Russell v. CSX Transportation, Inc.
Filing
50
ORDER denying 41 MOTION for Summary Judgment filed by CSX Transportation, Inc. Final Pretrial Conference set for 5/8/2014 at 9:00 AM in East St. Louis Courthouse before Chief Judge David R. Herndon. Signed by Chief Judge David R. Herndon on 3/3/2014. (mtm)
IN THE UNITED STATES DISTRICT COURT
FOR THE SOUTHERN DISTRICT OF ILLINOIS
JAMES MELVIN RUSSELL,
Plaintiff,
v.
CSX TRANSPORTATION, INC.,
a Corporation,
Defendant.
No. 12-cv-316-DRH-PMF
MEMORANDUM & ORDER
HERNDON, Chief Judge:
I.
INTRODUCTION
Before the Court is defendant CSX Transportation, Inc.’s, motion for
summary judgment (Doc. 41, Memo. at Doc. 42). Defendant CSX Transportation,
Inc., (CSX) seeks summary judgment on plaintiff James Melvin Russell’s
complaint. Plaintiff James Melvin Russell (Russell) has responded in opposition
(Doc. 47), to which CSX has replied (Doc. 48). For the following reasons, CSX’s
motion is DENIED.
II.
BACKGROUND
Russell, a train conductor in CSX’s employ, filed this action in this Court
against CSX on April 17, 2012. On December 21, 2009, Russell was on a train
travelling from Louisville, Kentucky to Cincinnati, Ohio. During the trip, Russell’s
train pulled into a side track in Verona, Kentucky to let another train pass.
Page 1 of 14
Russell dismounted his locomotive to perform a visual inspection of the passing
train. Russell stepped down from the locomotive facing the steps and when he
stepped down onto the ballast with his right foot he alleges the ground “separated”
and he fell.
Russell brings his one-count complaint under the Federal Employers’
Liability Act (FELA), 45 U.S.C. § 51, et seq. Russell alleges CSX negligently and
carelessly failed to provide Russell with a safe work place, a reasonably safe
manner within which to do his work, and a firm and level ballast and work
surface.
Russell alleges CSX failed to maintain Russell’s work area in a condition
which would protect Russell and did not correct dangerous work conditions.
Russell’s complaint cites CSX’s alleged violations of 49 C.F.R. § 213.33, “in failing
to keep its work surfaces adjacent to the roadbed maintained and free of
obstruction,” 49 C.F.R. § 213.103, “in failing to conduct scheduled track and
ballast inspections,” and 49 C.F.R. § 213.233, “in failing to conduct scheduled
track and ballast inspections” (See Doc. 2, ¶¶ 7 and 8).
Russell alleges CSX’s
negligence caused him to sustain “severe and permanent injuries” to his knees,
legs, and feet, in addition to other related injuries.
CSX moves for summary judgment, arguing that the Federal Railroad
Safety Act (FRSA), 49 U.S.C. § 20106(a), and specifically the Federal Railroad
Administration (FRA) ballast regulations, 49 C.F.R. § 213.103, preclude Russell’s
claims. CSX argues there is no evidence to support Russell’s allegation that the
Page 2 of 14
ballast on which Russell stepped failed to meet the FRA’s performance standards
for ballast.
And further, no evidence support Russell’s remaining claims of
negligence.
III.
LAW AND APPLICATION
1. Standard
Summary judgment is proper when the pleadings, discovery, and
disclosures establish that there is no genuine issue of material fact and the
movant is entitled to judgment as a matter of law. Fed. R. Civ. P. 56(a); Winsley
v. Cook Cnty., 563 F.3d 598, 602–03 (7th Cir. 2009); see Celotex Corp. v.
Catrett, 477 U.S. 317, 322–23 (1986). The movant bears the initial burden of
establishing the absence of fact issues and its entitlement to judgment as a matter
of law.
Santaella v. Metro. Life Ins. Co., 123 F.3d 456, 461 (7th Cir. 1997)
(citing Celotex, 477 U.S. at 323). Once the movant has shown the facts entitle it
to judgment in its favor, the burden shifts to the non-moving party to identify
some evidence in the record that establishes a triable factual issue. Trentadue v.
Redmon, 619 F.3d 648, 652 (7th Cir. 2010).
A genuine dispute as to a material fact exists if “the evidence is such that a
reasonable jury could return a verdict for the nonmoving party.” Pugh v. City of
Attica, Indiana, 259 F.3d 619, 625 (7th Cir. 2001). The Court will enter
summary judgment against a party who does not “come forward with evidence
Page 3 of 14
that would reasonably permit the finder of fact to find in [its] favor on a material
question.” McGrath v. Gillis, 44 F.3d 567, 569 (7th Cir. 1995).
2. Arguments and Application
a. Preclusion
CSX argues Russell’s FELA claims are precluded in light of the FRA ballast
regulation, 49 C.F.R. § 213.103. In 1908, Congress enacted the FELA. 45 U.S.C.
§ 51, et seq. The FELA provides:
Every common carrier by railroad while engaging in commerce
between any of the several States or Territories . . . shall be liable in
damages to any person suffering injury while he is employed by such
carrier in such commerce, . . . for such injury or death resulting in
whole or in part from the negligence of any of the officers, agents, or
employees of such carrier, or by reason of any defect or insufficiency,
due to its negligence, in its cars, engines, appliances, machinery,
track, roadbed, works, boats, wharves, or other equipment.
45 U.S.C. § 51.
“The intent of the FELA is to provide broad remedial measures
for railroad employees.” Green v. CSX Transp., Inc., 414 F.3d 758, 765 (7th Cir.
2005). As this broad language covers injury caused “in whole or in part” by the
railroad’s negligence, the railroad is liable if, “the proofs justify with reason the
conclusion that employer negligence played any part, even the slightest, in
producing the injury or death for which damages are sought.”
Coffey v.
Northeast Illinois Regional Commuter R. Corp., 479 F.3d 472, 476 (7th Cir,
2007) (quoting Rogers v. Missouri Pacific R.R., 352 U.S. 500, 506 (1957)
(emphasis added)).
Page 4 of 14
In 1970, Congress passed the FRSA to “promote safety in every area of
railroad operations and reduce railroad-related accidents.” 49 U.S.C. § 20101.
The FRSA vests the Secretary of Transportation with the authority to prescribe
regulations to “supplement” railroad safety laws and regulations.
49 U.S.C. §
20103. The Secretary has delegated that authority to the FRA. 49 C.F.R. § 1.88.
The Secretary appointed a Task Force charged with studying railroad safety
problems and recommending solutions. H.R. Rep. No. 91-1194 (1970), reprinted
in 1970 U.S.C.C.A.N. 4104, 4108. The Task Force unanimously recommended
the enactment of broad federal regulation over all areas of railroad safety. Id. It
noted the “truly interstate character” of railroads required a “uniform body of
regulation and enforcement.”
Id.
The Task Force recommended that existing
state statutes would stay in effect until preempted by federal action. Id.
In response to the Task Force’s recommendations, Congress enacted the
preemption clause of the FRSA. 49 U.S.C. § 20106, provides:
(a) National uniformity of regulation.--(1) Laws, regulations, and
orders related to railroad safety and laws, regulations, and orders
related to railroad security shall be nationally uniform to the extent
practicable.
(2) A State may adopt or continue in force a law, regulation, or order
related to railroad safety or security until the Secretary of
Transportation (with respect to railroad safety matters), or the
Secretary of Homeland Security (with respect to railroad security
matters), prescribes a regulation or issues an order covering the
subject matter of the State requirement. A State may adopt or
continue in force an additional or more stringent law, regulation, or
order related to railroad safety or security when the law, regulation,
or order-Page 5 of 14
(A) is necessary to eliminate or reduce an essentially local
safety or security hazard;
(B) is not incompatible with a law, regulation, or order of the
United States Government; and
(C) does not unreasonably burden interstate commerce.
CSX relies on the preemption clause of the FRSA and specifically, the FRA
ballast regulation in arguing Russell’s claims are precluded as a matter of law. In
Waymire v. Norfolk and Western Railway Co., 218 F.3d 773 (7th Cir. 2000), the
Seventh Circuit determined, “whether a railroad company can be liable in a FELA
negligence action claiming unsafe speed and inadequate warning devices when the
complained of conduct complies with the conduct mandated by FRSA.” Id. at 775.
In finding the plaintiff’s FELA claims were precluded, the court looked to the
Supreme
Court’s
preemption
analysis
in
CSX
Transportation,
Inc.
v.
Easterwood, 507 U.S. 658 (1993).
In Easterwood, the Supreme Court found that the plaintiff’s state law
excessive speed claims were barred under the preemption clause of the FRSA, as
regulations under the FRSA set the maximum train speeds and the defendant’s
train was within that limit. In determining the speed regulations “covered” the
subject, the Supreme Court noted that to prevail in a preemption argument, the
proponent must establish that the regulations more than “touch upon” or “relate
to” the subject matter; the regulation must “substantially subsume the subject
matter of the relevant state law.” Id. at 665.
Page 6 of 14
Thus, the Seventh Circuit found, “[i]n Easterwood, the train was operating
within the FRSA prescribed 60 miles per hour speed limit, as was [the
defendant’s] train in this case. It would thus seem absurd to reach a contrary
conclusion in this case when the operation of both trains was identical and when
the Supreme Court has already found that the conduct is not culpable negligence.”
Waymire, 218 F.3d at 776. The court went on to employ similar reasoning in
rejecting the plaintiff’s inadequate warning device claim. Id. at 776-77.
CSX, not for the first time, argues the FRA ballast regulations “cover” the
subject matter of ballast and thus Russell’s claims are precluded.
The FRA
ballast regulations provide as follows:
Unless it is otherwise structurally supported, all track shall be
supported by material which will—
(a) Transmit and distribute the load of the track and railroad rolling
equipment to the subgrade;
(b) Restrain the track laterally, longitudinally, and vertically under
dynamic loads imposed by railroad rolling equipment and thermal
stress exerted by the rails;
(c) Provide adequate drainage for the track; and
(d) Maintain proper track crosslevel, surface, and alinement.
49 C.F.R. § 213.103.
Additionally, 49 C.F.R. §§ 213.33 and 213.37 address
roadbed drainage and trackside vegetation, and related regulations concern
technical track geometry requirements, 49 C.F.R. §§ 213.57 (curves), 213.63
(track surface), and 213.55 (alinement).
Page 7 of 14
CSX asks that this Court rely upon the Sixth Circuit’s majority opinion in
Nickels v. Grand Trunk Western Railroad, Inc., 560 F.3d 426 (6th Cir. 2009),
and find that the regulations above demonstrate that the FRSA “covers” the
subject matter of Russell’s claims. In Nickels, the plaintiffs brought FELA claims
alleging years of walking on over-sized track ballast caused them injury.
The
majority held the regulation “substantially subsumes the issue of ballast size,”
even though the regulation did not prescribe a specific size of ballast for certain
types of classes or tracks, instead leaving that determination to the railroad’s
discretion.
Id. at 431.
In so finding, the Sixth Circuit noted that while the
plaintiffs argued 49 C.F.R. § 213.103 does not address, “what constitutes
reasonably safe walkway for railroad employees performing their duties adjacent
to the track,” plaintiffs’ complaint did not allege, “negligence in the railroad’s use
of oversized ballast in areas separate from those where track stability and support
are concerned.” Id. at 432.
In contrast, the dissent found application of the Easterwood analysis would
not require a finding that the plaintiffs’ claims were categorically precluded. Id. at
433 (Rogers, J., dissenting). The dissent agreed with Waymire, 218 F.3d at 77576, in its general application of the FRSA’s preemption clause to FELA claims
provided the claim would be preempted if brought under state tort law. However,
the dissent noted, “under the Supreme Court's FRSA federal preemption analysis,
the FRSA regulations that require adequate physical support for rails do not
sufficiently imply that railroads may use any grade of sufficiently supportive
Page 8 of 14
ballast, no matter the risk to employees who must walk on the ballast.” Id. at
433. “Nothing in 49 C.F.R. § 213.103 or any related regulations addresses the
issue of trackside walkways and ballast size. The regulations generally require
adequate support for the trains, and advert in no way to the nature of a walking
surface.” Id. Thus, the dissent found that,
[T]he FRSA [ballast] regulation is a floor that guarantees a minimum
level of safety and there are many ways that the railroad can meet the
standard. The manner in which the railroad complies with the
standard may involve using ballast that is more or less conducive to
creating safe walkways for railroad employees. While compliance with
the FRSA regulation is evidence of due care, it “does not preclude
finding negligence if reasonable railroads would have taken
additional precautions to prevent injury to their employees.”
Id. at 435-36 (citing Lane v. R.A. Sims, Jr., Inc., 241 F.3d 439, 442 (5th Cir.
2001)).
As the parties are aware, the Seventh Circuit has not addressed the issue of
preclusion of FELA ballast-related claims in light of the FRA ballast regulation.
CSX argues the ballast regulation “covers” the subject of ballast configuration,
although a particular configuration of ballast is not specified.
CSX relies on
Nickels as well as decisions of district courts outside of the Seventh Circuit in
support of its argument for preclusion. See e.g. Lybrand v. Union Pac. R.R. Co.,
2012 WL 1436690, *3 (E.D. Ark. April 25, 2012) (Moody, J.) (finding the
plaintiff’s claims based on size and shape of ballast precluded, while claims as to
failure to provide reasonably safe walkway were not); Crabbe v. Consolidated
Rail Corp., 2007 WL 3227584, *4 (E.D. Mich. Nov. 1, 2007) (Duggan, J.)
Page 9 of 14
(granting summary judgment as to FELA allegations claiming improper ballast or
oversized ballast, while leaving remaining FELA negligence claims generally
alleging failure to provide adequate and safe work methods and inspect and
investigate premises intact); Brenner v. Consolidated Rail Corp., 806 F. Supp. 2d
786, 796 (E.D. Pa. 2011) (Joyner, J.) (relying persuasively on Nickels and finding
the plaintiff’s FELA negligence claims based on the nature and size of ballast used
for track stability, support, and drainage were precluded); McCain v. CSX
Transp., Inc., 708 F. Supp. 2d 494, 504 (E.D. Pa. 2010) (Robreno, J.) (finding the
plaintiff’s claims based on the nature and size of the track ballast were precluded,
in persuasive reliance on Nickels); CSX Transp., Inc. v. Pitts, 61 A.3d 767, 78283 (Md. 2013) (Adkins, J.) (finding that FRSA “covers” the use of ballast that
support a track, but that CSX failed to prove the ballast at issue performed a
track-support function).
As for cases within the Seventh Circuit, in Norfolk S. Ry. Co. v. Box, 556
F.3d 571 (7th Cir. 2009), the Seventh Circuit held an Illinois law requiring rail
switching yards to include walkways, parallel to each track, for persons who work
there was not preempted as “no federal regulation deals with walkways.” Id. at
572. Although Norfolk was of course not decided in the context of a FELA claim,
its reliance on an absence of federal railroad walkway regulations is informative to
the task as hand. Additionally, as CSX is aware, numerous district courts within
this Circuit have addressed the issue of preclusion in relation to FELA ballastrelated claims. See e.g. Grimes v. Norfolk S. Ry. Co., 116 F. Supp. 2d 995, 1002
Page 10 of 14
(N.D. Ind. 2000) (Sharp, J.) (finding plaintiff’s claim that railroad was negligent in
failing to provide a safe walkway for employees to use when they must walk
alongside the train to inspect cars was not precluded by FRA regulations); Wilcox
v. CSX Transp., Inc., 2007 WL 1576708, * (N.D. Ind. May 30, 2007) (Lee, J.)
(noting favorable reliance on Grimes, and holding that the plaintiff’s claim that he
developed injury over time from walking on over-sized ballast was not precluded
by the FRA ballast regulations as they contain no language about employee safety);
Grogg v. CSX Transp., Inc., 659 F. Supp. 2d 998, 1015 (N.D. Ind. 2009) (Lee, J.)
(finding that the plaintiff’s FELA negligence claim alleging that he was forced to
work on uneven ballast and that this caused or contributed to the arthritis in his
knee was not precluded, noting the law in the Seventh Circuit had not changed
since Wilcox).
In extensively reviewing the cases above, it would appear the general
consensus among these decisions is that FELA claims alleging negligence in
relation to “walkway” ballast are not necessarily precluded. This is in part due to
the FRA’s decision not to adopt federal walkway rules, see Box, 556 F.3d at 573
(citing 41 Fed. Reg. 50, 302 (1976)), and thus it does not appear the FRA ballast
regulations “substantially subsume” the subject of FELA negligence claims in
relation to walkway ballast. Easterwood, 507 U.S. at 665.
In its decision not to
adopt federal walkway regulations the FRA stated that, “if an employee safety
problem does exist because of the lack of walkways in a particular area or on a
particular structure, regulation by a State agency that is in a better position to
Page 11 of 14
assess the local need is the more appropriate response.” Id. (quoting 42 Fed. Reg.
22, 184–85 (1977)) (quotation marks omitted). The ballast regulation at issue, 49
C.F.R. § 213.103, falls under Subpart D, “Track Structure,” and addresses the
need to provide a safe roadbed for the trains. The argument that uniformity in
regulations of this type is required is not lost on this Court.
However, the
regulation does not address the use or configuration of ballast as a walking
surface for railroad employees.
CSX offers an affidavit of Roy L. Dean (Dean), a civil engineer in Wake
Forest, North Carolina. Dean avers the following:
2. [Russell] claims ballast gave way as he dismounted the locomotive
near Verona, Kentucky. [Russell] dismounted the locomotive on
mainline track.
3. When dismounting the locomotive, plaintiff stepped on ballast that
structurally supported the track. Track supporting ballast extends a
minimum of four (4) feet beyond the ends of the cross ties. [] Russell
would have stepped on the ballast approximately 20 inches to 24
inches beyond the end of the cross ties. The track supporting ballast
would have extended approximately an additional two (2) feel beyond
the location [] Russell placed his foot.
(Doc. 42-2, p. 1).
At his deposition, Russell testified that the configuration of the ballast that
he stepped onto while disembarking a locomotive caused his injury (Doc. 47-1, p.
33). He was facing the steps of the locomotive and holding onto its railing when
he stepped down onto ballast. When he stepped down, the ballast, i.e., “ground,”
“separated” (Id.). Russell alleges the “ballast was not properly level. It was below
the tie. And the area where [he] was—basically it was wash-out from erosion,
Page 12 of 14
things of that nature” (Id. at p. 24). When asked whether the “surface that was
adjacent to the roadbed” caused any injury, Russell answered, “well, what I am
saying is there was . . . [n]o ballast by the ties” (Id. at p. 32). And later when
asked, “[s]o, with respect to the surface adjacent to the roadway, did that have
anything to do with your injury?” Russell, answered, “No, Sir.” Russell then went
on to admit he had no expertise on the construction of railroad roadways or
ballast (Id. at p. 33).
Generally, Russell alleges CSX failed to provide him a reasonably safe work
place as it did not provide him an adequate work surface on which he could
disembark from the locomotive. This Court feels Russell’s claims are not and
should not be precluded. As it is most obviously an unsettled question in the
Seventh Circuit, this Court feels the dissent of Nickels persuasively demonstrates
that the FRA ballast regulations do not “substantially subsume” Russell’s claims.
The ballast regulation is a floor which does not take into account the fact that
ballast serves as a walkway and/or place for railroad employees to dismount. In
the course of Russell’s employment, he is required to disembark from CSX’s
locomotive to inspect passing trains.
The FRA ballast regulations do not
contemplate this employer-mandated use of ballast. In contrast and by way of
analogy, the Court feels CSX’s argument would perhaps be well taken in the
context of a commercial shipper’s claim that ballast shifted and thus caused
damage to its cargo. If the shipper then claimed this damage resulted from CSX’s
failure to comply with a state ballast regulation designed to prevent erosion and
Page 13 of 14
shifting of ballast, its property damage claim would most likely be preempted.
However, in this case, we have a human being whose employer requires him to
disembark from a locomotive onto ballast.
In this Court’s opinion, the FRA
ballast regulations do not preclude Russell’s FELA claim.
b. Factual Disputes
CSX offers Dean’s affidavit which alleges that the ballast at the location
incident conformed to all applicable FRA regulations (Doc. 42-2). As the Court
notes above, this does not carry the day.
Russell offers purported CSX
regulations concerning track inspections (Doc. 47-1).
In reviewing the entire
record, it appears genuine factual disputes are present. Thus, CSX’s motion for
summary judgment is DENIED (Doc. 41).
IV. CONCLUSION
CSX’s motion for summary judgment is DENIED (Doc. 41). This case is
set for final pretrial conference to be held on Thursday, May 8, 2014, at 9:00 a.m.
IT IS SO ORDERED.
Signed this 3rd day of March, 2014.
Digitally signed by
David R. Herndon
Date: 2014.03.03
16:38:40 -06'00'
Chief Judge
U.S. District Court
Page 14 of 14
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.
Why Is My Information Online?