BPA includes a one-year base ordering period with four oneyear options).
17
99; Tab 11.13 (E-mail from Navy to Insight regarding Best and Final Offers, dated May 29, 2021)
at AR 3629.
Both Insight and Dell Marketing timely submitted new Best and Final Offers. See Tab
11.16 (Email from Dell to Navy transmitting its Revised Price Proposal Version 3, dated May 29,
2021); Tab 11.19 (Email transmitting Insight’s Final Pricing, dated May 30, 2021); Tab 11.21
(Letter from Insight to Navy regarding Final Pricing, dated May 30, 2021). While evaluating the
final offers, the Navy determined that two prices listed on Dell Marketing’s BPA Product and
Pricing List did not match the prices in Dell Marketing’s Evidence of Product Inclusion on GSA
FSS contract. See Tab 11.26 (Email from Dell to Navy transmitting Final Price Revisions, Updated
Microsoft Price List on Dell Marketing’s Federal Supply Schedule Contract, and Representations,
dated May 30, 2021) at AR 3811-12. It also determined that Dell Marketing did not include seven
CLINs in its Evidence of Product Inclusion on GSA FSS contract. Id. The Navy requested Dell
Marketing clarify these nine issues by submitting “the most recent copy of Dell’s GSA pricing for
Microsoft products and services.” Id.
Dell Marketing responded the same day by submitting revised pricing that corrected the
two previously mismatched prices and by attaching its “current Microsoft Price List on Dell GSA
GS35F059DA.” Id.; see Tab 11.27 (Dell Final Price Revisions, submitted May 30, 2021) at AR
3820-23; Tab 11.29 (Dell Updated Microsoft Price List on Dell Marketing’s Federal Supply
Schedule Contract, submitted May 30, 2021). The Navy reviewed Dell Marketing’s updated
submissions and verified that (i) the nine CLINs previously at issue were included on Dell
Marketing’s GSA FSS contract, and (ii) the prices matched the GSA FSS contract pricing reported
in Dell Marketing’s final BPA pricing submission. See Tab 40 at AR 4740. To further check for
discrepancies, the Navy spot-checked random CLINs and did not find discrepancies between Dell
18
Marketing’s two GSA price lists. Id. After the promotional CLINs were removed and all requested
modifications were incorporated, Dell Marketing’s final total evaluated price was
$2,493,272,919.21, and Insight’s final total evaluated price was $2,580,216,750.72. See Tab 11.20
(Insight Final Pricing, submitted May 30, 2021) at AR 3750; Tab 11.27 (Dell Final Price
Revisions, submitted May 30, 2021 (attachment to Tab 11.26)) at AR 3823; Tab 12.1 at AR 4379.
Accordingly, Dell Marketing’s final total evaluated price was approximately $86.9 million less
than Insight’s bid.
C. Subsequent Award to Dell Marketing
The next day, on May 31, 2021, the Navy verbally approved granting the award to Dell
Marketing. See Tab 12.1 at AR 4360, 4380. The Navy formalized the award and communicated
its decision to Dell Marketing on the same day. See Tab 66 (E-mails between Navy and Dell
regarding BPA documentation, dated May 31, 2021) at AR 5868; Tab 67 (Dell BPA, signed May
31, 2021) at AR 5874. On June 1, 2021, the Navy notified Insight that it had awarded the BPA to
Dell Marketing. See Tab 1 (Notification to Insight Public Sector, Inc. of BPA award to Dell
Marketing, dated June 1, 2021). The Navy documented its decision in a Business Clearance
Memorandum that was approved several days later. See Tab 12.1 at AR 4358-80.
The Navy explained in its Business Clearance Memorandum that it had suspended the
initial award to Insight based on an ambiguity “with regard to how the vendors priced certain
promotional products offered by Microsoft” that “resulted in an unequal evaluation of prices.” Id.
at AR 4360. The Navy explained that it requested new quotes from Insight and Dell Marketing,
the latter of which “quoted the lowest total overall price by $86,943,832 less than Insight.” Id.
Although the Navy concluded that “Insight’s past performance was slightly better than Dell’s,” it
concluded that such past performance was not sufficiently superior to overcome an almost $87
19
million price difference. Id. At most, the Navy concluded, Insight’s past performance “would be
worth a slightly higher price (no more than $5 million over the course of 5 years).” Id. The Navy
also reasoned that Dell Marketing’s quote “provided the Government with a reasonable
expectation that they will successfully perform the required effort,” and that Dell Federal’s “past
performance was generally rated good, with positive comments.” Id. The Navy therefore
concluded that an award to Dell Marketing “is in the best interest of the Government.” Id.
IV.
Insight’s GAO Protest
Subsequently, on June 7, 2021, Insight filed a bid protest before the Government
Accountability Office (GAO). See Tab 19 (Insight GAO Protest, dated June 7, 2021). The Navy
produced its Agency Report on July 6, 2021, revealing to Insight for the first time that Dell had
identified specific promotional CLINs in its May 27, 2021 email to the Navy. Tab 34 (Navy
Contracting Officer Statement of Facts and Memorandum of Law, dated July 6, 2021). Insight
responded to this new information by filing a supplemental protest at the GAO on July 9, 2021.
Tab 38 (Insight Supplemental Protest, dated July 9, 2021). In its supplemental protest, Insight
detailed its belief that Dell’s May 27, 2021 email evidenced a possible violation of the Procurement
Integrity Act that the Navy had failed to investigate. Id.
The Administrative Record does not contain independent documentation of a Navy
investigation into any alleged PIA violations at that time. In the Navy’s response to Insight’s
supplemental protest at the GAO, however, it argued insufficient evidence existed to require a PIA
investigation. See Tab 44 at AR 4928-30. The Navy explained to the GAO that although Dell’s
May 27, 2021 question to the Navy was “highly specific, it was also not an unreasonable
assumption.” Id. at AR 4927. In support of its decision to forgo a PIA investigation, the Navy
further elaborated that “Dell indicated Microsoft initially did not offer promotional pricing for
20
years 4 & 5 of the Promo CLINs, but at the last minute (but apparently before its initial quote on
6 April 2021) offered a lesser discount.” Id. The Navy also argued to the GAO that only a handful
of CLINs could have affected the price evaluation, despite that the BPA included over 500 CLINs:
A review of the vendors’ 6 May 2021 BPA Attachment 2 – BPA Product and Price
Lists shows that there are a limited number of “heavy hitters” that will affect the
price evaluation. There are 19 CLINS (which includes two of the [CLINs cited in
Dell’s May 7, 2021 email]), which are each priced out over $20M for the 5 year
period of performance. (See AR 7, Dell, Item 4 p. 308, and AR 7, Insight, Item 4,
p. 314.) Taken together, the evidence supports Dell may have just made a
reasonable assumption about the Promo CLINs, which turned out to be true.
Id. at AR 4928.
Before the GAO resolved the parties’ dispute, Insight informed the GAO that it would file
a bid protest action in this Court. Tab 49 (Insight Notice of Intent to File Protest in Court of
Federal Claims and Request to Provide Protected Information United States Government
Investigative Agencies, dated August 17, 2021). The GAO dismissed Insight’s protest when
Insight filed the present action. Tab 52 (GAO Dismissal of Insight’s Protest, dated August 26,
2021).
V.
Procedural History
Insight filed the present bid protest in the United States Court of Federal Claims on August
25, 2021. See Compl. During the following nine months, Insight’s protest developed into a
leviathan.
The contentious character of this suit first revealed itself in a dispute over the
Administrative Record’s scope and content. See December 9, 2021 Memorandum and Order on
Motion to Complete the Administrative Record (ECF No. 57) (AR Memorandum and Order); Sept.
23 Tr.; Order Denying Motion to Complete the Administrative Record (ECF No. 32). This case’s
full form came into view during its second developmental stage, when the parties filed their
respective cross-motions for judgment on the administrative record (collectively, the parties’
MJARs). See Plaintiff’s Motion for Judgment on the Administrative Record (ECF No. 33) (Pl.’s
21
MJAR); Defendant’s Cross-Motion for Judgment on the Administrative Record and Response to
Plaintiff’s MJAR (ECF No. 38) (Def.’s Cross-MJAR); Intervenor-Defendant’s Cross-Motion for
Judgment on the Administrative Record and Response to Plaintiff’s MJAR (ECF No. 39) (Int.Def.’s Cross-MJAR). After oral argument on the parties’ MJARs, the Court granted Plaintiff’s
MJAR in part, remanding this action to the Navy to thoroughly investigate one of Insight’s
Procurement Integrity Act (PIA) violation allegations. 11 See Remand Order at 3. Finally, in this
action’s third phase, the Court, identifying a material defect in the Navy’s PIA investigation,
remanded the case yet again for the Navy to fully comply with this Court’s December 9, 2021
Order mandating the Navy investigate one of Plaintiff’s PIA violation allegations. See Second
Remand Order. The Navy completed its final PIA violation investigation on April 29, 2022, and
the parties submitted further briefing regarding the Navy’s April 29, 2022 Supplemental PIA
Report. Defendant’s May 2, 2022 Notice of Completion (ECF No. 98); Supplemental PIA Report;
Pl.’s Second SMJAR; Int.-Def.’s Resp. to Pl.’s Second SMJAR; Def.’s Resp. to Pl.’s Second
SMJAR.
After review of the Navy’s April 29, 2022 Supplemental PIA Report and the parties’ briefs,
the Court provided an oral ruling on the record to accommodate the parties’ desire for an expedited
ruling and for clarity prior to fast-approaching procurement deadlines. See May 10 Order; May
10 Tr.; supra note 4. The Court also immediately lifted the injunction that was in place. See May
10 Order at 2; May 10 Tr. at 6:2-4. As consented by the parties, this Memorandum and Order
details the reasoning behind the Court’s decision. See supra note 4. Prior to addressing the parties’
11
As described infra, the Court granted Plaintiff’s MJAR in part concerning Plaintiff’s allegation
that a PIA violation occurred prior to Dell’s May 27, 2021 email, but denied as untimely Plaintiff’s
MJAR regarding its second allegation that the Navy’s May 27, 2021 email suspending the award
to Insight violated the PIA by disclosing Plaintiff’s total evaluated price and unpriced CLINs. See
Remand Order at 11-12, 25-26.
22
legal arguments, however, it is helpful to review certain background and findings of fact more
specifically regarding this case’s three developmental phases.
A. Completing/Supplementing the Administrative Record
This action’s first phase centered on the contents and scope of the Administrative Record.
Insight filed a motion seeking to add Dell Marketing’s General Services Administration Federal
Supply Schedule Contract No. GS-35F-059DA to the Administrative Record, either via
completion or supplementation. AR Memorandum and Order at 2. Despite that, as noted, Dell
Marketing did not submit — and was not required to submit — its GSA FSS contract to the Navy
as part of its quote, Insight nevertheless alleged that (i) the supply schedule contract was “a core
document that must be produced to have a complete Administrative Record,” and (ii) inclusion of
GSA FSS contract in the Administrative Record was necessary for this Court to determine whether
Dell Marketing was eligible for award. Id. at 2, 17.
This Court disagreed. Id. at 10. It explained that the Administrative Record was complete
without Dell Marketing’s Federal Supply Schedule contract as the contract was not before the
Navy when the Navy made its procurement decision. Id. at 10. Additionally, the Court determined
that it could “effectively review the Navy’s procurement process — including the Navy’s decision
to forgo additionally verifying the contents of Dell Marketing’s GSA Schedule through GSA —
without reviewing the full GSA Schedule” itself. Id. As this Court’s role is not to perform a de
novo review, the Court denied Insight’s motion. Id. at 10-11; see Sept. 23 Tr. at 5:13-21.
B. Remand and Initial PIA Investigation
Insight’s case neared full development during the second phase of this case when the
parties filed competing motions for judgment on the administrative record. See Remand Order;
Pl.’s MJAR; Def.’s Cross-MJAR; Intervenor-Def.’s Cross-MJAR. Insight argued in its motion for
23
judgment on the administrative record “that (1) the Navy failed to evaluate whether Dell
Marketing’s proposal complied with the requirements in the Request for Quotations; (2) Dell
Marketing was ineligible for the award because it did not have a valid Contractor Teaming
Arrangement, necessary for it to meet some eligibility requirements; (3) the Navy conducted a
flawed past performance evaluation; (4) the Navy displayed bias in favor of Dell Marketing
throughout the procurement; and (5) the Navy failed to investigate a potential violation of the
Procurement Integrity Act (PIA).” Remand Order at 2. The Court (i) granted Insight’s motion in
part, holding that the Navy failed to investigate the alleged PIA violation, (ii) enjoined the Navy
from proceeding with its award to Dell Marketing, and (iii) remanded to the Navy for investigation
of the alleged PIA violation. Id. at 3. Given the remand, the Court deferred ruling on Insight’s
other legal arguments until the Navy completed its PIA violation investigation. Id. at 27-28.
In its December 9, 2021 Remand Order, the Court addressed two arguments Insight had
advanced relating to its request for a PIA violation investigation. Id. at 11-12. First, Insight argued
that Dell’s May 27, 2021 email to the Navy allegedly demonstrated that Dell had inappropriately
received Insight’s CLIN-level pricing. Id. at 11. Second, Insight argued that the Navy had
allegedly violated the PIA by responding to Dell’s email on May 27, 2021, indicating that “[o]ne
vendor submitted pricing for years 4 and 5 of those CLINs/SKUs, while the other zeroed the
pricing for those CLINs/SKUs for years 4 and 5.” Id. at 12 (quoting Tab 11.1 at AR 3523-30).
The Court rejected the second argument as waived because (i) Insight had waited until its reply
brief to raise the argument, and (ii) Insight did not raise this potential PIA violation with the Navy
until more than 14 days after it discovered the possible violation. Remand Order at 26. The Court
was, however, persuaded by Insight’s arguments regarding the timeliness of Insight’s first alleged
PIA violation. See id. at 13-16. The Court concluded that Insight timely notified the Navy that
24
Dell’s May 27, 2021 email had indicated a PIA violation, that Insight’s allegation was sufficient
to trigger an investigation, and that the Navy unreasonably failed to conduct that investigation. Id.
at 17-25.
To remedy this failure, the Court temporarily enjoined the Navy “from implementing or
otherwise proceeding with the BPA award” and remanded the action “to the Navy to investigate
Plaintiff’s first allegation of a PIA violation; namely, that the information in Dell Marketing’s May
27, 2021 email to the Navy concerning certain allegedly mispriced CLINs in Insight’s bid
potentially indicates a PIA violation occurred.” Id. at 27-28. The Court directed a fulsome
investigation, as “Insight broadly alleged that at some time before Dell Marketing’s May 27, 2021
email to the Navy, Dell Marketing received ‘inside information about Insight’s proposal.’” Id. at
21 (quoting Tab 38 at AR 4730). Thus, the allegation to be investigated was not limited merely to
disclosures predating the Navy’s initial, May 21, 2021 award to Insight. See Remand Order at 21.
Instead, the Court sought full transparency on what had transpired so that it could assess the
reasonableness of any Navy conclusion stemming from its investigation. See Second Remand
Order at 4.
The Navy completed its initial PIA investigation and filed a copy of its investigative
conclusions with this Court. Remand Decision (ECF No. 64-1) (PIA Report); Tab 81. In his PIA
Report, Spencer Sessions, the Navy contracting officer for this procurement, “determined that no
one from Dell obtained or was provided Insight’s CLIN-level pricing information before Dell sent
its 27 May 2021 e-mail to the Navy, in violation of 41 U.S.C. § 2102.” Tab 81 at AR 7401.
Alexander Roberts, “a senior level contracting officer on the DoD ESI contracting team,” had
conducted “[t]he day-to-day handling of this acquisition.” Id. at AR 7394. “Mr. Roberts limited
distribution of vendors’ pricing information to just those on the evaluation team, and just when
25
needed.” Id. The PIA Report further reflects that Mr. Roberts implemented the following
safeguards to prevent disclosure of pricing data:
briefing the evaluation team about safeguarding procurement sensitive data;
requiring the technical evaluation team . . . to sign Non-Disclosure Agreements;
anonymizing Dell and Insight’s quotes . . . when the quotes were sent to the
technical evaluation team for evaluation; and using buffered prices (1.0763% above
the average of the two vendors price submissions) to communicate estimates to
outside stakeholders (i.e. customers) as necessary for budgeting.
Id.
Mr. Roberts also performed the PIA investigation. Id. at AR 7393. His investigation
included interviewing three Dell representatives, collecting and reviewing hundreds of pages of
documents and contemporaneous correspondence provided by Dell, obtaining declarations from
six people involved in drafting Dell’s May 27, 2021 email to the Navy, and obtaining declarations
from the nine Navy personnel who had received Insight’s pricing before the initial award to Insight.
Id. at AR 7394-99. The Dell employees interviewed by Mr. Roberts explained that Microsoft’s
late price changes to years 4 and 5 of certain promotional CLINs led them to believe that Insight’s
multi-million dollar advantage could have owed to Insight failing to price those promotional
CLINs. Id. at 7394-97; Tab 74 (Memoranda to File regarding Interviews with Dell Employees,
dated December 21, 2021, and January 5, 2022). Dell’s Vice President for Strategic Programs,
Ray McDuffie, stated during his interview that “no one from the Government provided Dell any
information related to Insight’s pricing.” Tab 81 at AR 7395. He also stated that, to his knowledge,
“no one from Dell received any information about Insight’s CLIN pricing on this opportunity.”
Id. Two other Dell representatives made similar statements that Dell did not receive Insight’s
CLIN pricing. Id. at AR 7395-97.
The declarations Mr. Roberts collected likewise reflected that Dell Marketing did not
receive Insight’s pricing information. Id. at AR 7397-99. Six Dell representatives declared under
26
penalty of perjury that they “did not see or receive any Insight price information related to the
RFQ.” Tab 80 (Dell Declarations (with cover e-mails), dated January 18-20, 2022) at AR 738284, 7386, 7389, 7391. They further declared that no one had provided Dell with information
regarding Insight’s CLIN-level pricing prior to Dell submitting its May 27, 2021 question to the
Navy. Id. at AR 7382-84, 7386, 7389, 7391. Navy personnel similarly declared under penalty of
perjury that they had complied with their “obligations to protect and keep confidential contractor
bid or proposal information,” and that “[p]rior to the initial award of the BPA to Insight on May
21, 2021, [they] did not discuss with or disclose Insight’s pricing to anyone.” Tab 79 (Government
Declarations, dated January 10-11, 2022).
The documents collected from Dell reflected that Dell was concerned about the Microsoft
promotional CLINs well before the Navy’s initial award to Insight. See Tab 81 at AR 7398-99.
On March 26, 2021, prior to even submitting its bid, Dell emailed Microsoft to inquire about these
promotional CLINs, which appeared to be priced only for one year rather than for all five years.
Id. at AR 7398; Tab 75 (E-mail from Dell to Navy providing Documentation regarding PIA
Investigation, dated December 24, 2021) at AR 6627-28. Microsoft responded that the CLINs
were promotional and that it would provide additional information in a few days. See Tab 81 at
AR 7398; Tab 75 at AR 6627. Then, on March 29, 2021, Microsoft sent Dell updated pricing,
which included the promotional CLINs at issue across all five years. See Tab 81 at AR 7398; Tab
75 at AR 6625. When Microsoft provided final pricing on April 2, 2021, Dell requested Microsoft
clarify whether the promotional CLIN “bundles will be available to transact in year 4 & 5, or will
it revert back to the a-la-cart skus?” Tab 75 at AR 6622; see also Tab 81 at AR 7390. Microsoft
responded, explaining that although the CLIN “bundles can remain on the catalog for years 4 and
5, however the discount for Visio and Project will no longer be offered and they will go back to
27
full price.” Tab 75 at AR 6622; see also Tab 81 at AR 7390. Dell Marketing accordingly
incorporated into its bid this last-minute information from Microsoft about pricing for years 4 and
5 of the promotional CLINs. See Tab 4 at AR 178 (pricing promotional CLINs x728 and x729 for
option years 4 and 5); Tab 179 (pricing promotional CLINs x764 and x765 for option years 4
and 5).
Dell’s emails dated after the Navy’s May 21, 2021 award to Insight similarly demonstrate
that the promotional CLINs were front of mind for Dell Marketing. See Tab 77. Less than an hour
after the Navy had announced the award to Insight, one Dell representative sent an internal email
questioning Insight’s ability to offer a total price with such a discount against Dell Marketing’s
price. Id. at AR 7358. Dell immediately surmised that the large discrepancy in bid price was
attributable to the Microsoft CLINs that were unpriced earlier in the bidding process. Id.
Accordingly, on May 27, 2021, Dell sent the following correspondence to the Navy:
Throughout the bidding process, Microsoft made multiple revisions to the pricing
for the Project & Visio bundle promotional CLINs – x728, x729, x764, x765.
Microsoft originally offered only 3 years of pricing for these bundles but, at last
minute, extended an offer for years 4 & 5 at a lesser discount. . . . We are concerned
that competitors’ proposals may have included no pricing for these bundled CLINS
in years 4 and 5 due to the late timing of Microsoft’s change to the offering. If that
were the case, then the Dell Total Evaluated Price would be unfairly evaluated at
more than $
higher than a competitor’s offer that shows no pricing for these
CLINS in Years and 4 and 5.
Tab 76 (DoD SAFE Drop-Off Documentation from Dell regarding PIA Investigation transmitted
on December 30, 2021) at AR 7353.
While the Navy did not uncover any evidence that Dell had received Insight’s CLIN-level
pricing, the PIA Report notes that “Insight’s Attachment 2 BPA Product and Price List was posted
on an internal Common Access Card (CAC) enabled SharePoint website for Navy customers to
utilize in placing their orders against Insight’s BPA.” Tab 81 at AR 7399 n.1. The Administrative
Record reflects that Insight’s CLIN pricing information was posted on the access-restricted
28
SharePoint site from May 24 until May 28, 2021. Id. The site’s system administrator “advised
that [the Navy] cannot tell who accessed the site and when.” Id. It is undisputed that the total list
of people with access to the site exceeded 3,500. Id. Mr. Roberts determined it impractical to
interview that entire class of individuals to confirm with each person that they did not disclose
Insight’s pricing, and that, in any event, it was unnecessary due to evidence provided by Dell
indicating that Dell did not have access to Insight’s CLIN price information. Id.
After review of Mr. Roberts’ investigation, interview transcripts, and documentation, Mr.
Sessions determined in his PIA Report that “[t]he evidence indicates that no one from Dell received
Insight’s CLIN pricing prior to the initial 21 May 2021 award to Insight or Dell’s 27 May 2021
email regarding the award to Insight (from the Government or otherwise).” Tab 81 at AR 7399.
Mr. Sessions reached this conclusion in the PIA Report based on the declarations from the Dell
representatives involved in pricing its quote for this RFQ as well as the declarations from Navy
personnel. Id. Specifically, the PIA Report concluded that the explanation provided in the Navy’s
interviews with Dell representatives “as to why Dell questioned whether Insight had priced all five
years of the promotional CLINs is reasonable and supported by the documents Dell provided.” Id.
at AR 7400. In the PIA Report, Mr. Sessions also attributed importance to Dell’s reasoning that it
“doubted that Insight was lower priced given how aggressively Dell bid” especially “in the greater
context of Microsoft competitions.” Id. Furthermore, Mr. Sessions reasoned, Dell’s emails
“support Dell’s explanation that the pricing of the promotional SKUs was last minute, and that
Dell asked Microsoft multiple questions to better understand the promotional SKUs.”
Id.
Accordingly, the PIA Report concluded that Dell’s internal emails “support Dell’s assertion that it
was only using information received from the award notice and that it did not receive Insight’s
CLIN pricing.” Id.
29
Given his conclusion that “no one from Dell obtained or was provided Insight’s CLINlevel pricing information before Dell sent its 27 May 2021 e-mail to the Navy,” Mr. Sessions
concluded “that Insight’s alleged PIA violation did not impact the award of the BPA to Dell
Marketing.” Id. at AR 7401. Sharon Pritchard, the Chief of Contracting Office for Naval
Information Warfare Center Pacific, concurred with Mr. Sessions’ determination. Id. Both Mr.
Sessions and Ms. Pritchard signed the no-impact determination. Id.
C. Second Remand and Supplemental PIA Investigation
This action entered its third and final phase on February 25, 2022, when Insight filed a
supplemental motion for judgment on the administrative record. See Pl.’s SMJAR. Insight argued
that the Navy violated the PIA by posting Insight’s pricing data on the SharePoint site on May 24,
2021, and by keeping it visible on the site for approximately a day after reopening the bidding
process on the evening of May 27, 2021. See Pl.’s Memorandum in Support of its SMJAR (ECF
No. 77-1) (Pl.’s SMJAR Mem.) at 22-27.
Insight further argued that (i) the Navy’s PIA
investigation did not comply with this Court’s December 9, 2021 Memorandum and Order and
that the investigation was inadequate because the Navy’s conclusion rested on Dell’s selfinterested statements, (ii) the investigation was not independent from the contracting officers
involved in the procurement, and (iii) the Navy did not investigate everyone who had access to the
SharePoint site during the relevant period. See id. at 270-35.
Agreeing in part with Insight, this Court granted Insight’s Supplemental Motion for
Judgment on the Administrative Record, holding that the Navy had “failed to fully comply with
this Court’s Remand Order.” Second Remand Order at 2. Rather than investigate the Navy’s
handling of Insight’s pricing data up until May 27, 2021, the Navy had sua sponte limited its
investigation by restricting the scope of its own declarations to the period preceding May 21, 2021,
30
not May 27, 2021, as the Court had ordered. Id. The Court accordingly remanded the action to
the Navy to fully comply with this Court’s December 9, 2021 Remand Order. Id. at 5.
The Navy completed the required investigation and filed an addendum to its Procurement
Integrity Act Report. See Supplemental PIA Report. As part of its supplemental PIA violation
investigation, the Navy obtained new declarations from the same nine Navy employees who had
previously provided declarations during the initial PIA investigation. Id. at 2. In addition to
averring that prior to the initial award to Insight “they did not discuss or disclose Insight’s pricing
to anyone except other members of the source selection team,” these new declarations also “stated
that during the period of 21-27 May 2021, they did not discuss or disclose to anyone outside the
source selection team any information regarding how Insight had bid particular CLINs.” Id. at 2;
see also Additional Documents Filed with Supplemental PIA Report (ECF No. 98-2). The only
disclosures made were to the SharePoint website and “to two Navy contracting personnel, Todd
Little and Sherelle Lockhart, in response to their request for award documentation to support a
Letter of Authorization to Leidos, Inc. (Leidos).” Supplemental PIA Report at 2; see also
Additional Documents Filed with Supplemental PIA Report (ECF No. 98-2). As part of its
supplemental PIA violation investigation, “[t]he Navy obtained declarations from Mr. Little and
Ms. Lockhart, in which they stated that they did not further discuss or disclose that information,
except amongst themselves.” Supplemental PIA Report at 2; see also Additional Documents Filed
with Supplemental PIA Report (ECF No. 98-2).
Mr. Sessions concluded in his Supplemental PIA Report “that the evidence from both the
PIA Investigation which was documented in [the] 21 January 2022 PIA report, and this addendum
thereto, taken together, indicate that no one from Dell received Insight's CLIN pricing prior to
Dell's 27 May 2021 email regarding the award to Insight (from the Government or otherwise).”
31
Supplemental PIA Report at 2. While Mr. Sessions acknowledged that he did not obtain statements
“from all the Navy personnel (including contractors) who may potentially have accessed Insight's
BPA price list from the SharePoint site between 24-27 May 2021,” he determined that “the
declarations from Dell personnel, interviews with Dell personnel, the contemporaneous
documentation provided by Dell, and the April 2022 Government declarations” provided sufficient
information to determine “that no one from Dell obtained or was provided Insight's CLIN-level
pricing before Dell sent its 27 May 2021 e-mail to the Navy.” Id. at 3. Sharon Pritchard concurred
in this conclusion, and both Mr. Sessions and Ms. Pritchard signed the supplemental no-impact
determination. Id.
Insight responded by filing a second supplemental motion for judgment on the
administrative record, in which it also renewed its original, deferred arguments for judgment on
the administrative record. See P1.’s Second SMJAR. With respect to the Navy’s supplemental
PIA investigation, Insight argued that the Navy failed to fully investigate the alleged PIA violation
by declining to interview all individuals who had access to the SharePoint site from May 24
through May 27, 2021. Id. at 3. Insight further faulted the Navy for not investigating Insight’s
allegations that the Navy also “violated the PIA by failing to remove Insight’s pricing from the
SharePoint website until May 28, 2021 – after the reopening of the procurement process on May
27, 2021.” Id. at 5-6.
On May 10, 2022, on consent of the parties, this Court ruled on the record, denying “the
unresolved portions of Plaintiff’s Motion for Judgment on the Administrative Record (MJAR)
(ECF No. 33), Plaintiff’s Supplemental MJAR (ECF No. 77), and Plaintiff’s Second Supplemental
MJAR (ECF No. 103),” and granting “the unresolved portions of Defendant’s Cross-Motion for
Judgment on the Administrative Record (Cross-MJAR) (ECF No. 38), Defendant’s Supplemental
32
Cross-MJAR (ECF No. 78), Intervenor-Defendant’s Cross-MJAR (ECF No. 39), and IntervenorDefendant’s Supplemental Cross-MJAR (ECF No. 79).” May 10 Order; May 10 Tr. at 5:14-6:2. 12
Specifically, and as explained in more detail below, the Court held that “(i) the Navy was
not required to examine Dell Marketing’s GSA Schedule; (ii) Dell Marketing has a valid
Contractor Team Agreement, or CTA, with Dell Federal; (iii) the Navy reasonably evaluated
Insight’s past performance; (iv) the Navy did not show improper favoritism toward Dell
Marketing; and (v) the Navy conducted a reasonable PIA investigation that rationally concluded
that the procurement was not affected by a PIA violation.” May 10 Tr. at 6:14-22. The Court,
therefore, lifted the injunction that was temporarily in place, and explained that “the U.S.
Department of the Navy may immediately proceed with its award to Dell Marketing L.P.” May
10 Order at 2; see also May 10 Tr. at 38:10-13.
APPLICABLE LEGAL STANDARD
This Court reviews post-award bid protests in two steps. First, the Court analyzes the
procurement under the Administrative Procedure Act (APA). 28 U.S.C. § 1491(b)(4); Harmonia
Holdings Grp., LLC v. United States, 20 F.4th 759, 766 (Fed. Cir. 2021). Second, the Court must
analyze whether the alleged errors prejudiced the protestor. See DynCorp Int’l, LLC v. United
States, 10 F.4th 1300, 1308 (Fed. Cir. 2021).
Turning to the first step, the APA requires a reviewing court to determine “whether the
agency’s actions were ‘arbitrary, capricious, an abuse of discretion, or otherwise not in accordance
with law.’” Off. Design Grp. v. United States, 951 F.3d 1366, 1371 (Fed. Cir. 2020) (quoting
Glenn Def. Marine (ASIA), PTE Ltd. v. United States, 720 F.3d 901, 907 (Fed. Cir. 2013)); 5
12
As noted, the parties agreed to receive an expedited oral ruling on the record for certainty relating
to upcoming procurement deadlines, with the understanding that the Court would issue a written
Memorandum and Order detailing its reasoning and enter judgment at that time. See supra note 4.
33
U.S.C. § 706. Although the inquiry under the APA “is to be searching and careful, the ultimate
standard of review is a narrow one. The court is not empowered to substitute its judgment for that
of the agency.” Citizens to Pres. Overton Park, Inc. v. Volpe, 401 U.S. 402, 416-20 (1971).
Accordingly, courts may set aside an award only if “(1) ‘the procurement official’s decision lacked
a rational basis or (2) ‘the procurement procedure involved a violation of regulation or procedure.’”
DynCorp, 10 F.4th at 1308 (quoting WellPoint Mil. Care Corp. v. United States, 953 F.3d 1373,
1377 (Fed. Cir. 2020)).
When a protestor alleges the agency’s decision lacked a rational basis, the court reviews
“whether the contracting agency provided a coherent and reasonable explanation of its exercise of
discretion.” Dell Fed. Sys., L.P. v. United States, 906 F.3d 982, 992 (Fed. Cir. 2018) (quoting
Banknote Corp. of Am., Inc. v. United States, 365 F.3d 1345, 1351 (Fed. Cir. 2004)). As the United
States Court of Appeals for the Federal Circuit has explained, “the disappointed bidder bears a
heavy burden of showing that the award decision had no rational basis.” Centech Grp., Inc. v.
United States, 554 F.3d 1029, 1037 (Fed. Cir. 2009) (quoting Impresa Contruzioni Geom.
Domenico Garufi v. United States, 238 F.3d 1324, 1332 (Fed. Cir. 2001)). Indeed, agency
decisions are “entitled to a presumption of regularity.” Impresa, 238 F.3d at 1338. Protestors bear
a similar burden when alleging that the procurement involved legal or procedural violations, as the
court reviews such claims for “a clear . . . violation of applicable statutes or regulations.” Id. at
1333 (quoting Kentron Hawaii, Ltd. v. Warner, 480 F.2d 1166, 1169 (D.C. Cir. 1973)).
At the second step, regardless of whether the alleged error relates to irrational conduct or
a violation of law, the protestor must establish that the agency’s conduct prejudiced the protestor.
Sys. Studs. & Simulations, Inc. v. United States, 22 F.4th 994, 997 (Fed. Cir. 2021). This is a
factual question for which the protestor must “show ‘that there was a “substantial chance” it would
34
have received the contract award but for’ the [alleged error].” Id. at 998; see also Bannum, Inc. v.
United States, 404 F.3d 1346, 1353 (Fed. Cir. 2005). De minimis errors in the procurement process
generally do not justify relief. Off. Design Grp., 951 F.3d at 1374.
If a protestor meets its burden of demonstrating that the procurement both violated the APA
and prejudiced the protestor, declaratory or injunctive relief may be appropriate. See 28 U.S. C. §
1491(b)(2). However, successful protestors are not automatically entitled to an injunction. See
Centech, 554 F.3d at 1037. Before entering injunctive relief, “the court must consider whether (1)
the plaintiff has succeeded on the merits, (2) the plaintiff will suffer irreparable harm if the court
withholds injunctive relief, (3) the balance of hardships to the respective parties favors the grant
of injunctive relief, and (4) the public interest is served by a grant of injunctive relief.” Id.
The Rules of the United States Court of Federal Claims (Rules or RCFC) provide the
equivalent of an expedited trial on a “paper record, allowing fact-finding by the trial court.”
Bannum, 404 F.3d at 1356. Parties initiate such proceedings by filing motions for judgment on
the administrative record. Rule 52.1(c). In adjudicating cross motions under Rule 52.1, courts
resolve questions of fact by relying on the administrative record. See id. If necessary, a court may
remand the case back to a governmental agency for further factual findings. Rule 52.2.
DISCUSSION
Plaintiff’s arguments fail under this Court’s limited APA review. The parties’ motions
raise seven issues: (1) whether the Navy was required to examine a copy of Dell Marketing’s GSA
Schedule, (2) whether Dell Marketing has a valid Contractor Teaming Arrangement with Dell
Federal, (3) whether the Navy reasonably evaluated Insight’s past performance, (4) whether the
Navy showed improper favoritism toward Dell Marketing, (5) whether the Navy conducted a
reasonable PIA investigation that concluded that the procurement was not affected by a PIA
35
violation, (6) whether the procurement was fundamentally unfair, and (7) whether Insight is
entitled to injunctive relief. See Plaintiff’s Memorandum in Support of Its MJAR (ECF No. 34)
(Pl.’s Mem.) at 23-48; Defendant’s Cross-Motion for Judgment on the Administrative Record and
Response to Plaintiff’s MJAR (ECF No. 38) (Def.’s Cross-MJAR) at 24-57; IntervenorDefendant’s Memorandum in Support of its Cross-Motion for Judgment on the Administrative
Record and Response to Plaintiff’s MJAR (ECF No. 39-1) (Int.-Def.’s Mem.) at 23-58. 13 On each
issue, Insight has not demonstrated that the Navy acted irrationally, violated the terms of the
Solicitation, or acted in violation of U.S. procurement law. Furthermore, several of Insight’s
arguments fail because the alleged errors did not prejudice Insight. This Court must therefore deny
Plaintiff’s MJAR, SMJAR, and Second SMJAR, and grant Defendant’s and IntervenorDefendant’s Cross-MJARs and Supplemental Cross-MJARs.
I.
The Navy Did Not Err in Failing to Evaluate Dell Marketing’s GSA Schedule
Plaintiff first alleges that “the Navy failed to evaluate whether Dell Marketing ha[d] all of
the required Microsoft products on its General Services Administration (‘GSA’) Federal Supply
Schedule (‘FSS’).” Pl.’s Mem. at 11. The Solicitation required offerors to have all the requested
products on their GSA FSS Schedules for the duration of the procurement. See Tab 3.1 (Excerpts
from Original Request for Quotations (RFQ), dated March 17, 2021) at AR 32. While the Navy
relied on representations and documentation provided by Dell Marketing to determine that it
satisfied the GSA FSS Schedule requirement, it did not independently review Dell Marketing’s
GSA Schedule. See Tab 4 (Dell Initial Quote, dated April 6, 2021) at AR 144, 173, 181-800; Tab
41 (Dell Comments on Agency Report, dated July 13, 2021) at AR 4738-41. Plaintiff argues that
13
Citations throughout this Memorandum and Order reference the ECF-assigned page numbers,
which do not always correspond to the pagination within the document.
36
the Navy’s failure to independently review a copy of Dell Marketing’s GSA Schedule was
erroneous because (i) such inspection was required to ensure compliance with the Solicitation, and
(ii) there was “significant countervailing evidence” triggering an obligation for the Navy to
independently verify Dell Marketing’s representations about the contents of its GSA Schedule.
Pl.’s Mem. at 23-29 (quoting Allied Tech. Grp., Inc. v. United States, 649 F.3d 1320, 1331 (Fed.
Cir. 2011)). This Court holds that Plaintiff’s claim fails on both grounds.
A. The Solicitation Did Not Require an Inspection of Dell Marketing’s GSA Schedule
First, Insight alleges that the Navy failed to review Dell Marketing’s GSA Schedule despite
the RFQ’s requirement that “each offeror have a GSA Schedule that (1) covers the duration of the
BPA, and (2) contains ‘[a]ll Microsoft products listed under Attachment #2 – BPA Product and
Price List.’” Pl.’s Mem. at 24 (quoting Tab 3.1 at AR 32). However, the terms of the Solicitation
did not require the Navy to independently verify Dell Marketing’s GSA Schedule. This Court’s
“duty [is] to determine whether the agency’s [eligibility] analysis was consistent with the
evaluation criteria set forth in the RFP, not to introduce new requirements outside the scope of the
RFP.” Alabama Aircraft Indus., Inc.-Birmingham v. United States, 586 F.3d 1372, 1375 (Fed. Cir.
2009) (citation omitted). The Solicitation clearly did not require the Navy to inspect Dell
Marketing’s GSA Schedule. Rather, it only required offerors to “submit evidence of product
inclusion on [the] GSA Schedule,” Tab 3.3 (Amendment 2 to RFQ, dated March 31, 2021 (without
responses to questions) at AR 101 (emphasis added), and to “only provide Microsoft product
listing and pricing.” Id. at AR 103-104. Indeed, as noted in this Court’s factual findings, neither
offeror submitted its full GSA FSS contract, nor did the RFQ require offerors to do so. See
generally Tab 3.3 at AR 101-04; Tab 4; Tab 5 (Insight Initial Quote, dated April 6, 2021); see also
supra pp. 10-11. Further, the Administrative Record does not support that either offeror objected
37
to the Navy’s process of using offerors’ self-provided Microsoft product and price list as opposed
to requiring submission of offerors’ full GSA FSS contracts. See Tab 3.3; Tabs 4-5.
The Navy complied with the Solicitation’s evaluation criteria by rationally relying on the
representations and documentation provided by both Insight and Dell Marketing. Such reliance is
generally standard practice in government procurements. See Allied Tech., 649 F.3d at 1330 (Fed.
Cir. 2011). “Where an offeror has certified that it meets the technical requirements of a proposal,
the Contracting Officer is entitled to rely on such certification in determining whether to accept a
bid.” Id. (internal quotation omitted).
The Navy’s reliance here was reasonably based on the representations and documentation
provided by Dell Marketing and the Navy’s own due diligence. First, Dell Marketing provided
detailed spreadsheets (i) identifying Microsoft products on its GSA Schedule and the pricing for
those products, and (ii) comparing the Solicitation’s stock-keeping unit numbers with those on
Dell Marketing’s Schedule. Tab 4 at AR 144, 181-800. Second, Dell Marketing certified that it
had the necessary products on its Schedule. Id. at AR 173 (“By responding to this RFQ, vendor is
certifying that all products listed in Attachment 2 are currently included on your GSA Multiple
Award Schedule (MAS) Contract (GS-35F-059DA And GS-35F-0884P*.”).
Third, Dell
Marketing submitted a letter from Microsoft referencing this Solicitation and confirming Dell
Marketing’s status as an authorized Microsoft reseller. Id. at AR 801. Fourth, the Navy conducted
its own independent analysis by comparing Dell Marketing’s submitted price list for the BPA to
Dell Marketing’s submitted evidence of inclusion on its FSS to ensure that Dell Marketing’s GSA
Schedule included the necessary products. See Tab 40 (Navy Response to GAO Request for
Information, dated July 13, 2021) at AR 4739. The Navy concluded that it did. Id. (“Almost all
of the SKUs and associated GSA prices listed on Dell’s BPA Attachment 2 – BPA Product and
38
Price List were matched using this method to the GSA SKUs and prices on Dell’s Consolidated
Microsoft Products excel.”); AR 4740 (confirming that all SKUs were “included on Dell’s
Microsoft Price List” and “the prices matched”). Thus, the Navy acted reasonably in relying on
Dell Marketing’s statements and spreadsheets, which reflected that its GSA Schedule contained
the necessary products to satisfy the RFQ. 14 Id. at AR 4740-41.
B. The Alleged Warning Signs Did Not Present “Significant Countervailing
Evidence” Requiring the Navy to Inspect Dell Marketing’s GSA Schedule
Second, there was no “significant countervailing evidence” requiring the Navy to review
Dell Marketing’s GSA Schedule. While an agency is permitted to rely on a bidder’s certification
“that it meets the technical requirements of a proposal . . . in determining whether to accept a bid,”
it should not accept a bid where there is “significant countervailing evidence reasonably known to
the agency evaluators that should create doubt whether the offeror will or can comply with the
requirement.” Allied Tech. Grp., 649 F.3d at 1330-31 (citation omitted). Accordingly, where a
bid “on its face” leads an agency “to the conclusion that an offeror could not and would not comply
with the [applicable requirement],” the agency has an obligation to independently determine
whether the bidder’s representations are accurate. Id. at 1330 (emphasis in original) (citation
omitted).
14
While Intervenor-Defendant understands Plaintiff to also argue in its initial MJAR that the
Solicitation should have, but did not, require the Navy to review bidders’ GSA Schedules, Plaintiff
clarified in its reply brief that it “does not suggest the evaluation scheme in the RFQ was
improper.” Int.-Def’s Mem. at 23-24; Plaintiff’s Response to Defendant’s and IntervenorDefendant’s Cross-MJARs and Reply In Support of Plaintiff’s MJAR (ECF No. 44) (Pl.’s Reply)
at 14. The Court agrees with Intervenor-Defendant that had Plaintiff raised such a claim, it would
have been untimely under Blue & Gold Fleet, L.P. v. United States, as “[v]endors cannot sit on
their rights to challenge what they believe is an unfair solicitation, roll the dice and see if they
receive award and then, if unsuccessful, claim the solicitation was infirm.” 492 F.3d 1308, 1314
(Fed. Cir. 2007). Plaintiff was required to raise such an objection to the express terms of the
Solicitation pre-award. Id.
39
Plaintiff points to seven alleged warning signs in Dell Marketing’s proposal that
purportedly demonstrate “significant countervailing evidence” that Dell Marketing’s GSA
Schedule may not have covered the duration of the BPA or may not have contained all the products
required by the Solicitation. Pl.’s Mem. at 26-28; see also Tab 3.3 at AR 101 (“Resellers shall
submit evidence of product inclusion on GSA schedule, i.e., a copy of your GSA approved Price
List.”), AR 102 (“Reseller must have a current General Services Administration (GSA) Federal
Supply Schedule (FSS) contract that covers the duration of the resultant Agreement.”). Plaintiff
contends that such alleged warning signs required the Navy to independently determine whether
Dell Marketing’s bid representations were accurate. See Pl.’s Mem. at 26. However, none of these
alleged warning signs meet the Allied Tech. “significant countervailing evidence” standard;
accordingly, none of the purported warning signs required further investigation by the Navy and
none would have required the Navy to request a copy of Dell Marketing’s full GSA Schedule to
determine whether it contained the products necessary for the procurement. Allied Tech. Grp., 649
F.3d at 1331. The Court will address each alleged warning sign in turn.
First, Plaintiff argues that a search of bidders on the GSA Advantage website, 15
www.gsaadvantage.gov, should have alerted the Navy that Dell Marketing purportedly did not
have the required products on its GSA Schedule, as required by the Solicitation. Pl.’s Mem. at 2627.
Specifically, Plaintiff contends that the Navy should have had concerns about Dell
Marketing’s GSA Schedule given “Dell Marketing does not even have the first part number from
the RFQ” listed on the GSA Advantage website and none of Dell Marketing’s products listed on
15
As described on GSA’s buying and selling tools website, the GSA Advantage website allows
“federal buyers” to view goods and services contractors provide and to “[s]hop [for] millions of
products and services … or research the market for selling.” https://www.gsa.gov/toolsoverview/buying-and-selling-tools (last viewed June 8, 2022).
40
the GSA Advantage website include required products 16 under the RFQ. See Pl.’s Mem. at 25-26.
However, Plaintiff fails to present evidence that other contractors produced their full GSA
Schedule on the GSA Advantage website, a circumstance that, if true, would certainly have
alarmed the Navy if offerors, such as Dell Marketing, did not follow suit. See generally Pl.’s Mem.
In fact, there is no evidence that Plaintiff’s hypothetical scenario exists. In stark contrast,
Defendants point to other authorized Microsoft Licensing Solution Providers, including Dell
Federal and CDW Government LLC, that, for various reasons, do not list any Microsoft products
on the GSA Advantage website. See Def.’s Cross-MJAR at 27; Int.-Def.’s Mem. at 32. Consistent
with that practice, Dell Marketing reasonably explained that it does not publish its full price list
on GSA Advantage given (i) its large size containing “over 300,000 [stock keeping units]” and (ii)
16
Defendant contends that the Court should not consider this “alleged warning sign” because the
GSA Advantage searches on which Plaintiff relies are not part of the Administrative Record.
Def.’s Cross-MJAR at 26. To the extent Plaintiff asks this Court to consider screenshots of GSA
Advantage searches attached to Plaintiff’s Reply in Support of its Motion to Complete the
Administrative Record (ECF No. 31), this Court agrees with Defendant that it will not consider
those screenshots as they are not a part of the Administrative Record. See Axiom Res. Mgmt., Inc.
v. United States, 564 F.3d 1374, 1381 (Fed. Cir. 2009) (explaining that the court is limited to
reviewing the administrative record under APA review to “guard against courts using new
evidence to convert the ‘arbitrary and capricious’ standard into effectively de novo review”
(internal citations and quotations omitted)); see also Exhibits 1-2 of Plaintiff’s Reply in Support
of its Motion to Complete the Administrative Record (ECF Nos. 31-1, 31-2) (containing GSA
searches performed by Plaintiff’s counsel that are not part of the Administrative Record).
Defendant argues that the Court’s inquiry should end there. Def.’s Cross-MJAR at 26. This Court
disagrees. The Administrative Record reflects that the Navy performed a search of the GSA
Advantage website, even though the screenshot of that search is not a part of the Administrative
Record. See Tab 63 (Vendor Submission Workbook) at AR 5565-67; Tab 70 (DoD Website Notice
of Contract Awards, June 4, 2021) at AR 6176. Given neither party contests the result of that
search — namely that Dell Marketing’s GSA Schedule products list was not posted on the GSA
Advantage website — this Court has a basis to conduct “meaningful judicial review” into whether
the omission of Dell Marketing’s products list on GSA Advantage’s website raises to the level of
“significant countervailing evidence.” Axiom Res. Mgmt., 564 F.3d at 1380; Allied Tech. Grp.,
649 F.3d at 1331; see generally Pl.’s Mem. at 25-26; Def.’s Cross-MJAR at 27; Int.-Def.’s Mem.
at 30-32; see also Nov. 17 Tr. at 74:4-7 (acknowledging on behalf of Defendant that Dell
Marketing’s complete pricing is not listed on the GSA Advantage website).
41
its “commercial practices change frequently.” Int.-Def.’s Mem. at 32 (citing Dell Marketing’s
Terms & Conditions); see also Def.’s Cross-MJAR at 27 (arguing the same). As Plaintiff presents
no evidence that it is routine for companies to post their entire GSA Schedule product list on the
GSA Advantage website, Plaintiff fails to establish that the absence of Dell Marketing’s Microsoft
products listed on the GSA Advantage website is “significant countervailing evidence” that would
lead the agency to doubt Dell Marketing’s representations concerning its ability to provide the
requisite products from its GSA FSS. Allied Tech. Grp., 649 F.3d at 1330-31.
Second, Plaintiff contends that Dell Marketing’s request to amend the Solicitation, to
permit Dell Federal and Dell Marketing to submit a bid under a Contractor Teaming Arrangement
(CTA), should have put the Navy on notice that Dell Marketing allegedly would not be able to
meet the requirements of the procurement. Pl.’s Mem. at 26. This claim similarly falls short as
Dell Marketing explicitly informed the Navy that it desired to submit a bid through a teaming
arrangement with Dell Federal because (i) Dell Federal’s FSS was set to expire in 2024 and did
not meet the Solicitation’s requirement that an offeror hold the requisite GSA Schedule for the
duration of the BPA, 17 and (ii) Dell Marketing was unable to handle classified orders, while Dell
Federal could do so. See Tab 3.6 (E-mail Chain regarding Dell Teaming Request, dated March
26-31, 2021) at AR 131-33. While these reasons rationally explain Dell’s request for a teaming
arrangement, neither explanation indicates that Dell Marketing lacked the required products on its
FSS. See Tab 3.1 at AR 31-32. Dell’s preference for submitting a bid under a CTA did not tell
the Navy anything about either entity’s ability to provide the procurement’s required products.
Accordingly, this alone cannot satisfy the “significant countervailing evidence” standard. Allied
Tech. Grp., 649 F.3d at 1330-31; see also Per Aarsleff A/S v. United States, 829 F.3d 1303, 1315
17
See supra pp. 6-7.
42
(Fed. Cir. 2016) (holding proposal based on teaming agreement would not put agency on notice
that the offeror “could not and would not” comply with the solicitation’s requirements (citation
omitted)).
Third, Plaintiff argues that Dell Marketing’s lack of a U.S. Department of Defense
Enterprise Software Initiative Blanket Purchase Agreement (DoD ESI BPA) indicates a defect
with Dell Marketing’s GSA Schedule. Pl.’s Mem. at 26. This claim is without merit as Dell
Marketing’s CTA and reliance on Dell Federal’s DoD ESI BPA are entirely consistent with the
Solicitation. As an initial matter, Dell Marketing is an “authorized [Microsoft] Licensing Solution
Partner” meaning that Dell Marketing is authorized “to sell Microsoft software to state, local, and
federal government customers,” as required by the Solicitation. Tab 4 at AR 801. Additionally,
the RFQ was amended to permit the use of CTAs, and Insight did not object to this amendment
pre-award. See Tab 3.3 at AR 101. Further, the Solicitation did not require a reseller to be a DoD
ESI BPA holder if its teaming partner held a DoD ESI BPA. Id. at AR 102 (“Reseller/ Teaming
Partner must be a DoD ESI BPA Holder for Microsoft Products and Azure Services.”). Since Dell
Federal is a teaming partner with a DoD ESI BPA, Dell Marketing’s proposal complied with the
Solicitation’s requirements. See Tab 34 (Navy Contracting Officer Statement of Facts and
Memorandum of Law, dated July 6, 2021) at AR 4704. Finally, under the circumstances here —
where its teaming partner satisfied the Solicitation requirement — it was immaterial that Dell
Marketing did not hold a DoD ESI BPA. Such a scenario did not inform the Navy about the
contents of Dell Marketing’s GSA Schedule. Thus, the absence of a Dell Marketing DoD ESI
BPA does not indicate “significant countervailing evidence” of a defect with Dell Marketing’s
GSA Schedule. Allied Tech. Grp., 649 F.3d at 1330-31.
43
Fourth, Plaintiff argues that Dell Marketing’s reference to “EA Pricing on GSA,” included
in Dell’s BPA Product and Price List, implied that Dell Marketing was using Dell Federal’s GSA
Schedule, rather than its own, to provide products under the procurement. Pl.’s Mem. at 26-27.
This argument is speculative and falls notably short of Allied Tech.’s “significant countervailing
evidence” test. Allied Tech. Grp., 649 F.3d at 1330-31. Plaintiff contends that “EA” means
“Enterprise Agreement” and refers to the DoD ESI BPA that is held by Dell Federal, while
Intervenor-Defendant contends “EA” commonly references enterprise pricing agreements, in
general, for large organizations. Pl.’s Mem. at 27; Int.-Def.’s Mem. at 29. Plaintiff fails to
establish why the use of “EA,” a common term in this arena, should be interpreted as specifically
referencing the DoD ESI BPA. Without providing a rationale for why the Navy should have
construed the term one way and not another, Plaintiff fails to present “significant countervailing
evidence” that “on its face” raises a red flag requiring further investigation. Allied Tech. Grp., 649
F.3d at 1330-31 (emphasis in original).
Fifth, Plaintiff argues that since the Navy knew that Dell Federal, rather than Dell
Marketing, typically sold enterprise software to the Government, Dell Marketing must not have
had all the requisite products on its GSA Schedule, as required by the Solicitation. Pl.’s Mem. at
27. This claim, which requires a large logical leap, similarly fails. Even assuming arguendo that
Dell Federal sold more enterprise software to the Government than Dell Marketing — an issue this
Court need not resolve — it would be of no moment, as it has no bearing on whether Dell
Marketing’s GSA Schedule covered the requisite Microsoft products mandated by the
Solicitation.18 Further, Plaintiff does not cite any authority reflecting that a general industry
18
Intervenor-Defendant contests Plaintiff’s premise that Dell Federal, rather than Dell Marketing,
is the entity that typically sells enterprise software to the Government. Int.-Def.’s Mem. at 29-30.
As noted, this Court need not evaluate the claim’s veracity as, even if true, the allegation would
44
sentiment or perception can constitute the type of “significant countervailing evidence” that would
require an agency to verify a bidder’s representations, upon which the agency is generally entitled
to rely. Allied Tech. Grp., 649 F.3d at 1330-31. Accordingly, this claim fails as well.
Sixth, Plaintiff argues that the Navy should have been aware that Dell Marketing allegedly
did not have all required products on its GSA Schedule given Dell Marketing submitted past
performance information solely for Dell Federal. Pl.’s Mem. at 27. However, Plaintiff fails to
account for the multitude of reasons why past performance data may be absent for the prime
contractor in a CTA. For example, the non-prime contractor may have performed more of these
types of contracts in the past, and thus had more relevant past performance data. Further, as
Intervenor-Defendant notes, the RFQ expressly permitted Dell to submit past performance
references from Dell Federal, rather than Dell Marketing. Int.-Def.’s Mem. at 30 (citing Tab 3.3
at AR 102 (permitting the “Reseller/Teaming Partner [to] submit 2” past performance references)).
It would be incongruous to suspect Dell Marketing of malfeasance for submitting precisely the
information that the RFQ permitted. Finally, Plaintiff has failed to demonstrate or cite any support
for the proposition upon which it seemingly relies — namely that the number of partner references
in comparison to the number of prime references can constitute “significant countervailing
evidence” that would trigger a duty to verify the bidder’s representations. Allied Tech. Grp., 649
F.3d at 1330-31. Accordingly, this claim similarly fails.
Seventh, Plaintiff argues that the CTA between Dell Marketing and Dell Federal was
invalid because Dell Federal allegedly could not supply the requisite products from its GSA
Schedule. Pl.’s Mem. at 27. Thus, based on Plaintiff’s hypothetical of an invalid CTA, Insight
fail to meet the Allied Tech. standard requiring further agency action. Allied Tech. Grp., 649 F.3d
at 1330-31; see also supra pp. 44-45.
45
contends that the Navy was required to independently review Dell Marketing’s GSA Schedule
because Dell Marketing purportedly could not have provided the requisite products under the
Solicitation without a valid CTA. See id. As an initial matter, Plaintiff’s premise is incorrect —
as explained below, the Solicitation did not require both CTA partners to provide products from
their respective GSA Schedules. See Tab 3.3 at AR 101-04; infra at pp. 46-48. As Dell’s CTA
was valid and neither the CTA nor the Solicitation required each team member to provide products,
any alleged failure by Dell Marketing to include in its proposal a list of products that would be
offered by Dell Federal does not present “significant countervailing evidence” triggering an
agency obligation to independently verify Dell Marketing’s representations about the contents of
its GSA Schedule. Allied Tech. Grp., 649 F.3d at 1330-31. As with Plaintiff’s other alleged
warning signs, this claim also fails.
Accordingly, the Navy did not err by declining to
independently review Dell Marketing’s GSA Schedule.
II.
Dell Marketing Has a Valid Contractor Teaming Arrangement with Dell Federal
Next, Plaintiff contends that Dell Marketing lacks a valid Contractor Teaming
Arrangement (CTA) with Dell Federal because under Dell’s proposal, Dell Federal does not supply
any products from its GSA Schedule. Pl.’s Mem. at 28-29. Defendants respond that Plaintiff’s
argument is (i) waived as untimely, 19 and (ii) lacks merit as both members of a CTA are not
required to supply products from their own GSA Schedules for the CTA to be valid. Def.’s CrossMJAR at 29-31; Int.-Def.’s Mem. at 32-37. While the timeliness issue falls in Plaintiff’s favor,
Defendants ultimately prevail on the merits of this argument.
19
The timeliness argument is raised by Intervenor-Defendant, but not by Defendant. Int.-Def.’s
Mem. at 32-37.
46
First, Intervenor-Defendant’s timeliness argument under Blue & Gold Fleet, 492 F.3d at
1313, is unavailing. Dell Marketing characterizes Plaintiff’s argument as a tardy objection to
Amendment 2 to the Solicitation, which permitted Dell Marketing to enter a CTA with Dell
Federal. See Int.-Def.’s Mem. at 33; Tab 3.3 at AR 101 (“Contractor Teaming Arrangements will
be accepted.”). Dell Marketing contends that Plaintiff waived this argument by failing to raise it
pre-award.
Int.-Def.’s Mem. at 33.
Dell Marketing mischaracterizes Plaintiff’s argument.
Plaintiff does not dispute that the Solicitation as amended allowed for teaming arrangements. See
Pl.’s Reply at 21 n.7 (“Insight has never claimed that ‘Dell Marketing could not enter a CTA with
Dell Federal.’” (quoting Int.-Def.’s Mem. at 33)). Rather, Plaintiff alleges that Dell Marketing did
not form a valid CTA with Dell Federal and thus should be ineligible for the award. See Pl.’s
Mem. at 28-29. Accordingly, as Plaintiff’s objection does not relate to the terms of the Solicitation,
Blue & Gold is inapplicable, and Plaintiff’s claim is timely. Blue & Gold, 492 F.3d at 1313.
Turning to the merits of Plaintiff’s claim, Plaintiff fails to cite any authority mandating that
each member of a CTA provide some products off its GSA Schedule for the CTA to be valid. See
Pl.’s Mem. at 28-29. This is likely because “[t]here is no FAR or [General Services Acquisition
Manual] FAR supplement regulation that actually provides any definition of what a CTA is and
what its elements must be. There is only [GSA’s] website.” Brooks Range Cont. Servs., Inc. v.
United States, 101 Fed. Cl. 699, 716 n.16 (2011) (citation omitted). While GSA’s website provides
useful guidance, it is not law and does not establish necessary elements for creating a valid CTA.
Brooks Range Cont. Servs., 101 Fed. Cl. at 716 n.16 (“Notwithstanding their mandatory phrasing,
the four elements [on GSA’s website] are not contained in [the Solicitation, the FAR, or in binding
precedent,] providing mandatory requirements for offerors.”). Further, the Solicitation does not
47
incorporate GSA’s website guidance for establishing a valid CTA. See Tab 3.3 at AR 101-04.
Thus, Dell’s CTA was not required to comply with guidance listed on GSA’s website.
However, even if satisfaction of GSA’s website guidance were required to create a valid
CTA, Dell Marketing’s CTA would clearly satisfy such requirements. GSA’s website lists four
elements for creating a CTA: (i) “[e]ach team member must have a GSA Schedule contract,” (ii)
“[e]ach team member is responsible for duties addressed in the CTA,” (iii) “[e]ach team member
has privity of contract with the government and can interact directly with the government,” and
(iv) “the buying entity is invoiced at each team member’s unit prices or hourly rates as agreed in
the . . . GSA Schedule BPA.” See https://www.gsa.gov/buying-selling/purchasing-programs/gsamultiple-award-schedule/schedule-features/contractor-team-arrangements (last viewed June 8,
2022). It is undisputed that both entities (i) have GSA Schedules, Tab 6.1 (Additional E-mails
between the Navy and Dell regarding Dell’s Quote, dated April 7-8, 2021) at AR 3301, (ii) are
responsible for duties under the CTA with Dell Federal providing services for secure orders and
Dell Marketing providing products, such as hardware and software, for all other orders, id., and
(iii) charge the Government based on Dell Marketing’s GSA Schedule, as indicated in the CTA.
Id. at AR 3312, 3302. Plaintiff contests only the “privity” element, arguing that Dell Federal is
not in privity of contract with the Government because a subcontractor could fulfill the secure
order requirements under the Solicitation. Pl.’s Reply at 19-20 (citing Winter v. FloorPro, Inc.,
570 F.3d 1367, 1371 (Fed. Cir. 2009) (“[S]ubcontractors are generally not in privity of contract
with the government.”)). This argument is not well taken.
Plaintiff does not allege that Dell Federal is operating as a subcontractor in this
procurement, nor could it as both Dell entities are teaming partners. See Pl.’s Reply at 19-20; Tab
6.1 at AR 3313. Rather, Plaintiff presents an unsupported argument that since a subcontractor
48
could provide the same services as Dell Federal, Dell Federal should be treated as a subcontractor,
and thus no privity exists between the Navy and Dell Federal. See Pl.’s Reply at 19-20. This
argument runs contrary to law. Privity of contract exists where “[t]he relationship between the
parties to a contract, allow[s] them to sue each other but prevent[s] a third party from doing so.”
Estes Exp. Lines v. United States, No. 11-597C, 2017 WL 3393298, at *9 (Fed. Cl. Aug. 8, 2017)
(quoting Privity of Contract, Black’s Law Dictionary (10th ed. 2014)). Direct privity is established
if the parties have a contractual relationship that evinces their intent to be bound. Estes Exp. Lines
v. United States, 739 F.3d 689, 693-94 (Fed. Cir. 2014) (finding privity of contract between the
Government and a federal motor carrier where no contract existed between the two, yet the
Government “expressly authorized, by contract its designation as a party to the bills of lading”
between the carrier and a third-party, and the Government accepted all shipments from the carrier
expressing its intent to be bound).
Direct privity exists between the Navy and Dell Federal. While this Court agrees with
Defendant that the “Government will not have ‘privity of contract’ with anyone for the BPA itself,”
since the Solicitation indicates that the Government is “under no obligation to exercise any options
contained in this BPA or any Order resulting from this BPA,” that changes when the Government
places an order from the BPA. Def.’s Cross-MJAR at 30 n.7; Tab 3.3 at AR 79; see also Crewzers
Fire Crew Transp., Inc. v. United States, 741 F.3d 1380, 1384 (Fed. Cir. 2014) (holding no privity
where the Government was not required to exercise its options by purchasing from the BPA and
the solicitation stated purchases from parties other than the BPA awardee would not violate the
Agreement). Once the Navy places orders from the BPA, it will be in privity with Dell Federal
and Dell Marketing — Dell Federal for fulfilling secure ordering needs and Dell Marketing for
“invoicing and payment for [s]oftware orders.” Tab 6.1 at AR 3313; see Zhengxing v. United
49
States, 204 F. App’x 885 (Fed. Cir. 2006) (holding BPAs create contractual obligations regarding
accepted orders); Mod. Sys. Tech. Corp. v. United States, 979 F.2d 200 (Fed. Cir. 1992) (holding
accepted orders from a BPA create enforceable obligations between the parties).
Privity will be established between the Government and Dell Federal as the latter is solely
“responsible for fulfilling any secure order requirements,” and Dell Marketing is not listed as
secondarily responsible for secure orders if Dell Federal fails to perform. Tab 6.1 at AR 3313
(emphasis added). Dell’s response to the Navy’s question about liability emphasizes this point by
indicating that “each individual team member [of the CTA] is responsible for their performance.”20
Id. at AR 3312. Since the Administrative Record clearly indicates that Dell Federal will be solely
responsible for secure orders under the CTA, and the Government selected Dell for the BPA with
knowledge of Dell’s CTA, a contractual relationship — and thus privity — will be established
between the Government and Dell Federal as soon as the Government places a secure order. Id.
at AR 3293 (describing responsibilities of Dell Federal and Dell Marketing to the Navy under the
CTA).
Finally, Plaintiff relies on the GAO’s decision in Veterans Healthcare to buttress its
argument that a valid CTA exists only where both partners provide products from their GSA
20
In its reply, Plaintiff argues for the first time that Dell’s CTA violated the FAR’s 8.4053(b)(1)(ii)(C) requirement that an “award is made in accordance with the basis for selection in the
RFQ.” Pl.’s Reply at 20 (quoting FAR 8.405-3(b)(1)(ii)(C)). First, Plaintiff waived this argument
by raising it for the first time in its reply brief. Novosteel SA v. U.S., Bethlehem Steel Corp., 284
F.3d 1261, 1274 (Fed. Cir. 2002) (“Raising the issue for the first time in a reply brief does not
suffice; reply briefs reply to arguments made in the response brief — they do not provide the
moving party with a new opportunity to present yet another issue for the court’s consideration.”
(emphasis in original)). Second, even if not waived, Plaintiff’s argument is based on an incorrect
premise that Dell Federal would not be in privity of contract with the Government. See Pl.’s Reply
at 20. Given that privity exists between Dell Federal and the Government, and the Solicitation did
not indicate that CTAs must comply with GSA’s website guidance, the Navy properly followed
the “basis for selection in the RFQ.” FAR 8.405-3(b)(1)(ii)(C); see also Tab 3.3 at AR 101-02.
50
Schedules. Veterans Healthcare, however, is inapposite to the proposition Plaintiff posits. The
GAO merely held that a solicitation requiring that each member of a CTA hold its own FSS
contract was “not unduly restrictive of competition or otherwise improper.” Veterans Healthcare
Supply Sols., Inc, B-409888, 2014 CPD ¶ 269, 2014 WL 4384601 at *3 (Comp. Gen. Sept. 5,
2014). Unlike the CTA at issue in Veterans Healthcare, Dell’s CTA contemplates that Dell
Federal would be in privity of contract with the Government to fulfill secure needs under the BPA,
while Dell Marketing would be in privity of contract with the Government to fulfill non-secure
product needs. Tab 6.1 at AR 3313. Significantly, unlike the solicitation’s CTA requirements in
Veterans Healthcare, the Solicitation here does not require each teaming partner to provide
products from its GSA Schedule. See Tab 3.3 at AR 101-04. Thus, the reasoning in Veterans
Healthcare is inapplicable to determining the validity of the CTA between Dell Marketing and
Dell Federal.
Having found, among other reasons discussed above, that both entities need not each
provide products from their respective GSA Schedules to create a valid CTA under this
Solicitation, the Court finds Dell Marketing and Dell Federal’s CTA valid.
III.
The Navy Conducted a Reasonable Past Performance Evaluation
Plaintiff objects to the Navy’s past performance evaluation, arguing that Insight should
have received (1) a “Substantial Confidence” — rather than a “Satisfactory Confidence” — Past
Performance rating (or “at a minimum a higher Confidence rating than Dell”), and (2) a “Very
Relevant” — rather than a “Relevant” — Relevance rating. Pl.’s Mem. at 29-31. Defendants
respond that the Navy reasonably evaluated the offerors’ past performance, but even if the
evaluation were unreasonable, Plaintiff’s claim would still fail for lack of prejudice. Def.’s CrossMJAR at 32-38; Int.-Def.’s Mem. at 37-41. Three issues arise out of Plaintiff’s objection to the
51
Navy’s past performance evaluation, all of which weigh in favor of Defendants: (i) whether
Insight’s Confidence rating was rationally assigned, (ii) whether Insight’s Relevance rating was
rationally assigned, and (iii) even assuming Insight’s ratings were irrationally assigned, whether
Insight was prejudiced.
In addition to the normal deference afforded to the agency under the Administrative
Procedure Act, even greater deference is given to an agency’s past performance evaluation. See
Active Network, LLC v. United States, 130 Fed. Cl. 421, 432 (2017) (“When reviewing an
evaluation of past performance in a negotiated procurement, the Court affords an agency, ‘the
greatest deference possible is given to the agency.’”), aff’d, 718 F. App’x 981 (Fed. Cir. 2018);
Westech Int’l, Inc. v. United States, 79 Fed. Cl. 272, 293 (2007) (same, referencing situation as “a
triple whammy of deference.”). In evaluating the agency’s expression of its discretion, the court
is “limited to determining whether the evaluation was reasonable, consistent with the stated
evaluation criteria and complied with relevant statutory and regulatory requirements.” Banknote
Corp. of Am. v. United States, 56 Fed. Cl. 377, 381 (2003), aff’d, 365 F.3d 1345 (Fed. Cir. 2004);
see also FAR 8.405-3(b)(1)(ii)(C) (requiring agencies to ensure that an “award is made in
accordance with the basis for selection in the RFQ”). Thus, mere disagreements with an agency’s
past performance evaluation fail to establish that the agency acted unreasonably. Active Network,
130 Fed. Cl. at 433; Fluor Intercontinental, Inc. v. United States, 147 Fed. Cl. 309, 329 (2020);
see also Newimar S.A. v. United States, No. 21-CV-1897, 2022 WL 1592813, at *30 (Fed. Cl. May
12, 2022) (explaining, in price reasonableness context, that “mere disagreement with the
[agency’s] conclusion . . . cannot sustain a protest”). Plaintiff fails to establish that its objections
to the Navy’s past performance evaluation amount to anything more than a disagreement with the
agency’s determination.
52
Servs., LLC v. United States, 153 Fed. Cl. 89, 126-134 (2021) (holding agency irrationally applied
ratings inconsistent with solicitation’s adjectival definitions); FFL Pro LLC v. United States, 124
Fed. Cl. 536, 555-57 (2015) (same). Instead, the Navy conducted a detailed review — considering
the precise differences Plaintiff references in its charts — by analyzing the parties’ sub-ratings and
narrative comments to determine that, while Insight’s past performance record was “slightly better
than Dell’s,” “[b]oth vendors’ past performance provided the Government with a reasonable
expectation that they will successfully perform the required effort.” Tab 12.1 at AR 4360, 437477. Plaintiff fails to demonstrate that the Navy’s ratings were inconsistent “with the stated
evaluation criteria and . . . with relevant statutory and regulatory requirements.” Banknote Corp.
of Am., 56 Fed. Cl. at 381. Indeed, the Navy acted well within its broad discretion in awarding
Insight and Dell Marketing their adjectival ratings.
Defendants contend that under Plaintiff’s mistaken, formulaic approach to past
performance analyses, the Navy would be required to merely add up each offeror’s numerical
ratings to determine its overall adjectival rating. Def.’s Cross MJAR at 35; Int.-Def.’s Mem. at
39. Plaintiff objects to that characterization of its argument, maintaining that it “is not arguing that
the Navy should have added scores together to find that Insight was rated higher than Dell.” Pl.’s
Reply at 21. Rather, Plaintiff contends that the Navy’s “failure to rate the proposals differently . .
. despite . . . significant differences, show a failure to meaningfully evaluate past performance at
all.” Id. at 22. This Court disagrees. Merely because the Navy “assigned [both] proposals the
same rating[] does not render the ratings per se improper.” Sys. Application & Techs., Inc., v.
United States, 100 Fed. Cl. 687, 719 (2011) (holding rational agency’s assignment of same
adjectival ratings to all three proposals despite differences), aff’d, 691 F.3d 1374 (Fed. Cir. 2012).
54
Further, the Court’s role is not merely to analyze the adjectival ratings in a vacuum. Rather,
it is this Court’s duty “to look beyond adjectival ratings because proposals with the same adjectival
rating are not necessarily of equal quality.” Id. (internal quotations and citation omitted). The
Administrative Record reflects that the Navy rationally assessed that it had a “reasonable
expectation” that both offerors could perform under the Solicitation based on their past
performance, and thus awarded both offerors the same “Satisfactory Confidence” rating despite
any differences. Tab 12.1 at AR 4375; see also SDS Int’l v. United States, 48 Fed. Cl. 759, 769
(2001) (holding agency may use its judgment to weigh various factors in awarding an adjectival
rating).
The cases on which Plaintiff relies do not alter this Court’s analysis. For example, unlike
here where the Navy’s RFQ lacked adjectival definitions for Past Performance Confidence ratings,
in Plaintiff’s cited cases, Mortgage Contracting Services and FEL Pro LLC, the solicitations
expressly defined adjectival ratings. Compare Tab 3.3 at AR 103, with Mortg. Contracting Servs.,
LLC v. United States, 153 Fed. Cl. 89, 126-134 (2021), and FFL Pro LLC v. United States, 124
Fed. Cl. 536, 555-57 (2015). Thus, Mortgage Contracting Services and FEL Pro LLC’s holdings,
that the agencies improperly assigned adjectival ratings based on solicitation definitions, are
inapposite here where no such definitions exist. Mortg. Contracting Servs., 153 Fed. Cl. at 126134; FFL Pro, 124 Fed. Cl. at 555-57. Further, while in its EFW, Inc. decision, the GAO found
past performance ratings irrational where the agency had stated that it “will not . . . discuss[]
further” why both offerors were assigned the same adjectival rating, here the Navy fully explained
that it found Insight’s past performance “slightly better” than Dell’s, yet awarded the bidders the
same adjectival rating because it reasonably believed both would be able to perform under the
contract. EFW, Inc., B-412608, B-412608.2, 2016 CPD ¶ 304, 2016 WL 6919877, at *9-10
55
(Comp. Gen. Apr. 7, 2016) (citation omitted); see Tab 12.1 at AR 4360. Given in EFW, unlike
here, the agency provided no explanation for assigning the same ratings, that GAO decision is
readily distinguishable.
Finally, that Plaintiff — or even this Court — may have assessed different adjectival ratings
had it done so itself is of no import. This Court does not undergo a de novo review in an APA bid
protest such as this one. Banknote Corp. of Am., 56 Fed. Cl. at 381 (analyzing whether past
performance evaluation was reasonable); CSE Const. Co. v. United States, 58 Fed. Cl. 230, 252
(2003) (same). Rather, the Court determines whether the agency action was reasonable while
affording the agency the “greatest deference possible.” Active Network, 130 Fed. Cl. at 432
(citation omitted); see Impresa, 238 F.3d at 1332 (applying reasonableness standard in APA
review). As past performance evaluations “are not subject to a mathematical calculation,” and the
Navy engaged in a reasonable analysis to support its evaluation, the Navy was generally entitled
to use its judgment in assigning adjectival ratings. See Glenn Def. Marine (ASIA), PTE Ltd. v.
United States, 720 F.3d 901, 909 n.6 (Fed. Cir. 2013) (deferring to agency’s discretion in weighing
sub-scores and narrative comments before assigning adjectival rating). Accordingly, this Court
defers to the Navy’s reasonable judgment here concerning Insight’s Confidence rating.
B. The Navy Rationally Assigned Insight’s Relevance Rating
Second, the Navy rationally assigned Insight’s Relevance rating. Plaintiff contends that it
should have received a “Very Relevant,” rather than a “Relevant,” Relevance rating because its
past performance references were valued at more than $50 million per year and thus were “similar”
to the BPA, as defined by the Solicitation. Pl.’s Mem. at 30-31 (citing Tab 8.8 (Insight CPARs)
at AR 3466-77). In essence, Plaintiff argues that the Navy acted contrary to the terms of the
Solicitation by discounting its past performance relative to the Solicitation’s Relevancy
56
definitions. See id. Again, as explained further below, Plaintiff’s argument amounts to a
disagreement with the Navy’s decision; that is insufficient to find the evaluation arbitrary and
capricious. Active Network, 130 Fed. Cl. at 433; Fluor Intercontinental, 147 Fed. Cl. at 329.
The Navy’s Relevance rating is “owed deference as it is among the minutiae of the
procurement process.” Glenn Def. Marine, 720 F.3d at 911 (citations and internal quotations
omitted) (deferring to agency’s finding that bidder’s past performance was relevant as it involved
“many of the same ports” as the solicitation and provided services “similar to the services required
by th[e] [s]olicitation”). Significantly, FAR 15.305(a)(2)(ii) leaves “what does or does not
constitute ‘relevant’ past performance [to the agency’s] considered discretion.” PlanetSpace, Inc.
v. United States, 92 Fed. Cl. 520, 539 (2010) (citing FAR 15.305(a)(2)(ii)). For the reasons
discussed below, the Navy applied such “considered discretion” in assigning Insight a Relevance
rating of “Relevant.” Id.; Tab 12.1 at AR 4374.
The Solicitation indicates that Relevance is evaluated based on “size” and “scope,” with
“similar size . . . valued at approximately $50M or greater per year, and similar scope . . .
includ[ing] any award that is agency/component-wide, multi-agency, or department-wide.” Tab
3.3 at AR 103. Significantly, Plaintiff’s argument rests on “size” alone without taking into account
the “scope” of those projects, as required by the Solicitation. See Pl.’s Mem. at 30-31; Tab 3.3 at
AR 103. As Plaintiff argues that the agency acted contrary to the terms of the Solicitation, it needs
to demonstrate that the Navy failed to adhere to the Relevancy definition by insufficiently rating a
project with a similar “size” and “scope.” See Banknote Corp. of Am., 56 Fed. Cl. at 381 (analyzing
solicitation requirements to determine whether the agency acted rationally); see also Pl.’s Mem at
30-31. Since Plaintiff does not argue that its projects were similar in “scope” to the BPA, its claim
cannot establish that the Navy irrationally evaluated Relevance. See Pl.’s Mem. at 30-31. In fact,
57
as noted below, the “scope” of Insight’s past projects was significantly narrower than the BPA, a
fact that supports finding that the Navy acted rationally. Plaintiff’s failure to critique the Navy’s
“scope” evaluation renders the claim meritless.
Further, since the Solicitation does not define the various Relevance ratings and does not
indicate whether projects of similar “size” and “scope” should be rated as “Somewhat Relevant,”
“Relevant,” or “Very Relevant,” the Navy had the discretion to determine how to rate offerors’
past projects. See Tab 3.3 at AR 103; DynCorp Int’l LLC v. United States, 139 Fed. Cl. 481, 48990 (2018) (agreeing with GAO that agencies are entitled to “greater discretion” in evaluating
relevancy when solicitation does not “expressly define” it). While Insight’s past projects were
valued at $256 million and $227 million annually (i.e., “size”), each serving one component of the
U.S. Department of Defense (i.e., “scope”), the BPA at issue here is valued at approximately $680
million annually (i.e., “size”), potentially serving the entire U.S. Department of Defense (i.e.,
“scope”). Compare Tab 5 at AR 807-10 (Insight’s past project’s pricing), with Tab 3.3 at AR 80
(BPA estimated pricing); see also Tab 3.1 at AR 10. Given the significant gap between the
respective “size” and “scope” of the BPA and Insight’s past projects and affording the “greatest
deference possible” to agencies conducting past performance evaluations, this Court holds the
Navy acted rationally in assigning Insight a “Relevant” rating. See Active Network, 130 Fed. Cl.
at 432-33; Westech Int’l, 79 Fed. Cl. at 293.
C. Plaintiff Was Not Prejudiced by Any Error in the Navy’s Past Performance
Evaluation
Third, even assuming arguendo that the Navy committed errors in assigning its Confidence
and Relevance ratings to Insight’s past performance, such errors were non-prejudicial. As Plaintiff
must establish prejudice to succeed in its bid protest, this claim must also fail for lack of prejudice.
Impresa, 238 F.3d at 1333. To establish prejudice, “a protestor must show that but for that error,
58
the protestor had a substantial chance of receiving a contract award.” Off. Design Grp. v. United
States, 951 F.3d 1366, 1373–74 (Fed. Cir. 2020). Plaintiff has not demonstrated that it would have
received the award “but for” either of the alleged errors in the Navy’s past performance evaluation.
The Navy clearly explained when it was making the procurement decision that price was more
important than the past performance ratings. Tab 3.3 at AR 102. Accordingly, it awarded the BPA
to Dell Marketing, even though Insight had “slightly better” past performance reviews, because
Dell Marketing’s proposal was approximately $87 million less than Insight’s bid. Tab 12.1 at AR
4360 (“[A]lthough Insight’s past performance was slightly better than Dell’s, it was not enough to
overcome almost an $87M price difference.”). Significantly, the Navy noted that “at best”
Insight’s “slightly better” past performance review would “be worth a slightly higher price (no
more than $5 million over the course of 5 years),” an amount insufficient to overcome the bidders’
$87 million price variance. Id. As agencies have “broad discretion in making a price/technical
tradeoff,” this Court defers to the Navy’s conclusion that Insight’s “slightly better” past
performance was worth “no more than $5 million over the course of 5 years.” Bahrain Mar. &
Mercantile Int’l BSC (C) v. United States, 118 Fed. Cl. 462, 480 (2014); Tab 12.1 at AR 4360. In
fact, the Navy went beyond the FAR’s requirements in conducting its tradeoff, as an “agency need
neither assign an exact dollar value to the worth associated with the technical benefits of a contract
nor otherwise quantify the non-cost factors.” Serco Inc. v. United States, 81 Fed. Cl. 463, 497
(2008) (citing FAR § 15.308).
Furthermore, Insight has not demonstrated that Dell Marketing’s Relevance ratings would
not similarly be affected in a positive manner if the Navy calculated its Relevance ratings in the
manner Plaintiff suggests.
Applying Plaintiff’s preferred rating method, Dell Marketing’s
Relevance rating may very well have also shifted from “Relevant” to “Very Relevant” given its
59
past performance references were respectively valued at over $350 million and over $200 million
annually (i.e., “size”), with the contracts respectively covering the entire U.S. Department of
Defense and various components within the Department (i.e., “scope”). Tab 4 at AR 145-46.
Thus, it is likely that even under Plaintiff’s desired calculation method, Insight and Dell Marketing
would have received identical ratings. Accordingly, the Court holds that even if the Navy had
erroneously conducted its past performance evaluation — which it did not — Plaintiff’s claim
would nevertheless fail for lack of prejudice. Off. Design Grp., 951 F.3d at 1373–74.
IV.
The Navy’s Conduct Does Not Demonstrate Improper Favoritism Toward Dell Marketing
Plaintiff next argues that the Navy conducted a flawed procurement process by displaying
favoritism toward Dell Marketing in three respects: (1) improperly responding to Dell Marketing’s
question sent after the Solicitation’s deadline, Pl.’s Mem. at 32-34; (2) engaging in disparate
treatment by permitting Dell Marketing to correct a deficiency in its proposal after the Solicitation
deadline while not engaging in similar discussions with Insight, id. at 34-36; and (3) improperly
accepting Dell Marketing’s late initial proposal. Id. at 36-37. These arguments lack merit.
As an initial matter, this Court finds Plaintiff’s arguments remarkable given the Navy
initially awarded this contract, worth more than $2.5 billion, to Insight. See Tab 10.1 (Notice of
BPA Award to Insight, dated May 21, 2021). Further, there is no inkling of favoritism in the
Administrative Record. Significantly, at issue here are the Navy’s communications with Dell
Marketing between March 26, 2021, and April 8, 2021, which occurred before the Navy originally
awarded the procurement to Insight on May 21, 2021. Id. It was only after the Navy realized that
Insight had failed to comply with the Solicitation by underbidding by tens of millions of dollars
that the Navy undertook corrective action. See Tab 11.1 (E-mails regarding Suspension of Insight
Award and Submission of Revised Price Lists, dated May 27-28, 2021) at AR 3523-26. Thus, this
Court agrees with Defendant that had the Navy been truly biased against Insight, it likely would
60
not have initially awarded Insight the procurement, as the Navy did here. See Def.’s Cross-MJAR
at 49.
Turning to the specifics of Plaintiff’s argument, Plaintiff contends that the Navy violated
FAR 1.602-2(b) 21 and 3.101-1, 22 which require contracting officers to act impartially during the
procurement process. Pl.’s Mem. at 31-32. In essence, Plaintiff makes an allegation of bad faith.
Defendants respond that Plaintiff’s claim of bad faith is unsupported by the record. See Def.’s
Cross-MJAR at 38-39; Int.-Def.’s Mem. at 41-42. This Court agrees with Defendants. There is a
“strong presumption in the law that administrative actions are correct and taken in good faith” and
can be rebutted only with “almost irrefragable proof.” Sanders v. United States Postal Serv., 801
F.2d 1328, 1331 (Fed Cir. 1986); Galen Med. Assocs., Inc. v. United States, 369 F.3d 1324, 1330
(Fed. Cir. 2004) (citation omitted). Plaintiff fails to overcome that presumption. The Court
addresses Plaintiff’s three specific contentions concerning purported favoritism in turn.
A. The Navy Permissibly Responded to Dell Marketing’s Inquiry After the
Solicitation’s Deadline for Question Submissions
First, it was proper for the Navy to respond to Dell Marketing’s inquiry, submitted after
the Solicitation’s deadline for accepting questions. While the Solicitation set a March 25, 2021
2:00 p.m. PDT deadline for bidders to “[s]end RFQ questions” to the Navy, Tab 3.1 at AR 33, Dell
21
“Contracting officers shall [e]nsure that contractors receive impartial, fair, and equitable
treatment.” FAR 1.602-2(b).
22
“Government business shall be conducted in a manner above reproach and, except as authorized
by statute or regulation, with complete impartiality and with preferential treatment for none.
Transactions relating to the expenditure of public funds require the highest degree of public trust
and an impeccable standard of conduct. The general rule is to avoid strictly any conflict of interest
or even the appearance of a conflict of interest in Government-contractor relationships. While
many Federal laws and regulations place restrictions on the actions of Government personnel, their
official conduct must, in addition, be such that they would have no reluctance to make a full public
disclosure of their actions.” FAR 3.101-1.
61
Marketing sent an email to the Navy on March 26, 2021, a day after that deadline, requesting the
Navy modify the Solicitation to permit Dell Marketing or Dell Federal to compete for the contract
by permitting bids based on CTAs. 23 Tab 3.6 at AR 131-33. The Navy responded by amending
the Solicitation enabling Dell Federal to compete based on its CTA with Dell Marketing and
extending the quote submission deadline. See Tab 3.6 at AR 137.
Plaintiff characterizes this email exchange between the Navy and Dell Marketing as a series
of purportedly “secret communications” that were improper because (i) Dell Marketing’s inquiry
was sent outside the timeframe established by the Solicitation for accepting questions, (ii) Dell
Marketing’s question and the Navy’s response were not disclosed to Insight, and (iii) Insight’s
“timely questions” were shared with all offerors while Dell Marketing’s late question was “kept
secret” allegedly prejudicing Insight’s ability to fairly compete for the contract. Pl.’s Mem. at 3234. This Court is unpersuaded by Plaintiff’s arguments and finds the Navy’s actions reasonable
and permissible.
First, Plaintiff cites no authority to support its claim that an agency is barred from
responding to correspondence after the expiry of a question submission deadline. 24 Instead,
Plaintiff cites cases and FAR provisions that generally reference the unremarkable principle that
23
Plaintiff contends Dell Marketing likely sent this question after realizing Dell Federal was
ineligible for the procurement because it lacked a GSA Schedule that covered the entirety of the
BPA, as required by the Solicitation. Pl.’s Mem. at 32; see Tab 3.3 at AR 102 (requiring GSA
Schedule cover the duration of the BPA). The sufficiency of Dell Marketing’s GSA Schedule and
CTA with Dell Federal is addressed in Discussion Sections I and II. See supra pp. 36-51.
24
While Defendant characterizes Dell Marketing’s March 26, 2021 email to the Navy as a
“request” to amend the Solicitation, rather than a “question” seeking clarifications of the terms of
the Solicitation, this Court need not resolve that semantics issue as the Navy acted within its
discretion in responding to the email even if construed as a question. See Def.’s Cross-MJAR at
40-41 (arguing that the form and substance of the email reflect a “request” rather than a
“question”).
62
all bidders should be treated equally and fairly. See generally Pl.’s Mem. at 33-34. However,
FAR 1.102-2(c)(3) provides that “prospective contractors shall be treated fairly and impartially
but need not be treated the same.” Thus, the Navy was free to treat Dell Marketing and Insight
differently if both were treated fairly. Plaintiff fails to demonstrate that the Navy treated it unfairly.
The Navy responded to Dell Marketing based on the particular issue it raised — namely, amending
the Solicitation to permit Dell Federal to compete for the procurement via a CTA with Dell
Marketing. See Tab 3.6 at AR 131-34. This was not an issue similarly raised by Insight as Insight
did not require or seek a CTA to compete for the procurement. See Tab 11.6 (Insight Final Pricing,
submitted May 30, 2021 (attachment to Tab 11.19 (E-mail transmitting Insight’s Final Pricing,
dated May 30, 2021))).
Further, the nature of Dell Marketing’s question necessitated a response by the Navy. Dell
Marketing requested the Navy “expand [its] competition base” to avoid “limit[ing] competition in
an already limited field of Microsoft Licensing Solution Providers” by permitting Dell Federal to
submit a bid under a CTA. Tab 3.6 at AR 132. Based on the nature of the request, the Navy could
have rationally concluded that Dell was alleging that the Solicitation “unduly restrict[ed]
competition.” Oracle Am., Inc. v. United States, 975 F.3d 1279, 1295 (Fed. Cir. 2020); see also
Veterans Healthcare, 2014 WL 4384601, at *2 (“Where a protester challenges a solicitation
provision as unduly restrictive of competition, the procuring agency must establish that the
provision is reasonably necessary to meet the agency’s needs.”). As a claim of unduly restricting
competition can be the basis for a bid protest, see Oracle, 975 F.3d at 1295, the Navy had an
obligation under the FAR to “use [its] best efforts to resolve concerns raised by an interested party
at the contracting officer level through open and frank discussions . . . [p]rior to submission of an
agency protest.” FAR 33.103(b). Similarly, the Navy’s Solicitation amendment permitting bids
63
based on CTAs, Tab 3.3 at AR 101, was an “exercise [of its] sound business judgment” to ensure
competition, which is expressly permitted under the FAR. FAR 1.102(d).
Significantly, in assessing Plaintiff’s claim of favoritism the “proper inquiry [for this
Court] is not whether the FAR authorizes” a specific practice, “but whether there is any statutory
or regulatory provision that precludes” the practice. Tyler Const. Grp. v. United States, 570 F.3d
1329, 1333 (Fed. Cir. 2009).
While Plaintiff characterizes the Navy’s response to Dell
Marketing’s late question as “improper,” it cites no statutory or regulatory provision precluding
the Navy from doing so, and this Court is unaware of any such provision. Pl.’s Mem. at 33; see
also Savantage Fin. Servs., Inc. v. United States, 158 Fed. Cl. 240, 249 (2022) (holding, in context
of “late is late” rule analysis, agency acted within its discretion in accepting two bidders’ final
proposals submitted past the deadline where those proposals had “no effect on price, quantity,
quality, or delivery” from initial timely submissions). Further, the Solicitation did not limit the
Navy’s response. While the Solicitation set a March 25, 2021 deadline for potential bidders to
“[s]end RFQ questions” to the Navy, it did not restrict the Navy from responding to late
submissions. Tab 3.1 at AR 33; Tab 3.3 at AR 103. Thus, the Navy did not “act contrary to the
Solicitation” by exercising its discretion in choosing to respond to Dell Marketing’s question sent
after the March 25, 2021 deadline. Linc Gov’t Servs., LLC v. United States, 108 Fed. Cl. 473, 490
(2012) (finding agency did not act “contrary to the [s]olicitation” in accepting proposal that “did
not conform to the price realism range” given the solicitation’s permissive language provided
agency discretion whether to accept or reject nonconforming bid).
Second, the Navy was not required to disclose to Insight Dell Marketing’s March 26, 2021
email or the Navy’s response as there is no authority requiring an agency to reveal communications
concerning one bidder’s submission with other bidders where the communications do not create
64
an unfair advantage. While Plaintiff cites Serco Inc. v. United States, 81 Fed. Cl. 463, 482 (2008)
to argue to the contrary, Serco is inapposite. Pl.’s Mem. at 33. The portion of Serco Plaintiff cites
references an agency’s obligation to analyze contractors’ past performance “evenhandedly against
common requirements and evaluation criteria.” Serco, 81 Fed. Cl. at 482 (citation omitted). Serco
does not discuss an agency’s purported obligation to reveal a bidder’s agency correspondence to
other bidders, and thus is inapplicable here. In fact, FAR 1.102-2(c)(3) illustrates the opposite as
it does not require an agency to treat all offerors “the same,” and the Solicitation does not contain
a clause requiring such blanket disclosure. FAR 1.102-2(c)(3); Tab 3.1; Tab 3.2 (Amendment 1
to RFQ, dated March 24, 2021); Tabs 3.3-3.4. Thus, the Navy had discretion to choose which
questions and answers to disclose to all offerors based on content.
Contrary to Plaintiff’s contention that the Navy shared Insight’s questions and answers
while keeping its correspondence with Dell Marketing “secret,” Pl.’s Mem. at 33, the
Administrative Record demonstrates that the Navy complied with FAR 1.102-2(c)(3), “treat[ing]
[both offerors] fairly and impartially,” by disclosing questions and answers from both Insight and
Dell Marketing that sought clarification about the terms of the Solicitation. Tab 3.5 (Insight and
Dell Questions on RFQ, dated March 19-30, 2021) at AR 125-29; Tab 42 (Insight Comments on
Agency Report, dated July 16, 2021) at AR 4806-07. The Navy was simply obligated to disclose
to all bidders any changes it made to the Solicitation based on correspondence with Dell
Marketing; the Navy did so on March 31, 2021. See Tab 3.3; FAR 15.206(b) (“Amendments
issued before the established time and date for receipt of proposals shall be issued to all parties
receiving the solicitation.”).
Third, even if Plaintiff had established that the Navy improperly exhibited favoritism for
Dell Marketing via its response to Dell Marketing’s March 26, 2021 email — which, it has not —
65
its claim would still fail for lack of prejudice. To establish prejudice, a plaintiff must prove that
there is a “substantial chance” it would receive the award in the absence of the allegedly unequal
treatment. WellPoint Mil. Care Corp. v. United States, 953 F.3d 1373, 1380 (Fed. Cir. 2020).
Plaintiff’s contention that it is prejudiced because “Dell Marketing was allowed to compete for the
BPA despite the fact that it should have been ineligible” lacks merit. Pl.’s Reply at 25. First,
Plaintiff provides no rationale for why Dell Marketing would become ineligible for the award
based solely on the Navy’s decision, made reasonably in its discretion, to respond to Dell
Marketing’s late question. Second, Plaintiff fails to demonstrate that Insight would have had a
“substantial chance” of receiving the award if, as Insight contends, the Navy (i) was somehow
legally restricted from responding to Dell Marketing’s late question, or (ii) was obligated to inform
Insight of Dell Marketing’s CTA correspondence with the Navy. Indeed, any hypothetical result
in either scenario would be, at best, highly speculative, and would likely not have resulted in an
award to Insight or other corrective action. Accordingly, even assuming Insight’s legal position
here has merit, at best the result would simply have placed Plaintiff in the same position it finds
itself in here; again, with a second opportunity to bid for the contract after the Navy realized Insight
underpriced its original bid. See Tab 11.1 at AR 3523-26. Plaintiff is not able to demonstrate
prejudice stemming from these allegations.
B. The Navy Properly Communicated with Dell Marketing About a Deficiency in its
Proposal
Second, Plaintiff contends that the Navy acted improperly by asking Dell Marketing in an
April 7, 2021 email to correct a deficiency in its proposal by adding the details of the CTA to its
proposal, while not requesting Insight to do the same. Pl.’s Mem. at 34-36. Plaintiff characterizes
the Navy’s April 7 email and Dell Marketing’s response later that day, Tab 6.1 at AR 3285-86, as
“discussions” under FAR 15.306 and contends that the Navy engaged in “disparate treatment” in
66
violation of that provision by communicating with one bidder and not the other. Pl.’s Mem. at 35.
This argument lacks merit.
While FAR 15.306(d)(1) requires contracting officers to engage in “discussions” with
“each offeror within the competitive range,” that provision is not applicable to this Federal Supply
Schedule procurement conducted under FAR subpart 8.4. See FAR 8.404(a) (“Parts 13 . . ., 14,
15, and 19 . . . do not apply to BPAs or orders placed against Federal Supply Schedules
contracts.”); see also Tab 3.3 at AR 101. Thus, the Navy was not required to comply with FAR
15.306 , as Insight contends.
Assuming arguendo that FAR 15.306 applied to this procurement, the communication
between the Navy and Dell Marketing concerning its submission of the details of its CTA would
nevertheless still be proper because (i) Dell Marketing’s omission of a CTA in its initial proposal
was not a significant deficiency – triggering a “discussion” about the solicitation under the FAR –
since the RFQ did not require a CTA, and (ii) even if properly characterized as a “discussion,” it
was “tailored to [the] offeror’s proposal” consistent with FAR 15.306(d)(1).
FAR 15.306 distinguishes between “discussions” that “are tailored to each offeror’s
proposal, and must be conducted by the contracting officer with each offeror within the
competitive range,” FAR 15.306(d)(1), and “clarifications” that “are limited exchanges, between
the Government and offerors, that may occur when award without discussions is contemplated.”
FAR 15.306(a). While the “acid test for deciding whether discussions have been held is whether
it can be said that an offeror was provided the opportunity to revise or modify its proposal,” the
Federal Circuit has also recognized that “[t]here is no requirement in the regulation that a
clarification not be essential for evaluation of the proposal.” Davis Boat Works, Inc. v. United
States, 111 Fed. Cl. 342, 353–54 (2013) (cleaned up); Info. Tech. & Applications Corp. v. United
67
States, 316 F.3d 1312, 1323 (Fed. Cir. 2003). Importantly, the agency’s characterization of its
communications with a bidder, as “discussions” or “clarifications,” is entitled to deference. Info.
Tech. & Applications Corp., 316 F.3d at 1323 (deferring to agency’s interpretation of its own
regulation).
The Navy’s communications with Dell Marketing, requesting that the latter submit “details
of the teaming arrangement,” are properly construed as “clarifications,” rather than “discussions.”
See Tab 6.1 at AR 3279-85. As the Solicitation did not require CTAs, and thus would not have
listed CTAs under “required documents,” Dell Marketing’s failure to submit the details of its CTA
with its initial bid would not have rendered that submission deficient. Tab 3.3 at AR 101-04.
Significantly, Dell Marketing informed the Navy that it would be relying on a CTA in its initial
proposal. Tab 4 at AR 140 (“In order to fulfil [sic] any security requirements, DMLP has entered
into a GSA teaming agreement with Dell Federal Systems L.P. (DFSLP) using DFSLPs GSA
Schedule number is GS-35F-0884P.”). In fact, the Navy noted in its April 7, 2021 email to Dell
Marketing that “Dell Marketing identified a teaming arrangement with Dell Federal L.P.” in its
initial proposal, and that the Navy was now requesting the “details of [that] teaming arrangement.”
Tab 6.1 at AR 3279. This request for additional, descriptive information can reasonably be
described as seeking a “clarification.”
Relatedly, the communications do not qualify as “discussions” because the Navy’s request
for Dell Marketing to supplement its initial proposal with the CTA details did not allow Dell
Marketing to “revise or modify its proposal.” Davis Boat Works, 111 Fed. Cl. at 353-54. In
response to the Navy’s email, Dell Marketing could not change its pricing, submit new past
performance reviews, or change other parts of its submission. Rather, the Navy requested
68
additional information only about a CTA of which Dell Marketing had already informed the Navy
in its initial proposal. See Tab 4 at AR 140.
Plaintiff relies on a GAO decision in Defense Base Services, Inc., to argue that “if an offeror
[chooses] to team with another entity, information explaining the CTA [is] needed” when
submitting its bid. Pl.’s Reply at 26 (citing Defense Base Services, 2017 WL 3263329); see also
Pl.’s Mem. at 34. Plaintiff’s reliance on Defense Base Services is misplaced. Unlike in Defense
Base Services, where the GAO held that missing information about a teaming agreement required
by the solicitation is a significant deficiency that amounts to a “discussion,” here, as previously
mentioned, the Solicitation did not require the submission of a CTA. Defense Base Services, 2017
WL 3263329, at *3 n.3; Tab 3.3 at AR 101. Further, even if Defense Base Services applied to
circumstances where a CTA was not required by the solicitation, this Court would still defer to the
Navy’s rational characterization of its communication with Dell Marketing as seeking a
“clarification.” Info. Tech. & Applications Corp., 316 F.3d at 1323.
Even assuming arguendo that these communications between the Navy and Dell Marketing
amounted to “discussions,” the Navy nevertheless complied with FAR 15.306(d)(1) by ensuring
its “discussions” were “tailored to [the] offeror’s proposal.”
FAR 15.306(d)(1). While Dell
Marketing indicated in its initial proposal that it would rely on a CTA, Insight did not. See Tab 4
at AR 140; see generally Tab 5. Thus, the Navy rationally followed up only with Dell Marketing
about information underlying the CTA because only Dell Marketing indicated that it would be
using a CTA. The Navy would have no reason to follow up with Insight about a CTA when Insight
had not indicated in its initial proposal that it would be using one. Id.
Finally, even if FAR 15.306 applied to this procurement — which it does not — and even
if the April 7, 2021 communications between the Navy and Dell Marketing about a CTA violated
69
FAR 15.306 — which they do not — Insight was not prejudiced because its proposal did not
contain errors that it could remedy had the Navy provided that opportunity. See WellPoint Mil.
Care Corp., 953 F.3d at 1380. Dell Marketing’s proposal relied on a CTA; Insight’s did not. Thus,
Plaintiff cannot meet its burden of demonstrating that it would have had a “substantial chance” of
receiving the award “in the absence of the allegedly unequal treatment” as the Navy had nothing
to communicate with Insight regarding a CTA. Id.
C. The Navy Properly Accepted Dell Marketing’s Initial Proposal
Third, the Navy did not err in accepting Dell Marketing’s initial proposal. Plaintiff
contends that Dell Marketing “should not have been eligible for [the] award because its [initial]
proposal did not comply with the RFQ requirements within the time frame required by the RFQ.”
Pl.’s Mem. at 36. Plaintiff’s contention is misplaced.
At the outset, Plaintiff’s claim lacks merit because Dell Marketing’s April 2021 submission
involved an initial proposal deadline, not a final proposal deadline. In fact, Dell Marketing and
Insight were each provided an opportunity to revise their proposals prior to May 6, 2021, after the
early April 2021 initial submission at issue here. See Tab 7.1 (Additional E-mails between the
Navy and Dell regarding Dell’s Quote, dated May 4-6, 2021) at AR 3340; Tab 7.2 (Additional Emails between the Navy and Insight regarding Insight’s Quote, dated May 4-6, 2021) at AR 3357.
The timing of Dell Marketing’s initial proposal submission is immaterial as an “evaluation of [a
bidder’s] initial proposal is irrelevant” after final proposals have been submitted. Computer Scis.
Corp. v. United States, 51 Fed. Cl. 297, 308 (2002).
However, even if deemed material, Dell Marketing’s initial submission was timely.
Defendants’ description of the Navy’s communications with Dell Marketing as follow-up
conversations to Dell Marketing’s initial proposal submission is consistent with the Administrative
70
Record. See Def.’s Cross-MJAR at 47; Int.-Def.’s Mem. at 48-49. Insight and Dell Marketing
timely submitted their initial quotes by the Solicitation’s April 6, 2021 deadline. See Tab 5 at AR
802; Tab 4 at AR 139. After reviewing both bidders’ initial quotes, the Navy indicated by email
that it sought additional clarifying information from Insight and Dell Marking by close of business
on April 7, 2021; Dell Marketing timely responded to that request later that same day at 1:09 p.m.
See Tab 6.2 (E-mails between the Navy and Insight regarding Insight’s Quote, dated April 7, 2021)
at AR 3328-338 (Insight); Tab 6.1 at AR 3285-87 (Dell). In response to the Navy’s request, Dell
Marketing indicated that it did “not anticipate that cloud computing services will be used in the
performance of any contract or subcontract resulting from this solicitation.” Tab 6.1 at AR 3306.
The Navy called Dell Marketing the next day on April 8, 2021, “to clarify given that some of the
products expected to be sold under the BPA were cloud computing services.” Tab 44 (Navy
Response to Insight Supplemental Protest and Comments, dated July 20, 2021) at AR 4933. Based
on that clarification, Dell Marketing submitted its revised representations to the Navy, including
concerning cloud computing services, later, on April 8, 2021. See Tab 6.1 at AR 3307.
Plaintiff argues that given Dell Marketing’s April 7, 2021 response indicated that it would
not be providing cloud services “despite . . . that multiple CLINs for the procurement require the
provision of Microsoft cloud services,” that submission was defective and had to be remedied prior
to the Navy’s April 7, 2021 close of business deadline. Pl.’s Mem. at 36 (citing Tab 6.1 at AR
3306). Since Dell Marketing only submitted its revised proposal to include cloud computing
services on April 8, 2021, Plaintiff argues that Dell Marketing’s proposal was late and should have
been deemed ineligible under the “late is late” principle, which prohibits an agency from accepting
late proposals, including revisions. Id. (citing Labatt Food Serv., Inc. v. United States, 577 F.3d
1375, 1381 (Fed. Cir. 2009) (“To avoid this potential for abuse, submission deadlines are strictly
71
enforced across the board. . . . A late proposal is tantamount to no proposal at all.”)). Plaintiff’s
position obfuscates the nature of the Navy’s communications with Dell Marketing about its initial
proposal and misapplies the “late is late” rule.
First, Dell Marketing submitted its initial proposal with the Navy’s requested additions by
the April 7, 2021 close of business deadline. See Tab 6.1 at AR 3285-86. Any clarification
thereafter was permissible given an agency’s ability to communicate with a particular bidder about
its proposal. Logistics Health, Inc., B-416145.7, 2021 CPD ¶ 184, 2021 WL 2315462, at *5
(Comp. Gen. Mar. 2, 2021) (“[T]here is nothing inherently improper in an agency conducting
additional discussions relating to previously discussed issues with only one or a limited number of
offerors where the agency has remaining concerns relating to those issues.”). Further, Plaintiff
cites no authority that would require a bidder to perfectly respond to requests for additional
information from an agency without the need for further clarification and supplementation. See
generally Pl.’s Mem. Indeed, agencies frequently follow up with offerors post-bid submission to
ensure the bidder can satisfy the procurement’s requirements. See, e.g., Info. Tech. & Applications
Corp. v. United States, 316 F.3d 1312, 1323 (Fed. Cir. 2003) (finding proper communications
between agency and bidder after bid submitted about subcontractors that would be performing
work under its proposal).
The April 8, 2021 communication between the Navy and Dell Marketing also comports
with FAR 15.306(d)’s requirement that “[d]iscussions are tailored to each offeror’s proposal.”
After realizing that Dell Marketing was mistaken about the Solicitation’s cloud computing services
requirement, the Navy followed up with Dell Marketing to rectify its misunderstanding. See Tab
44 at AR 4933. Such clarification is not prohibited by the FAR. Significantly, Insight, just like
Dell Marketing, was also initially confused about whether cloud computing services were required
72
under the Solicitation until it received clarification from the Navy. Id. at AR 4933 n.8. Under
Plaintiff’s turned-upside-down logic, Dell Marketing should have been excluded from
consideration because Insight was able to receive clarification about cloud computing services
prior to the initial submission deadline, while Dell Marketing was not. This is nonsensical and
would have provided Insight an unfair advantage over Dell Marketing — the exact type of
favoritism about which Plaintiff now complains. Instead, the Navy’s decision to provide Dell
Marketing with the same clarification it provided Insight, the day after Dell Marketing timely
submitted its initial proposal on April 7, 2021, demonstrates that the Navy treated both bidders
“fairly and impartially” as required by the FAR. FAR 1.102-2(c)(3).
Second, the “late is late” principle is inapplicable here. Defendant cites the GAO’s opinion
in Asset Protection & Security Services to argue that the “late is late” rule is inapplicable to this
procurement. Def.’s Cross-MJAR at 48. Although not binding, Asset Protection is instructive as
it also involved an RFQ for an FSS BPA. See generally Asset Protection & Security Services, B406474.2, 2012 CPD ¶ 210, 2012 WL 2914677 (Comp. Gen. July 17, 2012). While the GAO held
that in RFQ contracts “[g]enerally, late quotations may be considered up to the time of issuance of
the order,” it also noted that the “RFQ may contain a late quotations clause to expressly limit the
agency’s consideration of late quotations.” Asset Protection, 2012 WL 2914677, at *1 n.1.
Applying that reasoning here, the Navy could have accepted a late quotation unless the Solicitation
expressly limited the timeframe for accepting bids — which it did not.
While Plaintiff further relies on Criterion Systems, Inc. v. United States, 144 Fed Cl. 409
(2019) to argue that the “late is late” rule applies to FAR Part 8 procurements such as this one,
Plaintiff omits Criterion Systems’ limiting principle that the “express RFQ terms” govern whether
an agency can accept a late submission. Criterion Sys., 144 Fed. Cl. at 415; see also Pl.’s Mem.
73
at 37. Unlike in Criterion Systems, which involved an FSS solicitation with a provision that stated,
“LATE QUOTES WILL NOT BE ACCEPTED,” 144 Fed. Cl. at 412 (emphasis and
capitalization in original), here no such “late is late” clause was incorporated in the Solicitation.
See Tab 3.1 at AR 6. Thus, Plaintiff’s reference to the April 7, 2021 close of business deadline in
the Navy’s email is immaterial as that date was not contained in the Solicitation. Pl.’s Mem. at
36. Accordingly, the “late is late” principle is inapplicable to these initial submissions. 25
For the reasons stated above, the Court finds that Plaintiff’s favoritism argument fails.
V.
Procurement Integrity Act Violation Allegations
In its penultimate protest ground, Plaintiff contends that a Procurement Integrity Act (PIA)
violation tainted the award to Dell Marketing. Insight asserts two PIA violation allegations: (1)
the Navy inadequately investigated an alleged pre-May 27, 2021 PIA violation, and (2) the Navy’s
investigation improperly ignored a purported post-May 27, 2021 PIA violation. See Compl. ¶ 8;
Pl.’s Mem. at 37-45; Pl.’s SMJAR Mem. at 27; Pl.’s Second SMJAR at 2-6. The Court is
unpersuaded by Insight’s arguments.
The PIA mandates that a federal government official “shall not knowingly disclose
contractor bid or proposal information or source selection information before the award of a
Federal agency procurement contract to which the information relates,” and contractors “shall not
knowingly obtain contractor bid or proposal information or source selection information before
the award of a Federal agency procurement contract to which the information relates.” 41 U.S.C.
25
Plaintiff’s additional argument that FAR 8.405-3(b)(1)(ii)(C) precludes the Navy from accepting
Dell Marketing’s “late” initial proposal is similarly unavailing. Pl.’s Mem. at 37. FAR 8.4053(b)(1)(ii)(C) requires contracting officers “ensure [that] all quotes received are fairly considered
and award is made in accordance with the basis for selection in the RFQ.” Given the April 7, 2021
deadline was contained in an email, and not in the Solicitation, the Navy did not act contrary to
the Solicitation in providing Dell Marketing with the same clarification about cloud computing
services that it had provided to Insight. See Tab 6.1 at AR 3285-87.
74
§ 2102(a)(1), (b). Contracting officers notified of a potential PIA violation “must determine if the
reported violation or possible violation has any impact on the pending award or selection of the
contractor.” FAR 3.104-7(a). However, contracting officers need only consider PIA violation
allegations brought to their attention within fourteen days of when the protestor first discovered
the possible violation. See 41 U.S.C. § 2106. When reviewing a contracting officer’s conclusions
as to whether an alleged PIA violation impacted an award, “the Court must analyze whether the
Agency conducted an adequate investigation consistent with the arbitrary and capricious standard
of review.” Oak Grove Techs., LLC v. United States, 155 Fed. Cl. 84, 115 (2021) (citing PAI
Corp. v. United States, 614 F.3d 1347, 1352–53 (Fed. Cir. 2010)).
As detailed below, the Navy adequately investigated Insight’s allegation of a pre-May 27,
2021 PIA violation and rationally concluded that no violation affected the Navy’s decision to
award the BPA to Dell Marketing. Furthermore, Insight failed to timely notify the Navy of a
potential post-May 27, 2021 PIA violation. Thus, the Navy was not obligated to investigate that
allegation. Finally, even if Insight were correct on the merits of its PIA allegations — which it is
not — its claims would still fail because it cannot demonstrate prejudice stemming from either
alleged violation.
A. The Navy Reasonably Investigated the Alleged Pre-May 27, 2021 PIA Violations
Plaintiff “broadly alleged that at some time before Dell Marketing’s May 27, 2021 email
to the Navy, Dell Marketing received ‘inside information about Insight’s proposal.’” Remand
Order at 21 (quoting Tab 38 at AR 4730). This Court previously found Plaintiff’s allegation
sufficiently credible to warrant additional investigation. See id. at 27-28. On December 9, 2021,
the Court “remand[ed] this action to the Navy to investigate Plaintiff’s first allegation of a PIA
violation; namely, that the information in Dell Marketing’s May 27, 2021 email to the Navy
concerning certain allegedly mispriced CLINs in Insight’s bid potentially indicates a PIA violation
75
occurred.” Id. at 27. After the Navy interviewed Dell and Navy personnel and reviewed
contemporaneous Dell communications, it concluded that no PIA violation had occurred. See
Supplemental PIA Report. Insight filed a supplemental MJAR challenging that conclusion, and,
after review, this Court held the Navy failed to carry its investigation up until May 27, 2021,
consistent with this Court’s December 9, 2021 Order. Second Remand Order at 2. On April 25,
2022, this Court again remanded this action to the Navy to complete its investigation consistent
with this Court’s Remand Order. Id.
In response to this Court’s Second Remand Order, the Navy produced a three-page
Supplemental PIA Report to its original, ten-page PIA Report. See Tab 81 (PIA No Impact
Determination, dated January 21, 2022); Supplemental PIA Report.
The Navy ultimately
concluded — based on, inter alia, interviews with three Dell Marketing representatives,
declarations from six Dell Marketing representatives, declarations from nine Navy personnel, and
Dell emails leading up to May 27, 2021 — “that no one from Dell obtained or was provided
Insight's CLIN-level pricing information before Dell sent its 27 May 2021 e-mail to the Navy.”
Supplemental PIA Report at 3; see also Tab 81 at 7394-99. Accordingly, the Navy concluded that
“Insight's alleged PIA violation did not impact the award of the BPA to Dell Marketing.”
Supplemental PIA Report at 3.
Insight contends that the Navy’s “no impact” determination is inadequate, and requests this
Court cancel the BPA award to Dell Marketing and require the Navy to re-open competition. Pl.’s
Second SMJAR at 3, 5. Plaintiff faults the Navy’s investigative process for (i) using the personnel
who conducted the procurement competition to investigate the alleged PIA violation, and (ii)
allegedly failing to question every individual with access to a Navy SharePoint website to ensure
that no one had disclosed Insight’s pricing to Dell Marketing. See Pl.’s SMJAR Mem. at 33-35;
76
Pl.’s Second SMJAR at 3. Insight further disagrees with the Navy’s investigative conclusions and
argues that the contracting officer conducting the investigation “had no basis to make [the “no
impact”] determination.” Pl.’s SMJAR Mem. at 32. This Court disagrees with each of Insight’s
contentions; the Navy conducted its investigation within the bounds of its discretion and rationally
concluded that no PIA violation had occurred.
B. The Navy Conducted the Investigation Within the Bounds of Its Discretion
Plaintiff’s disagreements generally center on how the Navy designed and carried out its
investigation. Plaintiff argues that the Navy “took no steps to maintain any ‘independence’ for its
PIA investigation” because it used the “the exact same contracting personnel who conducted the
procurement competition . . . [to] conduct the investigation.” Pl.’s SMJAR Mem. at 33-35. It
further argues that the Navy should have more thoroughly investigated whether any contractors or
government personnel with access to Insight’s pricing on the SharePoint website between May 21
and May 27, 2021, disclosed that pricing to Dell Marketing. See Pl.’s SMJAR Mem. at 22-27;
Pl.’s Second SMJAR at 2-5. This Court again disagrees. As noted below, both choices were
discretionary, and the Navy has “provided a coherent and reasonable explanation of its exercise of
discretion.” Dell Fed. Sys., 906 F.3d at 992 (citation omitted).
i. The Navy Reasonably Staffed the PIA Investigation
Insight contends that it was improper for Alexander Roberts, the contracting officer who
handled the procurement’s day-to-day operation, and Navy counsel involved in the procurement,
Ana Smith and Tracey Ferguson, to oversee and participate in the PIA investigation. See Pl.’s
SMJAR Mem. at 34. Plaintiff, however, does not cite any authority that would prevent the Navy
from staffing its PIA investigation as it did. Nor has Plaintiff overcome the presumption that these
government agents carried out their investigative duties in good faith.
77
While Insight laments that “the Navy here took no steps to maintain any ‘independence’
for its PIA investigation,” applicable law did not prohibit the Navy from tasking Alexander Roberts
with performing the PIA investigation and tasking Ana Smith and Tracey Ferguson with
overseeing the investigation. Pl.’s SMJAR Mem. at 33-34. The FAR requires only that a
“contracting officer who receives or obtains information of a violation or possible violation of [the
PIA] . . . determine if the reported violation or possible violation has any impact on the pending
award or selection of the contractor.” FAR 3.104-7(a). The Navy’s reliance on Mr. Roberts, a
contracting officer, to investigate the alleged PIA violation does not conflict with that requirement.
Indeed, the Court of Federal Claims has found no issue with contracting officers investigating
other alleged FAR violations in the procurements they previously handled. See, e.g., Oracle Am.,
Inc. v. United States, 144 Fed. Cl. 88 (2019) (approving a contracting officer’s investigation into
individual and organization conflicts of interest in the same procurement in which the contracting
officer made awards), aff’d, 975 F.3d 1279 (Fed. Cir. 2020). That the FAR does not affirmatively
state that the “contracting officer” investigating the alleged PIA violation can be a contracting
officer involved in the procurement is of no moment.
The proper question when evaluating practices under the FAR is “whether there is any
statutory or regulatory provision that precludes” the practice. Tyler Const. Grp. v. United States,
570 F.3d 1329, 1333 (Fed. Cir. 2009) (emphasis added). Plaintiff has not identified, and this Court
is unaware of, any regulation that would prohibit Alexander Roberts, Ana Smith, and Tracey
Ferguson from participating in the PIA investigation. Instead, Plaintiff relies on the GAO’s
Government Auditing Standards to support its argument that a conflict of interest should have
disqualified Mr. Roberts from participating in the investigation. Pl.’s SMJAR Mem. at 33 (citing
GAO-21-368G, Government Auditing Standards, https://www.gao.gov/assets/gao-21-368g.pdf
78
(Apr. 2021) (GAO Yellowbook)). However, those standards are applicable to “auditors and audit
organizations that audit government entities” in “financial audits,” “attestation-level examination,”
and “performance audits,” but do not reference PIA investigations. GAO Yellowbook at 6-7. The
Navy is not an audit organization, and the PIA investigation required under the FAR and ordered
by this Court concerns potential investigatory and confidentiality breaches, not financial or
performance accounting issues. See FAR 3.104-7 (requiring agencies to investigate potential
disclosures of contractor bid or proposal information). While some laws and regulations require
applying these standards to government audits, 26 the PIA does not.
Even if this Court were to agree that the law — apart from the inapplicable GAO standards
offered by Insight — implicitly required the Navy to avoid such purported conflicts of interest,
Plaintiff’s arguments concerning lack of independence among the selected Navy personnel ignores
“the principle that government officials are presumed to discharge their duties in good faith.” Rd.
& Highway Builders, LLC v. United States, 702 F.3d 1365, 1368 (Fed. Cir. 2012). This Court
presumes that Mr. Roberts would have disclosed any malfeasance uncovered by his investigation.
See id. The Administrative Record lacks any evidence that would overcome a presumption of
good faith here where Mr. Roberts did not provide the final word on the Navy’s investigative
conclusions. See Tab 81 at AR 7401. Instead, Spencer Sessions, the Navy contracting officer for
this procurement, ultimately made the “no impact” determination. Id. Sharon Pritchard, the Office
for Naval Information Warfare Center Pacific’s Chief of Contracting, also reviewed the evidence
26
The GAO explains that various “laws, regulations, or authoritative sources may require the use
of [generally accepted government auditing standards].” GAO Yellowbook at 5. For example,
federal inspectors general appointed under the Inspector General Act of 1978, as amended (5
U.S.C. App.), must use the generally accepted government auditing standards outlined in the
Yellowbook “for audits of federal establishments, organizations, programs, activities, and
functions.” Id.
79
— including evidence collected by Mr. Roberts and collected from Dell — and independently
approved the “no impact” determination. Id.
While Insight may speculate that Mr. Sessions and Ms. Pritchard are complicit in a scheme
against Insight, this Court must also presume that Mr. Sessions and Ms. Pritchard “discharge[d]
their duties in good faith.” Rd. & Highway Builders, 702 F.3d at 1368. The Administrative Record
again lacks any evidence to overcome this presumption. As Plaintiff has not presented the
“irrefragable proof” necessary to overcome the presumption that the Navy personnel carried out
their investigation in good faith, it may not sustain a protest based on how the Navy staffed its PIA
investigation. Savantage Fin. Servs., Inc. v. United States, 595 F.3d 1282, 1288 (Fed. Cir. 2010)
(quoting Alaska Airlines, Inc. v. Johnson, 8 F.3d 791, 795 (Fed. Cir. 1993)).
ii. The Navy Reasonably Opted Not to Investigate Every Person Who Had
Access to the SharePoint Website
According to Plaintiff, despite that none of the 3,500-4,300 individuals with access to the
SharePoint website were Dell employees, the Navy “failed to investigate whether any of these
thousands of government personnel or hundreds of contractor personnel disclosed Insight’s pricing
to Dell Marketing or its affiliates, or to other entities or individuals who may have disclosed
Insight’s pricing to Dell.” Pl.’s SMJAR Mem. at 20. Plaintiff faults the Navy for relying on “handselected information presented by Dell Marketing” to conclude that no one with access to the
SharePoint website disclosed Insight’s pricing to Dell Marketing. Pl.’s Second SMJAR at 4. It
further faults the Navy for limiting its investigation to two Navy contracting personnel while
ignoring the numerous SharePoint website users. Id. at 5 (citing Supplemental PIA Report at 2).
Insight suggests that the Navy needed to survey all individuals with access to the SharePoint
website or review whether contractors with access to the SharePoint website had any relationship
with Dell Marketing. Pl.’s Second SMJAR at 3-4. As further explained below, this Court
80
disagrees with Plaintiff’s assessment; the Court did not order a no-stone-left-unturned
investigation, and the Navy reasonably chose not to perform the investigation urged by Plaintiff
given other evidence it reviewed during its PIA violation investigation.
In its December 9, 2021 and April 25, 2022 Remand Orders, this Court ordered the Navy
“to investigate Plaintiff’s first PIA-violation allegation; namely, that the information in Dell
Marketing’s May 27, 2021 email to the Navy concerning certain allegedly mispriced CLINs in
Insight’s bid potentially indicates a PIA violation occurred.” Remand Order at 27; Second Remand
Order at 2. The Court did not direct any specific format for the Navy’s investigation. See Remand
Order at 27-28; Second Remand Order at 4-6. Instead, the Court sought to ensure that the Navy’s
investigation accounted for the breadth of Plaintiff’s allegation that a PIA investigation could have
occurred at any time leading up to Dell Marketing’s May 27, 2021 email. Second Remand Order
at 2. Based on the record before it, this Court holds that the Navy complied with the Court’s Order.
The Dell declarations stating that “no one from Dell received any information about Insight’s
CLIN pricing on this opportunity,” necessarily encompass the review period ordered by the Court.
Tab 81 at AR 7395. The Navy’s interviews with Dell representatives explored Dell’s conduct up
until Dell’s May 27, 2021 email to the Navy. See Tab 81 at AR 7394-97; Tab 74 (Memoranda to
File regarding Interviews with Dell Employees, dated December 21, 2021 and January 5, 2022).
While the declarations from Navy personnel were initially limited to events leading up to May 21,
2021, the supplemental declarations collected from the same Navy personnel attested to what
occurred between May 21, 2021, and May 27, 2021. See Tab 80 (Dell Declarations (with cover emails), dated January 18-20, 2022) at AR 7382-84, 7386, 7389, 7391; Additional Documents Filed
with Supplemental PIA Report. The Navy did exactly what this Court ordered: it conducted a PIA
81
investigation that “fully cover[ed] the period through May 27, 2021.” Second Remand Order
(emphasis in original).
The Navy’s decision to forgo interviewing every individual with access to the SharePoint
website does not undermine this conclusion, as the Navy “provided a coherent and reasonable
explanation of its exercise of discretion.” Dell Fed. Sys., 906 F.3d at 992 (citation omitted); see
Tab 81 at AR 7399 n.1. Mr. Roberts explained that it would be “impractical to ask the entire group
to verify whether they had disclosed Insight’s price to anyone given that it was posted after [the
initial] award.” Tab 81 at AR 7399 n.1. He went on to explain that even if the Navy had invested
the time and money necessary to “obtain verification from more than 3,500 people that they did
not disclose Insight’s pricing information to Dell,” it would still be “unnecessary because the Dell
employees involved made it clear in their declarations that they did not have Insight’s CLIN price
information when they asked about the promotional CLINs on 27 May 2021.” Id.
This is a reasonable conclusion given the Navy’s obligations under the PIA are to ensure
that PIA violations, if any, do not impact an award decision. FAR 3.104-7(a). There is simply no
evidence in the Administrative Record or in Insight’s briefing reflecting that anyone provided
Insight’s CLIN-level pricing to Dell. Given this lack of evidence, the Navy could not have
concluded that the award to Dell Marketing was impacted by any hypothetical disclosure owing
to third parties having access to the SharePoint website.
Could the Navy have designed a more expansive investigation? Certainly. Would this
Court have conducted the investigation in the same manner as the Navy? Maybe not. Yet, these
are not the questions that this Court must answer while weighing Plaintiff’s protest. The Navy’s
responsibility was to reasonably investigate the alleged PIA violation and draw rational conclusion
from its findings. Dell Fed. Sys., 906 F.3d at 992. Based on the record before it, the Court is
82
satisfied that the Navy fulfilled those obligations regarding the alleged pre-May 27, 2021 PIA
violation.
C. The Navy Rationally Concluded that a PIA Violation Did Not Taint the Award to
Dell Marketing
According to Plaintiff, “the determination by the Navy that the ‘alleged PIA violation did
not impact the award of the BPA to Dell Marketing,’ AR 7401, is unsupported by the record and
[is] arbitrary and capricious.” Plaintiff’s Reply in Support of its SMJAR (ECF No. 83) (Pl.’s
SMJAR Reply) at 13. Plaintiff specifically argues that the Navy reached an irrational conclusion
because (i) the Navy relied on self-interested statements from Dell, (ii) the Navy did not launch an
independent investigation, and (iii) Microsoft’s price adjustments did not actually occur “last
minute.” Id. at 13-17; see also Pl.’s SMJAR Mem. at 32; Pl.’s Second SMJAR at 4 (“In any event,
the Navy never should have determined that it could stop looking into these circumstances based
solely on information from Dell Marketing.”). After reviewing the evidence collected during the
Navy’s thorough investigation, this Court disagrees with Insight’s contentions.
i. The Navy’s Investigative Conclusions Do Not Rest Solely on “SelfServing” Evidence from Dell
According to Plaintiff, the Navy’s PIA investigation rests entirely on “the word of selfinterested contractor personnel from Dell Marketing.” Pl.’s SMJAR Mem. at 30; see also Pl.’s
SMJAR Reply at 14 (“Moreover, the reliance on Dell Marketing declarations is particularly
inappropriate . . . because they are from individuals with a financial interest in a particular
outcome”); Pl.’s Second SMJAR at 4 (“The only information considered by the Navy that is not
hand-selected information presented by Dell Marketing are the declarations from 11 government
employees that had no insight or information about disclosure through SharePoint.”). This
argument completely ignores that the Navy also based its no-impact determination on declarations
83
from Navy personnel, internal Dell emails predating May 27, 2021, and interviews with Dell
employees. See Tab 81 at AR 7399-400.
Dell personnel involved in the procurement declared under penalty of perjury that they “did
not see or receive any Insight price information related to the RFQ” and that they had not received
Insight’s CLIN-level pricing prior to Dell’s submission of its May 27, 2021 question to the Navy.
Tab 80 at AR 7382-84, 7386, 7389, 7391. Any suspicion or supposition that these Dell employees
would perjure themselves to conceal misconduct in this procurement becomes more tenuous when
viewed along with the declarations from Navy personnel who similarly declared under penalty of
perjury that they complied with their obligations to keep contractor proposal information
confidential and “did not discuss with or disclose Insight’s pricing to anyone.” Tab 79; see also
Additional Documents Filed with Supplemental PIA Report. Mr. Sessions expressly cited these
Navy declarations as evidence supporting his no-impact determination. Tab 81 at AR 7399.
The Navy took the additional step of interviewing Dell employees to better assess their
credibility. See Tab 74. The Dell employees offered a consistent narrative that Microsoft’s late
price changes to promotional CLINs 4 and 5 led them to believe that those changes could have
resulted in Insight’s price differential. Tab 81 at AR 7394-97. All three Dell representatives
interviewed during the investigation stated that they did not receive Insight’s CLIN pricing. Id. at
AR 7395-97. Dell’s Vice President for Strategic Programs explained that, to his knowledge, “no
one from Dell received any information about Insight’s CLIN pricing on this opportunity.” Id. at
AR 7395. Again, Mr. Sessions cites Mr. Roberts’ interview notes as supporting his no-impact
determination. Tab 81 at AR 7400.
Even if the declarations and Dell employee interviews were choreographed to conceal a
PIA violation, the Navy did not stop its investigation upon receiving that evidence. The Navy also
84
collected Dell emails from the period between March 26, 2021 and May 27, 2021, corroborating
Dell’s narrative that its concerns over Microsoft’s revisions to the promotional CLINs motivated
its May 27, 2021 email to the Navy. See Tab 75 at AR 6627-28, AR 6622; Tab 77 at AR 735859. Dell reached out to Microsoft on March 26, 2021, before the bid deadline, when it realized
that several promotional CLINs lacked pricing on Microsoft’s price list. See Tab 81 at AR 7398.
On April 2, 2021, Dell emailed Microsoft again after Microsoft had provided final pricing,
specifically seeking clarification on whether years 4 and 5 of the promotional CLINs would be
priced and available for transaction. Tab 75 at AR 6622; see also Tab 81 at AR 7390. It is
reasonable to conclude that Microsoft’s late pricing concerning years 4 and 5 of these CLINs
would confuse other competitors. Thus, it is unsurprising that shortly after the Navy announced it
was awarding the BPA to Insight, Dell emails reflect that its employees quickly homed in on the
possibility that Microsoft’s initial failure to provide pricing for promotional CLIN years 4 and 5
could explain a price discrepancy; this would be the case if Insight had not similarly sought such
a pricing clarification from Microsoft. See Tab 77 at AR 7358. Mr. Sessions reached exactly that
conclusion in his PIA no-impact determination, where he reasoned that Dell’s emails “support
Dell’s assertion that it was only using information received from the award notice and that it did
not receive Insight’s CLIN pricing.” Tab 81 at AR 7400.
Plaintiff downplays the breadth and thoroughness of the Navy’s investigation by criticizing
the Navy employees’ declarations for lacking “insight or information about disclosure through
SharePoint,” Pl.’s Second SMJAR at 4, and the Dell Marketing declarations for “fail[ing] to
address the period of time after May 27, 2021.” Pl.’s SMJAR Mem. at 21. However, those
arguments relate to the PIA violation Plaintiff alleges occurred after the Navy reopened the
procurement, and as explained below, the Navy was not obligated to consider those allegations,
85
which were untimely asserted. Plaintiff does not point to any evidence casting doubt on the
truthfulness of the evidence collected from Navy and Dell personnel, and the contemporaneous
emails collected from Dell independently corroborate the statements made by Dell and Navy
personnel in their declarations and interviews.
ii. The Lack of an “Independent Investigator” Does Not Undermine the Navy’s
Investigative Conclusions
Plaintiff next tries to undermine the rationality of the Navy’s conclusion by arguing that
“[t]he Navy’s failure to conduct an independent PIA investigation is itself an arbitrary and
capricious action.” Pl.’s SMJAR Mem. at 35. As explained above, the Navy reasonably selected
Mr. Roberts to perform the investigation, and Mr. Sessions and Ms. Pritchard to independently
review the evidence and Mr. Roberts’ conclusions. See infra pp. 78-80. Plaintiff cannot point to
any evidence, let alone the requisite “irrefragable proof,” that would lead this Court to deviate
from the presumption that these Navy personnel carried out the investigation in good faith.
Savantage Fin. Servs., 595 F.3d at 1288 (quoting Alaska Airlines, Inc., 8 F.3d at 795).
iii. The Timing of Microsoft’s Price Changes Does Not Undermine the Navy’s
Investigative Conclusions
Finally, Plaintiff contends the Navy’s conclusion was irrational because it did not address
the actual sequence of events regarding Microsoft’s revisions to the promotional CLIN prices. See
Pl.’s SMJAR Mem. at 32-33. Plaintiff specifically alleges that the Navy’s investigation “fails to
explain how the pricing change was ‘last minute’ when the investigation confirmed that the change
occurred more than a month before the May 6, 2021 Best and Final Offers.” Pl.’s Second SMJAR
at 5 n.3. That argument ignores that Mr. Sessions viewed the sequence of events as one of several
factors supporting his no-impact determination. See Tab 81 at AR 7400 (“The emails Dell
provided related to Dell's conversations with Microsoft support Dell's explanation that the pricing
of the promotional SKUs was last minute”). Furthermore, Dell’s explanation that Microsoft
86
extended an offer for years 4 and 5 for the Project & Visio bundle promotional CLINs — x728,
x729, x764, x765 — “last minute” does not imply the changes were made on the eve of this
procurement closing. Tab 10.2 at AR 3519. The changes were last minute in the sense that
Microsoft originally did not price years 4 and 5 of those CLINs, and only did so in its final pricing
after Dell had reached out to Microsoft seeking clarification on those CLINs as the deadline for
bidding approached. See Tab 81 at AR 7398; Tab 75 at AR 6625-27.
Rather than provide “no basis whatsoever to determine that ‘[there was] no impact on the
pending award or selection of the contractor,’” Pl.’s SMJAR Mem. at 24 (quoting FAR 3.1047(a)), the Navy provided a well-reasoned analysis of the evidence it collected. See Tab 81;
Supplemental PIA Report. Evidence collected from both Dell and the Navy support the Navy’s
conclusion “that Insight's alleged PIA violation did not impact the award of the BPA to Dell
Marketing.” Supplemental PIA Report at 3; see also Tab 81 at AR 7399-401. In short, Plaintiff
has not carried its burden to sustain a protest based on a pre-May 27, 2021 PIA violation.
D. Insight’s Allegation of a Post-May 27, 2021 PIA Violation is Untimely
Plaintiff further argues that the Navy inadequately investigated Plaintiff’s PIA allegations
by ignoring what Plaintiff characterizes as “a clear, undisputed PIA violation.” Pl.’s SMJAR
Mem. at 22; Pl.’s Second SMJAR at 5-6. As Plaintiff correctly notes, the Navy did not remove
Insight’s pricing information from the SharePoint website until May 28, 2021, the day after the
Navy had reopened the procurement on May 27, 2021. See Tab 11.5 (E-mail from Navy to Insight
regarding Removal of Promotional SKUs, dated May 28, 2021) at AR 3555 (setting 7 p.m. Pacific
Time on May 28, 2021, as the final deadline for submitting revised proposals after the Navy
vacated its initial award to Insight); Tab 81 at AR 7399 n.1 (indicating the Navy removed Insight’s
pricing data from the SharePoint website on May 28, 2021); see also Pl.’s Second SMJAR at 5-6.
However, the two communications that Plaintiff alleges notified the Navy of a potential post-May
87
27, 2021 violation did not trigger an obligation for the Navy to investigate because (1) the first
communication — which was timely — did not provide notice of a potential PIA violation, and
(2) the second — which did provide notice of a potential PIA violation — was untimely.
Under the PIA, a plaintiff “may not file a protest against the award or proposed award of a
Federal agency procurement contract alleging a violation of [the PIA], . . . unless the person, no
later than 14 days after the person first discovered the possible violation, reported to the Federal
agency responsible for the procurement the information that the person believed constitutes
evidence of the offense.” 41 U.S.C. § 2106. Although the statute establishing the fourteen-day
deadline expressly references the Comptroller General’s ability to hear certain protests, the Court
of Federal Claims has applied this waiver rule to bid protests before this court. See, e.g., Melwood
Horticultural Training Ctr., Inc. v. United States, 153 Fed. Cl. 723, 742 (2021); Omega World
Travel, Inc. v. United States, 82 Fed. Cl. 452, 467 (2008). Applying the fourteen-day time bar in
this Court makes sense given the Federal Circuit’s previous explanation that it would be
“incongruous to bar later GAO protests but to permit a later court challenge.” Comint Sys. Corp.
v. United States, 700 F.3d 1377, 1383 (Fed. Cir. 2012).
At oral argument, Plaintiff argued that the Supreme Court’s decision in SCA Hygiene
Prods. Aktiebolag v. First Quality Baby Prods., LLC, 137 S. Ct. 954 (2017), prohibits applying
“deadlines that get rid of . . . plaintiffs’ cases, unless they are clearly set forth by Congress.” Apr.
8 Tr. at 19:3-10. However, the Federal Circuit explicitly rejected that notion in Inerso Corp. v.
United States, 961 F.3d 1343, 1349 n.1 (2020), and explained that SCA Hygiene “hold[s] only that
the general non-statutory equitable timeliness doctrine of laches does not override the
congressionally enacted statute of limitations applicable to legal actions for damages.” Id. Further,
the case on which Plaintiff relies to suggest it is inappropriate to apply the fourteen-day time bar,
88
McKing Consulting Corp. v. United States, 78 Fed. Cl. 715, 729 (2007), predates the Federal
Circuit’s admonition in Comint Systems that belated court challenges should not be permitted when
time-barred at the GAO. See 700 F.3d at 1383. Thus, as this Court has previously held, Plaintiff
was required to raise its concern about a PIA violation with the Navy within fourteen days of
discovering the purported PIA violation. Insight Pub. Sector, Inc. v. United States, 157 Fed. Cl.
416, 425 (2021).
i. Plaintiff’s January 26, 2022 Email
The first communication that Plaintiff alleges meets this requirement did not sufficiently
allege a PIA violation. On January 26, 2022, two days after Plaintiff first received a courtesy copy
of the Navy’s initial PIA report, Plaintiff emailed the Navy regarding new information disclosed
in the PIA Report concerning pricing disclosure on the SharePoint website. Pl.’s SMJAR Mem.
at 26. According to Plaintiff, the following statements in that email constitute a report of a
potential PIA violation: “Please provide information on this CAC enabled SharePoint website,
who had access to it, whether non-government personnel had access, and how any information on
the website was accessed. We view this disclosure as potentially a significant issue.” Pl.’s SMJAR
Ex. B (ECF No. 77-3) at 1; see also Pl.’s SMJAR Mem. at 26. But rather than “contain[] the
necessary evidence to support a PIA claim,” Plaintiff’s January 26, 2022 message merely raised a
generalized, “potential” concern that overlaped with its already asserted, pre-May 27, 2021 PIA
violation allegation. See Melwood Horticultural Training Ctr., 153 Fed. Cl. at 742; see, e.g.,
Alpine Cos., Inc., B-419831 et al., 2021 WL 2667135, at *6 (Comp. Gen. June 8, 2021) (holding
that a protestor’s letters sent to the agency less than fourteen days after learning facts indicating a
potential PIA violation occurred did not satisfy the timeliness requirement where “the protester's
allegations . . . were vague, and did not credibly allege a violation of the PIA”). Indeed, the Navy
89
interpreted Insight’s January 26, 2022 email as a generalized request for supplemental information
regarding the performed PIA investigation, rather than an allegation of a separate post-May 27,
2021 PIA violation. See Pl.’s SMJAR Ex. C (ECF No. 77-4) at 2 (replying to Insight’s concern
that the SharePoint disclosure was “potentially a significant issue” by informing Insight that “most
if not all of the information [Insight sought] would be included in an amendment to the
administrative record if Insight is challenging the PIA determination.” (emphasis added)). Such
generalized, vague concern, noting a “potential” issue, is insufficient to trigger the Navy’s
obligation to investigate an alleged PIA violation.
ii. Plaintiff’s February 15, 2022 Email
Plaintiff alternatively points to its subsequent, February 15, 2022 letter to the Navy as
providing adequate notice to the Navy. Pl.’s SMJAR Mem. at 26. Unlike its January 26 email,
Plaintiff’s February 15 letter provided specific allegations of a PIA violation. Insight’s February
15, 2022 letter stated:
One of Insight’s concerns is that the Navy disclosed its pricing such that Dell
Marketing had access to it both before Dell Marketing’s email to the Navy seeking
to reopen the competition on May 27, 2021, and before Dell Marketing submitted
revised price proposals on May 28, 29 and 30, 2021. . . . [T]he fact that Insight’s
pricing was apparently widely available prior to the submission of revised proposals
on May 28, 29, and 30, 2021, also raises concerns about the fairness of the
competition.
Pl.’s SMJAR Ex. D (ECF No. 77-5) at 2-3. In contrast to Insight’s January 26, 2022 email, its
February 15, 2022 letter provides sufficient specificity for the Navy to discern that Insight alleged
a new post-May 27, 2021 PIA violation had occurred. It also clearly demonstrates that Insight
knew how to properly allege a PIA violation.
Plaintiff contends that its February 15, 2022 letter was timely under the PIA’s fourteenday deadline because it was sent within fourteen days of February 3, 2022, when it purportedly
first learned that Navy contractors also had access to the SharePoint website. Pl.’s SMJAR Mem.
90
at 26. However, Insight possessed all the information necessary to support its new PIA violation
allegation on January 24, 2022, not February 3, 2022. See FAR 3.104-3, 3.104-7. The copy of the
PIA Report that Insight received on January 24, 2022, explained that Insight’s pricing information
was available on the SharePoint website after the Navy reopened the procurement and that Navy
customers (i.e., non-Navy personnel) had access to the SharePoint website. See Tab 81 at AR
7399 n.1. Therefore, Plaintiff had sufficient basis to allege a new PIA violation as of that date.
Taken together, Plaintiff’s purported notices to the Navy of a post-May 27, 2021 PIA
violation are insufficient to trigger an investigation. Plaintiff’s January 26, 2022 email to the Navy
met the fourteen-day deadline but did not put the Navy on notice it was alleging a new PIA
violation. Plaintiff’s February 15, 2022 letter contained the requisite level of specificity to put the
Navy on notice of a new PIA violation allegation but was untimely, sent more than fourteen days
after Plaintiff learned, on January 24, 2022, of a potential new PIA violation. 27 As neither
communication sufficiently provided the Navy timely notice of a potential post-May 27, 2021 PIA
violation, the Navy was not required to investigate Plaintiff’s post-May 27, 2021 PIA violation
allegation.
E. Insight Cannot Demonstrate Prejudice from Any Alleged PIA Violation
The Government and Dell contend that even if a PIA violation had occurred, this Court
must nevertheless dismiss Plaintiff’s PIA protest ground because Plaintiff has not shown any
prejudice caused by an alleged PIA violation. See Def.’s Suppl. Cross-MJAR at 51-55; IntervenorDefendant’s Suppl. Cross-MJAR at 34-36. Plaintiff responded in its MJAR Reply that the alleged
PIA violation prejudiced Plaintiff by “overturn[ing] a valid award of a BPA to Insight — directly
27
To fall within the fourteen-day time bar, Insight was required to sufficiently assert a PIA
violation by February 7, 2022. See 41 U.S.C. § 2106. The February 15, 2022 letter clearly exceeds
that deadline.
91
causing the loss of a $2.5 billion BPA.” Pl.’s Reply at 36. Plaintiff then broadened these
allegations in its SMJAR, where it alleged that various flaws in the Navy’s PIA investigation
deprived Plaintiff “of the ability to fairly compete for the contract and in turn lost the opportunity
to perform the BPA.” Pl.’s SMJAR Mem. at 36. Plaintiff’s prejudice theory shifted again in its
SMJAR Reply, where it argued exclusively that it only needed to establish that the Navy
improperly investigated the PIA violation to meet its burden on prejudice. See Pl.’s SMJAR Reply
at 32 (“Indeed, without the Navy actually conducting a fulsome investigation to determine the
extent and scope of the possible PIA violations and impact of those violations, Insight cannot do
more to establish prejudice.”). This Court agrees with the Defendants; Plaintiff cannot establish
that a pre- or post-May 27, 2021 PIA violation would have prejudiced it given Dell’s superior price
offering when comparing the parties’ initial offers on equal footing.
To prevail in a bid protest, even one based on an alleged PIA violation, “the protestor must
show that it was prejudiced by the government’s actions.’” Sys. Studs. & Simulations, 22 F.4th at
997 (quoting Glenn Def. Marine, 720 F.3d at 912). The prejudice inquiry “is always required
before setting aside a bid award.” Sys. Studs. & Simulations, 22 F.4th at 997 (emphasis added). A
plaintiff’s failure to address prejudice in its motion for judgment on the administrative record
waives the plaintiff’s “right to assert that it was prejudiced by agency error.” Brooks Range Cont.
Servs., Inc. v. United States, 101 Fed. Cl. 699, 709 (2011) (citing Novosteel, 284 F.3d at 1274);
see also Golden IT, LLC v. United States, 157 Fed. Cl. 680, 695 (2022) (collecting cases).
Here, Plaintiff waived any argument about prejudice based on a pre-May 27, 2021 PIA
violation by failing to address such prejudice in its MJAR. See Pl.’s Mem. at 37-45 (neglecting to
discuss prejudice).
Even ignoring this waiver, Plaintiff cannot establish prejudice because
Plaintiff’s noncompliant bid did not give it the requisite “substantial chance” to receive the award.
92
Bannum, 404 F.3d at 1353. While Plaintiff won the award initially, it did so unfairly; Insight’s
own failure to price all the required CLINs led to that result. See Tab 11.1 at AR 3523, 3525
(explaining that Insight’s failure to price the promotional CLINs/ SKUs x728, x729, x764 and
x765 impacted the Navy’s decision to award the BPA to Insight). This Court cannot hold that
Plaintiff’s loss of an unfair competitive advantage is a type of prejudice that this Court is
empowered to remedy. See FAR 8.405-3(b)(1)(ii)(C) (mandating that an agency establishing a
BPA “[s]hall ensure all quotes received are fairly considered and award is made in accordance
with the basis for selection in the RFQ”).
Plaintiff likewise cannot establish prejudice for any alleged post-May 27, 2021 PIA
violation, even if timely asserted. Even assuming, as Insight insinuates, that Dell gained access to
Insight’s detailed pricing information via the SharePoint website, Plaintiff has not established that
such access would have provided Dell Marketing a competitive advantage. See Pl.’s SMJAR
Mem. at 21-22 (explaining that agencies have the discretion to disclose one bidder’s otherwise
confidential information to another bidder where it is necessary to “address the imbalance created
by the disclosure of one offeror’s pricing,” and proceeding to argue that similar corrective action
is necessary here); Pl.’s SMJAR Reply at 24; Pl.’s Second SMJAR at 5 (“In the face of this
disclosure to the SharePoint website, . . . [t]he Navy retains the ability to equally disclose pricing
to create a fair procurement”). Dell already offered the superior quote before the Navy awarded
the BPA to Insight, as Insight had failed to price all the CLINs required by the Solicitation.
This becomes apparent when comparing Insight’s and Dell Marketing’s initial quotes once
equalized to account for Insight’s failure to price promotional CLINs x728, x729, x764 and x765
for years 4 and 5 of the BPA as required. Insight’s total evaluated price, which did not include
pricing for years 4 and 5 of those promotional CLINs, was $2,555,033,130. Tab 9 (Initial Business
93
VI.
The Procurement Was Not Fundamentally Unfair
Finally, Plaintiff argues that it has a stand-alone protest ground because the Navy
purportedly conducted “a fundamentally unfair competition.” Pl.’s SMJAR Reply at 23. Plaintiff
contends that “good-faith actions by the government – even if they do not rise to the level of PIA
violations – can still create an unfair procurement.” Id. Quoting a GAO decision, Plaintiff further
contends that “this basis of protest is entirely independent of the specific procurement integrity
provisions, which focus on specific prohibited actions by government officials. . . . allegations
dealing with apparent unfair competitive advantages do not necessarily turn on prohibited
behavior, and, as noted above, arise without regard to the good faith behavior of the parties.” Id.
(quoting Health Net Fed. Servs, LLC, B-401652.3 et al., 2009 WL 3843162, at *25 (Comp. Gen.
Nov. 4, 2009)). Further still, Plaintiff contends that the Navy’s display of Plaintiff’s pricing (postinitial award) “on a SharePoint site that was accessible by thousands of individuals, including
hundreds of contractors” for less than a day after the Navy reopened the procurement “was not a
fair situation.” Pl.’s SMJAR Reply at 24. To remedy this purportedly unfair procurement process,
Plaintiff requests a goose/gander remedy: that this Court disclose to Plaintiff Dell Marketing’s
CLIN-level pricing. Id. at 25. Plaintiff’s requested remedy is unwarranted.
This Court does not discern any alleged unfairness that would necessitate Plaintiff’s
proposed remedy or any other relief. Insight’s “unfairness” theme runs throughout its other protest
grounds, and as explained in detail for each ground, the Administrative Record does not support
any argument that Plaintiff was unfairly prejudiced here.
See e.g., supra pp. 62-65, 73.
Furthermore, Plaintiff’s unfairness allegations seem particularly absurd here since it received the
was $
, and for CLIN
was $
). In sum, Dell Marketing did
not lower its price to beat Insight’s price; Dell Marketing already had submitted the lower price
for these CLINS.
95
initial BPA award by omitting, even if inadvertently, pricing for several required CLINs. See Tabs
10.1; 11.1. Insight understandably laments losing the BPA award. However, Insight’s loss of an
award that was previously in its grasp is not unfair when Insight had only initially grasped it using
an unfair advantage. Here, the Navy fulfilled its obligation to “treat all offerors equally, evaluating
proposals evenhandedly against common requirements and evaluation criteria,” by appropriately
reopening the procurement and requiring both offerors to price all requisite CLINs. Serco, 81 Fed.
Cl. at 482 (cleaned up).
Even if this Court had discerned a scintilla of unfairness in the reopened procurement —
which it does not — Plaintiff’s proposed remedy would still be inappropriate. While an agency
has discretion to equalize the disclosure of information to offerors, the agency must first determine
that one offeror has the other’s information. See Power Connector, Inc., B-404916.2, 2011 WL
5029615, at *4 (Comp. Gen. Aug. 15, 2011) (holding that, “consistent with FAR 15.507,” the
agency should remedy a contracting officer’s disclosure of offeror prices to one offeror “by
advising all offerors of the pricing information”); Symvionics, Inc., B-293824.2, 2004 WL
2389921, at *5 (Comp. Gen. Oct. 8, 2004) (“We recommend that the Navy provide all the firms
in the recompetition with the same information about the likely impact of the PPV program on the
subject requirements that it provided Eastern in its post-award debriefing and allow for the
submission of revised proposals.”). Here, as noted, the Administrative Record lacks evidence
indicating that Dell ever received Insight’s CLIN-level pricing. Under the present circumstances
there is no reason whatsoever to award Insight the remedy it seeks. Indeed, under the facts of this
case, it would be inappropriate for this Court to order disclosure of Dell Marketing’s CLIN-level
pricing data to Insight, a serial competitor, where no legal or equitable reason compels such a step.
Plaintiff simply does not provide any basis on which this Court could sustain its protest.
96
VII.
Insight is Not Entitled to Injunctive Relief
The Court considers four factors when deciding whether to grant injunctive relief: (1)
whether the plaintiff has succeeded on the merits, (2) whether the plaintiff will suffer irreparable
harm if the court withholds injunctive relief, (3) whether the balance of hardships to the respective
parties favors granting an injunction, and (4) whether the public interest is served by granting an
injunction. Centech Grp., Inc. v. United States, 554 F.3d 1029, 1037 (Fed. Cir. 2009). This Court
need not progress beyond the first factor. “A plaintiff who cannot demonstrate success upon the
merits cannot prevail upon a motion for injunctive relief.” By Light Prof'l IT Servs., Inc. v. United
States, 131 Fed. Cl. 358, 367 (2017); see Blue & Gold Fleet, 492 F.3d at 1312 (noting that success
on the merits is “the most important factor required to enjoin the award of a contract”). As
discussed above, Insight’s protest fails on the merits. Accordingly, Insight is not entitled to
injunctive relief.
CONCLUSION
For the reasons discussed above, the Court DENIES Plaintiff’s Motion for Judgment on
the Administrative Record (ECF No. 33), Plaintiff’s Supplemental Motion for Judgment on the
Administrative Record (ECF No. 77), and Plaintiff’s Second Supplemental Motion for Judgment
on the Administrative Record (ECF No. 103). The Court GRANTS Defendant’s Cross-Motion
for Judgment on the Administrative Record (ECF No. 38), Defendant’s Supplemental CrossMotion for Judgment on the Administrative Record (ECF No. 78), Intervenor-Defendant’s CrossMotion for Judgment on the Administrative Record (ECF No. 39), and Intervenor-Defendant’s
Supplemental Cross-Motion for Judgment on the Administrative Record (ECF No. 79). 29
29
As noted, on May 10, 2022, the Court lifted the injunction (ECF No. 56 at 27-28) previously in
place and permitted the Navy to immediately proceed with its award to Dell Marketing L.P. Order
Denying MJAR at 2; see May 10 Tr. at 6:2-4.
97
The Clerk of Court is DIRECTED to enter Judgment accordingly.
The parties are directed to CONFER and FILE a Notice within seven days of this
Memorandum and Order, attaching a proposed public version of this Sealed Memorandum and
Order, with any competition-sensitive or otherwise protected information redacted.
IT IS SO ORDERED.
Eleni M. Roumel
ELENI M. ROUMEL
Judge
July 25, 2022
Washington, D.C.
98