Lakeshore Engineering Services, Inc. v. Richmond Utilities Board
Filing
51
OPINION & ORDER: It is ordered that HDR's 28 MOTION to Alter or amend under Rule 59(e) is DENIED. Signed by Judge Karen K. Caldwell on 3/17/2014.(SCD)cc: COR
UNITED STATES DISTRICT COURT
EASTERN DISTRICT OF KENTUCKY
CENTRAL DIVISION
AT LEXINGTON
LAKESHORE ENGINEERING,
CIVIL ACTION NO. 5:12-121-KKC
Plaintiff,
V.
OPINION & ORDER
RICHMOND UTILITIES BOARD, and
HDR ENGINEERING,
Defendants.
*** *** ***
This matter is before the Court on Defendant HDR Engineer’s motion to alter or amend
(DE 28) the Court’s previous Memorandum Opinion and Order (DE 27). In its prior order,
this Court denied the defendant’s motion to dismiss pursuant to Rule 12(b)(6), and HDR
now moves the Court to reconsider this ruling under Rule 59(e) of the Federal Rules of Civil
Procedure. For the following reasons, the Court will deny the defendant’s motion.
The facts of this case can be briefly summarized.1 The City of Richmond awarded
Lakeshore Engineering Contracting Corp. a contract to install a sewage pipeline and
submersible pump in Richmond, Kentucky. Prior to issuing its advertisement for bids,
Richmond hired HDR Engineering to design the project. HDR hired Thelen Associates to
perform a geotechnical analysis of the subsurface conditions, and Thelen prepared a
geotechnical report. Richmond issued instructions to bidders informing them that they
could rely on the data in the geotechnical report. Lakeshore was awarded the contract and
completed the project.
A full recitation of the facts may be found in the Court’s original memorandum opinion and order,
found at Docket Entry 27.
1
Lakeshore now seeks compensation above the contract price because of alleged “large
quantities of unanticipated bedrock” that were not encompassed in the geotechnical report.
Lakeshore brought suit against both Richmond Utilities Board and HDR Engineering for a
number of claims. In its prior motion, HDR sought dismissal of Lakeshore’s claim for
negligent misrepresentation, which the Court denied. HDR now moves the Court to
reconsider its ruling on the grounds that the Court committed three clear errors of law.
A court may alter or amend its ruling under Rule 59(e) “based on (1) a clear error of law;
(2) newly discovered evidence; (3) an intervening change in controlling law; or (4) a need to
prevent manifest injustice.” Leisure Caviar, LLC v. U.S. Fish & Wildlife Serv., 616 F.3d
612, 615 (6th Cir. 2010) (quoting Intera Corp. v. Henderson, 428 F.3d 605, 620 (6th Cir.
2005)); Howard v. Magoffin Co. Bd. Of Educ., 830 F. Supp. 2d 308, 319 (E.D. Ky. 2012).
However, “[a] motion under Rule 59(e) is not an opportunity to re-argue a case.” Sault Ste.
Marie Tribe of Chippewa Indians v. Engler, 146 F.3d 367, 374 (6th Cir. 1998).
According to HDR, Lakeshore’s claim for negligent misrepresentation must be dismissed
because (1) it is barred by the statute of limitations, (2) the complaint fails to meet the
heightened pleading standards HDR contends is required for negligent-misrepresentation
claims, and (3) Lakeshore released any claim against HDR it might have had. In its motion,
HDR contends that this Court committed clear error of law in rejecting each of these three
arguments.
I. Statute of Limitations
The Court will not reconsider its ruling that more facts are necessary to determine
when the statute of limitations period began. In its prior order, the Court found that in
viewing the facts in the complaint in the light most favorable to Lakeshore, further
discovery is needed to determine when Lakeshore became aware of the subsurface
2
conditions that led to its alleged injury. As the Court previously wrote, “Lakeshore’s
complaint does not specify the time frame in which it discovered the problematic bedrock
that allegedly led to excess excavation costs. The complaint merely indicates that ‘as the
work progressed’ it became obvious that bedrock couldn’t be excavated and that ‘Lakeshore
repeatedly advised and informed the Defendants’ of these conditions.’” (DE 27, at 4). Thus it
was held that “[i]f, as HDR maintains, the evidence shows that Lakeshore encountered the
adverse subsurface conditions in 2009, the court will revisit this issue on summary
judgment.” (DE 27, at 5). HDR contends that the Court committed two errors of law in
rendering this prior ruling. First, HDR argues that the Court should have converted the
motion to dismiss into one for summary judgment, and second, the Court should have found
that the uncontradicted evidence supports its claim that Lakeshore first discovered the
problematic subsurface conditions in August 2009.
To begin, it is simply incorrect that the Court should have converted the motion to
dismiss into one for summary judgment. HDR correctly states that when “the court
considers matters outside the pleadings before it in a 12(b)(6) motion, the [motion] will
automatically be converted into a Rule 56 summary judgment procedure.” RMI Titanium
Co. v. Westinghouse Elec. Corp., 78 F.3d 1125, 1134 (6th Cir. 1996) (quoting Mortensen v.
First Federal Sav. And Loan Ass’n, 549 F.2d 884, 891 (3d Cir. 1977)). Moreover, courts are
permitted to convert a motion to dismiss into one for summary judgment so long as the
parties are not “likely to be surprised by the proceedings.” See Salephour v. Univ. of
Tennessee, 159 F.3d 199, 204 (6th Cir. 1998).
In this case, however, the Court never considered matters outside of the pleadings and
therefore did not convert the motion into one for summary judgment. HDR mistakenly
assumes that because it attached an affidavit to its motion to dismiss, the Court must have
3
relied on it and therefore should have converted the motion to one for summary judgment.
But instead of relying on the affidavit HDR attached to its motion, the Court treated the
motion to dismiss as exactly that, and it analyzed only whether the facts as alleged in the
complaint state a plausible claim for relief.
This, in turn, explains why HDR’s second argument for reconsideration of the Court’s
statute of limitations rulings is in error. HDR contends that the “undisputed facts . . .
demonstrate that Lakeshore encountered adverse subsurface conditions in 2009.” (DE 28-1,
at 5). HDR points to two reasons as to why this fact is undisputed: First, HDR directs the
Court to the affidavit it attached to the motion, which—as explained above—was not
considered by this Court. In addition to the affidavit, however, HDR notes that Lakeshore
acknowledged in its response memorandum that it encountered problematic subsurface
conditions in September 2009 (DE 23, at 24) and that Lakeshore engaged in continued
discussions with HDR about the conditions from September 2009 to February 2010 (DE 23,
at 24). According to HDR, these statements by Lakeshore in its response establish as an
undisputed fact that Lakeshore discovered the conditions more than one year before it filed
suit in April 2012.
But Lakeshore’s complaint alleges only that the reality of its economic damage became
obvious “as the work progressed” and that Lakeshore “repeatedly advised and informed
Defendants of the unanticipated subsurface conditions.” (DE 1, ¶¶ 21–25). This point is
crucial because “a ‘motion under Rule 12(b)(6) is directed solely to the complaint itself,’”
Roth Steel Prods. v. Sharon Steel Corp., 705 F.2d 134, 155 (6th Cir. 1983) (quoting Sims v.
Mercy Hosp. of Monroe, 451 F.2d 171, 173 (6th Cir. 1971)), and the complaint in this case
does not indicate a definitive point in time on which Lakeshore would be “certain that
damages would flow.” ISP Chems. LLC v. Dutchland, Inc., 2011 WL 304584, at *6, No. 5:08-
4
CV-153 (W.D. Ky. Jan. 26, 2011) (citing Estill Cnty. Bd. of Educ. V. Zurich Ins. Co., 84 Fed.
App’x 516, 519 (6th Cir. 2003)). See also Broam v. Bogan, 320 F.3d 1023, 1026 n. 2 (9th Cir.
2003) (explaining that “a court may not look beyond the complaint to a plaintiff’s moving
papers, such as a memorandum in opposition to a defendant’s motion to dismiss”) (internal
quotations omitted). Without further discovery, the Court is unable to determine exactly
when Lakeshore became “certain that damages would flow,” and HDR’s motion to alter the
Court’s prior ruling on this issue will be denied.
II. Pleading Standard for Negligent Misrepresentation
With regard to the second issue presented by HDR—whether a claim for common law
negligent misrepresentation requires the plaintiff to adhere to the higher pleading standard
of Rule 9(b)—the Court agrees that it is appropriate to modify its prior ruling. HDR asks
the Court to revisit this issue and to address the Sixth Circuit case Republic Bank & Trust
Co. v. Bear Stearns & Co., Inc., 683 F.3d 239 (6th Cir. 2012). According to HDR, Republic
Bank requires that Lakeshore plead its claim of negligent misrepresentation so as to
conform to the requirements of Rule 9(b), and this Court made a clear error of law in
evaluating the complaint under Rule 8.
HDR is correct in concluding that Rule 9(b) applies to state-law negligentmisrepresentation claims brought under Kentucky law. In Republic Bank, the plaintiff
brought claims of both fraud and negligent misrepresentation. Although Rule 9(b)’s
“heightened standard unquestionably applies to [the plaintiff’s] fraud-and-deceit” claim, the
court in Republic Bank noted that “[i]t is less clear whether Rule 9(b) also applies to [the
plaintiff’s] common-law negligent-misrepresentation claim.” Id. at 247. This lack of clarity
arises, according to the court in Republic Bank, because of a complex split among the
federal courts of appeals on the issue. See id. (comparing cases). See also Kimball Dean
5
Parker, Comment, A Historical Approach to Negligent Misrepresentation and Federal Rule
of Civil Procedure 9(b), 80 U. CHI. L. REV. 1461, 1474–1480 (2013) (describing a three-way
circuit split regarding the federal pleading requirements for negligent-misrepresentation
claims).
Despite this lack of clarity, the court in Republic Bank followed the lead of prior Sixth
Circuit guidance and found that “[w]hether a state-law claim sounds in fraud, and so
triggers Rule 9(b)’s heightened standard, is a matter of substantive state law, on which we
must defer to the state courts.” Republic Bank, 683 F.3d at 247. The court then went on to
find that Kentucky law “holds parties pleading negligent misrepresentation to Kentucky’s
version of Rule 9(b),” and thus a plaintiff’s negligent-misrepresentation claim “must satisfy
Rule 9(b)’s heightened pleading standard to survive dismissal.” Id. at 248. See also Morris
Aviation, LLC v. Diamond Aircraft Indus., Inc., 536 Fed. App’x 558, 562 (6th Cir. 2013)
(noting that “negligent-misrepresentation claims under Kentucky law are subject to
Rule 9(b)’s heightened pleading standards”). Thus, HDR correctly argues that this Court
was in error when it previously examined the plaintiff’s negligent-misrepresentation claim
under the Rule 8(a) pleading standard.
Even under the more stringent Rule 9(b) standard, however, the Court finds the
plaintiff’s complaint sufficient. Rule 9(b) “requires a plaintiff: (1) to specify the allegedly
fraudulent statements; (2) to identify the speaker; (3) to plead when and where the
statements were made; and (4) to explain what made the statements fraudulent.” Republic
Bank, 683 F.3d at 247 (citing Ind. State Dist. Council of Laborers and Hod Carriers Pension
and Welfare Fund v. Omnicare, Inc., 583 F.3d 935, 942–43 (6th Cir. 2009)). HDR contends
that Lakeshore fails to meet this pleading requirement because it did not “allege particular
facts from which one could reasonably infer that it is plausible that (1) HDR supplied false
6
information and (2) that [sic] Lakeshore justifiably relied on the alleged false information.”
(DE 28-1, at 8).
Lakeshore’s complaint alleges detailed factual allegations that clearly meet this burden.
The complaint states that the geotechnical report prepared by HDR contained specific
negligent and misleading information. (DE 1, ¶ 57). It states that the defendants failed to
exercise reasonable care in obtaining or communicating the geotechnical report and other
information provided to Lakeshore, and provided reasons that Lakeshore justifiably relied
on the defendants’ misrepresentations in preparing its bid. (DE 1, ¶¶ 16–17, 58–60). The
complaint further alleges that Lakeshore suffered damages due to the subsurface
conditions that were materially different than the information provided by the defendants.
(DE 1, ¶ 60–62). Moreover, the complaint goes into specific detail as to what made the
geotechnical report deficient, such as its analysis of the bedrock quality and the report’s
failure to mention potential groundwater, cavities, or mudseams. (DE 1, ¶ 57). In reading
the complaint as a whole, it is clear that Lakeshore’s allegations are specific and particular
enough to support its negligent-misrepresentation claim even under the heightened
pleading standard of Rule 9(b).
III. Validity of Third-Party Release
Finally, the Court will address its prior ruling that HDR was not released from claims
against Lakeshore because Lakeshore did not have a contract with HDR. HDR argues that
language contained in the contract between Lakeshore and Richmond operate to release
any claim for negligent misrepresentation made against HDR. Under Kentucky law, a
release is valid only if there is an agreement between the parties in which one party
abandons a claim or right to sue another party. See Frear v. P.T.A. Indus., Inc., 103 S.W.3d
7
99, 107 (Ky. 2003). The Court previously ruled that even if such a waiver was valid it was
not applicable to HDR because HDR was not a party to that contract.
HDR directs the court to the unpublished decision in Pennington v. Amer. Telephone &
Telegraph Co., 202 F. App’x 880 (6th Cir. 2006), for the proposition that a general release
does not require that the tortfeasor be identified by name in order to be discharged from
liability by that release. In that case, the court held that an unambiguous general release in
a settlement agreement purporting to release “all other persons, firms or corporations
liable, or who might be claimed to be liable” included within its scope the defendant, who
was an otherwise unnamed tortfeasor. Id. at 881, 887.
The facts of Pennington are dramatically different than the case before this Court. In
the instant case, the provision of the contract2 that HDR claims operates as a release states:
Contractor may rely upon the general accuracy of the
“technical data” contained in such reports and drawings, but
such reports and drawings are not Contract Documents. Such
“technical data” is identified in the Supplementary Conditions.
Except for such reliance on such “technical data,” Contractor
may not rely upon or make any claim against Owner or
Engineer, or any of their Related Entities with respect to:
1. the completeness of such reports and drawings
Contractor’s purposes, including, but not limited to,
aspects of the means, methods, techniques, sequences,
procedures of construction to be employed by Contractor,
safety precautions and programs incident thereto; or
for
any
and
and
Portions of this contract at issue have been incorporated by reference, but this section of the
contract is not specifically discussed in the complaint. It remains appropriate, however, for the Court
to consider it in this context. The contract between Lakeshore and Richmond is an integral part of
the complaint and portions of it and the Standard General Conditions are cited to and quoted at
length therein. In ruling on a motion to dismiss, the court may consider “exhibits attached [to the
complaint], public records, items appearing in the record of the case and exhibits attached to
defendant’s motion to dismiss so long as they are referred to in the complaint and are central to the
claims contained therein[.]” Rondigo, LLC v. Twp. of Richmond, 641 F.3d 673, 680–81 (6th Cir. 2011)
(internal citations omitted).
2
8
2. other data, interpretations, opinions, and information
contained in such reports or shown or indicated in such
drawings; or
3. any Contractor interpretation of or conclusions drawn from
any “technical data” or any such other data, interpretations,
opinions, or information.
(DE 6-4, Section 4.02) (emphasis added). Unlike Pennington, the release in this case is
narrowly tailored to specific aspects of the geotechnical report provided by Thelen to HDR
and ultimately to the bidders such as Lakeshore. This is not a general release of liability to
any party not otherwise named in the contract, which can operate in some cases to relieve
other non-party defendants of liability.
But even if this were a general release that relieved a non-party such as HDR from
liability, Lakeshore contends that the release is inapplicable because its claim is based on
the “technical data” specifically excepted from the contractual provision. Without reviewing
the details of the geotechnical report along with other information that might be provided
during discovery, the Court cannot determine whether the above-cited release will
ultimately bar Lakeshore’s claims against HDR—nor will it attempt to do so on a motion to
dismiss. Thus, in construing the facts alleged in the complaint in a light most favorable to
the plaintiff, as it must do on a motion to dismiss, the Court finds that the release HDR
points to does not bar Lakeshore from moving forward with its negligent-misrepresentation
claim. To the extent that HDR subsequently finds that the evidence obtained during
discovery supports its proposed interpretation of the contract, it may reassert this
argument in a motion for summary judgment.
***
For all of these reasons, the Court finds that any errors in its prior memorandum
opinion and order do not require alteration of its ruling that Lakeshore’s complaint states a
9
valid cause of action against HDR for negligent misrepresentation. Accordingly, IT IS
ORDERED that HDR’s motion to alter or amend under Rule 59(e) (DE 28) is DENIED.
Dated this 17th day of March, 2014.