MEMORANDUM Opinion and Order Signed by the Honorable John J. Tharp, Jr on 10/10/2013:Mailed notice(air, )
IN THE UNITED STATES DISTRICT COURT
FOR THE NORTHERN DISTRICT OF ILLINOIS
EASTERN DIVISION
STEWART TITLE GUARANTY
COMPANY
Plaintiff,
v.
INSPECTION AND VALUATION
INTERNATIONAL, INC. & IVI
INTERNATIONAL, INC.,
)
)
)
)
)
)
)
)
)
)
)
No. 12 C 08918
Judge John J. Tharp, Jr.
Defendants.
MEMORANDUM OPINION AND ORDER
This lawsuit concerns the renovation of Hotel 71 at 71 East Wacker Drive in Chicago,
Illinois. The plaintiff in this case, Stewart Title Guaranty Company (“Stewart”), brings
subrogation, breach of contract, and negligent misrepresentation claims against IVI International,
Inc. and Inspection and Valuation International, Inc. (collectively, “IVI”). Stewart claims that
IVI breached its agreement with Wachovia, Stewart’s assignor and subrogor, by failing to detect
or report problems with renovation work on Hotel 71. Stewart also claims that IVI negligently
misrepresented the progress of the renovations.
IVI now moves to dismiss Stewart’s complaint in its entirety pursuant to Federal Rule of
Civil Procedure 12(b)(6). For the reasons explained below, IVI’s motion is granted. Stewart’s
claims against IVI are time-barred. Further, Stewart’s claim against IVI for negligent
misrepresentation is dismissed by application of the economic loss rule.
I.
Factual Background 1
Stewart is a title insurance underwriter in Illinois. In 2005, Column Financial Inc. loaned
H&S Hotel Property LLC (“H&S”), a developer, more than $100 million for the purchase and
renovation of Hotel 71. Column initially disbursed approximately $64 million of the loan to
H&S on March 30, 2005, as purchase money. The remaining $36 million was placed in escrow
or reserve accounts for future payments, of which $19,704,967 was placed in a reserve account
specifically designated for renovation expenses. In connection with a mortgage against the title
to the property, Stewart underwrote a title insurance policy to Column Financial. Column
assigned its rights under the loan, the mortgage, and the title insurance policy to a trust.
Wachovia Bank, N.A. (“Wachovia”) managed and administered some of the obligations of the
trust.
From June 2005 until March 2007, renovations at Hotel 71 progressed. H&S contracted
with an architect, construction managers, trade contractors, management companies, and
vendors. Wachovia disbursed funds from the renovation reserve account to pay them. Prudently,
but ultimately to no avail, Wachovia also sought to protect the trust’s interests by contracting
with IVI to serve as a project manager. By agreement, IVI was to (1) periodically visit the
project site; (2) attend monthly job meetings; (3) review and evaluate work in progress,
completed work, and work to be performed; (4) determine whether work was proceeding
according to plans, schedule, and budget; (5) provide project management and oversight; (6)
provide written reports of progress; (7) evaluate and certify construction contractor pay
1
In reviewing a motion to dismiss, the Court accepts the plaintiff’s well-pleaded factual
allegations as true and draws all reasonable inferences in its favor. Gessert v. United States, 703
F.3d 1028, 1033 (7th Cir. 2013). The facts recited here are taken from the plaintiff’s amended
complaint and are presumed to be true only for purposes of evaluating this motion.
2
applications (also known as “Draw Requests,” which included invoices, contractor affidavits,
and mechanics’ lien waivers); (8) advise on matters that would affect timely completion of the
project; and (9) send a licensed architect to periodically visit the project site. As for the Draw
Requests, IVI was responsible for their review, after which H&S submitted them to Wachovia
for payment. Stewart alleges that IVI certified Draw Requests totaling $19,873,441 for work
performed through February 12, 2007, more than the total amount of funds held in the renovation
reserve account.
Stewart (to which Wachovia’s claims against IVI were ultimately assigned) also alleges
that IVI “repeatedly reported” that it received “current and generally appropriate” lien waivers
from the principal suppliers and subcontractors, that the project was progressing in conformance
with plans, that no areas of unsatisfactory workmanship were observed, and that work completed
was performed in accordance with generally accepted construction industry standards. Stewart
further alleges that Wachovia relied on IVI’s reports before issuing payments from the
renovation reserve account.
On October 29, 2007, H&S filed for Chapter 11 bankruptcy. In re Chicago H&S Hotel
Property, L.L.C., Case No. 07-20088 (Bankr. N.D. Ill.). Sometime before February 14, 2008, 2
Wachovia learned that, notwithstanding the $19.8 million in disbursements from the construction
escrow account that IVI had certified, there were some $6.8 million of mechanics’ liens pending
on the project as of the filing of H&S’s bankruptcy petition. Based on the H&S bankruptcy
filings (of which the Court can take judicial notice), these liens appear to have prompted the
2
Stewart’s complaint for declaratory judgment against Wachovia (see below) alleges that
Wachovia had actual knowledge of millions of dollars of mechanics’ liens against the property
during 2006 and 2007, but for purposes of this opinion, it suffices that Wachovia clearly had
knowledge of the liens by the time it asserted its coverage claim against the title insurance
policy.
3
filing, at least in part. In any event, it is clear that Wachovia knew of these liens as of February
14, 2008, because on that date Wachovia advised Stewart of the bankruptcy and submitted a
written claim to Stewart seeking indemnity for loss or damage resulting from the lack of priority
of the mortgage by virtue of those same liens. In short, the H&S bankruptcy left Wachovia
holding the bag for the liens because the funds set aside for the renovation escrow account were
already depleted; Wachovia therefore sought coverage under the title insurance policy because
the H&S default had effectively reduced the value of its mortgage by about $6.8 million. 3
Stewart responded on October 27, 2008 by filing an action against Wachovia seeking a
declaration that no coverage existed under the title policy for the mechanics’ liens. Wachovia
then counterclaimed. Stewart Title Guaranty Co. v. Wachovia Bank, N.A., as Master Servicer
and Special Servicer for Wells Fargo Bank, N.A., as Trustee for Credit Suisse First Boston
Mortgage Securities Corp., the Assignee of Column Financial, Inc., Case No. 08-CH-40378 (Ill.
Cir. Ct. Cook Cnty.).
Sometime after October 27, 2008, Wachovia’s counsel received discovery from trade
contractors in the underlying mechanics’ lien litigation that did not match Draw Requests
provided to Wachovia by IVI during construction. In particular, Draw Request invoices and lien
waivers appeared to have been altered to increase dollar amounts, change project addresses,
falsify signatures, and conceal or falsify the identity of the project on which certain contractors
were working. Christopher M. Falor, a representative of the developer who was responsible for
submitting contractor invoices and preparing Draw Request paperwork, ultimately pled guilty in
2011 to a superseding criminal information alleging, among other things, that the Draw Requests
3
Ultimately, as part of the resolution of the bankruptcy proceedings, Wachovia
purchased the Hotel 71 property in a transaction expressly conditioned upon its funding of an
escrow account to cover payments to the mechanics’ lien claimants in the amount of $6,852,479.
4
submitted by H&S included fabricated and inflated expenses, fictitious invoices, and false waiver
of lien forms. See United States v. Falor, No. 10 CR 537, Dkt. 28 (superseding information) and
34 (entry of guilty judgment). Stewart’s chief complaint against IVI is that IVI breached its
agreement with Wachovia by failing to exercise the appropriate standard of care in reviewing the
status of the project and the propriety of disbursements and in negligently misrepresenting the
status of the project in its reports to Wachovia. 4
II.
Discussion
Stewart asserts three claims against IVI: (1) subrogation; (2) breach of contract; and (3)
negligent misrepresentation. IVI makes two arguments in favor of dismissing each of Stewart’s
claims. First, IVI argues that all three of Stewart’s claims are time-barred by the four-year statute
of limitations set forth in 735 ILCS 5/13-214 (“Construction – Design management and
supervision”). Second, IVI argues that Stewart’s claim for negligent misrepresentation is barred
by the economic loss doctrine.
This case involves diversity jurisdiction, so the Court will apply state substantive law.
See Fednav Intern. Ltd. v. Cont’l Ins. Co., 624 F.3d 834, 837-38 (7th Cir. 2010); see also
Conover v. Lein, 87 F.3d 905, 907 (7th Cir. 1996) (timeliness of diversity action is governed by
Illinois law, including the Illinois statute of limitations). Further, the parties agree that Illinois
law applies. See Fednav, 624 F.3d at 838 (forum state’s law applies absent a conflict-of-laws
dispute).
4
Wachovia later sold the project to CVOF 71, LLC. On or near March 1, 2012, Stewart
settled its lawsuit against CVOF (formerly against Wachovia) by paying CVOF a confidential
sum. CVOF assigned certain claims to Stewart, including claims against IVI, which are the
subject of this lawsuit. Stewart filed its complaint against IVI in the Circuit Court of Cook
County on October 19, 2012. IVI removed the lawsuit to federal court on November 7, 2012,
pursuant to 28 U.S.C. § 1332 based on complete diversity of citizenship between the parties.
5
A. Stewart’s Claims are Time-Barred.
IVI first argues that Stewart filed its lawsuit after the statute of limitations expired, and
that therefore Stewart’s complaint should be dismissed in its entirety. The Court agrees.
The parties agree that the statute of limitations applicable to Stewart’s claims is 735 ILCS
5/13-214, which states:
Actions based upon tort, contract or otherwise against any person for an act or omission
of such person in the design, planning, supervision, observation or management of
construction, or construction of an improvement to real property shall be commenced
within 4 years from the time the person bringing an action, or his or her privity, knew or
should reasonably have known of such act or omission.
The purpose of this statute is to “prevent liability in perpetuity against persons involved in the
design and construction of buildings, such as architects, contractors and engineers (see 80th Ill.
Gen. Assem., House Proceedings, May 25, 1979, at 11).” DeMarco v. Ecklund, 341 Ill. App. 3d
225, 228, 792 N.E.2d 404, 407 (2d Dist. 2003) (citation omitted). This statute expresses the socalled “discovery” rule; an aggrieved party has four years to file a claim from the time they
discover (or reasonably should have discovered) harmful acts or omissions. See Ctr. Ice of
Dupage, Inc. v. Burley’s Rink Supply, Inc., No. 96-C-5537, 1997 WL 43230, at *2 (N.D. Ill. Jan.
24, 1997) (defining the “discovery rule” in the context of Section 13-214).
Here, the parties dispute at what point in time Wachovia discovered or reasonably should
have discovered IVI’s alleged wrongs. 5 Stewart maintains that its claims against IVI did not
accrue until Wachovia discovered, after October 27, 2008, that H&S falsified, modified, altered,
or created documents that were submitted by certain contractors. Stewart argues, in essence, that
it was only the discovery of H&S’s fraud that put Wachovia on notice of potential claims against
5
As Wachovia’s assignee/subrogee, Stewart stands in Wachovia’s shoes and application of the
statute of limitations is governed by the date that Wachovia was on inquiry notice of its claims.
See Dix Mut. Ins. Co. v. LaFramboise, 149 Ill. 2d 314, 319, 597 N.E.2d 622, 625 (1992).
6
IVI. For its part, IVI counters that Stewart’s focus on the discovery of the H&S fraud is
misplaced because Wachovia was on notice well before then that IVI may have fallen short in
the performance of its contractual duties to monitor the course of the project and to certify that
project expenditures were in order. IVI argues that by February 14, 2008, when Wachovia
asserted a claim on the title insurance policy, Wachovia knew that, despite IVI’s Draw Request
certifications and statements that the principal contractors on the projects had granted lien
waivers, thirty-six suppliers and subcontractors were claiming that they were owed almost $7
million for materials and labor. Wachovia also knew that it had already disbursed almost $20
million to H&S, more than the entire renovation reserve account for the project, to pay material
suppliers, contractors, and subcontractors.
The Court finds that time began to accrue on or before February 14, 2008, when
Wachovia knew there was a significant problem with the renovation reserve account and also
knew, or should have known, that it might have an actionable claim against IVI. The Illinois
Supreme Court has interpreted the “discovery period” in 735 ILCS 5/13-214 to begin “when a
person knows or reasonably should know of his injury and when a person knows or reasonably
should know that it was wrongfully caused.” LaSalle Nat’l Bank v. Skidmore, Owings & Merrill,
et al., 262 Ill. App. 3d 899, 902, 635 N.E.2d 564, 567 (1st Dist. 1994) (emphasis in original)
(citing Cnty. of Du Page v. Graham, 109 Ill. 2d 143, 153-54, 485 N.E.2d 1076, 1080 (1985)). An
aggrieved party has knowledge that an injury is “wrongfully caused” when he or she possesses
“enough information about the injury to alert a reasonable person to the need for further inquiries
to determine if the cause of the injury is actionable at law.” Id.
Taking as true the amended complaint’s factual allegations, Wachovia knew on February
14, 2008, at the latest, that IVI failed to report almost $7 million in mechanics’ liens. In fact, IVI
7
certified that it received “current and generally appropriate” lien waivers from the principal
suppliers and subcontractors for work performed through February 2007. IVI argues that
mechanics’ liens are common and the existence of such liens does not necessarily imply
malfeasance. That is true enough, but IVI essentially told Wachovia that there were no liens, and
Wachovia knew by February 2008 that IVI’s representation in that regard was, at best, grossly
inaccurate. By that time, Wachovia knew that the principal suppliers and contractors could not
have granted all necessary lien waivers: there were outstanding claims by those suppliers and
contractors that they were owed almost $7 million for materials and labor and that based on IVI’s
Draw Request certifications, the entire renovation reserve account—almost $20 million—had
already been paid to H&S. Put another way, Wachovia knew by the time it asserted a claim on
Stewart’s title policy that IVI, the firm it hired to “determine whether the work was proceeding
in accordance with the approved plans, schedule and budget,” Am. Compl. ¶ 18.d., had failed to
provide timely notification that there was a cost overrun on the project of about 35 percent (the
$7 million in outstanding liens divided by the $20 million renovation budget). These facts were
more than sufficient to put Wachovia on notice not only that something was amiss with the
renovation project but also that IVI may not have performed adequately its duties to keep tabs on
the project. Accordingly, they mark the latest date by which the statute of limitations on
Wachovia’s claims against IVI began to run.
Discovery of the H&S fraud is irrelevant to this analysis. Wachovia knew that it had been
injured by the appearance of unreported mechanics’ liens well before it learned that H&S’s fraud
might have caused some or all of those liens, and Stewart’s claim, in any event, is not against
H&S for fraud but against IVI for failing to perform its duties as Wachovia’s project manager.
Those duties may have included fraud detection, but they also included (according to Stewart’s
8
amended complaint) the failure “to identify, detect or report that the Draw Requests actually
lacked ‘current and generally appropriate’ lien waivers from the principal suppliers and
subcontractors.” Am. Compl. ¶ 37.h. The relevant issue for purposes of the statute of limitations
is whether Wachovia (now represented by Stewart) had reason to investigate whether it had a
claim against IVI based on IVI’s failure to alert it to the pending mechanics’ liens and its
erroneous certifications that lien waivers had been received from the project’s contractors and
suppliers. The developer’s fraud has no bearing on this question; IVI could be liable for
breaching its duties to Wachovia even if no fraud contributed to the cost overruns. Fraud or not,
on discovering millions in unreported mechanics’ liens, Wachovia had ample reason to believe
that IVI had dropped the ball and might therefore be liable to Wachovia. Stewart was, then,
required to file suit on or before February 14, 2012; its claims arising from IVI’s alleged breach
of its duties as project manager, filed in November 2012, are therefore time-barred.
B. Stewart’s Claim for Negligent Misrepresentation is Barred by the Economic
Loss Doctrine.
Stewart’s claim for negligent misrepresentation must be dismissed for a second reason.
Stewart alleges that IVI made a variety of negligent misrepresentations to Wachovia regarding
the “progress, quality, quantity and status of the work” on Hotel 71, as well as the budget and
schedule. Am. Compl. ¶ 48. In particular, Stewart alleges that IVI failed to report to Wachovia
that (1) contractors who were not performing work on Hotel 71 were nonetheless submitting pay
requests; (2) a general contractor who attested to Draw Requests was not observed or
interviewed by IVI and never performed work on the hotel; (3) IVI did not properly oversee the
Draw Requests for the project; (4) IVI did not attend or report that it failed to attend monthly job
meetings; (5) IVI did not report that work did not appear to be in conformance with plans; and
9
(6) IVI did not report issues that would affect timely completion of the renovation project.
Stewart further alleges that Wachovia relied on IVI’s negligent misrepresentations.
IVI argues that Stewart’s negligent misrepresentation claim is barred by the economic
loss doctrine. In Illinois, suits for “solely economic loss[es]” are generally not recoverable in
tort. See Moorman Mfg. Co. v. Nat’l Tank Co. et al., 91 Ill. 2d 69, 81, 435 N.E.2d 443, 448
(1982); see also First Midwest Bank, N.A. v. Stewart Title Guar. Co., 218 Ill. 2d 326, 337, 843
N.E.2d 327, 333 (2006). Moorman defines “economic loss” as “damages for inadequate value,
costs of repair and replacement of the defective product, or consequent loss of profits – without
any claim of personal injury or damage to other property.” 91 Ill. 2d at 82 (citation omitted). The
familiar rationale of the economic loss doctrine is that “contract law and the Uniform
Commercial Code offer the appropriate remedy for economic losses occasioned by diminished
commercial expectations.” Hartford Fire Ins. Co. v. Henry Bros. Constr. Mgmt. Servs., LLC, 877
F. Supp. 2d 614, 619 n.3 (N.D. Ill. 2012) (citation omitted).
There is an exception to Moorman that is relevant to this case – a tort claim for negligent
misrepresentation can stand if a party negligently conveys false information and that party is in
the business of supplying information for the guidance of others in their business transactions.
See First Midwest Bank, 218 Ill. 2d at 337; see also Tolan and Son, Inc. v. KLLM Architects,
Inc., et al., 308 Ill. App. 3d 18, 27, 719 N.E.2d 288, 296 (1st Dist. 1999) (stating test as (1) the
defendant is in the business of supplying information for the guidance of others in their business
dealings; (2) the defendant provided information that constitutes a misrepresentation; and (3) the
defendant supplied the information for guidance in the plaintiff’s business dealings).
The key question in assessing whether a defendant is in the business of supplying
information is whether the parties’ relationship is in furtherance of the creation of a tangible
10
product. Where the ultimate result of the contractual undertaking is the creation of a tangible
product, the economic loss doctrine generally bars recovery of damages in tort. See, e.g.,
Hartford Fire, 877 F. Supp. 2d at 620 (“[I]f the intended end result of the relationship is for the
defendant to create a product – a tangible thing – then the defendant will not fit into the ‘business
of supplying information’ negligent misrepresentation exception.”); MW Mfrs., Inc. v. Friedman
Corp., No. 97-C-8319, 1998 WL 417501, at *4 (N.D. Ill. July 21, 1998) (negligent
misrepresentation claim barred because the “end result of the plaintiff-defendant relationship”
was for the defendant software vendor to create a product, “a tangible thing”). It is not always
clear, however, whether a business is merely supplying intangible information or facilitating the
creation of a tangible product, particularly in the construction context. For that reason, there are
no absolutes, and no bright lines, that govern application of this exception in Illinois. Rather, the
Court must undertake a “precise, case-specific inquiry.” Tolan and Son, 308 Ill. App. 3d at 27.
According to the amended complaint, IVI used “a licensed architect” to oversee the
renovation project and “in the usual course of events, architects and engineers provide
information, plans, and specifications that are incorporated into a tangible product, building, or
structure.” Tolan and Son, 308 Ill. App. 3d at 27, 31 (negligent misrepresentation claim barred
because architect and engineer provided information that was ancillary to their role in designing
and constructing buildings); see also Guitar Ctr. Stores, Inc. v. 7250 South Cicero Equities, LLC,
No. 07-C-4227, 2007 WL 3374592, at *3 (N.D. Ill. Nov. 8, 2007) (negligent misrepresentation
claim barred because contractor informing purchaser about progress of construction was not in
business of supplying information). Seeking to fit within the information business exception,
however, Stewart casts IVI not as an architect or construction manager but as an information
purveyor retained solely as a consultant “to inspect work, report to and advise Wachovia.” Pl.’s
11
Br. 11. And it is true enough that a defendant’s occupational title does not determine whether the
economic loss rule applies. “[T]here may well be situations where a plaintiff may maintain a
cause of action against an architect or engineer based on the negligent misrepresentation
exception,” such as where the architect or engineer is “engaged solely to provide information
based upon an evaluation and the value of the services lies in its analytical work rather than a
tangible end product.” Tolan and Son, 308 Ill. App. 3d at 21, 27, 30. See also, e.g., Tribune Co.
v. Geraghty & Miller, Inc., No. 97-C-1889, 1997 WL 438836, at *3 (N.D. Ill. July 25, 1997)
(negligent misrepresentation claim allowed because defendant environmental assessment
services provided analytic work in a report); see also Ill. Bell Tel. Co. v. Plote, Inc., et al., 334
Ill. App. 3d 796, 800, 778 N.E.2d 1203, 1206 (2002) (negligent misrepresentation claim allowed
because defendant phone company provided information about the location of its facilities).
This, however, is not such a case. IVI was retained to supervise a construction project—
namely, the renovation of Hotel 71. Any information IVI provided to Wachovia – such as the
written progress reports and certified Draw Requests – was learned from job meetings, visits to
the construction site, and other activities related to IVI’s role providing “project management and
oversight for the Project.” Am. Compl. ¶ 18.e. This information was part and parcel of the
construction and had no independent significance; ultimately, it was “transformed into the
building itself.” 2314 Lincoln Park West Condo. Ass’n v. Mann, Gin, Ebel & Frazier, Ltd., et al.,
136 Ill. 2d 302, 313, 555 N.E.2d 346, 351 (1990) (negligent misrepresentation claim barred
because even though “it may be the case that an architect does in fact supply information,” the
information supplied by the architect here is “merely incidental” and “is transformed into the
building itself”); see also, e.g., Fireman’s Fund Ins. Co. v. SEC Donohue, Inc., 176 Ill. 2d 160,
12
169, 679 N.E.2d 1197, 1201 (1997) (negligent misrepresentation claim barred because
engineer’s plans and drawings were incidental to a tangible product, i.e., a water supply system).
In this regard, this case is indistinguishable from Hartford Fire. 6 There, the court
dismissed a plaintiff’s negligent misrepresentation claim where the defendant construction
management company was retained to supervise the renovation of a school. 877 F. Supp. 2d at
621. As here, the defendant construction manager’s responsibilities included supervising
contractors and subcontractors, inspecting work, and reporting problems. Id. The court found that
the “end product … was not the information … [but] the completion of the school renovation
project.” The defendant, the court concluded, was in the business of supervising construction, not
supplying information. Id. at 621-22.
So too here. The information IVI supplied (or was supposed to supply, in any event) was
incidental to and for the purpose of facilitating the creation of a tangible product: the renovated
Hotel 71. Accordingly, the Court concludes that IVI was not in the business of supplying
information and cannot be sued for negligent misrepresentation under that exception to the
economic loss doctrine. Stewart’s claim for negligent misrepresentation fails as well on this
additional basis.
*
*
*
For the reasons set forth above, the defendants’ motion to dismiss is granted and the
complaint is dismissed with prejudice in its entirety.
6
Hartford Fire is not, of course, controlling authority, but Judge Dow’s comprehensive
discussion of the business information exception to the economic loss doctrine in that case, and
its application in the closely analogous situation of a construction manager, is highly persuasive.
13
Entered: October 10, 2013
John J. Tharp, Jr.
United States District Judge