Salomon et al v. Cincinnati Insurance Company
Filing
55
OPINION AND ORDER: Court DENIES 44 Plaintiffs' Motion for Summary Judgment; GRANTS 47 Defendant's Motion for Summary Judgment; and DENIES 50 Motion to Strike. Signed by Magistrate Judge Andrew P Rodovich on 6/20/2013. (tc)
UNITED STATES DISTRICT COURT
NORTHERN DISTRICT OF INDIANA
HAMMOND DIVISION
EDWARD SALOMON and ANNETTE SALOMON,
Plaintiffs,
v.
CINCINNATI INSURANCE COMPANY,
Defendant.
)
)
)
)
)
)
)
)
)
2:10-CV-372-APR
OPINION AND ORDER
This matter is before the court on the Motion for Summary Judgment [DE 44] filed by the
plaintiffs, Annette Salomon and Edward Salomon, on January 31, 2013, the Motion for
Summary Judgment [DE 47] filed by the defendant, Cincinnati Insurance Company, on January
31, 2013, and the Motion to Strike [DE 50] filed by the plaintiffs on February 27, 2013. For the
following reasons, the Motion for Summary Judgment [DE 44] filed by the plaintiffs is
DENIED; the Motion for Summary Judgment [DE 47] filed by Cincinnati Insurance is
GRANTED; and the Motion to Strike [DE 50] is DENIED.
Background
The plaintiffs, Edward and Annette Salomon, owned the real estate located at 811 East
Lake Front Drive, Beverly Shores, Indiana. The Salomons hired Mark Scott Construction, LLC,
(MSC) to demolish the house on the property and to build a new house and retaining wall. They
also hired architect Mark VonDerHeide to design their new home. VonDerHeide hired Soils and
Structures, Inc. to perform engineering work on the property.
A large sand dune was located on the Salomon’s property. To hold the sand dune in
1
place, VonDerHeide and Soils and Structures designed a retaining wall to sit behind the house
and wrap around the sides of the house. The wall directly behind the house was designed to be
25 feet tall and was labeled on the engineering and architectural plans as a “Type B” wall. The
plans called for shorter walls on the sides of the house and were described in the plans as “Type
A” walls.
Soil & Structures provided VonDerHeide with their engineering drawings for the Type A
and Type B walls. The drawings called for the Type B retaining wall to be constructed in
terraced segments of three feet of rise to three feet of run. The face of each terraced segment
included almost vertical 6x6 timbers cemented into the ground. The engineering plans also
called for the Type B wall to be anchored to the ground by Manta Ray Anchors.
VonDerHeide’s architectural plans for the Type B wall modified the engineering plan.
His plan allowed for five feet of rise to two feet of run. The steeper walls designed by
VonDerHeide would have been required to hold a greater load of lateral pressure than the wall
designed by Soil & Structures.
When constructing the retaining walls, MSC used a design different from either that
provided by VanDerHeide or Soil & Structures. Specifically, MSC did not use either the
cemented vertical timbers or the Manta Ray Anchors called for in the designs. Instead, MSC
used a system of crisscrossing timbers behind the retaining wall as a means of anchoring the
wall. Mark Scott, the president of MSC, stated that he used this anchoring system rather than the
one called for in the design because he believed it was in the best interest of the project after
considering the sand dune, the trees, the neighbors, and the costs. Scott had used this design in
the past and had found it in a book. He did not discuss using the crisscross timber anchoring
2
system with the Salomons or VonDerHeide prior to incorporating it into the timber retaining
wall.
MSC used 6x6 timbers, concrete, and spikes to construct the timber retaining wall. None
of the materials that went into the construction of the wall were defective, and the wall was built
according to Scott’s intended plan. After the timber retaining wall was completed, MSC built a
temporary wall of plywood and timber between the timber retaining wall and the area where the
house would sit. Scott admitted that the temporary wall was based on his own personal design.
After the permanent and temporary retaining walls were completed, a subcontractor hired
by MSC began excavation work for the foundation of the home. On September 29, 2009, while
the excavation work was in progress, the retaining wall shifted and bowed. The parties agree
that the subcontractor performed its work according to the design.
At the time the retaining wall shifted and bowed, MSC had an insurance policy in place
with the defendant, Cincinnati Insurance. The policy was comprised of three parts, including the
“Builders’ Risk Inland Marine Coverage Part”, the “Installation Floater Special Coverage Part”,
and the “Commercial General Liability Coverage Part”. The Salomons were listed as additional
insureds under the Builders’ Risk Coverage Form and Installation Floater Special Coverage.
The Salomons requested that Cincinnati Insurance reimburse them for their costs and damages
incurred in the repair and replacement of the retaining wall. Cincinnati denied their request.
The Salomons then filed suit against Scott, seeking damages for the repair of the
retaining wall. Scott tendered the lawsuit to Cincinnati seeking a defense and indemnity under
the CGL Policy. Cincinnati refused to provide Scott’s defense and to reimburse him for the cost
of repairing the retaining wall. The Salomons and Scott entered into a Settlement and
3
Assignment Agreement. The Salomons’ claims against Scott were settled for $259,000, and the
payment obligation of Scott to the Salomons was satisfied by the assignment of his rights,
claims, and entitlements for defense and indemnity under the CGL Policy to the Salomons. The
Salomons filed their complaint against Cincinnati Insurance on September 22, 2010.
Cincinnati retained an engineering firm to determine the cause of the wall’s failure.
Thomas Leahy, a structural engineer, examined the timber retaining wall after it shifted and
bowed. Leahy reviewed the engineering plan, architectural plan, photographs, correspondence,
and other documents related to the planning and construction of the timber wall and prepared an
expert report. Leahy opined that the constructed walls differed significantly from the design.
The design called for Type B walls unless it was noted that Type A walls should be used. The
difference between the Type A and Type B walls was that the Type A walls omitted the
embedded vertical post on the exterior face of the wall and the Manta Ray Anchors. The two
wall types relied on different methods for their strength and stability. Type A walls depended on
the weight of the interlocking timbers behind the wall and the weight and strength of the backfill
to provide resistence to lateral forces. Type B walls depended on the embedment of vertical
posts in front of the stacked timbers and anchorage of the Manta Ray. Upon inspection, Leahy
found that the constructed walls were closer to Type A walls.
Leahy further noted that “the shift in the wall may also be attributed to possible
settlement of backfill behind the wall and/or excavation of soil in front of the lower, temporary
retaining wall at the base of the main retaining wall . . . If backfill was not placed and compacted
properly, the stability of the crib-type wall would be greatly affected.” (Leahy Aff. Ex. B p. 4)
Leahy also acknowledged that excavation could have been a “contributing” factor. (Leahy Aff.
4
Ex. B p. 5)
On January 31, 2013, both parties filed a motion for summary judgment. Cincinnati
Insurance attached an affidavit prepared by Leahy to its motion. In his affidavit, Leahy stated
that excavation and inadequate backfill could have been contributing factors, but that the shift
primarily was caused by errors, omissions, and defects in the design of the wall and that the
excavation and backfill would not have been a factor except for the use of the crib-type system
to anchor the wall. This is because the crib-type walls relied on the weight and strength of the
backfill to provide resistance. The Salomons have moved to strike Leahy’s affidavit as an
untimely supplement to his expert report.
Discussion
Federal Rule of Civil Procedure 26(a)(2)(B) requires an expert to prepare a report
containing “a complete statement of all opinions to be expressed and the basis and reasons
therefore; the data or other information considered by the witness in forming the opinions; [and]
any exhibits to be used as a summary of or support for the opinions.” The rules further direct an
expert to supplement or correct his disclosures in a timely manner if the party learns that some
material aspect of the response is incomplete or incorrect. Rule 26(e). Any additions or changes
to an expert report “must be disclosed by the time the party’s pretrial disclosures under Rule
26(a)(3) are due.” Rule 26(e). However, a party may not sandbag information from its
opponents by supplementing an expert report after discovery has been closed. Allgood v.
General Motors Corp., 2007 WL 647496, *3 (S.D. Ind. Feb. 2, 2007).
An expert may submit an affidavit in support of a motion for summary judgment, but
5
generally the court will not consider new opinions set forth in the affidavit that were not
disclosed prior to the date the motion was filed unless the new opinions are harmless or the
submitting party offers a substantial justification for their untimely disclosure. Solaia
Technology LLC v. ArvinMeritor, Inc., 361 F.Supp.2d 797, 806 (N.D. Ill. 2005). When
determining whether an expert’s supplemental affidavit should be excluded, the court first must
ask whether the statements offered by the expert are new or contradictory opinions. Solaia
Technology, 361 F.Supp.2d at 807. If the opinions do not differ substantially from those offered
earlier, they are not late for purposes of Rule 26(a), and there is no reason to exclude the
opinions. Rowe International Corp. v. Ecast, Inc., 586 F.Supp.2d 924, 935 (N.D. Ill. 2008). If
it is determined that the statements differ substantially, the court then must ask whether the party
seeking to introduce the statements offered a substantial justification for interjecting the new
information at a late stage of the litigation. Solaia Technology, 361 F.Supp.2d at 807.
In addition, a party resisting summary judgment may not “patch-up potentially damaging
deposition testimony with a contradictory affidavit.” Commercial Underwriters Insurance
Company v. Aires Environmental Services, Ltd., 259 F.3d 792, 799 (7th Cir. 2001); see also
Buckner v. Sam’s Club, Inc., 75 F.3d 290, 292 (7th Cir. 1996)(“[T]he law of this circuit does
not permit a party to create an issue of fact by submitting an affidavit whose conclusions
contradict deposition or sworn testimony.”). If a party intends to defeat summary judgment by
offering testimony that contradicts a sworn statement, the party introducing the contradictory
statement first must explain the contradiction or resolve the disparity. Cleveland v. Policy Mgt.
Sys., Corp., 526 U.S. 795, 806, 119 S.Ct. 1597, 143 L.Ed.2d 966 (1999).
The Salomons argue that Leahy’s affidavit is a supplement to his earlier report, sets forth
6
new theories and disposes of his old theories, and was untimely submitted. Cincinnati counters
that Leahy’s affidavit is not a supplement because it does not advance any new theories, and
even if the court were to consider it as a supplement, it is not untimely because the parties’
pretrial disclosures are not due yet.
In his expert report, Leahy devoted most of his opinion to explaining the differences in
the construction of the retaining wall from the original plans. He then added that “[w]e believe
the shift in the wall may also be attributed to possible settlement of backfill behind the wall
and/or excavation of soil in front of the lower, temporary retaining wall on the base of the main
retaining wall. Settlement of the sandy soil behind the wall could occur due to likely inadequate
compaction of backfill and the heavy rains after construction of the wall was completed.”
(Leahy Aff. Ex. B p. 4) Leahy explained that if the backfill was not placed and compacted
properly, the stability of the wall would be greatly affected. Leahy also concluded that
“[e]xcavation in front of the temporary retaining wall at the bottom of the main wall could have
been a contributing factor in the settlement and movement of the retaining wall.” (Leahy Aff. Ex.
B p. 5)
Leahy acknowledged that the excavation may have been a contributing factor, but he
never stated that the excavation alone could have produced the damage to the wall. His theory
that the excavation contributed to the destruction of the wall relied on what he considered to be
the predominant cause, the improper construction of the retaining wall. There is nothing in his
expert report to reflect that Leahy thought otherwise. Therefore, his clarification that the backfill
was a condition, rather than cause, of the wall’s damage and that the collapse would not have
occurred but for the type of wall that was constructed is consistent with his conclusions in his
7
expert report.
Additionally, Leahy stated in his expert report that inadequate compaction of backfill and
heavy rains could have affected the stability of the “crib-type wall”. Leahy’s expert report
specifically mentioned the type of wall, highlighting that his opinion relied directly to the type of
wall that was built. Leahy never stated that inadequate backfill could have affected the stability
if the Type B wall called for in the design had been constructed. In fact, in his report Leahy
explained that the constructed walls were similar to the Type A walls called for in the design,
which relied on the adequacy of the backfill for their stability and strength, whereas the Type B
walls derived their strength from anchors. Leahy elaborated on this in his affidavit, explaining
that the compaction of backfill only would be an issue with the “crib-type” wall because this
type of wall relied on the weight of the backfill for its strength and stability. In both documents,
Leahy’s opinion relied on the type of wall built as a necessary and predominate factor of the
wall’s collapse and, therefore, his affidavit did not introduce any new theories.
It never was Leahy’s position that the excavation or backfill could have caused the
damage but for the construction of the crib-type wall. For these reasons, the court does not find
that Leahy was introducing new opinions in his affidavit, and his opinions are not late for
purposes of Rule 26(a). See Rowe, 586 F.Supp.2d at 935 (finding that expert’s opinions were
not late for purposes of Rule 26(a) because his affidavit did not introduce new or contradictory
opinions). The Salomons’ motion to strike is DENIED.
Both parties also moved for summary judgment, arguing that the provisions of the
insurance policy dictate judgment in their favor. Pursuant to Federal Rule of Civil Procedure
56(c), summary judgment is proper only if it is demonstrated that “there is no genuine issue as to
8
any material fact and the moving party is entitled to a judgment as a matter of law.” Celotex
Corp. v. Catrett, 477 U.S. 317, 322-23, 106 S. Ct. 2548 , 91 L. Ed. 2d 265 (1986); Kidwell v.
Eisenhauer, 679 F.3d 957, 964 (7th Cir. 2012); Stephens v. Erickson, 569 F.3d 779, 786 (7th
Cir. 2009). The burden is upon the moving party to establish that no material facts are in
genuine dispute, and any doubt as to the existence of a genuine issue must be resolved against
the moving party. Adickes v. S.H. Kress & Company, 398 U.S. 144, 160, 90 S. Ct. 1598, 1610,
26 L. Ed.2d 142, 155 (1970); Stephens, 569 F.3d at 786. A fact is material if it is outcome
determinative under applicable law. There must be evidence on which the jury could reasonably
find for the nonmoving party. Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248, 106 S. Ct.
2505, 2510, 91 L.Ed.2d 202, 212 (1986); Stephens, 569 F.3d at 786; Wheeler v. Lawson, 539
F.3d 629, 634 (7th Cir. 2008). However, summary judgment may be entered against the nonmoving party if it is unable to “establish the existence of an essential element to [the party’s]
case, and on which [that party] will bear the burden of proof at trial . . .”. Kidwell, 679 F.3d at
964 (citing Benuzzi v. Bd. of Educ., 647 F.3d 652, 662 (7th Cir.2011) (quoting Celotex Corp. v.
Catrett, 477 U.S. 317, 322, 106 S.Ct. 2548, 91 L.Ed.2d 265 (1986)).
In deciding a motion for summary judgment, the trial court must determine whether the
evidence presented by the party opposed to the summary judgment is such that a reasonable jury
might find in favor of that party after a trial.
The inquiry performed is the threshold inquiry of determining
whether there is the need for a trial--whether, in other words, there
are any genuine factual issues that properly can be resolved only by
a finder of fact because they may reasonably be resolved in favor of
either party.
[T]his standard mirrors the standard for a directed verdict under
9
Federal Rule of Civil Procedure 50(a), which is that the trial judge
must direct a verdict if, under the governing law, there can be but one
reasonable conclusion as to the verdict.
Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 250, 106 S. Ct. 2505,
2511, 91 L.Ed.2d 202, 212 (1986).
See also Reeves v. Sanderson Plumbing Prods., Inc., 530 U.S. 133, 149-51, 120 S.Ct. 2097, 2109,
147 L. Ed.2d 105, 120-22 (2000) (setting out the standard for a directed verdict); Celotex Corp., 477
U.S. at 322-23, 106 S. Ct. at 2553; Stephens, 569 F.3d at 786; Argyropoulos v. City of Alton, 539
F.3d 724, 732 (7th Cir. 2008)(stating that a genuine issue is one on which a reasonable fact finder
could find for the nonmoving party); Springer v. Durflinger, 518 F.3d 479, 483 (7th Cir.
2008)(stating that a genuine issue exists and summary judgment is inappropriate if there is sufficient
evidence for a jury to return a verdict for the nonmoving party).
The parties agree that Indiana law governs the interpretation of the terms of the policies
because the contract was formed to insure a home in Indiana. See Nautilus Ins. Co. v. Reuter, 537
F.3d 733, 737 (7th Cir. 2008)(discussing that the law of the state with the most intimate contacts,
which is assessed by considering the place of contracting, place of contract negotiation, place of
performance, location of subject matter, and domicile or place of business of the parties, governs
interpretation of the contract). Interpretation of an insurance policy is a question of law to be
decided by the court. National Fire and Casualty Company v. West, 107 F.3d 531, 534 (7th Cir.
1997). Insurance policies are interpreted according to the same rules of construction as other
contracts. Barga v. Indiana Farmers Mut. Ins. Group, Inc., 687 N.E.2d 575, 578 (Ind. App.
1997); Colonial Penn Ins. Co. v. Guzorek, 690 N.E.2d 664, 667 (Ind. 1997). Words are given their
plain and ordinary meaning, and ambiguities are to be resolved in favor of the insured. Anderson
v. State Farm Mut. Auto Ins. Co., 471 N.E.2d 1170, 1172 (Ind. App. 1984). When interpreting the
10
contract, the court favors a meaning that provides coverage to the insured. West, 107 F.3d at 535;
Barga, 687 N.E.2d at 578.
The parties first dispute whether the Builder’s Risk Policy provides coverage for the cost of
repair and replacement of the retaining wall. The Builder’s Risk Policy states in relevant part:
We cover direct physical loss caused by a Covered Cause or Loss to buildings and
structures described on the “declarations” while in the course of construction,
erection, or fabrication. This includes materials and supplies which will become a
permanent part of the buildings or structures, all while located on the premises of the
buildings or structures described on the “declaration”, or within 1,000 feet of the
such premises. This includes foundations, excavations, grading and filling.
The Builder’s Risk Policy does not define “in the course of”. Cincinnati asks the court to
read “ in the course of construction” to extend coverage to an individual structure only at the time
that specific structure is under construction. Although this is one way to interpret the plain terms
of the contract, the provision also could be interpreted to provide coverage to the structures
identified in the declarations that suffer physical damage while other construction on the property
was ongoing. To determine the intended meaning, the court must consider the contract as a whole.
Within the same provision, the Builder’s Risk Coverage Form extends coverage to materials
and supplies on or within 1,000 feet of the property that will become a permanent part of the
building or structure. The contract specifically identifies foundations, excavations, grading, and
filling as covered property. Grading is the process of leveling off a sloping surface. It would be
illogical to believe that the contract covered ground that had yet to be graded because at that point
it would not be “grading” and no expense would have been incurred. Rather, the provision makes
clear that completed grading that was affected by construction would be covered. The retaining wall,
which certainly was intended to be permanent and was located on the property, was built to grade
11
the property so that the sand dune would not be disturbed and the house would be stable. The court
sees little distinction between the ground work specifically named by this provision and the retaining
wall, which was a necessary structure to keep the sand dune in place and provide stability to the
home. It appears by the very terms of this provision, the retaining wall was covered by damage
caused in the course of construction on the property.
The Builders’ Risk Coverage Form also lists property that is not covered. Among the
exclusions are existing buildings or structures to which additions, alterations, improvements, or
repairs are being made. The contract does not exclude property damage to existing structures arising
from construction on other parts of the property. Rather, it only excludes coverage to the existing
structures that are being improved. If the wall was an “existing structure” listed in the document,
it is not clear that damage to it caused by work done in the course of construction on another
structure on the property would be excluded from coverage. See Exelon Generation Co., LLC v.
Local 15, International Brotherhood of Electrical Workers, 676 F.3d 566, 571 (7th Cir. 2012);
Jerik v. Columbia Natl., Inc., 1999 WL 1267702, *4 (N.D. Ill. Sept. 30, 1999) (explaining the
maxim of expressio unius est exclusio alterius, which states that if certain provisions are identified
in a contract, the parties intend to exclude other like provisions).
The provisions of the Builders’ Risk Coverage Form suggest that coverage was intended for
the retaining wall. However, the court’s inquiry does not end there. The parties agree that the
insurance policy consisted of three parts, including the Builder’s Risk Policy, the CGL, and the
Installation Floater Special Coverage. The CGL states that Cincinnati Insurance will pay the sums
the insured becomes legally obligated to pay, but it excludes coverage for damage to “[t]hat
particular part of real property on which you or any contractors or subcontractors working directly
12
or indirectly on your behalf are performing operations if the ‘property damage’ arises out of those
operations” (Pl.’s Mot. Summ. J. Ex. 4) “That particular part of real property . . . is not limited to
the precise spot on real property where the contractor is performing operations at the moment the
damage occurs. Rather the phrase is limited to the area where the contractor was hired to perform
operations.” (Pl.’s Mot. Summ. J. Ex. 4)
Cincinnati previously denied coverage under the CGL Policy because the wall, although
completed, was within “the particular part of real property” on which the contractors were
“performing operations”. Now Cincinnati asserts that the retaining wall was completed and not “in
the course of construction”.
In support of their argument, the Salomons refer the court to Bosecker v. Westfield, 724
N.E.2d 241 (Ind. 2000). In Bosecker, the insurance policy defined “covered property” as
“[b]uildings or structures including foundations while in the course of construction, installation,
reconstruction or repair.” Under a separate provision, the contract defined “Property Not Covered”
as “[e]xisting buildings or structures to which improvements, alterations, repairs, or additions are
being made”. The court found the policy ambiguous, explaining that a structure was both covered
and not covered if it was under repair. Bosecker, 724 N.E.2d at 243. The Salomons argue that the
insurance policy at issue creates the same type of illusory coverage and must be construed to provide
coverage.
Cincinnati argues that its denial of coverage under the CGL does not shed light on whether
there is an ambiguity in the insurance policy because its duty to provide coverage depends on the
facts as alleged in the complaint against the contractor. Because the Salomons alleged negligence
by Scott, the lawsuit concerned activities Scott did while working on the property. Cincinnati also
13
argues that Bosecher is inapplicable because the Salomons have not demonstrated that the retaining
wall was both covered and uncovered property within the meaning of the contract as did the
plaintiffs in Bosecher.
Cincinnati asks the court to interpret the Builder’s Risk Coverage Form to limit coverage
only to structures that were being worked on at the time the damage occurred. Yet, under the CGL
damage to the property that the contractors or subcontractors were working on either directly or
indirectly was excluded from coverage if the damage arose out of that entity’s work. Despite the
Salomons’ contention that this creates illusory coverage under Cincinnati’s interpretation of the
contract, the provisions leave some, albeit a narrow category of, damage that would be covered.
Read together, property damage to structures the contractors were working on at the time the
damage arose would be covered provided that the damage did not arise from the contractor or
subcontractor’s work. This is not a complete conflict as the one identified in Bosecher and does not
demand that the court interpret the contract in favor of coverage.
The Salomons also ask the court to adopt the portion of the CGL which expands “that
particular part of real property” beyond the precise spot where the contractors were working.
However, the court is not willing to take that leap. The provision in the Builders’ Risk Coverage
Form limits coverage to the “buildings” and “structures” and does not state that it provides coverage
for the property as a whole. If the provision in the Builders’ Risk Coverage Form similarly referred
to “that particular part of real property”, the court would be more amenable to this argument.
However, the difference in wording implies that the parties intended a different meaning.
Although the CGL does not create the type of ambiguity the Salomons contend, when
considered as a whole, the court believes that the parties intended to create coverage for the retaining
14
wall in its state right before the collapse. First, the retaining wall still may have been “in the course
of” construction. A temporary wall remained behind it as further support while the construction was
ongoing, suggesting that the wall was not entirely finished because the temporary support had yet
to be removed. The contract also provided coverage for grading, filling, and excavation that would
become part of the permanent structure. Because the retaining wall was a permanent part of the
grading that would help support the house, it appears to be covered under this provision. The policy
also excluded certain types of damage to “existing structures”, so even if the court were to consider
the wall an existing structure as Cincinnati advances, it is not clear that damage caused by work on
a new structure on the property resulting in damage to the “existing structure” is excluded.
Moreover, the very fact that the provision is ambiguous supports an interpretation in favor of
coverage. Anderson, 471 N.E.2d at 1172 (explaining that ambiguities should be resolved in favor
of coverage). However, regardless of whether the retaining wall is “covered property”, the Builder’s
Risk Coverage form excludes certain types of losses, which deprives the plaintiffs of coverage.
One of these exclusions is loss arising from “[d]esign, specification, construction or
workmanship”. The parties dispute whether Scott “designed” the retaining wall or whether his
deviations from the architect and engineer’s design was a “method” of construction. “Design” is
not defined by the contract, but its ordinary meaning is “1. A plan or scheme. 2. Purpose or
intention combined with a plan.” Black’s Law Dictionary 511 (9th Ed. 2009).
The Salomons hired an engineer and an architect to design the retaining wall. Their design
called for four foot on center almost vertical posts across the face of each level of the wall, with each
post cemented into the ground, and with each post anchored by a Manta Ray Anchor (an anchor
driven deep into the sand dune). The wall constructed by MSC did not have four foot on center
15
vertical posts and was not anchored by Manta Ray Anchors. Instead, Scott used crisscrossing
timbers to anchor the wall. The Salomons maintain that the difference between the constructed wall
and the designs should be attributed to Scott’s method of building the wall. The Salomons point out
that Scott did not draw or write down his ideas. Scott also testified that the finished project was
essentially the same as what the architect’s design called for.
The court does not find Scott’s failure to write down or draw out his plan dispositive of
whether he “designed” the wall. In fact, later in his deposition Scott admitted that he designed the
temporary retaining wall and that it was built according to the design he had developed in his mind
and had not written down. Furthermore, Scott has not alleged that he was following the design given
to him by the architect and that he erred in following it or could not follow it as written. Rather, he
stated that “[b]ased on the conditions on the site, we felt it was really in the best interest to design–
to build the walls as we did.” (Scott Dep. p. 72) Scott also testified that he took into consideration
the conditions of the dune, trees, neighbors, and cost. (Scott Dep. p. 72) This was not an oversight
or failure to follow the plan precisely. By Scott’s own admission, he considered multiple factors,
intentionally rejected the design given to him, and purposely implemented an anchoring plan of his
own. See Black’s Law Dictionary 511 (9th Ed. 2009) (defining design as having a purpose or
intention combined with a plan).
The undisputed evidence shows that neither the architect nor structural engineer designed
the system that was used to anchor the wall, so the design must be attributable to someone. Scott
testified that he chose the method based on information he saw in books. Although he did not invent
the method he used, he intentionally applied it based on his survey of multiple conditions, and in
doing so, he chose the design of the retaining wall. This was not a matter of using a wrong part or
16
improperly carrying out the plan. Rather, Scott employed an entirely different method to anchor the
wall after careful consideration. The damage resulted from Scott’s deliberate choice to deviate from
the plans, not from his method of carrying out the plan given to him.
The Salomons further argue that a question of fact remains concerning whether the
“inadequate design” caused the wall’s collapse. The Salomons insist that Leahy postulated a number
of possible causes, including settlement of backfill, excavation, and inadequacy of the lower
temporary retaining wall. As explained above, Leahy did state that other factors could have
contributed to the wall’s damage, but the invariable factor in his opinion was the wall’s design. It
was Leahy’s opinion that these additional conditions would not have contributed to the damage if
the wall had not been built using the “crib-type” design. This is because the stability of the crib-type
design relied on the earth surrounding it. The Salomons have submitted no evidence of their own
to show that the damage could have been caused by these or other factors irrespective of the wall’s
design. The only evidence of record reflects that the design of the wall, whether individually or
when combined with the additional contributing factors of excavation or inadequate backfill, caused
the wall to fail.
The parties also dispute whether the Installation Floater Special Coverage Form creates
coverage for the retaining wall. The Installation Coverage Form provides additional coverage for
a collapse and states in relevant part “We will pay for the ‘loss’ caused by or resulting from risks
of direct physical ‘loss’ involving collapse of all or part of a building or structure caused by one or
more of the following . . . F. Use of defective materials or methods in construction, remodeling or
renovation . . .” However, the Installation Floater Coverage also provides an exclusion similar to
that in the Business Risk Coverage Form, for a loss resulting from inadequate or defective design.
17
For the same reasons stated above, the Salomons’ argument must fail. Again, the undisputed
evidence shows that the damage was caused by the design of the wall, not Scott’s methods for
carrying out the plans. It did not occur from Scott’s failure to drive an anchor far enough into the
dune or from inadequate spacing, rather, it resulted from Scott using an alternative method of
securing the retaining wall that proved ineffective. The Salomons point to their complaint, which
alleges that the damage was the failure of Scott and the excavation subcontractor to utilize proper
materials and methods. However, at this stage the Salomons must do more than point to the
unsupported allegations in their complaint, and they have failed to do so. See Anderson, 106 S.Ct.
at 2510, 477 U.S. at 249.
The parties next dispute whether coverage is excluded under the provision of the CGL which
excludes: “‘[p]roperty damage’ to ‘your work’ arising out of it or any part of it. . . This exclusion
does not apply if the damaged work or the work out of which the damage arises was performed on
your behalf by a subcontractor.” The undisputed evidence supports only one conclusion – that the
damage arose out of Scott’s work and did not arise out of the work performed by Scott’s
subcontractor. Leahy acknowledged that inadequate back fill and excavation may have contributed
to the wall’s damage. However, his opinion concludes that the failure occurred because the wall was
built in the crib-like style, rather than using anchors as called for in the design. The Salomons have
not supplied their own expert or pointed to any other evidence to show that either the excavation or
inadequate backfill were the cause of the damage or that Scott’s design was not a necessary factor
and the predominate reason for the wall’s collapse. This failure is fatal to their case.
To conclude, the uncontradicted evidence shows that Scott intentionally deviated from the
designs given to him and applied a different system for anchoring the retaining wall. Leahy’s expert
18
report and affidavit are the only evidence explaining the cause of the retaining wall’s damage. This
uncontradicted evidence shows that although excavation and inadequate backfill may have
contributed to the damage, it would not have happened but for the use of the crib-type anchoring
Scott designed. Because the insurance policy excluded coverage for property damage caused by the
design of the structure being constructed, the policy does not provide coverage for the damage that
occurred.
Based on the foregoing, the Motion for Summary Judgment [DE 44] filed by the plaintiffs
is DENIED; the Motion for Summary Judgment [DE 47] filed by Cincinnati Insurance is
GRANTED; and the Motion to Strike [DE 50] is DENIED.
ENTERED this 20th day of June, 2013.
/s/ Andrew P. Rodovich
United States Magistrate Judge
19
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.
Why Is My Information Online?