MEMORANDUM DECISION AND ORDER - NOW THEREFORE IT IS HEREBY ORDERED that:1. Syngenta Seed, LLCs Motion to Transfer Pursuant to 28 U.S.C. § 1404(a) (Dkt. 6 ) is GRANTED and this case is transferred to the United States District Court for the Dist rict of Minnesota; 2. Plaintiffs Motion to Strike Declaration of Mark Smith in Support of Defendant Syngenta Seeds, LLCs Motion to Transfer Pursuant to 28 U.S.C. §1404(a) (Dkt. 10 ) is DENIED; and 3. Plaintiffs Motion to Strike Declaration of J ose Joe Bengochea in Support of Defendant Syngenta Seeds, LLCs Motion to Transfer Pursuant to 28 U.S.C. § 1404(a) (Dkt 14 ) is DENIED. Signed by Judge Edward J. Lodge. (caused to be mailed to non Registered Participants at the addresses listed on the Notice of Electronic Filing (NEF) by (cjs)
UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF IDAHO
VINCENT FARMS, INC., an Idaho
Corporation
Case No. 1:17-cv-00338-EJL-CWD
Plaintiff,
MEMORANDUM DECISION AND
ORDER
vs.
SYGENTA SEEDS, LLC,
Defendant.
INTRODUCTION
Pending before the Court are Syngenta Seed, LLC’s Motion to Transfer Pursuant to
28 U.S.C. § 1404(a) (“Motion to Transfer”) (Dkt. 6); Plaintiff’s Motion to Strike
Declaration of Mark Smith in Support of Defendant Syngenta Seeds, LLC’s Motion to
Transfer Pursuant to 28 U.S.C. §1404(a) (“Motion to Strike Smith Declaration”) (Dkt. 10);
and Plaintiff’s Motion to Strike Declaration of Jose “Joe” Bengochea in Support of
Defendant Syngenta Seeds, LLC’s Motion to Transfer Pursuant to 28 U.S.C. § 1404(a)
(“Motion to Strike Bengochea Declaration”) (Dkt. 14). These motions are now ripe for
decision. Having fully reviewed the record herein, the Court finds that the facts and legal
arguments are adequately presented in the briefs and record. Accordingly, in the interest of
avoiding further delay, and because the Court conclusively finds that the decisional process
would not be significantly aided by oral argument, the motions shall be decided on the
record before the Court without oral argument.
MEMORANDUM DECISION AND ORDER- 1
FACTUAL AND PROCEDURAL BACKGROUND
On July 10, 2017, Plaintiff Vincent Farms, Inc. (“Vincent Farms”) initiated these
proceedings by filing a lawsuit against Defendant Sygenta Seeds, LLC (“Sygenta”) in the
Fifth Judicial District of Idaho, Twin Falls County. (Dkt. 1-1, Ex. 1, Complaint.) Syngenta
then filed a timely Notice of Removal to this Court pursuant to 28 U.S.C. §§ 1332, 1441,
and 1446. (Dkt. 1.)
Plaintiff Vincent Farms is an Idaho corporation with its principal place of business
in Idaho. (Dkt. 1-1.) 1 Vincent Farms is engaged in farming operations in Twin Falls
County, Idaho. Defendant Syngenta is a Delaware Limited Liability Company registered
to do business in Idaho with its principal place of business in Minnesota.
Vincent Farms raised Sugar Hart seed peas for Syngenta during the 2016 crop year
pursuant to a valid and existing contract between the parties (“Contract”). The Contract
required that the Sugar Hart snap peas raised by Vincent Farms satisfy a germination
percentage requirement of 85%.
Vincent Farms alleges that it complied with the terms of the Contract by raising the
seed peas and delivering them to Syngenta with a germination percentage rate of 87%.
Nevertheless, Syngenta rejected the delivery on the basis that the seed peas did not satisfy
the 85% germination requirement.
1
All facts contained herein are based on the allegations in the Complaint unless
otherwise stated.
MEMORANDUM DECISION AND ORDER- 2
Vincent Farms claims that Syngenta breached the Contract by refusing to accept and
pay for the Sugar Hart snap peas. Vincent Farms further claims that Syngenta was negligent
in its performance of its duty to prepare the Sugar Hart seed peas for testing. Vincent Farms
seeks $283,006.08 in economic damages plus prejudgment interest and attorneys fees.
On August 30, 2017, Syngenta filed its Motion to Transfer premised on a forum
selection clause it contends is contained in the Contract. (Dkt. 6.) In support of the Motion,
Syngenta proffered the Declaration from Mark Smith, Syngenta’s litigation counsel. (Dkt.
6-1). Attached to the Declaration are two documents that Mr. Smith attests to represent the
parties’ written Contract: (1) a “Production Services Agreement” dated March 1, 2016 and
(2) a “Schedule of Supplemental Terms and Conditions for Peas and Green Bean Seed
Production” dated March 15, 2016 (“Schedule of Supplemental Terms.”) (Dkt. 6-2.)
On September 20, 2017 Vincent Farms filed its responsive brief in opposition to the
Motion to Transfer (Dkt. 11), the Declaration of John C. Peterson (Dkt. 11-1), and a Motion
to Strike (Dkt. 10). Vincent Farms argues that Syngenta’s Motion to Transfer should be
denied because it is based on the existence of a forum selection clause that is contained in
a document that Syngenta has not proven to be part of the Contract. (Dkt. 11). Further,
Vincent Farms’ counsel, John C. Peterson attests that, before filing this lawsuit, his own
personal knowledge as to what constituted the parties’ Contract was limited to the Schedule
of Supplemental Terms (Dkt. 11-1, ¶ 4.) According to Mr. Peterson, it was only after he
filed the lawsuit that he learned of the existence of the Production Services Agreement.
(Dkt. 11-1, ¶¶5-6.)
MEMORANDUM DECISION AND ORDER- 3
As a basis for the Motion to Strike Smith Declaration, Vincent Farms argues that
the documents attached to that declaration are hearsay and defense counsel, Mark Smith,
lacks personal knowledge to authenticate them properly. (Dkt. 11). In reply, Syngenta
proffers the Declaration of Jose “Joe” Bengochea. (Dkt. 12- 2). Mr. Bengochea attests that
he was a field representative for Syngenta at the time the Contract was executed and has
personal knowledge of the written documents that constitute the parties’ agreement. (Dkt.
12-2, ¶1-2). Mr. Bengochea further attests that he witnessed Mr. Roger Vincent sign both
the Production Services Agreement and the Schedule of Supplemental Terms. (Dkt. 12-2,
¶ 2).
In addition, Syngenta requested that the Court take Judicial Notice of Vincent
Farms’s 2016 Annual Report filed with the Idaho Secretary of State. (Dkt. 12-3.) In that
annual Report, Mr. Vincent is identified as the President and Registered Agent for Vincent
Farms. (Dkt. 12-3.)
Vincent Farms filed a Motion to Strike Bengochea Declaration solely on the basis
that the Bengochea Declaration is untimely. (Dkt. 14). Vincent Farms argues that the
Declaration should have been filed and served at the same time as the motion.
MOTIONS TO STRIKE
Syngenta has set forth the declarations of Mr. Smith and Mr. Bengochea in an effort
to create a record regarding the existence of two written agreements that constitute the
parties’ Contract. Vincent Farms seeks to strike these declarations but also offers an
affidavit from counsel with the same two documents attached thereto. For the reasons set
forth below, the Court denies both motions to strike.
MEMORANDUM DECISION AND ORDER- 4
1.
Motion to Strike Smith Declaration is Denied.
Vincent Farms argues that the Smith Declaration should be stricken because the
documents attached are hearsay and also that counsel lacked personal knowledge to
authenticate the documents. In response, Syngenta both argued that the Motion to Strike is
improper and provided a second declaration from one of its employees who witnessed Mr.
Vincent sign the documents in question.
First, contracts do not constitute hearsay. “Hearsay” is “a statement other than one
made by the declarant while testifying at the trial or hearing, offered in evidence to prove
the truth of the matter asserted.” Fed. R. Civ. P. 801(c). “[O]ut of court statements that are
offered as evidence of legally operative verbal conduct are not hearsay. They are
considered ‘verbal acts.’” United States v. Pang, 362 F.3d 1187, 1192 (9th Cir. 2004)
(citing Stuart v. UNUM Life Ins. Co. of America, 217 F.3d 1145, 1154 (9th Cir. 2000)
(insurance policy); United States v. Arteaga, 117 F.3d 388, 395–98 (9th Cir. 1997) (money
wire transfer forms)). Because a contract is “a legally operative document that defines the
rights and liabilities of the parties in this case,” it is excluded from the definition of hearsay.
See Stuart v. UNUM Life Ins. Co. of Am., 217 F.3d at 1154 (citing United States v. Bellucci,
995 F.2d 157, 161 (9th Cir.1993); United States v. Rubier, 651 F.2d 628, 630 (9th Cir.
1981)).
Second, Vincent Farms suggests that Mr. Smith cannot authenticate the documents
attached to the declaration because he lacks personal knowledge regarding the creation and
execution of the agreements. In response, Syngenta offered the declaration of Mr.
MEMORANDUM DECISION AND ORDER- 5
Bengochea who does have personal knowledge of the documents. In addition, Vincent
Farms’ counsel submitted the same documents in his own declaration. In short, all three
declarations contain copies of the same two documents.
Under the circumstances presented here, the Court denies the Motion to Strike Smith
Declaration. Vincent Farms has not set forth any direct evidence to challenge the
authenticity, existence, validity or enforceability of the two agreements and Syngenta
addressed any issues with authentication through the Bengochea Declaration, discussed
below.
2.
Motion to Strike Bengochea Declaration is Denied.
Vincent Farms argues that the Bengochea Declaration should be stricken as
untimely. The Court disagrees.
Federal Rule of Civil Procedure 6(c)(2) states that “[a]ny affidavit supporting a
motion must be served with the motion.” Fed. R. Civ. P. 6(c)(2). Nevertheless, evidence
submitted on reply in response to arguments raised in an opposition is not considered
“new” evidence. See Terrell v. Contra Costa County, 232 Fed. Appx. 626, 629 n. 2 (9th
Cir. 2007); see also Zkey Investments, LLC v. Facebook Inc., 225 F.Supp.3d 1147, 1158
(C.D. Cal. 2016) (“where evidence is ‘submitted in direct response to proof adduced in
opposition to a motion, it is not ‘new.’”)
The Bengochea Declaration is a timely response to Vincent Farms’ opposition.
Vincent Farms questioned the authenticity of the documents attached to counsel’s
declaration and Syngenta responded with an additional declaration authenticating the same
documents. Accordingly, Plaintiff’s Motion to Strike Bengochea Declaration is denied.
MEMORANDUM DECISION AND ORDER- 6
MOTION TO TRANSFER
Syngenta seeks a transfer of venue to the United States District Court for the District
of Minnesota pursuant 28 U.S.C. § 1404(a) and the parties’ forum selection clause
contained in the March 1, 2016 Production Services Agreement. As explained more fully
below, the Court grants the motion.
Pursuant to 28 U.S.C. § 1404(a), the Court “may transfer any civil action to any
other district or division where it might have been brought or to any district or division to
which the parties have consented” provided such transfer is “[f]or the convenience of
parties and witnesses” and “in the interest of justice.” 28 U.S.C. § 1404(a); Atlantic Marine
Const. Co. v. U.S. Dist. Court for W. Dist. of Texas, 134 S. Ct. 568, 581 (2013). “Section
1404(a) is . . . a codification of the doctrine of forum non conveniens for the subset of cases
in which the transferee forum is within the federal court system; in such cases, Congress
has replaced the traditional remedy of outright dismissal with transfer.” Id. at 580.
“Section 1404(a) is intended to place discretion in the district court to adjudicate
motions for transfer according to an ‘individualized, case-by-case consideration of
convenience and fairness.” Stewart Organization, Inc. v. Ricoh Corp., 487 U.S. 22, 33
(1988) (quoting Van Dusen v. Barrack, 276 U.S. 612, 622 (1964)). The purpose of the rule
is “to prevent the waste of time, energy and money and to protect litigants, witnesses, and
the public against unnecessary inconvenience and expense.” Van Dusen, 276 U.S. at 616
(internal quotations omitted).
As discussed more fully below, the parties have a valid forum selection clause and
it governs this dispute.
MEMORANDUM DECISION AND ORDER- 7
1.
The Parties’ Contract Includes a Valid and Enforceable Forum Selection
Clause.
Syngenta argues that Plaintiff’s breach of contract and negligence claims explicitly
arise from the Production Services Agreement, which fully incorporates the Schedule of
Supplemental Terms. In response, Vincent Farms argues that Syngenta has not shown the
Production Services Agreement is legally binding between Vincent Farms and Syngenta.
The Court finds that the parties’ Contract includes a valid and enforceable forum
selection clause. More specifically and for the purposes of the Motion to Transfer only, the
Court finds the Schedule of Supplemental Terms together with the Production Services
Agreement constitute a single agreement and the written embodiment of the parties’
Contract.
First, the Production Services Agreement provides for the following in terms of
price and payment: “Syngenta shall pay Producer for Services as set forth in the Schedule.”
(Dkt. 12-2, ¶ 2.) The only Schedule in the record comes from the Schedule of Supplemental
Terms.
Second, the Production Services Agreement also specifically provides that the
“agreement may be executed in counterparts, and such counterparts will collectively
constitute a single agreement.” (Dkt. 22-2, ¶ 12.20.) The Schedule of Supplemental terms
is a logical counterpart to the Production Services Agreement.
Third, the Schedule of Supplemental Terms states that “[t]he following
supplemental terms and conditions to the Production Services Agreement dated 03-152016 (the “Agreement”) are hereby incorporated into the Agreement as of the date signed
MEMORANDUM DECISION AND ORDER- 8
by Syngenta.” (Dkt. 12-2.) While the date is somewhat problematic, the only Production
Services Agreement in the record is the March 1, 2016 Production Services Agreement
with the forum selection clause at issue.
In short, reading the two documents together, along with the record as a whole, the
Court finds the Contract unambiguously includes both the Production Services Agreement
as well as the Schedule of Supplemental Terms. Moreover, Vincent Farms’ two central
arguments against finding the Production Services Agreement enforceable are simply not
compelling.
First, Vincent Farms specifically takes issue with the fact that the Production
Services Agreement is dated March 1, 2016, rather than March 15, 2016 as set forth in the
Schedule of Supplemental Terms. However, Mr. Bengoechea, a field representative for
Syngenta and Sygenta’s primary contact with Vincent Farms, explained that his meeting
with Roger Vincent to sign the Production Services Agreement and the Schedule of
Supplemental Terms was originally scheduled for March 1, 2016. (Dkt. 12-2, Bengoechea
Declaration, ¶ 2, 3.) Mr. Bengoechea provided that when the meeting was moved to March
15, 2016 the date was not corrected on the Production Services Agreement. (Dkt. 12-2,
Bengoechea Declaration, ¶ 2, 3.)
Mr. Bengoechea further stated that he was present during the meeting and witnessed
Mr. Vincent sign both the Production Services Agreement and the Schedule of
Supplemental Terms on March 15, 2016 and the Production Services Agreement provided
in the record is the only Production Services Agreement between Syngenta and Vincent
Farms. (Dkt. 12-2, Bengoechea Declaration, ¶ 3.)
MEMORANDUM DECISION AND ORDER- 9
The explanation from the Bengochea Declaration is reasonable on its face and there
are no other facts in the record to rebut it. Accordingly, the Court finds the different dates
are simply the result of a scheduling change and typographical error.
Second, Vincent Farms also argues that the Production Services Agreement is
between Syngenta and Producer Roger Vincent, whereas the Schedule of Supplemental
Terms is between Syngenta and Producer Vincent Farms. (Dkts. 11; 11-1; Ex. A, B.)
However, Roger Vincent is the President and registered agent of Vincent Farms. (Dkt. 12.)
Additionally, both contracts provide for the same contact phone number and mailing
address. (Dkt. 11-1, Ex. A, B; 12-2, Ex. A, B.) This phone number and mailing address is
the same contact information for Vincent Farms provided to the State of Idaho’s Secretary
of State on behalf of Vincent Farms’ President Roger Vincent. (Dkt. 12-3, Ex. 1.)
In short, the record suggests that Mr. Vincent signed the Production Services
Agreement in his capacity as President of Vincent Farms. In addition, Mr. Vincent signed
the Supplemental Schedule of Terms as President of Vincent Farms. There is no other
explanation for his signature in the record.
In sum, this Court is not persuaded by Vincent Farms’ arguments. The record is
clear: the parties have a valid and enforceable forum selection clause set forth in the
Production Services Agreement and both the Production Services Agreement and the
Supplemental Schedule of Terms, together, constitute the parties’ Contract.
2.
The Forum Selection Clause Governs This Dispute.
The “proper application of § 1404(a) requires that a forum selection clause be ‘given
controlling weight in all but the most exceptional cases.’” Atlantic Marine, 134 S.Ct. at
MEMORANDUM DECISION AND ORDER- 10
575 (quoting Stewart Organization, Inc., 487 U.S. at 33). “When the parties have agreed
to a valid forum selection clause, a district court should ordinarily transfer the case
specified in that clause” unless the non-moving party shows “extraordinary circumstances
unrelated to the convenience of the parties.” Id.
The existence of a valid forum selection clause changes the typical 1404(a) analysis
in three ways. Atlantic Marine, 134 S.Ct. at 581. “First, the plaintiff’s choice of forum
merits no weight,” instead it bears the “burden of showing why the court should not transfer
the case to the forum to which the parties agreed.” Id. at 581-82. Second, the Court “should
not consider arguments about the parties’ private interests.” Id. at 582. Rather, “a district
court may consider arguments about public-interest factors only” and “those factors will
rarely defeat a transfer motion.” Id. “Third, when a party bound by a forum selection clause
flouts its contractual obligation and files suit in a different forum, a § 1404(a) transfer of
venue will not carry with it the original venue’s choice-of-law rules– a factor that in some
circumstances may affect public-interest considerations.” Id. (citing Piper Aircraft Co. v.
Reyno, 454 U.S. 235, 241 n. 6 (1981)).
A.
Plaintiffs’ Claims Arise out of and Relate to the Production Services
Agreement.
The Ninth Circuit has held that “because enforcement of a forum selection clause
necessarily entails interpretation of the clause before it can be enforced, federal law . . .
applies to the interpretation of forum selection clauses.” Manetti-Farrow, Inc. v. Gucci
America, Inc., 858 F.2d 509, 513 (9th Cir. 1988). The Ninth Circuit has also held that the
MEMORANDUM DECISION AND ORDER- 11
scope of a forum selection clause is not limited to contract claims, but can encompass tort
or statutory claims that arise out of the contract. See Manetti-Farrow, 858 F.2d at 514.
Vincent Farms’ Complaint contains allegations of breach of contract, both express
and implied, and negligence against Syngenta. (Dkt. 1-1.) Syngenta contends that both of
these claims arise out of the Production Services Agreement. (Dkt. 6-1, 12.) Vincent Farms
maintains its claims arise out of the Schedule of Supplemental Terms; therefore, they are
not governed by any forum selection clause. (Dkt. 11.)
In the Production Services Agreement the parties agreed that “[a]ll disputes between
the parties arising under or relating to this Agreement shall be heard in the federal courts
in Minnesota, or, if such courts are unavailable, in the state courts of Minnesota in
Hennepin County.” (Dkt. 12-2, Ex. A.) The Production Services Agreement also provides
that “[t]his Agreement and the Schedules attached hereto are the complete agreement
between the parties” and “[i]n the event of any conflict between the terms of this
Agreement and the terms of any Schedule, the terms of this Agreement shall control.” (Dkt.
12-2, Ex. A.) The Schedule of Supplemental Terms provides that its terms and conditions
are supplemental to the Production Services Agreement. (Dkt. 12-2, Ex. B.)
Vincent Farms asserts that Syngenta breached the express terms of the Schedule of
Supplemental Terms by withholding payment of $283,006.08 for the Sugar Hart seed peas
provided to Syngenta by falsely claiming that Vincent Farms’ seed peas did not meet the
85% germination percentage required. (Dkt. 1-1.) Vincent Farms also asserts that Syngenta
was negligent in its preparation of the Sugar Hart seed peas for testing, which resulted in
MEMORANDUM DECISION AND ORDER- 12
Syngenta’s finding the Sugar Hart seed peas as not meeting the Schedule of Supplemental
Terms requirements for germination. (Dkt. 1-1.)
Thus, the Court finds the claims at issue arise out of and relate to the Production
Services Contract. The Schedule of Supplemental Terms is not a stand-alone contract. It is
a supplement to the Production Services Agreement. Therefore, the claims brought under
the Schedule of Supplemental Terms are necessarily brought under the Production Services
Agreement.
B.
Consent
Section 1404(a) grants courts discretion to transfer a civil action to “any district or
division to which all parties have consented.” 28 U.S.C. § 1404(a). Here, the parties have
consented to the federal courts of Minnesota as the proper forum in the Production Services
Agreement. Based on this consent, the Court finds that Atlantic Marine controls this case.
Thus, the Court should transfer the suit unless Vincent Farms demonstrates “extraordinary
circumstances unrelated to the convenience of the parties.” Atlantic Marine, 134 S.Ct. at
581.
C.
Extraordinary Circumstances
Where, as here, a valid forum selection clause exists, the Court’s analysis of the
Motion to Transfer Venue is limited to considering the public interest factors relevant to a
forum non conveniens inquiry and any other extraordinary circumstances the non-moving
party identifies in opposition to the transfer. Atlantic Marine, 134 S.Ct. at 581-82. The
Court does not consider the plaintiff’s choice of forum, private interests, or Idaho’s choiceof-law rules. Id.
Rather, the public interest factors the Court considers are: the
MEMORANDUM DECISION AND ORDER- 13
administrative difficulties flowing from court congestion; the local interest in having
localized controversies decided at home; and the interest in having the trial of a diversity
case in a forum that is at home with the law. Atlantic Marine, 143 S.Ct. 581, n. 6 (quoting
Piper Aircraft Co., 454 U.S. 241, n. 6).
Vincent Farms argues that this is an Idaho controversy, therefore the public interest
is served by having the case heard in Idaho. (Dkt. 11.) Specifically, Vincent Farms asserts
that the seed peas that are the crux of the controversy were grown on real property in Idaho
and the referee testing laboratory for quality of seed disputes is the Idaho State Seed
Laboratory. (Dkt. 11.)
While this may be so, the Court does not find that these facts satisfy Vincent Farms’
burden of establishing “extraordinary circumstances unrelated to the convenience of the
parties.” Atlantic Marine, 134 S.Ct. at 581. Vincent Farms agreed to litigate all its claims
arising out of the Production Services Agreement, including the Schedule of Supplemental
Terms, in Minnesota and has failed to demonstrate any extraordinary circumstances to
justify disregarding this knowing and voluntary choice.
CONCLUSION
The parties agreed at the outset of their relationship that any disputes arising from
or related to their Contract would be heard in the federal courts in Minnesota. Plaintiff’s
claims arise from and relate to that Contract. Therefore, without a showing of extraordinary
circumstances, the case shall be transferred to the United States District Court for the
District of Minnesota.
MEMORANDUM DECISION AND ORDER- 14
ORDER
NOW THEREFORE IT IS HEREBY ORDERED that:
1. Syngenta Seed, LLC’s Motion to Transfer Pursuant to 28 U.S.C. § 1404(a) (Dkt.
6) is GRANTED and this case is transferred to the United States District Court
for the District of Minnesota;
2. Plaintiff’s Motion to Strike Declaration of Mark Smith in Support of Defendant
Syngenta Seeds, LLC’s Motion to Transfer Pursuant to 28 U.S.C. §1404(a) (Dkt.
10) is DENIED; and
3. Plaintiff’s Motion to Strike Declaration of Jose “Joe” Bengochea in Support of
Defendant Syngenta Seeds, LLC’s Motion to Transfer Pursuant to 28 U.S.C. §
1404(a) (Dkt 14) is DENIED.
DATED: January 2, 2018
_________________________
Edward J. Lodge
United States District Judge
MEMORANDUM DECISION AND ORDER- 15
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.
Why Is My Information Online?